Presentation to the SGWASA Board
August 8, 2017 S
OU
TH
GR
AN
VIL
LE
WATE
R &
SE
WE
R
AUTHORITY
Introduction to Hazen and Sawyer
Hazen – Drinking Water Expertise
Disinfection By-Products
Reduction and SCADA
Evaluation
Our Project Team Disinfection By-Products Reduction and SCADA Evaluation
DBP Expertise
Guidance on
Compliance with the
Stage 2 D/DBP
Regulation
Hazen
developed tools
for the Water
Research
Foundation to
help assess
Risk and
survey DBP
Compliance
Options
The Decision Support Tool
DBPs Experience
Hazen’s Process Optimization and Chemical
Feed Experience
Gary Iversen, PE
• 44 years experience
• Former Operator and WTP Superintendent
• Expert in water chemistry, process optimization,
and operator training
Project Approach
Bench-Scale Testing
• Develop bench-scale testing protocol that simulates WTP
performance “plant match”
• Evaluate alternate coagulant types, doses, and pH
• Evaluate need for, type, and required dosage of coagulant
aid polymers, pre-oxidants, and PAC
• Goal is to assess optimal strategies for DBP precursor
removal
• Holistic approach – need to ensure that any strategy does
not compromise other treatment goals
Mobile Laboratory
Hazen’s mobile process laboratory will be deployed to SGWASA WTP beginning Aug. 21
Gary Iversen will lead the Process Optimization efforts and will mobilize Hazen’s Mobile Laboratory
Project Approach
Chemical Feed Evaluation
• Site visit to assess existing facilities.
• Determine required storage and feed
equipment capacities.
• Confirm compatibility of proposed
changes.
Operations Support and Training
• On-site support during planned
conversion to ferric sulfate
• On-site support during any future
process changes
• Operator Training sessions
Online THM Analyzer
Project Approach
SCADA and Automation Evaluation
• Determine automation and SCADA
system needs.
• Review SCADA system architecture at
WWTP
• Coordinate with any recommended
process changes
Regulatory Agency Coordination
• Communicate and coordinate with
PWS regarding project progress,
findings, and recommendations.
Example HMI Workstation
Schedule
Aug 8 Notice to proceed
Aug 21 Begin bench-scale testing
Oct 10 Present bench-scale testing preliminary results
Nov 28 Submit draft report
Dec 12 Present draft DBP and SCADA evaluation
recommendations
Engineering Fee
Contracts setup on time and materials
reimbursement not to exceed basis
$97,300 • DBP Reduction and
• SCADA Evaluation
Questions and Discussion
WTP Sludge Removal
System and
Dewatering Facility
Our Project Team WTP Sludge Removal System and Dewatering Facility
Residuals Experience
Comprehensive Project Approach
Project Approach
Residuals Collection
System Assessment
• Evaluate existing equipment and
coordinate with manufacturers
• Recommend improvements to
enhance reliability
• Concept-level capital costs
Residuals Production
Estimates
• Critical to coordinate with DBP
project
A switch to an iron-based
coagulant and additional PAC
and potassium permanganate
results in greater solids
production.
Project Approach
Dewatering Alternatives
• New Dewatering Facility
• Thickening + Dewatering
• Relocate existing rotary
drum thickener +
dewatering
• Residuals lagoon
2-M Belt Filter Press
Schedule
Aug 8 Notice to proceed
Nov 1 Preliminary DBP strategy informs possible range
of residuals production
Jan 15 Submit draft report
Engineering Fee
Contracts setup on time and materials
reimbursement not to exceed basis
$91,900 • Sludge Collection and
• Dewatering Facility
Questions and Discussion