JCOMM TR No. 48 -JCOMM Pilot Project for WIGOS, Project Report
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support...
-
Upload
charity-harper -
Category
Documents
-
view
214 -
download
0
Transcript of DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support...
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1)
JCOMM in situ Observing Platform Support Centre
• Most developments now achieved– Infrastructure in place
• Database, GIS, application servers
– Software developments
⇒ Centre is operational
• Developments are ongoing• Excellent synergy between DBCP&SOOP, Argo TCs
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (2)
• Presently fully supported:– DBCP– SOOP– Argo
• Marginal support to:– GLOSS– SOT
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (3)
Developments during intersessional period
• New web site– Apple Xserve G5 2.3 GHz server– Graphic design– Ergonomics– Compatibility with AIC– DBCP & SOOP web site directory structure integrated– Comprehensive information available– Buoy metadata collection system– New monitoring tools
• Platforms, ships, WMO numbers, GTS stats• Buoy monit. Stats, last GTS obs.• Life-time stats.• Map of barometer drifters by country
– Quick search (platforms, contacts, news, documents)
• New mapping system– Global equal cylindrical projection– Universal polar stereographic projection (N. & S.)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (4)
Web site structure
• Implementation• Monitoring• Map room• Instrumentation• Data
Plus quick links– News
– Platforms
– Contacts
– Documents
– Meetings
– Gallery
– Links
– Help
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (5)
Web site structure
• Implementation– DBCP, SOOP, Argo
– Requirements (e.g. WWW, GCOS-92)
– GTS
– Deployment opportunities
– Manufacturers
– Satellite data telecommunication
• Monitoring– Status
– Platform query
– GTS monitoring
– Quality information
…
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (6)
Web site structure
…• Map room
– Dynamic
– Static
– Lists of typical maps
• Instrumentation– Manufacturers
– Metadata
– Standards
– Instrument evaluation
• Data– How to get data
– GTS
– List of data centres
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (7)
Universal Polar Stereographic Projection (S)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (8)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (9)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (10)
Monitoring system for Argo
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (11)
Integration of observing systems
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (12)
• Much discussion on SOT coordination since JCOMM-I
– SOT-I, II, II
– OCG-I, II, III
– DBCP-20
– JCOMM/MAN-IV, Paris, Feb. 2005
– JCOMM-II, Halifax, September 2005
• Outcome
– JCOMMOPS potential recognized
– JCOMMOPS or Member states providing services
– Additional resources might be needed
– Identified activities and functions for JCOMMOPS itself
• Monitoring tools, e.g. VOS global distribution
• Metrics on ship performances for AP, SST
• Performance indicators on timeliness of ship reports
– New ToR proposed by OCG for JCOMMOPS
Support to Ship Observation Team (SOT)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (13)
new Terms of Referencesfor JCOMMOPS
(endorsed by JCOMM-II)
Under guidance of OCG;Following direction of DBCP, SOT, AST, and ET/SDR*:
(i) Act as a focal point for implementation & operation of obs. systems, and provide assistance to platform operators for free and unrestricted data exchange (telecom. systems, formats, clarifying & resolve issues);
(ii) Maintain information on data requirements (GOOS, GCOS, WWW);
(iii) Gateway for information on instrument deployment, servicing opportunities, contact information;
(iv) Provide information on observational programmes, e.g. instrumentation, instr. Evaluation, data quality.
* JCOMM-II required to add support ot ET on Satellite Data Requirements
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (14)
Future funding for JCOMMOPS
• Goal: Secure long term funding and widen participation
• JCOMM-II recommendation
– OCG to investigate establishing budget line under JCOMM trust
fund for
• JCOMMOPS development & operations
– Secretariats to investigate with funding Members/Member
States
• DBCP, SOOP & Argo contributions made through JCOMM trust fund ?
– Decision by MAN during intersessional period