Transcript of Proposed Changes to PTCS Air Source Heat Pump Specifications April 18, 2006 RTF Meeting Bob Davis,...
Proposed Changes to PTCS Air Source Heat Pump Specifications
April 18, 2006 RTF Meeting
Bob Davis, Ecotope
Overview of Changes
• PTCS Provider requirements/duties enumerated (major addition)
• Technician reporting requirements more completely described
• Duct location designation made more generic• Controls section slightly expanded and clarified• Refrig. charge section expanded and clarified• Wording changes added throughout to distinguish
between new installs and service
PTCS Provider Reqs
• Expanded Section 1• Text addresses PTCS
Provider role– Training on specs
– Data mgmnt
– Tech registry
– Data review
– Field QA
Duct Language Changes
• Section 3.2
• Unconditioned/cond-
itioned space language taken out (left up to specific programs to define)
• New section 8.2.3 says new duct systems should meet PTCS tightness requirements
Controls Changes/Addition
• Was Section 4.3/4.4; now Section 5• Aux heat staging/sequencing language removed• Added sentence to clearly specify no aux heat
allowed in Stage 1 call• Single capacity compressor: added explicit
sentence saying discharge air sensor control not allowed
• Multi-stage compressor: added option to allow discharge air sensor staging temperature warmer than 85° F (current req) as long as ODT is installed
Refrigerant Checks (formerly Section 5.4, now Section 7)
• Complying methods now more specific:– Operating pressures (year-
round)– Capacity check (ditto)– Superheat/subcooling
(summer)
• Documentation– CheckMe– ACRx– New HP start up form– “other approved method”
Summary
• Recommend acceptance of revised/amended HP specs
• Need to come up with language for dual-fuel “hybrid” systems
• Need to revise/amend ground/water-source HP specs