    1/31

    Car Barn Training Center

    U.S. Commission of Fine Arts

    Concept Design Presentation February 21, 2013

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    2/31

    February 2013 - 2

    Concept Redesign

    The preliminary design concept was presented to the Historic Preservation Review Board on November 1st,

    and the Commission of Fine Arts on November 15th.

    Following these first reviews, and in response to comments received from HPRB and CFA, DDOT directed the

    DC Streetcar Program Management Team (PMT) to assume the design work from the Design Build Team (DBT).

    January 9th Work Session - HPRB, CFA, DDOT, Design Team Review of previous comments received by HPRB and CFA, and discussion on potential design directions

    January 23rd Work Session - HPRB, CFA, DDOT, Design Team

    Presentation and review of 3 alternative concepts addressing site improvements, landscape, architecture, materials and

    notion of civic

    Preference for the contained scheme that relocated the entry to the southwest of the building was the group consensus

    deserving further development

    January 31st Work Session - HPRB, CFA, DDOT, Design Team

    Review of 3 further developed architectural and landscape concepts Podium, Punched and Lateral.

    Attributes of all 3 concepts were identified as having strengths.

    Staff recommended refining concepts into 2 concepts for submission to HPRB and CFA.

    Upon receiving concept approvals, DDOT will direct the PMT to develop bridging documents that will be

    provided to the DBT.

    The PMT will be providing oversight of the DBT through development of the construction documents and

    construction of the facility.

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    3/31

    February 2013 - 3

    Project Site

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    4/31

    February 2013 - 4

    Previous Submission

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    5/31

    February 2013 - 5

    Previous Submission

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    6/31

    February 2013 - 6

    CFA and HPRB Review Comments

    Summary of Comments:

    The CFA and HPRB accepted the location.

    Sensitive landscape and infrastructure design is essential.

    Building design and massing should be simplified. Design needs to be more civic.

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    7/31

    February 2013 - 7

    Campus Context

    Spingarn

    Phelps

    Brown

    Young

    Langston Terrace

    Site

    Langston Golf Course

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    8/31

    February 2013 - 8

    Site Context and Design Response

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    9/31

    February 2013 - 9

    Site and Infrastructure Design

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    10/31

    February 2013 - 10

    Streetcar Yard Materials

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    11/31

    February 2013 - 11

    Streetcar Yard Materials

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    12/31

    February 2013 - 12

    Low Impact Development / Stormwater Management

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    13/31

    February 2013 - 13

    Landscape Materials - Trees

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    14/31

    February 2013 - 14

    Landscape Materials Vines and Green Screens

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    15/31

    February 2013 - 15

    Architectural Concepts

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    16/31

    February 2013 - 16

    Site Understanding

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    17/31

    February 2013 - 17

    Conceptual Floor Plans

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    18/31

    February 2013 - 18

    Architectural Concepts

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    19/31

    February 2013 - 19

    Aerial View Looking North

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    20/31

    February 2013 - 20

    Conceptual Building Sections

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    21/31

    February 2013 - 21

    Building Elevation Benning Road

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    22/31

    February 2013 - 22

    Building Entry

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    23/31

    February 2013 - 23

    Building Elevation 26th Street NE

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    24/31

    February 2013 - 24

    Building Elevation West Side and Entry Approach

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    25/31

    February 2013 - 25

    Building Elevation North Side / Wash Bay

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    26/31

    February 2013 - 26

    Architectural Materials

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    27/31

    February 2013 - 27

    View from Benning Road

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    28/31

    February 2013 - 28

    Landscape Design Building Entry

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    29/31

    February 2013 - 29

    View from Benning Road and 26th Street NE

    Scheme 1 Vertical / Civic

    Scheme 2 Horizontal / Podium

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    30/31

    February 2013 - 30

    Campus Context

    Benning Road and 26th St. NE Elevations

    Scheme 1 Vertical / Civic

  • 7/29/2019 Dcstreetcar Cbtc Cfa 021813

    31/31

    February 2013 - 31

    Questions?