DEP’s Role in Pipeline Permitting - WordPress.com...DEP’s Role in the Pipeline Process After...
Transcript of DEP’s Role in Pipeline Permitting - WordPress.com...DEP’s Role in the Pipeline Process After...
May 1, 2018
Society of Women Environmental Professionals (SWEP)
DEP’s Role in Pipeline Permitting
2
Agenda
1. What’s within DEP’s Role
2. What’s NOT in DEP’s Role
3. A Brief overview of the
Regional Permit
Coordination Office
3
DEP’s Role in the Pipeline Process
• Review and Issue Permits
–Chapter 102 Permit – Erosion and
Sediment Control – related to earth
disturbance during construction and
runoff management.
4
DEP’s Role in the Pipeline Process
• Review and Issue Permits
–Chapter 102 Permit – Erosion and
Sediment Control – related to earth
disturbance during construction and
runoff management.
–Chapter 105 Permit – Water
Obstructions and Encroachments –
mostly stream and wetland
crossings.
5
DEP’s Role in the Pipeline Process
• Review and Issue Permits
–Chapter 102 Permit – Erosion and
Sediment Control – related to earth
disturbance during construction and
runoff management.
–Chapter 105 Permit – Water
Obstructions and Encroachments –
mostly stream and wetland
crossings.
–State Water Quality Certification
(FERC-regulated projects only)
6
DEP’s Role in the Pipeline Process
• Other DEP Permits/Approvals:
–NPDES Permit for Discharge of
Hydrostatic Testing Water
• Clean Water Program
–Air Permits (e.g. Compressor
Stations)
• Air Quality Program
Call the respective regional office for
questions about these other permits.
7
DEP’s Role in the Pipeline Process
After Permits are Issued:
• Inspect permitted sites for
compliance with DEP permits.
• Ensure compliance with
regulations and permits.
• Pursue enforcement, when
necessary.
• Coordinate with other agencies*
as necessary. Construction Entrance
8
DEP’s Role in the Pipeline Process
• Work with other agencies at
pre-approval stage:
–County Conservation Districts,
–PA Fish and Boat Commission,
–U.S. Army Corps of Engineers,
–U.S. Fish & Wildlife Service.
9
DEP’s Role in the Pipeline Process
• Communicate with other
agencies during
construction:
–County Conservation Districts
–FERC
–PUC
–PHMSA
10
Not DEP’s Role in the Pipeline Process
• Determining Pipeline Route
–Proposed by the applicant – like any
other project.
–Market Driven
11
Not DEP’s Role in the Pipeline Process
• Determining Pipeline Route
–Proposed by the applicant – like any
other project.
–Market Driven
• Determining or inspecting for
Pipeline Safety
–DEP’s role is with regards to
environmental protection through our
regulatory authority.
–Falls under FERC, PUC and PHMSA
12
Regional Permit Coordination Office
• DEP’s Regional Permit Coordination Office (Est. May 2017)
Office of Program IntegrationDirector: Aneca Atkinson
Regional Permit
Coordination OfficeManager: Domenic Rocco
13
Regional Permit Coordination Office (RPCO)
Overall Mission
A centralized office providing
synchronized and consistent reviews
and approvals for general to complex
projects regulated under Chapter 102
and Chapter 105.
“Regional” “Permit” “Coordination”
REGIONAL:
• RPCO provides technical support on Ch. 102 and Ch. 105
permitting in conjunction with established bureau
personnel.
Permit CoordinationRegional
PERMIT
• Reviews and approves permit applications and their
companion plans (Ch. 102 and 105) for general to complex
projects.
– This may include multi-county/multi-regional projects
– FERC regulated projects, and
– Projects with complex engineering/geologic considerations.
Regional Permit Coordination
COORDINATION
• Assists with cross-program coordination and consistency
with the various Departmental Programs that have authority
to process permits/authorizations under Chapter 102 and
Chapter 105. (e.g. regional offices, Oil and Gas, Dam
Safety, Flood Protection, Mining, Conservation Districts)
Regional Permit Coordination
18
Status of RPCO
• Total of 15 positions
(engineers, geologist,
aquatic biologist, program
specialist)
• We are currently in the
midst of filling vacancies.
(10 out of 15)
• Staff Training
19
Contact
Regional Permit Coordination Office
Domenic Rocco, P.E.
Acting Environmental Program Manager
Department of Environmental Protection
Regional Permit Coordination Office
Rachel Carson State Office Building
400 Market St. | Harrisburg PA 17101
Phone: 717-772-5987
www.dep.pa.gov
20
Q&A