Page 1 of 164 Government of Malawi Government of Malawi Government of Malawi Government of Malawi DESK INSTRUCTIONS DESK INSTRUCTIONS DESK INSTRUCTIONS DESK INSTRUCTIONS FOR PUBLIC PROCUREMENT FOR PUBLIC PROCUREMENT FOR PUBLIC PROCUREMENT FOR PUBLIC PROCUREMENT Issued by Issued by Issued by Issued by The Office of the Director of Public he Office of the Director of Public he Office of the Director of Public he Office of the Director of Public Procurement Procurement Procurement Procurement

Transcript of DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of...

Page 1: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 1 of 164

Government of MalawiGovernment of MalawiGovernment of MalawiGovernment of Malawi

DESK INSTRUCTIONSDESK INSTRUCTIONSDESK INSTRUCTIONSDESK INSTRUCTIONS

FOR PUBLIC PROCUREMENTFOR PUBLIC PROCUREMENTFOR PUBLIC PROCUREMENTFOR PUBLIC PROCUREMENT

Issued by Issued by Issued by Issued by TTTThe Office of the Director of Public he Office of the Director of Public he Office of the Director of Public he Office of the Director of Public

ProcurementProcurementProcurementProcurement

Page 2: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 2 of 164

TTTTABLE OF ABLE OF ABLE OF ABLE OF CCCCONTENTSONTENTSONTENTSONTENTS

TTTTABLE OF ABLE OF ABLE OF ABLE OF CCCCONTENTSONTENTSONTENTSONTENTS ............................................................................................................................................................................................................................................................................................................................................................................................ 2222

LLLLIST OF IST OF IST OF IST OF DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS ........................................................................................................................................................................................................................................................................................................................................................ 3333

IIIINTRODUCTION TO THE NTRODUCTION TO THE NTRODUCTION TO THE NTRODUCTION TO THE DDDDEEEESK SK SK SK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS ................................................................................................................................................................................................................................................................ 3333

PURPOSE OF THE DESK INSTRUCTIONS.........................................................................3

APPLICATION OF THE DESK INSTRUCTIONS ...................................................................3

SCOPE OF THE DESK INSTRUCTIONS ............................................................................3

ISSUE AND AMENDMENT OF THE DESK INSTRUCTIONS ....................................................3

TTTTHE HE HE HE PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT SSSSYSTEMYSTEMYSTEMYSTEM ........................................................................................................................................................................................................................................................................................................................................................ 3333

THE LEGAL FRAMEWORK ..........................................................................................3

Public Procurement Act.....................................................................................3

Public Procurement Regulations ........................................................................3

Desk Instructions...............................................................................................3

Standard Documents .........................................................................................3

THE ORGANISATIONAL FRAMEWORK ..........................................................................3

Office of the Director of Public Procurement .....................................................3

Procuring Entities ..............................................................................................3

Internal Procurement Committees .....................................................................3

Procurement Unit .............................................................................................3

End Users .........................................................................................................3

PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT RRRRULES AND ULES AND ULES AND ULES AND PPPPROCEDURESROCEDURESROCEDURESROCEDURES........................................................................................................................................................................................................................................................................................ 3333

THE PROCUREMENT PROCESS ....................................................................................3

APPROVALS REQUIRED DURING THE PROCUREMENT PROCESS ..........................................3

HOW TO USE THE DESK INSTRUCTIONS.......................................................................3

FORMAT OF THE DESK INSTRUCTIONS .........................................................................3

Page 3: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 3 of 164

LLLLIST OF IST OF IST OF IST OF DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

This list will be reissued by ODPP, with a revised date of issue, when any Desk Instructions are revised.

NoNoNoNo Title of Desk InstructionTitle of Desk InstructionTitle of Desk InstructionTitle of Desk Instruction Date of Date of Date of Date of IssueIssueIssueIssue

Section A: Initiating and Planning ProcurementSection A: Initiating and Planning ProcurementSection A: Initiating and Planning ProcurementSection A: Initiating and Planning Procurement

1 Raising a requisition 10th Oct 2003

2A Preparing a description of requirements for goods 10th Oct 2003

2B Preparing a description of requirements for works 10th Oct 2003

2C Preparing a description of requirements for services 10th Oct 2003

3 Selecting a procurement method and planning the procurement 10th Oct 2003

Section B: Identifying Sources & Preparing Invitation DocumentsSection B: Identifying Sources & Preparing Invitation DocumentsSection B: Identifying Sources & Preparing Invitation DocumentsSection B: Identifying Sources & Preparing Invitation Documents

4A Conducting a pre-qualification 10th Oct 2003

4B Obtaining and assessing expressions of interest 10th Oct 2003

5A Preparing an invitation to tender notice 10th Oct 2003

5B Developing a shortlist 10th Oct 2003

6A Drafting a bidding document or request for proposals document 10th Oct 2003

6B Drafting a request for quotations document 10th Oct 2003

Section C: Managing the Tendering ProcessSection C: Managing the Tendering ProcessSection C: Managing the Tendering ProcessSection C: Managing the Tendering Process

7 Publishing an invitation to tender notice 10th Oct 2003

8 Issuing invitation documents 10th Oct 2003

9 Managing a pre-bid conference and site visit 10th Oct 2003

10 Handling bidder clarifications, modifications and extensions 10th Oct 2003

11 Receiving tenders 10th Oct 2003

12A Opening tenders (one stage - single envelope) 10th Oct 2003

12B Opening tenders (one stage - two envelopes) 10th Oct

Page 4: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 4 of 164

NoNoNoNo Title of Desk InstructionTitle of Desk InstructionTitle of Desk InstructionTitle of Desk Instruction Date of Date of Date of Date of IssueIssueIssueIssue

2003

Section D: Evaluating OffersSection D: Evaluating OffersSection D: Evaluating OffersSection D: Evaluating Offers

13 General evaluation procedures for goods, works and routine services

10th Oct 2003

13A Evaluating offers for goods 10th Oct 2003

13B Evaluating offers for works 10th Oct 2003

13C Evaluating offers for routine services 10th Oct 2003

14 General evaluation procedures for consultancy services 10th Oct 2003

14A Evaluating proposals for consultancy services using QCBS 10th Oct 2003

14B Evaluating proposals for consultancy services using QBS 10th Oct 2003

14C Evaluating proposals for consultancy services using LCS 10th Oct 2003

15 Conducting a post-qualification 10th Oct 2003

16 Conducting negotiations 10th Oct 2003

17 Cancelling procurement proceedings 10th Oct 2003

Section E: Awarding ContractsSection E: Awarding ContractsSection E: Awarding ContractsSection E: Awarding Contracts

18 Issuing a notice of acceptance 10th Oct 2003

19A Preparing and issuing a contract document 10th Oct 2003

19B Preparing and issuing a purchase order 10th Oct 2003

20 Publishing a contract award notice and debriefing unsuccessful bidders

10th Oct 2003

Section F: Administering ContractsSection F: Administering ContractsSection F: Administering ContractsSection F: Administering Contracts

21 Administering a contract 10th Oct 2003

22 Amending a contract 10th Oct 2003

23 Completing a contract 10th Oct 2003

24 Terminating a contract 10th Oct 2003

Page 5: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 5 of 164

NoNoNoNo Title of Desk InstructionTitle of Desk InstructionTitle of Desk InstructionTitle of Desk Instruction Date of Date of Date of Date of IssueIssueIssueIssue

Other Methods of ProcurementOther Methods of ProcurementOther Methods of ProcurementOther Methods of Procurement

25 Two-Stage Tendering

26A Single Source Procurement for low value requirements 10th Oct 2003

26B Single Source Procurement from a sole supplier 10th Oct 2003

26C Single Source Procurement for emergency requirements 10th Oct 2003

26D Single Source Procurement for additional requirements from the same source

10th Oct 2003

General Desk InstructionsGeneral Desk InstructionsGeneral Desk InstructionsGeneral Desk Instructions

27 Overall procurement planning 10th Oct 2003

28 Supplier qualifications 10th Oct 2003

Page 6: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 6 of 164

IIIINTRODUCTION TO THE NTRODUCTION TO THE NTRODUCTION TO THE NTRODUCTION TO THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

PPPPURPOSE OF THE URPOSE OF THE URPOSE OF THE URPOSE OF THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward, but detailed, guidance on the procedures to be followed when conducting procurement using government funds. They are designed to be simple to use and understand, by breaking the overall procurement process down into a series of individual procedures and breaking each procedure down into step-by-step instructions.

The procurement procedures contained in these Desk Instructions are intended to:

� provide working procedures which implement the legal requirements of the Act and Regulations;

� promote efficiency, economy and the attainment of value for money in the use of government funds;

� promote transparency and accountability in public procurement;

� provide uniform procedures for application by all procuring entities; and

� provide standard procedures, against which procurement activities can be monitored and audited.

AAAAPPLICATION OF THE PPLICATION OF THE PPLICATION OF THE PPLICATION OF THE DDDDEEEESK SK SK SK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

These Desk Instructions apply to all procurement carried out by procuring entities, using public funds.

A procuring entity is defined as “any Ministry, department, agency or organ, of the Government or statutory body or other unit, or any subdivision thereof, engaged in procurement”.

Public funds are defined as “any monetary resources appropriated to procuring entities through budgetary processes, aid grants and credits put at the disposal of procuring entities by foreign donors, or revenues of procuring entities”.

Where donor funded procurement is required to follow the procurement rules of the donor or funding agency, those rules will prevail over these Desk Instructions to the extent that there is any conflict. However, these Desk Instructions will continue to apply in all areas where they are consistent with the rules of the donor. Where any approval or “no objection” is required from a donor or funding agency, IPC approval, and any other applicable approvals specified in these Desk Instructions, should be obtained, prior to obtaining donor approval.

SSSSCOPE OF THE COPE OF THE COPE OF THE COPE OF THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

The Desk Instructions cover the whole procurement cycle from initiation through to contract completion. They provide guidance on all methods of procurement and on the procurement of goods, works, routine services and consultancy services.

The Desk Instructions do not cover supply management of stores procedures, but references are made to supply management issues, where they impact on procurement procedures.

Page 7: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 7 of 164

The Desk Instructions do not provide procedures for administrative review or the monitoring or audit of public procurement, although they establish the procedures against which reviews and investigations will be made.

The Desk Instructions do not provide procedures for procurement under privately financed infrastructure projects and related forms of private sector involvement in providing public services.

IIIISSUE AND SSUE AND SSUE AND SSUE AND AAAAMENDMENT OF THE MENDMENT OF THE MENDMENT OF THE MENDMENT OF THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

These Desk Instructions are issued by the Director of Public Procurement, under the Public Procurement Act, 2003.

It is intended that these Desk Instructions will be subjected to continuous upgrading to reflect amendments in legislation, changing needs, the commercial environment, and the adoption of new improved procedures and practices. Revised versions of existing Desk Instructions or additional Desk Instructions on new subjects will be issued by the Director of Public Procurement from time to time.

The holder of a copy of the Desk Instructions is required to keep them up-to-date at all times, by removing any Desk Instructions which are superseded and inserting any new or revised Desk Instructions into the set. ODPP will issue a revised List of Desk Instructions, whenever any new or amended Desk Instructions are issued. This will show the complete list of Desk Instructions and the dates of issue of each and should replace pages 2 to 3 of this Introduction. Each Desk Instruction has an issue date on the bottom, right-hand corner of each page for reference. Procurement staff should check this date against the date of issue in the latest List of Desk Instructions, to ensure they are referring to the correct version of any Desk Instruction.

Any comments, queries or suggestions on these Desk Instructions should be submitted to the Director of Public Procurement, who will take these into account, when issuing revisions.

Page 8: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 8 of 164

TTTTHE HE HE HE PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT SSSSYSTEMYSTEMYSTEMYSTEM

TTTTHE HE HE HE LLLLEGAL EGAL EGAL EGAL FFFFRAMEWORKRAMEWORKRAMEWORKRAMEWORK

Public Procurement ActPublic Procurement ActPublic Procurement ActPublic Procurement Act

The Public Procurement Act (No. 8 of 2003), which came into force on 21st August 2003, provides the legal basis of the Government of Malawi’s public procurement system. It sets out the organisational structure of the procurement system and establishes the basic principles which all procurement rules and procedures must comply with.

Key provisions of the Act include:

� the establishment of the Director of Public Procurement, as a public office with responsibility for the regulation and monitoring of public procurement in Malawi;

� the decentralisation of procurement responsibility to procuring entities;

� the establishment of Internal Procurement Committees in all procuring entities, as the bodies responsible for controlling and approving procurement activities within the procuring entity;

� the establishment of a cadre of procurement professionals, to conduct procurement activities within specialised procurement units;

� the principle that public procurement should normally be conducted through open tendering and the definition of five alternative methods of procurement, with strict conditions for use;

� a framework of procurement rules designed to achieve fairness, transparency and value for money in public procurement;

� a requirement for suppliers to meet qualification criteria, in order to be awarded government contracts and the establishment of a mechanism for debarring suppliers for misconduct;

� a requirement for both public officials and bidders and suppliers to adhere to ethical standards of conduct;

� confirmation of the Auditor General’s role in auditing procurement activities; and

� the right for bidders to seek administrative review of procurement decisions by procuring entities which are in breach of the Act.

Public Procurement RegulationsPublic Procurement RegulationsPublic Procurement RegulationsPublic Procurement Regulations

The Public Procurement Regulations, which were issued by the Minister on xxxx 2004, provide a more detailed framework of rules to implement the objectives of the Act and govern all public procurement.

In the event of any conflict, the Act will prevail over the Regulations at all times.

Desk InstructionsDesk InstructionsDesk InstructionsDesk Instructions

These Desk Instructions implement the principles and rules in the Act and Regulations by providing step-by-step procedures for all aspects of the procurement cycle.

Page 9: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 9 of 164

In the event of any conflict, the Act and Regulations will prevail over the Desk Instructions at all times.

Standard DocumentsStandard DocumentsStandard DocumentsStandard Documents

The Director of Public Procurement issues standard bidding documents and forms, to provide working documents for the implementation of public procurement activities. The use of the standard documents is mandatory for all procuring entities.

The standard documents are intended to provide standard drafts for documents and records, which:

� are compliant with the rules and procedures contained in the Act, Regulations and Desk Instructions; and

� include the basic contractual provisions and safeguards required by the Government of Malawi in the execution of public procurement and the use of public funds.

The use of documents with standard formats and clauses, which all parties involved in public procurement are familiar with, should:

� simplify the drafting of bidding documents, contracts and records of procurement;

� minimise the time required to approve documents and records;

� reduce bidders’ time and effort in responding to tenders; and

� facilitate the monitoring and auditing of public procurement activities.

TTTTHE HE HE HE OOOORGANISATIONAL RGANISATIONAL RGANISATIONAL RGANISATIONAL FFFFRARARARAMEWORKMEWORKMEWORKMEWORK

The organisational framework for public procurement in Malawi is shown diagrammatically on the next page. A summary of the role of each key body is given in the following paragraphs.

Office of the Director of Public ProcurementOffice of the Director of Public ProcurementOffice of the Director of Public ProcurementOffice of the Director of Public Procurement

The Director of Public Procurement is a public office, responsible for the regulation and monitoring of public procurement in Malawi and the administration of the Public Procurement Act. It is staffed by the Director and a Deputy Director, supported by other officers and staff.

As a regulatory and monitoring body, the Office of the Director of Public Procurement (ODPP) is not involved in conducting procurement activities or approving procurement decisions, with the exception of the two procurement management functions listed below.

The main functions of the Director of Public Procurement are:

� PolicyPolicyPolicyPolicy functions, which includes advising the Government on procurement policy and recommending any desirable changes to the public procurement system.

� RegulatoryRegulatoryRegulatoryRegulatory functions, which includes issuing standard documents, establishing review committees to conduct administrative reviews and issuing the list of bidders debarred from public procurement.

Page 10: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 10 of 164

� Procurement ManagementProcurement ManagementProcurement ManagementProcurement Management functions, which are limited to approving the use of procurement methods other than open tendering and request for proposals and nominating external members of IPC’s for requirements above a procuring entity’s threshold.

� MonitoringMonitoringMonitoringMonitoring functions, which include monitoring the compliance of procuring entities with the Act, examining particular procurement proceedings and referring violations of the Act to budget and law enforcement authorities.

� CapacityCapacityCapacityCapacity----BuildingBuildingBuildingBuilding functions, which include managing the procurement cadre and its professional development, setting competence levels for procurement staff and developing capacity building plans for institutional and human resource development in procurement.

� Information Management Information Management Information Management Information Management functions, which include conducting research and collecting and analysing data on public procurement, making procurement documents available to procuring entities and the general public and establishing relevant databases.

Page 11: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 11 of 164

Procuring Entities

Controlling Officer

(Chairperson of IPC)

Internal Procurement Committee

Procurement

Unit

End

User

Departments

Office of the Director

of Public Procurement

Office of the Director of Public Procurement:

Regulates and monitors public procurement.

Procurement Unit:

Manages and coordinates all aspects of the

procurement process.

End User Departments:

Initiate requirements and provide technical

support to the Procurement Unit.

Internal Procurement Committee:

Ensures the procuring entitiy’s procurement is

compliant with the Act, through approval of key

recommendations and documents.

External IPC Members

External IPC Members:

Strengthen IPC’s when considering procurement

requirements above the procuring entity’s

threshold.

Approves

Liases

Nominates

Strengthen

Procuring Entities:

Responsible for managing their own procurement.

Procuring EntitiesProcuring EntitiesProcuring EntitiesProcuring Entities

“Procuring entity” is a term used to define all government bodies involved in public procurement. It includes ministries, departments, agencies, statutory bodies and parastatals organisations.

Procuring entities are responsible for managing their own procurement activities, in accordance with the Act and other applicable laws.

Internal ProcuremeInternal ProcuremeInternal ProcuremeInternal Procurement Committeesnt Committeesnt Committeesnt Committees

Internal Procurement Committees (IPC’s) must be established in all procuring entities. The IPC’s main responsibility is to ensure that the procuring entity’s procurement activities are conducted in compliance with the Act. This is done by reviewing key recommendations and documents submitted to it by the procurement unit, at key stages throughout the procurement process and approving or rejecting those recommendations and documents.

Page 12: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 12 of 164

The IPC’s key functions include:

� ascertaining the availability of funds to pay for procurement;

� approving bidding documents, prior to their issue;

� managing public bid openings;

� approving evaluation reports, including contract award recommendations, prior to any contract being awarded;

� approving contract document, prior to their release; and

� approving any contract amendments.

IPC’s are chaired by the Controlling Officer of the procuring entity, who will appoint at least two other committee members, who may be procurement professionals, accountants, other budget professionals, engineers or other technically qualified staff. The members appointed must meet the requirements set by ODPP.

Where the estimated value of any procurement requirement exceeds the threshold set by ODPP, the IPC approving any procurement document or recommendation must include external members. Up to three external members will be nominated by ODPP from among procurement professionals, technical experts and neutral members, such as those from the National Audit Office, Accountant General’s Office or Ministry of Finance. The functions of the external members will be the same as the functions of the IPC as a whole; the external members are selected to strengthen the IPC and broaden its range of skills and experience, when considering higher value procurement requirements.

In considering submissions made by the procurement unit, the IPC may approve or reject any submission. Where a submission is rejected, they must provide reasons, to enable the submission to be corrected and resubmitted. The IPC are not permitted to change submissions or recommendations; any changes must be made by the procurement unit, in line with the reasons given for the rejection.

Procurement UnitProcurement UnitProcurement UnitProcurement Unit

Procurement units are responsible for conducting all procurement activity, in consultation with end users and subject to IPC approval of key stages in the process. Each procuring entity will normally have its own procurement unit, although procuring entities with low levels of procurement may share a procurement unit.

Procurement units will be staffed by procurement professionals, who are members of the procurement cadre. ODPP will set the qualification requirements to be met by procurement staff.

Procurement units will manage all aspects of procurement activity, using specialist advice where required, including:

� procurement planning;

� drafting pre-qualification, bidding, request for proposals and request for quotations documents, along with invitation notices and shortlists;

� issuing invitation documents, receiving tenders and closing bidding at the time of the bidding deadline;

� assisting the IPC with public bid openings;

Page 13: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 13 of 164

� evaluating tenders, proposals and quotations and preparing evaluation reports;

� conducting post-qualifications and negotiations, where required;

� making contract award recommendations to the IPC;

� issuing contract award notices;

� preparing and issuing contract documents and purchase orders;

� administering contracts; and

� preparing and issuing contract amendments.

End UsersEnd UsersEnd UsersEnd Users

End users are responsible for initiating procurement requirements and preparing technical descriptions of their requirements. They will often be called on by the procurement unit to provide technical inputs, particularly to evaluations. The end user may also be assigned responsibility for the day-to-day administration of contracts. Although the procurement process is managed by the procurement unit, this will always be done in consultation with the end user, to ensure that it meets the user’s needs.

Page 14: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 14 of 164

PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT RRRRULES AND ULES AND ULES AND ULES AND PPPPROCEDURESROCEDURESROCEDURESROCEDURES

TTTTHE HE HE HE PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT PPPPROCESSROCESSROCESSROCESS

Individual procurement processes will differ slightly, depending on:

� the method of procurement i.e. open tendering, restricted tendering, two-stage tendering, request for proposals, request for quotations or single source procurement; and

� the type of procurement i.e. goods, works, routine services or consultancy services.

However, despite these differences, all public procurement follows the same basic process, which can be broken down into six key stages. These are shown in the diagram below, along with notes providing more details on each stage in the process. The Desk Instructions are structured around these six key stages and the relevant sections are shown in the note below.

Page 15: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 15 of 164

Initiate and Plan Procurement

Identify Sources and Draft

Invitation Document

Manage the Bidding Process

Evaluate Offers

Award Contract

Administer Contract

Section A of Desk InstructionsRequisition

Description of Requirements

Methods and Procurement Planning

Section B of Desk InstructionsPre-qualification and Expressions of Interest

Invitation Notices and Shortlists

Bidding, RFP and RFQ Documents

Section C of Desk InstructionsPublication of Notices and Issue of Documents

Pre-bid Conferences and Bidder Clarifications

Receipt and Opening of Tenders

Section D of Desk InstructionsEvaluation for goods, works and services

Post-qualification

Negotiations

Section E of Desk InstructionsAcceptance Notices

Contract Documents and Purchase Orders

Contract Award Notices

Debriefing Unsuccessful Bidders

Section F of Desk InstructionsContract Administration

Contract Amendments

Contract Completion

AAAAPPROVALS REQUIRED DUPPROVALS REQUIRED DUPPROVALS REQUIRED DUPPROVALS REQUIRED DURING THE RING THE RING THE RING THE PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT PPPPROCESSROCESSROCESSROCESS

Approvals are required at certain key points in the procurement process. These are intended to ensure that procurement activities comply with the Act, Regulations and Desk Instructions and that procurement is being conducted in a manner which is fair, transparent and likely to achieve value for money.

The approvals required are summarised in the table below:

Page 16: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 16 of 164

Step in the ProcessStep in the ProcessStep in the ProcessStep in the Process Approval Required ForApproval Required ForApproval Required ForApproval Required For Approval BodyApproval BodyApproval BodyApproval Body

Raising a requisition Availability of funding Budget authorities within PE

Approval to purchase Budget controller within PE

Selecting a procurement method

Use of methods other than open tendering and request for proposals

ODPP

Pre-qualification Pre-qualification document and invitation to pre-qualify notice

IPC

Drafting an invitation document

Bidding, RFP or RFQ document and invitation to tender notice, list of pre-qualified bidders or shortlist

IPC

Evaluation Evaluation report and recommendations

IPC

Negotiations Result of negotiations and recommendations

IPC

Contract award Contract award decision, normally approved as part of the evaluation report or negotiation results.

IPC

Commitment of funds for contract

Commitment control authorities within PE

Contract document Contract document IPC

Contract amendment Contract amendment IPC

Commitment of any additional funds for contract amendment

Commitment control authorities within PE

HHHHOW TO OW TO OW TO OW TO UUUUSE THE SE THE SE THE SE THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

Page 17: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 17 of 164

The Desk Instructions break the overall procurement process down into small steps, with each individual Desk Instruction, from 1 to 24, providing the procedure for a different step in the process. The Instructions are grouped into six main sections, A to F, which correspond to the steps of the procurement process shown in the procurement process section above. Staff involved in procurement should therefore refer to the appropriate Desk Instruction, depending on the stage reached in the procurement process.

Alternative procedures are provided on separate Desk Instructions, where different procedures may apply to different types or methods of procurement, e.g. Desk Instructions 2A, 2B and 2C provide the procedures for preparing descriptions of requirements for goods, works and services respectively.

As the procurement process differs for each method and type of procurement, a different combination of Desk Instructions will apply to each. The matrix included after this introduction, shows the sequence of Desk Instructions which should be used for each method and type of procurement. On the matrix:

� App denotes Applies i.e. the procedure will always apply;

� N/A denotes Not Applicable i.e. the procedure will never apply; and

� Opt denotes Optional i.e. the procedure may apply.

For example, the procurement process for Restricted Tendering for Works will require the application of the following Desk Instructions:

� Desk Instruction 1: Raising a requisition;

� Desk Instruction 2B: Preparing a description of requirements for works;

� Desk Instruction 3: Selecting a procurement method and planning the procurement;

� Desk Instruction 5B: Developing a shortlist;

� Desk Instruction 6A: drafting a bidding document and obtaining approval;

� Desk Instruction 8: Issuing invitation documents;

� Desk Instruction 10: Handling bidder clarifications, modifications and extensions;

� Desk Instruction 11: Receiving tenders;

� Desk Instruction 12A: Opening tenders (one stage – single envelope);

� Desk Instructions 13 and 13B: General evaluation procedures and Evaluating offers for goods;

� Desk Instruction 18: Issuing a notice of acceptance;

� Desk Instruction 19A: preparing and issuing a contract document;

� Desk Instruction 20: Publishing a contract award notice and debriefing unsuccessful bidders;

� Desk Instruction 21: Administering a contract; and

� Desk Instruction 23: Completing a contract.

Page 18: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 18 of 164

The following Desk Instructions may also apply, depending on the needs of the particular procurement requirement:

� Desk Instruction 9: Managing a pre-bid conference and site visit;

� Desk Instruction 15: Conducting a post-qualification;

� Desk Instruction 16: Conducting negotiations; and

� Desk Instruction 22: Amending a contract.

Desk Instructions 17 or 24 would apply, only if there were a need to cancel the procurement proceedings or terminate the contract.

Two-stage tendering and single source procurement follow a slightly different process to the other methods of procurement and therefore, they are covered by separate Desk Instructions. These cover the entire procurement process in a single Desk Instruction, but refer to other instructions, where possible, highlighting the differences. These Desk Instructions are:

� Desk Instruction 25 for Two-Stage Tendering;

� Desk Instruction 26A for Single Source Procurement for low value requirements;

� Desk Instruction 26B for Single Source Procurement for emergency requirements;

� Desk Instruction 26C for Single Source Procurement from a sole supplier; and

� Desk Instruction 26D for Single Source Procurement for additional requirements from the same source.

Two general Desk Instructions are also provided, which do not form part of the procurement process. These are:

� Desk Instruction 27: Overall procurement planning; and

� Desk Instruction 28 Supplier qualifications.

FFFFORMAT OF THE ORMAT OF THE ORMAT OF THE ORMAT OF THE DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

Each Desk Instruction follows a standard format, to make it easier for procurement staff to find and follow the required information. Each Desk Instruction contains the following information:

� a summary of the procedure, to assist staff in understanding where the procedure fits within the overall procurement process;

� details on which methods and types of procurement it applies to, to ensure that the correct Desk Instructions are used;

� the purpose of the procedure, to assist staff in understanding the importance of following the specified procedure and the reasons for the rules which apply;

� references to the Act and Regulations, to enable staff to quickly find the relevant parts of the legislation;

Page 19: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 19 of 164

� a statement of the staff involved, to make it clear who is responsible for each step in the procurement process and to assist with resource planning;

� step-by-step instructions for the procedure, to break the overall procedure down into a series of small steps, which should be easier to follow;

� details of the approvals required, to ensure that the appropriate approvals are obtained at the appropriate time;

� a list of the documents and/or records required for each procedure and the information to be included in each, to assist procurement staff in maintaining the required records;

� a statement of the next step in the overall procurement process, to assist staff in managing the overall procurement process.

TTTTYPES AND YPES AND YPES AND YPES AND MMMMETHODS OF ETHODS OF ETHODS OF ETHODS OF PPPPROCUREMENT AND ROCUREMENT AND ROCUREMENT AND ROCUREMENT AND AAAAPPLICABLE PPLICABLE PPLICABLE PPLICABLE

DDDDESK ESK ESK ESK IIIINSTRUCTIONSNSTRUCTIONSNSTRUCTIONSNSTRUCTIONS

KeyKeyKeyKey: : : : App = Applies i.e. procedure always applies. N/A = Not Applicable i.e. procedure never applies. Opt = Optional i.e. procedure may apply.

OpenOpenOpenOpen TenderingTenderingTenderingTendering

RestrictedRestrictedRestrictedRestricted TenderingTenderingTenderingTendering

Request forRequest forRequest forRequest for QuotationsQuotationsQuotationsQuotations

Number of Desk

Number of Desk

Number of Desk

Number of Desk

Instructi

Instructi

Instructi

Instructi on

on

on

on Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction

(Stage in Procurement (Stage in Procurement (Stage in Procurement (Stage in Procurement Process)Process)Process)Process)

Goods

Works

Routine Services

Goods

Works

Routine Services

Request for Proposals

Request for Proposals

Request for Proposals

Request for Proposals

(Consultancy Services)

Goods

Works

Routine Services

Section A: Initiating and Section A: Initiating and Section A: Initiating and Section A: Initiating and Planning ProcurementPlanning ProcurementPlanning ProcurementPlanning Procurement

1 Raising a requisition AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

2A Preparing a description of requirements for goods

AppAppAppApp N/A N/A AppAppAppApp N/A N/A N/A AppAppAppApp N/A N/A

2B Preparing a description of requirements for works

N/A AppAppAppApp N/A N/A AppAppAppApp N/A N/A N/A AppAppAppApp N/A

2C Preparing a description of requirements for services

N/A N/A AppAppAppApp N/A N/A AppAppAppApp AppAppAppApp N/A N/A AppAppAppApp

3 Selecting a procurement method and planning the procurement

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

Section Section Section Section B: Identifying B: Identifying B: Identifying B: Identifying Sources and Drafting Sources and Drafting Sources and Drafting Sources and Drafting

Page 20: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 20 of 164

OpenOpenOpenOpen TenderingTenderingTenderingTendering

RestrictedRestrictedRestrictedRestricted TenderingTenderingTenderingTendering

Request forRequest forRequest forRequest for QuotationsQuotationsQuotationsQuotations

Number of Desk

Number of Desk

Number of Desk

Number of Desk

Instructi

Instructi

Instructi

Instructi on

on

on

on Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction

(Stage in Procurement (Stage in Procurement (Stage in Procurement (Stage in Procurement Process)Process)Process)Process)

Goods

Works

Routine Services

Goods

Works

Routine Services

Request for Proposals

Request for Proposals

Request for Proposals

Request for Proposals

(Consultancy Services)

Goods

Works

Routine Services

Invitation DocumentsInvitation DocumentsInvitation DocumentsInvitation Documents

4A Conducting a pre-qualification

OptOptOptOpt OptOptOptOpt OptOptOptOpt N/A N/A N/A N/A N/A N/A N/A

4B Obtaining and assessing expressions of interest

N/A N/A N/A N/A N/A N/A OptOptOptOpt N/A N/A N/A

5A Preparing an invitation to tender notice

OptOptOptOpt OptOptOptOpt OptOptOptOpt N/A N/A N/A N/A N/A N/A N/A

5B Developing a shortlist N/A N/A N/A AppAppAppApp AppAppAppApp AppAppAppApp OptOptOptOpt AppAppAppApp AppAppAppApp AppAppAppApp

6A Drafting a bidding document or request for proposals document

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A N/A N/A

6B Drafting a request for quotations document

N/A N/A N/A N/A N/A N/A N/A AppAppAppApp AppAppAppApp AppAppAppApp

Section C: Managing the Section C: Managing the Section C: Managing the Section C: Managing the Bidding ProcessBidding ProcessBidding ProcessBidding Process

7 Publishing an invitation to tender notice

OptOptOptOpt OptOptOptOpt OptOptOptOpt N/A N/A N/A N/A N/A N/A N/A

8 Issuing invitation documents

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp ApApApAppppp

9 Managing a pre-bid conference and site visit

Opt Opt Opt Opt Opt Opt Opt N/A N/A N/A

10 Handling bidder clarifications, modifications and extensions

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

11 Receiving tenders AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A N/A N/A

12A Opening tenders (one stage - single envelope)

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A N/A N/A N/A

12B Opening tenders (one stage - two envelopes)

N/A N/A N/A N/A N/A N/A AppAppAppApp N/A N/A N/A

Section D: Evaluating Section D: Evaluating Section D: Evaluating Section D: Evaluating OffersOffersOffersOffers

13 General evaluation AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A AppAppAppApp AppAppAppApp AppAppAppApp

Page 21: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 21 of 164

OpenOpenOpenOpen TenderingTenderingTenderingTendering

RestrictedRestrictedRestrictedRestricted TenderingTenderingTenderingTendering

Request forRequest forRequest forRequest for QuotationsQuotationsQuotationsQuotations

Number of Desk

Number of Desk

Number of Desk

Number of Desk

Instructi

Instructi

Instructi

Instructi on

on

on

on Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction

(Stage in Procurement (Stage in Procurement (Stage in Procurement (Stage in Procurement Process)Process)Process)Process)

Goods

Works

Routine Services

Goods

Works

Routine Services

Request for Proposals

Request for Proposals

Request for Proposals

Request for Proposals

(Consultancy Services)

Goods

Works

Routine Services

procedures for goods, works and routine services

13A Evaluating offers for goods

AppAppAppApp N/A N/A AppAppAppApp N/A N/A N/A AppAppAppApp N/A N/A

13B Evaluating offers for works

N/A AppAppAppApp N/A N/A AppAppAppApp N/A N/A N/A AppAppAppApp N/A

13C Evaluating offers for routine services

N/A N/A AppAppAppApp N/A N/A AppAppAppApp N/A N/A N/A AppAppAppApp

14 General evaluation procedures for consultancy services

N/A N/A N/A N/A N/A N/A AppAppAppApp N/A N/A N/A

14A Evaluating proposals for consultancy services using QCBS

N/A N/A N/A N/A N/A N/A OptOptOptOpt N/A N/A N/A

14B Evaluating proposals for consultancy services using QBS

N/A N/A N/A N/A N/A N/A OptOptOptOpt N/A N/A N/A

14C Evaluating proposals for consultancy services using LCS

N/A N/A N/A N/A N/A N/A OptOptOptOpt N/A N/A N/A

15 Conducting a post-qualification

Opt Opt Opt Opt Opt Opt N/A N/A N/A N/A

16 Conducting negotiations Opt Opt Opt Opt Opt Opt Opt N/A N/A N/A

17 Cancelling procurement proceedings

Opt Opt Opt Opt Opt Opt Opt Opt Opt Opt

Section E: Awarding Section E: Awarding Section E: Awarding Section E: Awarding ContractsContractsContractsContracts

18 Issuing a notice of acceptance

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A N/A N/A

19A Preparing and issuing a contract document

AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp N/A N/A N/A

19B Preparing and issuing a purchase order

N/A N/A N/A N/A N/A N/A N/A AppAppAppApp AppAppAppApp AppAppAppApp

Page 22: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 22 of 164

OpenOpenOpenOpen TenderingTenderingTenderingTendering

RestrictedRestrictedRestrictedRestricted TenderingTenderingTenderingTendering

Request forRequest forRequest forRequest for QuotationsQuotationsQuotationsQuotations

Number of Desk

Number of Desk

Number of Desk

Number of Desk

Instructi

Instructi

Instructi

Instructi on

on

on

on Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction Title of Desk Instruction

(Stage in Procurement (Stage in Procurement (Stage in Procurement (Stage in Procurement Process)Process)Process)Process)

Goods

Works

Routine Services

Goods

Works

Routine Services

Request for Proposals

Request for Proposals

Request for Proposals

Request for Proposals

(Consultancy Services)

Goods

Works

Routine Services

20 Publishing a contract award notice and debriefing unsuccessful bidders

AAAApppppppp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

Section F: Administering Section F: Administering Section F: Administering Section F: Administering ContractsContractsContractsContracts

21 Administering a contract AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

22 Amending a contract Opt Opt Opt Opt Opt Opt Opt Opt Opt Opt

23 Completing a contract AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp AppAppAppApp

24 Terminating a contract Opt Opt Opt Opt Opt Opt Opt Opt Opt Opt

Page 23: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 23 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 1:1:1:1: RRRRAISING A AISING A AISING A AISING A RRRREQUISITIONEQUISITIONEQUISITIONEQUISITION

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for raising a requisition and obtaining approval to proceed with the procurement. It also includes requirements for obtaining goods from stores, where appropriate.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement. The method of procurement will not have been selected at this stage.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

A requisition must be raised to start any procurement process. It serves a number of purposes, including:

� documenting the goods, works or services required;

� confirming the availability of funding, based on the estimated value of the procurement requirement;

� confirming that goods cannot be obtained from stores, where appropriate; and

� documenting the approval to proceed with the procurement.

References:References:References:References:

No reference in the Public Procurement Act, 2003.

Regulation 3.6, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The end user is responsible for raising a requisition and obtaining all necessary approvals.

StepStepStepStep----bybybyby----Step InstrucStep InstrucStep InstrucStep Instructions:tions:tions:tions:

1. The procurement process will start with the identification of a need for goods, works or services.

2. For goods, check whether the items required are included in the Government Central Stores (GCS) Catalogue (or available from other relevant stores organisations) as standard stock items. For stockable items, proceed to step 3. For non stockable items (i.e. those falling under the Not in Vocabulary category) and for works and services, proceed to step 4.

3. For stockable items, raise a Requisition and Issue Voucher (RIV) for each item and take them to GCS (or other stores organisations). Where items are in stock, obtain a proforma invoice from GCS, obtain a cheque and purchase the items from GCS. Where stockable items are out of stock at GCS, obtain written confirmation of this and proceed to step 4.

4. List the goods, works or services required on a requisition form. Where a long list has already been prepared, such as for spare parts, this may be attached to the requisition, with a summary description on the form.

Page 24: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 24 of 164

5. Prepare an initial description of requirements – see Desk Instruction 2A, 2B or 2C for further guidance.

6. Estimate the value of the goods, works or services. The estimate may be based on recent, similar contracts, market research or an estimate by a technical specialist, such as an engineer for construction contracts. Seek assistance from the Procurement Unit, where required.

7. Obtain confirmation of the availability of funding for the requirement, through the signature of an authorised official on the requisition form.

8. Obtain approval to proceed with the procurement, through the signature of the budget holder, or other authorised official, on the requisition form.

9. Finalise the description of requirements, as far as possible and attach it to the requisition form.

10. Pass the requisition to the Procurement Unit.

11. The Procurement Unit will check the requisition and description of requirements and discuss any clarifications or changes required with the end user.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

The requisition form must be signed by the appropriate official, to provide the following approvals:

� availability of funding for the procurement requirement, based on the estimated value on the requisition form; and

� confirmation of the need for the goods, works or services listed on the requisition form and approval to proceed with the procurement process for those items.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A requisition form must be completed and passed to the Procurement Unit, who will open a procurement file for the requirement. The end user should also keep a copy of the requisition for his own records. The requisition form must include:

� the name of the end user department raising the requisition and the contact name for queries;

� a list of the goods, works or services required, including quantities and units of measure;

� the estimated unit and total value for each item;

� the location for delivery or performance of the goods, works or services;

� the date or dates for delivery, completion or performance of the goods, works or services;

� confirmation of availability of funding;

� confirmation that the items were not available from stores, where appropriate; and

� approval to proceed with the procurement.

Page 25: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 25 of 164

A detailed description of requirements should be attached to the requisition form.

The Procurement Unit will allocate a procurement reference number to each procurement requirement.

Next Steps:Next Steps:Next Steps:Next Steps:

Prepare a description of requirements to accompany the requisition – see Desk Instruction 2A, 2B or 2C: Preparing a description of requirements for goods, works or services for guidance. Then:

� Proceed to Desk Instruction 3: Selecting a procurement method and planning the procurement.

Page 26: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 26 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 2A:2A:2A:2A: PPPPREPARING A REPARING A REPARING A REPARING A DDDDESCRIPTION OF ESCRIPTION OF ESCRIPTION OF ESCRIPTION OF RRRREQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR

GGGGOODSOODSOODSOODS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for preparing a description of requirements for the procurement of goods, including any incidental works or services required.

Where possible, the description of requirements should be fully prepared at the stage of raising the requisition. However, it is often only possible to prepare an outline description of requirements at this stage, in which case the description must be finalised during the drafting of the bidding document.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement. The method of procurement will not have been selected at this stage.

TypeTypeTypeType: This Desk Instruction applies to goods only.

Descriptions of requirements for works and services are covered by Desk Instructions 2B and 2C. Parts of this Desk Instruction may apply to works or services, where the description of requirements includes goods, which are incidental to the works or services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The description of requirements is a key document, which is used throughout the procurement process. It is used to:

� inform the Procurement Unit and IPC what the end user needs to purchase, providing the basis for the procurement planning and budgeting;

� inform bidders of the procuring entity’s requirements through inclusion in the bidding document;

� provide the technical standard against which tenders are evaluated;

� form part of the contract, defining the goods to be supplied; and

� set the technical standard against which the goods supplied can be inspected, prior to acceptance.

ReferencReferencReferencReferences:es:es:es:

Section 15, Public Procurement Act, 2003. Section 2 provides a definition of “goods”.

Regulation 3.2 and 5.2.4.1, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The description of requirements for goods should be prepared by the end user, who should obtain additional technical advice if required. The end-user should consult the Procurement Unit, if necessary, on the procurement rules which apply to the description of requirements.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Page 27: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 27 of 164

12. The preparation of the description of requirements will normally start with a general, summary description of the requirement e.g. 4WD vehicle or desktop computer.

13. Prepare a complete list of the items required – see guidance note 1 below for the information to include.

14. Consider the purpose the goods are being purchased for and any special requirements e.g. for use off-road in mountainous terrain or to use desktop publishing programmes.

15. Prepare a specification for each item required – see guidance note 2 below for further details.

16. Prepare the required delivery schedule – see guidance note 3 below for further details.

17. Send the description of requirements, along with the requisition, to the Procurement Unit.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– List of Goods List of Goods List of Goods List of Goods

The list of goods should briefly describe each of the goods that the procuring entity requires and specify the quantities of each. Consideration should be given to including any spare parts or consumable items required, either by specifying the items required or requesting the spares or consumables normally required for a specified period of operation, such as one year. The list of goods should also describe any incidental works or services required, such as installation and commissioning, preparation of the site for installation or user training.

Each item should be numbered sequentially on the list for reference purposes. Along with the quantity, the unit of measure must also be specified e.g. kilograms, litres, reams etc. Complete items, such as vehicles or computers, should be given a unit of measure of “each”.

An example of a typical list of goods is shown below:

Item Item Item Item numbernumbernumbernumber

Brief Description of Goods and Related Brief Description of Goods and Related Brief Description of Goods and Related Brief Description of Goods and Related Services Services Services Services

QuantityQuantityQuantityQuantity Unit of Unit of Unit of Unit of MeasureMeasureMeasureMeasure

1 Personal Computer 2 Each

2 LaserJet Printer 1 Each

2a Toner Cartridge for item 2 2 Each

Guidance NGuidance NGuidance NGuidance Note 2 ote 2 ote 2 ote 2 –––– Specifications Specifications Specifications Specifications

The specifications should define the technical characteristics and quality standards of the goods required by the procuring entity. Well-prepared specifications will facilitate the preparation of tenders by bidders and the evaluation of tenders by the procuring

Page 28: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 28 of 164

entity. Where required, the end user should seek technical advice from other government bodies or external specialists in preparing specifications.

Technical specifications should specify the minimum requirements of the procuring entity. The evaluation will then assess whether tenders reach this standard. Credit will not be given for exceeding the standard.

Technical specifications should contain a complete, precise and unambiguous description of the goods required, by specifying:

� the functions or characteristics required e.g. colour printing for a printer, double-sided copying for a photocopier, dimensions of items, the dosage of a drug, air-conditioning in a vehicle;

� the performance required e.g. the speed of a printer, a photocopier or a computer processor or the accuracy of laboratory equipment; and/or

� the quality standards for equipment, materials or workmanship.

Specifications must be generic i.e. they must not refer to a particular trademark, brand name, make or model, patent, catalogue number or any other detail which would limit the specification to a specific manufacturer. For example, a specification for a printer must not state Hewlett Packard or Canon, but should give the technical characteristics of the printer e.g.

“LaserJet printer, black and white, minimum print speed 20 pages per minute, minimum print quality 1200x1200 dpi, minimum input capacity of 200 A4 sheets” etc.

In exceptional cases, where there is no sufficiently precise way of describing the goods without use of a brand name or similar, the words “or equivalent” must be included. The use of particular makes or models may also be permitted for reasons of compatibility e.g. spare parts or consumables for a piece of equipment.

Standards specified must not be restrictive. Where possible, recognised international standards should be used. Where other standards are used, they should normally be followed by a statement that “other authoritative standards that ensure at least a substantially equal quality will also be acceptable”.

Where appropriate, specifications should also include:

� The purpose and intended use of the goods.

� Details of the conditions in which the goods must operate e.g. temperature or humidity ranges or, where no specific or unusual conditions apply, state “suitable for use in Malawi”.

� Descriptions of required manufacturing processes, workmanship or materials.

� Drawings of the goods, including site plans for installation.

� Any environmental or safety features required of the goods.

� Packaging, marking and labelling requirements, such as a requirement for pills to be packaged in blister packs corresponding to weekly dosages, for HIV test kits to be individually packaged, along with the required protective gloves and instructions for use or for drugs to be marked with their expiry date.

Page 29: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 29 of 164

� Details of inspection or testing requirements, including performance parameters, including outputs, timescales, and any indicators or criteria against which the satisfactory performance of the goods will be tested.

� Any documentation required e.g. manuals, user guides, licences, test certificates etc.

Where appropriate, procuring entities should make use of standardised specifications or specifications used previously.

Details should also be included of any incidental works or services required. For example:

� where the supplier is responsible for preparing a site for installation, the current state of the site and the work required should be stated e.g. a particular thickness of concrete base for machinery.

� the number of people to be trained in use, maintenance or repair of equipment, the location for training, the standard to be attained etc.

Desk Instructions 2B and 2C on the preparation of descriptions for works and services may provide useful guidance for incidental works or services.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Delivery Schedule Delivery Schedule Delivery Schedule Delivery Schedule

The delivery schedule should specify the delivery period and place for each of the goods. Where any related works or services are included, the delivery schedule should also state the completion period and the site.

In preparing the delivery schedule, the following guidance should be taken into account:

� The delivery and completion periods should be realistic. Unrealistically short delivery or completion expectations may result in restricted competition or may prompt complaints from prospective bidders.

� The delivery and completion periods are best expressed as a number of days, weeks or months from the date of contract award, as precise dates cannot be determined until the contract has been placed.

� The delivery period should take into account whether the procurement is of standard, readily available goods or goods which are likely to be manufactured to order.

� Where appropriate, different delivery periods should be given for different items or the total requirement should be split into several batches, with phased deliveries.

� The delivery period should take into account whether the goods are likely to be available in Malawi or require importing. Where the goods are likely to be sourced internationally, the location of the goods and likely transport times should be considered.

� When the description of requirements is included in a bidding document, the Procurement Unit should check that the delivery period specified takes into account the Incoterm specified for delivery. It must be remembered that under the Incoterms CIF, CIP, FOB, FCA or EXW, the delivery of goods takes place

Page 30: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 30 of 164

when they are delivered to the carrier, not when they are delivered to the final destination. Under other Incoterms, a realistic time should be allowed for delivery considering the mode of transport.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No specific approval of the description of requirements is required at this stage. However, the final description of requirements included in the bidding or request for quotations document will be reviewed by the IPC, when approving the invitation document – see Desk Instruction 6A or 6B.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the description of requirements must be attached to the requisition form, which should be kept on the procurement file. The end user should also retain a copy of the requisition and description of requirements for their own reference.

Next Steps:Next Steps:Next Steps:Next Steps:

Ensure that the requisition has been completed – see Desk Instruction 1: Raising a requisition for guidance. Then:

� Proceed to Desk Instruction 3: Selecting a procurement method and planning the procurement.

Page 31: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 31 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 2B:2B:2B:2B: PPPPREPARING A REPARING A REPARING A REPARING A DDDDESCRIPTION OF ESCRIPTION OF ESCRIPTION OF ESCRIPTION OF RRRREQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR

WWWWORKSORKSORKSORKS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for preparing a description of requirements for the procurement of works, including any incidental goods or services required.

This Desk Instruction is based on works which are fully designed by the procuring entity, prior to inviting tenders, where the supplier will be responsible for construction only. Alternative specialist advice should be sought for the preparation of a description of requirements for design and build or turnkey contracts.

Where possible, the description of requirements should be fully prepared at the stage of raising the requisition. However, it is often only possible to prepare an outline description of requirements at this stage, in which case the description must be finalised during the drafting of the bidding document.

Applies tApplies tApplies tApplies to:o:o:o:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement. The method of procurement will not have been selected at this stage.

TypeTypeTypeType: This Desk Instruction applies to works only.

Descriptions of requirements for goods and services are covered by Desk Instructions 2A and 2C. Parts of this Desk Instruction may apply to goods or services, where the description of requirements includes works, which are incidental to the goods or services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The description of requirements is a key document, which is used throughout the procurement process. It is used to:

� inform the Procurement Unit and IPC what the end user needs to purchase, providing the basis for the procurement planning and budgeting;

� inform bidders of the procuring entity’s requirements through inclusion in the bidding document;

� provide the technical standard and, for some requirements the estimated quantities, against which tenders are evaluated;

� form part of the contract, defining the works to be performed and the technical standard against which the works can be inspected prior to acceptance; and

� provide, for some types of contracts, the rates and estimated quantities against which actual work is measured for payment purposes.

References:References:References:References:

Section 15, Public Procurement Act, 2003. Section 2 provides a definition of “works”.

Regulation 3.2 and 5.2.4.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Page 32: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 32 of 164

The description of requirements for works must be prepared by an engineer with appropriate technical qualifications and experience. Where the end user department does not have an appropriate member of staff, external technical advice should be sought. The end-user should consult the Procurement Unit, if necessary, on any procurement rules which apply to the description of requirements.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

18. The preparation of the description of requirements will normally start with a general, summary description of the requirement e.g. construction of classrooms or repair of airport road. This will normally be developed into a design brief for the engineer.

19. Prepare the drawings and specifications for the works – see guidance notes 1 and 2 below for further details.

20. Prepare a bill of quantities or activity schedule as required – see guidance notes 3 and 4 below for further details.

21. Prepare the required completion schedule – see guidance note 5 below for further details.

22. Prepare an overall scope of works, which will form the first part of the description of requirements – see guidance note 6 below for further details.

23. Send the description of requirements, along with the requisition, to the Procurement Unit.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Drawings for Works Drawings for Works Drawings for Works Drawings for Works

Technical drawings are required to define the works required by the procuring entity. The construction drawings, even if not fully developed, must show sufficient detail to enable bidders to understand the type and complexity of the work involved and to price their tenders. In addition to the construction drawings, a simplified map showing the location of the Site in relation to the local geography, including major roads, posts, airports and railroads, is helpful.

When preparing the bidding document, it is normal practice to insert a list of drawings, although the drawings themselves are often bound and issued in a separate volume, particularly where they are numerous or issued in large format, such as A1 or A2 paper.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Specifications for Works Specifications for Works Specifications for Works Specifications for Works

A set of precise and clear specifications is a prerequisite for bidders to respond realistically and competitively to the procuring entity’s requirements without qualifying or conditioning their tenders. Specifications must be drafted to permit the widest possible competition and, at the same time, present a clear statement of the required standards of workmanship, materials, and performance of the related goods and services to be procured. Only if this is done will the objectives of economy, efficiency, and fairness in procurement be realised, responsiveness of tenders be ensured, and the subsequent task of evaluation be facilitated. The specifications should require that all goods and materials to be incorporated in the Works be new, unused, of the most recent or current models, and incorporate all recent improvements in design and materials unless provided otherwise in the Contract.

Page 33: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 33 of 164

Care must be taken in drafting specifications to ensure that they are not restrictive. In the specification of standards for goods, materials, and workmanship, recognised international standards should be used as much as possible. Where national, or other, standards are used, the specifications should state that goods, materials, and workmanship that meet other authoritative standards, and which ensure substantially equal or higher quality than the standards mentioned, will also be acceptable.

Most specifications are normally written specially to suit the specific works in hand. There is no standard set of specifications for universal application in all sectors, although there are established principles and practices.

There are considerable advantages in standardising General Specifications for repetitive Works in recognised public sectors, such as highways, ports, railways, urban housing, irrigation, and water supply, in the same region or where similar conditions prevail. The General Specifications should cover all classes of workmanship, materials, and equipment commonly involved in construction, although not necessarily to be used in a particular Works Contract. Deletions or addenda can then be used to adapt General Specifications to the particular Works.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Bills of Quantities Bills of Quantities Bills of Quantities Bills of Quantities

A bill of quantities should be prepared for inclusion in the bidding document, where the requirement is to be contracted as an admeasurement contract – for lump sum contracts, see guidance note 4 below. Bidders are then required to price the bill of quantities in their tenders and the priced bill of quantities becomes part of the contract. Payment is then made using the rates in the priced bill of quantities, but based on the quantity of work actually performed, which is measured on a regular basis.

Therefore, the objectives of the bill of quantities are:

� to provide sufficient information on the quantities of Works to be performed to enable tenders to be prepared efficiently and accurately; and

� to provide a priced bill of quantities for use in the periodic valuation of Works executed, once a Contract has been entered into.

In order to attain these objectives, Works should be itemised in the bill of quantities in sufficient detail to distinguish between the different classes of Works, or between Works of the same nature carried out in different locations or in other circumstances which may give rise to different considerations of cost. The layout and content of the bill of quantities should be as simple and brief as possible.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 –––– Activity Schedule Activity Schedule Activity Schedule Activity Schedule

An activity schedule should be prepared for inclusion in the bidding document, where the requirement is to be contracted as a lump sum contract – for admeasurement contracts, see guidance note 3 above. Bidders are required to tender a lump sum price, based on the activity schedule and the successful bidder’s tender price becomes the contract price. The actual work performed will not be remeasured for payment purposes, as under an admeasurement contract, so the breakdown of price on the activity schedule is only used for contract variations.

Page 34: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 34 of 164

Therefore, the objective of the activity schedule is to provide a breakdown of the activities and their associated cost that form the Works to be paid on a lump sum basis. The breakdown is intended to be used:

� as the basis for certifying interim payment to the supplier; and

� to assist in valuing any ordered variations.

The works should be broken down by consideration of the nature of each activity and if applicable by the location. The procuring entity will have to determine the degree to which the Works need to be broken down by consideration of the complexity of the Works and the stated time for completion. Schedules can be provided for each different discrete element of the works. If the works require plant and equipment to be provided, separate schedules for the supply only of the plant and equipment may be provided. The activity schedule should be as simple and brief as possible.

Guidance Note 5 Guidance Note 5 Guidance Note 5 Guidance Note 5 –––– Completion Schedul Completion Schedul Completion Schedul Completion Scheduleeee

The completion schedule should specify the completion period and site for each part of the works. In preparing the completion schedule, the following guidance should be taken into account:

� The completion periods should be realistic. Unrealistically short completion periods may result in restricted competition or may prompt complaints from prospective bidders.

� The completion periods are best expressed as a number of days, weeks or months from the date of contract award, as precise dates cannot be determined until the contract has been placed.

Guidance Note 6 Guidance Note 6 Guidance Note 6 Guidance Note 6 –––– Scope of Works Scope of Works Scope of Works Scope of Works

The scope of works should provide:

� a description of the works;

� approximate quantities of major items;

� a background narrative to the work required, where appropriate; and

� the objectives of the works required, where appropriate.

The scope of works will normally form the first part of the description of requirements, but will need to be prepared last, once approximate quantities etc are known. A description of approximately 1-2 pages is appropriate for most contracts.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No specific approval of the description of requirements is required at this stage. However, the final description of requirements included in the bidding or request for quotations document will be reviewed by the IPC, when approving the invitation document – see Desk Instruction 6A or 6B.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the description of requirements should be kept on file, along with the requisition form. The end user should also retain a copy of the requisition and description of requirements for their own reference.

Page 35: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 35 of 164

Next Steps:Next Steps:Next Steps:Next Steps:

Ensure that the requisition has been completed – see Desk Instruction 1: Raising a requisition for guidance. Then:

� Proceed to Desk Instruction 3: Selecting a procurement method and planning the procurement.

Page 36: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 36 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 2C:2C:2C:2C: PPPPREPARING A REPARING A REPARING A REPARING A DDDDESCRIPTION OF ESCRIPTION OF ESCRIPTION OF ESCRIPTION OF RRRREQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR EQUIREMENTS FOR

SSSSERVICESERVICESERVICESERVICES

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for preparing a description of requirements for the procurement of services, both routine and consultancy, including any incidental goods or works required.

Where possible, the description of requirements should be fully prepared at the stage of raising the requisition. However, it is often only possible to prepare an outline description of requirements at this stage, in which case the description must be finalised during the drafting of the bidding document.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement. The method of procurement will not have been selected at this stage.

TypeTypeTypeType: This Desk Instruction applies to routine and consultancy services.

Descriptions of requirements for goods and works are covered by Desk Instructions 2A and 2B. Parts of this Desk Instruction may apply to goods or works, where the description of requirements includes services, which are incidental to the goods or works.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The description of requirements is a key document, which is used throughout the procurement process. It is used to:

� inform the Procurement Unit and IPC what the end user needs to purchase, providing the basis for the procurement planning and budgeting;

� inform bidders of the procuring entity’s requirements through inclusion in the bidding or request for proposals document;

� provide the terms of reference against which tenders or proposals are evaluated;

� form part of the contract, defining the services to be supplied; and

� set the technical standard and/or deliverables against which the services performed can be judged, prior to acceptance.

References:References:References:References:

Section 15, Public Procurement Act, 2003.

Regulation 3.2 and 5.2.4.3 for routine services and 5.5.2.4 for consultancy services, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The description of requirements for services should be prepared by the end user, who should obtain additional technical advice if required. The end-user should consult the Procurement Unit, if necessary, on the procurement rules which apply to the description of requirements. It is important that the recipient or manager of the

Page 37: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 37 of 164

services is involved in drafting or checking the description of requirements, as it must reflect the requirements of the intended contract.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

24. The preparation of the description of requirements will normally start with a general, summary description of the requirement e.g. cleaning services for the Ministry headquarters or training in new finance rules.

25. Prepare detailed terms of reference for the services – see guidance notes 1 and 2 below for the information to include for routine and consultancy services respectively.

26. Send the description of requirements, along with the requisition, to the Procurement Unit.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Terms of Reference for Routine Services Terms of Reference for Routine Services Terms of Reference for Routine Services Terms of Reference for Routine Services

The terms of reference should provide sufficient information to enable bidders to understand the services required by the procuring entity and should be complete, precise and clear. Well-prepared terms of reference will facilitate the preparation of tenders by bidders and the evaluation of tenders by the procuring entity.

The precise contents of the terms of reference will be determined by the individual assignment, but should include the following details, where applicable:

� the purpose of the assignment and what it is expected to achieve;

� a description of the scope of the services required;

� the location or locations for performance of the services e.g. specify the address, where services are to be performed on the procuring entity’s premises;

� the role, qualifications and experience of any key staff required, such as supervisors;

� the duration of the contract or expected completion date;

� the hours of work or hours when the supplier will have access to the site;

� an estimate of the amount or value of work involved, where the scope of the services cannot be precisely defined e.g. vehicle repair services for 50 vehicles for a one-year period;

� any facilities, services or resources to be provided by the procuring entity;

� any particular equipment to be provided by the supplier e.g. security screening equipment for a building security contract;

� any required performance targets or response times e.g. routine repairs must be completed within 3 days;

� arrangements for reporting to the procuring entity, including lines of communication and the contact point for management and administration of the assignment;

� any other details or requirements relevant to the assignment.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Terms of Reference for Consultancy Services Terms of Reference for Consultancy Services Terms of Reference for Consultancy Services Terms of Reference for Consultancy Services

Page 38: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 38 of 164

The terms of reference should provide sufficient information to enable bidders to understand the services required by the procuring entity. They should be complete, precise and clear, but should not be over-prescriptive, where the success of an assignment is largely dependent on the skills and experience of the consultants. Well-prepared terms of reference will facilitate the preparation of proposals by bidders and the evaluation of proposals by the procuring entity.

The precise contents of the terms of reference will be determined by the individual assignment, but should include the following details, where applicable:

� the background to the assignment, including details of any larger project which the assignment will be part of;

� the objectives of the assignment and what it is expected to achieve;

� a description of the scope of the services required;

� the specific deliverables required, such as study reports and recommendations, software, databases, bidding documents, drawings, specifications, maps, software, training materials etc and the dates by when they are required;

� requirements for the transfer of knowledge or training programmes;

� the role, qualifications and experience of any key staff required;

� the period of the assignment and expected completion dates;

� any facilities, services or resources to be provided by the procuring entity, including any counterpart staff;

� arrangements for reporting to the procuring entity, including lines of communication and the contact point for management and administration of the assignment;

� a schedule of any reports required, including inception, progress and final reports;

� any other details or requirements relevant to the assignment.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No specific approval of the description of requirements is required at this stage. However, the final description of requirements included in the bidding, request for proposals or request for quotations document will be reviewed by the IPC, when approving the invitation document – see Desk Instruction 6A or 6B.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the description of requirements must be attached to the requisition form, which should be kept on the procurement file. The end user should also retain a copy of the requisition and description of requirements for their own reference.

Next Steps:Next Steps:Next Steps:Next Steps:

Ensure that the requisition has been completed – see Desk Instruction 1: Raising a requisition for guidance. Then:

� Proceed to Desk Instruction 3: Selecting a procurement method and planning the procurement.

Page 39: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 39 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 4A:4A:4A:4A: CCCCONDUCTING A ONDUCTING A ONDUCTING A ONDUCTING A PPPPRERERERE----QUALIFICATIONQUALIFICATIONQUALIFICATIONQUALIFICATION

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

The pre-qualification procedure obtains and assesses information on the qualifications of potential bidders, in order to restrict actual bidding to a list of qualified bidders. This is achieved through the publication of a pre-qualification notice, the receipt of submissions and the evaluation of submissions against pre-defined criteria.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: Pre-qualification may be used under the Open Tendering method, for procurement of a particularly high value or complexity, but its use is not mandatory. A decision on whether to not to use pre-qualification should be made at the procurement planning stage. Pre-qualification may also be used under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

Pre-qualification may also be conducted for a group of similar contracts, with the list of qualified suppliers used as a basis for preparing shortlists for use in Restricted Tendering, Two-Stage Tendering and Request for Quotations or for identifying a source for Single Source Procurement.

TypeTypeTypeType: Pre-qualification may be used for goods, works or routine services.

Pre-qualification for consultancy services (under the Request for Proposals method) is achieved through obtaining and assessing expressions of interest – see Desk Instruction 4B for guidance.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Pre-qualification is used to identify bidders who have adequate capabilities, resources and experience to perform a contract, prior to the invitation and submission of detailed tenders. This can be beneficial for high value or complex procurement, as:

� the preparation of detailed tenders can be costly and this may discourage competition if bidders feel that they are competing against a large number of bidders;

� the evaluation of a large number of detailed tenders can require excessive time and resource from the procuring entity;

� the supplier’s capabilities, resources and experience may be key to the successful performance of the contract and therefore bidding should be limited to qualified bidders.

Pre-qualification for a group of similar contracts can be beneficial, as it avoid the need for repeated pre-qualification procedures and also allows a bidder to be pre-qualified up to a certain value or size of contract or contracts.

References:References:References:References:

Section 13, Public Procurement Act, 2003.

Chapter IV, Public Procurement Regulations, 2003.

Page 40: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 40 of 164

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit manages the pre-qualification process, consulting with the end-user or other technical specialist, on drafting the pre-qualification criteria. Advice should also be sought, where required, on the application of the criteria.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

The pre-qualification process is effectively a mini tendering process, involving the invitation, receipt and evaluation of applications to pre-qualify. These instructions therefore make reference to the relevant Desk Instructions for general guidance on the various steps in the “tendering” process.

27. Select the appropriate standard pre-qualification document. See guidance note 1 below for a list of available documents.

28. Draft a pre-qualification document for the requirement, completing the data sheet, the qualification criteria and a description of the type of goods, works or services to which the pre-qualification applies. See Desk Instruction 28 for assistance in drafting the qualification criteria.

29. Draft an invitation to pre-qualify notice – see Desk Instruction 5A for general guidance.

30. Submit the pre-qualification document and invitation to pre-qualify notice to the IPC for approval, prior to issue.

31. Publish the notice – see Desk Instruction 7 for general guidance.

32. Issue pre-qualification documents to all bidders who request them – see Desk Instruction 8 for general guidance.

33. Receive applications up until the deadline – see Desk Instruction 11 for general guidance. Late applications must not be accepted.

34. Open the applications and record the names of all applicants. No public tender opening is required.

35. Assess each application against the criteria defined in the pre-qualification document and determine whether each bidder is qualified or not qualified. Record the results of the evaluation.

36. Prepare a list of pre-qualified bidders and obtain IPC approval for the evaluation and the pre-qualified list. This approval can normally be obtained at the same time as approval for the bidding document.

GuidancGuidancGuidancGuidance Note 1 e Note 1 e Note 1 e Note 1 –––– Standard Pre Standard Pre Standard Pre Standard Pre----qualification Documentsqualification Documentsqualification Documentsqualification Documents

The Government of Malawi has issued the following standard pre-qualification documents for use in public procurement:

� standard pre-qualification document for works;

� standard pre-qualification document for goods;

� etc;

If no appropriate standard document has been issued, consult the Office of the Director of Public Procurement for advice.

Page 41: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 41 of 164

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

The Internal Procurement Committee must approve the pre-qualification document and invitation to pre-qualify notice before issue. The IPC will also approve the list of pre-qualified bidders, when approving the subsequent bidding document.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The pre-qualification document must be drafted using the appropriate standard pre-qualification document of the Government of Malawi. A copy of the approved pre-qualification document, and the IPC’s written approval, must be retained on the procurement file.

The procurement file must also contain records of:

� the potential bidders to whom the pre-qualification document is issued;

� the potential bidders submitting applications;

� the evaluation of applications;

� the list of pre-qualified bidders.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 6A: Drafting a bidding document or request for proposals document.

Page 42: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 42 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 4B:4B:4B:4B: OOOOBTAINING AND BTAINING AND BTAINING AND BTAINING AND AAAASSESSING SSESSING SSESSING SSESSING EEEEXPRESSIONS OF XPRESSIONS OF XPRESSIONS OF XPRESSIONS OF IIIINTERESTNTERESTNTERESTNTEREST

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

The expression of interest procedure obtains and assesses information on the qualifications and experience of potential bidders, in order to restrict actual bidding to a list of qualified bidders. This is achieved through the publication of a notice calling for expressions of interest, the receipt and assessment of expressions of interest and the development of a limited shortlist.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The expressions of interest procedure may be used under the Request for Proposals method only. Its use is not mandatory, but it is recommended for all but the smallest and simplest assignments.

The development of a shortlist without use of the EOI procedure is covered by Desk Instruction 5B.

TypeTypeTypeType: The expressions of interest procedure is used for consultancy services only.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The EOI procedure is a form of pre-qualification procedure for consultancy services. It is used to identify bidders who have adequate capabilities, personnel and experience to perform a consultancy assignment, in order to establish a limited shortlist and invite detailed proposals from three to six qualified bidders. The EOI procedure offers the following benefits:

� Publication of a notice calling for EOI’s assists the procuring entity in identifying potential bidders. Consultancy assignments can vary greatly and be highly complex or specialised, making the identification of sources difficult.

� Only a limited number of bidders are required to prepare detailed proposals and keep key staff available for the validity period. Bidders are more likely to commit resources to proposal preparation and keep staff available if they feel that they are only competing against a limited number of bidders;

� The procuring entity does not require excessive time and resource for the evaluation of a large number of detailed proposals, including complex methodologies and several CV’s;

� Bidding is limited to suppliers likely to have the capabilities, personnel and experience required for the successful performance of the contract. The qualifications of both the supplier and its key staff are critical in the delivery of consultancy assignments.

References:References:References:References:

Section 34(2), Public Procurement Act, 2003.

No reference, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit manages the EOI procedure, consulting with the end-user or other technical specialist, in assessing the EOI’s received and developing the shortlist.

StepStepStepStep----bybybyby----Step InstrStep InstrStep InstrStep Instructions:uctions:uctions:uctions:

Page 43: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 43 of 164

37. Draft a notice calling for expressions of interest – see guidance note 1 below for details of the content.

38. Submit the EOI notice to the IPC for approval, prior to publication.

39. Publish the notice – see Desk Instruction 7 for general guidance.

40. Receive EOI’s up until the deadline – see Desk Instruction 11 for general guidance. Late EOI’s must not be accepted.

41. Open the EOI’s and record the names of all applicants. No public tender opening is required.

42. Assess the EOI’s for the key skills, experience or capabilities required for the assignment.

43. Prepare a shortlist of three to six bidders who are the best qualified for the proposed assignment. Obtain IPC approval for the shortlist when obtaining approval for the Request for Proposals document.

GuidaGuidaGuidaGuidance Note 1 nce Note 1 nce Note 1 nce Note 1 –––– EOI Notices EOI Notices EOI Notices EOI Notices

A notice calling for EOI’s should normally include the following information:

� the name and address of the procuring entity;

� a brief description of the project, if any, of which the assignment forms a part;

� a brief description of the proposed contract;

� a statement of the information required from potential bidders, such as descriptions of similar work performed and indications of the type of staff available for the assignment;

� instructions on the location and deadline for submission of EOI’s

� any special instructions on the sealing and labelling of EOI’s.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

The Internal Procurement Committee must approve the notice calling for EOI’s before publication. They will also apply the shortlist of bidders, when approving the subsequent Request for Proposals document.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the published EOI notice, and the IPC’s written approval, must be retained on the procurement file.

The procurement file must also contain records of:

� the potential bidders submitting EOI’s;

� the evaluation of the EOI’s;

� the shortlist of bidders.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 6A: Drafting a bidding document or request for proposals document.

Page 44: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 44 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 5A:5A:5A:5A: PPPPREPARING AN REPARING AN REPARING AN REPARING AN IIIINVITATION TO NVITATION TO NVITATION TO NVITATION TO TTTTENDER ENDER ENDER ENDER NNNNOTICEOTICEOTICEOTICE

Summary ofSummary ofSummary ofSummary of Procedure: Procedure: Procedure: Procedure:

This Desk Instruction provides guidance on the information to be included in an invitation to tender notice, for publication as part of the Tendering method. Guidance on publication of the notice is included in Desk Instruction 7.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: An invitation to tender notice is required under the Open Tendering method, where no pre-qualification has been conducted. An invitation to tender notice may also be used under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

This Desk Instruction can also be used to provide general guidance on the preparation of an invitation to pre-qualify notice – see Desk Instruction 4A for guidance on the use of pre-qualification.

TypeTypeTypeType: Invitation to tender notices are required for goods, works and routine services.

Opportunities to tender for consultancy services are advertised through a notice requesting expressions of interest – see Desk Instruction 4B.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Invitation to tender (or pre-qualify) notices are published in order to:

� attract the widest possible competition, which should assist the procuring entity in obtaining value for money;

� offer all potential bidders a fair opportunity to tender for government funded contracts.

References:References:References:References:

Section 31(1)-(2) and (4), Public Procurement Act, 2003.

Regulation 5.2.1.1, Public Procurement Regulations, 2003. (a) relates to invitation to tender notices and (b) to invitation to pre-qualify notices.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for the preparation of the invitation to tender or pre-qualify notice.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

44. Complete all required information using the standard notice format. See guidance notes 1 and 2 below for details of the information to be included.

45. Submit the draft notice to the IPC for approval, along with the draft bidding document, or in the case of pre-qualification, with the draft pre-qualification document.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Invitation to Tender Notices Invitation to Tender Notices Invitation to Tender Notices Invitation to Tender Notices

The invitation to tender notice must include at least the following information:

� the name and address of the procuring entity;

Page 45: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 45 of 164

� a brief description of the goods, works or services required, including the location for delivery or performance and the time for delivery or completion;

� the address for viewing and obtaining the bidding documents;

� the price, if any, for the purchase of the bidding documents and the currency and means of making payment – see guidance note 3 below on establishing the price of bidding documents;

� the language(s) in which the bidding documents are available;

� the location, date and time of any pre-bid conference and/or site visit to be held;

� instructions on the location and deadline for submission of tenders.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Invitation to Pre Invitation to Pre Invitation to Pre Invitation to Pre----qualify Noticesqualify Noticesqualify Noticesqualify Notices

The invitation to pre-qualify notice must include at least the following information:

� the name and address of the procuring entity;

� a brief description of the goods, works or services subject to the pre-qualification and an indication of whether pre-qualification is for a single contract or a group of contracts;

� the address for viewing and obtaining the pre-qualification documents;

� the price, if any, for the purchase of the pre-qualification documents and the currency and means of making payment;

� the language(s) in which the pre-qualification documents are available;

� instructions on the location and deadline for submission of applications to pre-qualify.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Price of Bidding Documents Price of Bidding Documents Price of Bidding Documents Price of Bidding Documents

Procuring entities may charge a fee for bidding documents in order to cover the cost of printing and distributing the document. The fee must not be set at a level which includes any element of profit for the procuring entity. In determining whether to charge a fee and the fee to charge, procuring entities should consider:

� the size of the document, which will affect printing and distribution costs. For example, a bidding document for a large construction contract may include several separate volumes of drawings and bills of quantities, whereas a bidding document for simple goods may be only 50-100 pages;

� the likely location of potential bidders. Distribution to international bidders will incur a greater cost than distribution to local bidders.

� the method of distribution. In some cases, distribution by courier, rather than normal postal services, may be required, which is likely to increase costs. Where documents can be distributed by electronic means, costs should be minimal.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Page 46: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 46 of 164

The invitation to tender or pre-qualify notice must be approved by the IPC prior to its publication. This approval should be obtained at the same time as approval for the bidding or pre-qualification document.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the published invitation to tender or pre-qualify notice, and the IPC’s written approval, must be retained on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 6A: Drafting a bidding document or request for proposals document.

Page 47: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 47 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 5B:5B:5B:5B: DDDDEVELOPING A EVELOPING A EVELOPING A EVELOPING A SSSSHORTLISTHORTLISTHORTLISTHORTLIST

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction outlines the procedure for developing a shortlist of bidders, where competition is restricted and no notice has been published.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The development of a shortlist is required under Restricted Tendering and Request for Quotations. It may also be required under Two-Stage Tendering – see Desk Instruction 25 for guidance.

It may also be required under Request for Proposals, where no notice calling for expressions of interest has been published. Guidance on developing a shortlist where EOI’s have been received is included in Desk Instruction 4B. Use of the EOI procedure is recommended for consultancy services, unless the proposed contract is of low value and complexity.

Guidance on developing a list of pre-qualified bidders, under the Open Tendering method, is contained in Desk Instruction 4A.

TypeTypeTypeType: A shortlist may be required for the procurement of goods, works, routine services or consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The shortlist is intended to ensure effective and real competition, where open competition, through the publication of a notice, is not appropriate.

References:References:References:References:

Section 32(1)-(2) for Restricted Tendering, 34(1) for Request for Proposals and 35(1) for Request for Quotations, Public Procurement Act, 2003.

No reference in Public Procurement Regulations, 2003.

Staff InvolStaff InvolStaff InvolStaff Involved:ved:ved:ved:

The Procurement Unit is responsible for developing shortlists, in consultation with the end-user or other technical specialist where appropriate.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

46. Where this procedure is used for Restricted Tendering, ensure that the grounds for use of Restricted Tendering are known, as this affects the development of the shortlist. Grounds will be either that only a limited number of sources exist or that the value of the procurement does not justify an Open Tendering procedure. Request for Quotations is always used on grounds of the relatively low value of the procurement.

47. Identify all, or at least a reasonable number of, potential sources of the goods, works or services to develop a “long list” – see guidance note 1 below for possible sources of information. Some work on the identification of potential sources is likely to have been done at the procurement planning stage and reference should be made to this.

48. Prepare a shortlist, based on the initial “long list”. Where competition is restricted because the goods, work or services are only available from a limited

Page 48: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 48 of 164

number of suppliers, all potential sources must be included on the shortlist. Where competition is restricted because of the relatively low value of the procurement, a minimum of three bidders must be included on the shortlist. See guidance note 2 below for considerations in selecting the shortlist.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Identifying Potential Sources Identifying Potential Sources Identifying Potential Sources Identifying Potential Sources

Information on suppliers who may be included in a shortlist can be found from a number of sources. These might include:

� any registration scheme or database operated by ODPP;

� pre-qualification exercises conducted for this type of goods, works or services;

� previous tenders received or contracts placed by the procuring entity, or another procuring entity;

� information available from trade or professional bodies, such as the National Construction Industry Council of Malawi;

� chambers of commerce in Malawi and abroad;

� trade representatives within embassies for foreign sources;

� existing knowledge of the market by either procurement or technical specialists;

� market research, using trade journals, the internet, trade directories etc.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Selecting the Shortlist Selecting the Shortlist Selecting the Shortlist Selecting the Shortlist

Where a limited shortlist of bidders is developed from a “long list” of potential sources, the following factors should be considered:

� there should be a rotation of different bidders on successive shortlists i.e. the same supplier should not be included every time, where numerous sources exist;

� suppliers who are not expected to be able to submit responsive tenders or meet qualification requirements should not be included;

� a shortlist should not consist entirely of bidders with the same ownership;

� for goods, a shortlist should not consist entirely of bidders offering the same brand of goods;

� suppliers included on the list of debarred suppliers issued by ODPP must not be included on a shortlist;

� some shortlisted bidders may choose not to submit tenders. Therefore, it is recommended that more than three sources are included on the shortlist, so that at least three tenders are received. The number of sources included should be proportionate to the value of the procurement requirement;

� where the goods, works or services are available at competitive prices from at least three sources in Malawi, the shortlist may be restricted to local suppliers. International bidders must be included where at least three, competitive local sources do not exist or where a national tendering procedure has failed.

Page 49: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 49 of 164

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

The shortlist must be approved by the IPC before issue of the bidding or RFQ documents. Approval should be sought at the same time as approval for the bidding or RFQ document.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the approved shortlist must be kept on the procurement file. A record should also be kept of the reasons for the inclusion of each source.

Next Steps:Next Steps:Next Steps:Next Steps:

� For Restricted Tendering and Request for Proposals, proceed to Desk Instruction 6A: Drafting a bidding document or Request for Proposals document.

� For Request for Quotations, proceed to Desk Instruction 6B: Drafting a request for quotations document.

Page 50: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 50 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 6A:6A:6A:6A: DDDDRAFTING A RAFTING A RAFTING A RAFTING A BBBBIDDING IDDING IDDING IDDING DDDDOCUMENT OR OCUMENT OR OCUMENT OR OCUMENT OR RRRREQUEST FOR EQUEST FOR EQUEST FOR EQUEST FOR

PPPPROPOSALS ROPOSALS ROPOSALS ROPOSALS DDDDOCUMENTOCUMENTOCUMENTOCUMENT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for drafting a bidding document, using one of the standard bidding documents of the Government of Malawi. It also provides the procedure for obtaining approval for the completed document, prior to issue.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: Bidding documents are required for Open Tendering, Restricted Tendering and Two-Stage Tendering. The request for proposals document used for the Request for Proposals method is also a bidding document and therefore this Desk Instruction applies.

The Request for Quotations method uses a request for quotations document – see Desk Instruction 6B for details.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services, although different standard documents should be used for each.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The bidding document is critical to the success of the tendering process. It informs bidders of:

� the precise description of the goods, works or services required;

� the rules for the tendering process;

� the evaluation criteria and methodology which will be applied;

� any qualification criteria which will be applied; and

� the type and conditions of the proposed contract.

A well drafted bidding document should result in a successful procurement process. Therefore this document must be approved by the IPC, prior to its issue.

References:References:References:References:

Section 31(3) for Tendering and Restricted Tendering, Section 34(3) for Request for Proposals, Public Procurement Act, 2003.

Regulation 5.2.2.2 for Tendering and Restricted Tendering, Regulation 5.5.2.4 for Request for Proposals, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for drafting the bidding document or request for proposals, in consultation with the end-user who raised the requisition. The Procurement Unit should seek advice from technical specialists, where required.

The Procurement Unit is responsible for obtaining approval from the Internal Procurement Committee, prior to issue of the document.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Page 51: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 51 of 164

49. Select the appropriate standard bidding document for the requirement – this requires consideration of the type of contract to be used. See guidance note 1 below for a complete list of standard bidding documents.

50. Consult with the end-user, and technical specialists if required, regarding finalisation of the description of requirements for inclusion in the document - see Desk Instruction 2A, 2B or 2C for further guidance. Include the final description in section xx of the document.

51. Complete the Bid Data Sheet in section xx with details of the tendering process e.g. the tender closing date, the address for submission, the evaluation criteria to be applied, any qualification criteria to be applied etc. Further guidance is included in the user guide for the relevant document. Desk Instruction 28 provides further guidance on the preparation of qualification criteria. Note that the Bid Data Sheet modifies the Instructions to Bidders – the text of the Instructions to Bidders must NOT be modified.

52. Complete the Special Conditions of Contract in section xx with the conditions which will apply to the contract e.g. payment terms, delivery/completion period, warranty, liquidated damages. Further guidance is included in the user guide for the relevant document. Note that the Special Conditions of Contract modify the General Conditions of Contract – the text of the General Conditions of Contract must NOT be modified.

53. The contract form should be left blank for inclusion in the bidding document, as these details can only be completed when the successful bidder has been decided.

54. Ensure that any related documents have been prepared e.g. the invitation to tender notice or shortlist - see Desk Instructions 5A or 5B for guidance.

55. Submit the draft bidding document, and related documents, to the Internal Procurement Committee for approval.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Choice of Standard Bidding Document: Choice of Standard Bidding Document: Choice of Standard Bidding Document: Choice of Standard Bidding Document:

The Government of Malawi has issued the following standard bidding documents for use in public procurement:

� Standard Bidding Document for the procurement of goods;

� Standard Bidding Document for the procurement of goods (framework contract);

� Standard Bidding Document for the procurement of works;

� Standard Bidding Document for the procurement of minor works;

� Standard Bidding Document for the procurement of routine services;

� Standard Request for Proposals for consultancy services (complex, time-based assignments);

� Standard Request for Proposals for consultancy services (complex, lump sum assignments);

� etc

Page 52: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 52 of 164

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval for the bidding documents must be obtained, prior to its issue or the publication of any invitation to tender notice.

Approval for any invitation to tender notice, shortlist or list of pre-qualified bidders should be sought at the same time.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Bidding documents must be drafted using the appropriate standard bidding document of the Government of Malawi. A copy of the approved bidding document, along with the IPC’s approval, must be retained on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 7: Publishing an invitation to tender notice for Open Tendering (where no pre-qualification has been conducted).

� Proceed to Desk Instruction 8: Issuing invitation documents for all other methods.

Page 53: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 53 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 6B:6B:6B:6B: DDDDRAFTING A RAFTING A RAFTING A RAFTING A RRRREQUEST FOR EQUEST FOR EQUEST FOR EQUEST FOR QQQQUOTATIONS UOTATIONS UOTATIONS UOTATIONS DDDDOCUMENTOCUMENTOCUMENTOCUMENT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This instruction provides the standard operating procedure for drafting a request for quotations document, using one of the standard documents issued by the Government of Malawi. It also provides the procedure for obtaining approval for the completed document, prior to issue.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: A Request for Quotations document is required for the Request for Quotations method only.

Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals methods use a full bidding document – see Desk Instruction 6A for guidance.

TypeTypeTypeType: This Desk Instruction applies to goods, works and routine services, although different standard documents should be used for each.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The request for quotations document is critical to the success of the procurement process. It informs bidders of:

� the precise description of the goods, works or services required;

� the rules for the procurement process;

� the evaluation criteria and methodology which will be applied;

� any qualification criteria which will be applied; and

� the type and conditions of the proposed contract (purchase order).

A well drafted RFQ document should result in a successful procurement process. Therefore this document must be approved by the IPC, prior to its issue.

References:References:References:References:

Section 35(2), Public Procurement Act, 2003.

No reference in Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for drafting the request for quotations document, in consultation with the end-user who raised the requisition. The Procurement Unit should seek advice from technical specialists, where required.

The Procurement Unit is responsible for obtaining approval from the Internal Procurement Committee, prior to issue of the document.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

56. Select the appropriate standard document for the requirement, which will be the RFQ document for goods, works or routine services.

57. Consult with the end-user, and technical specialists if required, regarding finalisation of the description for inclusion in the document - see Desk

Page 54: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 54 of 164

Instruction 2A, 2B or 2C for further guidance. Include the final description in section xx of the document.

58. Complete details of the procurement process e.g. the bid closing date, the address for submission, the evaluation criteria to be applied, any qualification criteria to be applied etc. Further guidance is included in the user guide for the relevant document. See Desk Instruction 28 for further guidance on qualification criteria.

59. Complete the Conditions of Contract in section xx with the conditions which will apply to the contract (purchase order) e.g. payment terms, delivery/completion period, warranty, liquidated damages. Further guidance is included in the user guide for the relevant document.

60. Ensure that a shortlist has been prepared - see Desk Instruction 5B for guidance.

61. Submit the draft RFQ document, and shortlist to the Internal Procurement Committee for approval.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval for the RFQ document must be obtained, prior to its issue.

Approval for the shortlist should be sought at the same time.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

RFQ documents must be drafted using the appropriate standard document of the Government of Malawi. A copy of the approved RFQ document, along with the IPC’s approval, must be retained on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 8: Issuing invitation documents.

Page 55: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 55 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 7:7:7:7: PPPPUBLISHING AN UBLISHING AN UBLISHING AN UBLISHING AN IIIINVITATION TO NVITATION TO NVITATION TO NVITATION TO TTTTENDER ENDER ENDER ENDER NNNNOTICEOTICEOTICEOTICE

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction outlines the rules for publishing an invitation to tender notice. Guidance on the preparation of invitation to tender notices can be found in Desk Instruction 5A.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The publication of an invitation to tender notice is required under the Open Tendering method, where no pre-qualification has been conducted. An invitation to tender notice may also be published under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

This desk instruction also applies to the publication of invitation to pre-qualify notice under Open Tendering and notices calling for expressions of interest under Request for Proposals.

No publication of notices is required for other methods.

TypeTypeTypeType: The publication of notices may apply to goods, works, routine services and consultancy services.

Purpose Purpose Purpose Purpose of Procedure: of Procedure: of Procedure: of Procedure:

Invitation notices are published in order to:

� attract the widest possible competition, which should assist the procuring entity in obtaining value for money or in preparing a strong shortlist of bidders;

� offer all potential bidders a fair opportunity to tender or pre-qualify for government funded contracts.

References:References:References:References:

Section 31(1)-(2), Public Procurement Act, 2003.

Regulation 5.2.1.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit are responsible for organising the publication of notices. Where publication is to include trade journals, the Procurement Unit should consult the end user, or other technical specialist, on the appropriate journals.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

62. Arrange for publication of the notice in the Gazette. The publication date in the Gazette will mark the starting date of the bidding period and will therefore be the date from which minimum bidding periods are calculated.

63. Arrange for publication of the notice in the local press. This must not occur before publication in the Gazette.

64. Display the notice in a publicly accessible place in the procuring entity’s head office.

65. For international tendering, arrange publication in appropriate publications of wide international circulation, such as internationally recognised newspapers, specialised trade journals, the internet etc.

Page 56: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 56 of 164

66. Ensure that sufficient copies of the bidding or pre-qualification document are available for distribution from the first publication date.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required for publication of the notice, once the draft notice has been approved by the IPC.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the published notice must be kept on file. This does not need to be a reproduction from the Gazette or any other publication, as long as the file copy is the same as that published.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 8: Issuing invitation documents.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 8:8:8:8: IIIISSUING SSUING SSUING SSUING IIIINVITATION NVITATION NVITATION NVITATION DDDDOCUMENTSOCUMENTSOCUMENTSOCUMENTS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for the physical issue or sale of bidding documents to bidders and keeping records of the documents issued. The instruction applies equally to the issue of other invitation documents, such as pre-qualification, Request for Proposals and Request for Quotations documents.

Guidance on the preparation of the documents is included in Desk Instructions 6A and 6B.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals and Request for Quotations methods.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Bidding and other invitation documents must be issued or sold promptly, to provide bidders with sufficient time to prepare and submit their tenders. Delays in issuing bidding documents may result in reduced competition, which itself may lead to the cancellation of a tendering process or higher prices for government.

Bidders must be issued with the same information, within the same period of time, to ensure that the procurement process is fair.

It is essential that records are kept of the documents issued, in case of queries or complaints from bidders. Where a fee is charged for documents, it is essential that records are kept of payments received.

References:References:References:References:

Section 31(3)(a) and (5), Public Procurement Act, 2003.

Regulations 5.2.2.1 and 5.2.5, Public Procurement Regulations, 2003.

Page 57: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 57 of 164

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for managing the issue of bidding documents. This function may be delegated to an accounts or administration department where appropriate or where this facilitates the collection of fees for the documents.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

67. Where documents are being issued to bidders on a shortlist or pre-qualified list, the documents must be dispatched to all bidders at the same time. A record must be kept of the issue of documents.

68. Where an invitation to tender or pre-qualify notice is being published, bidders may request to preview the documents prior to purchase. Arrangements must be put in place to permit previews, at the address and time stated in the published notice. The procuring entity must ensure that sufficient copies of the bidding document will be available by the date of publication of the first notice.

69. Where a fee is charged for the documents, arrangements must be put in place for receiving and confirming payments and issuing receipts. The precise arrangements will depend on the method of payment

70. Documents must be dispatched promptly to all bidders who respond to any notice and pay any required fee. Documents must be dispatched within five days of receipt of the request or payment of the fee, whichever is later. A record must be kept of the issue of documents.

71. Under restricted tendering, where the value is above MKw xxx, a notice must be published in the Gazette, stating the grounds for use of the method.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the issue of bidding documents must be completed and kept on file. At a minimum, this record must include:

� the name and address of each bidder, to whom the document was issued;

� the date of receipt of the request for the documents, where applicable;

� confirmation of the payment of any required fee;

� the date of issue of the document;

� the method of dispatch of the document;

� the signature of the official responsible for the issue of the documents.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 9: Managing a pre-bid conference and site visits, where a conference or visit is required.

� Proceed to Desk Instruction 10: Handling bidder clarifications, modifications and extensions, where any clarifications, modifications or extensions are requested by bidders or issued by the procuring entity.

Page 58: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 58 of 164

� Proceed to Desk Instruction 11: Receiving tenders, where neither of the above apply.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 9:9:9:9: MMMMANAGING A ANAGING A ANAGING A ANAGING A PPPPRERERERE----BBBBID ID ID ID CCCCONFERENCE AND ONFERENCE AND ONFERENCE AND ONFERENCE AND SSSSITE ITE ITE ITE VVVVISITISITISITISIT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for managing pre-bid conferences, where the procuring entity briefs bidders on the procurement requirement and responds to questions from bidders, in order to assist them in preparing their bids. It also provides the procedure for site visits, where bidders are given the opportunity to view the site where goods are to be installed or works or services performed.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: Pre-bid conferences and/or site visits may be conducted under Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals.

Conferences or visits are not mandatory, but may be arranged where the procurement is highly technical, where a significant number of requests for clarification are likely to be received or where knowledge of the site is important to tender preparation. The need for pre-bid conferences or site visits must be considered at the procurement planning stage and appropriate provisions included in the bidding document.

Pre-bid conferences and site visits should not normally be required under the Request for Quotations method, as this method is only used for simple, low value procurement requirements.

TypeTypeTypeType: Pre-bid conferences and/or site visits may be required for goods, works, routine services or consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Pre-bid conferences and site visits are intended to provide a structured way of providing additional information for bidders, which cannot easily be included in a bidding document. A pre-bid conference or site visit can offer the following benefits:

� the procuring entity is able to provide additional information to bidders, ensuring that all bidders receive the same information;

� bidders are assisted in preparing tenders which should be based on more detailed and accurate information, responsive to the procuring entity’s needs and less likely to include reservations, conditions or caveats;

� the procuring entity is able to get early warning of any unforeseen queries or problems, while there is still time to modify the bidding document if necessary;

� the majority of likely requests for clarification can be addressed at the same time;

� the possibility of contractual disputes, caused by a bidder’s misunderstanding of the procuring entity’s requirements, is reduced.

References:References:References:References:

No reference in the Public Procurement Act, 2003.

Page 59: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 59 of 164

Regulation 5.2.7, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for managing pre-bid conferences and site visits. The end user, or other technical specialist, must be closely involved to provide responses on technical issues.

StepStepStepStep----bybybyby----Step IStep IStep IStep Instructions:nstructions:nstructions:nstructions:

72. Consider the need for a pre-bid conference or site visit at the procurement planning stage and include details of the location, date and time in the bidding document and any invitation to tender notice. They should be held early during the bidding period, to allow bidders time to take the information into account in preparing their tenders. Where both a pre-bid conference and a site visit are to be held, they should be arranged to coincide wherever possible, particularly where international bidders are likely.

73. Ensure that arrangements are made in advance, including booking a meeting room, ensuring that sufficient, appropriate staff are available, ensuring that access to the site is possible at the appointed time, making appropriate safety arrangements on site if required, preparing an agenda for the conference etc

74. Brief all staff involved on the procedure for the pre-bid conference and/or site visit, including the responsibilities of each staff member and anticipated questions and answers.

75. The management of the pre-bid conference will be determined by the agenda prepared by the procuring entity. Typically, this might include opening and welcome by the procuring entity, a brief presentation by the procuring entity on the procurement requirement, questions by bidders and closing. Where requests for clarification have been received prior to the conference, these may be used to determine the agenda and prepare responses.

76. The management of any site visit will be determined by the nature and size of the site and the type of procurement envisaged. Bidders should be given a tour of as much of the site as possible and allowed to view any facilities which are being provided by the procuring entity.

77. Record full details of the pre-bid conference and/or site visit – see Documents/ Records Required section below.

78. Following completion of the pre-bid conference and/or site visit, issue a record of the meeting to all bidders who were issued with bidding documents, regardless of whether they attended the conference. The record issued must include all questions raised and the formal clarifications issued.

79. Where necessary, issue a formal modification of the bidding document and/or extension to the bidding deadline.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required, unless the pre-bid conference results in substantial modifications to the bidding document.

Page 60: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 60 of 164

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the pre-bid conference and/or site visit must be completed, kept on the procurement file and distributed to all bidders who were issued with the bidding document. At a minimum, this record must include:

� the date, time and location of the pre-bid conference and/or site visit;

� a list of all persons who attended, including both procuring entity staff and bidders;

� a list of all questions asked and the responses given;

� any other information provided to bidders.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 10: Handling bidder clarifications, modifications and extensions, if further clarifications or modifications need to be issued or an extension is required.

� Proceed to Desk Instruction 11: Receiving tenders, if no further clarifications, modifications or extensions are required.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 10:10:10:10: HHHHANDLING ANDLING ANDLING ANDLING BBBBIDDER IDDER IDDER IDDER CCCCLARIFICATIONSLARIFICATIONSLARIFICATIONSLARIFICATIONS,,,, MMMMODIFICATIONS AND ODIFICATIONS AND ODIFICATIONS AND ODIFICATIONS AND

EEEEXTENSIONSXTENSIONSXTENSIONSXTENSIONS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction establishes standard operating procedures for responding to bidder clarifications, issuing modifications to a bidding document and granting extensions of the bid deadline.

� Bidder clarifications are requests from bidders for clarification of a particular element of the bidding document, to which the procuring entity is required to issue a formal response to all bidders;

� Modifications are formal amendments to the bidding document, which the procuring entity may choose to make, either in response to a bidder clarification or on its own initiative;

� Extensions are formal extensions by the procuring entity of the deadline for submission of tenders, to give bidders more time in which to prepare their tenders, normally in response to a bidder clarification or modification.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This procedure may apply under any method where a formal invitation document has been issued i.e. to Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals and Request for Quotations.

Where no requests for clarification are received and the procuring entity has no reason to modify a document or extend the bid deadline, the procedure will not be required.

TypeTypeTypeType: This procedure applies to goods, works, routine services and consultancy services.

Page 61: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 61 of 164

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Ideally, bidder clarifications, modifications and extensions to the bid deadline should not be required. However, where they are required, it is important that clarifications, modifications and extensions are issued promptly and in sufficient time before the bid closing date. It is also essential that the same information is issued to all bidders at the same time.

Mishandling of bidder clarifications, modifications and extensions may result in complaints from bidders, unnecessary delays to the bidding process or a reduced number of tenders.

References:References:References:References:

Section 31(6) and 34(5), Public Procurement Act, 2003.

Regulation 5.2.6, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit should manage requests for clarifications and the issue of any modifications to the bidding document or extensions to the bid deadline. The Procurement Unit should consult with the end user, or other technical specialist, where required on clarifications or modifications to be issued. Where any substantial change is made to the original, approved bidding document, the Procurement Unit must first consult the IPC.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

80. A clarification or modification can be issued, or an extension of the bidding deadline given, either in response to a request for clarification from a bidder or on the procuring entity’s own initiative. Where a request is received from a bidder, ensure that it is received before the latest date for clarifications stated in the bidding document. Where it is received later, send a reply stating that the request was received after the latest date for clarification requests and that therefore no response can be given.

81. Agree on the appropriate response to the request for clarification, or agree any modification that the procuring entity considers necessary. Consult with the end user, or technical specialist, where appropriate.

82. Consider whether the clarification or modification is likely to have a significant impact on the preparation of tenders and therefore, whether an extension to the bidding deadline should be given.

83. Draft a formal clarification or modification. Where the clarification is in response to a request from a bidder, ensure that the response includes a description of the request, but without identifying the bidder who made the request. Ensure that any extension to the bidding deadline is clearly stated, giving the time and date of the new deadline. State also the revised time and date for any public tender opening.

84. If the clarification or modification involves a substantial change to the bidding document, obtain IPC approval before issue.

85. Issue the same clarification, modification or extension to all bidders at the same time, keeping a record of its issue. Where a pre-bid conference is to be held,

Page 62: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 62 of 164

formal issue of the clarification, modification or extension may be delayed until after the pre-bid conference. However, the procuring entity must still prepare the clarification, modification or extension, as information will need to be provided at the pre-bid conference and a formal clarification, modification or extension must be issued after the conference.

86. If any extension to the bidding deadline has been given, ensure that arrangements for the receipt of tenders and any public tender opening are revised e.g. revise room bookings, advise relevant staff of the new time and date etc.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for any clarification or modification which involves a substantial change to the original bidding document.

DocumDocumDocumDocuments/Records Required:ents/Records Required:ents/Records Required:ents/Records Required:

A record must be kept on the procurement file of the issue of all clarifications, modifications or extensions to the bid deadline. At a minimum, this record must include:

� a copy of the clarification, modification or extension letter sent;

� evidence of despatch to all bidders e.g. fax confirmations, copies of letters posted etc.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 11: Receiving tenders.

Page 63: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 63 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 11:11:11:11: RRRRECEIVING ECEIVING ECEIVING ECEIVING TTTTENDERSENDERSENDERSENDERS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides a standard operating procedure for the receipt of tenders, closing tendering at the time of the deadline and safe-keeping of tenders until the time for tender opening.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The formal receipt of tenders applies to the Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals methods.

The procedure may also apply to the Request for Quotations method.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of ProcedurePurpose of ProcedurePurpose of ProcedurePurpose of Procedure: : : :

This procedure for the formal receipt of tenders, closing of tendering and safe-keeping of tenders is essential to the integrity of the tendering process for the following reasons:

� it ensures that submitted tenders are kept unopened until the time for the public tender opening, to promote fair competition;

� it ensures that tendering is closed at the precise date and time of the deadline and that no late tenders are accepted;

� it ensures that a record is kept of all tenders submitted on time, to help avoid the opening of any late tenders submitted at the opening.

References:References:References:References:

Section 31(7)-(9), Public Procurement Act, 2003.

Regulation 5.2.11.1 – 5.2.11.3, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit will manage the receipt of tenders, the closing of tendering and shall be responsible for the safe-keeping of tenders until they are delivered to the Internal Procurement Committee for opening.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

87. Make a locked tender box available during the tendering period, to allow bidders to deposit their tenders in the box – see guidance note 1 below for details of tender boxes. The tender box must be in a location which is accessible to the public during normal working hours. The tender box must be labelled with the procurement reference number, particularly where several tender boxes are in use at any one time, for tenders closing at different times.

88. Ensure that staff are available during normal working hours to issue receipts for tenders, prior to their placement in the tender box. Ensure that a standard format of receipt is available – see Documents/Records Required below.

89. Ensure that arrangements are in place for the receipt of tenders, or other packages such as samples, which are too large to fit in the tender box. A record

Page 64: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 64 of 164

must be kept of all tenders, or other items, not placed in the tender box and these items must be kept securely and taken with the tenders to the location for tender opening at the appointed time.

90. Ensure that staff have been nominated to manage the tender closing and that they know the date and time of the closing. These staff must be at the location for tender receipt before the time of tender closing.

91. Seal the tender box at the precise date and time of the deadline for tendering.

92. Take the sealed tender box, along with any tenders or other items which were too large for the tender box, to the location for the tender opening and deliver it into the custody of the IPC member responsible for the tender opening. The tender box must not be opened or left unsupervised between the tender closing and the tender opening.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Tender Boxes Tender Boxes Tender Boxes Tender Boxes

The tender box must have three different locks and the three keys must be held by the IPC Chairperson, the IPC Secretary and another ICP member nominated by the IPC.

The tender box must have an opening which is sufficiently large to allow the deposit of most tenders, but no so large that a person could reach inside the tender box and remove a tender.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required, although the member of the IPC responsible for the tender opening may wish to witness the closing of tendering at the time of the deadline.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record must be kept on the procurement file of all tenders, or other items, which are received, but not placed in the tender box. Copies of all receipts issued to bidders must also be kept on the procurement file.

At a minimum, receipts for tenders submitted must include:

� the name of the bidders;

� the precise time and date of receipt of the tender;

� the name and signature of the official receiving the tender and issuing the receipt; and

� the number of envelopes/packages received.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 12A: Opening tenders (one stage – single envelope) for Open Tendering and Restricted Tendering.

� Proceed to Desk Instruction 12B: Opening tenders (one stage – two envelopes) for Request for Proposals.

� See Desk Instruction 25 for guidance on Two-Stage Tendering.

Page 65: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 65 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 12A:12A:12A:12A: OOOOPENING PENING PENING PENING TTTTENDERS ENDERS ENDERS ENDERS (O(O(O(ONE NE NE NE SSSSTAGE TAGE TAGE TAGE –––– SSSSINGLE INGLE INGLE INGLE EEEENVELOPENVELOPENVELOPENVELOPE))))

SumSumSumSummary of Procedure:mary of Procedure:mary of Procedure:mary of Procedure:

Tenders which have been received on time are opening publicly, in the presence of bidders, and summary details read out and recorded.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This procedure applies to Open Tendering and Restricted Tendering.

The Request for Proposals method will include a one stage - two envelope tender opening – see Desk Instruction 12B for guidance. The Two Stage Tendering method will include a two stage tender opening – see Desk Instruction 25 for guidance.

No public tender opening is required for the Request for Quotations method.

TypeTypeTypeType: This procedure applies to goods, works and routine services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The public tender opening is an important step in the tendering process as:

� opening tenders publicly helps to demonstrate that the tendering processes is transparent and increase bidders’ confidence in the public procurement process;

� reading out prices should avoid any disputes regarding price changes at a later date;

� the formal procedure, which coincides with the tender closing, should prevent late tenders from being included in the evaluation.

References:References:References:References:

Section 31(11)-(12), Public Procurement Act, 2003.

Regulation 5.2.14.1, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Internal Procurement Committee will nominate one of its members to manage the tender opening procedure.

The Procurement Unit, or other staff, will be required to provide support to the IPC at the opening.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

93. Prepare the room prior to the tender opening time. Staff must ensure that appropriate resources, both physical and human, are available to manage the tender opening efficiently – see guidance note 1 below.

94. The person chairing the opening must ensure that all staff involved understand their respective roles in the procedure.

95. The chairperson should welcome bidders to the opening and request them all to sign the record of attendance. He/she should briefly explain the procedure which will be followed, which is normally opening of the tender box, opening of tenders, reading out and recording of information by the procuring entity,

Page 66: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 66 of 164

opportunity for bidders to ask questions, closing of meeting and removal of tenders for safe-keeping and evaluation.

96. The tender box should be opened and all tenders removed and counted. Any tenders which were too large for the tender box and received separately must be accounted for, by checking against the record of tenders received. Any tenders which were not in the tender box or included in the record of tenders received must NOT be opened. Any missing tenders must be accounted for before the opening commences.

97. First, envelopes marked “Withdrawal” should be opened one at a time. These should be read out and the envelope containing the corresponding tender located and returned to the bidder unopened. The withdrawal must be noted on the record of the tender opening.

98. Next, envelopes marked “Modification” should be opened one at a time and the envelope containing the corresponding tender located and opened. Details of the modified tender should be read out and recorded, ensuring that the details relate to the modified, not the original, tender. See guidance note 2 below for guidance on the details to be read out. Both the original tender and modification should be stamped on key pages and signed or initialled by the chairperson of the opening. For guidance on the key pages, see guidance note 3 below.

99. All other tenders should be opened, one at a time, and the relevant details read out and recorded. Each tender should be stamped on key pages and signed or initialled by the chairperson of the opening. Each tender should also be marked with a number (1, 2, 3 etc), corresponding to its number on the tender opening record. With the exception of late tenders, the tender opening committee must not make any comments regarding the acceptance or rejection of any tender. Any missing or incorrect documents should be noted in the record of tender opening, but not commented on.

100. When all tenders received on time have been opened, read out and recorded, the chairperson should allow bidders to ask questions. For guidance on answering such questions, see guidance note 4 below.

101. The chairperson should close the tender opening meeting, reminding bidders that they must not seek to influence the evaluation and that the successful tender will be published in due course.

102. Copies of the tender opening record should be distributed to bidders. The original record should be added to the procurement file.

103. All tenders should be immediately taken to a place of safe keeping, until the evaluation committee is ready to meet. Any tender securities must also be kept securely.

104. Where tender openings for more than one tendering process are conducted at the same time, they must be conducted consecutively, with one opening completed, recorded and tenders removed, before the next opening commences.

Page 67: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 67 of 164

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Resources for Tender Opening: Resources for Tender Opening: Resources for Tender Opening: Resources for Tender Opening:

Physical resources for an efficient tender opening include:

� a room which is accessible to bidders, arranged so that bidders’ representatives are seated at a short distance from the table where the opening is to be conducted. It is important that bidders witness, rather than participate in, a tender opening procedure;

� office materials, such as scissors, marker pens, sellotape etc for opening and marking of tenders;

� a copy of the bidding document, in case there is a need to refer to the bidding instructions or other details;

� blank forms for recording tender details and sufficient pens;

� blank attendance forms and pens, for all bidders and other attendees to sign their attendance.

Prompt access to photocopying facilities for distributing copies of the tender opening record will also be required.

Sufficient staff should be on hand to ensure that the opening proceeds efficiently. Different staff should normally be responsible for the following tasks:

� chairing the opening procedure;

� opening the tenders, numbering and passing the tenders to the chairperson to read out;

� recording the details of the tender opening;

� ensuring the safe-keeping of opened tenders;

� ensuring that bidders sign the attendance record.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Information to be Read Out: Information to be Read Out: Information to be Read Out: Information to be Read Out:

Information to be read out should be as stated in the bidding document.

This must include at least:

� the name and address of each bidder;

� the total price of each tender, stating the currency and amount.

It may also include:

� the presence or absence of a tender security, and the form and amount of the tender security, where one was requested in the bidding document;

� any other details stated in the bidding document.

No additional information concerning any tender should be read out, other than that required by the bidding document.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Key Pages: Key Pages: Key Pages: Key Pages:

The key pages, which require stamping and signing or initially should be determined by the chairperson of the opening. As guidance, they should include at least:

� the tender submission form;

Page 68: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 68 of 164

� any pages with financial information, such as price schedules.

Stamping and signing of standard literature and brochures is not normally required.

In determining the key pages, it should be remembered that stamping and signing of excessive numbers of pages can be time-consuming, especially where a large number of tenders are received.

Stamping and signing is only required on the original of the tender and not any copies.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 –––– Questions from Bidders: Questions from Bidders: Questions from Bidders: Questions from Bidders:

Information given should normally be restricted to that which is included in the bidding document. Staff should seek to refer bidders back to the bidding document, rather than risk giving contradictory responses.

Staff managing a public tender opening must take care not to answer questions regarding the acceptance or rejection of tenders, or to discuss the specific details of any tender. A standard response of “that will be decided by the evaluation committee” may be given to such questions.

The names of staff who will be evaluating the tenders must not be revealed under any circumstances, even if the information is requested by bidders. This confidentiality regarding the names of evaluators should reduce opportunities for bidders to seek to influence the evaluation.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required for the public tender opening, as the procedure is managed by a representative of the IPC.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the tender opening must be completed and kept on the procurement file. At a minimum, this record must include:

� the names of all bidders whose tenders were opened;

� the total prices of the tenders read out;

� the presence or absence of a tender security if one was required and the form and amount of the security;

� the number of copies of the tender received;

� any withdrawals or modifications.

Copies of the record must be distributed to bidders on request.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 13: General evaluation procedures for goods, works and routine services.

Page 69: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 69 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 12B:12B:12B:12B: OOOOPENING PENING PENING PENING TTTTENDERS ENDERS ENDERS ENDERS (O(O(O(ONE NE NE NE SSSSTAGE TAGE TAGE TAGE –––– TTTTWO WO WO WO EEEENVELOPESNVELOPESNVELOPESNVELOPES))))

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

The outer envelope of tenders which have been received on time are opening publicly, in the presence of bidders, to obtain the separate technical and financial proposals within. The technical proposals are also opened and summary details read out and recorded. Financial proposals are kept sealed until the technical evaluation has been completed and approved.

The financial proposals of tenders proceeding to the financial evaluation are opened publicly at a separate tendering opening, at a date and time notified after the technical evaluation. Summary details, including technical scores and prices, are read out and recorded.

ApApApApplies to:plies to:plies to:plies to:

MethodMethodMethodMethod: This procedure applies to the Request for Proposals method.

The Open Tendering, Restricted Tendering and Request for Quotations methods include a one stage - single envelope tender opening – see Desk Instruction 12A for guidance. The Two Stage Tendering method will include a two stage bid opening – see Desk Instruction 25 for guidance.

TypeTypeTypeType: This procedure applies to consultancy services only.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The public tender opening is an important step in the tendering process as:

� opening tenders publicly helps to demonstrate that the tendering processes is transparent and increase bidders’ confidence in the public procurement process;

� reading out technical scores and prices at the financial opening should avoid any disputes regarding changes of price or the evaluation results at a later date;

� the formal procedure, which coincides with the tender closing, should prevent late tenders from being included in the evaluation.

References:References:References:References:

Section 34(6), Public Procurement Act, 2003.

Regulation 5.5.3.1, 5.5.4.6 and 5.5.5.1, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Internal Procurement Committee will nominate one of its members to manage the tender opening procedures.

The Procurement Unit, or other staff, will be required to provide support to the IPC at the openings.

StepStepStepStep----bybybyby----Step Instructions for Technical Opening:Step Instructions for Technical Opening:Step Instructions for Technical Opening:Step Instructions for Technical Opening:

105. Prepare the room prior to the tender opening time. Staff must ensure that appropriate resources, both physical and human, are available to manage the tender opening efficiently – see guidance note 1 below.

Page 70: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 70 of 164

106. The person chairing the opening must ensure that all staff involved understand their respective roles in the procedure.

107. The chairperson should welcome bidders to the technical opening and request them all to sign the record of attendance. He/she should briefly explain the procedure which will be followed, which is normally opening of the tender box, opening of outer envelopes, opening of technical proposals, reading out and recording of information by the procuring entity, opportunity for bidders to ask questions, closing of meeting and removal of proposals for safe-keeping and evaluation.

108. The tender box should be opened and all proposals removed and counted. Any proposals which were too large for the tender box and received separately must be accounted for, by checking against the record of proposals received. Any proposals which were not in the tender box or included in the record of tenders received must NOT be opened. Any missing proposals must be accounted for before the opening commences.

109. First, envelopes marked “Withdrawal” should be opened one at a time. These should be read out and the envelope containing the corresponding proposal located and returned to the bidder unopened. The withdrawal must be noted on the record of the tender opening.

110. Next, envelopes marked “Modification” should be opened one at a time and the envelope containing the corresponding proposal located and the outer envelope opened. The envelopes marked “technical proposal” should be opened and details of the modified proposal should be read out and recorded, ensuring that the details relate to the modified, not the original, proposal. See guidance note 2 below for guidance on the details to be read out. Both the original technical proposal and modification should be stamped on key pages and signed or initialled by the chairperson of the opening. For guidance on the key pages, see guidance note 3 below.

111. The outer envelopes of all other proposals should be opened, one at a time, the technical proposals within them opened and relevant details read out and recorded. Each technical proposal should be stamped on key pages and signed or initialled by the chairperson of the opening. Each proposal should also be marked with a number (1, 2, 3 etc), corresponding to its number on the tender opening record. With the exception of late proposals, the tender opening committee must not make any comments regarding the acceptance or rejection of any proposal. Any missing or incorrect documents should be noted in the record of tender opening, but not commented on.

112. When all proposals received on time have been opened, read out and recorded, the chairperson should allow bidders to ask questions. For guidance on answering such questions, see guidance note 4 below.

113. The chairperson should close the tender opening meeting, reminding bidders that they must not seek to influence the evaluation and that bidders whose proposals are proceeding to the financial evaluation will be notified of the arrangements for the financial opening in due course.

Page 71: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 71 of 164

114. Copies of the tender opening record should be distributed to bidders. The original record should be added to the procurement file.

115. All technical proposals should be immediately taken to a place of safe keeping, until the evaluation committee is ready to meet. All financial proposals and any tender securities must also be kept securely.

116. Where tender openings for more than one procurement process are conducted at the same time, they must be conducted consecutively, with one opening completed, recorded and proposals removed, before the next opening commences.

StepStepStepStep----bybybyby----Step Instructions for Financial Opening:Step Instructions for Financial Opening:Step Instructions for Financial Opening:Step Instructions for Financial Opening:

1. Ensure that all bidders whose proposals are proceeding to the financial opening have been notified of the time, date and location for the opening, at least two weeks prior to the opening.

2. Prepare the room prior to the tender opening time. Staff must ensure that appropriate resources, both physical and human, are available to manage the tender opening efficiently – see guidance note 1 below.

3. The person chairing the opening must ensure that all staff involved understand their respective roles in the procedure.

4. The chairperson should welcome bidders to the financial opening and request them all to sign the record of attendance. He/she should briefly explain the procedure which will be followed, which is normally reading out technical scores, opening of financial proposals, reading out and recording of financial information by the procuring entity, opportunity for bidders to ask questions, closing of meeting and removal of financial proposals for safe-keeping and evaluation.

5. Read out the names of all bidders whose proposals are proceeding to the financial evaluation and their respective technical scores. The tender opening committee must not discuss these scores or the results of the technical evaluation in any way.

6. Open the financial proposals, one at a time, and read out and record the relevant details – see guidance note 5 below for details to be read out. Each financial proposal should be stamped on key pages and signed or initialled by the chairperson of the opening – see guidance note 6 below for details of the key pages. The tender opening committee must not make any comments regarding the prices or the financial evaluation.

7. When all relevant financial proposals time have been opened, read out and recorded, the chairperson should allow bidders to ask questions. For guidance on answering such questions, see guidance note 4 below.

8. The chairperson should close the tender opening meeting, reminding bidders that they must not seek to influence the financial evaluation and that the successful proposal will be published in due course.

9. Copies of the tender opening record should be distributed to bidders. The original record should be added to the procurement file.

Page 72: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 72 of 164

10. All financial proposals should be immediately taken to a place of safe keeping, until the evaluation committee is ready to meet.

11. Where tender openings for more than one procurement process are conducted at the same time, they must be conducted consecutively, with one opening completed, recorded and proposals removed, before the next opening commences.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Resources for Tender Opening: Resources for Tender Opening: Resources for Tender Opening: Resources for Tender Opening:

Physical resources for an efficient tender opening include:

� a room which is accessible to bidders, arranged so that bidders’ representatives are seated at a short distance from the table where the opening is to be conducted. It is important that bidders witness, rather than participate in, a tender opening procedure;

� office materials, such as scissors, marker pens, sellotape etc for opening and marking of tenders;

� a copy of the Request for Proposals document, in case there is a need to refer to the bidding instructions or other details;

� blank forms for recording tender details and sufficient pens;

� blank attendance forms and pens, for all bidders and other attendees to sign their attendance;

� details of the technical scores to be read out, for the financial opening.

Prompt access to photocopying facilities for distributing copies of the tender opening record will also be required.

Sufficient staff should be on hand to ensure that the opening proceeds efficiently. Different staff should normally be responsible for the following tasks:

� chairing the opening procedure;

� opening the proposals, numbering and passing the proposals to the chairperson to read out;

� recording the details of the tender opening;

� ensuring the safe-keeping of both opened proposals and the sealed financial proposals at the first stage;

� ensuring that bidders sign the attendance record.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Information to be Read Out at Technical Opening: Information to be Read Out at Technical Opening: Information to be Read Out at Technical Opening: Information to be Read Out at Technical Opening:

Information to be read out should be as stated in the Request for Proposals document.

This must include at least the name and address of each bidder, including the names of all parties to a joint venture, consortium or association.

It may also include:

� the presence or absence of a tender security, and the form and amount of the tender security, where one was requested in the Request for Proposals document;

Page 73: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 73 of 164

� any other details stated in the Request for Proposals document.

No additional information concerning any proposal should be read out, other than that required by the Request for Proposals document.

No financial information will be read out, as financial proposals will remain sealed at this stage.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Key Pages of Technical Proposal: Key Pages of Technical Proposal: Key Pages of Technical Proposal: Key Pages of Technical Proposal:

The key pages, which require stamping and signing or initially should be determined by the chairperson of the opening. As guidance, they should include at least the technical proposal submission form. The sealed envelope containing the financial proposal should also be stamped and signed. Stamping and signing of standard literature and brochures is not normally required.

In determining the key pages, it should be remembered that stamping and signing of excessive numbers of pages can be time-consuming.

Stamping and signing is only required on the original of the technical proposal and not any copies.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 –––– Questions from Bidders: Questions from Bidders: Questions from Bidders: Questions from Bidders:

Information given should normally be restricted to that which is included in the Request for Proposals document and, in the case of a financial opening, the technical scores which have been read out. Staff should seek to refer bidders back to the Request for Proposals document, rather than risk giving contradictory responses.

Staff managing a public tender opening must take care not to answer questions regarding the acceptance or rejection of proposals, or to discuss the specific details of any proposal, score or price. A standard response of “that will be decided by the evaluation committee” may be given to such questions.

The names of staff who will be evaluating the tenders must not be revealed under any circumstances, even if the information is requested by bidders. This confidentiality regarding the names of evaluators should reduce opportunities for bidders to seek to influence the evaluation.

Guidance Note 5 Guidance Note 5 Guidance Note 5 Guidance Note 5 –––– Information to be Read Out at Financial Opening: Information to be Read Out at Financial Opening: Information to be Read Out at Financial Opening: Information to be Read Out at Financial Opening:

The technical scores of each bidder must be read out, prior to the opening of the financial envelopes.

The name of each bidder and the total price of the financial proposal should be read out.

No additional information concerning any proposal should be read out. The breakdown of any technical score or price must not be read out.

Guidance Note 6 Guidance Note 6 Guidance Note 6 Guidance Note 6 –––– Key Pages of Financial Proposal: Key Pages of Financial Proposal: Key Pages of Financial Proposal: Key Pages of Financial Proposal:

The key pages, which require stamping and signing or initialling should be determined by the chairperson of the opening. As guidance, they should include at least:

� the financial proposal submission form;

� the summary of costs.

Page 74: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 74 of 164

The chairperson may also choose to stamp and sign pages giving the breakdown of costs.

In determining the key pages, it should be remembered that stamping and signing of excessive numbers of pages can be time-consuming.

Stamping and signing is only required on the original of the financial proposal and not any copies.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required for the public tender openings, as the procedure is managed by a representative of the IPC.

Documents/RecDocuments/RecDocuments/RecDocuments/Records Required:ords Required:ords Required:ords Required:

Records of both the technical and financial tenders opening must be completed and kept on the procurement file.

At a minimum, the record of the technical opening must include:

� the names and addresses of all bidders whose proposals were opened;

� the presence or absence of a tender security if one was required and the form and amount of the security;

� the number of copies of the technical proposal received;

� any withdrawals or modifications.

At a minimum, the record of the financial opening must include:

� the names of all bidders whose proposals are proceeding to the financial evaluation;

� the technical score of each bidder proceeding to the financial evaluation;

� the total price of each financial proposal;

� the number of copies of the financial proposal received.

Copies of the record must be distributed to bidders on request.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 14: General evaluation procedures for consultancy services.

Page 75: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 75 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 13:13:13:13: GGGGENERAL ENERAL ENERAL ENERAL EEEEVALUATION VALUATION VALUATION VALUATION PPPPROCEDURES FOR ROCEDURES FOR ROCEDURES FOR ROCEDURES FOR GGGGOODSOODSOODSOODS,,,, WWWWORKS ORKS ORKS ORKS

AND AND AND AND RRRROUTINE OUTINE OUTINE OUTINE SSSSERVICESERVICESERVICESERVICES

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction sets out general procedures for evaluating tenders for goods, works and routine services. It must be read in conjunction with the relevant Desk Instruction for the particular evaluation methodology to be used, which will be either:

� Desk Instruction 13A: Evaluating offers for goods;

� Desk Instruction 13B: Evaluating offers for works; or

� Desk Instruction 13C: Evaluating offers for routine services.

Evaluations will vary for goods, works and routine services, but the evaluation methodology will always consist of three stages:

� a preliminary screening, to eliminate tenders which do not comply with the basic requirements of the bidding document and bidders who do not meet mandatory qualification requirements;

� a detailed evaluation, to determine whether tenders are substantially responsive to the technical and commercial requirements of the bidding document;

� a financial evaluation to compare the costs of responsive tenders and determine which is the successful tender and should be recommended for award of contract.

A diagram summarising this evaluation methodology is attached to this Desk Instruction.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The general principles in this Desk Instruction apply to evaluations under the Open Tendering, Restricted Tendering and Request for Quotations methods.

The general principles in this Desk Instruction also apply to evaluations under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

TypeTypeTypeType: The general principles in this Desk Instruction apply to the evaluation of tenders for goods, works and routine services. The detailed methodologies for each are included in Desk Instructions 13A, 13B and 13C respectively.

The evaluation of proposals for consultancy services, under the Request for Proposals method, is covered by Desk Instruction 14.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of evaluation is to objectively assess and compare all tenders received, using a pre-defined methodology and criteria, to determine which is the successful bidder, who should be awarded a contract. A well conducted evaluation should ensure that:

� competition is fair and that all bidders have an equal opportunity of winning government funded contracts;

Page 76: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 76 of 164

� the goods, works or services purchased under the contract are of appropriate quality; and

� the procuring entity gets the best possible value for money.

References:References:References:References:

Section 31(13)-(19) and 35(4), Public Procurement Act, 2003.

Regulation 5.2.15 Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations, but will obtain technical advice from the end user, or other technical specialists, as required. Where appropriate, the Procurement Unit will establish an evaluation team, with joint responsibility for conducting the entire evaluation.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Read this section in conjunction with the detailed step-by-step instructions in Desk Instruction 13A, 13B or 13C as appropriate.

12. The head of the Procurement Unit should identify appropriate member(s) of staff to manage the evaluation – see guidance note 1 below for assistance in selecting staff.

13. Review and list the requirements, instructions and evaluation criteria specified in the bidding document and ensure that these are clearly understood. Seek clarification from the person responsible for writing the bidding document, where necessary. The evaluation must apply the criteria specified in the bidding document, and no new or varied criteria.

14. The member of the Procurement Unit responsible for managing the evaluation should meet with any selected evaluator(s) to review the evaluation methodology and criteria specified in the bidding document and ensure that it is fully understood by all evaluators.

15. Conduct a preliminary screening – see guidance note 2 below for further details. Eliminate tenders which do not pass the preliminary screening.

16. Conduct a detailed evaluation on the tenders which passed the preliminary screening – see guidance note 3 below for further details. See also guidance note 4 below for assistance in determining responsiveness and identifying material and non-material deviations.

17. Correct tenders or seek clarification from bidders as required – see guidance note 5 below on areas where clarifications are permitted and the procedure for clarification and correction of tenders.

18. Conduct a financial evaluation on the tenders which passed the detailed evaluation to determine the lowest priced tender– see guidance note 6 below for further details. See also guidance note 7 on the correction of arithmetic errors and guidance note 8 on the application of discounts.

19. Where required, conduct a post-qualification on the successful bidder – see Desk Instruction 15 for guidance.

Page 77: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 77 of 164

20. Prepare an evaluation report for submission to the IPC for approval – see Documents/Records Required for details of the contents of the report.

Request bidders to extend the validity of their tenders at any point during this process if required – see guidance note 9 for details of the procedure.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Sele Sele Sele Selecting Staff to Conduct Evaluationscting Staff to Conduct Evaluationscting Staff to Conduct Evaluationscting Staff to Conduct Evaluations

The Procurement Unit has the overall responsibility for conducting evaluations and preparing evaluation reports, to be submitted to the IPC for approval. However, evaluations will frequently require inputs from other staff, particularly those with technical knowledge of the goods, works or services being procured. The head of the Procurement Unit must select the most appropriate member or members of staff to conduct each evaluation. The appropriate number and type of staff will depend on the type, value and complexity of the procurement. For example:

� an evaluation under the Request for Quotations method for routine stationery items could be conducted entirely by one member of the Procurement Unit;

� an evaluation for a construction contract will require inputs from at least one civil works engineer;

� any evaluation of a high value should be conducted jointly by an evaluation team.

Each evaluation should be allocated to a member of the Procurement Unit to manage. That member of staff will then be responsible for coordinating any inputs from other staff, ensuring that the evaluation is conducted on time and in accordance with all applicable rules and procedures and preparing an evaluation report.

Where an evaluation is particularly high value or complex, the entire evaluation should be allocated to an evaluation team, rather than an individual, to manage. In this case, the head of the Procurement Unit should nominate one member to chair the evaluation team.

In identifying staff to provide inputs to an evaluation or to be members of an evaluation team, the head of the Procurement Unit must consider the type of skills, knowledge or experience needed, which might include:

� procurement and contracting skills;

� technical knowledge;

� financial management skills;

� legal expertise;

� representation by the end user; and

� specialist knowledge or experience, such as SME promotion programmes or preference schemes.

It is important that IPC members are not involved in conducting evaluations, but only in approving completed evaluation reports. IPC members must not be selected as evaluators, as this would result in them reviewing and approving their own work.

Page 78: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 78 of 164

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Preliminary Screening Preliminary Screening Preliminary Screening Preliminary Screening

The preliminary screening is conducted to determine whether tenders comply with the basic instructions and requirements of the bidding document. It enables the evaluators to eliminate the weakest tenders, without the time and effort spent in conducting a detailed evaluation. Where no pre-qualification has been conducted, the preliminary screening can also be used to assess whether bidders meet the mandatory qualification requirements – see Desk Instruction 28 for further guidance on qualifications.

The preliminary screening is conducted on a pass or fail basis, with tenders that are not substantially compliant being rejected. The criteria to be used for the preliminary screening depend on the requirements and instructions of the bidding document, so the preliminary screening must always start with a review of the bidding document to list the requirements to be met. As guidance only, the preliminary screening might typically include checks of the following:

� submission of a tender security, if one was required, in the correct form and amount and from an acceptable financial institution;

� submission of an original and the correct number of copies of the tender;

� submission of all forms and documents required, including, in particular the tender submission form and any required price schedules;

� signature and authorisation of the tender in accordance with the instructions in the bidding document, including any required power of attorney;

� correct tender validity;

� the tender is for all items included in the bidding document, or in a particular lot, if so required by the bidding document;

� submission of any additional documentation or samples required; and

� whether the bidder meets the mandatory qualification requirements.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Detailed Evaluation Detailed Evaluation Detailed Evaluation Detailed Evaluation

The detailed evaluation must only be conducted on tenders which passed the preliminary screening.

The detailed evaluation is conducted to determine whether tenders are substantially responsive to the technical and commercial requirements of the bidding document. The technical evaluation is conducted on a pass or fail basis; only tenders which are responsive, or substantially responsive, to the requirements of the bidding document are included in the subsequent financial evaluation. Non responsive tenders are eliminated from the evaluation.

The ways of assessing responsiveness will vary considerably between evaluations for goods, works and routine services. Therefore, further guidance on the detailed evaluation is included in Desk Instructions 13A, 13B and 13C respectively.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 –––– Determining Responsivene Determining Responsivene Determining Responsivene Determining Responsivenessssssss

In evaluating tenders, the evaluator(s) is required to decide whether a tender is “responsive” (i.e. meets the procuring entity’s requirements) or “non responsive” (i.e. does not meet the procuring entity’s requirements).

Page 79: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 79 of 164

In practice, few tenders are perfect and therefore the key test is whether a tender is “substantially responsive”. A “substantially responsive” tender is defined as a tender which conforms to all the instructions, requirements, terms and conditions of the bidding document without material deviation, reservation, or omission. In other words, minor (or “non material”) errors or problems can be accepted by the evaluator(s) or corrected by the bidder, while tenders with major (or “material”) errors or problems must be rejected.

As a general rule, a material deviation, reservation, or omission is one that –

� affects the scope, quality or performance of the goods, works or services in a substantial way; or

� would limit the procuring entity’s rights or the bidder’s obligations under the contract in a substantial way; or

� would unfairly affect the competitive position of other bidders if it were corrected.

Determining whether a deviation is material or non material is a decision for the evaluator(s). The decision must be based on the contents of the tender only. Additional information or previous knowledge of a product or bidder must not be taken into account.

What is a material or non material deviation will vary between different tendering procedures, depending on the particular requirements of each. However, decisions on what constitute material and non material deviations must be applied consistently to all tenders which are part of the same evaluation process.

In deciding whether deviations are material or non material, the evaluator(s) should consider the impact on key factors, such as cost, risk, time and quality of the procurement. As guidance only, material deviations, reservations or omissions are likely to include:

� unacceptable schedules for delivery or completion;

� unacceptable technical details, such as design, materials, workmanship, specifications, standards or methodologies; and

� unacceptable counter-proposals on key contract terms and conditions, such as payment terms, price adjustment, liquidated damages, sub-contracting or warranty.

As guidance only, non material deviations, reservations or omissions are likely to include:

� minor differences in delivery or completion schedules, where time is not critical;

� the omission of minor items;

� arithmetic errors;

� alternative technical details, such as design, materials, workmanship, specifications, standards or methodologies, which are substantially responsive and acceptable to the procuring entity; and

Page 80: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 80 of 164

� minor amendments to contract terms and conditions, which are acceptable to the procuring entity.

Where a tender is determined to be substantially responsive, the evaluator(s) may waive, clarify or correct the non-conformity, error or omission in the tender – see guidance note 5 below for further details.

Guidance Note 5 Guidance Note 5 Guidance Note 5 Guidance Note 5 –––– Tender Clarifications fro Tender Clarifications fro Tender Clarifications fro Tender Clarifications from Bidders and Correctionsm Bidders and Correctionsm Bidders and Correctionsm Bidders and Corrections

Where information contained in a tender is unclear, the evaluator(s) may seek clarification of the information from the bidder. Clarifications can not be used to amend the price of the tender (with the exception of the correction of arithmetic errors), to correct material deviations or to make other significant changes to any aspect of the tender.

Requests for clarification must be addressed to the bidder in writing and must state that a written response is required by a specified date. The request must also state that failure by the bidder to respond to the request may result in the rejection of his tender.

Where a tender includes non material deviations, errors or omissions, the evaluator(s) may choose to accept or to correct them. In order to make the evaluation fair to all bidders, the nonconformity should be quantified and expressed in monetary terms, wherever possible. This amount should then be added to the tender price, for purposes of the financial evaluation only, to reflect the price or cost of the missing or non-conforming item.

For example, where a tender for goods does not include the price of a spare part or consumable item, the price of the missing item should be added to the tender price, using the highest price for the same item from the other tenders.

As a further example, where a tender includes a slightly later delivery date than required by the bidding document and this delay is acceptable to the procuring entity, the late delivery could be quantified and expressed in monetary terms, using the monetary penalties for liquidated damages contained in the draft contract.

Guidance Note 6 Guidance Note 6 Guidance Note 6 Guidance Note 6 –––– Financial Evaluation Financial Evaluation Financial Evaluation Financial Evaluation

The financial evaluation must only be conducted on tenders which were determined to be substantially responsive during the detailed evaluation.

The financial evaluation is conducted to determine the evaluated price of tenders, rank the tenders according to their evaluated price and identify the lowest priced tender. This will be the successful tender, which should be recommended for award of contract.

Unless otherwise required by the instructions in the bidding document, the procedure for determining the evaluated price of each tender is as follows:

� determine the total tender price, including or excluding particular costs, as indicated in the bidding document e.g. the bidding document may give particular instructions on the inclusion of all taxes and duties in the tender price or the exclusion of provisional sums and contingencies, but the inclusion of competitively priced dayworks, in tenders for works;

� correct any arithmetic errors – see guidance note 7 below;

Page 81: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 81 of 164

� apply any non-conditional discounts offered by bidders – see guidance note 8 below;

� convert all tenders to a single evaluation currency for purposes of comparison, using the currency and the date and source of the exchange rate specified in the bidding document;

� make adjustments for any non material nonconformities, errors or omissions;

� apply any non-price criteria specified in the bidding document;

� apply any margin of price preference; and

� determine the total evaluated price of each tender.

Where the evaluation is for a procurement requirement consisting of more than one lot and bidders are permitted to offer discounts which are conditional on the award of contracts for more than one lot, these must be taken into account in a further financial evaluation at this stage – see guidance note 8 below.

Guidance Note 7 Guidance Note 7 Guidance Note 7 Guidance Note 7 –––– Arithmetic Errors Arithmetic Errors Arithmetic Errors Arithmetic Errors

In conducting a financial evaluation, arithmetic errors may be corrected by the evaluator(s). The procedure for correcting arithmetic errors is normally stated in bidding documents and the procedure stated must be used. This is normally the procedure stated below.

Where no specific procedure is stated in the bidding document, the following procedure should be applied:

� if there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected, unless in the opinion of the evaluator(s) there is an obvious misplacement of the decimal point in the unit price, in which case the total price as quoted shall govern and the unit price shall be corrected;

� if there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and

� if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to the notes above.

Bidders should be notified in writing of any arithmetic corrections made and requested to agree to the corrections in writing.

Guidance Note 8 Guidance Note 8 Guidance Note 8 Guidance Note 8 –––– Discounts Discounts Discounts Discounts

Bidders are permitted to offer discounts to their tender prices, provided that any discounts are included in their tender. Discounts, or any other change in price, is not permitted after the tender closing date. Non-conditional discounts should be taken into account in the evaluated price of the tenders.

Prompt payment discounts, which are conditional on prompt payment by the procuring entity, must not be taken into account in the financial evaluation, but should be included as a contract term, if the tender is accepted.

Page 82: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 82 of 164

If so stated in the bidding document, bidders may be permitted to offer conditional (or cross) discounts i.e. discounts which are conditional on the simultaneous award of contracts for more than one lot. Conditional discounts should be excluded from the main financial evaluation.

Following completion of the financial evaluation and determination of the successful tender(s), a further financial comparison should be conducted to take any conditional discounts into account. This comparison must identify the best overall value for money for the procuring entity i.e. the combination of contract awards which offers the lowest total price.

Guidance Note 9 Guidance Note 9 Guidance Note 9 Guidance Note 9 –––– Requesting Extensions to Tender Validity Requesting Extensions to Tender Validity Requesting Extensions to Tender Validity Requesting Extensions to Tender Validity

The tender validity period requested in the bidding document should normally be sufficient to enable the procuring entity to undertake the evaluation, obtain IPC approval and place a contract. Therefore, extensions to the validity of tenders should not normally be required.

Where an extension to the validity of tenders is required, all bidders should be requested, in writing, to extend the validity of their tenders for an additional specified period of time. This request should be issued a reasonable period before the expiry of the validity of tenders, to give sufficient time for responses to be received.

Bidders must not be permitted to change the price, or any other details, of their tender, when extending the validity.

Where a tender security is required, bidders extending the validity of their tenders must also extend the validity of their tender securities by the same period of time. Any bidder is free to refuse to extend the validity of his tender, without forfeiting any tender security submitted.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the completed evaluation report – see Documents/Records required below for guidance on preparing the evaluation report. No communications accepting or rejecting any tender, or indicating which is the successful tender, must be sent to any bidder before this approval is obtained.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved evaluation report, and all supporting documents used in conducting the evaluation, must be kept on the procurement file.

Minutes of evaluation meetings and copies of all correspondence with bidders, such as letters relating to clarifications, the correction of arithmetic errors or extensions of the tender validity, must also be kept on the procurement file.

The evaluation report should include at least the following information:

� the results of the preliminary screening;

� the results of the detailed technical and commercial evaluation;

� any tenders which were rejected and the reasons for rejection;

� details of any non material deviations, errors or omissions accepted, clarified or corrected and, where relevant, the way in which deviations or omissions have been quantified and taken into account in the financial evaluation;

Page 83: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 83 of 164

� the price of each tender read out at the tender opening;

� the evaluated price of each tender, following any correction or adjustments to the price and the conversion to a single currency;

� the ranking of the tenders, according to their evaluated price;

� a statement of which tender has the lowest evaluated price and is therefore the successful tender; and

� the results of any post-qualification.

The evaluation report must contain clear recommendations to the IPC on:

� the successful tender and the price of the proposed contract; and

� whether any negotiations should be held with the successful bidder.

The evaluation report must be signed by all staff who have been involved in the evaluation.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with the relevant Desk Instruction from 13A to 13C, and Desk Instruction 15 if post-qualification is required, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

Where no negotiations are required:

� Proceed to Desk Instruction 18: Issuing a notice of acceptance under the Open Tendering and Restricted Tendering methods.

� Proceed to Desk Instruction 19B: Preparing and issuing a purchase order under the Request for Quotations method.

Page 84: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 84 of 164

Preliminary

Screening

Tenders Opened

Detailed

Evaluation

Responsive

Non Responsive Reject

Financial

Evaluation

Substantially Responsive

RejectNon Responsive

Reject

Recommend for

Contract Award

Lowest Price

Others

Clarify

(in writing)

Not Clear

Arithmetic Errors

Confirm

Corrections

(in writing)

Detailed Evaluation of compliance to

technical and commercial requirements of

the bidding document e.g.

- acceptance of key contract terms and

conditions

- technical compliance to description of

requirements

- acceptable delivery/completion period

Financial Evaluation to:

- correct arithmetic errors.

- quantify non-material deviations and/or

non-price criteria.

- convert to a common curency (using

exchange rate stated in bidding doc).

- compare total costs.

- rank prices with lowest price as No 1.

Preliminary Screening to eliminate non

responsive tenders. Criteria typically

include:

- inclusion of all required documents

- correct authorisation of tender

- acceptable tender security

- sufficient tender validity

- eligible bidder

Recommendation: lowest priced,

substantially responsive tender

recommended for contract award, subject to

any post-qualification or negotiations

required.

Recommendation submitted to IPC for

approval in evaluation report.

Evaluation Procedure for Goods, Works and Routine Services

Tender Opening: evaluation includes

tenders listed in the tender opening record,

as received on time, opened and read out.

Late tenders not included.

Page 85: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 85 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 13A:13A:13A:13A: EEEEVALUATING VALUATING VALUATING VALUATING OOOOFFERS FOR FFERS FOR FFERS FOR FFERS FOR GGGGOODSOODSOODSOODS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of tenders for the supply of goods. It must be read in conjunction with Desk Instruction 13: General Evaluation Procedures for Goods, Works and Routine Services.

The evaluation methodology for goods consists of three stages:

� a preliminary screening, to eliminate tenders which do not comply with the basic requirements of the bidding document and bidders who do not meet mandatory qualification requirements;

� a detailed evaluation, to determine whether tenders are substantially responsive to the technical specification and commercial requirements stated in the bidding document and to eliminate tenders which are not responsive;

� a financial evaluation to compare the costs of responsive tenders and determine which is the lowest priced tender.

The successful tender will be the lowest priced tender, which is substantially responsive to requirements of the bidding document.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Open Tendering, Restricted Tendering and Request for Quotations methods.

The general principles in this Desk Instruction also apply to evaluations under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

TypeTypeTypeType: This Desk Instruction applies to evaluations for goods only.

The evaluation of tenders for works and routine services are covered by Desk Instructions 13B and 13C respectively. Evaluations for consultancy services under the Request for Proposals method are covered by Desk Instruction 14.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of the evaluation methodology for goods is to determine the lowest priced tender, which is responsive to the requirements of the bidding document. This ensures that the procuring entity only purchases goods which meet its specification, but does not pay any more than necessary for those goods.

References:References:References:References:

Section 31(13)-(19), Public Procurement Act, 2003.

Regulation 5.2.15, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations for goods, but will obtain technical advice from the end user, or other technical specialists, as required when determining the responsiveness of tenders to the technical specification in the bidding document.

Where appropriate, the Procurement Unit will establish an evaluation team to conduct the evaluation – see Desk Instruction 13 for further guidance.

Page 86: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 86 of 164

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

21. The head of the Procurement Unit should identify appropriate member(s) of staff to manage the evaluation – see Desk Instruction 13 for guidance.

22. Review and list the requirements, instructions, specifications and evaluation criteria specified in the bidding document and ensure that these are clearly understood. Seek clarification from the person responsible for writing the bidding document or preparing the specification where necessary.

23. The member of the Procurement Unit responsible for managing the evaluation should meet with any selected evaluator(s) to review the evaluation methodology and the specifications and criteria included in the bidding document and ensure that these are fully understood by all evaluators.

24. Conduct a preliminary screening – see Desk Instruction 13 for guidance. Eliminate tenders which are not substantially responsive.

25. Conduct a detailed evaluation to determine whether tenders are substantially responsive to the minimum specification and the commercial requirements included in the bidding document – see guidance notes 1 and 2 below for further detail. See Desk Instruction 13 for guidance on determining responsiveness, seeking clarifications and correcting minor deviations, errors and omissions. Eliminate tenders which are not substantially responsive.

26. Start the financial evaluation by determining the evaluated price of each tender - see Desk Instruction 13 for further details and guidance note 3 below on the application of non-price criteria for goods.

27. Rank the tenders according to their evaluated price. Identify the lowest priced tender, which will be the successful tender.

28. Where required, conduct a post-qualification on the successful bidder – see Desk Instruction 15 for guidance.

29. Prepare an evaluation report for submission to the IPC for approval – see Desk Instruction 13 for details of the contents of the report.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Detailed Technical Evaluation Detailed Technical Evaluation Detailed Technical Evaluation Detailed Technical Evaluation

The technical evaluation for goods is conducted by comparison with the specification in the bidding document. This specification provides a minimum standard, which tenders must reach. Tenders which do not reach this standard are non responsive. Tenders which equal or exceed the standard are responsive. The evaluation is conducted on a pass or fail basis, so no extra credit or benefit is given to tenders which exceed the standard, except where this is provided for by non-price criteria – see guidance note 3 below. Substantially responsive tenders may be considered to have passed the technical evaluation.

For example, if the specification in the bidding document for a photocopier specified a copy speed of 25 pages per minute:

� a tender offering a copy speed of 15 pages per minute would be non responsive;

� a tender offering a copy speed of 24 pages per minute may be substantially responsive, if the evaluator(s) so decide;

Page 87: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 87 of 164

� a tender offering a copy speed of 25 pages per minute would be responsive;

� a tender offering a copy speed of 33 pages per minute would be responsive, but would receive no additional preference in the evaluation compared to the tender offering 25 pages per minute.

In conducting the technical evaluation, all aspects of the technical specification must be considered and technical advice sought, where required. In particular, technical advice and advice from the end user on the precise purpose and use of the goods will be required in determining whether deviations from the specification are material or non material. For example:

� failure to offer the specified engine size would almost certainly be a material deviation in an evaluation for a vehicle;

� failure to offer the specified colour of vehicle may be a non material deviation if the vehicle is for general use, but may be a material deviation if the vehicle is for police or military use and requires a particular colour or markings for identification or camouflage purposes.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Detailed Commercial Evaluation Detailed Commercial Evaluation Detailed Commercial Evaluation Detailed Commercial Evaluation

The commercial evaluation is conducted by assessing whether the tender conforms, or substantially conforms, to all the terms, conditions and requirements of the bidding document. The criteria will therefore depend on the bidding document, but might include:

� acceptance of key contract conditions, such as payment, warranty and liquidated damages;

� delivery schedule for goods within the time period specified;

� completion schedule for incidental services within the time period specified, where installation and commissioning or user training is required;

� availability of spare parts and consumable items;

� service arrangements, such as a requirement for a local agents.

As with the technical evaluation, the commercial standard must be set by the terms and conditions of the bidding document and tenders should be evaluated as responsive or non responsive against this standard. No extra benefit should be given to tenders which exceed the standard required, except where this is done through the application of non-price criteria – see guidance note 3 below.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Non Non Non Non----Price CriteriaPrice CriteriaPrice CriteriaPrice Criteria

The successful tender for goods is normally the lowest priced tender, which has met the procuring entity’s technical and commercial requirements, as determined by the detailed evaluation. However, procuring entities are permitted to apply non-price criteria, as long as they are specified in the bidding document.

Non-price criteria must be given a relative weight or expressed in monetary terms wherever possible. Examples of non-price criteria might include:

� a penalty for late delivery and/or a bonus for early delivery, based on the delivery schedule stated in the bidding document. Penalties and bonuses could be expressed in monetary terms, by increasing or reducing the evaluated price

Page 88: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 88 of 164

by a specified amount for each day or week that delivery will be late or early. The amount could be calculated using the rates normally applied to liquidated damages for late deliveries.

� a penalty for payment terms, which require payment earlier than specified in the bidding document. The penalty could be expressed in monetary terms, by calculating the interest which would be earned on the money, using a defined interest rate.

� inclusion of the estimated cost of spare parts and/or consumable items for a specified period of operation. This could be expressed in monetary terms, by requiring bidders to provide prices for a specified list of items, which would be added to the evaluated price.

� inclusion of the costs of operating and maintaining equipment during its projected lifetime;

� a penalty or bonus for productivity or performance of equipment below or above a specified level.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the completed evaluation report. No communications accepting or rejecting any tender, or indicating which is the successful tender, must be sent to any bidder before this approval is obtained.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved evaluation report, and all supporting documents used in conducting the evaluation, must be kept on the procurement file – see Desk Instruction 13 for further guidance on the contents of the evaluation report.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with Desk Instruction 13, and Desk Instruction 15 if post-qualification is required, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

Where no negotiations are required:

� Proceed to Desk Instruction 18: Issuing a notice of acceptance under the Open Tendering and Restricted Tendering methods.

� Proceed to Desk Instruction 19B: Preparing and issuing a purchase order under the Request for Quotations method.

Page 89: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 89 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 13B:13B:13B:13B: EEEEVALUATING VALUATING VALUATING VALUATING OOOOFFERS FOR FFERS FOR FFERS FOR FFERS FOR WWWWORKSORKSORKSORKS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of tenders for the provision of works. It must be read in conjunction with Desk Instruction 13: General Evaluation Procedures for Goods, Works and Routine Services.

The evaluation methodology for works consists of three stages:

� a preliminary screening, to eliminate tenders which do not comply with the basic requirements of the bidding document and bidders who do not meet mandatory qualification requirements;

� a detailed evaluation, to determine whether tenders are substantially responsive to the commercial and technical requirements stated in the bidding document and to eliminate tenders which are not responsive;

� a financial evaluation to compare the costs of responsive tenders and determine which is the lowest priced tender.

The successful tender will be the lowest priced tender, which is substantially responsive to requirements of the bidding document.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Open Tendering, Restricted Tendering and Request for Quotations methods.

The general principles in this Desk Instruction also apply to evaluations under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

TypeTypeTypeType: This Desk Instruction applies to evaluations for works only.

The evaluation of tenders for goods and routine services are covered by Desk Instructions 13A and 13C respectively. Evaluations for consultancy services under the Request for Proposals method are covered by Desk Instruction 14.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of the evaluation methodology for works is to determine the lowest priced tender, which is responsive to the requirements of the bidding document. This ensures that the procuring entity only purchases works of the required standard, but does not pay any more than necessary for the performance of those works.

References:References:References:References:

Section 31(13)-(19), Public Procurement Act, 2003.

Regulation 5.2.15, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations for works, but will obtain technical advice from the end user, or other technical specialists, as required when determining the responsiveness of tenders to the bidding document.

Where appropriate, the Procurement Unit will establish an evaluation team to conduct the evaluation – see Desk Instruction 13 for further guidance.

Page 90: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 90 of 164

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

30. The head of the Procurement Unit should identify appropriate member(s) of staff to manage the evaluation – see Desk Instruction 13 for guidance.

31. Review and list the requirements, instructions, description of works and evaluation criteria specified in the bidding document and ensure that these are clearly understood. Seek clarification from the person responsible for writing the bidding document or preparing the description of works where necessary.

32. The member of the Procurement Unit responsible for managing the evaluation should meet with any selected evaluator(s) to review the evaluation methodology and the description of works and criteria included in the bidding document and ensure that these are fully understood by all evaluators.

33. Conduct a preliminary screening – see Desk Instruction 13 for guidance. Eliminate tenders which are not substantially responsive.

34. Conduct a detailed evaluation to determine whether tenders are substantially responsive to the commercial and technical requirements included in the bidding document – see guidance note 1 below for further detail. See Desk Instruction 13 for guidance on determining responsiveness, seeking clarifications and correcting minor deviations, errors and omissions. Eliminate tenders which are not substantially responsive.

35. Start the financial evaluation by determining the evaluated price of each tender - see Desk Instruction 13 for further details and guidance note 2 below on the application of non-price criteria for works.

36. Rank the tenders according to their evaluated price. Identify the lowest priced tender, which will be the successful tender.

37. Check that the prices of the lowest evaluated tender are not seriously unbalanced or front loaded and request further price analysis if required.

38. Where required, conduct a post-qualification on the successful bidder – see Desk Instruction 15 for guidance.

39. Prepare an evaluation report for submission to the IPC for approval – see Desk Instruction 13 for details of the contents of the report.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Detailed Commercial and Technical Evaluatio Detailed Commercial and Technical Evaluatio Detailed Commercial and Technical Evaluatio Detailed Commercial and Technical Evaluationnnn

The detailed evaluation is conducted by assessing whether the tender conforms, or substantially conforms, to all the terms, conditions and requirements of the bidding document. The criteria will therefore depend on the bidding document, but might include:

� acceptance of key contract conditions, such as payment, price adjustment, warranty, insurance, liquidated damages, dispute resolution, liability and performance security, or inclusion of only minor deviations which are acceptable to the procuring entity and can be quantified in the evaluation;

� completion schedule for the works within the time period specified and/or meeting key milestones of the construction programme;

Page 91: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 91 of 164

� equipment, material, workmanship and design of the standards or codes specified in the bidding document or equivalent;

� use of construction methods specified in the bidding document or acceptable alternatives;

� suitability of the bidder’s key staff, taking into account their qualifications and experience;

� tender based on the design specified in the bidding document or an acceptable alternative design, where alternatives are permitted by the bidding document;

� compliance with applicable regulations, such as those concerning labour; and/or

� sub-contracting within the amounts and in the manner permitted by the bidding document and sub-contractors meeting requirements specified in the bidding document.

The standard for responsiveness must be set by the terms, conditions and requirements of the bidding document and tenders should be evaluated as responsive or non responsive against this standard. Tenders which are substantially responsive may be accepted, although the minor deviations, errors or omissions should be quantified and taken into account in the financial evaluation. No extra benefit should be given to tenders which exceed the standard required, except where this is done through the application of non-price criteria – see guidance note 2 below.

The detailed evaluation of tenders for works will require technical input from staff qualified in the relevant field and staff representing the end user.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Non Non Non Non----Price CriteriaPrice CriteriaPrice CriteriaPrice Criteria

The successful tender for works is normally the lowest priced tender, which has met the procuring entity’s technical and commercial requirements, as determined by the detailed evaluation. However, procuring entities are permitted to apply non-price criteria, as long as they are specified in the bidding document.

Non-price criteria must be given a relative weight or expressed in monetary terms wherever possible. Examples of non-price criteria might include:

� a penalty for late completion and/or a bonus for early completion, based on the completion schedule stated in the bidding document. Penalties and bonuses could be expressed in monetary terms, by increasing or reducing the evaluated price by a specified amount for each day or week that delivery will be late or early. The amount could be calculated using the rates normally applied to liquidated damages for late deliveries.

� a penalty for payment terms, which require payment of any sums earlier than specified in the bidding document. The penalty could be expressed in monetary terms, by calculating the interest which would be earned on the money, using a defined interest rate.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the completed evaluation report. No communications accepting or rejecting any tender, or indicating which is the successful tender, must be sent to any bidder before this approval is obtained.

Page 92: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 92 of 164

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved evaluation report, and all supporting documents used in conducting the evaluation, must be kept on the procurement file – see Desk Instruction 13 for further guidance on the contents of the evaluation report.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with Desk Instruction 13, and Desk Instruction 15 if post-qualification is required, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

Where no negotiations are required:

� Proceed to Desk Instruction 18: Issuing a notice of acceptance under the Open Tendering and Restricted Tendering methods.

� Proceed to Desk Instruction 19B: Preparing and issuing a purchase order under the Request for Quotations method.

Page 93: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 93 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 13C:13C:13C:13C: EEEEVALUATING VALUATING VALUATING VALUATING OOOOFFERS FOR FFERS FOR FFERS FOR FFERS FOR RRRROUTINE OUTINE OUTINE OUTINE SSSSERVICESERVICESERVICESERVICES

Summary Summary Summary Summary of Procedure:of Procedure:of Procedure:of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of tenders for the provision of routine services. It must be read in conjunction with Desk Instruction 13: General Evaluation Procedures for Goods, Works and Routine Services.

The evaluation methodology for routine services consists of three stages:

� a preliminary screening, to eliminate tenders which do not comply with the basic requirements of the bidding document and bidders who do not meet mandatory qualification requirements;

� a detailed evaluation, to determine whether tenders are substantially responsive to the commercial and technical requirements stated in the bidding document and to eliminate tenders which are not responsive;

� a financial evaluation to compare the costs of responsive tenders and determine which is the lowest priced tender.

The successful tender will be the lowest priced tender, which is substantially responsive to requirements of the bidding document.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Open Tendering, Restricted Tendering and Request for Quotations methods.

The general principles in this Desk Instruction also apply to evaluations under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

TypeTypeTypeType: This Desk Instruction applies to evaluations for routine services only.

The evaluation of tenders for goods and works are covered by Desk Instructions 13A and 13B respectively. Evaluations for consultancy services under the Request for Proposals method are covered by Desk Instruction 14.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of the evaluation methodology for routine services is to determine the lowest priced tender, which is responsive to the requirements of the bidding document. This ensures that the procuring entity only purchases services of the required standard, but does not pay any more than necessary for the performance of those services.

References:References:References:References:

Section 31(13)-(19), Public Procurement Act, 2003.

Regulation 5.2.15, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations for routine services, but will obtain technical advice from the end user, or other technical specialists, as required when determining the responsiveness of tenders to the bidding document.

Page 94: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 94 of 164

Where appropriate, the Procurement Unit will establish an evaluation team to conduct the evaluation – see Desk Instruction 13 for further guidance.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

40. The head of the Procurement Unit should identify appropriate member(s) of staff to manage the evaluation – see Desk Instruction 13 for guidance.

41. Review and list the requirements, instructions, terms of reference and evaluation criteria specified in the bidding document and ensure that these are clearly understood. Seek clarification from the person responsible for writing the bidding document or preparing the terms of reference where necessary.

42. The member of the Procurement Unit responsible for managing the evaluation should meet with any selected evaluator(s) to review the evaluation methodology and the terms of reference and criteria included in the bidding document and ensure that these are fully understood by all evaluators.

43. Conduct a preliminary screening – see Desk Instruction 13 for guidance. Eliminate tenders which are not substantially responsive.

44. Conduct a detailed evaluation to determine whether tenders are substantially responsive to the commercial and technical requirements included in the bidding document – see guidance note 1 below for further detail. See Desk Instruction 13 for guidance on determining responsiveness, seeking clarifications and correcting minor deviations, errors and omissions. Eliminate tenders which are not substantially responsive.

45. Start the financial evaluation by determining the evaluated price of each tender - see Desk Instruction 13 for further details.

46. Rank the tenders according to their evaluated price. Identify the lowest priced tender, which will be the successful tender.

47. Where required, conduct a post-qualification on the successful bidder – see Desk Instruction 15 for guidance.

48. Prepare an evaluation report for submission to the IPC for approval – see Desk Instruction 13 for details of the contents of the report.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Detailed Commercial and Technical E Detailed Commercial and Technical E Detailed Commercial and Technical E Detailed Commercial and Technical Evaluationvaluationvaluationvaluation

The detailed evaluation is conducted by assessing whether the tender conforms, or substantially conforms, to all the terms, conditions and requirements of the bidding document and responds adequately to the terms of reference. The criteria will therefore depend on the bidding document, but might include:

� acceptance of key contract conditions, such as payment, insurance, dispute resolution and liability or inclusion of only minor deviations which are acceptable to the procuring entity and can be quantified in the evaluation;

� suitability of the bidder’s key staff, taking into account their qualifications and experience;

� equipment, material and workmanship of the standards specified in the bidding document or equivalent;

� acceptable methodology for performance of the services;

Page 95: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 95 of 164

� compliance with applicable regulations, such as those concerning labour; and/or

� sub-contracting within the amounts and in the manner permitted by the bidding document and sub-contractors meeting requirements specified in the bidding document.

The standard for responsiveness must be set by the terms, conditions, requirements and terms of reference in the bidding document and tenders should be evaluated as responsive or non responsive against this standard. Tenders which are substantially responsive may be accepted, although the minor deviations, errors or omissions should be quantified and taken into account in the financial evaluation. No extra benefit should be given to tenders which exceed the standard required, except where this is done through the application of non-price criteria – see guidance note 2 below.

The detailed evaluation of tenders for routine services will often require input from technical staff and/or staff representing the end user.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the completed evaluation report. No communications accepting or rejecting any tender, or indicating which is the successful tender, must be sent to any bidder before this approval is obtained.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved evaluation report, and all supporting documents used in conducting the evaluation, must be kept on the procurement file – see Desk Instruction 13 for further guidance on the contents of the evaluation report.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with Desk Instruction 13, and Desk Instruction 15 if post-qualification is required, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

Where no negotiations are required:

� Proceed to Desk Instruction 18: Issuing a notice of acceptance under the Open Tendering and Restricted Tendering methods.

� Proceed to Desk Instruction 19B: Preparing and issuing a purchase order under the Request for Quotations method.

Page 96: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 96 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 14:14:14:14: GGGGENERAL ENERAL ENERAL ENERAL EEEEVALUATION VALUATION VALUATION VALUATION PPPPROCEDURES FOR ROCEDURES FOR ROCEDURES FOR ROCEDURES FOR CCCCONSULTANCY ONSULTANCY ONSULTANCY ONSULTANCY

SSSSERVICESERVICESERVICESERVICES

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction sets out general procedures for evaluating proposals for consultancy services. It must be read in conjunction with the relevant Desk Instruction for the particular evaluation methodology to be used, which will be either:

� Desk Instruction 14A for quality and cost based selection (QCBS);

� Desk Instruction 14B for quality based selection (QBS); or

� Desk Instruction 14C for least cost selection (LCS).

Precise evaluation procedures vary between the different methodologies, but all consist of three stages:

� a preliminary screening, to eliminate proposals which do not comply with the basic requirements of the request for proposals document and bidders who do not meet mandatory qualification requirements;

� a detailed evaluation, to determine whether proposals are responsive to the terms of reference in the request for proposals document, to assess the relative quality of the proposals, using a merit point scoring system and to determine which proposals should proceed to the financial opening and evaluation;

� a financial evaluation to examine the prices of the proposal or proposals and determine which is the successful proposal and should be recommended for award of contract.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: The general principles in this Desk Instruction apply to all evaluations under the Request for Proposals method.

TypeTypeTypeType: The general principles in this Desk Instruction apply to the evaluation of proposals for consultancy services only.

The evaluation of tenders for goods, works and routine services, under the Open Tendering, Restricted Tendering and Request for Quotations methods is covered in Desk Instruction 13.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of evaluations for consultancy services is to assess and compare all proposals received, in as objective a manner as possible, using a pre-defined methodology and criteria, in order to determine which is the successful bidder, who should be awarded a contract. A well conducted evaluation for consultancy services should ensure that:

� competition is fair and that all bidders have an equal opportunity of winning government funded contracts;

� the supplier selected has appropriate staff and experience to successfully perform the services; and

Page 97: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 97 of 164

� the consultancy services purchased under the contract offer the procuring entity an appropriate balance of quality and cost, depending on the objectives and circumstances of the procurement requirement.

References:References:References:References:

Section 34(6)-(7), Public Procurement Act, 2003.

Regulation 5.5.3.2 – 5.5.7, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations, but will invite a number of other staff to assist in awarding merit point scores to each proposal. These will be staff with technical knowledge of the services and who are able to represent the end user of the services.

Where appropriate, the Procurement Unit will establish an evaluation team with joint responsibility for conducting the entire evaluation.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Read this section in conjunction with the detailed step-by-step instructions in Desk Instruction 14A, 14B or 14C as appropriate.

49. The head of the Procurement Unit should identify appropriate members of staff to manage the evaluation – see guidance note 1 below for assistance in selecting staff.

50. Review the methodology specified in the request for proposals document and ensure that it is understood. Review and list the requirements, instructions, terms of reference and evaluation criteria specified in the request for proposals document, and the maximum number of points allocated to each criterion and ensure that these are clearly understood. Seek clarification from the person responsible for writing the request for proposals document, where necessary. The evaluation must apply the criteria and scores specified in the request for proposals document, and no new or varied criteria.

51. Conduct a preliminary screening – see guidance note 2 below for further details. Eliminate proposals which do not pass the preliminary screening.

52. The member of the Procurement Unit responsible for managing the evaluation should meet with the staff selected to conduct the merit point evaluation, to review the terms of reference, the criteria and the maximum number of points for each specified in the request for proposals document and ensure that they are fully understood by all evaluators.

53. Conduct a detailed technical evaluation on the proposals which passed the preliminary screening, using the merit point scoring system – see guidance note 3 below for further details.

54. Conduct interviews if required – see guidance note 4 below for further details.

55. Determine which proposal or proposals should proceed to the financial opening and evaluation, according to the evaluation methodology used.

Page 98: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 98 of 164

56. Prepare a technical evaluation report for submission to the IPC for approval – see Desk Instruction 14A, 14B or 14C, as appropriate, for details of the contents of the report.

57. Notify bidders whose proposals are being rejected, stating that their financial proposals will be returned unopened after completion of the evaluation process.

58. Notify bidders whose financial proposals are to be opened of the date, time and location for the financial tender opening and conduct the tender opening – see Desk Instruction 12B for further guidance on the financial opening.

59. Start the financial evaluation by determining the evaluated price of each proposal - see guidance note 5 below for further details. See also guidance note 6 on the correction of arithmetic errors.

60. Complete the financial evaluation and determine the successful proposal in accordance with Desk Instruction 14A, 14B or 14C, as appropriate.

61. Prepare an evaluation report for submission to the IPC for approval – see Documents/Records Required for details of the contents of the report.

Request bidders to extend the validity of their proposals at any point during this process if required – see guidance note 7 for details of the procedure.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Selecting Staff to Conduct Evaluations Selecting Staff to Conduct Evaluations Selecting Staff to Conduct Evaluations Selecting Staff to Conduct Evaluations

The Procurement Unit has the overall responsibility for conducting evaluations and preparing evaluation reports, to be submitted to the IPC for approval. However, evaluations for consultancy services will always require inputs from other staff, as merit point systems require scores to be given by a number of staff, in order to arrive at an average score.

Each evaluation should be allocated to a member of the Procurement Unit to manage. That member of staff will then be responsible for coordinating the inputs from other staff, including obtaining and comparing individual scores, ensuring that the evaluation is conducted on time and in accordance with all applicable rules and procedures and preparing an evaluation report.

Where an evaluation is particularly high value or complex, the entire evaluation should be allocated to an evaluation team, rather than an individual, to manage. In this case, the head of the Procurement Unit should nominate one member to chair the evaluation team.

The head of the Procurement Unit must select the most appropriate members of staff to provide inputs to an evaluation, with particular attention to those responsible for awarding merit point scores. Staff involved in awarding scores to proposals for consultancy services must have knowledge or experience of the services being procured and the evaluators must include staff who are able to represent the needs of the end user.

In identifying staff to provide inputs to an evaluation or to be members of an evaluation team, the head of the Procurement Unit must consider the type of skills, knowledge or experience needed, which might include:

� procurement and contracting skills;

Page 99: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 99 of 164

� technical knowledge;

� financial management skills;

� legal expertise;

� representation by the end user; and

� specialist knowledge or experience, such as SME promotion programmes or preference schemes.

It is important that IPC members are not involved in conducting evaluations, but only in approving completed evaluation reports. IPC members must not be selected as evaluators, as this would result in them reviewing and approving their own work.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Preliminary Screening Preliminary Screening Preliminary Screening Preliminary Screening

The preliminary screening is conducted to determine whether proposals comply with the basic instructions and requirements of the request for proposals document. It enables the evaluators to eliminate the weakest proposals, without the time and effort spent in conducting a detailed merit point evaluation. The preliminary screening can also be used to assess whether bidders meet the mandatory qualification requirements – see Desk Instruction 28 for further guidance on qualifications.

The preliminary screening is conducted on a pass or fail basis, with proposals that are not substantially compliant being rejected. The criteria to be used for the preliminary screening depend on the requirements and instructions of the request for proposals document, so the preliminary screening must always start with a review of the request for proposals document to list the requirements to be met. As guidance only, the preliminary screening might typically include checks of the following:

� submission of an original and the correct number of copies of the proposal;

� submission of all forms and documents required, including, in particular the proposal submission form;

� signature and authorisation of the proposal in accordance with the instructions in the request for proposals document, including any required power of attorney;

� signature of curriculum vitae by proposed consultants, if required;

� submission of a separately sealed financial proposal;

� correct proposal validity;

� submission of any additional documentation required; and

� whether the bidder meets the mandatory qualification requirements.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Detailed Evaluation using the Merit Point Scoring System Detailed Evaluation using the Merit Point Scoring System Detailed Evaluation using the Merit Point Scoring System Detailed Evaluation using the Merit Point Scoring System

The detailed evaluation must only be conducted on proposals which were determined to be substantially responsive during the preliminary screening.

The merit point scoring system is used to assess the relative quality of proposals. A variable number of points are awarded to each proposal for pre-determined criteria out of a maximum number of points stated in the request for proposals document. This gives a score indicating the relative quality of each proposal. The scores of several

Page 100: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 100 of 164

evaluators are used to calculate an average score for each proposal, which becomes the total technical score for that proposal.

The procedure for merit point scoring systems is as follows:

62. All evaluators should jointly discuss the criteria and any sub-criteria, to ensure that all evaluators have a common understanding of the criteria and their relative importance.

63. Each evaluator should conduct an evaluation of each proposal, independently from all other evaluators. Consider each proposal and award scores out of the maximum number of points against each criterion. Record all scores and sign the score sheet.

64. Where a number of points are allocated to performance at interview, conduct interviews – see guidance note 4 below for further details.

65. The Procurement Unit will collect scores, compile them on a single score sheet and calculate average scores for each proposal. To calculate the average, add the scores of all evaluators together and divide by the number of evaluators.

66. The Procurement Unit will compare the scores of each evaluator for each proposal, in order to check that there has been a consistency of approach and a common understanding of the criteria and each proposal. Any significant deviations from the average score or inconsistencies in scoring should be identified and evaluators may be called upon to explain their scores, at a meeting of all evaluators.

67. In exceptional cases, where the evaluators agree that there has not been a consistency of approach or where discussions reveal a misunderstanding of a criterion, the scoring method or a proposal, one or more evaluator may be permitted to adjust his individual scores. No evaluator shall be obliged to make adjustments to his scores. The original score sheets must be retained and revised scores recorded on a new score sheet. Where any scores are revised, the Procurement Unit will collect and compile scores again and recalculate the average score for each proposal.

The proposals which pass the detailed evaluation and proceed to the financial evaluation are determined by the individual evaluation methodology.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 ---- Conducting Interviews Conducting Interviews Conducting Interviews Conducting Interviews

Interviews may be conducted as part of a merit point evaluation, provided that this was clearly stated in the RFP document. Bidders must be given reasonable notice of the arrangements for any interview. Within reason, the procuring entity should be flexible as to the precise date and time for the interview, to give the bidder a reasonable opportunity to attend, particularly where foreign bidders are invited for interview.

Interviews should be conducted after evaluation against all other technical evaluation criteria. In the case of QCBS and LCS, only bidders who are still able to reach the minimum technical threshold should be invited for interview. In the case of QBS, only bidders who are still able to attain the highest technical score should be invited for interview.

Page 101: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 101 of 164

Interviews should only be held with key staff or consultants of the bidder, such as the team leader.

Interviews should be managed by the Procurement Unit, but involve the staff responsible for the merit point evaluation, or nominated representatives from among those staff. The questions to be addressed at the interview should be planned and agreed in advance by all staff involved in the merit point evaluation.

Detailed minutes must be kept of the interview and of the subsequent discussion and decision on the number of points to be awarded. These minutes should form part of the technical evaluation report.

Guidance Note 5 Guidance Note 5 Guidance Note 5 Guidance Note 5 –––– Financial Evaluation Financial Evaluation Financial Evaluation Financial Evaluation

The proposal or proposals proceeding to the financial evaluation will be determined by the relevant methodology for the technical evaluation.

The financial evaluation is conducted to determine the evaluated price of proposals, compare the proposals and determine the successful proposal i.e. the proposal which should be recommended for award of contract. The financial evaluation and the determination of the successful proposal differs between different evaluation methodologies.

Unless otherwise required by the evaluation methodology or the instructions in the request for proposals document, the procedure for determining the evaluated price of each proposal is as follows:

� determine the total proposal price, including or excluding particular costs, as indicated in the request for proposals document e.g. the request for proposals document may state that all taxes and duties are to be included in the evaluation;

� correct any arithmetic errors – see guidance note 5 below;

� assess whether all items are included in the proposal price and add the cost of any missing items;

� convert all proposals to a single evaluation currency for purposes of comparison, using the currency and the date and source of the exchange rate specified in the request for proposals document;

� apply any margin of price preference;

� determine the total evaluated price of each proposal.

Guidance Note 6 Guidance Note 6 Guidance Note 6 Guidance Note 6 –––– Arithmetic Errors Arithmetic Errors Arithmetic Errors Arithmetic Errors

In conducting a financial evaluation, arithmetic errors may be corrected by the evaluator(s). The procedure for correcting arithmetic errors is normally stated in bidding and request for proposals documents and the procedure stated must be used. This is normally the procedure stated below.

Where no specific procedure is stated in the request for proposals document, the following procedure should be applied:

� if there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected, unless in the opinion of the evaluator(s)

Page 102: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 102 of 164

there is an obvious misplacement of the decimal point in the unit price, in which case the total price as quoted shall govern and the unit price shall be corrected;

� if there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and

� if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to the notes above.

Bidders should be notified in writing of any arithmetic corrections made and requested to agree the corrections in writing.

Guidance Note 7 Guidance Note 7 Guidance Note 7 Guidance Note 7 –––– Requesting Extensions to Proposal Validity Requesting Extensions to Proposal Validity Requesting Extensions to Proposal Validity Requesting Extensions to Proposal Validity

The proposal validity period requested in the request for proposals document should normally be sufficient to enable the procuring entity to undertake both the technical and financial evaluations, obtain IPC approval and place a contract. Therefore, extensions to the validity of proposals should not normally be required.

Where an extension to the validity of proposals is required, all bidders should be requested, in writing, to extend the validity of their proposals for an additional specified period of time. This request should be issued a reasonable period before the expiry of the validity of proposals, to give sufficient time for responses to be received.

Bidders must not be permitted to change their financial proposal, or any details of their proposal, when extending the validity.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the completed technical evaluation report, prior to proceeding with the financial tender opening and evaluation.

IPC approval is subsequently required for the financial evaluation report. No communications accepting any proposal, or indicating which is the successful proposal, must be sent to any bidder before this approval is obtained.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved technical and financial evaluation reports, and all supporting documents used in conducting the evaluation, such as signed individual score sheets, must be kept on the procurement file. See Desk Instruction 14A, 14B or 14C for further details on the contents of the evaluation reports.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with the relevant Desk Instruction from 14A to 14C, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

� Proceed to Desk Instruction 18: Issuing a notice of acceptance, where no negotiations are required.

Page 103: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 103 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 14A:14A:14A:14A: EEEEVALUATING VALUATING VALUATING VALUATING PPPPROPOROPOROPOROPOSALS FOR SALS FOR SALS FOR SALS FOR CCCCONSULTANCY ONSULTANCY ONSULTANCY ONSULTANCY SSSSERVICES ERVICES ERVICES ERVICES

USING USING USING USING QQQQUALITY AND UALITY AND UALITY AND UALITY AND CCCCOST OST OST OST BBBBASED ASED ASED ASED SSSSELECTION ELECTION ELECTION ELECTION (QCBS)(QCBS)(QCBS)(QCBS)

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of proposals for consultancy services, using the QCBS methodology. It must be read in conjunction with Desk Instruction 14: General Evaluation Procedures for Consultancy Services.

The evaluation methodology for QCBS consists of three stages:

� a preliminary screening, to eliminate proposals which do not comply with the basic requirements of the RFP document and bidders who do not meet mandatory qualification requirements;

� a detailed technical evaluation to assess the quality of proposals, using a merit point system and to eliminate proposals which do not meet the specified minimum score;

� a financial evaluation to compare the costs of proposals which reached the minimum score, to award financial scores and to weight the technical and financial scores to give a total score for each proposal.

The successful proposal will be the proposal with the highest total score.

A diagram summarising this evaluation methodology is attached to this Desk Instruction.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Request for Proposals method, where QCBS is used. Desk Instructions 14B and 14C apply to the Request for Proposals method, where QBS or LCS is used.

TypeTypeTypeType: This Desk Instruction applies to evaluations for consultancy services only.

Evaluations for goods, works and routine services, under the Open Tendering, Restricted Tendering and Request for Quotations methods are covered by Desk Instruction 13.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of the QCBS evaluation methodology is to determine the proposal which offers the best overall value to the procuring entity, taking into account both the quality and the price of proposals.

References:References:References:References:

Section 34(7)(a), Public Procurement Act, 2003.

Regulation 5.5.3.2 – 5.5.6.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations using the QCBS methodology, but will invite several staff, with knowledge of the type of consultancy services required, to evaluate the technical aspects of the proposals and award scores.

Page 104: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 104 of 164

The Procurement Unit will normally chair meetings relating to merit point evaluations.

Where appropriate, the Procurement Unit will establish an evaluation team with joint responsibility for conducing the entire evaluation – see Desk Instruction 14 for further guidance.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

68. The head of the Procurement Unit should identify appropriate members of staff to manage the evaluation – see Desk Instruction 14 for guidance.

69. Review the basic requirements of the RFP document and conduct a preliminary screening – see Desk Instruction 14 for guidance. See Desk Instruction 14 for guidance on seeking clarifications and correcting minor deviations, errors and omissions. Eliminate proposals which are not substantially responsive.

70. The member of the Procurement Unit responsible for managing the evaluation should meet with the staff selected to conduct the merit point evaluation, to review the terms of reference, the criteria and the maximum number of points for each specified in the request for proposals document and ensure that they are fully understood by all evaluators. Seek clarification from the person responsible for writing the request for proposals document or drafting the terms of reference, where necessary.

71. Conduct a detailed technical evaluation, assessing whether the proposals are responsive to the terms of reference and awarding merit point scores, to determine the (average) technical score of each proposal – see Desk Instruction 14 for the detailed procedure for merit point evaluations.

72. Compare the technical score of each proposal against the minimum technical threshold specified in the RFP document. Eliminate any proposals which do not reach this threshold or which the evaluators agree are not responsive to important aspects of the terms of reference.

73. Prepare a technical evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

74. Notify bidders whose proposals are being rejected, stating that their financial proposals will be returned unopened after completion of the evaluation process.

75. Notify bidders whose proposals reached the threshold of the date, time and location for the financial tender opening and conduct the tender opening – see Desk Instruction 12B for further guidance on the financial opening.

76. Start the financial evaluation by determining the evaluated price of each proposal - see Desk Instruction 14 for further details.

77. Award financial scores to each proposal, based on their evaluated price – see guidance note 1 below for details.

78. Weight the technical and financial scores, using the weights stated in the RFP document and add the weighted scores together to obtain the total score for each proposal – see guidance note 2 below for details.

Page 105: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 105 of 164

79. Rank the proposals according to their total scores. Identify the proposal with the highest total score, which will be the successful proposal.

80. Prepare a financial evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

GuidanceGuidanceGuidanceGuidance Note 1 Note 1 Note 1 Note 1 –––– Awarding Financial Scores Awarding Financial Scores Awarding Financial Scores Awarding Financial Scores

Financial scores must be awarded using the method specified in the RFP document. This is normally as follows:

� the lowest priced proposal is given a financial score of 100

� all other proposals are given a financial score proportionate to this, using the formula Sf = 100 x Fm/F, in which

Sf denotes the financial score of the proposal under consideration;

Fm is the price of the lowest price proposal;

F denotes the price of the proposal under consideration.

For example, if prices were as follows:

Proposal A $ 500,000

Proposal B $ 450,000

Proposal C $ 600,000

� Proposal B has the lowest price and would be awarded 100 points.

� The formula would be applied to Proposal A as follows: 100 x 450,000/500,000 = 90 points.

� The formula would be applied to Proposal C as follows: 100 x 450,000/600,000 = 75 points.

Alternatively, a directly proportional or other methodology may be used in allocating financial scores, providing it has been fully described in the RFP document.

GuidanGuidanGuidanGuidance Note 2 ce Note 2 ce Note 2 ce Note 2 –––– Weighting Scores to Calculate the Total Score Weighting Scores to Calculate the Total Score Weighting Scores to Calculate the Total Score Weighting Scores to Calculate the Total Score

The technical and financial scores must be weighted using the weights stated in the RFP document. This is normally in the range of 70-90% for the technical score and in the range of 10-30% for the financial score. The combined weights must always total 100%.

To determine the weighted scores, multiply the actual technical and financial scores by the percentage weights stated in the RFP document.

To determine the total score, simply add the weighted technical and financial scores together.

The example in the table below shows the technical and financial scores received by a proposal, the weights stated in the RFP document, the calculation required, the weighted scores and the total score:

Page 106: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 106 of 164

Original SOriginal SOriginal SOriginal Scorescorescorescores Weight in RFP Weight in RFP Weight in RFP Weight in RFP documentdocumentdocumentdocument

CalculationCalculationCalculationCalculation Weighted Weighted Weighted Weighted ScoresScoresScoresScores

TechnicalTechnicalTechnicalTechnical 75 80% 75 x 80/100 60

FinancialFinancialFinancialFinancial 85 20% 85 x 20/100 17

TotalTotalTotalTotal 100% 77

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the technical evaluation report prior to the opening of financial proposals.

IPC approval is then required for the financial evaluation report, following completion of the evaluation.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved technical and financial evaluation reports, and all supporting documents used in conducting the evaluation, such as signed individual score sheets and minutes of meetings of the evaluators, must be kept on the procurement file.

Evaluation reports must be signed by all staff who have been involved in the evaluation.

The technical evaluation report should include the following information:

� the results of the preliminary screening;

� the technical scores of each evaluator for each proposal;

� a summary of the relative strengths and weaknesses of each proposal;

� any proposals which were rejected for being non responsive to important aspects of the terms of reference and the reasons.

� an analysis of any discrepancies in scores between evaluators and a summary of any discussions held and adjustments made;

� the total technical score for each proposal;

� which proposals reached the minimum technical threshold and a recommendation to open the financial proposals of these bidders; and

� a recommendation to reject all other proposals.

The financial evaluation report should include the following information:

� the total proposal prices and technical scores read out at the financial proposal opening;

� the evaluated price of each proposal, following any corrections or adjustments to the price and the conversion to a single currency;

� the financial scores of each proposal and the methodology for allocating financial scores;

� the weighting of technical and financial scores;

Page 107: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 107 of 164

� the total score for each proposal; and

� a statement of which proposal had the highest total score and is therefore the successful proposal.

The financial evaluation report must contain clear recommendations on:

� the successful proposal and the price of the proposed contract; and

� whether any negotiations should be held with the successful bidder.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with Desk Instruction 14, then:

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

� Proceed to Desk Instruction 18: Issuing a notice of acceptance, where no negotiations are required.

Page 108: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 108 of 164

Preliminary

Screening

Technical Proposals Opened

Detailed

Evaluation

Responsive

Non Responsive Reject

Financial

Evaluation

Over Threshold

RejectUnder Threshold

Reject

Recommend for

Contract Award

Highest Total Score

Others

Clarify

(in writing)

Not Clear

Arithmetic Errors

Confirm

Corrections

(in writing)

Detailed Technical Evaluation using

merit point system, to:

- award points against criteria in the request

for proposals document; and

- compare scores to the minimum technical

threshold in the request for proposals

document.

Financial Evaluation to:

- correct arithmetic errors

- convert to a common curency (using

exchange rate stated in RFP doc)

- award financial scores

- weight technical and financial scores to

give the total score of each proposal.

Preliminary Screening to eliminate non

responsive proposals. Criteria typically

include:

- inclusion of all required documents

- correct authorisation of proposal

- signature of CV’s

- sufficient proposal validity

Recommendation: proposal with highest

total score recommended for contract

award, subject to any negotiations required.

Recommendation submitted to IPC for

approval in financial evaluation report.

Evaluation Procedure for Quality and Cost Based Selection

Technical Opening: evaluation includes

proposals received on time, opened and

read out. Late proposals not included.

Financial proposals remain sealed.

Recommend for

Financial

Opening

Financial Proposals Opened

Recommendation: proposals which reach

the minimum technical threshold

recommended to proceed to financial

opening and evaluation.

Recommendation submitted to IPC for

approval in technical evaluation report.

Financial Opening: financial proposals

opened. Technical scores and prices read

out.

Page 109: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 109 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 14B:14B:14B:14B: EEEEVALUATING VALUATING VALUATING VALUATING PPPPROPOSALS FOR ROPOSALS FOR ROPOSALS FOR ROPOSALS FOR CCCCONSULTANCY ONSULTANCY ONSULTANCY ONSULTANCY SSSSERVICES ERVICES ERVICES ERVICES

USING USING USING USING QQQQUALITY UALITY UALITY UALITY BBBBASED ASED ASED ASED SSSSELECTION ELECTION ELECTION ELECTION (QBS)(QBS)(QBS)(QBS)

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of proposals for consultancy services, using the QBS methodology. It must be read in conjunction with Desk Instruction 14: General Evaluation Procedures for Consultancy Services.

The evaluation methodology for QBS consists of three stages:

� a preliminary screening, to eliminate proposals which do not comply with the basic requirements of the RFP document and bidders who do not meet mandatory qualification requirements;

� a detailed technical evaluation to assess the quality of proposals, using a merit point system and to determine the highest quality proposal;

� a financial evaluation to examine the financial proposal of the bidder with the highest technical score only and prepare for any negotiations.

The successful proposal will be the proposal with the highest technical score.

A diagram summarising this evaluation methodology is attached to this Desk Instruction.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Request for Proposals method, where QBS is used. Desk Instructions 14A and 14C apply to the Request for Proposals method, where QCBS or LCS is used.

TypeTypeTypeType: This Desk Instruction applies to evaluations for consultancy services only.

Evaluations for goods, works and routine services, under the Open Tendering, Restricted Tendering and Request for Quotations methods are covered by Desk Instruction 13.

Purpose ofPurpose ofPurpose ofPurpose of Procedure: Procedure: Procedure: Procedure:

The purpose of the QBS evaluation methodology is to determine the proposal which offers the best quality for the procuring entity, without any reference to price, where obtaining the highest possible technical quality is the main objective of the procurement.

References:References:References:References:

Section 34(7)(b), Public Procurement Act, 2003.

Regulation 5.5.7, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations using the QBS methodology, but will invite several staff, with knowledge of the type of consultancy services required, to evaluate the technical aspects of the proposals and award scores.

Page 110: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 110 of 164

The Procurement Unit will normally chair meetings relating to merit point evaluations.

Where appropriate, the Procurement Unit will establish an evaluation team with joint responsibility for conducing the entire evaluation – see Desk Instruction 14 for further guidance.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

81. The head of the Procurement Unit should identify appropriate members of staff to manage the evaluation – see Desk Instruction 14 for guidance.

82. Review the basic requirements of the RFP document and conduct a preliminary screening – see Desk Instruction 14 for guidance. See Desk Instruction 14 for guidance on seeking clarifications and correcting minor deviations, errors and omissions. Eliminate proposals which are not substantially responsive.

83. The member of the Procurement Unit responsible for managing the evaluation should meet with the staff selected to conduct the merit point evaluation, to review the terms of reference, the criteria and the maximum number of points for each specified in the request for proposals document and ensure that they are fully understood by all evaluators. Seek clarification from the person responsible for writing the request for proposals document or drafting the terms of reference, where necessary.

84. Conduct a detailed technical evaluation, assessing whether the proposals are responsive to the terms of reference and awarding merit point scores, to determine the (average) technical score of each proposal – see Desk Instruction 14 for the detailed procedure for merit point evaluations.

85. Rank the proposals according to their technical scores. Identify the proposal with the highest technical score, which will the be successful proposal, subject to satisfactory negotiations. Eliminate all other proposals.

86. Prepare a technical evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

87. Notify bidders whose proposals did not obtain the highest technical score that their proposals are not proceeding to the financial evaluation and that their financial proposals will be returned unopened after completion of the evaluation process. The letter should not reject the proposals at this stage, but should state that they may be considered for financial evaluation and negotiations, if negotiations with the highest ranked bidder fail.

88. Notify the bidder whose proposal obtained the highest technical score of the date, time and location for the financial tender opening and conduct the tender opening – see Desk Instruction 12B for further guidance on the financial opening.

89. Examine the financial proposal, correcting any arithmetic errors and checking whether all relevant costs have been included in the proposal. Assess whether the proposal prices offer value for money to the procuring entity, decide whether negotiations are required and prepare for negotiations.

Page 111: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 111 of 164

90. Prepare a financial evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the technical evaluation report prior to the opening of the financial proposal of the best ranked bidder.

IPC approval is then required for the financial evaluation report, following completion of the evaluation and prior to any negotiations.

IPC approval will be required for the opening of any other financial proposals, where negotiations with the highest ranked bidder fail.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The approved technical and financial evaluation reports, and all supporting documents used in conducting the evaluation, such as signed individual score sheets and minutes of meetings of the evaluators, must be kept on the procurement file.

Evaluation reports must be signed by all staff who have been involved in the evaluation.

The technical evaluation report should include the following information:

� the results of the preliminary screening;

� the technical scores of each evaluator for each proposal;

� a summary of the relative strengths and weaknesses of each proposal;

� any proposals which were rejected for being non responsive to important aspects of the terms of reference and the reasons.

� an analysis of any discrepancies in scores between evaluators and a summary of any discussions held and adjustments made;

� the total technical score for each proposal;

� which proposal obtained the highest technical score and a recommendation to open the financial proposal of this bidder only;

� a recommendation to reject all other proposals, following conclusion of a contract with the successful bidder.

The financial evaluation report should include the following information:

� the total proposal price and technical score read out at the financial proposal opening;

� the evaluated price of the proposal, following any corrections or adjustments to the price;

� a statement that this proposal had the highest technical score and is therefore the successful proposal, subject to satisfactory negotiations;

� recommendations regarding any required negotiations with the bidder.

Next Steps:Next Steps:Next Steps:Next Steps:

Read this Desk Instruction together with Desk Instruction 14, then:

Page 112: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 112 of 164

� Proceed to Desk Instruction 16: Conducting negotiations, where negotiations are required.

� Proceed to Desk Instruction 18: Issuing a notice of acceptance, where no negotiations are required.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 14C:14C:14C:14C: EEEEVALUATING VALUATING VALUATING VALUATING PPPPROPOSALS FOR ROPOSALS FOR ROPOSALS FOR ROPOSALS FOR CCCCONSULTANCY ONSULTANCY ONSULTANCY ONSULTANCY SSSSERVICES ERVICES ERVICES ERVICES

USING USING USING USING LLLLEAST EAST EAST EAST CCCCOST OST OST OST SSSSELECTION ELECTION ELECTION ELECTION (LCS)(LCS)(LCS)(LCS)

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for the evaluation of proposals for consultancy services, using the LCS methodology. It must be read in conjunction with Desk Instruction 14: General Evaluation Procedures for Consultancy Services.

The evaluation methodology for LCS consists of three stages:

� a preliminary screening, to eliminate proposals which do not comply with the basic requirements of the RFP document and bidders who do not meet mandatory qualification requirements;

� a detailed technical evaluation to assess the quality of proposals, using a merit point system and to eliminate proposals which do not meet the specified minimum score;

� a financial evaluation to compare the costs of proposals which reached the minimum score and determine which is the lowest priced proposal.

The successful proposal will be the proposal with the lowest evaluated price.

A diagram summarising this evaluation methodology is attached to this Desk Instruction.

Applies to:Applies to:Applies to:Applies to:

MethoMethoMethoMethodddd: This Desk Instruction applies to the Request for Proposals method, where LCS is used. Desk Instructions 14A and 14BC apply to the Request for Proposals method, where QCBS or QBS is used.

TypeTypeTypeType: This Desk Instruction applies to evaluations for consultancy services only.

Evaluations for goods, works and routine services, under the Open Tendering, Restricted Tendering and Request for Quotations methods are covered by Desk Instruction 13.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of the LCS evaluation methodology is to determine the lowest priced proposal, which meets the minimum quality standard set by the procuring entity in the RFP document. This ensures that the procuring entity purchases consultancy services of the required standard, but does not pay any more than necessary for those services.

References:References:References:References:

Section 34(7)(c), Public Procurement Act, 2003.

Page 113: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 113 of 164

No reference in Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for evaluations using the LCS methodology, but will invite several staff, with knowledge of the type of consultancy services required, to evaluate the technical aspects of the proposals and award scores. The Procurement Unit will normally chair meetings relating to merit point evaluations.

Where appropriate, the Procurement Unit will establish an evaluation team with joint responsibility for conducing the entire evaluation – see Desk Instruction 14 for further guidance.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

91. The head of the Procurement Unit should identify appropriate members of staff to manage the evaluation – see Desk Instruction 14 for guidance.

92. Review the basic requirements of the RFP document and conduct a preliminary screening – see Desk Instruction 14 for guidance. See Desk Instruction 14 for guidance on seeking clarifications and correcting minor deviations, errors and omissions. Eliminate proposals which are not substantially responsive.

93. The member of the Procurement Unit responsible for managing the evaluation should meet with the staff selected to conduct the merit point evaluation, to review the terms of reference, the criteria and the maximum number of points for each specified in the request for proposals document and ensure that they are fully understood by all evaluators. Seek clarification from the person responsible for writing the request for proposals document or drafting the terms of reference, where necessary.

94. Conduct a detailed technical evaluation, assessing whether the proposals are responsive to the terms of reference and awarding merit point scores, to determine the (average) technical score of each proposal – see Desk Instruction 14 for the detailed procedure for merit point evaluations.

95. Compare the technical score of each proposal against the minimum technical threshold specified in the RFP document. Eliminate any proposals which do not reach this threshold or which the evaluators agree are not responsive to important aspects of the terms of reference.

96. Prepare a technical evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

97. Notify bidders whose proposals are being rejected, stating that their financial proposals will be returned unopened after completion of the evaluation process.

98. Notify bidders whose proposals reached the threshold of the date, time and location for the financial tender opening and conduct the tender opening – see Desk Instruction 12B for further guidance on the financial opening.

99. Start the financial evaluation by determining the evaluated price of each proposal - see Desk Instruction 14 for further details.

Page 114: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 114 of 164

100. Rank the proposals according to their evaluated price. Identify the proposal with the lowest price, which will be the successful proposal.

101. Prepare a financial evaluation report and seek IPC approval for the report – see the Documents/Records Required section below for guidance on the contents of the report.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for the technical evaluation report prior to the opening of financial proposals.

IPC approval is then required for the financial evaluation report, following completion of the evaluation.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Page 115: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 115 of 164

Preliminary

Screening

Technical Proposals Opened

Detailed

Evaluation

Responsive

Non Responsive Reject

Financial

Evaluation

Highest Score

RejectOthers

Recommend for

Contract Award

Highest Technical Score

Clarify

(in writing)

Not Clear

Arithmetic Errors

Confirm

Corrections

(in writing)

Detailed Technical Evaluation using

merit point system, to:

- award points against criteria in the request

for proposals document; and

- rank scores, with highest score as No 1.

Financial Evaluation to:

- correct arithmetic errors

- check all relevant costs are included

- assess value for money

- prepare for negotiations, if required.

Preliminary Screening to eliminate non

responsive proposals. Criteria typically

include:

- inclusion of all required documents

- correct authorisation of proposal

- signature of CV’s

- sufficient proposal validity

Recommendation: proposal with highest

technical score recommended for contract

award, subject to any negotiations required.

Recommendation submitted to IPC for

approval in financial evaluation report.

Evaluation Procedure for Quality Based Selection

Technical Opening: evaluation includes

proposals received on time, opened and

read out. Late proposals not included.

Financial proposals remain sealed.

Recommend for

Financial

Opening

Financial Proposal Opened

Recommendation: proposal with the

highest technical score only recommended

to proceed to financial opening and

evaluation.

Recommendation submitted to IPC for

approval in technical evaluation report.

Financial Opening: single financial

proposal opened. Technical score and price

read out.

Page 116: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 116 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 15:15:15:15: CCCCONDUCTING A ONDUCTING A ONDUCTING A ONDUCTING A PPPPOSTOSTOSTOST----QQQQUALIFICATIONUALIFICATIONUALIFICATIONUALIFICATION

Summary Summary Summary Summary of Procedure:of Procedure:of Procedure:of Procedure:

This Desk Instruction explains the procedure for conducting a post-qualification on the successful bidder, to establish whether the bidder is qualified to perform the proposed contract satisfactorily. It also provides procedures for verifying pre-qualification information, following the evaluation process.

This Desk Instruction should be read in conjunction with Desk Instruction 28: Supplier Qualifications, which gives examples of qualification criteria which may be applied.

Applies to:Applies to:Applies to:Applies to:

MethMethMethMethodododod: Post-qualification may apply under the Open Tendering and Restricted Tendering methods, if specified in the bidding document. It may also be used under the Two-Stage Tendering method – see Desk Instruction 25 for guidance.

A decision on whether pre- or post-qualification is required should be taken at the procurement planning stage.

Post-qualification will not normally be required under the Request for Quotations method, as contracts will be of relatively low value and complexity and quotations will be invited from known suppliers. Post-qualification will not normally be required under the Request for Proposals method, as the successful bidder’s experience and staff are taken into account in the shortlisting or evaluation process.

TypeTypeTypeType: Post-qualification can be used for goods, works and routine services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Post-qualification is conducted to check whether a successful bidder has the resources, experience and qualifications required to satisfactorily perform a contract. As post-qualification is conducted before a contract is awarded, and the contract denied if the bidder is not qualified, it should reduce the likelihood of defaults or poor performance under a contract.

References:References:References:References:

Section 13, Public Procurement Act, 2003.

Regulation 4.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Post-qualification will normally be conducted by the member of the Procurement Unit responsible for the evaluation. Where required, technical advice will be sought, normally from the member of staff who provided technical inputs to the evaluation.

StepStepStepStep----bybybyby----Step Instructions for PostStep Instructions for PostStep Instructions for PostStep Instructions for Post----Qualification:Qualification:Qualification:Qualification:

102. Identify the successful bidder through the evaluation process.

103. Review the bidding document for details of the post-qualification criteria set and the evidence of post-qualification requested from bidders.

104. Examine the evidence submitted by the successful bidder and assess whether it meets the criteria. Seek clarifications or updated information from the bidder if required. Where post-qualification requires a visit to the successful bidder, or

Page 117: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 117 of 164

any other checks which are likely to incur significant costs, obtain IPC approval of the evaluation report before incurring expenditure.

105. Where the successful bidder is qualified, include this information in the evaluation report and proceed to submit the completed report, with the recommendation for award of contract, to the IPC for approval.

106. Where the successful bidder is not qualified, conduct a post-qualification check on the bidder with the next lowest evaluated price and repeat this process as required until a qualified bidder is identified. Include the results of all post-qualification checks in the evaluation report, which should be submitted to the IPC for approval, with reasons why any bidder was determined not to be qualified and a clear recommendation for contract award. Bidders must not be rejected prior to obtaining IPC approval of the post-qualification results.

StepStepStepStep----bybybyby----Step Instructions for Verification of PreStep Instructions for Verification of PreStep Instructions for Verification of PreStep Instructions for Verification of Pre----Qualification Information:Qualification Information:Qualification Information:Qualification Information:

107. Identify the successful bidder through the evaluation process.

108. Review the pre-qualification document for details of the post-qualification criteria set and the bidding document for updated information requested from bidders.

109. Examine the updated information submitted by the successful bidder and assess whether it still meets the original pre-qualification criteria. Seek clarifications or further updates from the bidder as required.

110. Where the successful bidder is still qualified, include this confirmation in the evaluation report and proceed to submit the completed report, with the recommendation for award of contract, to the IPC for approval.

111. Where the successful bidder is no longer qualified, verify the pre-qualification information of the bidder with the next lowest evaluated price and repeat this process as required until a qualified bidder is identified. Include the results of all checks on pre-qualified bidders in the evaluation report, which should be submitted to the IPC for approval, with reasons why any bidder was determined to be no longer qualified and a clear recommendation for contract award. Bidders must not be rejected prior to obtaining IPC approval of the post-qualification results.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval for the results of the post-qualification will be required. This should be obtained by inclusion of the post-qualification results in the evaluation report – see Desk Instruction 13 for further details.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the post-qualification must be completed and kept on the procurement file. A summary of the post-qualification results must be included in the evaluation report.

Next Steps:Next Steps:Next Steps:Next Steps:

Post-qualification is normally conducted at the end of the evaluation process, prior to completion of the evaluation report. Therefore:

Page 118: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 118 of 164

� Return to Desk Instruction 13A, 13B or 13C on evaluation as appropriate.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 16:16:16:16: CCCCONDUCTING ONDUCTING ONDUCTING ONDUCTING NNNNEGOTIATIONSEGOTIATIONSEGOTIATIONSEGOTIATIONS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on when negotiations are permitted, what areas may be subject to negotiations and the procedure for holding negotiations with a bidder.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: Negotiations may be required under the Open Tendering, Restricted Tendering and Request for Proposals methods. Negotiations may also be held under the Two-Stage Tendering and Single Source Procurement methods – see Desk Instructions 25, 26A, 26B, 26C or 26D for guidance.

Negotiations should not be held under the Request for Quotations method.

TypeTypeTypeType: This Desk Instruction applies to negotiations for contracts for goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The purpose of negotiations is to discuss and finalise certain details of a contract with the successful bidder, prior to contract placement. Negotiations should lead to a contract which is acceptable to both parties and therefore reduce the likelihood of disputes or the need for contract amendments.

Negotiations are not held with the intention of making substantial changes to a contract or of obtaining price reductions from the successful bidder, with the exception of negotiations following an evaluation using the Quality Based Selection methodology, where there has been no competition on price.

References:References:References:References:

Section 31(15) for Tendering and Restricted Tendering and 34(9) for Request for Proposals, Public Procurement Act, 2003.

Regulation 5.5.6.3-5.5.6.4 for Request for Proposals using the QCBS evaluation methodology and 5.5.7.1 for Request for Proposals using the QBS evaluation methodology, Public Procurement Regulations, 2003. No reference in the Public Procurement Regulations, 2003 for Tendering, Restricted Tendering or Request for Proposals using the LCS methodology.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for negotiations, but will require technical input from the end user, or other technical specialists. The Procurement Unit will normally make use of staff who were involved in the evaluation, as they will be familiar with the bidding document and the successful tender. Negotiations will always be conducted by a minimum of three staff, selected by the head of the Procurement Unit.

Page 119: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 119 of 164

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

112. The evaluators should make recommendations in the evaluation report, as to whether negotiations are required and the issues to be negotiated. The recommendation to negotiate must be approved by the IPC before any preparations are made.

113. The head of the Procurement Unit should identify appropriate member(s) of staff to manage the negotiations – see guidance note 1 below for assistance in selecting staff.

114. Invite the successful bidder for negotiations, proposing the time, date and location for negotiations. The invitation letter may state that the bidder’s tender has been evaluated as the successful tender, but it is important that no contractual commitment is made to the bidder i.e. the letter must not make any reference to the tender being accepted or a contract being awarded.

115. The negotiators should begin by reviewing the bidding document, the tender from the successful bidder and the evaluation report.

116. Identify areas where negotiations are required – see guidance note 2 below for areas which negotiations are permitted to cover. For each area, identify the objectives which the procuring entity wishes to achieve. Where possible, quantify these objectives and set maximum and minimum negotiating parameters.

117. Hold the negotiations with the successful bidder. It is important that the negotiators do not commit the procuring entity to any arrangements or agreements during the negotiations.

118. Prepare a record of the negotiations and make recommendations on how to proceed – see guidance note 3 below for assistance on likely recommendations.

119. Seek IPC approval for the recommendations and proceed as appropriate. Where the recommendation is for further negotiations with the successful bidder or negotiations with the next bidder, repeat this process from step 3 onwards.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Selecting Staff to Conduct Negotiations Selecting Staff to Conduct Negotiations Selecting Staff to Conduct Negotiations Selecting Staff to Conduct Negotiations

The Procurement Unit has the overall responsibility for conducting negotiations and making recommendations on the results to the IPC. However, negotiations will always be conducted by a minimum of three people, who will include staff with technical knowledge of the goods, works or services being procured and who are able to represent the needs of the end user.

Negotiations should normally be managed by the member of the Procurement Unit who managed the evaluation, although additional procurement staff with greater experience or particular skills may also be involved. That member of staff will then be responsible for coordinating inputs from other staff, ensuring that the negotiations are conducted in accordance with all applicable rules and procedures and preparing minutes of the negotiations and recommendations for the IPC.

The head of the Procurement Unit must select the most appropriate members of staff to conduct negotiations. Where it offers benefits of continuity or significantly reduces the amount of preparation work required, staff who contributed to the evaluation

Page 120: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 120 of 164

should be used, as they will already be familiar with the requirements of the procuring entity, as defined in the bidding document, the contents of the successful tender, the reasons why negotiations were recommended, the areas requiring negotiations and the objectives of those negotiations. The appropriate number and type of staff will depend on the type, value and complexity of the procurement, the areas which require negotiations and the extent of the negotiations.

In identifying staff to be involved with negotiations, the head of the Procurement Unit must consider the type of skills, knowledge or experience needed, which might include:

� procurement and contracting skills, including experience of negotiations;

� technical knowledge;

� legal expertise;

� representation by the end user.

It is important that IPC members are not involved in conducting negotiations, but only in approving the results and recommendations, so that they do not end up reviewing and approving their own work.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Areas which may be subject to Neg Areas which may be subject to Neg Areas which may be subject to Neg Areas which may be subject to Negotiationsotiationsotiationsotiations

Negotiations may not relate to the price or substance of tenders or proposals, but only to minor technical, contractual or logistical details. As guidance only, negotiations may normally relate to the following areas:

� minor alterations to technical details, such as the terms of reference, the specification or drawings;

� minor amendments to the Special Conditions of Contract;

� finalising the payment arrangements;

� mobilisation arrangements;

� agreeing final delivery or completion schedules to accommodate any changes required by the procuring entity;

� the proposed methodology or staffing;

� inputs required from the procuring entity;

� clarifying details that were not apparent or could not be finalised at the time of bidding;

� the bidder’s tax liability in Malawi.

Negotiations must not be used to:

� substantially change the technical quality or details of the requirement, including the tasks or responsibilities of the bidder or the performance of the goods;

� substantially alter the terms and conditions of contract stated in the invitation document;

� reduce unit rates or reimbursable costs;

Page 121: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 121 of 164

� reduce work inputs solely to meet the budget; or

� substantially alter anything which formed a crucial or deciding factor in the evaluation of the tenders or proposals.

In the case of consultancy services, the bidder should not be allowed to substitute key staff, unless the procuring entity and the bidder agree that delays in the procurement process, changes in the terms of reference or other unavoidable circumstances make it necessary.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 –––– Recommendations following Negotiations Recommendations following Negotiations Recommendations following Negotiations Recommendations following Negotiations

Following negotiations, the recommendations made to the IPC may include:

� proceed with contract award to the successful bidder, incorporating the revisions agreed during negotiations;

� revise the objectives of the negotiations and negotiate further on specified areas;

� terminate the negotiations, where they have failed to result in an acceptable contract, reject the bidder and award the contract or hold negotiations with the next best ranked bidder;

� cancel the procurement proceedings, where it is believed that the original bidding document was flawed, the need has changed or the budget is insufficient for the requirement.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

The results of any negotiations, and the resulting recommendations, must be approved by the IPC before any contract award or other commitment is made to any bidder.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of any negotiations must be completed and kept on the procurement file. At a minimum, this record must include:

� the name of the bidder with whom negotiations were held and the names of the bidder’s representatives;

� the names of all staff involved in the negotiations;

� the time, date and location of the negotiations;

� the areas subject to negotiation and the main points or requests made on each side;

� the final agreement reached on each area of negotiation;

� any points where agreement was not reached or further discussion is required.

The record of the negotiations must be signed by all staff of the procuring entity involved in the negotiations.

Any other correspondence or information relating to the negotiations must also be kept on the procurement file, including letters inviting the bidder to negotiate and the procuring entity’s preparation of its negotiating position.

Next Steps:Next Steps:Next Steps:Next Steps:

Page 122: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 122 of 164

� Proceed to Desk Instruction 18: Issuing a notice of acceptance.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 17:17:17:17: CCCCANCELLING ANCELLING ANCELLING ANCELLING PPPPROCUREMENT ROCUREMENT ROCUREMENT ROCUREMENT PPPPROCEEDINGSROCEEDINGSROCEEDINGSROCEEDINGS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides a standard operating procedure for cancellation of procurement proceedings at any point prior to award of contract.

Where there is a need to cancel a requirement after contract award, Desk Instruction 24: Terminating a contract will apply.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all procurement methods, when required.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services, when required.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The cancellation of procurement proceedings should be avoided, wherever possible, as it means a waste of time and resources for both the procuring entity and the bidders. However, where it is in the public interest to do so, procurement proceedings may be cancelled at any stage prior to the award of a contract. This Desk Instruction establishes a procedure to ensure that any unavoidable cancellations are handled properly and in a manner which is fair to all bidders.

References:References:References:References:

Section 23(a)-(b), Public Procurement Act, 2003.

Regulation 5.2.9 for cancellation prior to opening of tenders, Regulation 5.2.18-5.2.19 for cancellation after opening of tenders, Regulation 5.5.6.5 for rejection of all proposals, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The cancellation of procurement proceedings will be conducted by the Procurement Unit, although the need to cancel may be identified by other staff.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

120. Identify the need to cancel procurement proceedings – see guidance note 1 below for grounds which may justify a cancellation. Discuss and agree the need with all relevant parties, including the Procurement Unit, the end user and any staff providing financial information.

121. Where no invitation document or notice has been issued, ensure that all relevant staff are notified. No further action is required.

122. Where an invitation document or notice has been issued, seek IPC approval to cancel. Approval must be obtained as promptly as possible, so that bidders do not waste or spend further time or resources in the preparation of tenders or in maintaining tender securities. The request for IPC approval to cancel must state in full the reasons for cancellation.

Page 123: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 123 of 164

123. Prepare a notice cancelling the procurement proceedings, which must be identical for all bidders or potential bidders. This notice should normally state the grounds for cancellation, to avoid enquiries from numerous bidders. However, the notice does not have to justify the grounds for cancellation.

124. Where the cancellation is prior to the bidding deadline, send the notice to all bidders who have been issued with the bidding document. Check the tender box and any other records of receipt and return unopened all tenders which have already been received.

125. Where the cancellation is after the bidding deadline, send the notice to all bidders who submitted tenders. Promptly return any unopened tenders (including separately sealed financial proposals in the case of the Request for Proposals method) and any tender securities.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Grounds for Cancellation Grounds for Cancellation Grounds for Cancellation Grounds for Cancellation

The cancellation of procurement proceedings should be avoided wherever possible, but is permitted where it is in the public interest. Where cancellation is required, it should be done as early in the procurement process as possible. In particular, the procuring entity should seek to avoid cancelling procurement proceedings where tenders have already been opened.

The grounds for cancelling procurement proceedings must be approved by the IPC, but as guidance might include:

� there is no longer any need for the procurement in question;

� the technical, contractual or other details have changed to such an extent that it is more appropriate to issue a new tender, than to modify the existing bidding document;

� the procurement requirement can be met by a substantially less expensive article;

� there is evidence of collusion among bidders;

� adequate funding is no longer available for the requirement;

� there is a lack of responsive tenders.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required prior to cancellation of the procurement proceedings, unless the cancellation is before the issue of any invitation document or notice.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A record of the cancellation notice sent to all bidders, along with IPC approval of the cancellation, must be kept on the procurement file. The procurement file must also contain information on the decision to cancel the procurement proceedings, including the grounds for cancellation.

Next Steps:Next Steps:Next Steps:Next Steps:

No further action is required following cancellation. Any new procurement proceedings, in place of the cancelled procurement, should start from the appropriate point of the procurement process e.g. requisition stage, if the description of or budget

Page 124: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 124 of 164

for the requirement have changed substantially or preparation of bidding document stage, if a revised bidding document is required.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 18:18:18:18: IIIISSUING A SSUING A SSUING A SSUING A NNNNOTICE OF OTICE OF OTICE OF OTICE OF AAAACCCCCEPTANCECEPTANCECEPTANCECEPTANCE

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction sets out the procedure for issuing a notice of acceptance to form a contract by accepting the tender or proposal of the successful bidder. It is of great importance that this procedure is handled properly, as the notice of acceptance is normally a contractually binding notice, which results in the entry into force of a contract.

It is important to note that this Desk Instruction provides the most commonly used procedure for sending notices of acceptance. If the bidding document states an alternative procedure for the notice or an alternative means of entry into force of the procurement contract, the terms of the bidding document will prevail over this Desk Instruction.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: Unless the bidding document states otherwise, a notice of acceptance is normally used under the Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals methods. A notice of acceptance may also be used under the Single Source Procurement method – see Desk Instruction 26B, 26C and 26D for guidance.

Under the Request for Quotations method, acceptance of a quotation is normally through issue of a purchase order – see Desk Instruction 19B for details.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Sending a notice of acceptance to the successful bidder provides a rapid means of forming a contract, rather than waiting while the complete contract document is prepared. This offers a number of potential benefits:

� the contract comes into force on an earlier date, meaning that delivery or mobilisation periods start sooner and overall contract completion should be achieved sooner;

� where the validity of a tender is due to expire shortly, it can be accepted quickly, before there is a need to request an extension to the validity, with the risk that the bidder is not prepared to extend the validity.

References:References:References:References:

Section 25, Public Procurement Act, 2003.

Regulation 5.2.20 for Open Tendering and Restricted Tendering, Public Procurement Regulations, 2003. No reference in the Public Procurement Regulations, 2003 for Request for Proposals.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Page 125: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 125 of 164

Notices of acceptance will be sent by the Procurement Unit, once all required approvals have been obtained.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

126. Ensure that IPC approval of the decision to award the contract has been received in writing.

127. Obtain any other necessary approvals, including financial approval for commitment of the required funds.

128. Ensure that the successful bidder’s tender is still valid and that any modifications to the tender have been confirmed in writing by the bidder.

129. Prepare the notice of acceptance – refer to Documents/Records Required below for guidance on the content. Ensure that the notice is signed by the authorised signatory of the procuring entity.

130. Dispatch the notice to the successful bidder, keeping evidence of dispatch, such as proof of posting, fax confirmation slip etc. The contract has now entered into force (unless otherwise stated in the bidding document, the tender is no longer valid or the notice of acceptance contains any provisions which are contrary to the tender i.e. a counter-offer).

131. Ensure that confirmation of receipt of the notice of acceptance is received from the bidder.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval of the contract award decision is required prior to the issue of any notice of acceptance. The necessary funds must also be committed prior to issue of the notice of acceptance.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the notice of acceptance, along with IPC approval of the notice, must be kept on the procurement file. Evidence of dispatch of the notice must also be kept on the procurement file; this is of critical importance as the contract enters into force when the notice is dispatched.

At a minimum, the notice of acceptance must include:

� the name and address of the procuring entity, which is party to the contract;

� the name and address of the supplier;

� the date of the notice;

� the reference number of the procurement transaction;

� a brief description of the goods, works or services procured;

� the date and any reference number of the bidder’s tender;

� reference to any clarifications or other correspondence which modifies the bidder’s tender;

� the currency and amount of the contract award;

� a statement of any items which are specifically excluded from the contract award e.g. certain lots included in the tender or any change in quantities;

Page 126: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 126 of 164

� a statement that the supplier should begin performance of the contract;

� a statement that a full contract is being prepared and will be sent to the supplier for signature in due course;

� a request that the supplier confirms receipt of the notice of acceptance and confirms that he is proceeding with contract performance;

� instructions on any immediate actions required from the supplier e.g. provision of a performance security;

� the signature of the authorised signatory of the procuring entity.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 19A: Preparing and issuing a contract document.

DDDDESK ESK ESK ESK IIIINSTRNSTRNSTRNSTRUCTION UCTION UCTION UCTION 19A:19A:19A:19A: PPPPREPARING AND REPARING AND REPARING AND REPARING AND IIIISSUING A SSUING A SSUING A SSUING A CCCCONTRACT ONTRACT ONTRACT ONTRACT DDDDOCUMENTOCUMENTOCUMENTOCUMENT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the preparation of contract documents, obtaining approval and issuing the contract documents.

This Desk Instruction is based on a procedure where a notice of acceptance has already been sent to form the contract – see Desk Instruction 18 for details. Where no notice of acceptance has been sent, staff should note that parts of Desk Instruction 18 relating to approvals and contract formation will apply.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals methods. It may also apply to the Single Source Procurement method, where a contract document, rather than a purchase order, is issued – see Desk Instruction 26B, 26C and 26D for guidance.

The Request for Quotations method is covered by Desk Instruction 19B: Preparing and issuing a purchase order.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

The contract document confirms in writing the contract which has been agreed and formed between the procuring entity and the supplier. It defines the goods, works or services to be provided, the price to be paid for the goods, works or services and establishes the rights and obligations of each party. The contract is the governing document for administration of the contract.

References:References:References:References:

Section 31(3)(c), Public Procurement Act, 2003.

Regulation 5.2.2.3(f) and 5.2.20(c)-(e), Public Procurement Regulations, 2003.

Page 127: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 127 of 164

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for the preparation of contract documents, obtaining all necessary approvals, getting the approved contract document signed and issuing the document.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

132. Collect copies of all documents which will form part of the contract document – see guidance note 1 below for a list of documents to include.

133. Assemble the complete contract document, by including all necessary documents in the correct order. Ensure that the contract does not include any terms or conditions which vary from the successful bidder’s tender, which was accepted by the notice of acceptance.

134. Obtain IPC approval for the document.

135. Make the required number of copies of the approved contract and bind or secure the pages in such a way that pages cannot be replaced or lost. The number of copies required must be at least two – one for the supplier and one for the procuring entity.

136. The authorised signatory for the procuring entity should sign all copies of the contract.

137. Send all copies of the contract to the supplier, with a covering letter instructing the supplier to counter-sign all copies, retain one for his records and return all other signed copies to the procuring entity.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Contents of Contract Document Contents of Contract Document Contents of Contract Document Contents of Contract Document

The contents of the contract document will depend on the model contract included in the bidding document. The contents of a contract and the order of precedence are normally listed in the contract form or special conditions of contract. As guidance only, contract documents normally consist of the following:

� the contract form or agreement;

� the contract award notice;

� the supplier’s tender and any modifications to that tender;

� the special conditions of contract;

� the general conditions of contract;

� the description of the goods, works or services, comprising specifications, terms of reference, drawings, bill of quantities, activity schedule and/or any other similar document.

Approvals RequireApprovals RequireApprovals RequireApprovals Required:d:d:d:

IPC approval of the final contract document is required before issue.

The financial commitment should have been made prior to issue of the notice of acceptance.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Page 128: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 128 of 164

A copy of the approved contract document sent to the supplier, along with IPC approval of the document, must be kept on the procurement file.

The original signed contract document returned by the supplier must be kept in a secure location, with a copy kept on the procurement file for reference.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 20: Publishing a contract award notice and debriefing unsuccessful bidders.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 19B:19B:19B:19B: PPPPREPARING AND REPARING AND REPARING AND REPARING AND IIIISSUING A SSUING A SSUING A SSUING A PPPPURCHASE URCHASE URCHASE URCHASE OOOORDERRDERRDERRDER

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the preparation and issue of purchase orders.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to the Request for Quotations method. It may also apply to the Single Source Procurement method, where a purchase order is issued – see Desk Instruction 26A, 26B, 26C and 26D for guidance.

The Open Tendering, Restricted Tendering, Two-Stage Tendering and Request for Proposals methods are covered by Desk Instruction 19A: Preparing and issuing a contract document.

TypeTypeTypeType: This Desk Instruction applies to goods, works and routine services.

PurposPurposPurposPurpose of Procedure: e of Procedure: e of Procedure: e of Procedure:

The purchase order is a simple form of contract between the procuring entity and the supplier. It is used to form a contract by accepting the successful bidder’s quotation, where no contract award notice or detailed contract document is required. The purchase order defines the goods, works or services to be provided, the price to be paid for the goods, works or services and the delivery period required.

References:References:References:References:

Section 35(4), Public Procurement Act, 2003.

No reference in Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for the preparation of purchase orders, obtaining all necessary approvals and issuing them to suppliers.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

138. Complete a blank purchase order document, using the information in the successful bidder’s quotation and any corrections made during the evaluation – see guidance note 1 below for details of the information to be included.

139. Obtain IPC approval for the document.

140. The authorised signatory for the procuring entity must sign the purchase order.

Page 129: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 129 of 164

141. Issue the top copy of the purchase order to the supplier, with an instruction for them to confirm receipt of the purchase order in writing.

142. Distribute other copies as required.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Information to b Information to b Information to b Information to be included in Purchase Orderse included in Purchase Orderse included in Purchase Orderse included in Purchase Orders

The following information must be included in the purchase order:

� the name of the supplier;

� the date of issue of the LPO;

� the delivery address;

� the name of the procuring entity purchasing the items;

� the quantity of each item required;

� any part or pattern number for each item;

� a brief description of each item;

� the unit cost or rate for each item;

� the delivery period required.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval of the purchase order is required before issue.

The necessary funds must also be committed prior to issue of the purchase order.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of the purchase order, along with IPC approval of the document, must be kept on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 20: Publishing a contract award notice and debriefing unsuccessful bidders.

Page 130: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 130 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 20:20:20:20: PPPPUBLISHING A UBLISHING A UBLISHING A UBLISHING A CCCCONTRACT ONTRACT ONTRACT ONTRACT AAAAWARD WARD WARD WARD NNNNOTICE AND OTICE AND OTICE AND OTICE AND

DDDDEBRIEFING EBRIEFING EBRIEFING EBRIEFING UUUUNSUCCESSFUL NSUCCESSFUL NSUCCESSFUL NSUCCESSFUL BBBBIDDERSIDDERSIDDERSIDDERS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction sets out the procedure for notifying unsuccessful bidders that they have not won the contract, following the entry into force of the contract with the successful bidder, and for publishing contract award notices, where they are required. It also provides guidance on debriefing unsuccessful bidders, where a request is received.

The contract award notice should not be confused with the notice of acceptance – see Desk Instruction 18.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all competitive methods of procurement i.e. Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals and Request for Quotations.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

It is important that unsuccessful bidders are notified that they have not won a contract, as soon as possible after the entry into force of the contract, and that they are provided with information on why they failed to win, if they request it. This practice of notifying and debriefing unsuccessful bidders has a number of benefits:

� it should encourage unsuccessful bidders to submit tenders again for future opportunities and assist them in submitting more responsive or competitive tenders. This contributes to greater competition, which should result in increased value for money for the procuring entity.

� it provides unsuccessful bidders with a fair opportunity to appeal, under the administrative review procedures, if they feel that the procurement has not been properly conducted. As applications for administrative review have to be submitted within a specified time of the bidder becoming award of the circumstances giving rise to the complaint, this official notification provides a definite start point for the time period, reducing the likelihood of applications being made long after the decision that is being appealed.

The publication of contract award information for higher value contracts increases the transparency of public procurement.

References:References:References:References:

Section 24, 26 and 31(20), Public Procurement Act, 2003.

Regulation 5.2.22, 5.2.24 and 10.5.1, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for notifying and debriefing unsuccessful bidders and publishing any required contract award notices.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Page 131: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 131 of 164

143. Ensure that the contract has entered into force with the successful bidder and that any required performance security has been received.

144. Prepare a standard letter to notify unsuccessful bidders of the contract award. This letter should state the name and address of the supplier and the contract price.

145. Send a copy of the letter to each unsuccessful bidder.

146. Where the contract exceeds MKw xxx, prepare a notice of contract award for publication. This notice must include the date and any reference number of the original invitation notice published in the Gazette, a brief description of the subject of the procurement, the name and address of the successful bidder and the contract price.

147. Arrange for publication of the notice in the Gazette within xxx days of the contract award.

148. Where a request for a debrief is received from an unsuccessful bidder, prepare and send a debrief letter, within three days of receipt of the request – see guidance note 1 below for the details to be included.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Contents of Debrief Contents of Debrief Contents of Debrief Contents of Debrief Letters Letters Letters Letters

Debrief letters should contain sufficient detail to provide the unsuccessful bidder with an explanation of why he did not win a contract, without providing excessive details or taking too much time to prepare. Debrief letters must be prepared individually for each unsuccessful bidder, as they should not disclose information on other tenders, with the exception of limited information on the successful tender.

Debrief letter should state which stage of the evaluation the tender was rejected at i.e. preliminary screening, detailed evaluation or financial evaluation.

Where a tender was rejected during the preliminary screening, the letter should give a brief statement of the reason or reasons for rejection. For example:

� your tender security was not issued by an acceptable institution;

� your tender was not signed and authorised; or

� your tender was not valid for the required period.

Where a tender for goods, works or routine services was rejected during the detailed evaluation, the letter should give a brief statement on how it failed to meet the technical specification or standard required or how it was commercially unacceptable. For example:

� your tender did not meet the required specification, as the engine size was too small;

� your tender did not meet the required specification, as the processor speed was too slow;

� your proposed payment terms did not comply with the conditions stated in the bidding document and were not acceptable to the procuring entity; or

� your supervisory staff did not have appropriate qualifications or sufficient experience for the contract.

Page 132: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 132 of 164

Where a proposal for consultancy services evaluated using QCBS or LCS was rejected during the detailed technical evaluation, the letter should state that the proposal failed to reach the minimum quality threshold specified and give a brief statement on the main weaknesses of the proposal. For example:

� the key personnel included in your proposal did not have sufficient experience of this type of work or of work in the conditions prevailing in Malawi;

� your team leader did not have sufficient management experience or experience of working at this level; or

� your methodology didn’t address the capacity building part of the terms of reference adequately or would not achieve sufficient transfer of knowledge.

Where a proposal for consultancy services evaluated using QBS was rejected during the detailed technical evaluation, the letter should state that the proposal did not obtain the highest technical score and give a brief statement on the relative strengths of the successful proposal, without disclosing details. For example:

� the successful proposal included key personnel with greater experience of this type of work or of work in the conditions prevailing in Malawi;

� the successful proposal included a much stronger capacity building programme.

Where a tender was rejected during the financial evaluation, the letter should state:

� for goods, works or routine services, that the bidder did not submit the lowest priced, responsive tender;

� for consultancy services evaluated using QCBS, that the bidder did not submit the proposal offering the best overall combination of quality and price;

� for consultancy services evaluated using LCS, that the bidder did not submit the lowest priced proposal, which reached the minimum quality threshold.

The price of the contract will already have been provided in the letter notifying the bidder that he was unsuccessful and, for consultancy services, the technical scores and prices will have been read out at the financial opening. However, the procuring entity may repeat these details in the debrief letter, for the sake of completeness.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required for this procedure, as the contract award itself will already have been approved by the IPC.

DocumentDocumentDocumentDocuments/Records Required:s/Records Required:s/Records Required:s/Records Required:

Copies of the notification letters and any debriefing letters sent to unsuccessful suppliers must be kept on the procurement file. A copy of any published contract award notice must also be kept on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 21: Administering a contract.

Page 133: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 133 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 21:21:21:21: AAAADMINISTERING A DMINISTERING A DMINISTERING A DMINISTERING A CCCCONTRACTONTRACTONTRACTONTRACT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides a general procedure for administering contracts, following the issue of a contract document or purchase order.

Contract administration procedures are largely determined by the terms and conditions of each individual contract and the description of requirements for the goods, works or services. Therefore, this Desk Instruction provides general rules and principles only and staff must be guided by the contents of each contract. Guidance notes are included on the particular requirements of administering goods, works and services contracts.

For goods, reference should also be made to relevant Regulations and Instructions on supply management.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all method of procurement i.e. Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals, Request for Quotations and Single Source Procurement.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Effective contract administration is critical to successful contract implementation and meeting the objectives of the procurement requirement. Contract administration procedures are designed to ensure that:

� the supplier performs the contract in accordance with the terms and conditions specified in the contract;

� the procuring entity fulfils its obligations and duties under the contract; and

� swift remedial or preventative action is taken when problems arise or are foreseen.

References:References:References:References:

Section 22, Public Procurement Act, 2003.

Chapter VI, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit has the overall responsibility for contract administration, but will draw on other resources, such as technical expertise, payment services, legal services and supply management systems, as required. Where such other services and systems are used, the Procurement Unit will remain responsible for monitoring their performance and ensuring that their activities, in relation to the contract, are completed on time and in accordance with procurement rules. Day-to-day contract administration will often be assigned to an end user or technical expert.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

Page 134: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 134 of 164

149. The head of the Procurement Unit should select the most appropriate person or team to administer the contract – see guidance note 1 below for further details.

150. Ensure that a signed copy of the contract or confirmation of the purchase order is received from the supplier.

151. Ensure that any required performance security or advance payment security is received from the supplier.

152. Ensure that the procuring entity meets any immediate obligations, such as payment of an advance payment, opening of a letter of credit or assistance with obtaining visas for the supplier’s foreign staff.

153. Prepare a contract implementation plan, showing key milestones, such as dates for mobilisation, deliveries or completion of certain deliverables or sections of work, and the procuring entity’s obligations, such as providing access to a works site, payment or approval of reports.

154. Monitor the performance of both parties against the contract implementation plan. Take action as required to address any problems or delays, whether actual or anticipated. See guidance notes 2, 3 and 4 for details of the normal contract administration responsibilities for goods, works and services respectively.

155. Ensure that all deliveries, targets or deliverables are completed by the supplier.

156. Check all payment documentation and authorise payments, using the procuring entity’s normal accounting and disbursement systems.

Where contract amendments are required at any stage, see Desk Instruction 22 for further details.

GGGGuidance Note 1 uidance Note 1 uidance Note 1 uidance Note 1 –––– Selecting a Contract Administrator Selecting a Contract Administrator Selecting a Contract Administrator Selecting a Contract Administrator

The head of the Procurement Unit should select the most appropriate person or persons to administer each contract, taking into account the skills or experience required, the time required for contract administration and any requirements to work closely with the end user. Where a contract is particularly large or complex, a contract administration team may be formed.

The Procurement Unit will retain overall responsibility for contract administration, but the member of staff with day-to-day responsibility for the contract will often come from outside the Procurement Unit. For example, the Procurement Unit will normally retain control of contract amendments, payments and dispute resolution, but may allocate day-to-day liaison with a team of consultants or supervision of a construction contract to the end user.

In selecting the person responsible for day-to-day contract administration, the head of the Procurement Unit should consider the following guidance:

� where supervision needs to be conducted by a person with appropriate technical skills, such as for construction contracts or the installation of complex plant and machinery, contract administration is best allocated to the end user or an external consultant;

Page 135: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 135 of 164

� where contract administration is likely to be time-consuming or require skills not available within the procuring entity, an external contract administrator should be appointed, such as a project manager for a major construction contract;

� where goods are to be received and issued by stores, contract administration is best allocated to the stores staff;

� where goods are to be delivered directly to the end user, contract administration is best allocated to either the end user or procurement staff, although there may still be a need for the goods to be included in the procuring entity’s records of assets;

� where a consultant is required to work with the end user in conducting a study, providing advice or building capacity, contract administration is best allocated to the end user and particular counterpart staff may need to be designated to work with the consultant;

� where services are provided in support of the general management or administration of the procuring entity, contract administration is best allocated to the member of staff responsible for that function, such as a Transport Officer for a vehicle repair contract or the Finance and Administration Department for cleaning or security services.

Issues relating to contractual disputes or a supplier’s failure to perform and any requirement for amendment of the contract must be referred to the Procurement Unit.

Contract administrators must make use of the procuring entity’s existing systems for making payments or seeking legal advice.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Contr Contr Contr Contract Administration for Goodsact Administration for Goodsact Administration for Goodsact Administration for Goods

Contracts administration for goods focuses on ensuring that goods are delivered on time, that the goods are acceptable to the procuring entity, in terms of quantity, quality and supporting documentation, and that the procuring entity meets its obligations to pay for the goods delivered.

For goods contracts, the contract administrator is typically responsible for:

� ensuring that the actual dates when deliveries are due are agreed with the supplier, based on the date of contract effectiveness;

� expediting during the delivery period, to ensure that manufacturing, freight-forwarding and deliveries are proceeding on schedule;

� witnessing tests or approving samples, where required;

� arranging collection, freight-forwarding, customs clearance or delivery, where the procuring entity is responsible for any of these tasks;

� arranging for receipt and inspection of the goods;

� checking all documentation relating to the goods, such as delivery notes, and ensure that documentation is correct before signing;

� recording any missing, damaged or incorrect items and initiating claims against insurance policies or the supplier;

Page 136: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 136 of 164

� reporting any contractual problems or requests for contract amendments to the Procurement Unit;

� checking invoices and supporting documentation for payment are correct and arranging payment;

� managing any securities, such as performance or payment securities, by ensuring that they are kept securely, ensuring that extensions to their validity are obtained in good time, when required, reducing their value, when required and releasing them promptly, when all obligations have been fulfilled;

� ensuring all documentation and information relating to warranties and warranty claims are in good order;

� ensuring that assets are registered and labelled, where required; and

� ensuring all user guides, manuals, licences etc are kept with the goods or in an appropriate place.

Goods should be recorded in the procuring entity’s asset records and issued to the end user in accordance with applicable stores and supply management procedures.

Guidance Note 3 Guidance Note 3 Guidance Note 3 Guidance Note 3 ––––Contract Administration for WorksContract Administration for WorksContract Administration for WorksContract Administration for Works

Contracts administration for works is often complex and time-consuming, as it involves supervision of the progress of the works, ordering variations where unforeseen conditions are encountered and measuring the work completed for payment purposes. For major contracts, the procuring entity will normally use a full-time supervising engineer or project manager, who will exercise control and supervision of the contact on behalf of the procuring entity. Where a project manager is used, the procuring entity must:

� ensure that the role of the project manager is clearly defined, in particular his powers to issue contract variations, which result in changes to the overall cost, completion date, quality and design of the works and to settle disputes;

� establish arrangements for keeping the procuring entity informed of contract progress, variations issued and any disputes; and

� designate a contract administrator within the procuring entity, who will be the contact point for the project manager.

This contract administrator is typically responsible for:

� ensuring that the actual mobilisation and completion dates are agreed with the supplier, based on the date of contract effectiveness;

� monitoring the overall progress of the works and the performance of the project manager;

� referring any requests for contract variations, which are outside the authority of the project manager, to the IPC, or other designated authority, for approval;

� reporting any contractual problems or requests for contract amendments to the Procurement Unit;

� checking invoices and supporting documentation for payment are correct and arranging payment;

Page 137: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 137 of 164

� managing any securities, such as performance or payment securities, by ensuring that they are kept securely, ensuring that extensions to their validity are obtained in good time, when required, reducing their value, when required and releasing them promptly, when all obligations have been fulfilled;

� ensuring all final acceptance and hand-over arrangements are completed and documented satisfactorily; and

� ensuring all final drawings, manuals etc are received and kept in an appropriate place.

Guidance Note 4 Guidance Note 4 Guidance Note 4 Guidance Note 4 ––––Contract Administration for ServicesContract Administration for ServicesContract Administration for ServicesContract Administration for Services

Contracts administration for services focuses on ensuring that services are delivered on time and to an acceptable quality. This can be difficult, as the quality of services, particularly consultancy services, can be subjective and difficult to measure. A good working relationship with the service provider and ongoing monitoring of services is therefore important, to ensure successful contract performance.

The procuring entity must also ensure that it meets its obligations, particularly where the performance of consultancy services is dependent on certain inputs or information from the procuring entity or where staff must be made available to benefit from capacity building initiatives.

For services contracts, the contract administrator is typically responsible for:

� ensuring that the actual dates for mobilisation, key milestones or deliverables and completion are agreed with the supplier, based on the date of contract effectiveness;

� monitoring contract performance to ensure that levels of service are maintained and that deliverables are submitted or completed on time;

� ensuring that all required reports are submitted on time;

� ensuring that, where required, the procuring entity provides written comments or approvals to deliverables or reports in a timely manner;

� ensuring that any resources, assistance or counterpart staff to be provided by the procuring entity are made available at the appropriate time;

� checking invoices and supporting documentation for payment are correct and arranging payment;

� managing any securities, such as performance or payment securities, by ensuring that they are kept securely, ensuring that extensions to their validity are obtained in good time, when required, reducing their value, when required and releasing them promptly, when all obligations have been fulfilled;

� notifying the service provider in writing of any failings in performance or failure to meet targets; and

� ensuring all reports or deliverables are kept in an appropriate place and circulated or implemented as required.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

IPC approval is required for any contract amendments – see Desk Instruction 22 for further guidance.

Page 138: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 138 of 164

Payments must be approved in accordance with the procuring entity’s normal finance and accounting procedures.

No other approvals are required for contract administration.

DocuDocuDocuDocuments/Records Required:ments/Records Required:ments/Records Required:ments/Records Required:

All correspondence and documentation relating to contract administration must be kept on the procurement file. In particular, records are required of:

� all invoices and other payment documents;

� all documentation relating to contract performance, such as delivery notes, progress reports and other deliverables;

� all contract variations;

� all contract amendments;

� all documents relating to claims under the contract, including warranty claims;

� all documents relating to contract disputes and dispute resolution.

Next Steps:Next Steps:Next Steps:Next Steps:

� Proceed to Desk Instruction 22: Amending a contract, where any amendment is required.

� Proceed to Desk Instruction 23: Completing a contract, when all contractual obligations have been completed.

� Proceed to Desk Instruction 24: Terminating a Contract, where termination is required.

Page 139: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 139 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 22:22:22:22: AAAAMENDING A MENDING A MENDING A MENDING A CCCCONTRACTONTRACTONTRACTONTRACT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for amending a contract, when required, during the period of performance of the contract.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement i.e. Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals, Request for Quotations and Single Source Procurement.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Ideally, a contract which has been placed should not need any amendment, but sometimes it is necessary to make changes to the terms and conditions of a contract or the description of requirements. Contract amendments provide a formal, legal way of amending a contract and of ensuring that both parties have agreed to the changes.

References:References:References:References:

No reference in the Public Procurement Act, 2003.

No reference in the Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for preparing all contract amendments and obtaining IPC approval, although the request for the amendment will normally come from the contract administrator, who may be outside of the Procurement Unit.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

157. Identify the need for a contract amendment – this will normally be done by the contract administrator. A contract amendment is required where the procuring entity wants to change any terms or conditions of the contract e.g. the delivery or completion period, the technical description of the goods, works or services, the quantity of an item purchased, the price etc.

158. Provide full details on the amendment required to the Procurement Unit.

159. The Procurement Unit will discuss the amendment with the supplier, if required.

160. Prepare the contract amendment – see guidance note 1 below for the details to include.

161. Obtain IPC approval.

162. Obtain any other necessary approvals, including financial approval for commitment of any additional funds.

163. Make the required number of copies of the approved contract amendment. The number of copies required must be at least two – one for the supplier and one for the procuring entity.

Page 140: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 140 of 164

164. The authorised signatory for the procuring entity should sign all copies of the contract amendment.

165. Send all copies of the contract amendment to the supplier, with a covering letter instructing the supplier to counter-sign all copies, retain one for his records and return all other signed copies to the procuring entity.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Contents of a Contract Amendment Contents of a Contract Amendment Contents of a Contract Amendment Contents of a Contract Amendment

The contents of a contract amendment will be determined by the reason for the amendment and the term or condition which is being amended. However, all contract amendments must include the following details:

� the reference number and date of the contract which is being amended and a brief description of the subject of the contract;

� the number of the contract amendment i.e. “Contract Amendment No 1, 2, 3 etc”;

� the date of the contract amendment;

� a clear statement of the part of the contract which is being amended, including relevant clause or annex numbers;

� a clear statement of how the contract is amended e.g. “the completion period is hereby extended by one week, to give a revised completion period of thirteen weeks” or “the quantity for item 3 is hereby increased by two (2) to give a revised quantity of five (5)”;

� where the contract price is being amended, a clear statement of the amount by which the contract is increased or decreased and the revised total contract price i.e. “the contract price is hereby increased by a sum of $5,000, giving a revised total contract price of $35,000”;

� a statement that all other terms and conditions of the contract remain unchanged.

AppAppAppApprovals Required:rovals Required:rovals Required:rovals Required:

IPC approval is required for all contract amendments.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

A copy of all contract amendments, signed by both parties, along with IPC approval for each amendment, must be kept on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

� Return to Desk Instruction 21: Administering a contract.

Page 141: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 141 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 23:23:23:23: CCCCOMPLETING A OMPLETING A OMPLETING A OMPLETING A CCCCONTRACTONTRACTONTRACTONTRACT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the standard operating procedure for completing a contract and closing the procurement file, once all contractual obligations of both parties have been fulfilled.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement i.e. Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals, Request for Quotations and Single Source Procurement.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

It is important that contracts are formally reviewed and the procurement file closed, once all contract activities and obligations have been completed. This procedure should ensure that the contract has in fact been completed and that no outstanding items, claims or payments are overlooked. It also ensures that files are archived for the appropriate period of time and available for audit purposes.

References:References:References:References:

Section 27(2), Public Procurement Act, 2003.

No reference in the Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for completing contracts and closing the file, in conjunction with the designated contract administrator.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

166. The Procurement Unit or contract administrator will identify that all contractual obligations and warranty periods have been completed.

167. The Procurement Unit should review the contract and the procurement file to check that the contract is in fact completed – see guidance note 1 below for a checklist.

168. Close the file and archive it, if required.

169. Ensure that the closed file is listed in the Procurement Unit’s records and is marked with the date which it must be retained until.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Contract Completion Checklist Contract Completion Checklist Contract Completion Checklist Contract Completion Checklist

Before closing a procurement file, the Procurement Unit should check that:

� all goods have been delivered, works completed and handed-over, services performed and contract deliverables received;

� there are no outstanding claims for missing or damaged items against either the supplier or an insurance company;

� all necessary payments have been made;

Page 142: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 142 of 164

� the total payment total is correct, taking into account any contract amendments, variations, price variations and the amortisation of any advance payment;

� all guarantees and securities have been returned;

� all necessary documentation is in place and correct; and

� the overall performance of the supplier has been reviewed and ODPP has been advised of any serious failings.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

No approvals are required for contract completion and closure of the procurement file.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

All records relating to the review of the contract must be kept on the procurement file. The Procurement Unit must maintain a register of:

� all procurement files closed;

� the date of closure of each file; and

� the date until which the file must be maintained, which is five years from the date of cancellation of the procurement or completion or termination of the contract, as appropriate.

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction provides the final step in the procurement process.

Page 143: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 143 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 24:24:24:24: TTTTERMINATING A ERMINATING A ERMINATING A ERMINATING A CCCCONTRACTONTRACTONTRACTONTRACT

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides the procedure for terminating a contract, after it has been awarded.

Where a procurement requirement needs to be cancelled prior to contract award, Desk Instruction 17: Cancelling procurement proceedings will apply.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to all methods of procurement i.e. Open Tendering, Restricted Tendering, Two-Stage Tendering, Request for Proposals, Request for Quotations and Single Source Procurement.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Contracts should not be terminated, where termination can be avoided. However, sometimes it is necessary to terminate a contract:

� to avoid or minimise further loss to the procuring entity or poor performance by the supplier;

� where contract performance has become impossible; or

� where a supplier is no longer qualified or has engaged in corrupt practices.

References:References:References:References:

Section 23(c), Public Procurement Act, 2003.

No reference in the Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

The Procurement Unit is responsible for terminating contracts, subject to IPC approval to terminate.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

170. Identify the need to terminate the contract.

171. Check the contract or purchase order document, to confirm the conditions of contract relating to termination – see guidance note 1 below for details. Identify which of the grounds for termination will be used and ensure that the procuring entity has sufficient justification for using the selected grounds. Seek legal advice prior to proceeding.

172. Estimate the amount of money, if any, which will be due to the supplier following termination.

173. Prepare a formal notice, terminating the contract and stating the grounds for termination.

174. Obtain IPC approval of the notice and the justification for terminating. Ensure that the IPC are informed of the costs of terminating the contract.

175. Issue the termination notice and ensure that it is received by the supplier.

Page 144: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 144 of 164

176. Take any follow-up action required, including making any payments due to the supplier under the contract and referring any default or corrupt practices by the supplier to ODPP.

177. Refer to Desk Instruction 23: Completing a contract, for guidance on archiving the procurement file.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Typical Grounds for Termin Typical Grounds for Termin Typical Grounds for Termin Typical Grounds for Terminationationationation

The grounds for termination of a contract will depend on the terms and conditions of the individual contract concerned. The following notes provide guidance on typical grounds for termination of a contract, but it is essential that the procuring entity is guided by the contract document itself:

� Termination for convenienceTermination for convenienceTermination for convenienceTermination for convenience: most contracts include a condition which enables the procuring entity to terminate the contract for its own convenience, without there having been any default by the supplier. Where the procuring entity terminates for its own convenience, it must make payment for all goods, works or services satisfactorily completed prior to termination and any other expenses incurred by the supplier.

� Termination for defaultTermination for defaultTermination for defaultTermination for default: most contracts include a condition which enables the procuring entity to terminate the contract, where the supplier has failed to perform its obligations under the contract or to comply with an agreement reached through arbitration or other dispute resolution mechanism. The contract will often specify a procedure by which the procuring entity must formally notify the supplier of the default and give them time to correct the default, before actually terminating the contract. Where the procuring entity terminates because of the supplier defaulting, it is normally permitted to procure the goods, works or services from another source and charge the original supplier for any additional costs incurred.

� Termination for corrupt practicesTermination for corrupt practicesTermination for corrupt practicesTermination for corrupt practices: most contracts include a condition which enables the procuring entity to terminate the contract, where the supplier has engaged in corrupt or fraudulent practices in competing for or implementing the contract. As with termination for default, the procuring entity is normally permitted to procure the goods, works or services from another source and charge the original supplier for any additional costs incurred.

� Termination for insolvencyTermination for insolvencyTermination for insolvencyTermination for insolvency: most contracts include a condition which enables the procuring entity to terminate the contract, where the supplier has become bankrupt or insolvent. In such cases, there is normally no compensation to the supplier.

� Termination for force majeureTermination for force majeureTermination for force majeureTermination for force majeure: most contracts include a condition which enables the procuring entity to terminate the contract, where the supplier has been unable to perform the contract for a specified period of time, due to an event of force majeure. In such cases, the procuring entity must normally make payment for all goods, works or services satisfactorily completed prior to termination and any other expenses incurred by the supplier.

The procuring entity should note that a contract will also give the supplier grounds for termination, which normally include failure by the procuring entity to make payments which are overdue by a specified period of time, force majeure or failure of

Page 145: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 145 of 164

the procuring entity to comply with an agreement reached through arbitration or other dispute resolution mechanism.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from the IPC, prior to terminating a contract.

Documents/Records RequireDocuments/Records RequireDocuments/Records RequireDocuments/Records Required:d:d:d:

A copy of the notice terminating the contract, and the IPC’s approval to terminate, must be kept on the procurement file. Any other correspondence or documentation relating to the termination must also be kept on the procurement file.

Next Steps:Next Steps:Next Steps:Next Steps:

No further action is required following termination of a contract. Any new procurement proceedings, in place of the terminated contract, should be treated as a completely separate procurement process and start from the requisition stage i.e. Desk Instruction 1. Consideration should be given to the reasons resulting to termination of the contract, to ensure that they are not repeated in any new procurement process.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 25:25:25:25: TTTTWOWOWOWO----SSSSTAGE TAGE TAGE TAGE TTTTENDERINGENDERINGENDERINGENDERING

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the procedures for conducting a two-stage tender for goods, works or routine services.

Procedures for Two-Stage Tendering are similar in many respects to those for Open or Restricted Tendering and therefore, this Desk Instruction should be read in conjunction with other relevant procedures. This Desk Instruction states the instructions which should be referred to and highlights only the modifications which are required for Two-Stage Tendering.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to Two-Stage Tendering only.

TypeTypeTypeType: This Desk Instruction applies to goods, works and routine services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Two-Stage Tendering is used for goods, works or services which are difficult to define fully at the start of the procurement process, where it would be beneficial to the procuring entity to consider the various solutions available, before refining its requirements.

References:References:References:References:

Section 30(4) and 33, Public Procurement Act, 2003.

Regulation 5.40, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Responsibilities for conducting each step in the Two-Stage Tendering process are the same as for Open or Restricted Tendering and are stated on each individual Desk Instruction.

Page 146: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 146 of 164

The Procurement Unit has the overall responsibility for conducting the procurement process, subject to IPC approval at specified points in the process. Two-Stage Tendering will require a greater input from the end user, or other technical specialist, than many other methods, due to the need to consider complex technical solutions and refine specifications.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

In these step-by-step instructions, references are made to other Desk Instructions which apply. Where any Desk Instruction should be applied with modifications, it is referred to for “general guidance” and the appropriate modifications are outlined below.

178. Raise a requisition – see Desk Instruction 1 for guidance.

179. Prepare an initial description of the goods, works or services – see Desk Instruction 2A, 2B or 2C for general guidance. The description should emphasise the objectives of the procurement and the performance required from the goods, works or services, to enable bidders to provide alternative solutions which meet the objectives and performance required.

180. Select the procurement method, considering whether the two-stage tendering should be open or restricted to a specified shortlist, and plan the procurement – see Desk Instruction 3 for guidance. Seek approval from ODPP for use of two-stage tendering.

181. Conduct a pre-qualification, prepare an invitation to tender notice or develop a shortlist, depending on whether the tender is to be open with pre-qualification, open without pre-qualification or restricted – see Desk Instruction 4A, 5A or 5B for guidance.

182. Prepare a bidding document – see Desk Instruction 6A for general guidance. The bidding document should be based on the appropriate standard bidding document, but modified to suit the requirements of two-stage tendering. The bidding document must clearly explain the tendering procedure which will be followed, contain an outline description of requirements and contract and state how tenders will be evaluated during the first stage of the tender. The bidding document should not request any financial information at this stage. Obtain IPC approval for the bidding document and the invitation to bid notice, shortlist or list of pre-qualified bidders, as appropriate.

183. Publish any invitation to tender notice – see Desk Instruction 7 for guidance. Issue the bidding documents – see Desk Instruction 8 for guidance.

184. Hold a pre-bid conference and site visit if required – see Desk Instruction 9 for guidance. Respond to any requests for clarification, issue modifications to the bidding document or extend the bidding deadline if necessary – see Desk Instruction 10 for guidance.

185. Receive tenders – see Desk Instruction 11 for guidance.

186. Open tenders – see Desk Instruction 12A for general guidance. No financial information will be included in the tenders at this stage, so there will be no requirement to read out prices.

Page 147: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 147 of 164

187. Conduct an evaluation of the tenders – see Desk Instruction 13 and 13A, 13B or 13C, for general guidance. The evaluation must be conducted using the criteria and methodology stated in the bidding document. The procuring entity should consider the relative advantages and disadvantages of the alternative solutions submitted. Prepare a first stage evaluation report, which should include a recommendation to reject any tenders which do not meet the procuring entity’s requirements.

188. Hold discussions with any bidders, where further information is required on the solutions included in any tenders.

189. Finalise the description of requirements – see Desk Instruction 2A, 2B or 2C for general guidance. Where the description of requirements has changed substantially and different bidders may be able to respond to the requirement, consider cancelling the procurement and commencing a new procurement process.

190. Prepare a revised bidding document – see Desk Instruction 6A for general guidance. The bidding document should be based on the original bidding document, but include the finalised description of requirements and contract and clear evaluation criteria. Obtain IPC approval for the first stage evaluation and the revised bidding document.

191. Issue the bidding documents to all bidders who submitted tenders during the first stage, unless their tenders were rejected during the first stage evaluation– see Desk Instruction 8 for guidance.

192. Hold a pre-bid conference and site visit if required – see Desk Instruction 9 for guidance. Respond to any requests for clarification, issue modifications to the bidding document or extend the bidding deadline if necessary – see Desk Instruction 10 for guidance.

193. Receive tenders – see Desk Instruction 11 for guidance.

194. Open tenders and read out prices – see Desk Instruction 12A for guidance.

195. Conduct an evaluation of the tenders – see Desk Instruction 13 and 13A, 13B or 13C, for guidance. Prepare an evaluation report and obtain IPC approval.

196. Conduct a post-qualification if required – see Desk Instruction 15 for guidance.

197. Hold negotiations if required and obtain IPC approval for the contract award recommendation– see Desk Instruction 16 for guidance.

198. Send a notice of acceptance, ensuring that all necessary approvals are obtained first – see Desk Instruction 18 for guidance.

199. Prepare a contract document, obtain IPC approval and issue the contract – see Desk Instruction 19A for guidance.

200. Notify unsuccessful bidders, publish a contract award notice and debrief unsuccessful bidders – see Desk Instruction 20 for guidance.

201. Administer and complete the contract – see Desk Instructions 21 and 23 for guidance.

Page 148: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 148 of 164

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from ODPP to use the two-stage tendering method.

Approvals are required from the IPC at various stages, as specified in the applicable Desk Instructions detailed above.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Records of all stages of the procurement process must be kept on the procurement file, as detailed in the applicable Desk Instructions detailed above.

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction summarises the complete process for Two-Stage Tendering from beginning to end. Therefore, no other steps apply.

Page 149: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 149 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 26A:26A:26A:26A: SSSSINGLE INGLE INGLE INGLE SSSSOURCE OURCE OURCE OURCE PPPPROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR LLLLOW OW OW OW VVVVALUE ALUE ALUE ALUE

RRRREQUIREMENTSEQUIREMENTSEQUIREMENTSEQUIREMENTS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the procedures for conducting single source procurement, where the estimated value is below the threshold of MKw xxx set in the Regulations.

Parts of the procedures for single source procurement are similar to those for competitive methods of procurement and therefore, this Desk Instruction should be read in conjunction with other relevant procedures. This Desk Instruction states the instructions which should be referred to and highlights only the modifications which are required for single source procurement for low value requirements.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to Single Source Procurement for low value requirements. Single Source Procurement in other circumstances is covered by Desk Instructions 26B, 26C and 26D.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Single source procurement provides a procedure for concluding a contract for low value requirements, where the time and cost of conducting competitive procurement proceedings would be disproportionate to the value of the requirement.

References:References:References:References:

Section 30(10)(a) and 36, Public Procurement Act, 2003.

Regulation 5.9.1, Public Procurement Regulations, 2003.

Staff InvolveStaff InvolveStaff InvolveStaff Involved:d:d:d:

Responsibilities for conducting each step in the single source procurement process are the same as for competitive methods of procurement and are stated on each individual Desk Instruction.

The Procurement Unit has the overall responsibility for conducting the procurement process, subject to IPC approval at specified points in the process. Technical inputs will be obtained from the end user, as required.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

In these step-by-step instructions, references are made to other Desk Instructions which apply. Where any Desk Instruction should be applied with modifications, it is referred to for “general guidance” and the appropriate modifications are outlined below.

202. Raise a requisition – see Desk Instruction 1 for guidance.

203. Prepare a description of the goods, works or services – see Desk Instruction 2A, 2B or 2C for guidance. The description does not need to be very detailed, given the low value, but must be sufficiently detailed to ensure that the procuring entity procures the items it requires.

Page 150: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 150 of 164

204. Select the procurement method and plan the procurement – see Desk Instruction 3 for guidance. Consider whether the requirement could, or should in future, be procured under a framework contract. Ensure that any purchase will not exceed the overall cap on this type of procurement set by the ODPP. Seek approval from ODPP for use of single source procurement.

205. Prepare a written description of the procuring entity’s needs, including the technical description of requirements and the terms and conditions of the proposed contract. Parts of the standard request for quotations document may be used as the basis for preparation of this written description. Identify a suitable supplier. Obtain IPC approval for the description document and proposed supplier.

206. Send the written description to the supplier, requesting a written quotation.

207. Evaluate the quotation to determine whether it meets the procuring entity’s requirements - see Desk Instruction 13 and 13A, 13B or 13C, for general guidance. The detailed evaluation should focus on whether the quotation meets the procuring entity’s technical requirements and whether the proposed terms and conditions of contract are acceptable to the procuring entity. The financial evaluation should consider, as far as is possible, whether the quotation offers value for money, taking into account a comparison with any prices previously obtained through competitive methods, the terms and conditions of the proposed contract, a breakdown of the costs involved and any other relevant details or circumstances. The evaluation must also assess whether the supplier is qualified.

208. Prepare an evaluation report, recommending whether the quotation should be considered for contract award, whether negotiations are required, whether an alternative supplier should be used or whether the procurement requirement should be cancelled or redefined. Obtain IPC approval for the recommendations.

209. Hold negotiations if required and obtain IPC approval for the negotiation results – see Desk Instruction 16 for guidance.

210. Prepare a purchase order document - see Desk Instruction 19B for guidance. Obtain IPC approval, and any other required approvals, including commitment of the required funds, and issue the purchase order.

211. Administer and complete the contract – see Desk Instructions 21 and 23 for guidance.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from ODPP to conduct single source procurement.

Approvals are required from the IPC at various stages, as specified in the applicable Desk Instructions detailed above.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Records of all stages of the procurement process must be kept on the procurement file, as detailed in the applicable Desk Instructions detailed above.

Page 151: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 151 of 164

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction summarises the complete process for Single Source Procurement for low value requirements. Therefore, no other steps apply.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 26B:26B:26B:26B: SSSSINGLE INGLE INGLE INGLE SSSSOURCE OURCE OURCE OURCE PPPPROCUREMENT FROM A ROCUREMENT FROM A ROCUREMENT FROM A ROCUREMENT FROM A SSSSOLE OLE OLE OLE SSSSUPPLIERUPPLIERUPPLIERUPPLIER

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the procedures for conducting single source procurement, where only one supplier is able to meet the procuring entity’s requirements, for technical , legal or capacity reasons.

Parts of the procedures for single source procurement are similar to those for competitive methods of procurement and therefore, this Desk Instruction should be read in conjunction with other relevant procedures. This Desk Instruction states the instructions which should be referred to and highlights only the modifications which are required for single source procurement, where there is a sole supplier.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to Single Source Procurement, where there is a sole supplier only. Single Source Procurement in other circumstances is covered by Desk Instructions 26A, 26C and 26D.

TypTypTypTypeeee: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Single source procurement provides a procedure for concluding a contract, where the goods, works or services are only available from one supplier and there is therefore no point in conducting competitive procurement proceedings.

References:References:References:References:

Section 30(10)(b) and 36, Public Procurement Act, 2003.

Regulation 5.9.1.2 and 5.9.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Responsibilities for conducting each step in the single source procurement process are the same as for competitive methods of procurement and are stated on each individual Desk Instruction.

The Procurement Unit has the overall responsibility for conducting the procurement process, subject to IPC approval at specified points in the process. Technical inputs will be required from the end user at various stages, particularly in determining whether there are functionally equivalent goods, works or services which would meet the procuring entity’s needs, as part of the justification for using single source procurement.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

In these step-by-step instructions, references are made to other Desk Instructions which apply. Where any Desk Instruction should be applied with modifications, it is

Page 152: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 152 of 164

referred to for “general guidance” and the appropriate modifications are outlined below.

212. Raise a requisition – see Desk Instruction 1 for guidance.

213. Prepare a description of the goods, works or services – see Desk Instruction 2A, 2B or 2C for general guidance. The description must state the purpose of the goods, works or services, to enable a judgement to be made on whether there are functionally equivalent goods, works or service which would also meet the need.

214. Select the procurement method and plan the procurement – see Desk Instruction 3 for guidance. Identify the single supplier, who is able to fulfil the requirement and prepare a detailed justification for use of single source procurement – see guidance note 1 below for the details to include. Seek approval from ODPP for use of single source procurement.

215. Where the estimated value exceeds MKw xxx, publish a notice in the Gazette, stating that single source procurement is being conducted and giving a brief description of the subject of the procurement.

216. Prepare a written description of the procuring entity’s needs, including the technical description of requirements and the terms and conditions of the proposed contract. Parts of the standard bidding documents may be used as the basis for preparation of this written description. Obtain IPC approval for the description document.

217. Send the written description to the sole supplier, requesting a written offer. No formal receipt or opening of the tender is required.

218. Evaluate the tender to determine whether it meets the procuring entity’s requirements - see Desk Instruction 13 and 13A, 13B or 13C, for general guidance. The detailed evaluation should focus on whether the tender meets the procuring entity’s technical requirements and whether the proposed terms and conditions of contract are acceptable to the procuring entity. The financial evaluation should consider, as far as is possible, whether the tender offers value for money, taking into account a breakdown of the costs involved, the cost of alternative solutions which were rejected, the size of the proposed contract, the terms and conditions of the proposed contract and any other relevant details or circumstances. The evaluation must also assess whether the supplier is qualified.

219. Prepare an evaluation report, recommending whether the tender should be considered for contract award, whether negotiations are required or whether the procurement requirement should be cancelled or redefined. Obtain IPC approval for the recommendations.

220. Hold negotiations if required and obtain IPC approval for the negotiation results – see Desk Instruction 16 for guidance.

221. Send a notice of acceptance, if required, ensuring that all necessary approvals are obtained first – see Desk Instruction 18 for guidance.

222. Prepare a contract or purchase order document - see Desk Instruction 19A or 19B for guidance. The type of document used will depend on the value of the

Page 153: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 153 of 164

contract and the terms and conditions which will apply. Obtain IPC approval, and any other required approvals, and issue the document.

223. Administer and complete the contract – see Desk Instructions 21 and 23 for guidance.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Justification for using Single Source Procurement where there is a Justification for using Single Source Procurement where there is a Justification for using Single Source Procurement where there is a Justification for using Single Source Procurement where there is a Sole SupplierSole SupplierSole SupplierSole Supplier

The justification for using single source procurement must be clear and comprehensive and include the following details:

� the grounds on which single source is to be used i.e. Section 30(10)(b) of the Public Procurement Act, 2003, the existence of only one supplier who is able to fulfil the requirement;

� the reasons why only one supplier is able to fulfil the requirement e.g. the supplier has a patent or copyright agreement covering the items, no other suppliers are technically able to meet the requirement, no other suppliers have the capacity to fulfil the requirement etc;

� an explanation as to why any alternative goods, works or services cannot be used e.g. the purchase of alternative products would breach patent agreements, to which the Government of Malawi is a signatory, similar products are not compatible with existing equipment etc;

� any other relevant details.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from ODPP to conduct single source procurement.

Approvals are required from the IPC at various stages, as specified in the applicable Desk Instructions detailed above.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Records of all stages of the procurement process must be kept on the procurement file, as detailed in the applicable Desk Instructions detailed above.

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction summarises the complete process for Single Source Procurement, where there is a sole supplier. Therefore, no other steps apply.

Page 154: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 154 of 164

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 26C:26C:26C:26C: SSSSINGLE INGLE INGLE INGLE SSSSOURCE OURCE OURCE OURCE PPPPROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR EEEEMERGENCY MERGENCY MERGENCY MERGENCY

RRRREQUIREMENTSEQUIREMENTSEQUIREMENTSEQUIREMENTS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the procedures for conducting single source procurement, where there is an emergency need for goods, works or services, which makes the use of any other method of procurement impractical.

Parts of the procedures for single source procurement are similar to those for competitive methods of procurement and therefore, this Desk Instruction should be read in conjunction with other relevant procedures. This Desk Instruction states the instructions which should be referred to and highlights only the modifications which are required for single source procurement, where there is an emergency need.

The procedures for emergency procurement will be determined, to a certain extent, by the circumstances of the emergency and the time available to fulfil the requirement. Therefore, procurement staff will be required to use their professional judgement in determining how to proceed, but as a general rule should seek to follow established procurement principles and rules, to the extent possible.

Applies to:Applies to:Applies to:Applies to:

MeMeMeMethodthodthodthod: This Desk Instruction applies to Single Source Procurement, where there is an emergency need only. Single Source Procurement in other circumstances is covered by Desk Instructions 26A, 26B and 26D.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Single source procurement provides a procedure for concluding a contract, where there is an emergency need for the goods, works or services and there is therefore insufficient time to use competitive methods of procurement.

References:References:References:References:

Section 30(10)(c) and 36, Public Procurement Act, 2003.

Regulation 5.9.1.3 and 5.9.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Responsibilities for conducting each step in the single source procurement process are the same as for competitive methods of procurement and are stated on each individual Desk Instruction.

The Procurement Unit has the overall responsibility for conducting the procurement process, subject to IPC approval at specified points in the process. Given the emergency circumstances of the procurement, the Procurement Unit and end user will be required to work closely and efficiently together.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

In these step-by-step instructions, references are made to other Desk Instructions which apply. Where any Desk Instruction should be applied with modifications, it is

Page 155: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 155 of 164

referred to for “general guidance” and the appropriate modifications are outlined below.

224. Raise a requisition – see Desk Instruction 1 for guidance.

225. Prepare a description of the goods, works or services – see Desk Instruction 2A, 2B or 2C for general guidance. The quantities included must be limited to the quantity required to address the emergency need.

226. Select the procurement method and plan the procurement – see Desk Instruction 3 for guidance. Identify a suitable supplier, who is able to fulfil the requirement and prepare a detailed justification for use of single source procurement – see guidance note 1 below for the details to include. Seek approval from ODPP for use of single source procurement. Where time is severely restricted, proceed with the following steps, up to step 9, pending receipt of ODPP approval. A contract must not be placed prior to the receipt of ODPP approval for use of the single source method.

227. Where the estimated value exceeds MKw xxx, publish a notice in the Gazette, as soon as is practical, given the emergency situation, stating that single source procurement is being conducted and giving a brief description of the subject of the procurement.

228. Prepare a written description of the procuring entity’s needs, including the technical description of requirements and the terms and conditions of the proposed contract. The level of detail possible will be determined by the time available, but parts of the standard bidding documents may be used as the basis for preparation of this written description. Obtain IPC approval for the description document.

229. Where there is insufficient time to obtain a written tender, proceed to step 9 – negotiations. Otherwise, send the written description to the sole supplier, requesting a written tender by a specified deadline. No formal receipt or opening of the tender is required.

230. Evaluate the tender to determine whether it meets the procuring entity’s requirements - see Desk Instruction 13 and 13A, 13B or 13C, for general guidance. The detailed evaluation should focus on whether the tender meets the procuring entity’s technical requirements, whether the delivery or completion period offered is acceptable and whether the proposed terms and conditions of contract are acceptable to the procuring entity. The financial evaluation should consider, as far as is possible, whether the tender offers value for money, taking into account a comparison with any prices previously obtained through competitive methods, a breakdown of the costs involved, including any additional costs for accelerated delivery or completion, the size of the proposed contract, the terms and conditions of the proposed contract and any other relevant details or circumstances. The evaluation must also assess whether the supplier is qualified.

231. Prepare an evaluation report, recommending whether the tender should be considered for contract award, whether negotiations are required or whether the procurement requirement should be cancelled or redefined. Obtain IPC approval for the recommendations.

Page 156: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 156 of 164

232. Hold negotiations if required and obtain IPC approval for the negotiation results – see Desk Instruction 16 for guidance.

233. Send a notice of acceptance, if required, ensuring that all necessary approvals are obtained first – see Desk Instruction 18 for guidance.

234. Prepare a contract or purchase order document - see Desk Instruction 19A or 19B for guidance. The type of document used will depend on the value of the contract, the terms and conditions which will apply and the time available for preparation of detailed documents. Obtain IPC approval, and any other required approvals, and issue the document.

235. Administer and complete the contract – see Desk Instructions 21 and 23 for guidance.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Justification for using Single Source Procurement where there is an Justification for using Single Source Procurement where there is an Justification for using Single Source Procurement where there is an Justification for using Single Source Procurement where there is an Emergency NeedEmergency NeedEmergency NeedEmergency Need

The justification for using single source procurement must be clear and comprehensive. Procuring entities must note that an emergency need is defined in the Act as one “involving an imminent threat to the physical safety of the population or of damage to property”; a simple urgency or a lack of earlier planning by the procuring entity do not constitute an emergency need. The justification must include the following details:

� the grounds on which single source is to be used i.e. Section 30(10)(c) of the Public Procurement Act, 2003, an emergency need for the goods, works or services;

� the reasons why there is an emergency need e.g. an unexpected outbreak of a contagious disease, a flood which has resulted in the destruction of a bridge on a major road or a landslide, which has left a building in a residential area dangerously unstable;

� a statement that there is insufficient time to use any other method of procurement;

� a statement that the quantity to be procured has been limited to what is needed to address the emergency need; and

� any other relevant details.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from ODPP to conduct single source procurement.

Approvals are required from the IPC at various stages, as specified in the applicable Desk Instructions detailed above. Where time does not allow a full IPC meeting to be called, the Procurement Unit should consult with the chairperson of the IPC on how to proceed. The Procurement Unit should seek to obtain at least the IPC chairperson’s approval. Where possible, the approval of other members should be sought through circulation of the submission and granting of approval in writing, without convening a meeting.

Page 157: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 157 of 164

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Records of all stages of the procurement process must be kept on the procurement file, as detailed in the applicable Desk Instructions detailed above.

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction summarises the complete process for Single Source Procurement, where there is a sole supplier. Therefore, no other steps apply.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 26D:26D:26D:26D: SSSSINGLE INGLE INGLE INGLE SSSSOURCE OURCE OURCE OURCE PPPPROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR ROCUREMENT FOR AAAADDITIONAL DDITIONAL DDITIONAL DDITIONAL

RRRREQUIREMENTS FROM THEEQUIREMENTS FROM THEEQUIREMENTS FROM THEEQUIREMENTS FROM THE SSSSAME AME AME AME SSSSOURCEOURCEOURCEOURCE

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides guidance on the procedures for conducting single source procurement, where there is a requirement for additional goods, works or services from the same source, for reasons of standardisation or compatibility.

Parts of the procedures for single source procurement are similar to those for competitive methods of procurement and therefore, this Desk Instruction should be read in conjunction with other relevant procedures. This Desk Instruction states the instructions which should be referred to and highlights only the modifications which are required for single source procurement, where there is a requirement for additional items from the same source

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction applies to Single Source Procurement, where there is a requirement for additional goods, works or services from the same source only. Single Source Procurement in other circumstances is covered by Desk Instructions 26A, 26B and 26C.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services.

Purpose of Procedure: Purpose of Procedure: Purpose of Procedure: Purpose of Procedure:

Single source procurement provides a procedure for concluding a contract, where additional goods, works or services must be procured from the same source as previous items, for reasons of standardisation or compatibility and there is therefore no point in conducting competitive procurement proceedings.

References:References:References:References:

Section 30(10)(d) and 36, Public Procurement Act, 2003.

Regulation 5.9.2, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Responsibilities for conducting each step in the single source procurement process are the same as for competitive methods of procurement and are stated on each individual Desk Instruction.

The Procurement Unit has the overall responsibility for conducting the procurement process, subject to IPC approval at specified points in the process. Technical inputs

Page 158: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 158 of 164

will be required from the end user at various stages, particularly in determining the need for standardisation or compatibility with existing goods, works or services, as part of the justification for using single source procurement.

StepStepStepStep----bybybyby----Step Instructions:Step Instructions:Step Instructions:Step Instructions:

In these step-by-step instructions, references are made to other Desk Instructions which apply. Where any Desk Instruction should be applied with modifications, it is referred to for “general guidance” and the appropriate modifications are outlined below.

236. Raise a requisition – see Desk Instruction 1 for guidance.

237. Prepare a description of the goods, works or services – see Desk Instruction 2A, 2B or 2C for general guidance. The description must refer to the original goods, works or services and the need for standardisation or compatibility.

238. Select the procurement method and plan the procurement – see Desk Instruction 3 for guidance. Identify the original supplier and prepare a detailed justification for use of single source procurement – see guidance note 1 below for the details to include. Seek approval from ODPP for use of single source procurement.

239. Where the estimated value exceeds MKw xxx, publish a notice in the Gazette, stating that single source procurement is being conducted and giving a brief description of the subject of the procurement.

240. Where the original contract has not been completed, contract the additional requirement as a contract amendment – see Desk Instruction 22 for guidance. The following steps are not required, but the procuring entity should continue to administer the amended contract.

241. Where the original contract has been completed, prepare a written description of the procuring entity’s needs, including the technical description of requirements, the additional quantity and the terms and conditions of the proposed contract. Parts of the standard bidding documents may be used as the basis for preparation of this written description. Obtain IPC approval for the description document.

242. Send the written description to the original supplier, requesting a written tender. No formal receipt or opening of the tender is required.

243. Evaluate the tender to determine whether it meets the procuring entity’s requirements - see Desk Instruction 13 and 13A, 13B or 13C, for general guidance. The detailed evaluation should focus on whether the tender meets the procuring entity’s technical requirements and whether the proposed terms and conditions of contract are acceptable to the procuring entity. The financial evaluation should consider, as far as is possible, whether the tender offers value for money, taking into account the unit prices of the original contract, the size of the additional requirement, the terms and conditions of the proposed contract, a breakdown of the costs involved and any other relevant details or circumstances. The evaluation must also assess whether the supplier is qualified.

244. Prepare an evaluation report, recommending whether the tender should be considered for contract award, whether negotiations are required or whether

Page 159: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 159 of 164

the procurement requirement should be cancelled or redefined. Obtain IPC approval for the recommendations.

245. Hold negotiations if required and obtain IPC approval for the negotiation results – see Desk Instruction 16 for guidance.

246. Send a notice of acceptance, if required, ensuring that all necessary approvals are obtained first – see Desk Instruction 18 for guidance.

247. Prepare a contract or purchase order document - see Desk Instruction 19A or 19B for guidance. The type of document used will depend on the value of the contract and the terms and conditions which will apply. Obtain IPC approval, and any other required approvals, and issue the document.

248. Administer and complete the contract – see Desk Instructions 21 and 23 for guidance.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Justification for using Single Source Procurement for Additional Justification for using Single Source Procurement for Additional Justification for using Single Source Procurement for Additional Justification for using Single Source Procurement for Additional Goods, Works or ServicesGoods, Works or ServicesGoods, Works or ServicesGoods, Works or Services

The justification for using single source procurement must be clear and comprehensive and include the following details:

� the grounds on which single source is to be used i.e. Section 30(10)(d) of the Public Procurement Act, 2003, the need for additional goods, works or services from the same source;

� the reasons why the goods, works or services must come from the same source e.g. spare parts or consumable items must be compatible with the original equipment and the use of substitutes would invalidate the warranty, the procuring entity is standardising on a particular type of vehicle, as it offers savings in costs for maintenance, stock-holding of spare parts and user training, an extension is required to a building and use of a different contractor would invalidate the original contractor’s liability for the building, additional computers are to be installed within an existing network and the use of a different supplier would invalidate the warranty on the whole network etc;

� details on the original contract, including the unit prices, quantity and total value of the contract and the performance of the supplier on the original contract;

� details of any additional requirements procured on these grounds;

� details of the quantity and value of the additional requirement and its value as a proportion of the original contract;

� information on whether the contract is still being performed, enabling an amendment to be issued, or whether a new contract is required;

� any other relevant details.

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Approval is required from ODPP to conduct single source procurement.

Approvals are required from the IPC at various stages, as specified in the applicable Desk Instructions detailed above.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

Page 160: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 160 of 164

Records of all stages of the procurement process must be kept on the procurement file, as detailed in the applicable Desk Instructions detailed above.

Next SNext SNext SNext Steps:teps:teps:teps:

This Desk Instruction summarises the complete process for Single Source Procurement, where there is a requirement for additional goods, works or services from the same supplier. Therefore, no other steps apply.

DDDDESK ESK ESK ESK IIIINSTRUCTION NSTRUCTION NSTRUCTION NSTRUCTION 28:28:28:28: SSSSUPPLIER UPPLIER UPPLIER UPPLIER QQQQUALIFIUALIFIUALIFIUALIFICATIONSCATIONSCATIONSCATIONS

Summary of Procedure:Summary of Procedure:Summary of Procedure:Summary of Procedure:

This Desk Instruction provides general rules on the qualification criteria to be met by suppliers who wish to participate in public procurement and the procedure for setting qualification criteria. It differentiates between:

� mandatory qualification criteria relating to the supplier’s compliance with basic legal requirements, which will apply to all contracts regardless of type, complexity or value; and

� additional qualification criteria relating to capabilities and capacity, which are applied to contracts of higher value and complexity and which are set according to the requirements of each individual contract.

Qualification requirements can be checked at any point in the procurement process, but are normally checked though either pre-qualification or post-qualification – see Desk Instructions 4A and 15 for further guidance. Where no pre-qualification has been conducted, mandatory qualification criteria are normally checked during the preliminary screening part of an evaluation – see Desk Instructions 13 and 14 for further guidance.

Applies to:Applies to:Applies to:Applies to:

MethodMethodMethodMethod: This Desk Instruction is of general application and does not apply to any particular procurement method. Suppliers are required to be qualified for any government funded contract, regardless of the procurement method used.

TypeTypeTypeType: This Desk Instruction applies to goods, works, routine services and consultancy services. Qualification criteria will differ for each type of procurement and guidance is given on each below.

Purpose of PrPurpose of PrPurpose of PrPurpose of Procedure: ocedure: ocedure: ocedure:

Qualification criteria are used to ensure that the Government of Malawi only awards contracts to suppliers who are:

� operating in accordance with applicable legal requirements; and

� capable of successfully performing the proposed contract.

ReferenReferenReferenReferences:ces:ces:ces:

Section 13 and 14, Public Procurement Act, 2003.

Regulation 4.1, 4.5 and 4.6, Public Procurement Regulations, 2003.

Staff Involved:Staff Involved:Staff Involved:Staff Involved:

Page 161: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 161 of 164

The Procurement Unit are responsible for setting qualification criteria and assessing whether suppliers are qualified, at the appropriate point or points in the procurement process. Qualification criteria will be set in consultation with the end user, to ensure that requirements relating to capability and capacity adequately reflect the needs of the contract.

StepStepStepStep----bybybyby----StStStStep Instructions:ep Instructions:ep Instructions:ep Instructions:

249. Decide, as part of the procurement planning process, whether the mandatory qualification criteria are sufficient or whether additional qualification criteria should be set – see guidance note 1 below for details.

250. Where additional qualifications are to be set, decide, as part of the procurement planning process, whether qualifications should be verified through pre-qualification or post-qualification. Where only mandatory qualifications are to be verified, this should normally be done through the preliminary screening part of the evaluation.

251. Prepare the qualification criteria and the documentation required from the supplier as evidence of meeting the criteria– see guidance note 2 below for examples of criteria and documentation required. Where appropriate, prepare qualification criteria and documentation requirements for subcontractors. Include them as part of the pre-qualification, bidding or request for quotations document, as appropriate – see Desk Instructions 4A, 6A or 6B for guidance.

252. Assess suppliers’ qualifications as part of the assessment of pre-qualification applications, preliminary screening and/or post-qualification, as appropriate – see Desk Instructions 4A, 13, 14 and 15 for guidance.

253. Disqualify any bidder who is found, at any time, to have submitted qualification information which is false, materially inaccurate or materially incomplete.

Guidance Note 1 Guidance Note 1 Guidance Note 1 Guidance Note 1 –––– Mandatory and Additional Qualification Criteria Mandatory and Additional Qualification Criteria Mandatory and Additional Qualification Criteria Mandatory and Additional Qualification Criteria

There are two categories of qualification criteria:

Mandatory qualificaMandatory qualificaMandatory qualificaMandatory qualification criteriation criteriation criteriation criteria apply to all contracts regardless of type, complexity or value. These relate to the supplier’s compliance with basic legal requirements and are designed to ensure that the government only does business with companies which are operating within the laws of Malawi, or their country of establishment. Verification of mandatory qualification criteria reinforces efforts by other government agencies, such as Malawi Revenue Authority, to enforce these laws. Mandatory qualification criteria include:

� that the supplier has the legal capacity to enter into the procurement contract i.e. the supplier is a legally registered company;

� that the supplier is not insolvent, in receivership, bankrupt or being wound up, their affairs are not being administered by a court or a judicial officer, their business activities have not been suspended and they are not the subject of legal proceedings for any of the foregoing;

� that the supplier has fulfilled their obligations to pay taxes and social security contributions;

Page 162: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 162 of 164

� that the supplier, including their directors or officers, have not been convicted of any criminal offence related to their professional conduct, corruption, or the making of false statements or misrepresentations as to their qualifications to enter into a procurement contract within a period of three years preceding the commencement of the procurement proceedings;

� that the supplier has not been debarred from participating in public procurement by the Director of Public Procurement; and

� that the supplier does not have a conflict of interest in the procurement requirement.

The supplier must also be registered with an appropriate body, such as the Registrar of Companies, the National Construction Industry Council of Malawi or any other prescribed body. Bidders may not be excluded from participating in public procurement if they are not registered, but may be required to register as a condition of contract award.

Mandatory qualification criteria will apply to the supplier, any joint venture partners and any subcontractors.

Additional qualification criteriaAdditional qualification criteriaAdditional qualification criteriaAdditional qualification criteria may be applied to contracts of higher value and/or complexity, if the procuring entity considers them necessary. These relate to the supplier’s capabilities and capacity to perform the contract and are designed to reduce the likelihood of awarding contracts to suppliers, who may default on a contract. Additional qualification criteria are set according to the needs of each individual contract and can include:

� that the supplier possesses the necessary professional and technical qualifications to successfully perform the contract;

� that the supplier has the necessary financial resources and condition to successfully perform the contract;

� that the supplier has the necessary equipment and other physical facilities to successfully perform the contract;

� that the supplier has the necessary personnel and managerial capability to successfully perform the contract; and/or

� that the supplier has a suitable record of past performance of similar contracts.

Additional qualification criteria may apply only to the supplier, jointly to the supplier and any joint venture partners or subcontracts or individually to each joint venture partner and/or subcontractor.

Guidance Note 2 Guidance Note 2 Guidance Note 2 Guidance Note 2 –––– Example Pre Example Pre Example Pre Example Pre----qualification Criteria and Documentationqualification Criteria and Documentationqualification Criteria and Documentationqualification Criteria and Documentation

The mandatory premandatory premandatory premandatory pre----qualification criteriaqualification criteriaqualification criteriaqualification criteria listed in guidance note 1 above may not be altered and are included in the standard documents. The standard documents also state the documentation required as evidence that the supplier is qualified, which includes:

� the supplier’s certificate of registration or incorporation or equivalent;

� the supplier’s VAT registration certificate or equivalent;

Page 163: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 163 of 164

� the supplier’s tax clearance certificate for the last complete financial year or equivalent.

Other mandatory pre-qualification criteria are addressed through appropriate declarations in the tender submission forms in the standard documents e.g. a declaration that the supplier has not been debarred from public procurement in Malawi, a declaration that the supplier has no conflict of interest in the procurement requirement etc.

Additional preAdditional preAdditional preAdditional pre----qualification criteriaqualification criteriaqualification criteriaqualification criteria must be prepared for each procurement requirement. The criteria should be limited to the minimum required to ensure that bidders are capable of performing the proposed contract. They must be specific and relevant to the procurement requirement and should not be excessive or designed to restrict competition unnecessarily. The criteria must be measurable and the documentation required as evidence that the supplier meets the criteria must be stated.

The following criteria are provided as examples only:

� that the supplier is financially sound, as evidenced by bankers’ statements, annual accounts etc;

� that the supplier has a cash flow of at least a specified amount, as evidenced by appropriate financial information;

� that the supplier does not have a history of contract non-performance, as evidenced by appropriate declarations;

� that the supplier does not have pending litigation which represents more than a specified percentage of its net worth, as evidenced by a declaration on all pending litigation;

� that the supplier has been manufacturing the goods or performing works or services of a similar type and value for at least a specified number of years, as evidenced by a list of contracts for the last number of years and/or references from previous contracts;

� that the supplier owns, or will be able to buy or hire, specified major pieces of plant or equipment, as evidenced by a declaration of plant or equipment owned or arrangements for purchase or hire;

� that the supplier has managers or supervisors with specified qualifications or levels of experience, as evidenced by curriculum vitae for nominated staff; or

� that the supplier has sufficient capacity to perform the contract, as evidenced by information on current contractual commitments, in relation to total manpower, plant, equipment and finances.

In preparing additional qualification criteria, the procuring entity must state whether they apply to the supplier, the joint venture or any sub-contractors. Separate criteria with lower requirements, are often applied to sub-contractors or the criteria are applied cumulatively to all parties involved, including joint venture partners and/or subcontractors.

Page 164: DESK INSTRUCTIONS FOR PUBLIC PROCUREMENTunpcdc.org/media/316597/odpp_malawi_desk...The Government of Malawi Desk Instructions for Public Procurement are intended to provide straightforward,

Page 164 of 164

Approvals Required:Approvals Required:Approvals Required:Approvals Required:

Qualification criteria will be approved by the IPC as part of the pre-qualification, bidding or request for quotations document – see Desk Instructions 4A, 6A and 6B for details.

Documents/Records Required:Documents/Records Required:Documents/Records Required:Documents/Records Required:

The qualification criteria will be recorded as part of the pre-qualification, bidding or RFQ document. Assessment of a supplier’s qualification will be recorded as part of the assessment of pre-qualification applications or the evaluation report. No separate records are required.

Next Steps:Next Steps:Next Steps:Next Steps:

This Desk Instruction provides general rules, which do not form a particular step in the procurement process.