1
DETAIL PROJECT REPORT (D.P.R.)
(I.W.M.P.-BIJNOR 1ST
)
INTEGRATED WATERSHED MANAGEMENT PROGRAMME
WATERSHED- MALIN RIVER, BLOCK-NAJIBABAD, DISTRICT- BIJNOR (U. P.)
Submitted to:- Prepared By
Department of Land Resources Bhoomi Sanrakshan Adhikari
Ministry of Rural Development, Department of Land Development
Government of India and Water Resources, Bijnor
DEPARTMENT OF LAND DEVLOPMENT AND WATER RESOURCES LUCKNOW (U.P.)
2
Contents S.N Particulars Page Nos. 1.
EXCUTIVE SUMMARY 5
1.1 Excutive Summary 6 1.2 Project At Glance 1.3 Introduction and Background 9 1.4 Status of Previous 10 1.5 Need and Scope for watershed development Programme 11 1.6 Weightage for the selection of the watershed 12 2. GENERAL DESCRIPTION OF PROJECT AREA 15 2.1 Location 16 2.2 Physiography 18 2.3 Climate 19 3. BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL 20 3.1 Detail of Population 21 3.2 Land holding pattern 22 3.3 Migration: Pre Project Status 23 3.4 Micro Watershed wise Detail of Crop their Productivity & Production 24 3.5 Livestock Population 3.6 Horticulture Status 33 3.7 Detail of Infrastructure 24 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status 65 3.11 Source wise Area Irrigrated in IWMP 1st 67 4. INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 69 4.1 Project Implementing Agency 70
4.2 Details of Staff at PIA 71 4.3 Details of WDT 72 4.4 Watershed committee Gram Panchayat wise 73 4.5 Details of Village wise (SHGs) 83 4.6 Details of SHGs Group wise Names 93 4.7 Details of Users Group 98 4.8 Activities wise formation of users Groups 98 4.9 Convergence 103
3
5. CAPACITY BUILDING PLAN 104 6. EPA 108 6.1 Entry Point Activity (EPA) 109 6.2 Estimation of Run off 110 7. PHASING OF PROGRAMME AND BUDGETING 138 7.1 Details of Item wise Financial Position 139 7.2 Details of Physical and Financial Year wise Phasing 140 8. EXPECTED OUTCOMES/ BENEFITS: 141 9. Chapter-9 EPA Photos 142, 143
10. MAPS
( Watershed map, Micro watershed Map)
155,156
157
11. Design of Earthen bund 158
12. Design of Drop Spill Way 159
13. Estimate of Drop Spill Way 160
14. Design of Field Out let 161
15. Estimate of Field Out let 162
4
CERTIFICATE This is to be certified that the proposed Project (IWMP-I) comprising Fifteen micro-watersheds of district Bijnor Uttar Pradesh has been selected for its sustainable development on watershed basis under Integrated Watershed Management Programme. The land is physically available for proposed interventions and is not overlapping with any other schemes. It will be developed as per Common Guidelines for Watershed Development Project-2008, GOI, New Delhi. The significant results will be achieved through proposed interventions on soil and water conservation, ground water recharge, availability of drinking and irrigation water, agricultural production systems, live stock, fodder availability, livelihoods of asset less, capacity building, etc. The proposed Detailed Project Report of IWMP-I, 2009-10 is approved for its implementation. Soil Conservation Officer IWMP-I Dept. of LDWR, Chandpur AT Bijnor UP Deputy Director LDWR, Moradabad UP Project Director DRDA, Bijnor UP
Chief Development Officer Distt.-Bijnor UP
5
Chapter- 1
EXECUTIVE SUMMARY
6
1.1 EXECUTIVE SUMMARY All the micro-watersheds of IWMP-I, 2009-10 are situated in Najibabad Block District Bijnor, Uttar Pradesh. The extent of latitude and longitude of the project is 29.39 to 29.70 N-S and 78.18 to 78.31 E-W. The project consists of Fifteen micro-watersheds namely Jaspur (2B5C1c3c), Bhaguwala (2B5C1c3d),Gudha 1st (2B5C1C3F), Gudha 2nd (2B5C1d2a), Prempur (2B5C1d1b), Moh Alampur (2B5C1e1a), vijaypur (2B5C1e1b) Gulalwali (2B5C1e1C) Veerpur 2nd (2B5C1e2a) Veerpur 1st (2B5C1e2b) Sahanpur N.P (2B5C1e3b) Pooranpur gadhi 1st (2B5C1e4a) Rampur mangal (2B5C1e4c) Bijori (2B5C1e4d) Rehmapur (2B5C1d1a)with total geographical area of 6148.00 ha, out of which 3812.00 ha is treatable with total outlay of Rs. 457.44 lakh under Integrated Watershed Management Programme. The Project Implementing Agency (PIA) is Bhumi Sanrakshan Adhikari, Department of Land Development and Water Resources, Chandpur At Bijnor , Uttar Pradesh. All micro-watershed falls in agro-climatic zone of Western resion representing a transitional zone of tropical sub-humid to semi-arid and comes under hot moist semi-arid ecological sub-region. The micro-watersheds of IWMP-I is situated at an elevation of some 201.10 to 249.17 m above mean sea level and has relief from 14 to 34 m. General topography of the watershed is mild to gentle.
Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3- 5,. Per cent areal extent of different slope classes in IWMP-I micro-watershed is shown in Page no .63 The dominant slope category in the micro-watershed is 1-3 per cent (85%) followed by 3-5 per cent (15%). On an average 26 per cent population is scheduled caste. The watershed is water scarce. Expected runoff is worked out as 40% per centannual rainfall. The watershed is dominated by cow and Buffalo . To achieve the sustainable development, all kinds of activities related to natural resource management, production systems and livelihood options for asset less people are described in Page no. 87 to 97 The total cost of the project is Rs. 457.44 lakh. All the activities of natural resource conservation are marked on the map of proposed plan. Major crops of the watershed were urd, mung, Sugarcane, during kharif and , wheat in.Rabi.
7
1.2 PROJECT AT A GLANCE 1 Name of Project IWMP-I
2 Name of Block (s) Najibabad
3 Name of district Bijnor
4 Name of State U.P
5 Name of Watershed IWMP 1st
6 Name of Micro watershed/ code with Coordinate latitude Longitude Latitude
1 jaspur 2B5C1c3c 78.20 29.44
2 Bhaguwala 2B5C1c3a 78.31 29.70
3 Guda 1st
2B5C1c3f 78.18 29.42
4 Prempur 2B5C1d1b 78.18 29.40
5 Gurda 2nd
2B5C1d2a 78.20 29.43
6 mo Alampur 2B5C1e1a 78.30 29.60
7 Vijaypur 2B5C1e1b 78.30 29.60
8 GulalWali 2B5C1e1c 78.20 29.41
9 Veerpur 2nd
2B5C1e2a 78.21 29.41
10 veerpur 1st
2B5C1e2b 78.20 29.39
11 Sahanpur N.P 2B5C1e3b 78.31 29.70
12 Puranpur Gadi 1st
2B5C1e4a 78.25 29.60
13 Rampur Mangal 2B5C1e4c 78.22 29.39
14 Bijori 2B5C1e4d 78.31 29.70
15 Rehmapur 2B5C1d1a 78.30 29.40
Project Period 2009-10 to 2013-14
Name of gram Panchayats No.- 14
Names of concerned villages-(No.) 35
Total Geographical area of Project (ha) 6148
Treatable area (ha.) 3812
Forest Area 320
Land under Agriculture use 4316
Total Project cost (Lacs) 457.44
Cost to be met through convergence -
Project period 4 Years
Formation of Watershed committees 14
No. of WCs 14
No. of members 154
Formation of SHGs 45
Total SHG Nos 98
Female SHG Nos 17
Total No. of members 452
Formation of UGs 30
No. of Ugs 67
No. of members 332
Important Outcome indicators
(1) Rainfed area (ha.) 4243.00
(2) Area under irrigation (ha.) 1243.00
8
(3) Area under crops (ha.) iKharif 2121.00 Rabi 2024.00
Productivity of important crops (Q/ha.) Urd 4.24
Moong 5.29
Jawar 800 kg
Bajara 800 kg
Wheat 1415kg/ha Pulse And Oil seed 800 kg/ha
Sugar Cane 400 k/ha
10) Mustard 5 kg/ha
(12) Ground water status (m) 4.35-15.55
(13) Milk Production (Liters) 2.00 litre
14) Average income per family (Rs.) 20000/year
(1) Land holding families 4540
(2) Land less/ poor families 710
18 Employment generation (1) During Project Period 68750/year
(2) After project 91500 Md/year
9
1.3 INTRODUCTION AND BACKGROUND
Status of watershed programme and approved plan by Steering committee, Govt. of India and status of previous Detailed Project Reports for Bijnor district of Uttar Pradesh is given in following Tables 1.1, 1.2 and 1.3.
Status of watershed programme District- Bijnor
Details No. Area ( ha.) Total Micro watersheds in the district 410 456100 Workable Micro Watersheds 278 362774 Micro Watersheds already treated by LDWR & other Agencies Uttar Pradesh 101 100175
Micro Watersheds (MWS) available for treatment (At the time of start of IWMP in the district)
177 262599
Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Govt. of
Year Project MWS Area (Treatable) (ha)
Project Cost (Rs. Lakh)
Name of PIA
Date of Sanction by S.C. Got. Of India
2009-10 IWMP-I 15 3812 457.44 B.S.A LDWR, Bijnor-I, U.P.
30/04/10
Total
10
1.4 Status of previous DPRs
Sl. No. Approved Project
Status of DPR under preparation/ prepared/approved by SLNA with date
Treatable Area ha
Project Area (Geographical) ha
Project cost Rs.(Lakh)
Project period (Fin. Year from.......q ......)
PIA
1 IWMP-I Prepared / under revision
3812 6148 457.44 2010/11to2013/14 B.S.A LDWR, Bijnor-I, UP
Total
1.1 Project Background
Integrated Watershed Management Programme-I comprises Fifteen micro-watershed namely Jaspur (2B5C1c3c), Bhaguwala (2B5C1c3d),Gudha 1st (2B5C1C3F), Gudha 2nd (2B5C1d2a), Prempur (2B5C1d1b), Moh Alampur (2B5C1e1a), vijaypur (2B5C1e1b) Gulalwali (2B5C1e1C) Veerpur 2nd (2B5C1e2a) Veerpur 1st (2B5C1e2b) Sahanpur N.P (2B5C1e3b) Pooranpur gadhi 1st (2B5C1e4a) Rampur mangal (2B5C1e4c) Bijori (2B5C1e4d) Rehmapur (2B5C1d1a)watershed project is situadated in Najibabad Block of District Bijnor and spread over in 51 villages of 14 gram Panchayat. The total geographical area of the IWMP-I 6148ha, out of which 3812 ha is treatableunder Integrated Watershed Management Programme (IWMP-I).
11
1.5 Need and Scope for Watershed Development Watershed project
Micro Watersheds (MWS) detail
Micro watersheds code
Treatable Area (ha) Name of Watershed in which MWS is falling (River / Nala name)
IWMP-I jaspur 2B5C1c3c 214.70 Malan River IWMP-I Bhaguwala 2B5C1c3a 512.85 Malan River IWMP-I Gudha 1
st 2B5C1c3f 143.50 Malan River
IWMP-I Prempur 2B5C1d1b 259.24 Malan River IWMP-I Gudha 2
nd 2B5C1d2a 268.77 Malan River
IWMP-I Moh Alampur 2B5C1e1a 289.64 Malan River IWMP-I Vijaypur 2B5C1e1b 184.74 Malan River IWMP-I GulalWali 2B5C1e1c 145.74 Malan River IWMP-I Veerpur 2
nd 2B5C1e2a 194.43 Malan River
IWMP-I veerpur 1st
2B5C1e2b 301.87 Malan River IWMP-I Sahanpur N.P 2B5C1e3b 119.58 Malan River IWMP-I Puranpur Gadhi 1
st 2B5C1e4a 301.21 Malan River
IWMP-I Rampur Mangal 2B5C1e4c 154.08 Malan River IWMP-I Bijori 2B5C1e4d 159.31 Malan River IWMP-I Rehmapur 2B5C1d1a 562.33 Malan River Total 3812.00 Western U.P region was in a grip of severe drought continuously and rains from 2004 to 2009. Watershed project was selected with following objectives: Long Term Objectives:
� To optimize productivity of the land
� To restore ecological balance in degraded and fragile eco-system
� To narrow down the disparity between rainfed and irrigated areas
� To create sustained employment opportunities
12
1.6 Crite Area of Weightage for selection of watershed
1 2 3 4 5 6 7 8
s.
n
o
distric
t
Name
of the
project
No of
micro-
Watersha
des
Proposed
to be
covered
Propose
d
Project
Area(ha
)
Type of
(hill/
desert/
other
Proposed
Cost(Rs.in
lakh)
I
Weightage under the criteria
II III IV V VI VII VIII IX X XI XII XIII Tota
l
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Bijnor IWMP i 15 3812 Other 457.44 7.5 10.0 5.0 10.0 0.0 0.0 10.0 5.0 10.0 10.0 10.0 15.0 0.0 92.5
Total 3812 457.44 - - - - - - - - - - - - -
1.7 Details of on going watershed programme:
Presently, no watershed development programme is going on in the watershed.
13
# Criteria and weightge for selection of Watershed S.No criteria Maximum
Score
Rangs & Score
i powerty index (% of poor to
population)
10 Above 80% (10) 80 to 50%(7.5) 50 to (5) Below 20 % (2.5)
ii % of SC/ST population 10 Moer than 40% (10) 20 to 40%(5) lees than 20% (3)
iii Actual Wages 5 Actual Wages are
significances lower then
minimum Wages (5)
Actual Wages are
equal to or high
than minimum
Wages (5
iV % of Small and marginal
farmers
10 Moer than 80% (10) 50 to 80 % (5) lees than 50% (3)
V Groups Water Status 5 over exploid (5) critical (3) sub critical (2) Safe (0)
Vi Moisture
index/DPAP/DDP/DDp Block
15
-66.7&Below (15)DDP
Block
-33.3 to 66.6(10)
DPAP Block
0 to-33.3(0)Non
DPAP/DDP Block
VII Area under rain-faid agriculture 15 more then 90% (15) 80 to 90% (10) 70 to 80%(5) Abobe
.70%(reject)
Viii Drinking Water 10 No Source (10) Problometic
Villlege (7.5)
Partially covered
(5)
Fully covered (0)
ix Degarded La nd 15 High-above 20%(15) Medium -10 to
20% (10)
Low-less then 1%
off TGA (5)
x Productivity potential of the
land
15
Land with low
production &where
Productivity ca be
significantly enhanced
with reasonable efforts
(15)
Land with
Moderate
production
&where
Productivity ca be
enhanced with
reasonable
efforts (10)
Land with high
production
&where
Productivity ca be
Marginaly
enhanced with
reasonable
efforts (5)
14
Xi contiguity to
another
watershed that
has already been
developed
/treated
10 contiguous to
previously trteated
watershed &
contiguity with in
the microwatershed
in the project (10)
contiguous with In
the watershed in
the project but non
contiguous to
previously treated
watershed (5)
Neighter contiguous
to previously
trteated watershed
nor contiguity with
in the
microwatershed in
the project (0)
Xii cluster approach
in the hills plaints
(more then
onecontiguous
microwatershed in
the project )
15 above 6 micro
watersheds in
cluster (15)
4 to 6 micro
watersheds in
cluster (10)
2 to 4 micro
watersheds in
cluster (0)
Xii cluster approach
in the hills plaints
(more then
onecontiguous
microwatershed in
the project
15 above 5 micro
watersheds in
cluster (15)
3 to 5 micro
watersheds in
cluster (10)
2 to 3 micro
watersheds in
cluster (5)
Total 150 150 90 41 2.5
15
Chapter- 2
GENERAL DESCRIPTION OF PROJECT AREA
16
GENERAL DESCRIPTION OF PROJECT AREA
2.1 Location: The micro-watersheds of IWMP-I is located in Najijabad block of Bijnor district. It is about 35 km. from Bijnor on Najibabad road. Location (lat/long), Gram Panchayat, villages and its geographical area for each micro-watershed are depicted in Total area of the project is 6148 ha, out of which 3812 ha is treatable.. : Micro-watershed wise details of location, Gram Panchayat, villages and geographical area of IWMP- I
Sl. No.
Name of micro watershed
with Code
Latitude / Longitude
Name of GP
Names of villages
Name of Block
Area of village
included in
MWS(Geographical
TreatableArea
Details of important
/approach road with distance km
1 jaspur 29.44 to 78.20
Gudha Jaspur Ramnagar Ramsahaywali Chahsaloono Jaspur Guda
Najibabad 4.79 15.09
257.37 53.03 20.72
214.70 Najibabad To JAspur 8 Km
2 Bhaguwala 29.70 to 78.31
Jaspur Guda Bhagowala Jaspur Guda Bhagoowala Kangarpur
Najibabad 45.21 28.11
101.95 486.25
512.85 Najibabd To Samipur Road 5 km
3 Gudha 1st
29.42 to 78.18
Gudha Gudha 1st Najibabad 231.50 143.50 Najibabd To Prempur
Road 3 km
4 Prempur 29.40 to 78.18
Gudha Prempur.Jatpura Moda .Vijaypur
Guda Prempur Niyamatpur Ahmadpur Majid Jatpura khas Rehmapur
Najibabad 186.68 111.84
0.08 56.75 12.41 47.47
259.24 Najibabd To Bijori Road 6km
5 Gudha 2nd
29.43 to 78.20
Gudha Chahsallono Guda
Najibabad 258.69 172.44
268.77 Najibabd To Pooranpur gadi
Road3 km
6 Moh
Alampur
29.60 to 78.30
Prempur.Vijaypur. Ranipur.Rahaatpur Khudra .Mo Alampur
Mo Alampur Prempur Rehmapur Jadopur Lalpur Bhikka Rehatpur Khurd Vijaypur Nangla Pithora
Najibabad 1.31 17.04 48.50 15.81 32.14 11.18
150.04 40.85
289.64 Najibabd To Pooranpur Road 3 km
17
7 Vijaypur 29.40 to 78.30
Prempur Vijaypur.Ranipur. Gulalwali Verpur Prempur rehmapur Jadopur Lalpur bhikka
Najibabad 57.68 82.99 76.33 0.10
61.65 16.05
184.74 Najibabd To Jhakaki Road 9 km
8 GulalWali 29.41 to 78.20
.Prempur. gulalwali Veerpur PRempur
Najibabad 148.67 85.33 0.03
145.75 Najibabd To Gulalwali By Road10 km
9 Veerpur 1st 29.41 to 78.21
Gudha Prempur Ranipur Sahanpur Nanu Veerpur Sahanpur Santoki Jadopur Lalpur bhikka
Najibabad 0.08 263.05 17.64 3.19
30.68
194.43 Najibabd To Veerpur By Road7km
10 Veerpur 2nd 29.39 to 78.20
Gudha .Prempur. ShanpurNanu Veerpur
Najibabad 325.54 163.06
301.87 Najibabd To Veerpur By Road 8 km
11 Sahanpur N.P 29.70 to 78.31
Prempur.Ranipur Amanullahpur . Veerpur Sahanpur Santoki Lalpur Bhikka Sahanpur girdhaba Sahanpur Amanullahpur
Najibabad 45.71 136.87 36.04 56.64 17.76 7.66
119.58 Najibabd To Sahanpur By Road6 km
12 Puranpur Gadhi
1st
29.60 to 78.25
Ranipur.Vijaypur.Pooranpur Gadi.Amanullahpur
Sahanpur Santoki Rampur Mangal Ranipur Lalpur bhikka Vijaypur Sahanpur Girdhaba Pooranpur Gadi Amanullahpur Purushottampur
Najibabad 62.64 32.49 52.33 3.37 0.34
155.96 18.88 14.80
127.47 20.37
301.21 Najibabd To Pooranpur Gadhi By Road6km
13 Rampur Mangal 29.39 to 78.22
Guda.Bijori.Ranipur. Veeruwala.
Sahanpur Nanu Bijori Rampur Mangal Ranipur
Najibabad 107.32 125.96 16.42 0.71
154.08 Najibabd To Rampur MAngal By Road 6 km
14 Bijori 29.70 to 78.31
G Meduwala.Moh Amekhanpur ,Sahanpur Nanu Bijori
Najibad 3.52 1.37
55.83 193.63
159.31 Najibabd To Bijori By Road 7km
15 Rehmapur 29.40 to 78.30
Guda.Jatpura Bonda.Vijaypura .RAhatpur khurd.Muusepur.Sekhupura Alam.
Najibabad 830.00 562.33 Najibabd To Gulalwali By Road10 km
Total 6148.00 3812.00
18
2.2 Physiography Slope: Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5.% and more than 5 per cent. Per cent areal extent of different slope classes in IWMP-I micro-watershed is shown in The dominant slope category in the micro-watershed were 1-3 per cent (85%) followed by 3-5 per cent 5, (15%). Areal extent of various slope classes in the micromicro-watershed of IWMP
Sl. No.
Name of MWS & code Slope range wise area (ha) Total ProjectArea (ha)
0-0.5% 0.5-1.0% 1-3% 3-5% >5% Undulating Terraced
1 jaspur 2B5C1c3c -- 105.45 74.90 34.35 34.35 -- 214.70
2 Bhaguwala 2B5C1c3a -- 255.85 180.00 77.00 77.00 -- 512.85
3 Gudha 1st
2B5C1c3f -- 74.50 47.00 22.00 22.00 -- 143.50
4 Prempur 2B5C1d1b -- 129.89 90.50 38.85 38.85 -- 259.24
5 Gudha 2nd
2B5C1d2a -- 134.77 93.80 40.20 40.20 -- 268.77
6 Moh Alampur 2B5C1e1a -- 153.64 92.50 43.50 43.50 -- 289.64
7 Vijaypur 2B5C1e1b -- 92.34 64.90 27.50 27.50 -- 184.74
8 GulalWali 2B5C1e1c -- 74.95 50.40 20.40 20.40 -- 145.75
9 Veerpur 2nd
2B5C1e2a -- 99.83 65.50 29.10 29.10 -- 194.43
10 veerpur 1st
2B5C1e2b -- 151.87 105.00 45.00 45.00 -- 301.87
11 Sahanpur N.P 2B5C1e3b -- 60.58 41.50 17.50 17.50 -- 119.58
12 Puranpur Gadhi
1st
2B5C1e4a -- 146.21 110.00 45.00 45.00 -- 301.21
13 Rampur Mangal 2B5C1e4c -- 77.08 54.00 23.00 23.00 -- 154.08
14 Bijori 2B5C1e4d -- 84.31 51.00 24.00 24.00 -- 159.31
15 Rehmapur 2B5C1d1a -- 284.33 197.00 81.00 81.00 -- 562.33
16 Total -- 1925.60 1378.00 568.40 550.90 -- 3812.00
19
Climate The annual rainfall of the Western region varies from 759 to 1020 mm, about 90% of which is received during South-West monsoon period (Singh et al. 2002). The major part of the rainfall is received during the month of July and August. The length of growing season in Western ranges between 90 to 150 days depending upon rainfall and temperature regimes. The winter rains are erratic, occasional, meager and uncertain. The total rainy days/year vary from 30-45 in the region with an average of 37. The distribution of rainfall is very erratic. Low rainfall and drought are common features. Long dry spells during rainy season are also experienced often, which adversely affect the crops. It has been observed that in a cycle of 5 years, 2 are normal, 2 drought years and 1 is excessive rainfall year (Tiwari et al. 1998). The climate of Bijnor is characterized by a hot dry summer and cold winter and is marked for high variability of rainfall year to year. There are primarily four seasons: – Dry Summer season – from March to May i.e. before advent of monsoon, moist summer season – from June to September (Monsoon) transition period - in October and November, which is the post monsoon period, and winter season – from December toFebruary The coldest months in the year are December and January. Average monthly rainfall and temperature Average monthly rainfall and temperature at IWMP-I, Month Rainfall in mm. Temperature c 2011
2004 2005 2006 2007 2008 2009 2010 2011 Average Max. Min. January 11.1 4.8 0 0.70 0.00 4.00 10.6 9.6 8.86 17.3 5.80
February 0 0.4 0 31.40 0.00 26.20 140.00 32.20 66.13 22.30 10.00
March 0 13 30.10 17.50 0.00 7.60 --- 12.20 6.60 29.60 13.3
April 10.4 1.8 0 0.10 2.80 8.60 7.40 15.60 10.53 33.70 17.1
May 4.60 6.4 22.40 13.90 18.20 28.70 32.40 101.20 54.10 34.50 22.3
June 95.3 39.4 50.90 69.50 583.20 36.00 16.40 137.70 63.36 32.40 24.60
July 135.9 196.4 170.10 82.30 244.00 66.60 842.60 273.30 394.16 31.60 25.70
August 286.6 127.8 80.90 99.90 206.80 315.00 295.40 415.80 342.06 31.50 24.90
September 57 106.2 27.50 36.50 90.30 246.50 304.00 22.60 191.03 31.70 24.00
October 47.8 0 6.80 0 0.00 15.60 5.00 --- 6.86 30.40 16.20
November 0 0 0 0 24.30 4.20 --- -- 1.40 15.20 5.10
December 0 1.4 0.10 0.80 0.00 ---- 21.50 -- 7.16 16.10 5.20
20
Chapter- 3
Baseline Survey
21
3.1: Demographic Features in the project area (IWMP-I, Bijnor)
Sr. No
Name of Micro Watershed
Name of village
Total Population Population of SC/ST
Total Male Female Total Male Female 1 jaspur 1610 880 730 417 242 175 2 Bhaguwala 11277 6057 5220 1952 1030 922
3 Gudha 1st
1002 570 432 195 105 90
4 Prempur 4406 2280 2126 1300 695 605
5 Gudha 2nd
964 530 434 180 100 80
6 Moh Alampur 2178 1173 1005 546 296 250
7 Vijaypur 540 290 250 145 80 65
8 GulalWali 1420 740 680 365 200 165
9 Veerpur 2nd
250 145 105
10 veerpur 1st
3877 2025 1852 1048 548 500
11 Sahanpur N.P 25725 13725 12000 6943 3573 3370 12 Puranpur Gadhi 1
st 4856 2556 2300 1460 760 700
13 Rampur Mangal 916 500 416 230 135 95
14 Bijori 1570 820 750 790 440 350
15 Rehmapur 580 330 250 197 105 92
Total 61171 32621 28550 15768 8309 7459
22
3.2 : Soil and Land Holding Pattern Majority of the land of the project is heavy textured soil. Category wise details of farmer and their irrigated area are described in : Details of Soil texture in IWMP-I Bijnor.
Sr. No. MWS Project Area in different Soil Group (ha) Total Light textured soil (sand, loamy sand)
Medium textured soil (Sandy loam, loam, silt loam)
Heavy textured soil (Clayey
1 jaspur 172.10 20.50 22.10 214.70
2 Bhaguwala 33.35 140.45 39.05 512.85
3 Gudha 1st
107.62 20.60 15.28 143.50
4 Prempur 181.46 62.30 15.48 259.24
5 Gudha 2nd
188.20 68.90 11.67 268.77
6 Moh Alampur 202.74 71.30 15.60 289.64
7 Vijaypur 133.50 40.48 10.76 184.74
8 GulalWali 99.40 35.30 11.05 145.75
9 Veerpur 2nd
136.20 35.40 22.83 194.43
10 veerpur 1st
210.80 76.60 14.47 301.87
11 Sahanpur N.P 84.50 28.30 6.78 119.58
12 Puranpur Gadhi 1st
225.80 65.40 10.01 301.21
13 Rampur Mangal 115.50 25.60 12.98 154.08
14 Bijori 114.70 30.10 14.51 159.31
15 Rehmapur 440.10 80.20 42.03 562.33
23
3.3: Migration Pre Project Status
S.
No.
No. of Village No. of Persons Migrating No. of Days per year of
Migration
Major Reasons for migrating
1 2 3 4 5
1 54 214 170 Unemployment & Low wages
24
3.4 : Micro-watershed wise details of Crops, their Productivity & Production Name of MWS: JASPUR
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Til. 22.00 72.00 10.00 5.00
B Rabi,
Wheat,Mator,Masoor 40.00 65.70 20.00 7.00
C Zaid
Moong,Urd 5.00 10.00 3.00 1.50
Total 67.00 147.70 33.00 13.50
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Bhaguwala
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 80.00 120.00 10.50 4.80
B Rabi,
Wheat,Mator,Masor 104.00 208.85 19.00 6.50
C Zaid
Moong,Urd - - - -
Total 184.00 328.85 29.50 11.30
25
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gudha 1st
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 30.00 38.50 10.00 5.00
B Rabi,
Wheat,Mator,Masor 40.00 35.00 21.00 6.00
C Zaid
Moong,Urd - - - -
Total 70.00 73.50 31.00 11.00
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Prempur
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 20.00 101.24 9.50 4.50
B Rabi,
Wheat,Mator,Masor 38.00 100.00 20.00 6.00
C Zaid
Moong,Urd - - - -
Total 58.00 201.24 29.50 10.50
26
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gudha 2nd
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 32.00 101.00 9.75 4.80
B Rabi,
Wheat,Mator,Masor 40.00 95.77 20.00 7.00
C Zaid
Moong,Urd - - - -
Total 72.00 196.77 29.75 11.80
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Moh Alampur
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 40.00 100.64 10.00 5.00
B Rabi,
Wheat,Mator,Masor 54.00 80.00 20.00 7.00
C Zaid
Moong,Urd 5.00 10.00 3.00 1.50
Total 99.00 190.64 23.00 13.50
27
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Vijaypur
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 30.00 60.00 9.75 4.50
B Rabi,
Wheat,Mator,Masor 39.00 55.74 19.00 6.50
C Zaid
Moong,Urd - - - -
Total 69.00 115.74
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gulalwali
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 20.00 77.70 10.50 4.50 B Rabi, Wheat,Mator,Masor 32.00 70.00 18.00 6.00
C Zaid
Moong,Urd Total 52.00 147.70
28
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Veerpur 1st
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 40.00 117.87 10.00 4.90
B Rabi,
Wheat,Mator,Masor 45.00 100.00 19.50 6.25
C Zaid
Moong,Urd
Total 84.00 217.87
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Sahanpur N P
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 30.00 30.00 10.00 5.00 B Rabi, Wheat,Mator,Masor 30.00 29.58 20.00 6.50
C Zaid
Moong,Urd Total 60.00 59.58
29
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Bijori
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 32.00 40.00 11.00 5.00
B Rabi,
Wheat,Mator,Masor 44.00 43.31 20.00 5.00
C Zaid
Moong,Urd
Total 76.00 83.31
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Rehmapur
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 50.00 250.00 10.50 5.00 B Rabi, Wheat,Mator,Masor 55.00 207.33 20.00 6.00
C Zaid
Moong,Urd Total 105.00 457.33
30
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Veerpur 2nd
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 48.00 108.00 11.00 5.00
B Rabi,
Wheat,Mator,Masor 36.00 110.61 20.00 5.00
C Zaid
Moong,Urd
Total 84.00 218.61
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Pooranpur Gadhi
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 48.00 200.00 10.20 5.00 B Rabi, Wheat,Mator,Masor 40.00 187.32 20.00 6.00
C Zaid
Moong,Urd Total 88.00 387.32
31
: Micro-watershed wise details of Crops, their Productivity Name of MWS: Rapur Mangal
Sino Crop. Area in (Ha
Productivity Q/Ha
Irrigated Rainfed. Irrigated Rainfed.
A Kharif,
Paddy,JAwar,Bajra ,Tie. 50.00 70.00 10.30 4.80
B Rabi,
Wheat,Mator,Masor 44.00 72.53 18.50 5.00
C Zaid
Moong,Urd
Total 94.00 142.53
32
3.5 : LIVESTOCK POPULATION
The watershed I.W.M.P-1has 12040 cows, 18100 Buffaloes, 10804Bullocks, 12784 Goats, 1700 Pigs, 462 Sheep and
3872 Poulutry
Poultry. The majority of the peoples are depended on Buffaloes and Cows. The micro-watershed wise detail of the
Livestock is given below
Detail of Live Stock (I.W.M.P‐‐‐‐1) Bijnor
S.No. Watershed No. Name of the Watershed
Buffaloes Cows Bullocks Goat Pig Sheep Poultry Total
1 2B5C1c3c jaspur 1410 875 245 720 65 20 550 3885
2 2B5C1c3a Bhaguwala 850 546 1139 815 60 - 340 3750
3 2B5C1c3f Gudha 1st
2000 1325 371 1170 250 50 610 5776
4 2B5C1d1b Prempur 1300 838 1213 1018 180 122 520 5191
5 2B5C1d2a Gudha 2nd
1410 500 273 1060 65 120 412 3840
6 2B5C1e1a Moh Alampur 1250 1041 265 1080 80 - 390 4106
7 2B5C1e1b Vijaypur 730 252 1172 911 70 - 300 3435
8 2B5C1e1c GulalWali 1080 410 830 710 220 30 120 3400
9 2B5C1e2a Veerpur 2nd
1100 720 516 650 140 20 110 3256
10 2B5C1e2b veerpur 1st
1210 600 750 820 80 - 70 3530
11 2B5C1e3b Sahanpur N.P 930 1290 810 900 100 60 120 4210
12 2B5C1e4a Puranpur Gadhi
1st
1050 420 720 800 120 - 80 3190
13 2B5C1e4c Rampur Mangal 1080 400 890 720 90 40 100 3320
14 2B5C1e4d Bijori 1200 1310 1100 810 100 - 90 4610
15 2B5C1d1a Rehmapur 1500 1513 510 600 80 - 60 4263
Total 18100 12040 10804 12784 1700 462 3872 59762
33
3.6 : Horticulture Status
S. N. Name of micro watershed with code
Name of village
Name of Important horticultural crop Orchand Scattered Fruit Crop
Name Area ha. Productivity qtl/ha
Production qtls
No Productivity qtl/No.
Production qtls
1 jaspur Mango 4.00 80 320 20 0.60 12.00
2 Bhaguwala Mango Guava
2.00 2.50
80 120
160 300
25 25
0.60 0.80
15.00 20.00
3 Gudha 1st
Mango 2.00 80 160 30 0.60 18.00
4 Prempur Mango 2.50 80 200 20 0.60 12.00
5 Gudha 2nd
Mango 4.00 80 320 20 0.60 12.00
6 Moh Alampur - - - - - - -
7 Vijaypur Vijaypur 3.00 80 240 20 60 12.00
8 GulalWali Mango 5.00 80 400 25 60 15.00
9 Veerpur 2nd
Mango 3.00 80 240 15 60 9.00
10 veerpur 1st
Mango 2.00 80 160 20 60 12.00
11 Sahanpur N.P Mango 3.00 80 240 20 60 12.00
12 Puranpur
Gadhi 1st
Mango 2.50 80 200 15 60 9.00
13 Rampur
Mangal
Mango 3.00 80 240 20 60 12.00
14 Bijori Mango 3.00 80 240
20 60 12.00
15 Rehmapur Mango 3.00 80 240 20 60 12.00
34
3.7: Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
1 Jaspur i Name of villages connected to the main road by an all-weather road
Najibabad To Jaspur
ii Village's Name provided with electricity Ramnagar,Jaspur,Gudha iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 03
(S) 02
(HS) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
-----
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis N.A
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 03
xiii Name of villages with access to Anganwadi Centre
Jaspur
xiv Cummunity centre, Panchayat Ghar Available
35
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
2 Bhaguwala i Name of villages connected to the main road by an all-weather road
Najibabad To Bhaguwala
ii Village's Name provided with electricity Bhaguwala,Jaspur,Gudha iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Available
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Bhaguwala
xiv Cummunity centre, Panchayat Ghar Available
36
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
3 Gudha 1st i Name of villages connected to the main road by an all-weather road
Najibabad To Gudha
ii Village's Name provided with electricity Gudha iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
N/A
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Gudha
xiv Cummunity centre, Panchayat Ghar Available
37
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
4 Prempur i Name of villages connected to the main road by an all-weather road
Najibabad To Prempur
ii Village's Name provided with electricity Prempur ,Niyamatpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
-----
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Prempur
xiv Cummunity centre, Panchayat Ghar Available
38
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
5 Gudha 2nd i Name of villages connected to the main road by an all-weather road
Najibabd To Gudha
ii Village's Name provided with electricity Gudha
iii No. of households without access to drinking water
-
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
-------
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Gudha
xiv Cummunity centre, Panchayat Ghar Available
39
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
6 Moh Alampur i Name of villages connected to the main road by an all-weather road
Najibabd To Moh Alampur
ii Village's Name provided with electricity Rehmapur.Jadopur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
----------
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Rehmapur Jaspur
xiv Cummunity centre, Panchayat Ghar Available
40
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
7 Vijaypur i Name of villages connected to the main road by an all-weather road
Najibabad To Vijaypur
ii Village's Name provided with electricity Prempur.veerpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
---------
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Prempur Vijaypur
xiv Cummunity centre, Panchayat Ghar Available
41
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
8 Gulalawali i Name of villages connected to the main road by an all-weather road
Najibabad To Gulalwali
ii Village's Name provided with electricity Gulalwali,Prempur,Veerpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
---------
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Prempur
xiv Cummunity centre, Panchayat Ghar Available
42
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
9 Veerpur 2nd i Name of villages connected to the main road by an all-weather road
Najibabad To Veerpur
ii Village's Name provided with electricity Sahanpur Nanu ,veerpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Najibabad
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Sahanpur N.P
xiv Cummunity centre, Panchayat Ghar Available
43
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
10 Veerpur 1st i Name of villages connected to the main road by an all-weather road
Najibabad To veerpur 1st
ii Village's Name provided with electricity Veerpur,Sahanpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Najibabad
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Sahanpur N.P
xiv Cummunity centre, Panchayat Ghar Available
44
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
11 Sahanpur N.P i Name of villages connected to the main road by an all-weather road
Najibabad To Shahanpur N.P
ii Village's Name provided with electricity Sahanpur,vijaypur,Amanullahpur iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) 01
(VI) 01
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Sahanpur
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks 01 ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries
N.A
xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Sahanpur
xiv Cummunity centre, Panchayat Ghar Available
45
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
12 Pooranpur Gadhi 1st
i Name of villages connected to the main road by an all-weather road
Najibabad To Pooranpur Gadhi
ii Village's Name provided with electricity Rampur Mangal.Pooranpur Gadhi
iii No. of households without access to drinking water
-
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
-------
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Pooranpur Gadhi.Rampur Mangal
xiv Cummunity centre, Panchayat Ghar Available
46
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
13 Rampur Mangal i Name of villages connected to the main road by an all-weather road
Najibabad To Rampur Mangal
ii Village's Name provided with electricity Bijori.Rampur Mangal iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 02
(H) -
(VI) -
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Najibabad
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Rampur Mangal .Bijori
xiv Cummunity centre, Panchayat Ghar Available
47
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
14 Bijori i Name of villages connected to the main road by an all-weather road
Najibabad To Bijori
ii Village's Name provided with electricity Bijori,Meduwala iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 04
(S) 03
(H) -
(VI) 01
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Najibabad
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Bijori.Meduwala
xiv Cummunity centre, Panchayat Ghar Available
48
Details of infrastructure in IWMP-I, Bijnor .
Sr. No
Name of Micro Watershed
Parameters Status
15 Rehmapur i Name of villages connected to the main road by an all-weather road
Najibabad ToRehmapur
ii Village's Name provided with electricity Rehmapur.Vijaypur,Jatpura iii No. of households without access to drinking
water -
iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)
(P) 03
(S) 02
(H) -
(VI) 01
v Names of villages with access to Primary Health Centre
Available -01
vi Names of villages with access to Veterinary Dispensary
Najibabad
vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/
mandis Available
x Names of villages with access to Agro-industries
N.A
xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) -
(S) -
(PA) -
(O) 04
xiii Name of villages with access to Anganwadi Centre
Rehmapur.Jatpura
xiv Cummunity centre, Panchayat Ghar Available
49
3.8: Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRIs Other Pvt. persons
Govt. (Specify dept
PRI Other
1
JASPUR
Wasteland/ degraded land 214.70 - - - 214.70 - - - Pastures - - - - - - - Orchards - - - - - - - Village Woodlot - - - - - - - Forest - - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 Community Buildings - - 1.30 - - - 1.30 Weekly Markets - - - - - Permanent markets - - - - - Temples/ Places of worship - - 0.60 - - - 0.60 Habitat, Chakmarg, Sector, Road etc
- 12.10 - - -
Total 214.70 12.10 2.50 - 214.70 - - 2.50
50
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRIs Other Pvt. persons
Govt. (Specify dept
PRI Other
2
Bhaguwala
Wasteland/ degraded land 512.85 - - - 512.85 - - - Pastures - - 0.60 - - 0.60 - Orchards - - - - - - - Village Woodlot - - - - - - - Forest - - - - - - - Village Ponds/ Tanks - - 1.10 - - 1.10 - Community Buildings - - 1.70 - - 1.70 - Weekly Markets - - - - - Permanent markets - - - - - Temples/ Places of worship - - 0.60 - - 0.60 - Habitat, Chakmarg, Sector, Road etc
- 10.20 - - -
Total 512.85 10.20 4.00 - 512.85 - 4.00 -
51
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRIs Other Pvt. persons
Govt. (Specify dept
PRI Other
3
Gudha 1st
Wasteland/ degraded land 143.50 - - - 143.50 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - - - Village Ponds/ Tanks - - 1.02 - - - 1.02 - Community Buildings - - 2.00 - - - 2.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - - 0.78 - - - 0.78 - Habitat, Chakmarg, Sector, Road etc
- 10.20 - - - -
Total 143.50 10.20 3.80 - 143.50 - 3.80 -
52
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
4
Prempur
Wasteland/ degraded land 259.24 - - - 259.24 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.15 - - - 1.15 - Community Buildings - - 2.00 - - - 2.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 8.70 0.54 - - - 0.54 - Habitat, Chakmarg, Sector, Road etc
- - - - -
Total 259.24 8.70 3.69 - 259.24 - 3.69 -
53
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
5
Gudha 2nd
Wasteland/ degraded land 268.77 - - - 268.77 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.10 - - - 1.10 - Community Buildings - - 3.00 - - - 3.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.50 - - - 0.50 - Habitat, Chakmarg, Sector, Road etc
- 10.50 - - - -
Total 268.77 10.50 4.60 - 268.77 - 4.60 -
54
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
6
Moh Alampur
Wasteland/ degraded land 289.64 - - - 289.64 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.10 - - - 1.10 - Community Buildings - - 0.85 - - - 0.85 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 1.05 - - - 1.05 - Habitat, Chakmarg, Sector, Road etc
- 8.10 - - - -
Total 289.64 8.10 3.00 - 289.64 - 3.00 -
55
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
7
Vijaypur
Wasteland/ degraded land 184.74 - - - 184.74 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 2.10 - - - 2.10 - Community Buildings - - 1.05 - - - 1.05 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.90 - - - 0.90 - Habitat, Chakmarg, Sector, Road etc
- 9.20 - - - -
Total 184.74 9.20 4.05 - 184.74 - 4.05 -
56
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
8
Gulalwali
Wasteland/ degraded land 145.75 - - - 145.75 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.00 - - - 1.00 - Community Buildings - - 2.10 - - - 2.10 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 1.00 - - - 1.00 - Habitat, Chakmarg, Sector, Road etc
- 10.70 - - - -
Total 145.75 10.70 4.10 - 145.75 - 4.10 -
57
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
9
Veerpur 2nd
Wasteland/ degraded land 194.43 - - - 194.43 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 - Community Buildings - - 1.50 - - - 1.50 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.60 - - - 0.60 - Habitat, Chakmarg, Sector, Road etc
- 7.60 - - - -
Total 194.43 7.60 2.70 - 194.43 - 2.70 -
58
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
10
Rehmapur
Wasteland/ degraded land 562.33 - - - 562.33 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.80 - - - 0.80 - Community Buildings - - 1.60 - - - 1.60 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc
- 15.10 - - 15.10 -
Total 562.33 15.10 3.20 - 562.33 15.10 3.20 -
59
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
11
Veerpur 1st
Wasteland/ degraded land 301.87 - - - 301.87 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.00 - - - 1.00 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc
- 10.20 - - 10.20 -
Total 301.87 10.20 3.00 - 301.87 10.20 3.00 -
60
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
12
Sahanpur N.P
Wasteland/ degraded land 119.58 - - - 119.58 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.50 - - - 0.50 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.70 - - 0.70 - Habitat, Chakmarg, Sector, Road etc
- 8.80 - - 8.80 -
Total 119.58 8.80 2.40 - 119.58 8.80 2.40 -
61
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
13
Pooranpur Gadhi
Wasteland/ degraded land 208.14 - - - 208.14 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.50 - - - 0.50 - Community Buildings - - 1.10 - - - 1.10 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.70 - - 0.70 - Habitat, Chakmarg, Sector, Road etc
- 10.20 - - 10.20 -
Total 208.14 10.20 2.30 - 208.14 10.20 2.30 -
62
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
14
Rampur Mangal
Wasteland/ degraded land 154.08 - - - 154.08 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc
- 9.10 - - 9.10 -
Total 154.08 9.10 2.60 - 154.08 9.10 2.60 -
63
Details of common property resources In IWMP-I, Bijnor ,
Sr. No
Names of MWS with code
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. Revenue
PRI Other Pvt. persons
Govt. (Specify dept
PRI Other
15
Bijori
Wasteland/ degraded land 159.31 - - - 159.31 - - - Pastures - - - - - - - - Orchards - - - - - - - -
Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.40 - - - 0.40 - Community Buildings - - 1.00 - - - 1.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.60 - - 0.60 - Habitat, Chakmarg, Sector, Road etc
- 8.80 - - 8.80 -
Total 159.31 8.80 2.00 - 159.31 8.80 2.00 -
64
3.9: Ground Water Status in IWMP-I, Bijnor
Sr. No.
Name & Code of Micro watershed
Name of Village
Depth of Ground Water Table (Below Ground in Meter
No. of Observation well
Remarks
Before monsoon
After monsoon
1 jaspur Ramnagar .Ramsahaywali .chahsaloono ,Jaspur,Gurda.
8.05 7.00 32
2 Bhaguwala Jaspur.gurda.Bhaguwala.gurda.Kamgarpur. 6.00 5.10 82
3 Gudha 1st Guda 1st
10.60 9.10 32 4 Prempur Guda.Prempur.Niyamqtpur Jatpura khas.Rehmapur. 8.80 7.60 22 5 Gudha 2nd chahsaluno.Guda. 10.60 9.10 36 6 Moh Alampur Prempur.Rehmapur.Jadopur.Lalpur
Bhikka.Rahatpur khurdh.Vijypur.Nangla pithora.Mo Alampur.
7.40 6.30 42
7 Vijaypur Gulalwali.Veerpur.Prempur.Rehmapur.Jadopur. Lalpur Bhikha.
9.50 8.30 34
8 GulalWali Gulalwali.Veerpur.Prempur. 9.50 8.30 24 9 Veerpur 2nd SahanpurNanu.Veerpur.Sahanpur
Santoki.Jadopur.Lalpur Bhikka 10.70 9.20 35
10 veerpur 1st Sahanpur Nanu.Veerpur 10.70 9.20 38 11 Sahanpur N.P Veerpur.Sahanpur SantokiLalpur Bhikka.Sahanpur
N.P.Girdhaba Sahanpur.Amanullahpur.Vijaypur 7.60 6.40 30
12 Puranpur Gadhi 1st
Sahanpur Santoki.Rampur Mangal.Ranipur.LaLpur Bikka.Vijaypur Purqnpur Gadi Villa Atmali.Amanullahpur.Purushottampur.
12.30 10.80 24
13 Rampur Mangal
Sahanpur Nanu.Bijori.Rampur Mangal.Ranipur. 9.50 8.50 40
14 Bijori Meduwala.Mo Amekhanpur Sahanpur Nanu.Bijori 7.90 6.70 29 15 Rehmapur Niyamatpur.Jatpurakhas.Ahmadpur Majeed Thapal
Jatpura Bhooda Rahatpur khurd Mahavatpur Dalpat 10.60 9.40 21
65
3.10: Irrigation Status in IWMP-I,Bijnor
Sr
No
.
Name &
Micro
Watershed
with code
Name of Village
Gross Cultivated Area Net
cultivate
Area
Gross Irrigated Area Net
Erricgated
Area
RainFed
Area Kharif Rabi Zai Total Kharif Rabi Zai Total
1 jaspur Ramnagar .Ramsahaywali
.chahsaloono ,Jaspur,Gurda.
135.00 196.30 15.00 346.30 316.30 22.00 40.00 5.00 67.00 67.00 249.00
2 Bhaguwala Jaspur.gurda.Bhaguwala.gurda.K
amgarpur.
410.00 417.18 827.18 787.18 80.00 104.00 - 184.00 184.00 603.00
3 Gudha 1st
Guda 1st
102.00 129.46 231.46 216.48 30.00 40.00 - 70.00 70.00 146.48
4 Prempur Guda.Prempur.Niyamqtpur
Jatpura khas.Rehmapur.
180.10 238.03 418.13 398.13 20.00 38.00 - 58.00 58.00 340.13
5 Gudha 2nd
chahsaluno.Guda. 190.00 218.50 25.00 433.50 403.50 32.00 40.00 - 72.00 72.00 331.50
6 Moh
Alampur
Prempur.Rehmapur.Jadopur.Lal
pur Bhikka.Rahatpur
khurdh.Vijypur.Nangla
pithora.Mo Alampur.
160.00 175.40 17.00 362.40 342.40 40.00 54.00 - 99.00 99.00 243.40
7 Vijaypur Gulalwali.Veerpur.Prempur.Reh
mapur.Jadopur.
Lalpur Bhikha.
140.00 157.58 297.98 277.98 30.00 39.00 - 69.00 69.00 208.98
8 GulalWali Gulalwali.Veerpur.Prempur. 102.00 109.09 22.00 235.09 225.09 20.00 32.00 - 52.00 52.00 173.09
9 Veerpur 2nd
SahanpurNanu.Veerpur.Sahanp
ur Santoki.Jadopur.Lalpur Bhikka
142.00 171.61 313.61 302.61 40.00 44.00 - 84.00 84.00 218.61
10 veerpur 1st
Sahanpur Nanu.Veerpur 215.00 248.89 23.00 486.09 460.89 40.00 45.00 - 85.00 85.00 375.89
11 Sahanpur
N.P
Veerpur.Sahanpur SantokiLalpur
Bhikka.Sahanpur N.P.Girdhaba
Sahanpur.Amanullahpur.Vijaypu
r
140.00 152.66 5.00 297.66 277.66 30.00 30.00 - 60.00 60.00 217.66
12 Puranpur
Gadhi 1st
Sahanpur Santoki.Rampur
Mangal.Ranipur.LaLpur
Bikka.Vijaypur Purqnpur Gadi
Villa
Atmali.Amanullahpur.Purushott
ampur.
220.00 265.32 - 485.32 455.32 30.00 38.00 - 68.00 68.00 387.32
66
13 Rampur
Mangal
Sahanpur Nanu.Bijori.Rampur
Mangal.Ranipur.
120.00 128.53 - 248.53 236.53 44.00 50.00 - 94.00 94.00 142.53
14 Bijori Meduwala.Mo Amekhanpur
Sahanpur Nanu.Bijori
125.00 131.96 - 256.96 236.98 32.00 44.00 - 76.00 76.00 160.96
15 Rehmapur Niyamatpur.Jatpurakhas.Ahmad
pur Majeed Thapal Jatpura
Bhooda Rahatpur khurd
Mahavatpur Dalpat
440.00 466.99 - 906.99 854.99 50.00 55.00 - 105.00 105.00 749.99
67
3.11: Source wise Area Irrigated in IWMP-I,Bijnor (area in ha
Sr.
No
.
Name
&Micro
watershed
with
code
Name of Village Canala
rea
State Tube
wells
Tanks Open Well Bore wells Lift
Irrigation
Othres
(specify)
total
Irrigati
on
Remark
No Area No Area No Area No Area No Area
1 jaspur Ramnagar
.Ramsahaywali
.chahsaloono
,Jaspur,Gurda.
- - 3 5.00 29 62.00 - - - - 67.00
2 Bhaguwala Jaspur.gurda.Bhagu
wala.gurda.Kamgar
pur.
- 1 20. - 2 4.00 82 160.00 - - - - 204.00
3 Gudha 1st
Gudha 1st
- - - - 32 70.00 - - - - 85.00
4 Prempur Guda.Prempur.Niya
mqtpur Jatpura
khas.Rehmapur.
- - - 12.00 22 58.00 - - - - 80.00
5 Gudha 2nd
chahsaluno.Gudha. - - 1 2.00 35 70.00 - - - - 87.00
6 Moh
Alampur
Prempur.Rehmapur.
Jadopur.Lalpur
Bhikka.Rahatpur
khurdh.Vijypur.Nan
gla pithora.Mo
Alampur.
- 1 15 - 1 2.00 41 82.00 - - - - 99.00
7 Vijaypur Gulalwali.Veerpur.P
rempur.Rehmapur.J
adopur.
Lalpur Bhikha.
- - 2 4.00 32 65.00 - - - - 79.00
8 GulalWali Gulalwali.Veerpur.P
rempur. - - 11.00 24 52.00 - - - - 71.00
9 Veerpur 2nd
SahanpurNanu.Veer
pur.Sahanpur
Santoki.Jadopur.Lal
pur Bhikka
- 1 10 - 2 4.00 36 70.00 - - - - 96.00
68
10 veerpur 1st
Sahanpur
Nanu.Veerpur - 1 15 - 4 - 35 70.00 - - - - 93.00
11 Sahanpur
N.P
Veerpur.Sahanpur
SantokiLalpur
Bhikka.Sahanpur
N.P.Girdhaba
Sahanpur.Amanulla
hpur.Vijaypur
28.00 - 4 8.00 30 60.00 - - - - 96.00
12 Puranpur
Gadhi 1st
Sahanpur
Santoki.Rampur
Mangal.Ranipur.LaL
pur Bikka.Vijaypur
Purqnpur Gadi Villa
Atmali.Amanullahpu
r.Purushottampur.
8.00 1 20 - 3 8.00 24 48.00 - - - - 82.00
13 Rampur
Mangal
Sahanpur
Nanu.Bijori.Rampur
Mangal.Ranipur.
10.00 1 15.00 - 3 6.00 40 82.00 - - - - 113.00
14 Bijori Meduwala.Mo
Amekhanpur
Sahanpur
Nanu.Bijori
8.00 1 15 - - - 29 61.00 - - - - 84.00
15 Rehmapur Niyamatpur.Jatpura
khas.Ahmadpur
Majeed Thapal
Jatpura Bhooda
Rahatpur khurd
Mahavatpur Dalpat
7.00 - - - 51 105.00 - - - - 112.00
69
Chapter- 4
Institutional Building & Project Managment
70
INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT Project Implementing Agency
The Project Implementing Agency (PIA) is Soil Conservation Officer, Department of Land Development and Water Resources, IWMP-I, Bijnor,
Uttar Pradesh. The PIA was given responsibility to develop the micro-watershed by District Watershed Development Unit (DWDU) and State Level Nodal
Agency (SLNA) considering its vast experiences in handling land and water management issues in the region. The PIA has well experienced trained and
sufficient staff to handle the watershed management programme efficiently. Most of the staff of PIA has exposure of several watershed projects. In
addition the PIA has access for technical backstopping from the ICAR viz. IGFRI and NRCAF, and KVK located at Bijnor . Details of PIA are presented in
subsequent section.
4.1 : Details of Project Implementing Agency (PIA), IWMP-I, Bijnor
Sr. No. Particulars of PIA
(i) Date of selection of PIA 16-03-2010
(ii) Type of organization State Govt. Agency
(iii) Name of organization Department of Land Development and Water Resources, Uttar Pradesh
(iv) Designation & Address
Unit Bijnor
Bhoomi Sanrakshan Adhikari, Land Development and Water Resources, Chandpur at
BIJNOR (U.P.)
(v) Telephone BSA- 07376757856
(vi) Fax 01342-260938
(vii) E-mail [email protected]
71
Detail of staff at PIA, IWMP- Ist BIJNOR
Sr. No. Designation Name M/F Qualification Field of Experience & Period
Remarks
1 B.S.A. Er. R.K. Ram M Diploma in Ag Eng. 25 -
2 Junior Engineer Er. S.D Goel M Diploma in civil Eng. 31
3 Junior Engineer Er. V.P. Singh M Diploma in Ag Eng. 31
4 Accountant Sh. Prdeep kumar Agarwal M M.Com 31
5 Draftmen Ram Shankar M Graduate 32
6 Junier Clerk Sh.krishan kumar tiwari M High School
7 ASCI Jai Bhagwan M ” 33
8 ASCI R.K. Pathak M Inter Diploma 33
9 ASCI S.S. Punia M Graduate Diploma 32
10 ASCI Devendra Singh M Inter Diploma 31
11 ASCI Aman kumar M MSc (Ag) 8
12 ASCI Sanjay Kumar M BSc (Ag) & MA 3 Months
13 ASCI Shashi Kant Tyagi M BSc (Ag) 3 Months
14 Jiledar Sh.Mohan lal M Intermedeate (canal Law)
15 Seench Parcakshak Gore Lal M Intermediate 26
16 Seench Pal Shyam Bihari Yadav M B.A. 26
17 Seench Pal Chote lal M MSc. 8
18 Seench Pal Avdesh Prasad M M.A. 8
19 IV Class Brajpal Sharma M VIII 32
20 “” Brajmohan Gupta M ” 21
21 ,, Sh.Ramjilal M High SChool
72
: Details of Watershed Development Team (WDT) in the project area Project- IWMP I PIA- BSA, LDWR, BIJNOR -II District – BIJNOR Sr. No.
Name of WDT member
M/F Age Qualification / Experience
Description of professional training
Role/ Function
Date of appointment of WDT member
1 Shri S.C. Garg M 62 Inter (Ag Diploma) Soil & Water
Conservation
Soil & Water
Conservation
23/12/2011
2 Shri Harpal
Singh
M 63 High school (Ag
Diploma)
Soil & Water
Conservation
Soil & Water
Conservation
06/08/2011
3 Shri Harvendra
Singh
M 30 MSc (Ag) Economics Ag Expert “
4 Shri Arun
Kumar
M 29 MSc.( Ag) Agronomy Ag Expert “
5 Smt.Mamta F 26 B.A Social Worker Social Worker 06/08/2011
73
4.4: Water shed Committee , Gram Panchayat: Jaspur Name of Project: - IWMP-I
Sl. N o.
Name of watershe
d
Name of Gram
Sabha/ GP
Name Designation
M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SHG GP Educa-tional qualification
Function(s) assigned
1 Jaspur Jaspur Babita kaur President F √ √ √ 10TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Gangaram Seceretary M √ √ √ 10TH
Shanty devi Member F √ √ √ 8TH
Subhash ‘’ M √ √ √ 5TH
Bhavani ‘’ M √ √ √ 8TH
Omprakash ‘’ M √ √ √ 10TH
Dharamal ‘’’’ M √ √ √ 8TH
Ramsharan ‘’ M √ √ √ 5TH
Dharampal 2 ‘’ M √ √ 8TH
Harnam ; M √ 5TH
Bala devi ‘’ F √ √ 5TH
74
Water shed Committee , Gram Panchayat: gudha Name of Project: - IWMP-I
Sl. N o.
Name of watershed
Name of
Gram Sabha/
GP
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
2 Gudha1st Gudha JAiprakash President M √ √ √ B.A Implementation
of Watershed programme under the supervision of PIA (as per common guide
lines)
Yogendra
singh
Seceretary M √ √ √ 12TH
Harpal
singh
Member M √ √ √ 10TH
Rode singh ‘’ M √ √ √ √ 5TH
Jagdish
Prasad
‘’ M √ √ √ M.A
Dharma
singh
‘’ M √ √ √ √ 10TH
Dharampal
singh
‘’’’ M √ √ √ 10TH
Bhojraj
singh
‘’ M √ √ √ 10TH
Foolwati ‘’ F √ √ √ 5TH
Begraj
singh
; M √ √ 5TH
Saroj ‘’ F √ √ 5TH
75
Water shed Committee , Gram Panchayat:Bhaguwala Name of Project: - IWMP-I
Sl.
N
o.
Name of
watershed
Name of
Gram
Sabha/ GP
Name Designation M
/F
S
C
ST OB
C/
Ge
n
SF M
F
LF Land
-less
UG SH
G
GP Educa-
tional
qualification
Function(s)
assigned
3 Bhaguwala Bhaguwala Mursat
jaha
President F √ √ √ 10 TH
Implementation
of Watershed
programme
under the
supervision of
PIA (as per
common guide
lines)
Sanjay Seceretary M √ √ √ 12TH
Liyakat Member F √ √ √ 8TH
Sahid ‘’ M √ √ √ √ 10TH
Suresh ‘’ M √ √ 10TH
Khatiba ‘’ M √ √ √ 8TH
Vinita ‘’’’ F √ √ √ 5TH
Najim ‘’ F √ √ √ 8TH
Kalva ‘’ M √ √ √ 8TH
Laxmi ; F √ 8TH
Sumer ‘’ M √ 5TH
76
Water shed Committee , Gram Panchayat: Prempur Name of Project: - IWMP-I
Sl. N o.
Name of watershed
Name of Gram
Sabha/ GP
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
4 Prempur Prempur Jagvindra
singh
President M √ √ √ 10TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Anil
kumar
Seceretary M √ √ √ 12TH ITI
Hukam
singh
Member M √ √ √ 8TH
Mahipal ‘’ M √ √ √ 5 TH
Khajan
singh
‘’ M √ √ √ 8TH
Dhyan
singh
‘’ M √ √ √ 5TH
Amar
singh
‘’’’ M √ √ √ 10TH
Gurmit
singh
‘’ M √ √ √ M.A
Soma ‘’ M √ √ √ 5TH
Geeta
devi
; F √ √ √ 8TH
77
Water shed Committee , Gram Panchayat:Ranipur Name of Project: - IWMP-I
Sl. N o.
Name of watershed
Name of Gram
Sabha/ GP& date of constitution
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional qualification
Function(s) assigned
6 Rampur
Mangal
Ranipur Parul W/o
Manoj
President F √ √ 5TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Jaipal S/o
Rampal
Seceretary M _ √ √ 10TH
Savita W/o
Veer singh
Member F _ √ √ √ -
Sureshna W/o
Raghuveer
‘’ F _ √ √ -
Neeta W/o
Ompal
‘’ F √ √ √ 5TH
Ayodhya W/o
Hetta
‘’ M √ √ √ 5TH
Manoj S/o Jai
Prakash
‘’’’ M √ √ √ 10TH
Ompal S/o
Sitaram
‘’ M √ √ √ 5TH
Vedram S/o
Ghasita
‘’ M √ √ √ 5TH
Rampal S/o
Lallu
; M √ √ √ 5TH
Ghanshyam
S/o Brahmpal
‘’ M _ √ √ √ 5TH
Parshuram S/o
RAmchandra
‘’ M √ 8th
WDT/ASCI
78
Water shed Committee , Gram Panchayat: Rahatpur khurd Name of Project: - IWMP-I
Sl. N o.
Name of Watershed
Name of Gram
Sabha/ GP
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
7 Moh
Alampur
Rahatpur
Khurd
Munni President F √ √ √ 10TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Vikash Seceretary M √ √ √ 12TH
Sitaram Member M √ √ √ 8TH
Omprakash ‘’ M √ √ √ 10TH
Hargovind ‘’ M √ √ √ 8TH
Sunita ‘’ F √ √ √ 10TH
Nootan
Kumar
‘’’’ M √ √ √ 8TH
Manju ‘’ M √ √ √ 5TH
Ratiram ‘’ M √ √ √ 10TH
Birmo ; M √ √ √ 8TH
Dharampal ‘’ M √ √ √ 8TH
79
Water shed Committee , Gram Panchayat: Pooranpur Gadhi Name of Project: - IWMP-I
Sl. N o.
Name of watershed
Name of Gram
Sabha/ GP & Date
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
9 Pooranpur
Gadhi
Pooranpur
Gadhi
03-08-10
Parul W/o Manoj President F √ √ √ 5TH
Implementation of Watershed programme under the supervision of PIA (as per common guide lines)
Manoj S/I Jaiprakash Seceretary M √ √ √ √ 10TH
Yashpal S/o Raghuveer Member M √ √ √ 10th
Praveen S/o Gangoo ‘’ M √ √ √ 8TH
Vijaysingh S/o
Ramprakash
‘’ M √ √ -
Ramesh S/o Ramshanker ‘’ M √ √ √ -
Neela devi S/o Ompal ‘’’’ F √ √ √ 5TH
Baby S/o Jitendra ‘’ F √ √ √ 10TH
Vedram S/o Ghasita ‘’ M √ √ √ 5TH
Shemsher S/o Ghesita ; M √ √ √ 8TH
Ayodhya S/o Hetta ‘’ M √ √ √ 5TH
Savita W/o Veer sinsh ‘’ F √ 8th
WDT/ASCI
80
Water shed Committee , Gram Panchayat: Bijori Name of Project: - IWMP-I
Sl. N o.
Name of Waershed
Name of Gram
Sabha/ GP & date
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
10 Bijori Bijori
05-08-10
Smt Veerbala W/o Dhara
singh
President M √ √ √ √ B.A Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Sh.Khajan singh S/o Jagdisg Seceretary M √ √ √ √ 10TH
Sh.Netram Singh S/o
Banbari
Member M √ √ √ 8TH
Param Singh S/o Bishan
singh
‘’ M √ √ √ 8TH
Santram S/o Lallu Singh ‘’ M √ √ 12TH
Rahtash S/o Ganga Ram ‘’ M √ √ √ 12th
Gopal S/o chulwa ‘’’’ F √ √ √ 5TH
Kranti Devi W/o Rampal ‘’ F √ √ √ -
Santosh Devi W/0 Diwan
Singh
‘’ F √ √ √ 11TH
Ramchandra S/o Baldev ; M √ √ √ 10TH
BAlkishanS/o Sukke ‘’ M √ √ √ 8TH
Rafiq S/o Shakoor ‘’ M √
Papensra S/o Chandan M √
Jagdish S/o Hemprakash M √
81
Water shed Committee , Gram Panchayat:Mussepur Name of Project: - IWMP-I
Sl. N o.
Namo of Watershed
Name of Gram
Sabha/ GP
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
12 Rehmapur Mussepur Sitaram President M √ √ √ 10TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Veersingh Seceretary M √ √ √ 12TH
MayaDevi Member F √ √ √ 8TH
Rajendra ‘’ M √ √ √ 10TH
Mahesh ‘’ M √ √ √ 8TH
Sunnu ‘’ M √ √ √ 10TH
Ramesh ‘’’’ M √ √ √ 8TH
Natthu ‘’ M √ √ √ 10TH
Harpal ‘’ M √ √ √ 10TH
Budhdhu ; M √ √ √ 8TH
Sudesh ‘’ M √ √ √ 8TH
82
Water shed Committee , Gram Panchayat: Vijaypur Name of Project: - IWMP-I
Sl. N o.
Name of Watershed
Name of Gram
Sabha/ GP
Name Designation M /F
S C
ST OB C/ Ge n
SF M F
LF Land -less
UG SH G
GP Educa-tional
qualification
Function(s) assigned
14 VIJAYPUR VIJAYPUR Munni President F √ √ √ 10TH
Implementation of Watershed programme under the supervision of PIA (as per common guide
lines)
Neetu Seceretary F √ √ √ 12TH
Rohtash Member M √ √ √ 8TH
Kusum ‘’ F √ √ √ 8TH
Ravindra ‘’ M √ √ √ 12TH
Sanjeev ‘’ M √ √ √ 9TH
Naresh ‘’’’ M √ √ √ 8TH
Harisingh ‘’ M √ √ √ 10TH
Amar
singh
‘’ M √ √ √ 11TH
Gopal ; M √ √ √ 10TH
Maya
devi
‘’ F √ √ √ 8TH
83
4.5: Village wise details of Self Help Groups (SHGs) in the project area IWMP- I
Project- IWMP I District – Bijnor
Sr.
No.
Name of
MWS
Names of
villages
Total no. of
Constituted/registered
SHGs
No. of members No. of SC/ST
in each
category
No. of OBC
in
each
categor
Date of
formation
of SHGs
With
only
Men
With
only
Women
With
both
Total Categories M F Total M F Total M F Total
1 Jaspur
2B5C1c3c
Jaspur 9 3 - 12 (i) Landless 6 2 8 2 2 4 7 1 8 06/09/11
- (ii) SF - - - - - - - - -
- (iii) MF 3 1 - -- - - - - --
- Total 9 3 12 2 2 4 7 1 8 -
Ramsahaywali 10 1 - 11 (i) Landless 4 1 5 5 1 6 5 - 5 10/05/11
- (ii) SF 2 - 2 - - - - - - -
- (iii) MF 4 - 4 - - - - - - -
- Total 10 1 11 5 1 6 5 - 5
Ramnagar 8 5 - 13 (i) Landless 4 2 6 5 3 8 3 2 5 11/08/11
84
- (ii) SF 3 3 6 - - - - - - -
- (iii) MF 1 - 1 - - - - - - -
- Total 8 5 13 5 3 8 3 2 5 -
2 Bhaguwala
2B5C1c3e
Bhaguwala 2 9 - 11 (i) Landless 2 5 7 - - - - - - 18/09/11
- (ii) SF - 4 4 2 5 7 4 4 -
- (iii) MF - - -
- Total 2 9 11 2 5 7 4 4
Bhaguwala - 11 - 11 (i) Landless - 7 7 - 8 8 - 3 3 05/10/11
- (ii) SF - 4 4 - - - - - -
- (iii) MF - - -
- Total - 11 11 - 8 8 - 3 3
Kamgarpur 10 2 - 12 (i) Landless 8 2 10 5 1 6 5 1 6 05/08/11
- (ii) SF 1 - 1 - - - - - -
- (iii) MF 1 - 1 - -
- Total 10 2 12 5 1 6 5 1 6
3 Gudha 1st
2B5C1c3f
Gudha - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 06/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Gudha 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 12/11/11
- (ii) SF -- - - -- - - - - -
85
- (iii) MF - - - - - - - - -
- Total 11 - 11 11 - 11 - - -
Gudha 8 4 - 12 (i) Landless 3 2 5 5 3 8 3 1 4 20/11/11
- (ii) SF 3 2 5 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 8 4 12 5 3 8 3 1 4
4 Prempur
2B5C1d1b
Prempur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 15/11/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Prempur 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 05/10/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 11 - 11 - - -
Jatpura khas 9 4 - 13 (i) Landless 5 3 8 6 3 9 3 1 4 06/08/11
- (ii) SF 2 1 3 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 9 4 13 6 3 9 3 1 4
5 Gudha 2nd
2B5C1d2a
Gudha - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 07/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
86
- Total - 11 11 - 11 11 - - -
Gudha 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 12/11/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 11 - 11 - - -
Chahsaluno 10 2 - 12 (i) Landless 5 1 6 6 2 8 4 - 4 14/09/11
- (ii) SF 2 1 3 - - - - - -
- (iii) MF 3 - 3 - - - - - -
- Total 10 2 12 6 2 8 4 - 4
6 Moh
Alampur
2B5C1e1a
Moh Alampur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 21/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Rahatpur khurd 12 - - 12 (i) Landless 6 - 6 7 - 7 5 - 5 17/09/11
- (ii) SF 4 - 4 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 12 - 12 7 - 7 5 - 5
Lalpur Bhikka 9 4 - 13 (i) Landless 4 2 6 5 3 8 4 1 5 12/10/11
- (ii) SF 2 1 3 - - - - - -
- (iii) MF 3 1 4 - - - - - -
- Total 9 4 13 5 3 8 4 1 5
7 Vijaypur Vijaypur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 08/08/11
87
2b5C1e1b
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Vijaypur 11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 10/09/11
- (ii) SF 3 - 3 - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 7 - 7 4 - 4
Jadopur 10 2 - 12 (i) Landless 6 2 8 9 2 11 1 - 1 25/09/11
- (ii) SF 2 - 2 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 10 2 12 9 2 11 1 - 1
8 Gulalwali
2B5C1e1c
Gulalwali - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 05/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Gulalwali 14 - - 14 (i) Landless 9 - 9 8 - 8 6 - 6 10/09/11
- (ii) SF 3 - 3 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 14 - 14 8 - 8 6 - 6
Gulalwali 11 - - 11 (i) Landless 6 - 6 8 - 8 3 - 3 25/09/11
- (ii) SF 3 - 3 - - - - - -
88
- (iii) MF 2 - 2 - - - - - -
- Total 11 - 11 8 - 8 3 - 3
9 Veerpur 2nd
2B5C1e2a
Veerpur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 08/04/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Veerpur 11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 10/06/11
- (ii) SF 3 - 3 - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 7 - 7 4 - 4
Lalpur Bhikka - 14 - 14 (i) Landless - 14 14 8 - 8 6 - 6 15/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 14 14 8 - 8 6 - 6
10
Veerpur 1st
2B5C1e2b
Veerpur
-
11
-
11
(i) Landless
-
11
11
-
8
8
-
3
3
02/04/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 8 8 - 3 3
Veerpur 11 - - 11 (i) Landless 4 - 4 4 - 4 7 - 7 11/05/11
- (ii) SF 4 - 4 - - - - - -
89
- (iii) MF 3 - 3 - - - - - -
- Total 11 - 11 4 - 4 7 - 7
Veerpur 8 4 - 12 (i) Landless 6 3 9 5 3 8 3 1 4 06/06/11
- (ii) SF 1 1 2 - - - - - -
- (iii) MF 1 - 1 - - - - - -
- Total 8 4 12 5 3 8 3 1 4
11 Sahampur
N.P
2B5C1e3b
Sahanpur N.P - 12 - 12 (i) Landless - 12 12 - 8 8 - 4 4 06/09/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 12 12 - 8 8 - 4 4
Sahanpur
Santoki
- 11 - 11 (i) Landless - 11 11 - 8 8 - 3 3 25/09/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 8 8 - 3 3
Sahanpur
Santoki
10 2 - 12 (i) Landless 4 2 6 4 2 6 6 - 6 11/10/11
- (ii) SF 4 - 4 - - - - - -
- (iii) MF 2 - 2 - - - - - -
- Total 10 2 12 4 2 6 6 - 6
12 Pooranpur
gadhi 1st
Pooranpur
Gadhi
5 7 - 12 (i) Landless 5 3 8 3 3 6 2 4 6 14/02/11
90
2B5C1e4a
- (ii) SF - 4 4 - - - - - -
- (iii) MF - - - - - - - - -
- Total 5 7 12 3 3 6 2 4 6
Pooranpur
Gadhi
- 11 - 11 (i) Landless - 11 11 - 5 5 - 6 6 16/04/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 5 5 - 6 6
Amanullahpur 11 - - 11 (i) Landless 11 - 11 7 - 7 4 - 4 12/06/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 7 - 7 4 - 4
13 Rampur
Mangal
2b5C1e4c
Rampur
mangal
11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 09/02/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 11 - 11 - - -
Rampur Mangal - 12 - 12 (i) Landless - 11 11 - 6 6 - 6 6 10/04/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 6 6 - 6 6
Rampur Mangal 8 4 - 12 (i) Landless 4 2 6 4 2 6 4 2 6 05/07/11
91
- (ii) SF 2 1 3 - - - - - -
- (iii) MF 2 1 3 - - - - - -
- Total 8 4 12 4 2 6 4 2 6
14 Bijori
2B5C1e4d
Bijori 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 10/02/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total 11 - 11 11 - 11 - - -
Bijori - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 14/04/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Bijori 8 4 - 12 (i) Landless 6 4 10 7 4 11 1 - 1 17/07/11
- (ii) SF 2 - 2 - - - - - -
- (iii) MF - - - - - - - - -
- Total 8 4 12 7 4 11 1 - 1
15 Rehmapur
2B5C1d1a
Rehmapur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 14/08/11
- (ii) SF - - - - - - - - -
- (iii) MF - - - - - - - - -
- Total - 11 11 - 11 11 - - -
Rehmapur 12 - - 12 (i) Landless 6 - 6 7 - 7 5 - 5 08/09/11
- (ii) SF 4 - 4 - - - - - -
92
- (iii) MF 2 - 2 - - - - - -
- Total 12 - 12 7 - 7 5 - 5
Rehmapur 10 2 - 12 (i) Landless 4 2 6 4 2 6 6 - 6 22/09/11
- (ii) SF 3 - 3 - - - - - -
- (iii) MF 3 - 3 - - - - - -
- Total 10 2 12 4 2 6 6 - 6
93
4.6: Details of Self Help Groups (SHGs) in the project area
Project- IWMP I
Sr.
No
Name of
micro
watershed
Name of
village
Name of
group
SHG
Date of
constituti
on
Name of
Adhyaksh
Name of
Sachiv
Total No. of Members Name of
Bank and
Address
Account
No. &Date
Up to
date
Savin
g
Rs.
Group
activities
Women Sc/St Other Total
1 Jaspur
2B5C1c3c
Jaspur Maharani Laxmi
Bai
06/09/11 Sri Vijendra
Singh
Sri Mangal
Singh
3 4 5 12 Under
Process
- Goatary
Ramsahaywali Jai bajrang bali
10/05/11
Sri Gopal
Singh
Sri Prem Kumar 1 6 4 11 Under
Process
- Dairy
Ramnagar Krishna 11/08/11 Sri Kaliram Sri Vedprakash 5 5 3 13 Under
Process
- Dairy
2 Bhaguwala
2B5C1c3e
Bhaguwala Radha
18/09/11 Smt Kusum Smt Beena 9 1 1 11 Under
Process
- Tailring
Bhaguwala Gaytri 05/10/11 Smt kiran Smt
Mamta
11 - - 11 Under
Process
- Tailring
Kamgarpur Ravi 05/08/11 Sri jai singh Sri Ram singh 2 5 5 12 Under - poultry
94
Process
3 Gudha 1st
2B5C1c3f
Gudha Santoshi 06/08/11 Smt Meena Smt Sema 11 - - 11 Under
Process
- Tailring
Gudha Om 12/11/11 Sri Vikram
singh
Sri Lakhan singh - 11 - 11 Under
Process
- Poultry
Gudha Shiv 20/11/11 Sri Shyam
singh
Sri Kallu Singh 4 5 3 12 Under
Process
- Dairy
4 Prempur
2B5C1d1b
Prempur Sarasvati 15/11/11 Smt Rekha Smt Meenu 11 - - 11 Under
Process
- Tailring
Prempur Vaibhav 05/10/11 Sri Vikash Sri Arun - 11 - 11 Under
Process
- Goatary
Jatpura khas Ashish 06/08/11 Sri Rahul Sri Anubhav 4 6 3 13 Under
Process
- Fishring
5 Gudha 2nd
2B5C1d2a
Gudha Maha laxmi 07/08/11 Smt Renu Smt Ritu 11 - - 11 Under
Process
- Tailring
Gudha Sri Ram 12/11/11 Sri Peetam Sri Anand - 11 - 11 Under
Process
- Dairy
Chahsaluno SriKrishana 14/09/11 Sri Rajat Sri komal 2 6 4 12 Under
Process
- Poultry
6 Moh
Alampur
2B5C1e1a
Moh Alampur Durga 21/08/11 Smt Babita Smt Mithless 11 - - 11 Under
Process
- Tailring
Rahatpur Khurd Peer 17/09/11 Mo Alam Mo Yunus - 7 5 12 Under
Process
- Poultry
95
Lalpur bhikka Ravidas 12/10/11 Sri Prem
Kumar
Sri Rajesh Singh 4 5 4 13 Under
Process
- Fishing
7 Vijaypur
2b5C1e1b
Vijaypur Rama Bai 08/08/11 Smt Deepa Smt Suneeta 11 - - 11 Under
Process
- Tailring
Vijaypur Ambedkar 10/09/11 Sri Surendra Sri Harvendra - 7 4 11 Under
Process
- Goatry
Jadopur Yuva dal 25/09/11 Sri Bhopal Sri Suneel 2 9 1 11 Under
Process
- Dairy
8 Gulalwali
2B5C1e1c
Gulalwali Laxmi 05/08/11 Smt Servesh Smt
Sheela
11 - - 11 Under
Process
- Tailring
Gulalwali Mahadev 10/09/11 Sri Virendra Sri Manoj - 8 6 14 Under
Process
- Beekeeping
Gulalwali Bhoola 25/09/11 Sri Charat Sri Teekam - 8 3 11 Under
Process
- Dairy
9 Veerpur 2nd
2B5C1e2a
Veerpur Sangani 08/04/11 Smt Dulari Smt Mamta 11 - - 11 Under
Process
- Tailring
Veerpur Bhem 10/06/11 Sri Charan Sri Harpal - 7 4 11 Under
Process
- Poiltary
Lalpur Bhikka Pratigya 15/08/11 Smt Neelam Smt Ponam 14 - - 14 Under
Process
- Tailring
10 Veerpur 1st
2B5C1e2b
Veerpur Shanti 02/04/11 Smt Rashmi Smt Neha 11 - - 11 Under
Process
- Tailring
Veerpur Gandhi 11/05/11 Sri Ramnath Sri Lala - 4 7 11 Under
Process
- Bekiping
Veerpur Bosh 06/06/11 Sri Nihal Sri Aman 4 5 3 12 Under - Goatiary
96
Process
11 Sahanpur
N.P
2B5C1e3b
Sahanpur N.P Shakuntala 06/09/11 Smt Reena Smt Hema 12 - - 12 Under
Process
- Tailring
Sahanpur
Santoki
Seeta 25/09/11 Smt Sangita Smt Kavita 11 - - 11 Under
Process
- Tailring
Sahanpur
Santoki
Jai Bharat 11/10/11 Sri Gore Lal Sri Avdesh 2 4 6 12 Under
Process
- Dairy
12 Pooranpur
Gadhi
2B5C1e4a
Pooranpur
Gadhi
Milan 14/02/11 Sri Parveen Sri Yashpal 7 4 1 12 P.N.B Bijnor
01-167688
- Dairy
Pooranpur
Gadhi
Parvayi 16/04/11 Smt Beena Smt Lata 11 - - 11 Under
Process
- Tailring
Amanullhpur Jai Hind 12/06/11 Sri Chote Lal Sri Shyam
Bihari
- 7 4 11 Under
Process
- Poiltary
13 Rampur
Mangal
2B5C1e4a
Rampur Mangal Parshuram 09/02/11 Sri lallu Lal Sri Vedu - 11
-
11 Under Process - Goatry
Rampur Mangal Deepika 10/04/11 Smt Kamla Smt Vimla 12 - - 12 Under Process Tailring
Rampur Mangal Ramjanki 05/07/11 Sri
Parshuram
Sri Vedram 4 6 2 12 P.N.B
Najibabad
18340001001
57703
- Poiltary
14 Bijori
2B5C1e4d
Bijori Shankar 10/02/11 Sri Fool
singh
Sri Sooraj Singh - 11 - 11 Under Process - Dairy
97
Bijori Savitri 14/04/11 Smt
Veerbala
Smt Santosh 11 - - 11 Under Process - Tailring
Bijori Shikhar 17/07/11 Sri Nandu Sri Ghashita 4 7 - 11 Under Process - Bekiping
15 Rehmapur
2B5C1d1a
Rehmapur Suchitra 14/08/11 Smt Geeta Smt Reena 11 - - 11 Under Process - Tailring
Rehmapur Bheem rao
Ambedkar
08/09/11 Sri Chaman
singh
Sri magan Singh 7 5 12 Under Process - Dairy
Rehmapur Teg Bahadur 22/09/11 Sri
Raghuveer
Sri Hariom 2 4 6 12 Under Process - Dairy
98
4.8 : Details of Formation of User Groups (UGs) User Groups were formed on the basis of beneficiaries of different natural resource conservation activities to be constructed in the
watershed. The location of the activities/group mentioned in Table 4.8 can be seen on the proposed plan available in the map section. Table :Activity wise formation of user groups
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
1. Jaspur Jaspur Ambedkar 12/09/11 lal singh Surendra - 5 6 11 Under
Process
Rs12/hr Irrigation done
Rampur Mangal
Jai bhem 25/09/11 Fattu
Singh
Ramnath 2 3 8 13 Under
Process
Rs12/hr CropProduction done
Total
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
2 Bhaguwala bhaguwala Yuva 22/08/11 Surendra Virendra - 5 6 11 Under
Process
Rs12/hr Irrigation done
Kamgarpur Bajrang 26/09/11 Bhopendra manoj 2 5 5 12 Under
Process
Rs12/hr CropProduction done
Total
99
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
3 Gudha 1st
Gudha shiv 12/08/11 Veersingh Balvant - 5 6 11 Under
Process
Rs12/hr Irrigation done
Gudha Bhola 04/09/11 Rajesh Gajendra -* 4 8 12 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
4. Prempur Prempur Krishna 15/10/11 Kapil Rohtash - 7 4 11 Under
Process
Rs12/hr Irrigation done
Jatpura khas
Gopal 02/11/11 Balakram mohan - 5 6 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
5
Gudha 2nd
Gudha Mohan 08/10/11 Naresh Tejpal - 6 5 11 Under
Process
Rs12/hr Irrigation done
Chahsaluno Nand 02/11/11 Munesh Ramsingh 1 7 4 12 Under
Process
Rs12/hr CropProduction done
100
. r. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
6. Mo
Alampur
Mo Alampur
Bheem 27/10/11 Ashoke Raju - 6 5 11 Under
Process
Rs12/hr Irrigation done
Lalpur bhikka
Arjun 01/11/11 Sumit Jaipal - 4 7 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
7. Vijaypur Vijaypur ganesh 16/10/11 sohan Rahul - 5 6 11 Under
Process
Rs12/hr Irrigation done
Jadopur Gandhi 02/11/11 Tapraj Dheeraj - 7 4 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
8 Gulalwali Gulalawali
Narayan
27/10/11 Ashoke Raju - 6 5 11 Under
Process
Rs12/hr Irrigation done
Gulalwali Arjun 01/11/11 Sumit Jaipal - 4 7 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro
Name of village
Name of
Date of constitution
Name of Adhyaksh
Name of Sachiv/
Total No. of Members Name of Bank
User Charges
Group Active
Status of Women Sc/ Other Total
101
watershed group Treasurer St and Address
ties User Agree ment
9 Veerpur
2nd
Veerpur Shyam 28/10/11 Kalva Foolsingh - 6 5 11 Under
Process
Rs12/hr Irrigation done
Lalpur Bhikka
Sunder 12/11/11 Rajesh Kripal - 4 7 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
10 Veerpur
1st
Veerpur Kanhaiya 25/10/11 Avdesh Khemsingh - 4 7 11 Under
Process
Rs12/hr Irrigation done
Veerpur Sangam 15/11/11 Praveen Jaisingh - 5 6 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
11 Sahanpur
N.P
Sahanpur N.P
Ganga 24/10/11 Girdhari Omkar - 4 7 11 Under
Process
Rs12/hr Irrigation done
Sahanpur Santoki
Godavri 22/11/11 Manoj Asharam - 5 6 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women
Sc/ St
Other Total
12 Pooranpur Pooranpur Yamuna 12/09/11 Munesh Hetram - 6 5 11 Under Rs12/hr Irrigat done
102
Gadhi Gadhi Process ion
Amanullahpur Brahamputra 21/10/11 Gangu
Singh
Ramprasad 2 5 4 11 Under
Process
Rs12/hr CropP
roduc
tion
done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
13 Rampur
Mangal
Rampur Mangal
Gaytrti 08/10/11 komal Buddhu - 5 6 11 Under
Process
Rs12/hr Irrigation done
Rampur Mangal
Gomti 14/11/11 Ashoke Mukandi - 4 8 12 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
14 Bijori Bijori Ravidas 18/10/11 Manoj Bhagbana - 6 5 11 Under
Process
Rs12/hr Irrigation done
Bijori Javahar 16/11/11 Balveer Perma - 7 5 11 Under
Process
Rs12/hr CropProduction done
Sr. No
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv/ Treasurer
Total No. of Members Name of Bank and Address
User Charges
Group Active ties
Status of User Agree ment
Women Sc/ St
Other Total
15 Rehmapur Rehmapur Surya 21/10/11 AShoke Mukesh - 4 7 11 Under
Process
Rs12/hr Irrigation done
Rehmapur Bhaga
t
Singh
08/11/11 Kalva Nepal - 5 6 11 Under
Process
Rs12/hr CropProduction done
103
Total user Groups -67 Has been Formed -30 Remaining UGs in Process -37
4.9: Convergence in IWMP-I, Bijnor
Several programmes are running in the area which are sponsored by Central and State Govt. and could be converged with watershed programmes. Some of them are listed in Below The details of the activities to be carried out under convergence in the project are mentioned. List of Central/State sponsored schemes
S.No. Name of Programme Implementing Agency Objectives of the Programme
1 Seed Distribution Programme (Pulse Development & ISOPAM
U.P. Agriculture Deptt To increase seed replacement ratio for higher productivity
2 Pump set Distribution (Food Security Mission Agriculture Deptt Providing irrigation
3 Training Programme Agriculture Deptt., KVK District RolarDevelopment in instititute haldaur
Capacity building of the farmers
4 HDPE pipe Agriculture Deptt
5 National Horticulture Mission (NHM) Horticulture Deptt. Increasing the area under fruits and vegetables
6 Sanitation Programme Gram Vikash To make hygienic condition in the rural areas
7 MGNERGA (Bunding, Farm Pond, Adarsh Jalashay, Blast well, Chakroad, etc.)
Gram Panchayat To provide work to the all village personnel under the rojgar guarantee yojana
8 Dept. of Animal Husbandry U.P. Animal Husbandry To improve the productivity of livestock
9 Afforestation Deptt. of Forest U.P.
10 NABARD (Agriculture & SMC Deptt. Of Agriculture
104
Chapter- 5
Capacity Building Plan
105
CAPACITY BUILDING PLAN
The capacity building of various stake holders will be given very high priority as the watershed is to be developed in
participatory mode. Capacity building initiative plays very important role in human resource development of watershed.
List of identified training institutes for capacity building.
Sl.No.
Name of Training institute
Address Designation of the Head of institute
Type of Institute
Area(s) of specialization
No. of training
assigned
No. of persons to be trained
Allocation to be made to the institute
1 2 3 4 5 6 7 8 9 1 Pandit
Deendayal Upadhyay Gram vikas Sansthan
Bakshi ka Talab Lucknow
Director General/ Principal
State Level Soil & Watershed Management, Agriculture, Horticulture,
Production System, Livelihood for landless
person, Animal Husbandary etc.
01 02 Bakshi ka Talab
Lucknow
2 S.B.B.P. Agriculture Univercity
KVK Nagina Director PIA 02 200 At village Level
Training to stakeholders on participatory watershed management
Sl. No.
Client Group
Title of the programme / duration / time
Objectives Coverage / Topics
Training methedology
Training institutions
1 PIA 1- 1 to 5 days/ 10.00 am
to 5.00 pm
2- 1 to 2 days/ 10.00 am
to 5.00 pm
Training
Orientation,
Livelihood,
enterprises,
Waterhsed
Management etc.
Skill
Development
Pandit Deendayal Upadhyay
Gram vikas Sansthan, Bakshi
ka Talab Lucknow , S.B.B.P.
Agriculture Univercity Meerut
2 WDT
3 WC
106
Table 5.3: Capacity Building Plan
Level of Stake Holder
2009-10 2010-11 2011-12 2012-13 2013-14
Total
Target
(no.)
Trainin
g/
Person
Achiev
ment
(no.)
Trainin
g/
Person
Target
(no.)
Training/
Person
Achiev
ment
(no.) Training/
Person
Target
(no.) Training
/Person
Achiev
ment
(no.)
Training
/Person
Target
(no.)
Training/Perso
n
Target
(no.)
Training/Pers
on
Target
(no.)
Training/
Person
Achiev
ment
(no.)
Training/
Person
SLNA Level - - - - - - - - - -
District Level - - - - - - - - - -
PIA Level - - 01/12 01/02 01/03 01/03 - -
WDT Level - - 01/05 - 02/05 02/05 - -
WC Level - - 8/910 02/200 5/520 - 05/542 -
Other - - 1/03 - 02/02 02/02 -
TOTAL - - 11/930 03/202 10/530 05/10 05/542
107
Detail of Institution Capacity Building Annual Action Plan
First Yeat Second Year Third Year Fourth year G. Total
S.
No.
Level Total
No. of
Person
No of
Person
to be
Trained
No. of
Training
to be
conduct
e
Trainin
g days
Tota
l
cost
Rs in
Lakh
No of
Perso
n to
be
Traine
d
No. of
Training
to be
conduct
e
Traini
ng
days
Total
cost
Rs in
Lakh
No of
Person
to be
Traine
d
No. of
Training
to be
conduct
e
Trai
nin
g
day
s
Total
cost
Rs in
Lakh
No of
Perso
n to
be
Train
ed
No.
of
Train
ing
to be
cond
ucte
Train
ing
days
Total
cost
Rs in
Lakh
Per
son
Cost
Rs in
Lakh
1 SLNA - - - - 0.91 - - - - - - - 0.45 - - - - - 1.36
2 WCDC 15 15 1 3 0.45 15 1 2 0.30 15 1 2 0.30 - - - - 45 1.05
3 PIA 18 18 1 3 0.54 18 1 2 0.36 18 2 3 1.08 18 1 2 0.36 72 2.34
4 WDT 5 5 1 3 0.09 5 1 3 0.09 5 1 3 0.09 5 1 2 0.06 20 0.33
5 SHG'S 86 172 2 5 1.72 172 2 2 0.69 172 2 3 1.03 102 1 1 1.02 618 4.46
6 UG'S 77 154 2 1 0.92 154 2 1 0.92 154 2 3 2.77 100 1 1 0.30 562 4.91
7 WC 10 110 4 1 2.20 110 1 1 0.55 110 2 1 1.10 110 1 1 0.55 440 4.40
8 OTHER - 800 1 1 2.40 500 1 1 1.50 - - - - 40 1 1 0.12 134
0
4.02
9 TOTAL 1274 9.23 974 4.41 474 6.82 335 2.41 309
7
22.8
7
108
Chapter- 6
Entry Point Activities
109
6.1: Entry Point Activities (EPA) Entry point activities were executed with the consent of stake holders and it helped in winning the confidence of the villagers for moving ahead the other programmes of watershed. In total 18 EPA activities were executed in the project area which costed Rs. 2973120.00. Photographs of entry point activities done in the project are given below:
Name of PIA
Name of Project
Year Name of Block
Name of project/ Name of village
Code of project
E.P.A cost in lakh
Detail of Works
1 2 3 4 5 6 7 8
LDWR I Bijnor IWMP I 2009-10 Nijibabad jaspur 2B5C1c3c 1.05 Road and pulia mentinence
Bhaguwala 2B5C1c3a 2.48 mentinence of culvert Road mentinence soil filing in
Vetantery Hospital
Gudha 1st
2B5C1c3f 0.68 kharanja and pulia mentence
Prempur 2B5C1d1b 1.24 E.W in schoool
Gudha 2nd
2B5C1d2a 1.29 kharanja
Moh Alampur 2B5C1e1a 1.39 Road Mentinence
Vijaypur 2B5C1e1b 0.88 kharanja mentinence
GulalWali 2B5C1e1c 0.69 E.W in school
Veerpur 2nd
2B5C1e2a 0.96 Kharanja nirman
veerpur 1st
2B5C1e2b 1.49 Kharanja nirman filing in school
Sahanpur N.P 2B5C1e3b 0.58 EW filing in Barat Ghar And Floor
Puranpur Gadhi 1st
2B5C1e4a 1.45 E w filling in DharamshalaAnd school
Rampur Mangal 2B5C1e4c 0.73 E W filling in school and road
Bijori 2B5C1e4d 0.76 E W filling in school and Boundry and C C road
Rehmapur 2B5C1d1a 2.69 E W filling in school and Boundry and panchayat ghar
Total 18.30
6.2: Works Phase
110
Following are the major problems of the watersheds
� Water scarcity both for drinking as well as irrigation
� Excess runoff and soil loss
� Low water holding capacity of the soil
� Low productivity of crops
� Low fertility of soil
� Low cropping intensity
� Lack of technical knowledge
� Anna Pratha (let loose system of cattle)
� Poor vegetative cover
� Poor/low productive breeds of miltch animals
� Lack of feed & fodder availability
� Non availability of wood/fuel
� Lack of proper market facilities
� Low income of the households
� Lack of employment opportunity.
Estimation of Runoff from the Watershed Runoff from the watershed is estimated by Curve Number method of the Soil Conservation Service of the USDA using 18 years data (1994-2009) with a gap of 2005 and 2006). It is estimated that runoff potential of the project area is 620 mm, equivalent to 21 per cent of average annual rainfall. Expected runoff and soil loss from the project area are depicted
Runoff and soil erosion in the project area (IWMP-I,Bijnor)
Sr. No. Name of Micro Watershed
Cause Type of erosion Area affected (ha) Run off (mm/ year)
Average Soil Loss (Tonnes/ ha/ year)
1 Jaspur
Water erosion
a Sheet 105.45 621 16.50 b Rill 74.90 c Gully 34.35 Total 214.70 2 Bhaguwala
Water erosion
a Sheet 255.85 621 16.50 b Rill 180.00
111
c Gully 77.00 Total 512.85 3 Gudha 1st
Water erosion
a Sheet 74.50 621 16.50 b Rill 47.00 c Gully 22.00 Total 143.50 4 Prempur
Water erosion
a Sheet 129.89 621 16.50 b Rill 90.50 c Gully 38.85 Total 259.24 5 Gudha 2nd
Water erosion
a Sheet 134.77 621 16.50 b Rill 93.80 c Gully 40.20 Total 268.77 6 Moh Alampur
Water erosion
a Sheet 153.64 621 16.50 b Rill 92.50 c Gully 43.50 Total 289.64 7 Vijaypur
Water erosion
a Sheet 92.84 621 16.50 b Rill 64.40 c Gully 27.50 Total 184.74 8 Gulalwali Water erosion
112
a Sheet 72.95 621 16.50 b Rill 52.40 c Gully 20.40 Total 145.75 9 Veerpur 2nd
Water erosion
a Sheet 99.83 621 16.50 b Rill 65.50 c Gully 29.10 Total 194.43 10 Veerpur 1st
Water erosion
a Sheet 151.87 621 16.50 b Rill 105.00 c Gully 45.00 Total 301.87 11 Sahanpur N.P
Water erosion
a Sheet 60.58 621 16.50 b Rill 41.50 c Gully 17.50 Total 119.58 12 Pooranpur Gadhi
Water erosion
a Sheet 146.21 621 16.50 b Rill 110.00 c Gully 45.00 Total 301.21 13 Rampur Mangal
Water erosion
a Sheet 77.08 621 16.50 b Rill 54.00 c Gully 23.00 Total 154.08
113
14 Bijori
Water erosion
a Sheet 84.31 621 16.50 b Rill 51.00 c Gully 24.00 Total 159.31 15 Rehmapur
Water erosion
a Sheet 284.33 621 16.50 b Rill 197.00 c Gully 81.00 Total 562.33
114
6.2 A : Watershed Development Activities Proposed : Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of Measures/Activitie
Uni JASPUR BHAGUWALA GUDHA 1st PREMPUR GUDHA 2nd Total
No., Length/
ha, Volum
Qanty Cost Qanty Cost Qanty Cost Qanty
Cost Qanty
Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - - - 2. Contour Bund (with Sodding) cum. 10575 4.23 26250 10.50 5732 2.24 5502 2.15 5374 2.10 3.Marginal Bund/PB cum. 9075 3.63 22750 9.10 9724 3.80 2195
5 8.58 2367
0 9.25
B- Water Resource Development
1. Tank/Pond No 1 0.65 - - - - - - - - 1a - Water storing capacity cum. 1875.0
0 - - - - - - - - -
1b- Area proposed for irrigation ha 4.00 - - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 1003 4.50 20800 9.36 5838 2.83 1041
7 5.05 9922 4.81
2a- Water storing capacity cum.
2b- Area proposed for irrigation ha - - - - - - - - - - 3. Check Dam / Drop Spill Way No. 8 1.00 17 2.50 6 0.60 14 1.32 10 1.08 3a- Water storing capacity cum. 2200 - 5800 - 1300 - 3200 - 4000 - 3b. Area proposed for irrigation ha 3.00 - 8.00 - 5.00 - 8 - 8.00 - Total 14.01 31.46 9.47 17.10 17.24 89.28
115
F JASPUR BHAGUWALA GUDHA 1st
PREMPUR GUDHA 2nd
Total
Total 14.01 31.46 9.47 17.10 17.74 89.28
Agroforestry
Plants
Ukeliptis ha 8.00 0.41 15.00 0.75 1.40 0.07 2.00 0.10 2.00 0.11
Sheesham And Seeras ha - - 15.00 0.75 1.00 0.05 2.10 0.12 1.89 0.09
Horticulture
Mango ha - - 8.00 0.75 0.50 0.05 0.5 0.05 1.20 0.12
Guava ha - -- 7.50 0.75 - - 0.50 0.05 - -
Total 14.42 34.46 9.64 17.42 18.06 94.00
Livelihood for landless People No. of SHGs/ No. of beneficiaries
-- -- -- -- -- -- -- -- -- --
1. Goatary do -- -- 1/11 0.25
2. Back Yard Poultry do -- -- 1/12 0.25
3. Poultry (Broiler) do -- -- 1/11 0.25 1/12 0.25
4. BeeKeeping do -- --
5. Dairy do 2/24 0.50 2/22 0.50 1/12 0.25 1/11 0.25
6. Tailoring do 1/12 0.25 -- -- 1/11 0.25 1/11 0.25 1/11 0.25
7. Fishries do -- -- -- -- -- -- 1/13 0.25
8. Vermi composting do -- -- -- -- -- -- -- -- -- --
9. Fruit Processing do -- -- -- -- -- -- -- -- -- --
10. Mini Dal Mill do -- -- -- -- -- -- -- -- -- --
11. Mini flour Mill do -- -- -- -- -- -- -- -- -- --
12. Mini Oil Expeller do -- -- -- -- -- -- -- -- -- --
13. Carpentry do -- -- -- -- -- -- -- -- -- --
Total 3/36 0.75 3/34 0.75 3/34 0.75 3/35 0.75 3/34 0.75 3.75
116
iii Agriculture Production and micro enterprises System
Jaspur BhagooWala Guda 1st Prempur Guda 2nd Total in lakh
A- Crop Demonstrations- (Crop Wise)
1.Wheet No. of farmers /Area (ha)
15/6.00 0.30 40/16.00 0.80 11/4.40 0.23 20/8.00 0.40 20/8.00 0.41
2.Paddy No. of farmers /Area (ha)
17/608 0.34 35/14.00 0.70 10/4.00 0.20 19/7.60 0.38 20/8.00 0.40
B.Seed Distribution
Ha/Rupees 20.00 0.78 45.00 1.80 13.00 0.52 23.25 0.93 24.20 0.97
C.Agroforestry - - -
Ha/Rupees 0.21 0.64 50.00 1.50 14.35 0.43 26.00 .078 26.90 0.81
D.Green manuring
Ha/Rupees 17.00 0.51 45.00 1.35 11.35 0.34 20.70 0.62 21.33 0.64
Total 2.57 6.15 1.72 3.11 3.23 16.78
117
Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of Measures/Activitie
Uni Veerpur 1st
Sahanpur Poranpur Gadhi Rampur Mangal Bijori Total in lakh No.,
Length/ ha, Volum Qanty Cos
t Qanty Cost Qanty Cost Qanty Cost Qanty Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - 819 3.20 - - - - 2. Contour Bund (with
Sodding) cum. 14325 5.73 6175 2.47 12795 5.00 3900 1.52 7512 2.93
3.Marginal Bund/PB cum. 14850 5.94 5275 2.11 14359 5.61 8060 3.15 7572 2.96
B- Water Resource Development
1. Tank/Pond No
1a - Water storing capacity cum.
1b- Area proposed for irrigation
ha
2- Water Harvesting Bundhi/GP
cum. 17200 7.74 4800 2.16 13760 6.67 9695 4.70 7467 3.62
2a- Water storing capacity cum.
2b- Area proposed for irrigation
ha
3. Check Dam / Drop Spill Way
No. 9 0.90 6 0.58 24 2.17 12 1.00 12 1.00
3a- Water storing capacity cum. 1800 - 1200 - 6600 - 3600 - 3600 -
3b. Area proposed for irrigation
ha 2.00 - 1.50 - 8.50 - 5.50 - 4.20 -
Total 20.31
7.32 19.45 9.37 10.51 71.16
118
B. F Veerpur 1st
Sahanpur np Poranpur Gadhi
Rampur Mangal
Bijori Total in lakh
Total 20.31 7.32 19.45 9.37 10.51 66.96
Agroforestry Plants Ukeliptis ha - - 3.00 0.16 3.00 0.15 1.50 0.07 1.00 0.05
Sheesham And Seeras ha - - 4.00 0.20 3.15 0.16 1.13 0.06 1.30 0.07
Horticulture
Mango ha - - 1.50 0.15 3.00 0.30 0.30 0.30 0.75 0.07
Guava ha - -- 2.08 0.21 1.70 0.17 3.50 0.35 - -
Total 20.31 8.04 20.23 10.35 10.70 69.51
Livelihood for landless People No. of SHGs/ No. of beneficiaries
1. Goatary do 1/12 0.25 1/11 0.25
2. Back Yard Poultry do
3. Poultry (Broiler) do 1/11 0.25 1/12 0.25
4. BeeKeeping do 1/11 0.25 1/11 0.25
5. Dairy do 1/12 0.25 1/12 0.25 1/11 0.25
6. Tailoring do 1/11 0.25 2/23 0.50 1/11 0.25 1/12 0.25 1/11 0.25
7. Fishries do
8. Vermi composting do
9. Fruit Processing do
10. Mini Dal Mill do
11. Mini flour Mill do
12. Mini Oil Expeller do
13. Carpentry do
Total 3/34 0.75 3/35 0.75 3/34 0.75 3/35 0.75 3/33 0.75 3.75
119
III
Agriculture Production and micro enterprises System
Veerpur 1st
Sahanpur Poranpur Gadhi Rampur Mangal Bijori Total in lakh
A- Crop Demonstrations- (Crop Wise)
16.78
1.Wheet No. of farmers /Area (ha)
20/8.00 0.40 10/4.00 0.20 25/10.00 0.50 13/5.20 0.26 12/4.80 0.24
2.Paddy No. of farmers /Area (ha)
20/8.00 0.40 8/3.20 0.16 20/8.00 0.40 10/4.00 0.20 12/4.80 0.24
B.Seed Distribution Ha/Rupees 18.00 0.72 11.00 0.43 27.15 1.08 13.90 0.55 14.34 0.57 C.Agroforestry - - -
Ha/Rupees 30.00 0.90 12.00 0.36 30.00 0.90 14.41 0.46 15.94 0.47
D.Green manuring Ha/Rupees 40.00 1.20 10.00 0.28 24.10 0.72 12.33 0.36 12.75 0.38
Total 3.62 1.43 3.60 1.83 1.90 12.38
G. Total 29.16
120
Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor Sr.
N Particular of Measures/Activitie
Uni Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur No., Length/ ha, Volum
Qanty Cost Qanty Cost Qanty Cost Qanty Cost Qanty
End Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - - - 2. Contour Bund (with Sodding) cum. 14080 5.63 9700 3.82 5630 2.20 10200 4.08 30125 12.05
3.Marginal Bund/PB cum. 14500 5.80 8260 3.30 10799 4.22 8250 3.30 23100 9.24
B- Water Resource Development
1. Tank/Pond No 1a - Water storing capacity cum. 1b- Area proposed for irrigation ha
2- Water Harvesting Bundhi/GP cum. 11200 5.04 7200 3.24 4745 2.30 7995 3.60 23200 10.44
2a- Water storing capacity cum. 2b- Area proposed for irrigation ha
3. Check Dam / Drop Spill Way No. 10 1.40 10 0.97 7 0.90 8 0.93 15 2.80
3a- Water storing capacity cum. 4000 2000 2600 2200 6000 3b. Area proposed for irrigation ha 5.10 2.00 3.20 4.10 10.40
Total 17.87 11.33 9.62 11.91 34.53
121
B. F Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur Total in lakh
Total 17.87 11.33 9.62 11.91 34.53 85.26 Agroforestry Plants Ukeliptis ha 8.00 0.40 5.70 0.30 2.00 0.10 5.30 0.28 15.00 0.81
Sheesham And Seeras ha 8.75 0.40 5.00 0.25 0.45 0.02 6.00 0.30 16.00 0.905
Horticulture
Mango ha 4.00 0.40 3.00 0.30 0.30 0.03 3.00 0.30 8.00 0.80
Guava ha 4.60 0.40 2.50 0.25 0.20 0.02 2.80 0.28 8.00 0.85
Total 19.47 12.43 9.79 13.07 37.895 92.655
Grand Total 256.165
Livelihood for landless People No. of SHGs/ No. of beneficiaries
1. Goatary do 1/11 0.25 -- -- -- -- -- -- 2. Back Yard Poultry do -- -- -- -- -- -- -- -- 3. Poultry (Broiler) do 1/12 0.25 -- -- -- -- 1/14 0.25 -- -- 4. BeeKeeping do 1/14 0.25 -- -- 5. Dairy do 1/11 0.25 1/11 0.25 2/24 0.50
6. Tailoring do 1/11 0.25 1/11 0.25 2/22 0.50 1/11 0.25
7. Fishries do 1/13 0.25 1/11 0.25
8. Vermi composting do -- -- -- -- -- -- -- -- -- -- 9. Fruit Processing do -- -- -- -- -- -- -- -- -- -- 10. Mini Dal Mill do -- -- -- -- -- -- -- -- -- -- 11. Mini flour Mill do -- -- -- -- -- -- -- -- -- -- 12. Mini Oil Expeller do -- -- -- -- -- -- -- -- -- -- 13. Carpentry do
Total 3/36 0.75 3/33 0.75 3/36 0.75 3/36 0.75 3/35 0.75 45- 11.25 HGs Formed in next year 41- 10.47 86- 21.72 77 UGs Formed in next year 77- 19.47 Gr. Total 163- 41.19
122
Soil & water con. Acti Livelihood activities Agi. Production & Micro Enterprises
III Agriculture Production and micro enterprises System
Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur Total in lakh
A- Crop Demonstrations- (Crop Wise)
29.16
1.Wheet No. of farmers /Area (ha)
23/9.20 0.46 15/6.00 0.30 11/4.40 0.22 15/6.00 0.30 45/18.00 0.90
2.Paddy No. of farmers /Area (ha)
20/8.00 0.40 13/5.20 0.25 11/4.40 0.22 14/5.60 0.28 40/16.00 0.80
B.Seed Distribution
Ha/Rupe 21.00 1.05 16.00 0.65 13.12 0.52 18.00 0.70 0.50 2.075
C.Agroforestry - - -
Ha/rupee 27.00 0.82 17.00 0.52 14.58 0.44 18.00 0.56 53.00 1.60
D.Green manuring
Ha/Rupe 24.00 0.73 16.00 0.48 11.66 0.35 16.00 0.49 48.00 1.45
Total 3.46 2.20 1.75 2.33 6.825 16.565
Grand Total 45.725
Summary Cost EW Structure 56% 256.16 520843.00 168 9% 41.19 - - 10% 45.73 - - Total 343.08
123
6.3: Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Ranipur
No., Length/
ha, Volum
Rampur mangal Pooranpur garhi Sahanpur NP Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - 819.00 0.32 - - 819 0.32 2. Contour Bund (with Sodding) cum. 927.50 0.36 787.50 1.48 4350 1.74 9065 3.58 3.Marginal Bund/PB cum. 3371 1.32 11892 4.65 2600 1.06 17863 7.03 B- Water Resource
Development - - - - - - - -
1. Tank/Pond No - - - - - - - - 1a - Water storing capacity cum. - - - - - - - - 1b- Area proposed for irrigation ha - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 3741.98 1.86 28610 11.99 4800 2.10 37151.98 15.95 2a- Water storing capacity cum. - - - -- - - - -
2b- Area proposed for irrigation ha - - - - - - - - 3. Check Dam / Drop Spill Way No. 6 0.40 13 1.47 6 0.58 25 2.45 3a- Water storing capacity cum. - - - - - - - 3b. Area proposed for irrigation ha - - - - - - - -
Total 3.94 19.91 5.48 29.33
124
Sr. N
Particular of
Measures/Activitie
Uni Ranipur
No., Length/ ha,
Volum
Rampur mangal Pooranpur garhi Sahanpur NP Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost
2 2 3 4 5 6 7 8 9 10 11 B. F 3.94 19.91 5.48 29.33
Agroforestry - - - - - - - -
Plants Ha 2.63 0.13 6.15 0.32 - - 8.78 0.45
Horticulture Ha - - 1.50 0.15 - - 1.50 0.15
Total 2.63 0.13 7.65 0.47 - - 10.28 0.60
Gra. Total 4.07 20.38 5.48 29.93 Livelihood for landless
People
No. of SHGs/ No of Beneficiaries
1. Dairy - - - - - - - - -
2. Goitary - 1/14 0.30 3/33 0.75 - - 4/47 1.05
3. Pattal Making - 1/12 0.30 2/23 0.50 - - 3/35 0.80
4. Tailoring - - - - - 2/22 0.55 2/22 0.55
TOTAL - 2/26 0.60 5/56 1.25 2/22 0.55 9/104 2.40
User’s Group 1/11 0.25 5/57 1.25 1/11 0.25 7/79 1.75
G. TOTAL - 3/37 0.85 10/113 2.50 3/33 0.80 16/183 4.15
125
iii Agriculture Production and micro enterprises System
Ranipur
Rampur mangal Pooranpur garhi Sahanpur NP Total
A- Crop Demonstrations-
13/5.20 0.26 45/18 0.90 11/440 0.22 69/27.60 1.38
B.Seed Distribution No. of farmers /Area (ha)
7.00 0.28 27.15 1.08 6.50 0.26 40.65 1.62
C.Agroforestry -
Ha/Rupees 7.41 0.24 30 0.90 7.00 0.22 44.41 1.36 D.Green manuring
Ha/Rupees 6.33 0.18 24.10 0.72 6.00 0.18 36.43 1.08 Total 0.96 3.60 0.88 5.44 Grand Total 5.88 27.23 7.16 39.52
126
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Bijori
No., Length/
ha, Volum
Rampur mangal Bijori Total
Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - 2. Contour Bund (with Sodding) cum. 648 0.25 921.50 0.36 1569.50 0.61 3.Marginal Bund/PB cum. 1701 0.66 5975 2.33 7676 2.99 B- Water Resource
Development - - - - - -
1. Tank/Pond No - - - - - - 1a - Water storing capacity cum. - - - - - - 1b- Area proposed for irrigation ha - - - - - - 2- Water Harvesting Bundhi/GP cum. 10238.02 4.92 14067 6.82 24305.02 11.74 2a- Water storing capacity cum. - - - - - -
2b- Area proposed for irrigation ha - - - - - - 3. Check Dam / Drop Spill Way No. 4 0.40 13 1.30 17 1.70 3a- Water storing capacity cum. - - - - - - 3b. Area proposed for irrigation ha - - - - - -
Total 6.23 10.81 17.04
127
Sr. N
Particular of
Measures/Activitie
Uni Bijori
No., Length/ ha,
Volum
Rampur mangal Bijori Total
Qty. Cost Qty. Cost Qty. Cost
2 2 3 4 5 6 7 10 11 B. F 6.23 10.81 17.04
Agroforestry - - - - - -
Plants Ha - - 2.30 0.12 2.30 0.12
Horticulture Ha 0.50 0.05 0.75 0.075 1.25 0.125
Total 0.50 0.05 3.05 0.195 3.55 0.245
Gr.Total 6.28 10.705 16985
Livelihood for landless People
No. of SHGs/ No of Beneficiaries
1. Dairy - - - - - - -
2. Goitary - 1/12 0.30 2/22 0.50 3/34 0.80
3. Pattal Making - - - - - - -
4. Tailoring - - - - - - -
TOTAL - 1/12 0.30 2/22 0.50 3/34 0.80 User’s Group 2/23 0.60 2/24 0.47 4/47 1.07
G. TOTAL - 3/25 0.90 4/46 0.97 7/81 1.87
128
iii Agriculture Production and micro enterprises System
Bijori Rampur mangal Bijori Total
A- Crop Demonstrations-
10/4 0.20 24/9.60 0.48 34/13.60 0.68
B.Seed Distribution No. of farmers /Area (ha)
6.90 0.27 14.34 0.57 21.24 0.84
C.Agroforestry -
Ha/Rupees 7.00 0.22 15.94 0.48 22.94 0.70 D.Green manuring
Ha/Rupees 6.00 0.18 12.75 0.38 18.75 0.56 Total 0.87 2.10 2.78 Grand Total 8.05 14.525 22.385
129
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Pooranpur garhi
No., Length/ ha, Volum
Pooranpur garhi Total
Qty. Cost Qty. Cost
1 2 3 4 5 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - 2. Contour Bund (with Sodding) cum. - - - - 3.Marginal Bund/PB cum. 420 0.16 420 0.16 B- Water Resource
Development - - - -
1. Tank/Pond No - - - - 1a - Water storing capacity cum. - - - - 1b- Area proposed for irrigation ha - - - - 2- Water Harvesting Bundhi/GP cum. - - - - 2a- Water storing capacity cum. - - - -
2b- Area proposed for irrigation ha - - - - 3. Check Dam / Drop Spill Way No. - - - - 3a- Water storing capacity cum. - - - - 3b. Area proposed for irrigation ha - - - -
Total 420 0.16 420 0.16
130
Sr. N
Particular of
Measures/Activitie
Uni Pooranpur garhi
No., Length/ ha, Volum
Pooranpur garhi Total
Qty. Cost Qty. Cost
2 2 3 4 5 6 7 B. F
Agroforestry - - - - -
Plants Ha - - - -
Horticulture Ha - - - -
Total - - - -
Livelihood for landless People
No. of SHGs/ No of Beneficiaries
- - - -
1. Dairy - - - - -
2. Goitary - - - - -
3. Pattal Making - - - - -
4. Tailoring - - - - -
TOTAL - - - - -
- - - -
User’s Group - - - -
G. TOTAL - - - - -
131
iii Agriculture Production and micro enterprises System
Pooranpur garhi Total
A- Crop Demonstrations-
- - - -
B.Seed Distribution No. of farmers /Area (ha)
- - - -
C.Agroforestry
Ha/Rupees - - - - D.Green manuring
Ha/Rupees - - - - Total Grand Total 0.16
132
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Gudha
No., Length
/ ha, Volum
Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd Bhaguwala
Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost
Qty. Cost Qty.
Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - - - - - -
2. Contour Bund (with Sodding)
cum. 5732 2.40 5374 2.10 3302 1.29 1900 0.76 9575 3.83 475 0.19 26358 10.57
3.Marginal Bund/PB cum. 9724 3.80 23670 9.25 13200 5.16 - - 74.50 3.00 - - 54044 21.21
B- Water Resource Development
- - - - - - - - - - - - - -
1. Tank/Pond No - - - - - - - - - - - - - -
1a - Water storing capacity cum. - - - - - - - - - - - - - -
1b- Area proposed for irrigation
ha - - - - - - - - - - - - - -
2- Water Harvesting Bundhi/GP
cum. 5838 2.83 9922 4.81 6560 3.20 - - 8700 3.84 - - 31020 14.68
2a- Water storing capacity cum. - - - - - - - - - - - - - -
2b- Area proposed for irrigation
ha - - - - - - - - - - - - - -
3. Check Dam / Drop Spill Way
No. 6 0.60 10 1.08 7 0.90 - - 1 0.30 - - 24 2.88
3a- Water storing capacity cum. - - - - - - - - - - - - - -
3b. Area proposed for irrigation
ha - - - - - - - - - - - - - -
Total 9.63 17.24 10.55 0.76 10.97 0.19 49.34
133
Sr. N
Particular of
Measures/Activitie
Uni Gudha
No., Length
/ ha, Volum
Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd
Bhaguwala
Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty.
Cost Qty.
Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 B. F 9.63 17.2
4 10.55 0.76 10.97 0.19 49.3
4 Agroforestry - - - - - - - - - - - - - - -
Plants Ha 2.40 0.12 3.89 0.20 2.35 0.12 - - - - - - 8.64 0.44
Horticulture Ha 0.50 .05 1.20 0.12 0.75 0.075 - - - - - - 2.45 0.245
Total 0.17 0.32 0.195 11.09 0.685
Gr. Total 9.80 17.56 10.745 0.76 10.97 0.19 50.025
Livelihood for landless People
No. of SHGs/ No of Beneficiaries
1. Dairy - - - - - - - - - - - - - - -
2. Goitary - 7/80 1.75 6/68 1.50 2/22 0.50 - - 1/11 0.25 - - 16/181 4.00
3. Pattal Making - - - - - 3/36 0.75 - - 1/11 0.25 - - 4/47 1.00
4. Tailoring - - - - - - - - - 2/24 0.50 1/11 0.25 3/35 0.75
TOTAL - 7/80 1.75 6/68 1.50 5/58 1.25 4/46 1.00 1/11 0.25 29/263 5.75
User’s Group 5/56 1.15 5/58 1.30 5/57 1.25 - - 3/24 0.80 1/11 0.25 19/216 4.75
G. Total 12/136 2.90 11/126 2.80 10/115 2.50 - - 7/80 1.80 2/22 0.50 42/479 10.50
134
iii
Agriculture Production and micro enterprises System
Gudha
No. of farmers /Area (ha)
Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd Bhaguwala Total
Qty. Cost Qty. Cost Qty. Cost Qty.
Cost Qty. Cost Qty. Cost Qty. Cost
A- Crop Demonstrations-
24/9.60 0.47 44/17.60 0.89 25/10 0.50 - - 27/10.80
0.54 8/3.20 0.15 120/48.0
2.39
B.Seed Distribution
16.00 0.64 26.20 1.05 14.60 0.59 - - 17.00 0.68 4.50 0.18 71.30 2.86
C.Agroforestry
Ha/Rupees
16.35 0.49 28.90 0.87 0.16 0.47 - - 19.00 0.56 5.00 0.15 79.25 2.36
D.Green manuring
Ha/Rupees
13.35 0.40 23.33 0.70 12.45 0.38 - - 15.00 0.46 5.00 0.12 63.13 1.88
Total 2.00 3.51 1.94 2.24 0.60 9.49
Grand Total 14.70 23.78 15.935 0.76 15.01 1.29 70.765
135
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Prempur
No., Length
/ ha, Volum
Prempur Moh. Alampur
Vijaypur Veerpur 1st Veerpur 2nd
Sahanpur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
Qty. Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - - - - - -
2. Contour Bund (with Sodding)
cum. 2200 0.86 6125 2.45 7100 2.84 10200 4.08 4750 1.90 1825 0.73 32200 12.86
3.Marginal Bund/PB cum. 8755 3.42 - - 8260 3.30 8250 3.30 7400 2.74 2675 1.05 35340 13.81
B- Water Resource Development
- - - - - - - - - - - - - -
1. Tank/Pond No - - - - - - - - - - - - - -
1a - Water storing capacity cum. - - - - - - - - - - - - - -
1b- Area proposed for irrigation
ha - - - - - - - - - - - - - -
2- Water Harvesting Bundhi/GP
cum. 3857 1.85 - - 7200 3.24 7995 3.03 8500 3.90 - - 27552 12.02
2a- Water storing capacity cum. - - - - - - - - - - - - - -
2b- Area proposed for irrigation
ha - - - - - - - - - - - - - -
3. Check Dam / Drop Spill Way
No. 4 0.48 - - 10 0.97 16 1.83 9 0.90 6 0.58 43 4.76
3a- Water storing capacity cum. - - - - - - - - - - - - - -
3b. Area proposed for irrigation
ha - - - - - - - - - - - - - -
Total 6.61 2.45 10.35 12.24 9.44 2.36 43.45
136
Sr. N
Particular of
Measures/Activitie
Uni Prempur
No., Length
/ ha, Volum
Prempur Moh. Alampur
Vijaypur Veerpur 1st Veerpur 2nd Sahanpur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
B. F 6.61 2.45 10.35 12.24 9.44 2.36 43.45
Agroforestry - - - - - - - - - - - - - - -
Plants Ha 1.54 0.08 - - 10.70 0.55 11.30 0.58 11.87 0.60 7.00 0.36 42.41 2.17
Horticulture Ha 0.45 0.045 - - 5.50 0.55 5.80 0.58 6.00 0.60 3.56 0.36 21.31 2.135
Total 0.125 - - 1.10 1.16 1.20 0.72 63.72 4.305
Gr. Total 6.735 2.45 11.45 13.40 10.64 3.08 47.755
Livelihood for landless People
No. of SHGs/ No of Beneficiaries
1. Dairy - - - - - - - 1/11 0.25 - - - - 1/11 0.25
2. Goitary - 6/68 1.50 - - 2/24 0.50 - - 2/22 0.50 - - 10/114 2.50
3. Pattal Making - - - -- - - - - - - - - -- - -
4. Tailoring - 2/22 0.25 2/22 0.50 1/11 0.20 1/11 0.25 6/66 1.20
TOTAL - 6/68 1.50 4/46 0.75 3/33 0.75 3/33 0.70 1/11 0.25 17/191 3.95
User’s Group 5/58 1.30 - - 3/34 0.72 3/33 0.75 3/34 0.75 1/11 0.25 15/170 3.77
G. Total 2.80 1.47 - 1.50 1.45 0.50 32/361 7.72
137
iii
Agriculture Production and micro enterprises System
Prempur
No. of farmers /Area (ha)
Prempur Moh. Alampur
Vijaypur Veerpur 1st Veerpur 2nd Sahanpur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
A- Crop Demonstrations-
17/6.80
0.35 1/.40 0.02 22/8.80
0.44 29/11.60
0.58 22/880
0.44 10/4.00
6.20 92/36.80
1.85
B.Seed Distribution 10.00 0.40 1.00 0.03 14 0.56 17 0.70 14 0.56 4 0.16 55.70 2.19
C.Agroforestry
Ha/Rupees
12.00 0.37 1.00 0.02 15 0.45 19 0.58 15 0.45 4 0.14 60.0 1.85
D.Green manuring
Ha/Rupees
10.25 0.30 1.00 0.02 13 0.39 15 0.46 12 0.37 5 0.13 49.25 1.47
Total 1.42 0.09 1.84 2.32 1.82 0.63 7.36
Grand Total 10.95 2.54 14.76 17.97 13.91 4.21 63.585
138
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Jaspur Mussepur
No., Length/
ha, Volum
Jaspur Bhaguwala Total Rahmapur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - 2. Contour Bund (with Sodding) cum. 8675 3.47 19425 7.77 28100 11.24 10800 4.32 10800 4.32 3.Marginal Bund/PB cum. 9075 3.63 17050 6.83 36125 10.46 11600 4.64 11600 4.64 B- Water Resource
Development - - - - - - - - - -
1. Tank/Pond No 1/1300 0.65 - - 1/1300 0.65 - - - - 1a - Water storing capacity cum. - - - - - - - - - - 1b- Area proposed for irrigation ha - - - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 1003 4.50 20800 9.36 21803 13.86 11300 5.10 11300 5.10 2a- Water storing capacity cum. - - - - - - - - - -
2b- Area proposed for irrigation ha - - - - - - - - - - 3. Check Dam / Drop Spill Way No. 8 1.00 17 2.50 25 3.50 - - - - 3a- Water storing capacity cum. - - - - - - - - - - 3b. Area proposed for irrigation ha - - - - - - - - - -
Total 13.25 26.46 39.71 14.06 14.06
139
Sr. N
Particular of
Measures/Activitie
Uni Jaspur Mussepur
No., Length/
ha, Volum
Jaspur Bhaguwala Total Rahmapur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
B. F 13.25 26.46 39.71 14.06 14.06
Agroforestry -
Plants Ha 8 0.40 30 1.50 38 1.90 - - - -
Horticulture Ha - - 15.50 1.50 15.50 1.50 - - - -
Total 0.40 3.00 3.40
Gr. Total 13.65 29.46 43.11 14.06 14.06 Livelihood for landless
People
No. of SHGs/ No of Beneficiaries
5. Dairy - 1/11 0.30 2/22 0.50 3/33 0.80 1/11 0.30 1/11 0.30
6. Goitary - 1/11 0.25 2/22 0.50 3/33 0.75 2/22 0.50 2/22 0.50
7. Pattal Making - - - 3/33 0.80 3/33 0.80 - - - -
8. Tailoring - 2/22 0.50 2/23 0.50 4/45 1.00 2/22 0.50 2/22 0.50
TOTAL - 4/44 1.05 9/100 2.30 13/144 3.35 5/55 1.30 5/55 1.30
User’s Group 4/45 1.05 8/89 2.00 12/134 3.05 4/45 1.00 4/45 1.00
G. Total 2.10 33/76 6.40 2.30 2.30
140
iii
Agriculture Production and micro enterprises System
No., Length/
ha, Volum
Jaspur Mussepur
Jaspur Bhaguwala Total Rahmapur Total
A- Crop Demonstrations-
31/12.40 0.64 61/24.40 1.22 90/36 1.80 34/13.60 0.70 34/13.60 0.70
B.Seed Distribution No. of farmers /Area (ha)
20 0.78 36 1.46 56 2.34 21 0.84 21 0.84
C.Agroforestry 20 0.605 40 1.27 60 1.87 23 0.665 23 0.665
D.Green manuring Ha/Rupees 15 0.46 32 0.98 47 1.44 17 0.51 17 0.51
Total 18.235 4.93 7.45 2.715 2.715
G. Total 18.235 38.69 56.96 19.075 19.075
141
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Rahatpur Khurd Vijaypur
No., Length
/ ha, Volum
Rahmapur Moh Alampur Total Moh Alampur Vijaypur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - - - - - - - - -
2. Contour Bund (with Sodding)
cum. 19325 7.74 6125 2.45 25450 10.19 14080 5.63 2600 0.98 16680 6.61
3.Marginal Bund/PB cum. 11500 4.60 7300 2.90 18800 7.50 14500 5.80 - - 14500 5.80
B- Water Resource Development
- - - - - - - - - - - -
1. Tank/Pond No - - - - - - - - - - - -
1a - Water storing capacity cum. - - - - - - - - - - - -
1b- Area proposed for irrigation
ha - - - - - - - - - - - -
2- Water Harvesting Bundhi/GP
cum. 11900 5.34 5600 2.50 7500 7.84 5600 2.54 - - 5600 2.54
2a- Water storing capacity cum. - - - - - - - - - - - -
2b- Area proposed for irrigation
ha - - - - - - - - - - - -
3. Check Dam / Drop Spill Way
No. 15 2.80 10 1.40 25 4.20 - - - - - -
3a- Water storing capacity cum. - - - - - - - - - - - -
3b. Area proposed for irrigation
ha - - - - - - - - - - - -
Total 20.48 9.25 29.73 13.97 0.98 14.95
142
Sr. N
Particular of
Measures/Activitie
Uni No.,
Length/ ha,
Volum
Rahatpur Khurd Vijaypur
Rahmapur Moh Alampur Total Moh Alampur Vijaypur Total
Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 8 9 10 11 B. F 20.48 9.25 29.73 13.97 0.98 14.95
Agroforestry - - - - - - - - - - - - -
Plants Ha 31 1.10 16.75 0.80 47.75 1.90 - - - - - -
Horticulture Ha 16 1.65 8.60 0.80 24.60 2.45 - - - - - -
Total 2.75 1.60 4.35
Gr. Total 23.23 10.85 34.08 13.97 0.98 14.95
Livelihood for landless People
No. of SHGs/ No of Beneficiaries
1. Dairy - 2/22 0.50 - - 2/22 0.50 - - - - - -
2. Goitary - 2/22 0.50 1/11 0.25 3/33 0.75 1/12 0.25 - - 1/12 0.25
3. Pattal Making - 2/22 0.50 - - 2/22 0.50 - - - - - -
4. Tailoring - 2/23 0.50 2/24 0.55 4/47 1.05 2/22 0.50 1/11 0.27 3/33 0.77
TOTAL - 8/89 2.00 3/35 0.80 11/124 2.80 3/34 0.75 1/11 0.27 4/45 1.02
User’s Group 7/78 1.78 3/35 0.80 10/113 2.58 3/35 0.75 - - 3/35 0.75
G. Total 27.01 12.45 5.38 15.47 1.25 7/80 1.77
143
iii
Agriculture Production and micro enterprises System
No. of farmers/Area (ha)
Rahatpur Khurd Vijaypur
Rahmapur Moh Alampur Total Moh Alampur
Vijaypur Total
A- Crop Demonstrations-
52/20.80
1.05 22/880 0.45 74/29.60
1.50 20/8.00
0.40 4/1.60 0.80 24/9.60
0.48
B.Seed Distribution 31 1.26 13 0.54 44 1.80 12 0.48 2.50 0.10 14.50 0.58
C.Agroforestry
Ha/Rupees
35 1.05 15 0.45 50 1.50 13 0.40 3 0.08 16 0.48
D.Green manuring
Ha/Rupees
28 0.85 12 0.36 40 1.21 11 0.32 2 0.6 13 0.38
Total 4.21 1.80 6.01 1.60 0.32 1.92
Grand Total 31.22 14.25 45.47 17.07 1.57 18.64
144
Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor
Sr. N
Particular of
Measures/Activitie
Uni Bhaguwala
No., Length/
ha, Volum
Bhaguwala Total Gr. Total
Qty. Cost Qty. Cost Qty. Cost
1 2 3 4 5 6 7 10 11 Soil & Water Conservation
Measures
A- Moisture Conservation Measures
1. Field Bund - - - - 819.00 0.32 2. Contour Bund (with Sodding) cum. 6350 2.54 6350 2.54 156572.50 62.52 3.Marginal Bund/PB cum. 5700 2.07 5700 2.07 192068.00 75.67 B- Water Resource
Development - - - - - -
1. Tank/Pond No - - - - 1/1300 0.65 1a - Water storing capacity cum. - - - - - - 1b- Area proposed for irrigation ha - - - - - - 2- Water Harvesting Bundhi/GP cum. - - - - 166232 83.73 2a- Water storing capacity cum. - - - - - -
2b- Area proposed for irrigation ha - - - - - - 3. Check Dam / Drop Spill Way No. 2 0.20 2 0.20 161 19.69 3a- Water storing capacity cum. - - - - - - 3b. Area proposed for irrigation ha - - - - - -
Total 4.81 4.81 242.58
145
Sr. N
Particular of
Measures/Activitie
Uni Bhaguwala
No., Length/ ha,
Volum
Bhaguwala Total Gr. Total
Qty. Cost Qty. Cost Qty. Cost
2 2 3 4 5 6 7 10 11 B. F 4.81 4.81 242.58
Agroforestry - - - - - - -
Plants Ha - - - - 147.88 6.98
Horticulture Ha - - - - 66.61 6.605
Total - - - - 214.49 13.585
Gra. Total 4.81 4.81 256.165 Livelihood for landless
People
No. of SHGs/ No of Beneficiaries
1. Dairy - - - - - 7/77 1.85
2. Goitary - - - - - 40/458 10.10
3. Pattal Making - - - - - 13/148 3.35
4. Tailoring - 2/23 0.60 2/23 0.60 26/293 6.42
TOTAL - 2/23 0.60 2/23 0.60 86/976 21.72
User’s Group 2/22 0.50 2/22 0.50 77/871 19.47
G. TOTAL - 4/45 1.10 4/45 1.10 162/1847 41.19
146
iii Agriculture Production and micro enterprises System
Bhaguwala Bhaguwala Total G. Total
A- Crop Demonstrations-
15/6.00 0.30 15/6.00 0.30 569/227.60 11.42
B.Seed Distribution No. of farmers /Area (ha)
9.00 0.36 9.00 0.36 345.39 13.75
C.Agroforestry
Ha/Rupees 10.00 0.30 10.00 0.30 375.60 11.405 D.Green manuring
Ha/Rupees 8.00 0.24 8.00 0.24 305.56 9.15 Total 1.20 1.20 45.725 Grand Total 7.11 7.11 343.08
147
Chapter-7
Phasing of Programme & Budgeting
148
7.1: Detail of Item wise Financial Position in Watershed
Total Finance of Project 457.44
Administration @ 10% 45.74
Monitoring @ 1% 4.57
Evaluation @ 1% 4.57
EPA @ 4% 18.30
ICB @ 5% 22.88
DPR @ 1% 4.57
Watershed Devlopment @56% 256.18
Livelihood @ 9% 41.17
Production &Micro Enterprises@10% 45.74
Cousolidotion @4% 13.72
Total 100 457.44
149
7.2: Detail of Physical & Financial Year wise Phasing
S.
No
.
Budget
Component
Purpose
Finance
2010-11 2011-12 2012-13 2013-14 TOTAL Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial
1 Administration 45.74 - 9.15 - 18.30 - 13.72 - 4.57 - 45.74
2 Monitoring 4.57 - 0.92 - 1.21 - 1.22 - 1.22 - 4.57
3 Evaluation 4.57 - 1.37 - 1.37 - 1.37 - 0.46 - 4.57
4 EPA 18.30 - 18.30 - - - - - - - 18.30
5 ICB 22.88 - 13.72 - 4.58 - 4.58 - - - 22.88
6 DPR 4.57 - 4.57 - - - - - - - 4.57
7 Watershed
Devlopment
256.18 510.80 34.32 1650.60 110.93 1650.60 110.93 - - 3812.0
0
256.18
8 Livelihood 41.17 - 4.57 - 18.30 - 18.30 - - - 41.17
9 Production
system & micro
Enterprises
45.74 - 4.57 - 20.58 - 20.59 - - - 45.74
10 Cousolidation 13.72 - - - - - - - 13.72 - 13.72
TOTAL 457.44 510.80 91.49 1650.60 175.27 1650.60 170.71 - 19.97 3812.0
0
457.44
150
Chapter-8
8.1: EXPECTED OUTCOMES/ BENEFITS:
S.No. Particulars of Items Unit Pre Execution Post Execution
1 Gross Cultivated area Ha. 2598 3812
2 Cropping intensity % 150 220
3 Agricultural Production
A
I
II
III
IV
Food Production
Cereals-
Pulses-
& Oil seed
Jawan Babare
Qtl.
185
800
3050
335
B
I
II
Fodder Production
Dry Fodder-
Green Fodder-
Qtl.
530
800
920
1215
C
I
Fuel Production (qtls)
Arhar + Mustard Plants
Qtl.
1.50
3.00
4 Average Household Income per annum Rs Lakh 20000 30000
5 Milk Production Liter 77000 130000
6 Irrigated area Ha. 1243 2100
7 Rainfed area Ha. 4243 3386
8 Additional area under Agro-Harte/Forestry. Ha. - 349.39
9 Employment Generation man days. No. 68750 91500
10 Women Benefitted by SHGs and IGA No. - 200
11 Value of land Rs Lakh per Hactare Rs Lakh 8 to 10 12 to 14
12 Average ground water table BGL M 8.00 7.00
13 Benefit Cost Ratio 1.60:1
151
EPA- PHOTOS
152
153
154
155
156
157
158
159
160
161
162
163
Details of Fund flow of Watershed Committee Accounts in IWMP-I, Bijnor (Amount in Rs.)
S. No
Name of MWS
with code
Name of watershe
d committe
e (WC)
Opening Balance
Deposit Withdrawal Interest accrued
Closing balance
DRDA/ ZP
cheque No./date
Amount / Date of deposit
in WC
Account
Total amount available in WC Account as on
31.03.2011
Amount with dra wn
by Cash/ Cheque
Date of withdra
wal
Purpose of
withdrawal
1 jaspur 2B5C1c3c jaspur ------------ 31/03/11 1.93230 ------------ ------------ ------------ ------------ ------------ 1.93230
2 Bhaguwala 2B5C1c3a Bhaguwala ------------ 31/03/11 4.61565 ------------ ------------ ------------ ------------ ------------ 4.61565
3 Gudha 1st 2B5C1c3f Gudha 1
st ------------ 31/03/11 1.29154 ------------ ------------ ------------ ------------ ------------ 1.29154
4 Prempur 2B5C1d1b Prempur ------------ 31/03/11 2.33316 ------------ ------------ ------------ ------------ ------------ 2.33316
5 Gudha 2nd
2B5C1d2a Gudha 2nd
------------ 31/03/11 2.41893 ------------ ------------ ------------ ------------ ------------ 2.41893
6 Moh Alampur 2B5C1e1a Moh Alampur
------------ 31/03/11 2.02212 ------------ ------------ ------------ ------------ ------------ 2.02212
7 Vijaypur 2B5C1e1b Vijaypur ------------ 31/03/11 1.66266 ------------ ------------ ------------ ------------ ------------ 1.66266
8 GulalWali 2B5C1e1c GulalWali ------------ 31/03/11 1.31180 ------------ ------------ ------------ ------------ ------------ 1.31180
9 Veerpur 2nd
2B5C1e2a Veerpur 2nd
------------ 31/03/11 1.4987 ------------ ------------ ------------ ------------ ------------ 1.4987
10 veerpur 1st 2B5C1e2b veerpur 1
st ------------ 31/03/11 2.71683 ------------ ------------ ------------ ------------ ------------ 2.71683
11 Sahanpur N.P 2B5C1e3b Sahanpur N.P
------------ 31/03/11 1.66086 ------------ ------------ ------------ ------------ ------------ 1.66086
12 Puranpur Gadhi 1
st
2B5C1e4a Puranpur Gadhi 1
st
------------ 13/07/11 2.71080 ------------ ------------ ------------ ------------ ------------ 2.71080
13 Rampur Mangal 2B5C1e4c Rampur Mangal
------------ 15/06/11 1.38672 ------------ ------------ ------------ ------------ ------------ 1.38672
14 Bijori 2B5C1e4d Bijori ------------ 15/06/11 1.43379 ------------ ------------ ------------ ------------ ------------ 1.43379
15 Rehmapur 2B5C1d1a Rehmapur ------------ 31/03/11 5.06096 ------------ ------------ ------------ ------------ ------------ 5.06096
16 Total 34.30799 ------------ ------------ ------------ ------------ ------------ 34.30799
164
165
166
167
Estimate of drop Spillway For 5 hect.Catchment .
S.no Item Nos. Lenth Width Hight/Depth Qt
1
E/W in Foundation
Head Wall EXN 2 2.00 0.35 0.70 1.54
Side Wall 2 1.65 0.55 0.70 1.27
Side Wall Exn 2 1.00 0.55 0.70 0.77
crest Wall Exn 1 1.30 0.80 0.70 0.728
Toe Wall 1 1.30 0.55 0.70 0.50
Apron 1 1.30 1.30 0.40 0.676
Total 5.484
2
C.C.Work 1:4:8
head Wall EXN 2 2.00 0.55 0.15 0.33
Side well 2 1.65 0.55 0.15 0.272
Side well Exn 2 1.00 0.55 0.15 0.165
Crest Wall 1 1.30 0.8 0.15 0.156
Toe Wall 1 1.30 0.55 0.15 0.107
Apron 1 1.30 1.3 0.20 0.338
Total 1.368
3
B/W 1:4
head Wall EXN 2 1.8 0.45 1.40 0.268
Side Wall Exn 2 1.55 0.45 0.65 0.906
Side wall up to toe Exn Toe 2 1.55+.65/2 0.45 0.80 2.12
Side Well abobe to Exn Top 1 1.30 0.7 0.25 0.227
Crest Well up to Apron 1 1.30 .45+.70/2 0.80 0.598
Crest well abobe to Apron side well Exn 1 0.90 0.45 0.65 0.526
Toe Wall 1 1.30 0.45 0.45 0.263
Total 48.90
168
4
P/W 1:4
Head Wall EXN Top 2 1.8 0.45
1.62
Crest Top 1 1.3 0.45
0.585
Crest V/S 1 1.3
0.6 0.78
crest D/S 1 1.3
0.84 1.092
Side Well Top 2 .65+1.20/2 0.45
1.665
Side Well Exn 2 0.9 0.45
0.81
Toe Wall Top 1 1.3 0.45
0.585
Toe Wall Top in side 1 1.3
0.2 0.26
Side Wall in abobe the Toe Wall 2
0.45 0.4 0.18
Side Abobe the Crest 2
0.45 0.4 0.36
Head Wall V/S 1 1.3
0.6 0.78
Head Wall Exn V/S 2 1.8
1 3.6
Side Wall inside Botem 2 1.55
0.4 1.24
Side Wall inside Top 2 1.55+.65/2
0.8 1.76
Total 15.317
Say 15.32
Summary of Work
1 Earth Work 5.49
2 C.C Work 1:4:8 1.368
3 Brick Work 6.908
4 PlasteringWork 15.32
169
Material And Cost Anailysis S.No Name of Work Quantity Brick Cement Course Cend Gitti
1 C.C Work 1:4:8 1.368 0 4.65 0.615 1.258 -----
Brick Work 1:4 6.908 3178 12.43 1.865 0 -----
PlasteringWork 1:4 15.32 0 1.68 0.229 0 -----
Total 3178 18.76 2.709 1.258 -----
Say
3178 18.76 2.71 1.26 -----
Rate
3797 300 1184 1112 Total Cost
Cost
12066.85 5628 3208.65 1401.1 22304.6
170
Expenditure of Labour
S.No Name of Work Quantity Skilled Unskilled
1 Earth Work 5.49 - 1.66
2 C.C Work 1:4 1.368 0.27 6.29
3 B/W/1:4 6.908 6.9 13.8
4
PlasteringWork
1:4 15.32 1.91 2.87
5 Water Quiring 0 0 5
Total 9.08 29.62
Rate 230 120 Total Cost
Cost 2088.4 3554.4 5642.8
Total Cost
Material -22304.60
Labour -5642.80
Cartage-2230
Toatal-30177.40 Say Rupeesh -30000
171
Estimate of Field Out let
1 Earth Work Nos. Lenth Width Hight/Depth Qt
Head Wall 1 2.40 0.60 0.80 1.15
Side Wall 2 2.50 0.40 0.50 1.00
Tank 1 1.10 1.00 0.50 0.55
Total 2.70
2 EW 1:4:8
Head Wall 1 2.40 0.60 0.15 0.21
Side Wall 2 2.50 0.40 0.15 0.30
Rapta 1 2.50 0.60 0.15 0.225
Tank 1 1.10 1.00 0.15 0.165
Total 0.90
3 Brick Work 1:4:8
Head Wall 1 2.26 0.35 0.60 0.474
Caller 2 0.60 0.23 0.40 0.110
Side Wall 2 2.50 0.23 0.60 0.690
Rapta 1 2.50 0.60 0.11 0.165
Tank 2 0.73 0.23 0.50 0.167
Tank 1 0.60 0.23 0.50 0.069
Toe Wall 1 1.06 0.23 0.62 0.151
172
Total 1.661
4 P/W
Coller 2 0.60 0.23 - 0.27
P/W 2 2.00 0.60 0.40 0.96
2 0.23 0.40 - 0.18
Side Wall Top 2 2.50 0.23 - 1.15
2 2.50 0.25 - 1.25
2 2.50 0.30 - 1.50
Rapta 1 2.50 0.60 - 1.50
2 0.50 0.23 - 0.23
Tank 1 1.06 0.23 - 0.24
Total 7.28
5 B/F 2 0.50 0.30 - 0.30
Tank 1 0.60 0.30 - 1.80
1 0.50 0.60 - 0.30
1 1.06 0.23 - 0.24
1 0.60 0.41 - 0.24
1 1.06 0.30 - 0.31
Total 10.47
173
Summary of Work
1 Earth Work 2.70
2 C.C Work 1:4:8 0.90
3 Brick Work 1:4 11cm 0.165
23cm 1.661
4 PlasteringWork 10.47
174
Anylysis of Materials
S.no Name of Work Quantity Brick Cement Coarse Sand Gitty
1 C.C Work 1:4:8 0.90 - 3.06 0.405 0.828
2 Brick Work 11cm 0.165 78 0.23 0.039 -
23cm 1.661 764 2.98 0.448 -
3 P/W 1:4 10.47 - 1.15 0.157 -
Total 842 7.42 1.049 0.83
Say 1.05
@ 3797 300 1184 1112
Cost 3197.00 2226 1243.20 922.95
Total Cost ---------- ------ ------- ------- 7589.20
-
175
Expenditure of Labour
S.No Name of Work Quantity Skilled Unskilled
1 Earth Work 2.70 - 0.81
2 C.C Work 1:4 0.90 0.18 4.14
3 B/W/1:4 1.826 1.82 3.64
4 PlasteringWork 1:4 10.47 1.30 1.96
5 Water Quiring - - 5.00
Total 3.30 15.55
Rate 230.00 120.00 Total Cost
Cost 759.00 1866.00 2625.00
Cost on material -7589.20
Cost on Labour -2625.00
Total-10214.20
Say Rupees-10000