Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Large Research Facilities StatusSLS, Proton Facility, PROSCAN, PSI-XFEL
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
EPICS Usage at PSI
In transitionPlanned
In use
He LiquefactionSLS
UCNTiming
XFEL 250 MeV Injector Test
PSI-XFELPROSCANXFEL LowEmittanceGun Test
Operations Building
ProtonSuperbuncher
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
New Operations Building
■ New "combined function" control room►SLS►Proton facility►PROSCAN►XFEL
■ New server room
■ New offices
■ New cafeteria
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
SLS Filling Pattern Feedback
■ Better charge distribution
■ Improved beam stability
Separate talk
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
SLS Beamline IT Infrastructure Upgrade
■ Old SLS control room became new server room for beamlines
■ New data storage►Up to 30 TB per beamline
■ New network topology
Separate talk
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
Other SLS (PX) Beamline Improvements
■ High precision rotation stage separate talk
■ Sample mounting robot separate talk
■ Pilatus 6M detector
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
ProtonFacility
PROSCANProton
Therapy
UCNUltra Cold Neutrons
SINQSpallationNeutron Source
Gantry 1
Gantry 2
Optis 2
OptisEye Cancer
TherapyRingCyclotron
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
Cyclotron Upgrade■ New cavities for beam current
upgrade to 3 mA
■ Replace old CAMAC with new VME hardware
■ New superbuncher runs with EPICS
■ Long term future plans:► Replace complete control system
with EPICS► Integrate pion/muon beamlines► Upgrade network infrastructure
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
UCN (Ultra Cold Neutrons)■ Spallation source under
construction (start ~2009)► 5K cold deuterium moderator► neutrons <1µeV, 7m/s, 25km/h
■ Proton beam time structure is controlled with EPICS
1. Lead target2. D2O moderator3. Solid D2 moderator 4. UCN guide5. Valve6. To experiments7. Storage tank
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
PROSCAN■ Dedicated accelerator for cancer
treatment with protons
■ Over one year in operation
■ At the moment: Trying to replace accelerator control system with EPICS► Problem: Can test only on weekends
■ Early 2009: Optis 2► Partially EPICS► Patient treatment system is not EPICS
■ Late 2009: Gantry 2
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
PSI-XFEL
80 m Undulators
Experiment Building
800 m tunnel
SLS
Aare
Tunnel is a bridge here !
farm land
Low Emittance
Gun
400 m Linac
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
PSI-XFEL Schedule■ 500 keV gun test dismantled
■ Setup of 4 MeV test
■ Building for 250 MeV test linac under construction
■ Milestone: Proof of principle in October 2010
■ XFEL construction start in 2011
■ XFEL operation start in 2016
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
Firewire Camera Server■ Linux IOC with
embedded HTTP server
■ Used for beam diagnostics at SLS, XFEL, …
See Mirosław Dach's talk at PCaPAC
Server
PC
/dev/video
EPICS server
WWWserver
Dirk Zimoch, EPICS Collaboration Meeting October 2008
PSI Status ReportPSI Status Report
Other controls activities
■ Upgrade of PCs to Scientific Linux 5►Many unexpected problems
■ Adaption of SLS controls tools for XFEL
■ Build up IT infrastructure for XFEL
■ Evaluation of embedded Linux IOCs
■ Evaluation of remote control (web access) for SLS beamlines
■ Planned: Upgrade of SLS IOCs to EPICS 3.14