Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial...

28
Demand Based Control of Demand Based Control of Lab & Lab & Commercial Commercial Building Ventilation Building Ventilation ASU: Biodesign Institute ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar Masdar City, UAE: City, UAE: MIST 1A MIST 1A Garvan Garvan Cancer Cancer Center, Australia Center, Australia

Transcript of Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial...

Page 1: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Demand Based Control of Demand Based Control of Lab & Lab &

Commercial Commercial Building Ventilation Building Ventilation

ASU: Biodesign InstituteASU: Biodesign Institute

Bank of AmericaLargest LEED Plat.

Masdar Masdar City, UAE: City, UAE: MIST 1AMIST 1A

Garvan Garvan Cancer Cancer

Center, Australia Center, Australia

Page 2: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

The Statistics of Laboratory Energy UseThe Statistics of Laboratory Energy Use

Lab Energy Usage:

�5 to 10 times office usage

Example: Universities:

�2.5 to 10% sq. footage

�10 to 40% site energy usage

>65 % of lab energy: HVAC

In Singapore, HVAC load will typically be >80% of

lab energy!

Page 3: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

The Goal: Dramatically Reduce Lab Energy Use The Goal: Dramatically Reduce Lab Energy Use

Outside air use: Largest energy driver

� Reducing OA reduces many energy uses

– Supply fans, Heating, Cooling, Reheat, Exhaust fans

New technologies can help:

� Demand Based Control of ACH

� Chilled beams & hydronic/non-air cooling

Additionally codes are changing:

� New versions of NFPA 45 & ANSI Z9.5:

– Changes to the fume hood min requirements

Result: Labs can often run at 2 - 4 ACH

� May require combining multiple approaches

Like peeling layers of an onion, multiple approaches may need to be combined to dramatically cut energy use

Like peeling layers of an onion, multiple approaches may need to be combined to dramatically cut energy use

Page 4: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Achieving Down to 2 ACH Safely in LabsAchieving Down to 2 ACH Safely in Labs

Goal: Achieve 2 ACH day/night or 3Goal: Achieve 2 ACH day/night or 3-- 4 day4 day // 2 night2 night

What are the drivers of lab airflow that affect this?� Hood flows, thermal loads & ACH rates

Hoods Thermal Load

Ven

tila

tio

n r

at e

(cf m

)

Demand Based Control of ACH

VAV Hoods

ACH / Dilution Requirement

VAV Supply

2 ACH Min

To achieve lab flows down to 2 ACH to reduce energy & 1st

cost, all flow requirements need to be reduced

To achieve lab flows down to 2 ACH to reduce energy & 1st

cost, allall flow requirements need to be reduced

Min Flow

Min Load

Page 5: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Reducing the ACH Rate Flow Drivers:Reducing the ACH Rate Flow Drivers:

Min lab ACH often fixed at 6-12 ACH

� Typically becomes largest energy driver

However, lab air is clean > 98% time

But, events happen requiring >6ACH

� Dilute vapors from a spill

� Eliminate fugitive vapors

� Dilute vapors or particles caused by:

– Working outside the hood, improper storage

– No localized exhaust for instruments

– …….

There is no one ventilation rate that is right all the time!There is no one ventilation rate that is right all the time!

Demand Based Control

ACH Requirement

2 ACH Min

The “human” factor

Page 6: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Laboratory Demand Control Ventilation Laboratory Demand Control Ventilation

Vary min ACH rate by sensing room IEQ� If room air is clean, maintain low dilution airflow

�When contaminants detected, Increase airflow

Set min dilution level at 4 to 2 ACH�One option is run at 4 ACH occupied & 2 ACH unocc.

Set max dilution to 8 - 16 ACH for safest purge�Typically set max ACH to max capacity of VAV device

Critical piece: Sensing of IEQ parameters:�Lab TVOC’s, particles, RH, CO, & CO2

��Barriers to date: Cost effectivity & practicalityBarriers to date: Cost effectivity & practicality–– Sensor cost, long term reliability, & calibration exp.Sensor cost, long term reliability, & calibration exp.

New cost effective sensing approach required

Page 7: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

A Cost Effective Approach: Multiplexed SensingA Cost Effective Approach: Multiplexed Sensing

Lab Room 101 Lab Room 102 Classroom 103 Supply Supply Air Air

Reference Probe Reference Probe

Web Based User Web Based User

InterfaceInterfaceBMS Connectivity to BMS Connectivity to

command ACH command ACH

increase/decreaseincrease/decrease

Sensor Sensor

Suite with Suite with

TVOC, CO2, TVOC, CO2,

dewpoint & dewpoint &

particulate particulate

sensorssensors

Air Data Air Data

RouterRouter

Vacuum Vacuum

PumpPump

ServerServer

Room Room

Sampling Sampling

PortPort

Supply Air Duct

General Exhaust Duct

GEX Duct GEX Duct

Probe (typ.)Probe (typ.)

Air Data Air Data

RouterRouter

Page 8: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Normal Lab Operation w/ Lab DCV SystemNormal Lab Operation w/ Lab DCV System

VOC event sensed at GEX

ACH varies 4 to 12.7

Page 9: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Industry Recommendations on ACH Rates Industry Recommendations on ACH Rates

No codes other than ASHRAE 62.1

�At best for Univ/college labs: 1.2 ACH fresh air

Most fixed ACH values are being dropped:

�NFPA 45 - 2011: 8 Occ / 4 Unocc rates were removed

�ANSI Z9.5 does not advocate for any fixed rate:

– “An air exchange rate (air changes per hour) cannot be specified that will meet all conditions.”

– “Furthermore, air changes per hour is not the appropriate conceptfor designing contaminant control systems.”

Page 10: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

ASHRAE Handbook Provides New GuidanceASHRAE Handbook Provides New Guidance

New 2011 ASHRAE Handbook, Lab chapter 14:

� Occ/Unocc Control scope is being limited:

– “There should be no entry into the laboratory during unoccupied setback times”

– “…Occupied ventilation rates should be engaged possibly one hour or more in advance of occupancy to properly dilute any contaminants.”

� Active/Demand Based Control is recommended:

– “Reducing ventilation requirements in laboratories and vivariums based on real time sensing of contaminants in the room environment offers opportunities for energy conservation.”

– “This approach can potentially reduce lab air change rates down safely to as low as 2 air changes per hour when the lab air is ‘clean’...”

Page 11: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

2008 Lab IEQ Performance Monitoring Study 2008 Lab IEQ Performance Monitoring Study

Largest known study done to date

�1,500,000 lab operating hours analyzed

� 20 Million sensor data values recorded

18 different sites selected

�6 East, 7 Central, 3 West, 2 Canada

Over 300 different lab areas

�Research: Life sciences, bio, physical chem, etc

�Almost all low density labs w/ dynamic control

�3 animal facility sites

*ASHRAE Journal

Feb 2010

Page 12: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Average TVOC Levels at 18 Different SitesAverage TVOC Levels at 18 Different Sites

At ~0.2PPM, site value range: ~ .05% to 2.25%

Average for all sites

Significant savings at all sites

Page 13: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Avg. Differential Particle Levels at 18 SitesAvg. Differential Particle Levels at 18 Sites

At 1M PCF, Site value range:

~ 0% to 1.4%

Average Level

Data shows significant savings at all sites

Page 14: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar
Page 15: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Lab Case Study: Arizona State UniversityLab Case Study: Arizona State University

ASU Biodesign Institute Bldgs A & B Retrofit

� Retrofit of Labs and Vivarium

LEED® NC Platinum, R&D 2006 Lab of the Year

� Lab DCV pilot in 2007 to look for EE: 65% savings achieved

� Full building retrofitted in 2009: $1 Million saved annually

� Currently 24 buildings have been retrofitted:

– Office, classroom, library, & sciences bldgs plus sports arena and more

0 CFM

2,000 CFM

4,000 CFM

6,000 CFM

8,000 CFM

10,000 CFM

12,000 CFM

14,000 CFM

16,000 CFM

18,000 CFM

May-17 May-24 May-31 Jun-8 Jun-15 Jun-22 Jun-29 Jul-6 Jul-16 Jul-23 Jul-30 Aug-6 Aug-13 Aug-20 Aug-27 Sep-3 Sep-11

Exhaust CFM Supply CFM

Average Savings: 10,757 CFMIn 11 Zones (~8,000 ft2)

At $5.14/CFM annually= $55,290 annually= $6.91/ft2annually< 11 month payback!

Old Average Supply: 15,978 CFM

New Average Supply air : 5,221 CFM

June 4, 2007System

Activation

10,757 CFM Savings

Pilot Study

Results

Page 16: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Major Energy & Capital Impact for Near Zero LabsMajor Energy & Capital Impact for Near Zero Labs

Masdar City, Abu Dhabi - Largest net/near zero project

� Near zero emissions lab w/ Demand Control & chilled beams

– 150K m2 total, ~ 40K m2 of labs: MIST 1 A (Built) & 1B (Under const.)

� Projected total energy savings: $2 M $ or 9,000 MWh /year

– Labs operate at 2 ACH (day & night), purge up to 14 ACH

� Downsized mechanical system to save HVAC capital costs

� Cuts solar PV capacity by ~ 3.75 MW or ~$20M first cost!

MIST 1A: 50K sq. m., 15K sq. m labs

Page 17: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Other Case Studies using Demand Based Lab Other Case Studies using Demand Based Lab ControlControl

Acadia University

Arizona State University

Beth Israel Medical Center

Chicago Botanic Garden

Cal State Univ., Monterey

Cal Tech

Case Western Reserve Univ.

Colorado Sch. Of Mines

Children’s Hospital of Phil.

Dalhousie Univ.

Dartmouth College

Eli Lilly

Ferris State University

Food & Drug Admin. (FDA)

Ferris State University

Grand Valley State Univ

Harvard (HSPH)

Indiana/Purdue Fort Wayne

LabCorp – BioRepository

Masdar Institute (MIST)

Michigan State University

Midwestern University

Ministère de l’agriculture,

Montreal Heart institute

Nevada Cancer Institute

Ohio State University

Oklahoma State University

Rice University

SUNY Stony Brook

Texas Children’s Hospital

University of Cal Irvine

University of Iowa

University of Louisville

University of Pennsylvania

Univ. Health Network: MaRS

Van Andel Institute

Univ. of Louisville: Bio Med 3

UPENN:Carolyn Lynch Lab

UPenn: FisherUPenn: “Demand Based Control is our #1 campus

ECM”

UPenn: “Demand Based Control is our #1 campus ECM”

Page 18: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Singapore Singapore Example: Energy & 1Example: Energy & 1stst Cost AnalysisCost Analysis

Model typical bldg. w/ 12.5K GSM

�Lab & lab support area: 5K NSM

�Office area: 3K NSM

Base dilution ventilation:

�8 ACH occupied, 6 ACH Unocc.

Energy Cost Assumptions:

�Electric: SGD 0.20/kWh Avg

Low to moderate hoods:

�One 1.8m hood/ 62.5 sq.m. module

Uses Singapore weather data

� In Singapore dollars (SGD)

Page 19: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Singapore Example Analysis AssumptionsSingapore Example Analysis Assumptions

Room Temp setpoint:

�24 DegC cooling

�22 DegC Heating/reheat

HVAC System Eff:

�Cooling:

– Total COP of chilled water plant: 3.3

– Eff. Chilled Beam “COP”: 4.0

�Heating: electric

Typical thermal loading used

�80% of labs at 35 W/m2 avg.

�20% of labs at 60 to 90 W/m2 avg.

Page 20: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Baseline Energy Costs For Singapore ExampleBaseline Energy Costs For Singapore Example

Cooling dominates energy use: >60% of total

� Skin & solar gains typically small compared to OA

Assumes a VAV lab air controls w/ reheat

Total baseline energy use is SGD 1.6M

Page 21: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Energy Savings of DBC using 4 Day/2 Night ACHEnergy Savings of DBC using 4 Day/2 Night ACH

Demand Based Control reduces lab HVAC energy by $908 SGD or by 57%. Payback is 0.65 years!

Demand Based Control reduces lab HVAC energy by $908 SGD or by 57%. Payback is 0.65 years!

Page 22: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Potential First Cost Savings of 4/2 ACHPotential First Cost Savings of 4/2 ACH

Demand Based Control at 4/2 ACH reduces peak HVAC airflow by 18% or ~ $553K for ~ breakeven on first cost!

Demand Based Control at 4/2 ACH reduces peak HVAC airflow by 18% or ~ $553K for ~ breakeven on first cost!

Page 23: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Singapore Example with 55% Glycol LoopSingapore Example with 55% Glycol Loop

No savings for sensible HR, actually wastes energy due to increased pressure drop of coils

No savings for sensible HR, actually wastes energy due to increased pressure drop of coils

Page 24: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Savings using 75% Enthalpy Wheel Savings using 75% Enthalpy Wheel vs. vs. DBC 4/2 ACHDBC 4/2 ACH

Enthalpy wheel heat recovery (room exhaust only, no FH exhaust allowed) savings: $401K or 25% vs. $908K for DBC

Enthalpy wheel heat recovery (room exhaust only, no FH exhaust allowed) savings: $401K or 25% vs. $908K for DBC

Page 25: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Savings using DBC 4/2 Savings using DBC 4/2 ACH w/ 75ACH w/ 75% Enthalpy % Enthalpy WheelWheel

Added HR savings is $197K or 12.3% added reduction,Total lab HVAC energy reduction is 69%!

Added HR savings is $197K or 12.3% added reduction,Total lab HVAC energy reduction is 69%!

Page 26: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Demand Based Control Presentation SummaryDemand Based Control Presentation Summary

DBC is single greatest means to cut lab energy

�Lab HVAC energy can be cut by 40 to 70%

DBC is often >2X savings of best heat recovery

�Adding heat recovery to DBC also beneficial

DBC is also applicable to non-lab bldg & retrofits

�Healthcare, educational, commercial office, assembly

For a copy of the presentation: For a copy of the presentation:

contact Gordon Sharp at contact Gordon Sharp at

[email protected]@Aircuity.com

Questions?Questions?

Page 27: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Impact of Dynamic Control on Dilution RatesImpact of Dynamic Control on Dilution Rates

1.5 L spill of acetone in 200 sq ft lab room, 1 sq. m spill

After vaporized, dynamic system hits TLV in 20 vs. 60 min

After 2 hours dynamic control has dropped level to 2.6 PPM

� After 2 hours, 6 ACH system is at 302 PPM or 116 times higher!

0.0

1000.0

2000.0

3000.0

4000.0

5000.0

6000.0

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92

PP

M C

on

ce

ntr

ati

on

Time in Minutes

Spill Dilution Conc. vs Time with 2 ACH Min & 15 ACH Purge

6 ACH Baseline Threshold in PPM Dynamic: 5 Min. Dynamic: 10 Min. Dynamic: 15 Min.

Dynamic control approach is always less than 6 ACH baseline

15 min. detection time still better than

6 ACH baseline!

Lower initial ACH helps!

Page 28: Demand Based Control of Lab & Commercial … Gordon...Demand Based Control of Lab & Commercial Building Ventilation ASU: Biodesign Institute Bank of America Largest LEED Plat. Masdar

Impact of Air Velocity on Actual Yale Spill ResultsImpact of Air Velocity on Actual Yale Spill Results