![Page 1: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/1.jpg)
FLORIDA SOLAR ENERGY CENTER
Creating Energy Independence Since 1975
Developing Exhaust Air Energy
Recovery Credits for the Florida
Energy Code
Interim Report
Bereket Nigusse / Muthusamy Swami
![Page 2: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/2.jpg)
Contract Overview
Start date: Nov 3, 2014
End date: June 1, 2015
Deliverables:
Interim Report: delivered
Final Report
Status: in progress
2/17/2015 2
![Page 3: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/3.jpg)
Task Summary
Identify Major Florida Cities
Identify Prototype Buildings
Computer Simulations
Update ERV Credits
Write Final Reports
2/17/2015 3
![Page 4: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/4.jpg)
Climate Zones and Cities
Identified six cities in climate zone 1A and 2A
Miami for Climate Zone 1A and Five Cities for
climate zone 2A (Tampa, Orlando, Jacksonville,
Gainesville, and Tallahassee)
Simulations to determine annual energy use for
the climate zone 2A cities for each of the nine
prototype buildings identified
Jacksonville and Gainesville has annual energy
use within 1.0%.
Decided to keep the six cities for this study
2/17/2015 4
![Page 5: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/5.jpg)
Prototype Buildings
Identified Commercial Buildings:
Small Size Office
Medium Size Office
Large Office
Standalone Retail
Primary School
Secondary School
Large Hospital
Small Size Hotel
Large Size Hotel
2/17/2015 5
![Page 6: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/6.jpg)
Computer Simulations
Modified prototype buildings
Created HVAC systems with and without ERV
Performed sizing calculations
Obtained effectiveness and pressure drop
data (AHRI certified database)
Created automated input file processor tool
Simulations for large office building
Analyzed results & reviewed assumptions
2/17/2015 6
![Page 7: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/7.jpg)
Computer Simulations
ERV Input Assumptions:
Pressure Drop Across ERV Device
Heating and Cooling Effectiveness
Power Input for Control and Drive Motor
2/17/2015 7
![Page 8: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/8.jpg)
Computer Simulations
Fan Pressure Adjustment Due to ERV Device:
2014 Florida Energy Code
Section C403.2.10 allows fan pressure
adjustment for ERV in the reference building
Two sets of simulations were conducted
With and without fan pressure drop
adjustment to the reference buildings
The reference building fan pressure
difference is adjustment per the standard
2/17/2015 8
![Page 9: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/9.jpg)
Preliminary Results
Total energy use and energy savings intensities of the large office building without fan pressure adjustment.
2/17/2015 9
The reference building total energy use is the sum of total energy use with ERV
and total energy savings of the building.
![Page 10: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/10.jpg)
Preliminary Results
Total energy use and energy savings intensity of the large office
building with fan pressure adjustment.
2/17/2015 10
The reference building total energy use is the sum of total energy use with ERV
and total energy savings of the building.
![Page 11: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/11.jpg)
Preliminary Results
HVAC energy intensity and percent savings for the large office
building.
2/17/2015 11
100 withoutERV withERV
withoutERV
HVACEnergyUse HVACEnergyUseHVACEnergySavings
HVACEnergyUse
HVAC energy percent savings calculation
Units Miami Tampa Orlando Gainesville Jacksonville Tallahassee
kBtu/ft2/yr 1.7 1.5 1.3 1.0 1.0 0.9
% 10.1 10.1 9.5 7.9 7.6 6.9
kBtu/ft2/yr 2.4 2.1 1.9 1.6 1.5 1.4
% 13.6 13.8 13.3 11.7 11.3 10.7
Without Fan Pressure
Adjustment
With Fan Pressure
Adjustment
Percent HVAC energy savings will be used in the Florida code.
![Page 12: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/12.jpg)
ERV Credits
ERV Credits Definition: annual cooling and heating
energy savings in percent.
Annual energy savings due to ERV device installation
is estimated as the ERV credit times the annual
cooling and heating energy consumption of the
reference building.
The reference building annual cooling and heating
energy use is the electric and gas energy consumed
to provide cooling and heating including the fan
electric energy use.
2/17/2015 12
ReferenceBuildingWithoutERVHVACEnergySavings ERVCredit HVACEnergyUse
![Page 13: Developing Exhaust Air Energy Recovery Credits for the ... · Contract Overview Start date: Nov 3, 2014 End date: June 1, 2015 Deliverables: Interim Report: delivered Final Report](https://reader034.fdocuments.us/reader034/viewer/2022042910/5f3e00a494c8da48722198cf/html5/thumbnails/13.jpg)