Transcript of December 3-4, 2003 Green Bank GBT PTCS In Progress Review Future Development Program Kim...
December 3-4, 2003 Green BankGBT PTCS In Progress Review
Future Development Program
Kim Constantikes, Richard Prestage
2
PTCS / High Frequency Environmental Envelope
s s
3
Goals for October 2004/Early 2005
• Production Q-band (50GHz) operation (pointing/focus, surface efficiency/beamshape) under “benign” conditions.
• Extend Q-band capabilities to “normal” conditions.
• Prototype W-band (92GHz) performance under “benign” conditions for engineering commissioning of Penn Array Receiver.
4
Approach
• Incremental approach using combination of traditional techniques and innovative use of simple technology (temperature sensors, inclinometers, holography).
• Laser rangefinders in specific roles if needed.• Concrete intermediate deliverables.
• Attempting to correct for effects on timescales of ~1min or longer. No need to address >1Hz effects at this time.
=> No need for new control architecture yet.
5
Approach
Pointing/Focus
Efficiency/Beamshape
Instrumentation
Algorithms
Astronomical Measurements
Astronomical Measurements
Algorithms
Instrumentation
6
Instrumentation and AlgorithmsNew Instrumentation Existing Instrumentation/Techniques
Instrument/
Technique
Inclinometers Star Tracker Penn Array Receiver
Temperature Sensors
(struct. / air)
Quadrant Detector
Holography
(trad. / oof)
Laser Rangefinders
Algorithms/
Development
• Track irregularities• Wind lift/drag• Vibration
• Test 1” differential capability• Substructure rotations, e.g., primary
• Rapid beam maps•Surface improvements
• Quadrant Detector path• LRF GRI• Thermal imaging• Add sensors
• Residuals, stability • Wind• Vibration
• Extend over grav, temp, wind• Improve FEM• Surface Peak-up
• Beam expand• Pointing• Diode replacement• Surface / collimation improvements
Enable W-Band Performance Under Benign Conditionsand Q-Band Performance Under Normal Conditions
Prototyping, Commissioning Experiments and Transition to Production Capabilities
7
Phased Approach: Surface Improvements I
• Benign conditions only:– Static improvements at “geostationary satellite” (~rigging
angle) elevation: Holography.– Extend over elevation: Holography, FEM improvements.– Refined active surface control/data processing: Better
“knobs”
• Short campaign December?
• Extensive campaign February.
8
Phased Approach: Surface Improvements II
• Extended thermal environments:– Simple thermal corrections (more BUS sensors, thermal
imaging, models)– Astronomical “peak-ups”
• Prototype/Prepare during Summer 2004
• Highest priority for October 2004.
9
Phased Approach: Pointing
• Effects:– Az track irregularities– ~10s of seconds to minute timescale wind.
• Instruments:– Inclinometer– Star Tracker
• Complete/install instrumentation Spring 2004
• Prototype/Commission Summer 2004 (astronomical experiments at optical, C and X-band)
10
Other Items I
• Completion of current work:– Production version of dynamic temp corrections– Production version of thermal stability monitor– Prototype installation of inclinometers
• Active Surface Control System Upgrade:– Need to refactor Active Surface manager for flexible,
convenient control (e.g. Zernike polynomials, SOAP)
• Antenna Manager Improvements:– Completion of pointing/focus model work– Trajectory calculation improvements– May need dynamic corrections to subreflector (0.1 Hz)
11
Other Items II
• Need to be able to characterize conditions for high-frequency observing:– Site Interferometer– Radiometer– Climate
• Cannot address these with resources currently available to PTCS group
12
Summary
• Address performance improvements incrementally.– Productionize thermal improvements– Development priorities: Wind, az track, surface phase I
• We have the real antenna available to us – use it!
• Many original concerns have turned out to be less important than expected.
• Only need to address << 1Hz effects in coming year.
13
Schedule
Q4 2003
Production versionsDynamic pointing/focus
Static Surface Accuracy improvements
Pointing Instrumentation/Techniques
Q-band under normal conditions
W-band under benign conditions
Pointing CommissioningExperiments/
production useSurface Improvements II
Production Q-band, Engineering W-band for winter 2004
Q1 2004 Q2 2004 Q3 2004