Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Large Research Facilities StatusSLS, Proton Facility, PROSCAN, PSI-XFEL

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

EPICS Usage at PSI

In transitionPlanned

In use

He LiquefactionSLS

UCNTiming

XFEL 250 MeV Injector Test

PSI-XFELPROSCANXFEL LowEmittanceGun Test

Operations Building

ProtonSuperbuncher

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

New Operations Building

■ New "combined function" control room►SLS►Proton facility►PROSCAN►XFEL

■ New server room

■ New offices

■ New cafeteria

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

SLS Filling Pattern Feedback

■ Better charge distribution

■ Improved beam stability

Separate talk

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

SLS Beamline IT Infrastructure Upgrade

■ Old SLS control room became new server room for beamlines

■ New data storage►Up to 30 TB per beamline

■ New network topology

Separate talk

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

Other SLS (PX) Beamline Improvements

■ High precision rotation stage separate talk

■ Sample mounting robot separate talk

■ Pilatus 6M detector

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

ProtonFacility

PROSCANProton

Therapy

UCNUltra Cold Neutrons

SINQSpallationNeutron Source

Gantry 1

Gantry 2

Optis 2

OptisEye Cancer

TherapyRingCyclotron

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

Cyclotron Upgrade■ New cavities for beam current

upgrade to 3 mA

■ Replace old CAMAC with new VME hardware

■ New superbuncher runs with EPICS

■ Long term future plans:► Replace complete control system

with EPICS► Integrate pion/muon beamlines► Upgrade network infrastructure

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

UCN (Ultra Cold Neutrons)■ Spallation source under

construction (start ~2009)► 5K cold deuterium moderator► neutrons <1µeV, 7m/s, 25km/h

■ Proton beam time structure is controlled with EPICS

1. Lead target2. D2O moderator3. Solid D2 moderator 4. UCN guide5. Valve6. To experiments7. Storage tank

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

PROSCAN■ Dedicated accelerator for cancer

treatment with protons

■ Over one year in operation

■ At the moment: Trying to replace accelerator control system with EPICS► Problem: Can test only on weekends

■ Early 2009: Optis 2► Partially EPICS► Patient treatment system is not EPICS

■ Late 2009: Gantry 2

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

PSI-XFEL

80 m Undulators

Experiment Building

800 m tunnel

SLS

Aare

Tunnel is a bridge here !

farm land

Low Emittance

Gun

400 m Linac

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

PSI-XFEL Schedule■ 500 keV gun test dismantled

■ Setup of 4 MeV test

■ Building for 250 MeV test linac under construction

■ Milestone: Proof of principle in October 2010

■ XFEL construction start in 2011

■ XFEL operation start in 2016

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

Firewire Camera Server■ Linux IOC with

embedded HTTP server

■ Used for beam diagnostics at SLS, XFEL, …

See Mirosław Dach's talk at PCaPAC

Server

PC

/dev/video

EPICS server

WWWserver

Dirk Zimoch, EPICS Collaboration Meeting October 2008

PSI Status ReportPSI Status Report

Other controls activities

■ Upgrade of PCs to Scientific Linux 5►Many unexpected problems

■ Adaption of SLS controls tools for XFEL

■ Build up IT infrastructure for XFEL

■ Evaluation of embedded Linux IOCs

■ Evaluation of remote control (web access) for SLS beamlines

■ Planned: Upgrade of SLS IOCs to EPICS 3.14