Digital Stormwater Data

46
Omaha Digital Data Omaha Digital Data Solutions for Solutions for Stormwater Stormwater Management Management Jesse W. Poore, CFM Felsburg Holt & Ullevig

description

Presentation One at the IECA Great Rivers Chapter and the City of Omaha MS4 Conference Program

Transcript of Digital Stormwater Data

Page 1: Digital Stormwater Data

Omaha Digital Data Omaha Digital Data Solutions for Solutions for Stormwater Stormwater

ManagementManagementJesse W. Poore, CFM

Felsburg Holt & Ullevig

Page 2: Digital Stormwater Data

Introduction to Permix Introduction to Permix & PIRT& PIRT

Facilitate New Post Construction Stormwater Requirements, BMP Locations, Documentation

Expedite Public Improvement Plan Review Enhance the Grading Permitting and

Inspection Process and Oversight Capabilities Monitor and Report Environmental

Commitments for CSO Projects AND Tie Permitting Processes to Each Other

Page 3: Digital Stormwater Data

Benefits and Benefits and OpportunitiesOpportunities

Standardize & Centralize Application Information

Track Decision Making Sequence Minimize the Paper Pushing Process Retain Important Design Assumptions Streamline Communication Between Parties Enhance Accountability to Stakeholders Control Circulation of Important News and

Info. Geographic Referencing to Interact with GIS

Page 4: Digital Stormwater Data

Permix Modular Permix Modular FrameworkFramework

Page 5: Digital Stormwater Data

Permits Tied to ProjectsPermits Tied to Projects

Page 6: Digital Stormwater Data

Sequential Review Sequential Review ProcessProcess

Page 7: Digital Stormwater Data

Post Construction Post Construction Stormwater ModuleStormwater Module

Start with the Applicant

Log In To the Websitewww.omahastormwater.org

Page 8: Digital Stormwater Data

Step 1: Account Log-inStep 1: Account Log-in

Page 9: Digital Stormwater Data

Step 2: Project Initiation Request

Name and location of the project as well as responsible parties

Grading: Disturb at least one (1) acre of soil (Yes) (No) Tied to an existing grading permit (Yes) (No)

Post-Construction: Will at least 5,000 square feet of surface area be disturbed (Yes) (No) Benefitting from a previously approved Post construction permit (Yes) (No) 

Public Improvements: Will the project require public improvements as part of a subdivision or development agreement, building permit, or other approval (Yes) (No) Provide information regarding existing agreements, permits, or approvals already in place for this project.

Building: Will the project require a Building Permit from the City (Yes) (No) Tied to an existing building permit (Yes) (No)

Page 10: Digital Stormwater Data

Step 3: Request Permit Step 3: Request Permit NumberNumber

Page 11: Digital Stormwater Data

Step 4: Complete Step 4: Complete ApplicationApplication

Page 12: Digital Stormwater Data

Step 3: Request Permit Step 3: Request Permit NumberNumber

Grading Permit Numbers SAR20100830-777-2

Post Construction Permit Numbers BEL20090215-222-P

Omaha Public Works Permit Numbers OPW51699

These numbers are required for application forms, plans, and other documents submitted

Page 13: Digital Stormwater Data

Step 4: Upload Step 4: Upload Supporting InfoSupporting Info

Page 14: Digital Stormwater Data

Step 4: Submit Step 4: Submit ApplicationApplication

Page 15: Digital Stormwater Data

Applicant Project List Applicant Project List StatusStatus

Page 16: Digital Stormwater Data

Kicked over to the ReviewerCity or Natural Resource

District

Page 17: Digital Stormwater Data

Reviewer Project List Reviewer Project List StatusStatus

Page 18: Digital Stormwater Data

Reviewer Project ScreenReviewer Project Screen

Page 19: Digital Stormwater Data

Document Commenting Document Commenting ScreenScreen

Page 20: Digital Stormwater Data

Multiple Reviewer Multiple Reviewer CommentsComments

Page 21: Digital Stormwater Data

Summary Comment ListSummary Comment List

Page 22: Digital Stormwater Data

Kicked back to the Applicant

Page 23: Digital Stormwater Data

Step 5: Comments Step 5: Comments Summary ListSummary List

Page 24: Digital Stormwater Data

Step 5: Review Step 5: Review CommentsComments

Page 25: Digital Stormwater Data

Step 5: Review Step 5: Review CommentsComments

Page 26: Digital Stormwater Data

Step 5: Upload RevisionsStep 5: Upload Revisions

Page 27: Digital Stormwater Data

Step 5: Upload RevisionsStep 5: Upload Revisions

Page 28: Digital Stormwater Data

Step 6: Resubmit with Step 6: Resubmit with ResponsesResponses

Page 29: Digital Stormwater Data

Kicked back to the Reviewer

Page 30: Digital Stormwater Data

Reviewer Assesses Reviewer Assesses ResponsesResponses

Page 31: Digital Stormwater Data

Satisfactory Review Satisfactory Review CompleteComplete

Page 32: Digital Stormwater Data

Submit Approval and Submit Approval and CommentsComments

Page 33: Digital Stormwater Data

Electronic Approval Electronic Approval NotificationNotification

Page 34: Digital Stormwater Data

Waiting for Applicant to Certify the

Project

Page 35: Digital Stormwater Data

Step 7: Certify BMPs & Step 7: Certify BMPs & As-BuiltsAs-Builts

Page 36: Digital Stormwater Data

Next Steps for PermixNext Steps for Permix

Incorporate Public Improvement Projects Migrate Grading Permits and Inspection

Tool Address CSO Environmental Commitments Kick Out BMP Inspection Reports Generate Programmatic Summary Reports Integrate BMP Locations into GIS Model Water Quality Benefits of BMPs

Page 37: Digital Stormwater Data

Migration from PCWP Migration from PCWP SiteSite

Page 38: Digital Stormwater Data

Match Capabilities to Match Capabilities to PIRTPIRT

Page 39: Digital Stormwater Data

Site Information Site Information QuestionsQuestions

Page 40: Digital Stormwater Data

Current BMP List ScreenCurrent BMP List Screen

Page 41: Digital Stormwater Data

PIRT BMP 1 Data Entry PIRT BMP 1 Data Entry ScreenScreen

Page 42: Digital Stormwater Data

Current BMP Current BMP Maintenance ScreenMaintenance Screen

Page 43: Digital Stormwater Data

PIRT BMP Findings PIRT BMP Findings ScreenScreen

Page 44: Digital Stormwater Data

PIRT BMP 2 Data Entry PIRT BMP 2 Data Entry ScreenScreen

Page 45: Digital Stormwater Data

Some PIRT BenefitsSome PIRT Benefits

Tracking and Trending Data for: Communities : Watersheds : Inspectors :

BMPs : BMP Problems : Enforcement : Other Priorities

Functional and Educational Interface Improve Consistency of Findings and

Corrective Actions by Project and City Inspectors

Tied Back to Permix for Permit Dependancies

Page 46: Digital Stormwater Data

Comments or

Questions