DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison...

11
DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa10GE board (needed for Mark 5C and e-VLBI) 3) Status of DBBC company "HAT-Lab"

description

Autocorrelation DBBC Autocorrelation DBE

Transcript of DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison...

Page 1: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

DBBC Status Report

1) Summary of firmware development and results of tests and Haystack comparison

2) Status of FiLa10GE board (needed for Mark 5C and e-VLBI)

3) Status of DBBC company "HAT-Lab"

Page 2: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

All the hardware completedFirmware Team (IRA, MPI, Arcetri)New firmware for Core2 in down conversion

configuration:- xx.99 problem solved- fringe amplitude with still

dependence on the IF amplitude levels: improvement

under development by a dedicated working

teamNew firmware for Core2 in fixed tuned wide

band:- Fully developed - Successful compatibility test with Haystack

DBEon May 5

Page 3: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

Autocorrelation DBBC

AutocorrelationDBE

Page 4: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

Cross-Correlation

DBBC/DBE

512-1024 MHz16x32 MHz ch

Page 5: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

FILA10G Ethernet Interface

Hardware complete (2 XFP + 2 SFP)Firmware Working Team (IRA, MPI,

Metsahovi, SHAO)Firmaware on prototype now running in one

board2 x 4.096 Gbps bidirectional (with std VLBI clock)2 x 8.192 Gbps bidirectional (with std VLBI clock)protocol UDP/IP with VDIF

Output on 2 optical fibers and 2 copper (1 Gbps ea.)

Developed additional interface Optical-CX4 (copper ) for MK5C

Page 6: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

HAT-LABSpin-off company approved by INAF on April

30Agreement between HAT-Lab / INAF / MPI

BonnAdditional bureaucracy still running, the

spin-off not still operational until completion of all the procedures

Requests can be addressed also now to the contact:

Dr. Danilo Arena, email: [email protected]

Orders already pending for AuScopeProduction capability is about 4 systems / 4

monthsEVN production scheduling required

Page 7: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

General DBBC very flexible in number of IF input and output

Input and output can be copper and/or optical fibers

Examples: 2 IF (512 MHz ea.) 8 BBCTot. 27.1 K€

2 IF (1024 MHz ea.) 8 BBCTot. 30.7 K€

FILA10G 5.5 K€1 XFP (optical) 0.8 K€

4 IF (512 MHz ea.) 16 BBCTot. 44.7 K€

2 IF (1024 MHz ea.) 16 BBCTot. 40.5 K€

FILA10G 5.5 K€1 XFP (optical) 0.8 K€

Page 8: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

DBBC

VSI1 -> 8

10G1 -> 8

GENERIC DBBC SYSTEM

FS PC or terminal

10G1 -> 16

10 MHz1PPS

1 –> 32 tunable bbcs (U&L)1 –> 8 polyphase (15 U/L ea.)

to MK5B/+

to MK5C

Page 9: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

DBBC Rx

Coax Bwd 512/1024 MHz 2 VSI

1

10G 1

VLBA(analog)-like System

FS PC or terminal

10 MHz1PPS

8 tunable bbcs (U&L)

to MK5B/+

to MK5C

Base 9.5 K€2 CoMo 4.2 K€2 ADB1 4.4 K€2 Core2 9.0 K€Tot. 27.1 K€

Base 9.5 K€2 CoMo 4.2 K€2 ADB2 8.0 K€2 Core2 9.0 K€Tot. 30.7 K€

FILA10G 5.5 K€1 XFP (optical) 0.8 K€

Page 10: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

DBBC Rx

Coax Bwd 512/1024 MHz 4/2 VSI

1

10G 1

GEO-like System

FS PC or terminal

10 MHz1PPS

16 tunable bbcs (U&L)

to MK5B/+

to MK5C

Base 9.5 K€4 CoMo 8.4 K€4ADB1 8.8 K€4 Core2 18.0 K€Tot. 44.7 K€

Base 9.5 K€2 CoMo 4.2 K€2ADB2 8.8 K€4 Core2 18.0 K€Tot. 40.5 K€

FILA10G 5.5 K€1 XFP (optical) 0.8 K€

Page 11: DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

DBBC Rx

Coax Bwd 512/1024 MHz 8/4 VSI

4

10G 2

FS PC or terminal

10 MHz1PPS

1 –> 8 polyphase (15 U/L ea.)

to MK5B/+

to MK5C

VLBI2010 GEO-like System