DATE ISSUED: August 26,2009 REPORT NO. 09-090
Transcript of DATE ISSUED: August 26,2009 REPORT NO. 09-090
DATE ISSUED: August 26,2009
REPORT NO. 09-090
ATTENTION:
Committeeon Land Use & Housing
Docket of September2,2009
SUBJECT:
Development ServicesDepartment Fee Proposal
REOUESTED ACTION:
Recommend City Council approves development review user fees to provide full cost recovery
to mandatory regulatory review and inspection services, and to meet service level standards.
STAFF RECOMMENDATION:
Approve the revised fees.
ENVIRONMENTAL IMPACT:
This activity is not a "project" and is therefore not subject to CEQA pursuant to State CEQA
Guidelines Section 15060(c)(3).
BACKGROUND:
The City's development review and inspection services are operated without general fund
subsidy as an EnterpriseFund. Development Service's customers pay for the department's
operating costs similar to most businesses. The level of servicethe departmentis able to provide
is directlyrelated to the fees charged. In addition, State law requires that the fees charged "shall
not exceed the estimated reasonable cost of providing the service" (California Government
Code).
The Building Inspection Enterprise Fund1was created in 1985. All development and building
inspection related activities have been included in the fund sincethe Council approvedthe
de&rtment7s last fee study in 2003.
I Now the "Development Services Enterprise Fund."
As noted at the time of the fiscal year 2008 budget hearings, a comprehensive review of the
department's fees was planned to reevaluate them in light of changes in operating costs, changes
in regulations, and improvements made to departmentprocesses. This report contains fees based
on the results of the fee study performed by the City's consultant, Wohlford Consulting,
SacramentoCalifornia (Attachment No. 1 -A copy of the entire Fee Study is available for
viewing in the Office of the City Clerk).
The fees are proposed to support service levels for high quality and timely plan check and
building inspection; to support s p i c e s that meet state and local law mandates; and to fully
recover department operating costs.
Customer service standards have been established sincethe inception of the Enterprise Fund
(Attachment No. 2). The department has continued to work with rate payers to refine these
measures to meet their needs. Development review and building inspection scl~edules that are
followed by these measures affect customer development costs many times more than the cost of
the review and inspection process itself. Reduction in the department's level of service can
increase time-sensitive financing, lead to costly construction delays, and increased land carrying
costs. Proposed fees support these specific review and inspection service levels expected by
building owners and the industry. In addition, proposed fees support the appropriate staffing,
resources, and training costs to meet the department's mission to protect the public safety, health,
and welfare.
DISCUSSION
The last fee analysis for the department was performed in fiscal year 2003 and resulted in a 27%
fee increase. Over the past 6 years, the department used this fee increase to implement computer
system improvements such as our geographic information system mapping, project tracking
system, interactive voice response inspection scheduling system, and handheld inspection data
entry. The past increase also allowed the department to increase staff training, carry out
customer service initiatives, establish a small business liaison, and return the department's
reserves to an established goal of 7% of the Enterprise Fund's annual expenses.
Followingis a description of the department's current condition, adjustments the departmenthas
made to reduce costs and to operatemore efficiently, and a description ofthe proposed fees to
restore the level of service that department customers expect.
Current Condition
Since the fiscal year 2003 fee adjustment, the department's work load, as represented by the
value of construction (valuation), increased from $2.01 billion in FY 2003 to 2.2 billion in FY05.
Since then, overall valuation has declined to an estimated $750 million in FY 2009 as a result of
the economicdownturn. Staffing has followed this same pattern going from 435 filled positions
in FY03 to 525 filled positions in FY 05. Filled positions, through two reductions in force and
attrition, have been reduced to 305 filled positions at the end of FY09. Further reductions in the
next two months are also necessary to respond to a significantdecline in workload and revenues
over the last four periods of FY09 and projected future declines in FYlO based on the current
economy.
During this same time period, the department has been required to absorb increases in
expenditures which were not automaticallycaptured through fee increases. Examples include a
4% salary increase in July 2007; annual charges for General Government Service Billing
resulting in an increase of 211% (over $2 million) from FY 2004 through FY 2010; fringe related
costs such as Other Post Employment Benefits (OPEB), Unfunded Accrued Actuarial Liability
(UAAL), retiree health contribution, City Employee Retirement System retirement contribution;
and EM Cost Allocation associated with the new citywide financial system. In addition, new
regulations and standards have required additional staff time for plan review and inspections as
part of the permitting process. The department has controlled overall expenses by not filling
positions that became vacant, by drawing down the department's fee stabilizationreserves, by
eliminatingtraining, and by implementing various cost controls and efficiencymeasures.
The department finished FY 2009 in a negative fund balance. At the current rate of workload
decline and lack of full cost recovery, the department, without drastic action, anticipates a
continued loss in FY 2010.
Cost Controls and EfficiencyMeasures
Data from the project tracking system fully implemented during FY03 shows a steady increase in
productivity by staff since tbe last fee increase. Annual reviews performed per staff person have
grown from 107 per employee in FY04 to 179 per employeein FY09. Annual inspections
performed per staff member over this sameperiod have grown from 191 per person to 408 per
person in FY09.
The department has also been able to achieve and maintain its key performance measures
including review and inspection schedules and customer service standards. Since the full
implementation of the project tracking system, staff improved in meeting establishedproject
review times 71% of the time in FY04 to 89 % of the time in FY09 (where the performance
standard is meeting established review targets 80% of the time). Inspection staff improved in
meeting their next day inspection performance goal 93% of the time in FY04 to 95% of the time
in FY09 (where the established goal is performing 90% ofinspections next day).
Improvementswere made to help facilitatethese efficiencies. Completion of the automated
tracking system helped the department's employees and project customers to better manage their
workloads and their projects. It also improved the department's accountability in meeting
established performance standards for our core services. Using standard cell phone technology,
the department has also provided inspectors with direct access to the tracking system to enter real
time inspection results. The Department is expanding this capability into Field Engineering (in
the Engineering and Capital Projects Department) and Neighborhood Code Compliance
Division. This teclmology allowed the departmentto eliminate data entry positions and provide
more flexibilityto customers on inspection scheduling. Additional improvements have been
made including expanded E-Permitting options (increased fiom 2,700 annually in FY03 to 4,300
issued annually in FY09) and a full range of information and forms on DSD's website (over
45,000 web visits per month). This helps reduce customer contacts and saves project applicants
from having to drive downtown or to our Ridgehaven office to obtain these services. In addition
to offeringbetter and smarter services, these new automated systems have allowed the
department to eliminate old "legacy" systems and better gage actual workload.
Other improvementsmade over the past few years include expanded over the counter services,
consolidated reviews, self certification, and municipal code cl~anges that have reduced permit
process levels and complexity for certain project G e s . Many ofthese changes resulted from
ideas and input from our LU&H Technical Advisory Committee (TAC), our employees,and
from the Business Process Reengineering (BPR) effort. These improvements combined with
our automation enhancements have allowed us to continuemeeting service levels, maintain
quality standards, and enhance customer service. In fact, the department was recently
recognized by the University of North Carolina benchmarking stud? as one of the top 3
development service departments in the country for innovation and services.
DSD is also committed to fully implement BPR recommendations that enhance accountability in
project management,project review, and management of project costs. The Departmentwill also
work to further enhance past improvementsthat include strengthening the authority of the
development project manager, furthering quality control, expanding self certification, and
enhancingbilling statement processes. The goal of these future efforts, working closely with the
TAC, will be to improve project review time and cost certainty for applicants and to reduce
department overhead costs.
Fee Proposal
Department workload and operating costs were reviewed by Wohlford Consulting to determine
the department's level of cost-recoverability. In order to develop a fee proposal, the fee
consultant and the department did extensive analysis of performance data, operating costs,
workload, and staffing to develop a fee proposal that would meet performance standards and
reflect the cost of that service. Based upon this analysis, both fee increases and decreases are
being proposed. A comparison of prototype buildings following the model establishedby the
Building IndustryAssociation for their annual fee surveyprovides an overview of the changes
(Attachment No. 3).
One objective of the fee analysis was to simplify and reduce the number of fees currentlyused.
DSD currently has 1,414 fees (AttachmentNo. 4) and has consolidated the number of fees in the
new fee schedule to 494 (AttachmentNo. 1). As an example, existing categories of fees such as
offices, medical offices, public building office, banks, etc. were collapsed into one fee category -
Business.
Fees were also created to correspond with construction practices such as the new
Foundation and Frame category. This methodology is comparable with industry assessment of
construction activities nationwide.
Similarto the department's last fee study, a square footage model using hourly charges and staff
time spent on each project type was followed. A comprehensive analysis was done by assessing
Development Review in Local Government: Benchmarking Best Practices, published 4/24/09 as a joint venture of
the University Of North Carolina School Of Govenunent and the Alliance for Innovation.
4
and developing time estimates for each activity performed by the department and using volume
counts (e.g., how many fees are charged in a year) for each of those activities to determine total
costs associated with performing that activity. Efficiencies implemented over the past 6 years
(project tracking system, web based permitting, increased over the counter services, and
handheld devices for inspection entry) were also factored in. The analysis was done using
calendar year 2008 workload data. The recommended fees presented in the study reflect the full
cost of providing the individual services.
As part of the City Council's recently completed budget process, employees agreed to a 3
percent salaryreduction and to pay for 3 percent of a retirement benefit previously picked up by
the City. In light of this, DSD's consultant has revised the proposed fee scheduleto reflect this
reduction in cost.
By using the same annual activity volumes and multiplying them by the current fees, the fee
consultantwas able to establish the potential revenue from current fees and comparethem to the
proposed. The difference between the two figures is the proposed fee to current fee "gap." The
followingtable shows this analysisbetween the current fees and the proposed new fees.
The cost analysis revealed that the current fee structure recovers approximately 86% ofthe cost
to provide the fee-related services. The recommended fees presented in the study reflect the full
cost of providing the individual services and bringing department reserves to 7% of expenditures
- consistentwith the City's Reserve Policy - over a 5 year timeframe.
At the recommended
fees, the cost recovery rate would increase to 99.9%. The analysis also revealed that some of the
current fees for New Construction (plan check and inspection combined) are less than the full
cost of providing the services,while other fees are currently higher than full cost. Adoptingthe
proposed fee schedule would result in bringing the fee for each service into better balance with
actual costs.
Mechanical,Plumbing
and Electrical
TOTALS:
Because this proposed increase in fees is a result of increased costs that have occurred since the
last fee study, the department is recommendingthat this fee proposal also include an annual cost
inflator that would increase or decreasebased on changes in staff costs (salary and fringe) and
overhead rate (as determined by the Ofice of the City Comptroller). By including this
automatic inflator, future changes in fees would occur gradually, thereby avoiding significant
changes in future years. The proposed change would occur at tlle beginning of each Fiscal Year.
$ 2,559,983
$ 27,267,285
$ 3,382,431
$ 30,014,356
$ 822,447
$ 2,747,072
32%
10%
If approved by Council, the effective date for new fees will be no sooner than sixty days after the
Council action according to California State Code.
FISCAL CONSIDERATIONS:
Because of increased operating costs and the increased complexityof building regulations
administered by DSD, costs of providing the same level of service in plan check and inspection
activities have increased.
Without a fee increase and using conservative revenue estimates, the department would
anticipate the need to further reduce staffing levels by 30 percent (90 employees), primarily in
the building plan check and inspection service areas. Overhead functions such as managing code
updates, providing records to the public, and other non-fee services such as early assistance
would also be drastically cut. Due to the anticipatedbacklog of review and inspection requests
that would occur, DSD estimates that review turnarounds would increase initially by 5-10
business days for typical projects and inspection turnarounds would increase by 2-3 business
days.
If servicerequests stabilize or begin to increase, these performance standards would be further
degraded due to lack of ability to fund staff levels to keep up with workload and backlog. In
addition to the reduction in core service area performance, degradation in quality of review and
inspection functions is anticipated. Based upon the recent reductions in force, the department
has already had to reduce staff in certain areas of expertise and in some instances only one staff
member within review disciplines remain. With future staff reductions, retirements, and
attrition, this could leave the departmentwithout critical expertise and a decline in the quality of
project review and inspection. Options such as allowing state registered project consultants to
self certify their own design and constructionwork would have to be employed.
Even with the proposed fee increases, additional reductions in force will be necessary because of
work volume declines and past fiscal year deficits.
PREVIOUS COUNCIL and/or COMMITTEE ACTION:
As part of the City's FY 10budget deliberations, the Office of the IndependentBudget Analyst
and City Council Budget and Finance Committee recommended that the Development Services
department fee study be completed as quickly as possible and brought forward for full Council
consideration.
COMMUNITY PARTICIPATION AND PUBLIC OUTREACH EFFORTS:
Drafts of the proposed fee study were provided to stakeholderand public interest groups
(Attachment No. 5) on May 22,2009 for review and comment. This was discussed at the
Technical Advisory Committeemeeting on June 10,2009, July 8,2009, and on August 12,2009.
The Committeemade the following motion at their last meeting and it passed by a vote of 8-2-1:
"The LU&H Technical Advisory Colnmittee (TAC) recommends approval of DSD's fee study."
Separate fiom the fee study motion, TAC made the additional motion that passed by a
unanimous vote:
"TAC recommends that DSD continue to be vigilant in moving forward with improvements that
increase accountability,predictability, efficiency, and effectiveness of the developmentprocess."
KEY STAKEHOLDERS AND RROJECTED IMPACTS:
Key stakeholders are the individuals and organizationsthat rely on the department for project
review, permitting, and inspection services for development projects. Approval of this
recomlnendation will allow the department to restore performance levels for the core services
offered by the department. It will allow the department to increase training to established
performance goals and continue to enhance customer service initiatives.
CONCLUSION
In conclusion, the last fee study and approved increase for these fees was completed in fiscal
year 2003. Since that time, the department's labor costs and overhead have increased
significantly. While workload is down, the department had matched this decline by eliminating
more than 37% of its staffing. The department has met its key performancemeasures during this
time while increasing staff productivity.
The fees proposed are necessary to maintain the quality of review and inspection; restore
department's performance and service levels; and enhance the fiscal health of the enterprise
fund. Alternatively, the Council may choose not to adopt some or all of the proposed fees or to
direct that changes to regulatory requirements be made to provide additional staff capacity. If a
no change alternativeis adopted,the departmentwill need to further cut its services,reduce its
existing workforce, and control expendituresaccordingly.
~ e s ~ e c f l l ~ submitted,
Development ServicesDirector
Chief OperatingOfficer
KGB
Attachments:
1. Proposed Fee Schedule
2. Customer ServiceReview Standards
3. Fee Change Comparison
4. Existing Fee Schedule
5. org anikons Notified
6. Miscellaneous Fee Change Comparison
LUBH -Attuchmant 1 -FINAL RESULTS WORKSHEETS - Aug 20 09
NC Fce Scheduic- PC
Cfry Lisa" oiogo
BUILDING COST OF SERVICES [FEE) STUDY
ATTACHMENT I
Davnlopmant SOWISLS Dewmmn t
I PLAN CHECKVARIABLEFEESCHEDULE FORNEW CONSTRUCTION
-
Page 1 of 23
LUSH - Atlachrnenl 1 -FINAL RESULTS WORKSHEETS -Aug 2008
NC Fcs Scheduie-PC
c1ry or san olego
BUILDINGCOST OF SERVICES (FEE) STUDY
ATTACHMENT 1
Dcvelopmrnt saw1s.r Depamcnt
PLAN CHECKVAF3ABLE FEESCHEDULE FOR NEW CONSTRUCTION
-
Wohlhrd conavlking page 2 of 23 Run: 812012009
LUSH -Attachment 1 - RNAL RESULTS WORKSHEETS -Aug 20 09
NC Fae Scheduis. PC
City or san Dlego
BUILDING COST OF SERVICES (FEE) STUDY
ATTACHMENT 1
Develapment Sewlcea Depanmenf
I
PLAN CHECKVARIABLE FEESCHEDULEFOR NEW CONSTRUCTION
I
-
Wohllord Conaulling Page 3 at 23 Run: B12OILooQ
LUBH . Aftschmenl I -FINAL RESULTS WORKSHEETS -Aug 20 09
NC Fec Schedule - PC
Clly irisan o l sp
BUlWlNG COST OF SERVICES (FEE) STUDY
ATTACHMENT I
O a ~sl o ~m ~n t Sewbes oopanmcnt
I
PLAN CHECKVARIABLE FEESCHEDULE FOR NEW CONSTRUCTION
1
-
CONSTRUCTION NP E &RA n O OFRE9UIREDEFFORr:
Group A: I Group 8:
RATED I hOT RATED
RolalkoEHorfFacfar: I RobflvaEHoflFaLor:
. ..
wohlford consulting
Page 4 01 23
LU&H -Altachmcnf 1 -FINAL RESULTS WORKSHEETS -Aug 20 09
NC FBB Schedule-PC
Clfy of san D l s p
ATTACHMENT 1
BUILDING COST OF SERVICES (FEE) STUDY
Devclopmonl Servlses Department
I
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
I
Wohlford Consulting
Page 5 a23
LUgH - Atlacllmonll -FINAL RESULTS WORKSHEETS - Auo 20 09 NC Fec Schedule - INSP
CJIY or snn DIO~O
BUILDING COST OF SERVICES [FEE) STUDY
Developmsn! Servlses ~epnr(men!
1 INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION I
CONSTRUCTION TYPE &RATIO OFREOURED EFFORT:
Group A: I GrDYD 8:
Wohlfotd consulting Page 6 d 23
LUBH - Atmchmanl I -FINAL RESULTSWORKSHEETS -Aug 20 09 NC Fee Schedule-INSP
CllY o1san Olego
BUILDING COST OF SERVICES (FEE)STUDY
Dcvclopmanl seNlcae Dapaman t
I
INSPECTIONVARIABLE FEE SCHEDULEFOR NEW CONSTRUCTION
I
Wahllord Conrvltlng Page 7 of 23
LUBH -Allachmant 1 -FINAL RESULTS WORKSHEETS -Aug 20 09
NCFee Schedule -INSP
Clly of Ean Dlsgo
BUILDING COST OF SERVICES [FEE) STUDY
Onvelopmsnt S~TVIEES ocpartment
I
INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
I
CONSTRUCTION TYPE 6 RAnO OFREOU IRED EFFORT:
I
page a 0123 Run: Bl2Ol2009
LUSH -Atlariiment 7 -FINAL RESULTS WORKSHEETS -Aug2009
c f t yorsm o k p
BUILDINGCOST OF SERVICES (FEE) STUDY
Development Servlss. Ocpam.nt
I
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
I
Wohllord consulting Page 9 of 23 Run: 812012009
LUBH- Attachmonll -FINALRESULTS WORKSHEETS -Aug 20 09 NC Fec Schedule-INSP
CIW orsan DI~OO
BUILDINGCOST OF SERVICES (FEE) STUDY
Development sewicea oepament
I
INSPECTIONVARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
I
CONSTRUCTION TYPE 6 RATIO OF REQUIRED EFFORT:
Orouo& I C..DUO B.
~~.~
I
- ~ ~ F -
RATED hDT RATED
ROlafl,O EHod Fr r lor : I RO!I~,<O E l lonFac to~
. "" "".
Page lo of23
LU&H - Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09
City ofSan Dlego
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
Wohlford Consulting Page 11 of 23
Run: 812012009
LU&H -Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09
City ofSan Diego
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
59 or Electric Self Contained - First Sign $ 97.06 1$ 135.11
Awning, Directional or Wall Sign, Non-Electric I
60 or Electric Self Contained -Additional 2-5 Signs $ 60.66 1$ 73.70
Wohlford Consulting
Page 12 of 23
Run: 812012009
LVBH -Attachment 1 -FINAL RESULTS WORKSHEETS - Aug 20 09
City of San Diego
..
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
RESULTS ANALYSIS - MISCELLANEOUS ITEMS
TOTALS:
Wohlford Consulting
Page 13 of 23
Run: 812012009
LUBH -Attachment 1 -F INAL RESULTSWORKSHEETS - Aug 20 09
City of San Diego
BUILDINGCOST OF SERVICES (FEE) STUDY
Development Services Department
RESULTS ANALYSIS -OTHER ITEMS
]OTHER FEES: I $ - I $
I
I l~eneral Plan Maintenance Fee fpassthrouah I I I
I ._l_flee for Plannng Deparlpen!: n?:&ost ana yi S]_~L._ ,
- I5
Mapp ng [passrhroJgn fee for IT; no cost
I
2
3
4
5
6
7
8
. '
Wohlford Consulting Page 14 of 23
analysis]
Application Fee
Permitissuance with plans - Each
Permit issuanceno plans - Each[No Cost
Calcs here - includedin MPE fees]
Application Extension fee - Each
Building Permit Extension fee - Each
Recordation
Work Done withoul a Permil fno cost analvsisl
fee cost; I$ - 1
$0.03 per $1.000
10
11
12
Run: 812012009 - 12:ll PM
$ -
$ -
$ 133.46
$ -
$ 140.65
$ -
$ 54.44
Double permit
$0.15 per 51.000
Seismic (residential) [no cost analysis]
Seismic (non-residential)[no cost analysis]
State (resldenlial) [no cost analysis]
$
$
$
$
$
$
$
valuation
$0.06 per $1,000
valuation
$0.07 per $1,000
valuation
$
$
$
LU8H - Attachment 1 -FINAL RESULTS WORKSHEETS - Aug 20 09
City of San Diego
BUILDING COST OF SERVICES (FEE) STUDY
DevelopmentServices Department
RESULTS ANALYSIS -OTHER ITEMS
Wohlford Consulting Page 15 of23
Run: 8/2012009 - 12:ll PM
LU&H -Attachment 1 -FINAL RESULTSWORKSHEETS - Aug 20 09
City of San Diego
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
tor Recal - Each
Page 16 of 23
Run: 812012009 - 12:ll PM
LUBH -Attachment 1 - FINAL RESULTSWORKSHEETS - Aug 20 09
CMy of San Diego
-
BUILDING COST OF SERVICES (FEE) STUDY
Resuits Other
Development Services Department
Wohlford Consulting Page 17 of 23 Run: 812012009 - 12:ll PM
LU&H - Attachment 1 -F INAL RESULTS WORKSHEETS - Aug 20 09
CityofSan Diego
BUILDINGCOST OF SERVICES (FEE) STUDY
Development Services Department
RESULTS ANALYSIS -OTHER ITEMS
I I
Other Unique Buildings (Atrium, Convention
Center, Covered Mall and Stadium) (deposit @
132 l~inimum (first 4 hours), - I $
IEmergency (NomScheduled) Call-Out -Each I I
133 additional hour
Afler Hours (Scheduled) Call-Out Fee -
134 Minimum (first 2 hours)
Afler Hours (Scheduled) Cali-Out-Each
135 ladditional hdur IS - I 5
IHourly Fee for Information and Application
I
I !services not covered bv standardfees - oer I I I
Results Other
Wohlford Consulting Page 18 of23
Run: 812012009 - 12:11 PM
LU&H -Attachment 1 - FINAL RESULTS WORKSHEETS -Aug 20 09
Results MPE
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
ReplacemenURemodeilAdditian -Per Floor (4
Wohlford Consulting
Page 19 oi23
Run: 812012009 - 12:11 PM
LUBH -Attachment 1 -FINAL RESULTS WORKSHEETS -Aug 20 09
City of San Diego
-
BUILDING COST OF SERVICES (FEE) SNDY
Results MPE
Development Services Dspartmant
RESULTSANALYSIS -MPE ITEMS
Wohtiord Consulting Page 20 of 23
Run: 8/2012009 - 12:11 PM
LU&H -Attachment 1 - FINAL RESULTS WORKSHEETS - Aug 20 09
Cityo f San Diego
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
Wohlford Consulting
Page 21 oi23 Run: 812012009 - 12:11 PM
LURH -Attachment 1 -FINAL RESULTSWORKSHEETS - Aug 20 09
City of San Diego
..
BUILDING COST OF SERVICES (FEE) STUDY
Development Services Department
RESULTSANALYSIS - MPE ITEMS
TOTALS:
Wohlford Consulting
Page 22 oi 23
Run: 812012009 - 12:ll PM
CUSTOMER SERVICE REVIEW STANDARDS Attachment No. 2
Wastewater & water Treatment plants
86 ) : 8 = # of work davs for 1st review. (5) =#of work davs for resub@)
(') Revlew tlmes musl be determtned at Prel mtnafy or Completeness revfew
Rev ew Tlme for single struct use the longer RT for mdltlplc slrucs
Page 1 of 4
SubdivisionApproval ReviewTimes 6/8/2009
Certificateof Compliance
Certificate of Correction
Reversionto Acreage
Expedite is typically 75% of Standard
Express is typically 50% of Standard
lO(10) : 10 =#of work days for lst.review, (10) =#of work days for resub.
(*) ReviewTimes must be determined at Preliminary or Completeness review
LUH ReportAttachment No 2 Review Standardsxls
EngineeringConstruction ReviewTimes 61812009
Grading and Public Improvements
greater than 20 Sheets
G &Public ROW with a Subdivision
ImprovementAgreement
Any projectwith multiple
approvals(grading, public improvement,
Expediteis typically 75% of Standard
Express is typically 50% of Standard
lO(10) : 10=#of work daysfor lst.review, (10)=#of work days for resub.
(*) ReviewTimes must be detrmined at preliminary or Completeness review
LUH Report Attachment No 2 Review Standards.xls
Discretionary Review Times 6/8/2009
DevelopmentAgreement
Expedite is typically 75% of Standard
Express is typically 50% of Standard
* Format lO(10) : 10 =#of working days for first review. (10) =#of working days for resubmittals
~ . . ~
LUH Report Attachment No 2 Review Standards.xls
ATTACHMENT 3
.. Fee Change Examples
These prototype projects used to illustratecosts are based upon the models used in an industry survey of fees,
reference the "San Diego Clounty Building industry Association (HA) Fee Survey."
Apartment assumes a Complete Building (not phased).
Single Family Model Home
Current Proposed
/ F e y _
- building Permit
I
P~ototype Description: 4 bedroom. 3 bathroom, 2.700 sq.ft.. 600 sq.
11. garage, 240 sq.ft. patio, fireplace, gas and electric hookups
I:\CSI\Anelysl\Fee-Rate Study -FYOgIFinal ReportIFee Change Prototype 6-25-09 vers 2
Single Family Production
Current Proposed
oPlan Check mother DBuilding Permit
Prototype Descrlption:4 bedroom. 3 bathroom. 2.700 sq.ft., 600
liq. 11. garage, 240 sq.ft, patio, fireplace, gas and electric hookups
Valuation $244,825
Single Family Room Addition
.- .
Current Pmposed
r G zh s c k - mother building Permit
Pmtotype Oescrtplian: 500 sq. 11.
Valuation: $51.000
- - -
OBuiiding Permit .Other OPtan Check
Prototype Description: 370 unit (873 sq. ft.lunit) aparlmenl
complexon 15.7acres.
Industrial 50,000 SF 528,214
Current Pioposed
. - . -
oPian Check mother DBuilding Permit
.
Prototype Description: 50,000 sq.ft., single story building with 20
restrooms on 3.59 acres
Valuation: $1.815.000
Retail -100,000 SF
Current Proposed
. . , - -
oBuilding Permit mother nPian Check
.-
Prototype Description : 100,000 sq. it.. single rtoiy building with 25
re~trooms o n 9.2 acres.
Valuation: $4,530,000
ATTACHMENT 3
Office - 50,000 SF
.- . - -
Current Pmposed
, -
oPlanCheck .Other o~uilding pennit i
L...-
Prototype Description : 50.000 sq. it.. 2 story building with 12
reetroom~ on 3.1 acres
Valuation: $3,215.000
Research & Development- 50,000 SF
Current Pmpo~ ed
1 DBuiiding Permit mother nPlan Check
Pmtotype Description: 50.000 sq. It., single story
buiiding with 12 restmoms on 9.2 acres
Valuation 3.137.000
These prototype projects used to illustrate costs are based upon the modelsused inan industry survey of fees,
reference the "San Diego Ciounty Building industry Association (BIA) Fee Survey."
Commercial Structures assumes a Complete Building (not phased).
I :\CSliAnaly~ t\Fee-Rate Study - FYOS\Final Reporl\Fee Change Prototype 6-25-09 vers 2
ATTACHMENT 4
Fee Schedule
Construction Permits - Structures
TH E can o r s r n oLar o
CITY OF SAN DIEGO DEVELOPMENT SERVICES
1222 FIRST AVENUE. MS 301. SAN DIEGO. CA 92101
CA1.L 1619) 44fi-5300 FOR APPOINTMENTS AND 16191 446-5000 FOR INFORMATION
Thii Info~mation Bulletin lists Lhe fees coUecLed by
tlie City of San Diega for construction permits for
structures (building perniits). Also listed are some,
but not necessarily all, fees that hay be required from
agencies other than the City of Sen Diego. An ab-
breviated foe scheduleis available for Single Fnmily
Dwelling and Duplex projects, see Information Bul-
letin 501a, "Fee Schedule for Confitruction Permits
- Single Family DwellinglDuplex."
The tables within this bulletm are designed to assist
annli ean~i nesti mati neco nstructi o nnermi t fees. Far
& . "
pro jectsubmi ttalrequi reni ents,seeLandDevelo pment
Manual Project Submittal Requirements, Section 2.
I. WHEN FEES ARE PAID
The fees associated with Building Permits may be
collected durinp different poinLs of Lhe permitting
- -
process: a t project submittal, duringreview,at permit
issuance, and during inspection. There are also en-
hancedlontional services for which feesare collected.
Tile follorving sectionsof this fee bulletin describe
what fees are collected and when in lhe erocesfi thev
are collected. Payment may be made by cash, check,
ATM card, Visa or Mastercard. Checks shall be in
Lhe exact amount, payable to the "City Treasurer."
Fee estimates may be requested at any stage of the
.
project. For assistance with a fee estimate, phone
(619) 446-5300 to schedule an appointment.
11. SUBMITTAL FEES
The following fees arepaid a t the time tlie prnject is
submitted for plan review.
A. Genera l P l a nMa int enance Fee
This fee is charged for projects with plans and docu-
ments to be reviewed for comoliance withthe aeneral
plat) nr lunrl dwclup~nonl codc provisions.
Gencra. Part Ida nlenaoce Foe. ............................. 5 88
B. Mapping Fee
This fee is charged when there are plans, drawings,
maps or other geographical documents utilized for
project review.
Mapping Fee ................................................................... S 10
C. New Const ruc t ion PIan Check
Table 501A liststhe pian check fees for new construc-
tion and is based upon the occupancy type, type of
construction and the proposed square footage. For
phased projects (fbundation only permit, structural
franlc eermit, ctc.). use tfic "oartial permit" fees for
that occupunr? type. 'I'llis inforn~ini~n is token frum
l i l t plnns ur projjrc~ ;iul,lnirtnl in order to r:ilrulnl? tiir
I MARCH 2006 1
/Documents referenced in this
1
lnformation Bulletin
.Land Development Manual, Prniect Submittal
Reouirements
.lnformation Bulletin 101, "Building Valuation
Schedule"
lnformation Bulletin 103, "Fee Schedule and
Worksheet for Mechanical, PlumbinglGas,
Electrical"
.lnformationBulletin 104, "Schedule forWater
&Sewer Fees"
lnformation B_u!k!!nl?_4. "How to Oblaln and
Permit Residenllal Master Plans"
! I
I ' Ln_fq~mattonBu llet,nW. '.Requirements for
Development Fee Deferrals"
Informa!lo.n.Bulle!in!!!, "Sign Plan Check to
Permit Issuance"
lnformation Bulletin_LM "How to Obtain Proj-
ect Inspections"
.@formation Bulletin 5OLa, "Fee Schedule for
Construction Permits -Single Family Dwelling1
Duolex
1
Bulletin 532, "lnformationRegard-
Ins lnclusionarv Housino"
- -
. lnformation Bulletin 71Q,"Permit Instructions,
Procedures for Building Demolition/Removal"
II
FEE TABLES
I
~ a a h k s J g e
Table 501A - New Conslruction
Building Plan Che&
Table 5018 - Miscella
Construction Categories I FR and I1 FR ............................ 20
Construction CategoriesI1 1-HR. Ill 1-HR andV 1-HR ..... 27
Construclion Catego 4
Miscellaneous llerns I
Table 501E - Waler & Sewer Fees ....................................... 42
plnncheckfecs. Theinfonnntianis thenverified during
project review and updated as approp~iate. Changes
made during project review may result in additional
plan check fees ruhicli may require payment prior to
subsequent reviews.
. - . - . . - - . ...... - ..... -- - -
i'r nled on racy:leo paper Vsll OLr v!su pngc at !r?,?r 5 i _ ? . 0 . ~ ~ 3 gcv.Ui?. c . . u~~le~l ic!~~c. e~?~
Jpon rc.qrrcsl. 111:s nlolmalon is ava abc tn nllerllrillvc formallor persgns vi;!h d ;obillles.
-. --
......
Us55Ul 13-06]
I
Paae 2 of 43
Citv of San Dieso
D. Rlisoellaneous I t ems P l a n Check
Table 501B lists Lhc Sees for miscellaneous itemfi,
such as nccossozy structures lrelaining tcallfi, Scncc.
garage), additions Lo single dwelling unit8 and du-
pleses, iireplaccs, etc. Thesr items can stand alone,
or he grouped with oiher items.
E. L and Development I tcview
Tho f~~llowing plan cheelr Sees will he assessed for
projects with prior development perqits .
e e r m i t r a p p r M L
CommerciallindustriaI
Multiple Dwelling Units
Single Dwelling Unit
Long Term Permit Monitoring
Storm Water Plan Check
(projecls <1 acre. single dwelling
unit, and tenani improvement)
Storm Water Plan Check
(projects >Iacre)
Initial Subsequent
-eYieYL
$734 5489
$734 $489
$489 $244
$1.225 NIA
5868 NIA
F. Landseupe Review
The following plan check fees ~ $ 1 be assessed when
the pqject includes a pliin review for landscape.
initisl Subsequent
& u && p p l ~ v n l ~ w h -
Sites 1 Acre and larger $734 $488
Sites E 1 Acre
$489 $244
EX. ISSUANCE FEES
Thc Followingfees are colleclcd a t the Linle of permit
issuance.
A. Pe rm i t I s suance P e e
This fSx ii chx:id fur :111 prrgc5ctc.
Prrn .I sslanc2 FLE 1:. 111 ,312-51 . . .S .I<
P~lrulitSL.JJ~CC FOC I.\ IIIOJI i: at^) .. . . . . . . . 5 22
B. Build ing P e rm i t F e e
Build ingpe~mit Sees are collected a t permit issuance.
Table 501C lists the pernlit fees for new construc-
tion and are based upon the occupancy type, type of
construction and the proposed square Soota.gc. For
phased prqjects (foundation only pelmil, structural
frame permit, etc.), use the "partial permit" fees for
Lhat occupancy type.
C. Fire P l a n Checlc & Inspec t ion
Fire plan check and inspection fees a re paid a t pennit
issuance and are contained in Table 6010. For more
inl'or~nation call the Fire Plan Review Section a t (G19)
'L'IG-6410.
Information Bulletin 501 March 2006
D. Ha za rd ou s Mnterinls P roces s ing F e e
This fee is nssessed for each nonresidential pcrmit to
recover the cost of processing the Sta te of California-
required hazardous materials c~11,ificarion.
Hazardous Materials Processing Fee $25
E. S t a t e of California
The State of California charges 10 cents per $1,000
estimated valuation on all permits for cnnstri~ction of
single- or multif:~mily structures one- or two-stories
high. Thc charge iir 21 cents per $1,000 estimated
valuation for ~nultifamily cunstruction three stories or
higher and for permits on nonreside~ltial construction.
Forvalrrationdeternrination, seeI nfo~~n~ationBu lleti~~
101, "Building Vnluation Schedule."
F. Coun ty Wa te r Authori ty
The Snn Diego County Water Autilority ICWA) is a
separate agency from tlic City of San Diego which
supplies mw water t,o the region. They may charge
a capacity fee when a new water meter is installed.
Center, third floor, 01. an the CWA m;b site a t wxm.
sdcwa.org.
I f a SanDiego County WaterAuthority feeisrequired,
proofofpaynlent must bo shownpriorto buildingpermit
issuance. This fee mav be mid directlv to the Countv
Water Autl~ority orth;ougi the Developnlent Services
Department. A$10 checkhandling fbe will be cliargad
Soreach CountyWater Authority capacity fee collected
by the Development Services Deportment.
G. School Fee s
A school See may be assessed by the local school
district(s) for new construction. Contact the appro-
priate school districth) within the project area for
the current Sees and where to pay. If a school fee is
required, proof of payment must he shown prior to
building permit issuance. With the exception of the
San Diegn Unified School District, this See is paid
directly to the school district(s). School fees within
the S"n Diego Unificd School District may be paid a t
their offices or a t the Uevelopment Services Depart-
ment. A $10 check handling fee will he charged for
each schoolfee collecied by the llevelupme~lt Services
DepartmenC
H. Development Fees
The Facilities Financing Scetian of the Planning De-
partment collects certain fees a s part of'land develnp-
nlcnt within the City of Snn Diego. Facilities Benefit
Assessments(Ii B.4)o rDevelo pmentImpactFeesi DIP)
arechargedfordevelopme~~t inall planned urbanizing
and urbinlieed communities. Applicnnts usually pay
onearthe other iIiBAor DIP). not both. In sornacases.
.4 Spccinl Park Fee nlny he required for all new units
constructed within certain commonities.
March 2006
City of San Diego a
Iiousing 111ipact Fees will alsobeassessed for nonresi-
dential new construction;additions or interior remod-
eling to aceommodale a change fion~ the structure's
currelit usc.
Development fies are paid at permit issuance. The
current Facilities Benefit Assessment and 1)evclor~-
melit Ilnpact Fees Schedule is available at wmxv.
sa1i di ego .go v/plan1i i 11gurattheDevelo pmentServi ces
Cenler. For information call Fa~i l i t ies Financing a t
(619) 633-3670,
I.
Water si S ewe r Plan Chec k Fee s
DevelopmentSer~cesassesses awaternnclscwerplan
check fee when a water and sewer review nf allv
charged for boil1 irrigationa swell a sdomesticmeters.
For the purposes of assessing Lhove fees; 20 iixturc
units are given rr value of 1 EDU. Thc plan check fees
a recharged a t permit issuance as tb1lou.s:
ltam Fee
1-29EDUs $166 per meter
3-59EDUs $333per meter
61 EDU's $500 per meter
No meter change B up to 1 EDU 6 88 per meter
Meter change & up lo 2 9 EDU $168 per meter
Cross Connecllon Controls $ 44 per lnstallatlon
J. Water a n d S ewe rCapa c i t y Fee s
Water and Sower capacity fees associated with new
construckion aredetermined duringtlie buildingpermit
- - .
plan review process. A capad& chargeis collected for
the maintenanceloneration ofpresent water andsewer
facilities: as well a sfutureexpansion. Water and sewer
capacity cbergcs arecalculated by Equivalent Dwell-
ingUnit (EDU), and are collected a t building permit
issuance. Capacity fees can be deferred. For further
inlbrniation, see Information Bulletin 108, 'Require-
ments fo~~De~relo~mcntFeeDeierrals." SeeTnble 6OlE
for a list ofwater and sewer capacity fees.
11. Water a n d Sewer Ins t a l la t ion F e e s
Water services nnd sewer lateral insLallation fees as-
sociated with new construction aredetermined during
tlic building permit plan review process. Tahlc 501E
lists ibes fix water and sewer services, including po-
table and redaimed water for the City of Stin Diego.
-4 Water Meter Data Card is used to determine the
correct size required forr~rater meter,service sndseu'er
lateral. Wnter Meter Data Cards areavailable a t the
Development Services Centel.. All water and sewer
costs associated with const,ruction will be assessed nt
the time of building permit issuance.
L. Unreinforced Mnsonry Adminis t ra t ive Fee
Eac 500
N . ENEIANCEDIOPTIONAL SERVICES
A. P ro i e c tManagementServices
Proposed
a ,Ft. Fee
0 - 1,000 $882
1,001 - 5,000 $882 + $7.36/each add'! 100 s.f.
over 1,001
5.001 -20,000 $1.177.00+ S5.891each add'l 100 s.f.
aver 5,001
$2,080.00 + $2,94/each add'l 100 8 .f .
over 20.001
B. Exp r e s s P l a n Checlc Fee s
When available,a reduced review period canbe nccom-
plished by paying Espress Plan Checkfies. a t $1,111
111~s 1.5 times regular plan checlr fee or 1.5 tinies the
hourly mta, -,hen applicabie.
. .
C. Requ e s t for Alterna te MethodsflMaterials
Alternate Methods:
~ ~ - - ~ - -
Cslcgory I (repasts an> lnlrlnlal coin@leril)., . . 51,291
Ci l t ~(~0ry 2 (CO~PIEX 0' 2 ISFJ CSJ . . . . 5 2 726
Calrgn-y 3 lhgllly LDI?>;BX or 3 ISSUBS 2r inloi~). E?.5L3'
'Category 3 requires a deposit into a trust fund account.
Alternate Materials:
Allernate Materials Application Review ...................... $333
Allemate Materiols Research (per hour) ..................... $144
Board of Appeals Hearing (each) ............................. $1,503
Inspections."
V. OTHERFEES
A. Afiordahle Hous ing In-Lieu Fees
The Citv of San Diego's Inclusionarv Housing Ordi-
-
nance requires all nerv residentinl development of hvo
units or more to provide affordable housing, or nav a
Inclusionaiy I-lousing" for more information, including
the in-lieu fees.
B. Plan Cha ng e Fee s
Cliarlges Lo approved plans (after i k ~ d approval aud
permit issua~lcel must be checked. A nonrefundable
supplemental plan check reti nlust be paid at the
hourly rnte isee "Services Not Cove~.ed Above" fbr the
liourly rates).
C. Services Not Covered Above
Building and Safety rechecks, s u ~~p lm e n t n l plan
checlffi and other services nut covered by standard
fees $1'1'1 per hour.
Project A'Ianegen~ent Services not covered by standard
fees S144 per hour.
Land Development Review services nut covered by
standard fees $121 per hour.
Information and Application Services not covered by
standard &es $82 per hour.
Page 4 of 43
City of San Diego. information Bulletin 501
March 2006
I
D. Worlr Done Without a P erm it
Wrrrlc done without a peimit will be assessed regular
,
plan cl~ecli fees and double building permit Sees.
VI. ELECTRICAL, MECHANICAL, PLUMB.
INGIGAS PERRlITS
-
at our Inspection Services Offire lloc;~terl at 9fi01
Ridgehaven Ct,., Suite 220, 858-492-5070), or any of
ourCommunity ServiceCenters (call 619-MG-5350 for
locations). Payment for pern1il;s issued at these loca-
tions most be by check only. You may also apply for
I
M I. DEMOLITION, REMOVAL PERMIT FEES
See Information Bulletin 710, Pcnnit. Inst,ructions.
Procedores for Building Dmnolitioi~/Removd.
I
1W . SLGN PERMIT FEES
See Inlormation Bulletin 111. Sieu Plan Checlr to
Aclditjonal fees are charged for specific: eleclrical, me-
cLai~i cai i i ndplumbingigasinstallati o nsf o ri nult~i f amily
and nonresidential construclion projepts (Information
Bu lletiu103,FceSchedu lcand WorlrsheetforMed~u~~i-
c d ; PlumbingIGns, Elcctricnl"). Thisfee ~cliedule can
be used for single Sonlily nud duplcx projects that
only involve electrical, mechanical or plun~bingigas
rvorlc ~~ i t h o u t any building permit worl~, Electrical,
Mech;inicnl, Plumbinp/GnsPcrmits can be obtaineda t
ATTACHMENT - 4
I March2006 c i t y of San Diego - Information Builet in 501 pa g e 5 of43 /
I
I Table 5018 - New Construction Building Plan Check I
i
ConstructionCategories Construction Categories
I FR, Ii FR
11 1-HR, ill 1-HR. V 1-HR
I
Project Base Plus Base
Plus Base
Plus
Sq. Ft.
Fee . Increment' .
Fee
increment7 Fee
increment' .
O = ~ E c L T Y E ~ - - - _ . - - -.
$84.00 $1,673.50 $70.34 $1,515.50 $56.70Agricu'turai Building -2.000 ~ 2 '5 E L E _-_- . .
........................
I 5.000 $5,591.50 .... S79.47 $4,667.00 $86.24 $3,783.50 $52.98 ,
10;OOO S9.565.00 $77.87 $7,9g9.00
$64.83 $6.432.50 $51 .9 ~ - /
20,000 $17,352.00 . .
$59.07
....... $14.467.50
$49.23 $1 ... 1,623.50 ...-............. $39.36 !
- -
50,000 535,073.00 $35,82 529.255.50
$29.85 $23,437.50 $23.88
Auditorium 1,000 . $2,100.50
576.90 $1,764.50
$64.09
- - $1,426.50 $51.26
5,000 $5,176.50 $76.32 $4,328.00
$63.87
$3,479.50 551.43
- ......... . . . ....
10,000 $8,992.50 $73.13 $7.521.50 _ - $60.94 $6,051.00 $48.75 -
- - - - . -
Bank
50,000
_-$23,365.50 $23.8_3
$19,516.00 $ 1 9 . 8 ~ ~ $15,646.50 $15.68
Bank -Shell 1,000 $1,243.50
$44.21 $1,050.00 .
$36.85 ..... $857.00
$29.48
5,000 $3,012.00 $44.60 52,524.00
$37.44 $ 2 . 0 3 6 ~ 0
$30.29
10,000 55,242.00 $42.05 $4.396.00 $35.04 $3,550.50 $2 8 .0 3 - 1
20,000 . $9,446.50 $31.90 $7,900.00 $26.58 ~ . . . . . $6,353:50 . .?21:?6. . ~
50,000 $19.015.50 $19.34 $15,674.50 $16.12 $12,73250 $12.89 .....
Bowling Aiiey .............. 1,000 $1.848.50 $67.30 $1.554.50 $56.06 $1,250.00 $44.86 -
............................. -.
5.000 $4,540.50 $66.98 $3,797.00 $56.10
~ $3.054.50 $45.22
10.000 $7,669.50 ~ $63.98 $6,602.00 $53.32 $5,315.50 $42.66 -
.. ........
20.000 ~ $14.287.50 ~ . ~ ~ $48.54 $11,934.00 $40.45 $9,581,00 $32.38
50.000 $28,849.00 $29.43 $24,066.50 $24.53 $19.288.00 $19.62
Car Wash 1.000 $3,333.00 $125.98 -. 52,791.00 $105.34 $2.250.00 $84.88
............ ....... ....
5,000 $8,372.00 $120.22 $7,004.50 $100.19 $5,637.00 580.16 . i
1 20.000 . $11,396.00 . $38.60 __ $9,524.50 $32.17 $7.653.50 $25.73 i
- 50,000 $22,976.00 $23.41 $19.175.00 $19.50 $15,373.50 $15.6Cl--.
Fitness Center 1.000 $3,096.00--- $117.03 $2,595.50 597.88 $2.093.00 $78.73
5,000 $7,779.00 $1 11.54 ... S6.510.50 $92.95 $5.242.00 $74.36
'Per each addilional 100 square feet or liaction thereof,
Page 6 of 43
City of San Diego. Information Bullet in Sol
-
Marcli 2006
Table 501 A -New Construction Building Plan Check
Construction Categories Construction Cate ories Construction Categorie:
I FR, 11 FR
ii I-HR, III I-HR, 31-HR
II N, III N, IV, v N
Project Base Plus Base Plus Base Plus
Sq. Ft. Fee Increment' Fee increment1
!?!?_COP_S"CLX~?~ ........ ....... ........... _ ... ................ - Fee-._!"_c~me!t'
Gas Station 400 . $2.805.00 $264.63 $2,351.00 . 5221.41
$1,898.00 $178.16
. . . . . - - - -
2.000 $7,039.00 $251.73 $5.8g3.50 . 5??9:E
.... $4.748.50 $167.83
$10,089.50 $205.53
4.000 $121073.50 .-E4664_ s8.ios.00 $1-
8.000
......................... $21.939.00
$187.10 . $18,310.50 ...
$155.91. _ . $14,681.50 $124.73 .
- 20.000
544.391.00 .......... $113.45
- $37,020.00
$94.55 $29.649.50 575.54~
Hazardous Uses, Other 100
$2,164.00 $793.00
$1.617.00 $1,470.50 5660.88
$528.63
500 .
$5,336.00 . $786.40 - $4.460.50
$658.20
$3 585.00 $529.90
1.000 59.268.00 _-_ $754.10
$7,751.50
$628.40 $6,234.50
$502.75
2,000 $16,803.00 $572.05
S14,035.50
$476.72
511,262.00 5381.35
.. ......... ~ -
5,000 $33.970.50 $346.87 528 337.00 $289.06 $22.702.50 5231.26
.-.. . . _ _ _ _ - _ ... _!_ . . .
_ _ _
Health Care Center 1.000 $2910.00 S81.06 $1,855.50 $67.55 S1,501.00 $54.05
5.000 $5,452.50
-- -
$80.36 54,557,50 . $67.25 $3,663.00 _-$54.13-
10,000 $9.470.50. $77.08 $7,320.00 564.24
$6,369.50 $51.39
.. .........
20.000 S17.178.50 S58.48 $14,344.00 $48.73 $11,508.50 $38.98
50,000 S34,722.00 535.46 S28.962.50
- . - -
$23.203.50 $23.6 1~
. .
Hotel &Motel 1.000 .. $1,861.00 $64.58 $1,579.00 .. $53.80 $1 296.50 $43.04
---I ---.-- . _ I _
5,000 $4,444.00 $66.02-- 53,731 .OO _- $55.58 $3,018.00 $45.14
~
10,000 $7.745.00
- s61.3g $6,510.00 $51.16 $5,275.00 S40.g3
20,000 $13 684.00 $46.57 $11.626.00 $38.81 _..~%%?6Ke0 . .$3!:!!5
$28.24
50,000 $27$l56:0~. $23,269.00 $23.54 $18,682.50 $18.83
Hotel & Motel - 1,000 $2,197.50
- -
$ 7 7 . 3 L - 51,859.00 -- $64.49 $1.521.00 $51.56 ..
/Partial Permit 5,000 $5,292.50 $78.46 ~ - $4,438.50 s6?~.............. $3.584.00 ~ ~ ~ ~ ~ ~ $53.43
1Manufacturing 12,000 $2,689.00 $15.33 $2.254.50 .. ... $12.88 $1.820.50 .... 510.43 !
...................................................... - - - - . . .
20,000 516,405.50 5;55.82 513.699.00 $46.52 510,992.50 S37.21
50.000 $33.151.50 $33.85 $22,156.50 $22.56
. . .......... ... . . 527.654.00 .-.@LL
Lab lR & D -Shell 1.000 $1,340.00 547.91 $1,130.50 $39.91 $921.50 $31.93
......... .. ........ ........ .-
10.000 $5,665.00
- -
$45.55 $4.748.50 $37.96 $3.832.50 $30.37
20,000 . $10,219.50 ... $34.56 S6,544.50 . $28.80 $6,869.00 ................ $23.04
..... ..
- -. 50,000 $20.58600 $20.g5 $17.183.00 $17.46 .... .. $13,780.00 $13.97,-
Laundromat 150 $976.50 $227.00 $827.50 5189.17
- - $679.00 $151.33
750 $2,338.50 $231.47 $1,962.50 $194.73 51,587.00 31_58:i)7_
.. .... . ........ . ............
1.500 2 2 !0 4 5 2 1 5 . L - s3.423.00 .. e 1 ' 3 . .......... $2,772.50 $143.83
3,000 $7.312.00 $163.71 s 6 , 1 2 0 . i ? L - $4,330.00 $109.16
7,500 $14,679.00 $99.27 $9.842.00 .......... $66.18
........... . . . ... ~-_.S?ZLEP:~~ . ~ 2 . 2
'Per each additional 100 square feet or fraclionthereof.
March 2006 City ofSan Diego. information Buiietin 501
Page 7 of 43
Table 50113 - New Construction Building Plan Check
Construction Categories Construction Cate ories Construction Categorie!
i FR, It FR 11 1-HA, 111 1-HR, $1-HR
I l N, I I i N, IV, V N
Project Base Plus Base Plus Base Plus
Sq. Ft. Fee
occupancy Type
Increment' Fee Increment' Fee Increment'
Library I Museum . .'J?!?O $1,970.50 $71.93 S59.94 $1,341.50 $47.95
..................- 1"!165".OP - .
5,000
$4.847.50
571.50 $_"10_5350
$59.87 $3,259.50
$48.22
10.000 58,422.50
$ 6 8 . 4 0 $7,047.00
557.00
$5.670.50 $4560 -
20,000 ~ i5.262 .50 . .
$51.89 .... $12.746.50
543.24 .....
$10,230.50 . $34.60
50.000 S30,829.50 .- - $3146 $25,719.00
$26.22
$20,609.00_ $20.88
NursingHome I 1.000 $2.= 573.70 $1,694.50 561.41 ..... 51,372.50 $49.13 .
Assisted Livillg 5,000 $4.96450 $73.20 $61 2 9 S3.337.50 $49.35
. .......... .... ..... . ................. $4,151 ao . . .... ..
10.000 S8.624.50 -_ S70.08 558.40 . $5,005.50 $46.7 2
I
$7.215.50
i
20,000 $15.632.50 $53.16 $13.055.00
...-....... ...
544.30 $10,477.00 $35.44
$31,580.50 .. .... - - $32.24 S26,345.00 $26.86 S21.109.50 $21.49
. - ............. ..........
Office .. 1.000 . $1,922.00 . $70.10 $1.615.50 $58.41 51,309.50 $46.71
$69.71 $3,952.00 $50.37 53,178.00 $47.04
5.000 54.726.00
10.000 $8.211.50 $66.65 56,870.50 $55.54 55.530.00 $44.43
. . .. .. ....
20,000 $14,878.00
-.
S50.56 $12,424.50 $42.13 $9,973.00 $33.71
/office, High Rise 50.000 $30,810.00 $16.24 525,703.00 $13.53 $20,596.00 $10.83
500,000 . $67.290.00 $6.02 $56.130.50 55.03 - $44,971,50 -__
...............
50,000 $33.874.50 $25.62 $28.258.50 $21.35 $22.838.50 $17.08
office. High Rise -
. . _ _ _ _ - - .
Phased Permit 100.000 546.683.00
_- $13.93.__ $38,930.00 $11.63 $31,178.00 $9.34
'Per eaih additional 100 square feet or fraclion iliereot.
Page 8 of 43
City of San Diego * information Bullet in 501
Table 5014 - New Construction Building Plan Check
1 Construction Categories ConstructionCategories Construction Cate ories
I
I FR, Ii FR
ii 1-HR, Iii 1-HR, V 1-HR 11 N, III N, I",? N
I Project
Base Plus Base Plus Base
Fee increment' Fee increment'
Fee Increment'
Office, Medical 1.000 $1,848.50 $67.30 .... $1,554.50
$1.260.00 $44.85
. . . . . . . .
. .......- ..... .-
wlOSHPD Cerl. 5,000 $4.540.50 $65.98 $3.787.00 $56.10 $3.054.50 $45.22
..........
10,000 $7,889.50 $63.98 $6,602.00 $53.32
........................ .
........................... ................ . .
...............
.. ...........
....................
. ~ ~
-.
$5.315.50 $42.66
20,000 $14,2&.50 $48.54 $11,934.00 $40.45 $9.581.00 $32.36
50,000 $28.849.00 -$29.43
Office. Tenant 1,000 $1.945.00 S20.10 - - $1,634.50 516.76
-
$1,324.50 . -$13.40
i Improvement - 5,000 $2,749.00 $17.31 $2.305.00 $14.71 $1,860.50 $12.10
10,000 $3,614.50 $21.38 $3.040.50 $17.81
- $2.465.50- $14.25 5 5 . -
$12.26 $4.821.50
20,000 $5,752.00. 810.21 $3,890.50 $8.17
50,000 $9,429.00 $10.02 $7,885.50 $8.35 $6,342.00 $6.68. . .
.. ..... .- .. .........
Parking Garage, 1.000 $1.011.50 $35.38 $29.49
S857.00 $702.00 $23.59
Enclosed 5,000 $2,428.50 $36.02 $2,036.50 $30.29 $1.645:50 $24.57
........ ....
10,000 ........... ............ $1,227.50 $33.65 $3,551 .OD $28.04 $2,874.00 $22.43 ...
......
20,000 $7,592.00 . $25.52 $8.354.50 $21.27 $5.117.00 $17.01 -
50,000 $15,248.00 $15.48
$12,734.50 - - $12.90 $10,221.00 $10.32
$39.91 $956.00 $33.26
........... . Garage, Open -.-E0_0_--3%%50~ ...... . oE78_2__OL~-S2&SPP
5.000 $2.727.00 $40.43 $2,286.50
$1.846.00 52752
$33'97
10.000 $4,748.50 $37,!36__ $3,985.00 - $31.63 S3.222.00 $25.30
. -
20,000 . $8.544.50 $28.80 ..... $7.148.00 $24.00 . . . . . . . . $5.752.00 $19.20 . .
-
50,000 $17,183.00 $17.46
..---..-.....--p-. S11,511.00 $11.64 ........ ............... $14,347.00 . $14.55 ...
Preschool / Dnycare - 1,000 $2,258.00 $82.91 $1,896.00 $69.09 $1,533.50 $5=.--
5,000 $5,574.50 $82.15 S4,85g.5~ . ..... $68.74 $3,744.00 $55.33 ,
'Public Building - 1,000 $3,542.00 $133.96- - - $2*968.00
. 12.118- $2.389.50
$90.00 ,_ /
Fire Station - 2 i% ! ! . .... EiB.900:511 ....... K-r.98 . . 57,445.00 $106.64 $5,989.50 $85.32 I
...... ........ ... - ~ . . . . ~ ~ . . . . . .
~ ~ ~ ~ ~ ~
20.000 $27,837.00 $95.1 1
-- $23,225.00 $79.26 $18.613.50 563.41
~ . ~ - ~ . ~ . . . . . . . . . 50,000 $56,371.00 $57.67 $47 L- 004.00 $48.06 $37,636.50 538.45
Public Building - 1.000 $2.620.50 $96.74 $2.198.00 $80.60 $1.775.00 $64.49 __
'Per each additional 100 squar? ieet or iraction thereof.
10,000 $1 1,267.50 [email protected] .$ Q -L- . 417.50 . $76.65 . $7,568.00 $61.31
20.000 . $20,465.00 .... $69.78 ..... .. $17,082.00 $58.15 $13,699.00 $48.52 -_
50.000 $41.387.50-
.- - - - -
$42.31
$34,525.50 $35.26
$27,654.00 $28.21
$80.71
S1.847.50 $87.25
$1,494.50 .553.81 .
Public Building . Office
. ! P!! .. .S2.?40.50 ..................................
5.000 55,429.00 $80.00 $4,537.50- $3.647.00 $53.90 -,
586.95
10.000 S9,429.00-- $75.74 $7.885.50 -. $6,342.00 $51.16
$63.96
20.000 S17,103.00 $58.22
I
............. . .......... ........................ ........
$14,281.00 548.51 $1 1,458.00 $38.81
50,000 $34.588.50
/ . $35.30 $28,834.50- $29.42 S23,101.50 $23.53
I Public Building - Police 1,000 S2,20O050 0 0 ~ 0 0 , 0 0 ,
I
$80.71 $1.847.50 $57.25 51,494.50 $53.83
.
5,000 $5,429.00 $80.00 $4,537.50 . $3,647.00 $53.90 ....
-............ .....- .- - - - - .......- ......... sfis.ss
10,000 $9,429.00 $76.74 $7,885.50 $6.342.00 $51.16
a63.96
20,000 $17.103.00
.- $58.22 $14.281.00 $48.51 51 1,458.00 $ 3 3
$34,568.50 ... .... ....
. .... ................ $35.30 ........ "8834.5! . ....... $?LC- 231101.50-E3S3
i
I
50,000 $46.348.00
$47.39 538,651.00 $39.49 $30,954.50 ~ $31.59
1Public Building - 1,000 $3,756.00 $140.04
$3,144.00
$116.65
$2.532.00 $93&
IUtillly Plant ..5.000 . _
... $9,357.50 ~. . _ ....- ~ 5137.58
- - $7 811,50
$114.93
$6,266.50 ~ $92.27 ~ ~ ~ ,
I
10,000 $16,236.50 $133.14 $13,558.00 $110.96
$10,880.00 $88.77
j- . - - .
March 2006
City of San Diego - information Bulletin 501
Page 9 of 43
Table 501 A - New Construction Building Plan Check
Construction Categories Construction Categories Construction Cate ories
I FR, It FR
I i 1-HR, 111 1-HR, V 1-HR ii N, lli N, IV, 1 N
Project Base Plus Base Plus Base Plus
Sq. Ft. Fee Increment' Fee
OCCUPE~ CY.!~ ~ Fee Increment'
Increment'
Public Building . _l&?!a , $2.925.50 $10835 ~ - . - . $2,452.00 . $90.29 $1.978.00 $72.23 -- ~ . .
Recreation 5,000 $7,259.50 $106.83 $6.063.50 $89.30 $4.867.00 $7179
10,000 $12,601.00 $103.02 $10,528.50 s85??--. $8,456.50 ~ . . ~ $88.68
I 20.000 ~ $22.902.50 $78.15 s1gp113.50.. $55113.~ ..,... 5_i_S:323:00~sS2:'2 .....
I
500.000 $85,798.00 $9.55 $71,554.00 $7.96 557,310.50 $6.38
~. . ... ~
~ ~ . . ~ ~ . ~ . - .
~
Residential - 1.000 $919.00 $69.60 $779.50 p -.-_--_.$59.45 5640.50 $49.20
$59.98
ManufacturedHousing 2,000 S1,815.00 $1,374.00 S49.98 $1,132.50 $40.00
- . . --
I
SeeTable 5018 for combined Pian Check and Inspection Fees
R~sidentisl-SFO!~:P'e_~iBi~~ . ~
Residential - SFDIDuplex, 1,000
nia nla
nla nla $1,240.00
$67.40 .
custom _!E ~ nia
~ nia
! I! _a_a. . . A
. .nia __ . -:?!!S7?:!P ! iE%
-
nla
2.000 da nla da $1.929.50 536.75-
..
nla nla
3,000 n/a nia s2.2g7.00 $52.08
5,000 nla nla nla 63.338.50, . $95.31 .
- __- ~
!! a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .. . - . ..
Residentiai - SFD/Duplex,-2,000 nia nla nia nla $703.50 $15:30_~
Models 1,500 nla .- nla "la ~ ~ ~ - ~ nla ~ - ~ - ~ ~ S780.00 $30.70
nla $933.50 $30.65
~ ~ ~ - -
3.000
- -
nia n/a 2!? ~ nla _ $1.240.00 $22.98
5,000 nia nla da nia $1,699.50 $30.64
- , ~ ~p
U e ~~t @ I I l s ~D ! D u p ! e x , ~~~~h a s e S4~e_I!rOrmation B~IIe~in.~j__4~_H~w!o.~b!aLn_a~ilfie~~iRe~id_eil!iajMastELPlvns.....
I
/ Residential Care go _--_ $2.016.50 S368.50 $1.694.50 5307.06 nia nia I
I
1 1 ,O0Op 54.964 50 $366 00 _ _ $4,151.00 $306 45
nla nla I
-- - - -
-
$350.40 $7 215.50 $291.98 nia nla
-.2.000 .. ..S%E?:?D
...-..--._4_4...._4.... _4. -_4-_4_4_---._4.--. . . . . . . _ . ..-. ,.
4,000 $15,632.50 $265.80 .. $13,055.00 $221.50 ... nla
clia nla
$134.32
'Per each addilianal 100 squaro feel or fraction thereof.
-
0 of 43 City of San Diego * I nformation Bulletln 501 March ZOO6 /
Table 501A - New Construction Building Plan Check
Construction Categories Construction Cate ories Construction Cate ories
I FR, II FR
II 1-HA, III I-HR, 31-HR
11 N, III N. IV, f N
1 Pralsct Base Plus Rase Pltts R a sn D ~ S C /
~ -
. - ~ ~
~ ~ ~ -
. . - - - . . .
---- .."-
Occupancy Type Sq. F t - Fee increment' Fee Increment'
Fee Increment'
. . .
1,000 $3.578.50 $135.35 s2~9gs~!'o S113.14 S2.413.50 $90.94
5.000 . S8.992.50 . $129.32 . . . 56,051.00 $86.20
$7,521.50 . $_107:T. -.
10,000 $15,458.50 -70 $12.910.00 5105.58 $10,361.00 $84.117
/
50.000 $56,962.50 558.28 $47.497.00 $48.57 $38,030.50 $36.65
-
. ...... -. .- .- ... ..... ...... .. ..... . ..
Restaurant -Shell 1,000- S2.763.00 ........ .... $104.25 $2,316.50 $87.23 $1.869.50 $70.23
............ ... .
0,000 510,623.00 $35.94 $8.880.50 $29.95 ~ ~ $7.137.50 $23.96
517,866.00 518.16 514,326.00 $14.53 ...
GO0 . _s21!405?0 . $21.74 . . . . . . . . . . . .
Retail .Store, Shell 1,000 $1,147.00 $40.53 $969.50-.
$792.50 $27.03
$33.78
5,000 $2,768.00 - .. $41.02
. $2,320.50 $34.46 $1,873.50 527.90 . . i
10,000 $4.819.00 $38.55 $4,043.50 . 1 z . . . . . $3,268:50 . .
_52570-- 1
20,000 $8.673.50
529.24 $7.255.50-_- $24.37 $6,838.00 $19.49 1
50,000 $17.444.52
$17.73 $14,565.00-_ 514.77 $1 1,685.50 $11.82 -i
1,000 $871.50
- $30.04 $740.50 $25.03
$608.50 $20.03
$30.63 $1.741.50 $25.98 ....... ....
ena ant improvement .. . ~.~E..-S_~,~Z~?.~P...~ . E:!
10,000 $3,614.50 . L E E ..- - - - - $3,040.50 $23.80 $2,465.50 $19.05
$21.67 55,420.50 $18.06 20,000 S6.471.00 54,370.00 $14.45
513.14 S10.837.50 $10.95 . . .
O.000 - . . $ 'Z E O ....... .......
...... $Ei7.04:00 58.76,
i
School 1.000 $2.258.00 S82.91 $69.09 $1.533.50 $55.26- -
$1,896.00 .. .........
'Per each addltlonal 100 square iael or fracllon thereof
March 2006
City of San Dlego. InformationBulletin 501
Page 11 of 43
1 Table 501A -New Construction Building Plan Check 1
Construction Categories Construction Cate ories Construction Categories
i FR, II FR
ti 1-HR, III I-HR, $ 1 - H R 11N, I I ~ N, IV, v N
Project Base Plus Base Plus Base Plus /
Sq. Ft. Fee Increment' Fee
occupancy Typ e
Increment' Fee Incrementt ;
...
Tenant Improvement, 200 s5 % o o . $90.19 5477.50 575.06 .... .................... 8399.00 $60.06 .-
Other .. ...... 1.000 $1.277.50 $95.80 S1.078.00 . . $879.50 $66.70 ~
. . ...
Theater 1.000 51,462.50 $52.58 $1,232.50 543.61 nia
1
"1.3
i
5,000 $3,565.50
... ..... --
$52.70 S2.985.00 $44.20
10.000 $6,200.50 $49.99 S5.195.00 $41.86 nla
. ... .... . .
20,000 $11,199.00 SQ.360.50 $31.60 nia nla 1
537.92 ----____
50,000 S22,575.00 $22.99
~ $16.840.50 - $19.16 nla
Warehouse 2.500 $1,043.00 .. $15.41 .. $ ! ! O - ~ ?iZE . . . . . 7 2 3.0 0 ? 2 : ? ?
- 12,000 S2.506.50 $14.30 52,102.50 s12.02 S1.698.50 .. ............. $9.75 /
125.000 S15,759.50 $8.40 $13.160.50 85.33 - $10,562.00 54.27
..................
Woodworking 1,000 $1.437.00 - $51.59 $1,211.50 $42.98 .-S986.00 S34.39
5.000 $3,500.50 $51.74 $2.930.50 543.41 $2,381.50 $35.06
.. . ...
10,000 56,087.50 -
-
$49.05 S5.101.00 $40.88 -- 5.1,114.50 532.70
1
20,000 S10.992.50 $37.21 $9.188.50 $31.01 57,384.00 $24.81
__1
- .. ---
'Per each addilionai 100 squarefeel or iraction thereof.
Table 501 B-Misceilaneous liems
Plan Check & Inspection Fee Schedule
Iwm Fee
Addressing-New Structure, per address ............................. $27
Antenna, each ................................................................... 5723
Antenna-CeiluiarIMobiie Phone, each .............................. 5645
Awning or Canopy (supported by building), each ............ $378
Carport-Standard, each ................... .............. ! .................. $31 1
Cerport-With Caics, each .............................................. 5533
Cammercia
Equipment
up to 200
each add'l
Fence or Fr
/ Additional
I Fenceor Freestanding Wail
i Masonry,City Standard up to 100 1.i................................... 5411
Masonry Special Design,up to 100 1.1 ................................. $634
Add'l Fence or Wail, Mascnry,each 100 1.1. ................... .... . 522
F ireoiace
Foundation Repair
Standard, up to 100 1.f. ...................................................... $378
Standard, each ad#] 100 1.i.................... . . . .................. $44
Special Design, up to 100 1.i. ......................... .. ............. $745
Special Desipn, each sdd'l 100 1.1 ................ ................. $44
Garage
Wood frame, each 1000 s.i ............................................... $678
Ivlasonry, each 1000 s.i ..................... ... ....................... $1090
Liuhtlno PoielFlaoooie
- - -.
First pole ........................................................................ $557
Each Addilionai pole ....................................................... $266
Paint Spray Booth, each 1000s.f...................................... $678
Partition - Commercial,interior
Up i 0 50 1.f ........................................................................ $367
Additional partition, each 20 i.i .......................................... S30
Partition -Residential, Interior
Balcony-With or Without Cnics
Pile Foundation-Any Material
First 10 piles, up to
23
/ Additional plies, eac 26
Retalnlna Walt-anv material 1
d ~ ~ ~. -
Slnndaro uii io 100 I i . . . . 5376
5pe;ial Dcsgr up lo IUD ,I ......... 57.15
Aoo lhlillal eta nlng v.a.1 each 101, I
i. I.!
Roof Structure Replacement With or Witii
tout Caics
Less than 10 s.i,, aac
Spa or Hot Tub (Pre-fabricated), eac
Stairs
iirst ilighi .................. .. ............................................ $266
Each additionalfiiqhl. per filghi .......................................... 51 11
Storaae Rscks
~ ~ d -
. . . . . . . . . . .
6 ' 2 ..p I 1 0 . : . 5 1 1
5712
AooitS3~ a~ lacZ.5, cilcil 50 1.1 ..........................
560
Stucco and Siding, Stone or Eric): Veneer ~ pp l ic j t ion
...................................... S10
................. 1,136
Closing of existing do
Replacement, iirst on
I
I
'This fee includes ali strucluial, electilcai, piumbingand mechanical wo rk within the footprint of the remodel or mom addition. Stand-
aloneiiems listed eisevihere inTable A are 119! added to lhe plan check and inspection fees, unless those sland-alone items are
outside the footprint ot the remodelor room addition.
i March 2006 Citv of San Dieao. llrformation Bullet in 501 P a u e 130 f 43 i
i
occupancy Type
Agricultural Building
Table 501C - New Construction Building Permit
Conslruclion Categories Construction Categories Construction Categories
I FR, I1 FR
I1 1-HR, 111 1-HR, V 1-HR 11 N, ill N, IV, V N
Project Base
Plus
Base Plus Base
Plus
Sq. Ft.
- Fee
Increment'
Fee
Increment' - _Fee ............. Increment1
1.000 $311.50
$7.86
$259.50 $6.55 $207.50
55.25
....... . . . . . .
5,000 $626.00
51.51
$5zL% $1.28
$417.50 51.00
10,000~---- $701.50 $0.78
$584.50 $0.65
$467.50 $0.52
5,000 $2,088.50 $5.01
-
$1.740.00 $4.18 $1.392.00 $3.34 /
10,000 .. $2,339.00 . . $2.60 $1,949.00 . $2.17
...
$1,559.00 $1.73
i
20.000 $2,598.50 $5.20 52.165.50 $4.33 $j.732.0(]- 53.47 -
- 50.000 54.158.50
$5.72 $3,465.00 s4.? ...... .. $2.772.50 . . 83.81 .
$22.48 $742.00 518.74
!
-1
/Banlr -Shell ..', O'? . . . $a? ! .Do ................................... .. ... $593.50 514.99 1
I ..!?!,ooo. $2.227.50 ....... 64.46 $1,856.00 83.71 . . - $1,484.50 .. - . $2.97
i
54.90
50,000 $3,584.50 , $2.970.00 s4.O9 52,375.50 $3.27
Boviling Alley 1.000 $1,336.00 $33.73 $1.113.50 s28.10 $691.00 $22.48
5,000 $2,685.00 $6.44 - $2,237.50 $5.37
$1.790.00 $4.29 1
p ~ ~ ~
50,000 $5 346.50 $7.35
_ _ _ L - 0 S;Bis_6_4-sO-so~$4.90
$6.13
........
.
Car Wash 1,000 $623.50 $15.74 $519.50 $13.11
$415.00 $10.50
$3.01 $1.044.00 ....
. . 52.51
$835.00 $2.01
__S!%!!_ -._S;!i?!!!-~-.
.
- ~ ~ ~ ~ ~ ~ - ~ - ~ .
Church 1,000 $3,712.50 Sg3.66 $3,094.00 $78.04 82,475.00 882.44.-
$17.90
5,000 -ir,459.00 $6.215.50 $14.93 54.972.50 S11.94
S9.29 $6,962.00 $7.74 65.569.50 $6.19
10.000 $8.35400
."
/nry Cleaning Piant 1.000 X :EE . $29.98 $980.50 ~24.98 $791 5 0 . . . .$19.99 i
53,168.50 >AS-
'Per each additional 100 square lee1 or fraction thereof.
1 ~ a g e 1 4 o f 4 3 city of San Diego. I nformation Bulletin 50 1
March 2006
Table 501C - New Construction Building Permit
Construction Categories Construction Categories ConstructionCategories
I FR, 11 FR
II 1-HR, I ll 1-HR. V 1-HR 11 N, I ll N, IV, V N
I
I
Project Base Plus Base Plus Base Plus
!Occupancy Type Sq. Ft.
- Fee
Increment' Fee
Increment'
Fee Increment'
/ &sZ i G n ~ 400
~ . ~ $1,559.00
~ ....... -$98.34 ~ $1,299.00 $81.94 $1,039.50 $65.56
I
2,000 $3.132.50 $18.80 $2,610.00 $15.70
$2.088.50 $1 2,53.
1 4.000 $3,508.50 $2,924.00 $8.11
$2,339.00 $6.49
S9.75 ~ ~ ~
.~
20.000 . _ $6,237.50 ~ $21.45 - $5 198.00 517.87 $4,158.50 $14.30
/
_
'Hazardous Uses, Other $445.00 $112.38 $370.50 $93.75 $298.50 574.88 -
500 $894.50 $21.50 $745.50 $17.90
$596.00 514.40
I
- - ~ . . ~ .
~ ~
- - ~ . ~
i
1,000 51,002.00 611.15 $835.00 $9.25 $668.00 $7.40
-
~ -
/Health Care Center 1,000 $2,450.00 $61.81 $2.041.50 $51.53
$1.633.00 $41.21
5,000 $4.922.50 $11.83 $4.102.50 - - $9.84
$3.281.50 $7.88
I
10,000 $5,514.
~ ~ ~ ~ ~ ~ ~ - . - -,
. _
I , 50,000 59.802.50 $13.48 $8.188.50 $11% $6.534.50 58.99
/Hotel & Motel 1.000 $1,707.50 $43.09 $1422.50 535.91 $1 138.50 $28.71
.. - - .! .... r ~
IHotel & Motel - 1,000 $1,707.50 $43.09 - $1,422.50 535.91 $1,138.50 $28.71 1
/partial Permit 5,000 $3,431.00 $8.24 $2,859.00 $6.87 $2,287.00 55.49
i
Laundromat 150 $1,113.50 - $187.33
$742.00 $124.92
$927.50 5156.17
750 $2.237.50 $35.80 ~ $1 864.50 $29.87 51.491.50 523.87
- ~ . ._
1 1,500 ~ $2,506.00 $18.57 $2.088.50 $15.43 $1,670.50 $12.37 --
$37.13
3,000 $2.784.50 $2.320.00 $30.94
$1.858.00 524.78
7.500 54,455.50 $40.85
- ... ~ . .. ~ - - - - ~ ~ ~ -~ . ~ ~
.,~ $3.712.50 . - ... $34.04 ~ ... $2,970.00 .. $27.23 . ~ ...
'Per each additional 100 square feet or fraction thereof.
-
I March 2006 City of San Diego - information Bulletin 501 ~ a g e 1 5 o f4 3 /
Table 501C - New Construction Buildina Permit
1
-
Construction Categories Construction Categories Construction Categories
i FR. I1 FR
It 1-HR, 111 1-HR, V 1-HR
ti N, I ll N, IV, V N
i
Project Base Plus Base Plus Base pius j
Sq. Ft. Fee Increment' FCC .. Increment' .... Fee Increment1
-I
1Library /Museum . 1,000 . . 52,375.50 S5g.95 ~ $1.979.50 $49.96 $1,583.50
~ . ? i ? X I
/AssistedLiving .%'??? .. $3,729.50 $6.95 $3,107.50 - $7.47 $2,406.00 $5.97~ . ~ . 1
20,000 $4,641 .OO $9.28 $3,867.50
50,000 $7,426.00 $10.21 $6,166.50 $8.51 $4,950.50 $6.81
. . . ~ .~ ~ ~ . ~ .. ~ ---- .. - ~ ~ ~ . - ..
Office 1.000 $1.670.60 $42.15 $1,392.00 $35.13
$1.113.50 $28.10 _ ,
$8.06 $2.797.00 $6.71 $2.237.50 55.3i5,000 $3,? EEK
~ ~ ~ ~ - ~ ~ ~ ~
1Office -Shell 1,000 $891.00 522.48 $742.00 $16.74 $593,50 $14.99_
I
5.000 $1,790.00 54.29
$1.491 5 0 $3.58
$1.193.00 $2.86
10,000
$2,004.50_____ $2.23 $1.670.50
$1.86 $1,836.00
$1.49
I
-
5~~~~ -
$4.90 $2.970.00
$4.09
52,375.50 . $3.27
Office, High Rise 50,000 $5.569.50
$5.57 $4.641 .OO
$4.64 $3.712.50
$3371.__
$8,354.00 $1.95 $6,962.00 $1.62
'EEo ~ ~ ~ . . . . S5.56950 . .
200,000 $10.303.50 $1.21 d % ? ! L S1.01 $8,869.00 $0.80
500,000 $13,924.00 $2.78 $2.32 $9.282.50 $1.86
- .-
50,000 55.569.50 $5.57 $4.641 .OD $4.64 $3,712.50 $3.71
Office, High Rise - ~ .
Partial Permit - - 100,000 $8,354.00 $1.95 $6*962.00 $1.62 $5,569.50 $1.30
-.
$1.21
200,000 $10,303.50 _____ $6,586.50 $1.01 $6.86900 $0.80
- -
$2.78
/ ~ 5 , s ~ S E .~ ~ _ ~ - S O ~ _ . ... .! %? -~.-~-8%ze~~ $ 1 .8 6 . .
Office, Medicai 1,000 $1,187.50 $29.38 Sg89.50 $24.98 $791.50 $19.99
i
$ 5 . 7 3 -
s.oao..-%EEE ~ $i,gss.50 $4.78 51.591 00 $3.82-._
I
10,000 $2,673.00 $2.97 .~ >Z???~Z . SZ!~ - . $1.782.00 $1.58
20.000 $2,Y70.04 $5.94 $2.475.00 $1,979.50 $3.96
5 4 . 9 5 .
50,000 - $4.752.00 $6.54 $3.960.00 ~ ~ - ~$5.45 $3,168.50 $4.36
Office, Medical - Shell $742.00 $18.74 5593.50 $14.59
1,491.50 $3.58 $1,193.00 S2.85_
10.000 ~ ~$2,004.50 $2.23 ~ ~ $1,670.50 $1.86 $1,336.00 $1.49 I
20,000 $2.227.50 $4.46 $1,856.00 ~ $3.71 ~ . ~ $1.484.50 ~ $2.97 ~ 1
~
50,000 $3,564.50 $4.90 - 52,970.00 $4.09 $2.375.50
$3.27 :
'Per each additional 100 square ice1 or fraction ll~ereaf.
.-
T G e 16 of 43 c i ty of San Diego information Bulletin 501 March 2006 I
Table 501C - New Construction Building Permit
Construction Categories Construction Categories Construction Categories
t FR, ti FR
I i 1-HR, I ll 1-HR. V 1-HR I i N, I ll N, IV, V N
1
1 P roiect Base Plus Rasp P l s t~ Ra+@ PIII.
.
. . . . . . ---- .
Occupancy Type ~ Sq. Ft. Fee incrementi Fee Increment' Fee Increment1I
Office. Medical 1,000 $1,484.50 $37.46 $1,237.00 $31.23 $969.50 $24.98
......... . .............
wlOSHPD Cert. 5,000 52.983.00 $7.17 $2,486.00 $5.97 $1,988.50
............... ....... .. ..
I
10.000 $3,341.50 $3.71 $2.784.50 $3.10 $2,227.50 $2.48
-____ . - -
~_
Enclosed 5.000 $2,237.50 $5.37 $1,664.50 54.48 $1.491.50 $3.58 '
.. - . - ......... . . . ..
10,000 $2,506.00 $2.79 $2,086.50 . $2.32 - .... l& ?z!% .z-.~-%!!!ss . . 1
i
I I--__---
50.000
.................. $3,712.50 $5.11
$3,094.00 54.25
$2,475.00 $ 3 .4 0
/Preschooi I Daycare 1.000 $1.206.00 $30.45 $1.005.00
$25.36
~ 804.00 $ 2 0 .2 9
i
5,000 $2,424.00
-
$5.81 $2,019.50 $4.66 $1.615.50 53.89
10,000 $2,714.50 -- $3.02 52.51 $1,810.00 $2.01
.. .......... sz.2s2.50
!
20.000 53.016.50 S6.03. $2.513.50 . .. $5.03 $2,010.50 ............ $4.02
$8.64 50,000 $4,E26.50 $4,022.00 $5.53 $3.217.50 $4.43-
Public Building - 1.000 $2.286.50 $57.70 51.906.00 S48.06 $1,524.50- 53846
p p .
Fire Station $3,828.50 ..... . . . . ..
. .................
~ ,o o o _ ~ _ _ E z ~ K 511.03 3929 $ 3 .es_ 31_00$7.35.
10,000 55.146.00 s5.72 54,288.00
54.77 $3,430.50 53.82
20.000 $5,718.00 $4,765.00
59.53 $3.812.00 57.62
$12.58 $7,624.00
$10.48 $6.099.00 $8.39
S17.44
50,000 $9,149.00
.... .............. .
I
Public Building - 1.000 51,670.50 S42.15 $1,392.00 $35.13
Misceilaneous 5.000 53,356.50 $8.08 $2,797.00 SG.71 $2.237.50 $5.37
- -
$3,132.50 $3.49 $2,506.00 $2.79
!O.Ooo . . ~3,isS.SE . . . ..,s.!s_ _ .... _ . _
20.000 $4.177.00 58.36 33,481.00 S6.96 ..... $2,784.50 ... $5.57 ...
I ~ ub i i c Building - Police _-I=- 61.856.00 s48.84 $1,546.50 - $39.03 $1,237.00 $31.23 1
I I
'Per each additional 100 square feel or fraction thereof.
/ March2006 City of San Diego. information Bulletin 501 page1 7 of 43 /
Table 501 C -New Construction Buiidina Permit
1
-
Construction Categories Construction Categories Construction Categories
i FA, I i FR I i 1-HR, I ll 1-HR, V 1-HR
II N, I ll N, IV, V N
Project Base Plus Base Plus Base Pius
Sq. Ft. Fee Increment' Fee
!&.w E!T x?L. ...... I nc r ~ e ! K - Fee Increment'
Pubiic Building - 1.000 $4.084.00 $103.03 $3,403.00 $85.86 - ~ $2.722.50 $68.69
-
Recreation 5.000 $8,205.00 __- $19.69 $6,837.50 "A $5.470.00 513.13
10,000 49,189.50 $10.21 $7,658.00 $8.51 56.126.50 $6.81.-
..
20.000 $10,210.50 $20.43 $8,508.50 517.02 $6,807.00 $13.62
. . . .... . .... ....
50.000 $16.338.00 522.46 $1 3.6%OP $18.72 $10.891.50 $14.98 __
PublicBuilding - . 1,000 $2,821.50 ................ $71.18 . $2.351.00 . . $59.33 $1.880.50 547.46-
Utility Plant
~ ~ . . ~ ..
$5.668.50 $13.62 $4,724.00 $11.34 $3.779.00 . - 59.S~ ~ .
5.000 . . . . . . . . . .
$i.O6 $5,291.00
..'LC!!!? s!!%%? ... .... $5.88 $4.232.50 $4 .7 1 ~ - ~ ~
$14.11
20.000 $7.055.00 55,879.00 $11.76 $4,703.00 $9.41
50,000 51 1.287.50 515.52 $9.406.00 $12.94 $7,525.00 $10.35
.. ....... ............. .... .. .... ...... ...
Repair Garage 1,000 $1.113.50 .$28.10 _- S927.50 $23.43 $742.00-_ $18.74
I
5.000 $2,237.50 55,37 $1,864.50 54.48 $1,491.50 $3.58---
Residential -AptlCando, 50.000 S11,139.00 $5.57 $9.282.50
S4.64 57,426.00 $3.71 I
High Rise 100.000 S13.924.00--
$6.96 - $11.603.50 S5.80 $9,282.50
$4.64
200,000 $20,886.50 $2.32 ~ -$17,405.50
$1.93 S13,924._00_,. $1155
;
Residential - 1.000 $559.00 $6.70 s 4 6 5 a $5.60 .. . __ $372.50
$626.00 $3.50 $521 SO
Manufactured Housing .-.2.000
$2.93 $417.50 $2.30
4,000 .... $696.00 . $6.96 $580.00 $5.79 . $463.50 .. $4.64 . .
Residentiai-SFDIDuplex, - - Addition See Table 5018 for combinedPlan Chech and Inspection Foe!
~ . -
Residential - S FD lO up l e x ,~ O nla nla nia nla 5835.00 _ _ _ _ _ . $69.60
Custom 1,500 nla nla nlo ......... nis ..... $1,183.00 .. $41.80
2,000 nla ~ nia nia nla $1,392.00 541 .80
3,000 nia nia nla $1 ,810.oO $6.95--n1a
- - - . _ _ _ _
5,000 nla nia nla nia $1,949.00 $6.96
/
. ............ . ..... ..
Residential - SFDIDupiex. 1.000 nla nla nla nla
SSQ7.00 $39.8",._-
Models
1.500 nla nia
nla n/a 5596.00
$19.90
- .- . -1
2.000 n!a nia n!a nia S795.5O $14.90
.. ........................... .... ... ..........
3,000 nla nla nia nla .... $944.50 $7.45
5.000
- -.
nki nla nla $1,093.50 $5.97
........ .....
i Residential - SFDIDupleu
I- ~ c t i r i ~ q h_ase~ . . . ......... SE !nf~'ma!!~_"~sol!etm !XHow14Pb!?~!?~?.~ermiiR?_~i_d~~!i!l _~ ~ ste i _~ l a ~ . ...... . . . . . . i
/Residential Care 200 $742.00 593.69 $618.00 $78.13 nla ..
$17.90 1.000 $1,491.50 $1.243.00 $14.90 - - nla
2,000 51,670.50 $9.28 $1.392.00 57.73 n/a nla
.................. . ........ . . . . . .
4.000 $1.856.00 $18.57 $1,546.50 $15.48 nla
1
nio
"la - -
10.000 $2,970.00 S20.43 $2.475.00 517.02 ... nla 1
I
'Per each additional 100 square ieet or iraciion thcreof
/ p a g e l a o f 4 3 City of San Diego - Information Bullet in 501
March 2006 1
Table 501C -New Construction Building Permit
ConstructionCategories Construction Cstegorles Construction Categories
I FR, ii FR II I-HR. 111 I-HR. V 1-HR
I1 N, Ill N, IV, V N
Project Base Plus Base Plus Base
Sq. Ft. Fee Increment' Fee i n c r em e n t '
E r &! pm T Y E . . . - . ...... . . . ........... Fee Increment'
... ..... .. ....
1,000 $1,496.50
$37.76 $1.247.00
$31.48
$997.50 $25.18
5,000 $3,007.00
$7.22
$2,506.00 ".02-. $2,004.50
$4,81
1 10,000 $3,368.00 $3.75
$2,807.00 63,12
$2,245.00 S2.50
20,000 $3.742.50 $7.49 ... ~ ~ ~ ~ ~ ! . . . . . . 6124 . . $2.495.00 . $4.99
-
50,000 $5,988.00 $8.24 $6.86 $3,991.50 $5.49
54,990.00 .
Restaurant -Shell -1,00030--. 5997.50 $25.18 $831 .OO s20.g9 $665.00 $16.78
.--.-_ _ _ _ .p
5.000 $2.004.50 $4.81 $1.670.50 $4.01 $1.336.00 53.21
- ~ . ..-........ .... . . .....
10,000 $2.245.00 $2.50 S1.871 .OO _$2.08 $1.496.50 $1.67
20.000 52.495.00 54.99 - $4.18 $1.663.00 $3.33
$2079.00
50,000 53,991.50 $6.49 $3,326.50 $4.58 $2,661.00 $3.68
.. ................................ ....... ........
Retail -Department Stare 1,000 $2.598.50 $65.56 $2,165.50 $54.84 $1,732.00 $43.73
--
_
20,000 $6,498.00- s13.00 $5,414.50
$10.83
$4,331.50 $8.6-
50,000 $10.398.50
514.30 $8,663.50
$11.91
$6.931.00 $9.53--_
-. ....... ........ . .........
Retail -Market 1.000 $1.670.50 . 542.15 51,392.00 $35.13 51,113.50 ... 528.10 - - -
5.000 $3.356.50 $8.06 52.797.00 $6.71 $2937.50 $5.37
50.000 ~ ~ $6,583.50 $9.19 $5,569.50 $7.66 $4,455.50 $8.13 -
Retail -Store 1,000 $1,335.00- 533.73 $1.113.50 $26.10 $891.00 S22.48__-
5.000 $2,685.00 $6.44
- -
$2,237.50 S5.37 $1,790.00
Retail - Store, Shell 1,000 $22.48 s891.00
$742.00 $18.74 $583.50 $14.99
5,000 $1,790.00 $4.29 $1,491.50 53.58 51,193.00 $2.86
. ~ - . ~ - ~ ... . ~ . . ~ ........... ~ . .....
10,000 $2,004.50 $2.23 $1.670.50 $1.86 $1,336.00 $1.49
..~ .............
50,000 $3.564.50 $4.90 52.970.00 $4.09 $2,375.50
.................-.. ... ... . . .
Retail -
- 1.000 $742.00 $18.74 $518.! x $15.83 ..-_-_-_-p $494.50 $12.49
School .l;O?L! . .$3E !:~ 0 . . . . . . $74.93 . S&?'!L"!? .... Se2.4t. . $1,979.50 . $49.96 -
5.000 $5.967.00 $14.33 $4.972.50 - $3,978.00 $9.55
$17.94 ...
'Per each additional 100 square feel or iiaclian thereof,
/ March 2006 c i ty of San Diego. Information Bulletin 501 p a g ZG 4
1 Table 501C - New Construction Buildina Permit 1
.'
Construction Categories Construction Categories Construction Categories
I FR, II FR
II 1-HR, 111 1-HR, V 1-HR ! IN, I ll N, IV, V N
Project Base Plus Base Plus Base
Sq. Ft. Fee Increment'
occupancy Type- - ~ - . . . . . . Fee - .
Increment' Fee Increment'
200 $324.50 $40.94 $270.50 $34.13 $216.00 $27.31 ...
Tenant improvement, _ . . . . . _ .
Other 1,000 $652.00 $7.85 -__ $543.50 $6.50 . . 5434.50 $5.25 i
$730.50
2,000
-
$608.50
S4,05 $3.40 $487.00 $2.70
. ...
$6.77 $541.00 $5.41
- --
$7.45 $865.50 $5.96
Theater - - $44.31 nla nia
-
5.000 54,235.50 $10.17 $3,529.50 $8.47 nla nla
................... . ... ..... ....
10.000 $4.744.00 $5.27 $3.053.00 - $4.40 n:a
n'a .......
$10.54 20,000 $5,271.00
- $4,392.50 $8.79 nla nla
50,000 $8.433.50 $11.60 $9.67 nla nla
...- .. . $7.028.00 . ___ - - - .................
Warehouse 2,500 . $1,085.50 $11.54 $9.61
$g04.60 $723.50 $7.69
$2.02 $1.817.50
12,000 $2,181.50 $1 .88 $1,454.00 $1.35
... .
25,000 $2,443.50 $1.08 $0.91 Sl.G29.00 $0.72
. . . . . ._-E.??~_ms.OO.... . ....... .... ..
125.000 54,344.00 $3,620.00
52.39 - . - _ _ _ -. .... ....
$1.99 52,896.00 $1.59
-_
Woodworiring 1,000 ... $965.00 .... 524.35 $804.00 $20.29 $643.50 $16.23
. -.........-. ....... ..... ..
I
5,000 $1.939.00 $4.65 $1.615.50 $3.89 $1,292.50 53.11
- -
_- -
I
'Per each atiditional 100 square ieei or Iiaclicn thereof.
Page 20 of 43
City of Sen Diego. Information Bulletin 501
March 2006
Table 501 D - Fire Plan Check and lnsaection
1
$1 681.00 $1,846.50 $6.05 $5.10 $14.19 $5.79
' 0 0 $1,0%00_-___~ ~ . . ~ -
i n n cr 9K . 2 "" " A c "n ,c .n n .."on "- "" -.. . .
I
(FA) -Construction Categories I FR and 11 FR
6
$1.48
$ 5 . 9 2 5 4 . 9 4 . ,
.50 $6.60 . .. ....~ $4.34 $=--,
50,000 $8.377.50 pl,B55.00 $4.651 .OD $5,079.50 -50.03
$0.54... $3.43 . . =
Church 1.000 $3.021.00 $1,049.00 $1.681.00 $1,646.50 $6.05
$14.19 $5.79$ S . lL .... ~ ~
!
5,000 ~ $3.263.00 $1,253.00 $2.448.50 . $2,078.00 _ . . . 516.89 %!%g. . , $9.33 $11.44
1
I
1Occupancy Project
1Type Sq. Ft.
1
4 $4.29 $5.38
-- ~.
-. -.
17.46 ~ $0.82 $3.31 55.70
~. ~
Dry Cleaning 1,000 $2.922.50 ~94900$1~780,5 ! $1,750.50 $ 5 ~ 5 $4.70 - . $13.91 $ 5 . 4 6
5,000 53 ,156 .00 $JSlii37.O0 $2.337.00 - $1,969.00 $16.38 $3.75 58.90 $10.97
1 !!!L!!OO. $,3.975_" .....%1~2% ?!s_o. .S2E2:(Ic.-$2.5 17:5 0_~E8_7_-~~. 52.88 ~ ~ $5.57 ~
$9.88 ..~ ~ j
Base Fee
Sprinklers
No Sprinklers
Sprinklers Alarms
& Alarms
or Alarms
Only Only
Plus Increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers
No Sprinklers Sprinklers Alarms
&Alarms
or Alarms Only Only
ATTACHMENT - 4
/ March 2006 Citv of San Dieso -Information Bulletin 501 ~ a o e 2 1 of43 1
1
Table 501D - Fire Plan Check and lns~ ection
20,000 $9,174.00 $2,451.50 $5,497.50 $5,926.00_-- $21.93 $2.10 $9.72 516.11
Hazardous 100 $3.417.50 $1.932.00 ~ . .~ $2.586.00 .. $2.433.00 569.75
uses. o'i'cr , sao -_s3L6_ss:sp
E ! ? KQL _ .>i ? L E -_ . _" ?m.S_182.30 30-.. XLE .8 0 .... 523.1! , _$_1_4116_0_
(FA) - Construction Categories I FR and iI FR
50.000 $9.1 17.50 $3.378.50 $5,889.00 $6,626.0p $8.59 S1.19 $il.Ol $7.06
..~ .. . - - ~ . . ~
LablR&D. 1.000 $3,017.50 $1.302.50 $2,056.50 $1,831.00 ~ ~ $18.14 $5.71
$5.99 , $6.90 ~ .
~
Shell 5,000 $3,257.00 51,578.50 .$2,762.00 $2,059.50 $17.01
5 5 . 5 3 - ? : ? ! $! ! LC_
Occupancy Project
Type Sq. Ft.
Base Fea
Sprinklers
No Sprinklers Sprinklers Alarms
& Alerms
or Alarms Only Only
Plus Increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers No Sprinlrlers Sprinklers
Alarms
&Alarms or Alarms
Only Only
Page 22 of 43
City of San Diego Information Bulletin 501
-
Table 5010 -Fire Plan Check and Inspection
I I
Laundromat. 150 52,432.50 0 0 0 0 $579.50 S1.424.50 $1,254.50. $32.00 ->%67 $87.17 $26.08
750 S2.62420 7!3.S~1,947.50 $1,41100- $91.73 $16.60
-- $49.47 $ 5 4 . 8 0
. ~ ~ ~ ~ ....... ..... . $29.63 $48.23 ......... 1.500 . S3:311.5_0 S82B:O_O_ SZ~iiLs15_0 .511822.0_0_$71.50 . ... _$ 1 1 :0 0 - ~
3,000 $4,385.00 5 9 3 . 0 $2,763.00 $2,545.50 $43.39 $5.53 $22.22 $24.41
7.500 $6.337.50- $1,242.00 - $3,763.00- $3,644.00 $41.60 $3.31 $19.86 $27.84
~ ~ ~ ~ ~
1,000 $3,312.50 $1.324.50 $2,120.00 $2,120.00 56.63
$16.55 . $6.61
Libraw' . . $6.63 .
Museum 5,000 $33.77.50 $1.589.50 $ $2,384.50 $18.55 $5.31
$10.81 $13.26 -
10,000 $4.505.00 $1,855.00 $3,312.54 $3.047.50 514.58
- - ..... ~ ~ . ~ ~ 53.98 $6.83 $11.93
20,000 ~ $5,963.00 $2.252.50 $3,975.00 $4,240.50 ~ - ~ . 58.84 $2.21 .
54.86 $6.18
.
.- - ~
50.000 $8,813.50 $2,915.00 -$5.13300 - $6,095.50 $ 8 2 2
$l.06 $3.84 $6.63 -
Nursing -- 1.000 $3,116.00 $1,126.00 51,918.50 $1,927.50 $6.20
.... . .............. $5.79 $16.04 $8.01
$4.84 $9.75 512.28
"'me'
.2! 990- . .-.S3,35_4.!_0 . $1,357.50 . 522EOO . ... _$ ~O_. . S 1 1 ~5 35 3. .
- - ........
Assisted . lO~~O~~~ll4,240.50 $1,589.50 S 3 . 0 4 Z 52,782.00 - 2 3 . 7 2 ~5 . 99 $&7- -
53.32 . . .......
20.000 $5,612.50 $1.921.00 - -_ 53,646.50 S3,879.00 $8.32 - -_-_
L iving ..__ $1.77 $4.44 $5.62 -
$0.93 53.67 $6.19
. - _LQloao~ _ . 2 s . 0 0 . - . 1 1 5 1 . s oL . ~E? .. .%5,5=LP_~7:BP_ _ ~ _ ~ P _ _ P _ . ~ ~ .......
.. ~ ~ ~ .
Office 1.000 $4,140.50 $1,656.00 $2,650.00 $2,650.00 $8.29
- .. ......... $8.28 $20.70 $ 8 . 28
5,000 S4.472.00 $1,987.00 53,478.00 $2.981.00_~523:g
. $6.63 $13.25 $16.57
10,000 $5.632.00 .............. $2,318.50 $4,140.50 $3,809.50 .. ....... 518.22 $4.98 $8.29 $14.91
.......... .
~ ~
~ ~ ~ ~ ~ ~ ~ ~
20.000 $7,45400- $2,818.00 S4.989.00 $5.300.50_ 511.04 $2.76..-- $6.07 $7.73-
$6 791.00 $7.819.50 $10.27 51.33 54.80 58.28
50,000 $10,766.50 $38844.00 !
O ff i c e S h e i l - 1 s $2,237.50 $551.50 51.3n.50 $1,092.00 ...... ~ . ~ $4.41 $12.86 s3.40-.
53.04
1
5,000 $2,414,00 $673.00 - $1,892.00 51228.00 $12.67
. $2.43 - - $7.21 $7.23 1
.... .... ....... .....
.?!L&!Q.. S3_.057So~-X e.159 3?22~?L02L5aS~22 -19.87 5L55 5 3 . ? 9 56.35 !
1
(FA) - Construction Categories I FR and 11 FR
$0.49 $2.89 $3.69----
. .1,000 ...... $4.140.50 $1,656.00 $2,650.00 $2,153.00 $8.29 $8.28 office- :?PL27E-~. S2I).74-.
Partial 5,000 __S4,472.00 $1.987.00 $3.47800 $2,901.00 _-$ ? 222 56.63 $13.25 $18.57
....
I
Occupancy Project
/Type Sq. Ft.
1
Permit 10,000 S5,832.00 $ 2 . 3 1 8 ~ $ 4 , 1 4 0 . 5 0 . - $3.809.50 $18.22 $4.98
$2.76
2 0 3 9 0 - -~7~4!4 .00$2,~1 '0_O_ .... S!L~L~:P!
S5,300' L? i)-~511104 ...... ................... E07_- '7.13
50,000 $10,7662.5~- $3,644.00 $8,791.00 57,619.50 $10.27 51.33 $3.31 $8.28
Office, 1,000 $1,011.50 nia nla nla
- . - - -
nla
...... $1.96 . la _____---__-
High Rlse 5,000 $1,090.00
- - - . _ -
nla nia $5.79 nla
. ........ . ....
nla ........
. . . . .
nle nla
.
n1a . _ __ - _-
10.000 $1,379.50 nia nla 54.48 .- nla nla .
20,000 $1.827.00 ~ ~ nla ~ nle n h nla 1
. . . ..
.. ....... . . -......... .---... . . ................
$2.72 / a
nla nia nla 52.70 nla nla i
50,000 52~64?JFL .- - ._?i%- I
1,000 S1,011.50
Office, .
nla nia *a - $1.96 nia nia
nla nla .
High Rise- ..5,000. .... $1.090.00 nia $579 nla nla
10,000 $1.379.50 .nlu nla nla $4.48 nia .
partial . . . . ... - ..,. . _ .
20,000 $1 ,027.00 nla nla $2.72
Permit ............... nla . n/a -.--I n/a
50.000 $2,642.00 .- nla nla $2.70 nla . . . . . nla
n h - .. - . -
, I/= ....
Base Fee
Sprinklers
No Sprinklers Sprinklers Alarms
&Alarms
or Alarms Only Only
Plus Increment Per Each Additional
lo0 SF or FractionThereof
Sprinklers No Sprinklers
Sprinklers Alarms
&Alarms or Alarms
Only Oniy 1
I-March 2006
City of San Diego-I nformation Bulle tin 501
Page 23 of 43 1
1,000 S2.629.00 , $662.00 $1,510.50 $1,469.50 $5.24
Office, - . .. 53.31 512.33 ~ ~ . ~ $4.59
Medical 5.000 $2,838.50 S794.50 $2.003.50 $1,653.00 $14.78 $2.65 $7.62 $9.34
....
1 ...-
..-.-.... . . . .... ............. .
10.000 $3,577.50 $927.00 $2,384.50 52,120.00 $11.58 $1.99
........... . . .
$4.72 $8.35
Table 501 D - Fire Plan Check and Inspection
I
(FA) - Construction Categories I FR and II FR
~ ~ ~
'
Office, ~ . $4.98 .. ....
.-..- ..
. $15.50 $4.58
1,ooo 52 .~ 7 .50 $927.00 $ L ~ ~ . . _~11161:00 ~ 5 . 2 ~ __-
Medical- - 5,000 $2,835.50 - 51,126.00 $2,337 .04- S1.644.00 $14.84-
$8.90 59.52
S3.97---p-p
Shell 10.000 S3.57 7 .5~ $~ ~ 2 5.: 0 ~ _&7 8 2 .0 0 52.120.00 - $11.58 $5.36 $8.41
52.65
20,000 54,735.50 $1,589.50 $3.317.50 $2,961.00 $7.03
- - - . . - .. .... - - ..... .. .. . $1.33 . 54.01 $4.27 .
. . . . . . . . . .
- 50,000 $6,842.!0 _--- $_?9L7.00 54.521.00 $4,240.50 $6.70 $0.80 $3.51 $4.84 ...........
Office, 1.000 $9629.00 $662.00 nia n/a
~ $5.24-.
... $3.31 . .. - nla ........... nla
Medical 5,000 $2,838.50 $794.50 nia nla
$14.78 $2.65 nln
-...- . . ...... .......- - . . - - - .
Occupsncy Project
Type Sq. Ft.
wlOSHPD 10,000 _ $3.577.50 $927.00 nia nla 61.99
$11 3 8 nia
nia
20.000 $4.735.50 $1.126.00 ~ ~ ~ ~ ~ ~
50,000 $8 842.00 $1
.. .... L
Office, T e n n n t , $1,573.50 $496.50.- $91 1.00
lmpravement 5,000 $1,9g4_50 8662.00
$! ,242.1)0 . -S1!324.50 E;!-3?5 $3.32 - - $3.31 $13.25
$6.83 $4.98
-.!WOO ....... 42,567oo ...... .$_828.?P. S3oi.E .. =Lo? ....
. ..S?.:SS .............
Base Fee
Sprinklers No Sprinklers Sprinklers Alarms
&Alarms or Alarms Only Only
nla $7.02
- - -
nia
$1"
...
,457.50 nla $6.60 $0.53 nla
.. - - - . . a
- -
$1.159.00 $8.28 $ 4 .1 4 58.28 $414
Plus Increment Per Each Addltional
100 SF or FractionThereof
Sprinklers No Sprinklers Sprinklers Alarms
&Alarms or Alarms Only Only
...... . - .........
20,000 53,561.00 5993.00 4~20701)(1_ $2.484.50 $10.49 86.07 $5.52
151.11
50.000 $6.708.50 $1.324.50 $3,892.00 $4.140.50 $10.27 50.66
55.63 $5.30 1
.
~
Parking 1,000 $2,435.50 5780.50 W,483,50 $1,458.50 $4,86
$3.93 $11.60 . ..... 5%. .
5,000 52.63000 5947.50 $1,947.50 $1,641.00 513.65
Oarage* ..... -- $3.13 . $7.42 $9.14 ,
i
20,000 $4,384.50 $1,343.00. $2,782.00.. $2,919.00 $6.50
- - $1.35 ._ S3.40 _ $4.26 1
.
50,000 $6,333.50 ....... .. 51,748.00 $3.803.00 $4,196.00 $6,06 $0.83 $2.69 $4.57__
1.000 $2,271.50 $625.50 $1.315.50 $1,298.00 $4.51 . .
parking ... . . . ?!I ........ L 34.06~
Garage 5,000 $2.452.00 S754.00 $1,762.00 . _ g144: 50 $12.79 . - - S2.58 $6.72 $8.33
- -
10,000 $3.091.50 $883.00 $2.098.00 $1.877.00 $10.07
,Open - - $1.84 $4.11 $7.41
i
i
20,000 $4.092.50 $1,067.00 $2.508.50... $2.618.00 $6.07 $0.98. . . . . . 33.05 $3.79
..-- . .
i
I
50,000 $5.913.00 $1,361.50 83.423.00 $3.754.00 $5.74 $0.52 --
$2.55 $4.21
Preschool/ - .L~ OL $5,651 .SO !17=.52,! 86.00 $2.178,00 57.25 $6.04 $18.39 $6.80
..........
.. ... .. $4.83 ....... ... .
~ a v c a r e 5 . ~ . $ 3 . 9 ~ 1 . 5 c . _ ~ ! ~ ~ ~ _ - ~ s z . s 2 ~ . ~j~seoo . g . g 613:?4
10.000 $4.969.00 $1.65650, 53,478.00 $3.147.00 S16.08 $3.45 $6.83 512.41
.......... .-
20,000 $6,577.00 $2,001.00 $4,160.50 %4,388.00_- $9.75
- - ... ............. -. 51.84 $5.06 56.36 I
........
50,000 $9,503.00 $2,553.50 $5.678.00 .. . $8,294.50 59.21 . $0.97 . . . . $1.21 $7,03
............ . . .
. ......
Public
1.000 s3,375.00
$965.00
$I,g95.00
$1,913.50
$6.73
...................... $4.85
$18.38 $5.99
Building- $3,644.00
5.000
S1,15~.00
52,650.00 S2.153.00
$18.98
$3.88
- - 510.09 S12.14 -
.. .......
F ire 52.88
$6.23 510.87
... !.OJO!O- ._$_4:j93:0_0 .._S! :353.00-33-1220 ....... 2?27_60.00 .. . % _4 :86 .........................................
Station 20,000 $6,07g.oc-. $1.642.00 $3,777.50 53.846.5F , .. $9.01 $1.59
5 4 . 6 0 -1$558-
. 50,000 >&783.00 $0.78
i
i
I page2 4 of4 3 Cltv of San Diego -information Bulletin 501 March 2006 1
1 Table 501D - Fire Plan Check and ins~ect ion I
I
(FA) - Construction Categories I FR and I i FR
I I Pius Increment Per Each Additional 1
Base Fee
100 SF or Fraction Thereof
I Occupancy
Proj.3ct / Sprlntdsrs No Sprinklers SPrinkien Aianns iSprinIers No Sprinklers Sprinklers Alarms
Type
Sq. Ft. &Alarms or Alarms Only Oniy 8 Alarms or Alarms Only Only
Public .
1.000 . $4,386.50 ........$1,904.50 $2,902.00 $2,891.00 $8.81
, ............. . .
$9.31
. .....
$21.35 $9.03 ...
1
Building - , 5,000
.$4,739.00
S2.277.00
g3L7S6 A(?q. $3,252.00 $24.48 -__ $7.46
$14.32 817.77
Misc. 10.000
55,963.00 $2,650.00
$4,472.00 $4,140 50 - S19.29
$5.80 $9.08
$16.12
...........................
I ............ 20,000 $7,892.00 $3.229.50 $5,380.00 $5.752.00. $11.69 - -53.31 .......... $6.60 $8.43
Public 1,000 $4,386.50 $ 1 ,9 0 4 . 5 0 ~ ~ ~ . 0 0 $2.891.00
.- .....
1.35 ... $9.03
5 000 54,739.00 $2,277.00 $3,756.00 $3,252.00 $24.46 $7.46 $14.32 $17.77
Building - - , ....... .. .
Office 30,000 $5.!363.00 $2,650.00 $4,472.00 $4,14050- -_S19.29 $9.08 $16.12
S 5 . E
/Public 1,000 $4.140.50- $1,656.00 $2.650.00 $2.650.00 .... $8.29
.. $20.70 $8.28 1
-
Building - 5,000 $4,472.00 $1,987.00 S3,478.00800. S2,981 .00 $23.20 $13.25 $16.57
56.63
10.000 $5.632.00 $2,318.50 54.140.50 $3,809.50 $18.22 $4.98 $8.29 $14.81 ..
poiice .............................
20.000 $7.454.00 $2,016.00 S4.989.00___IS5~00.50 $11.04 52.76 $6.07 57.73
Public 1.000 $4,140.50 51,656.00 $2,650.00 $2.85000 $8.29 $8.28
$20.70 $8.28
......... . .........
Bullding- 5,0 0 0 $4.472.00 $1,987.00
S3,478,00
$2,981.00 $23.20
$6.63 813.25 $16.57
Recreation _LD,OOO $ 5 . 6 3 2 . 0 0 . . ~ ~ . 5 0
$4.140.50 $3,809.50
$18.22
---......-..-. $4.88 ,- $8.29 $14.91
-.
20,000 $7,454.00 $2.816.00 $4,969.00 $5,300.50 $11.04 $2.76 $6.07 .. $7.73
. .. ........
50.000 $10.766.50 $3.644.00 $6.791.00 .. $7,619.50 $10.27 $1.33_ $4.80 $8.28
Public . 1,000 $6,829.50 - -$4,748.00 $5.300.50 $5.477.00 $13.84 $23.48 $37.24 . $17.11 ..
........... ........ ......
Building - 5,000 57.383.00 $5,687.00 $6,790.00 $ 6 6 $37.86 518.78 $25.87 533.14
10,000 $9,276.00 $6,626.00-$8,083.50 57,818.50 $30.00 $14.36 $16.59 ..... $30.26
Utility
.
20,000 $12,275.50 $8,061.50 $9,742.50 S10.844.50 1 8 .! 6 . . . $8.10 . . $12.00 $15.98
- 50,000 $17.i~ 2[)_S10.491.00 $13.342.00 .=iLUOo $16.37 $375- $8.83 $16_%_
1,000 $3,778.00 $1,324.50. S2.391.50 $2,318.50 $7.61
Repair ............ $6.23 $18.73 $7.25
OBrage _>$P!! . .. .. %E??!.. -$!&?L3:% .... !??!D6%!E _..S2.fi01(Lf20_s210460Z?2t-~%l-;5 ..... $4.97 ........... $11.67 $14.08 ~ . ,
10,000 $5.134.50 $1,822.00 $3,440 0 $3.312.50
,S16.6-- $4.14 $7.49 $12.84
20,000 $6,705.50 $2,235.50 $4,392.50 - $4,596.50 $10.06
. . $2.49 $5.41 $6.77
50,000 $9,813.00 $2,981.00 $6,016.00 $6,628.00 $9.20 $3.97 $6.95
.-....--..... ........
Residential-. 1,000 $3.114.00 $1.115.00 $1,886.50 S1,919.00 & i ~ - $5.94 - -
$16.84 $6.00
AptjCondo 5,000 $3.360.50 $1,352.50 $22$gS0e SIL59.00 $17.60 $4.74 $9.75 $12.46
10,000 $4,240.50 $1,589.50 $3,047.50 $2.782.00 $13.72 .. ................... $3.21 $5.89 . $11.04
.............. ..................- . . .
20,000
55,612.50
$ 1. 9 10. 0 0 . . $3&3_WOio
52A6.00 $6.33
$1.62 $4.44
55.60
50.000 S8.111.00 $2.395.50
$4,956.00
$5.565.00 $0.95
$7.94
$3.81 $6.33 1
. .. . .
nla nla $1.96 nla nla ..
~ esiaentiai- l,oao 5 .............. nia, .... . ..... - . .............. za_
nla
AptJCondo, 5,000 g l g 0 0 0 nla $5.79 nla nla
n1a - - - -____--
nla ...
nla nla
Higir Rise .10.000 $1.379.50 . nla - $4.48 nla nla
nia ....
~ . .
nla nla nla $2.72 nia nla
........................... . ..................................... 20.90"',8~7!110_ n!a
50,000 $2.642.00 nla nla "!a_---- $2.70 nia nla
nla - - _ . _ _ _ _
March 2006 City of San Dieso -Information Bulletln 501
Pane 25 of 43 1
1
Table 501 D -Fire Plan Check and Inspection
(FA) - Construction Categories I FR and II FR
I
Plus increment Per Each AddLianal
Base Fee
100 SF or Fraction Thereof
Restaurant- 1,0 0 0 $ 2,947.00- $ 983.50 $ 1,760.00 1,766.50 55.83
. - - _ - -
$ 5.21 $ 15.61 $ 5.57
Shell 5 ,0 0 0 $ 3,160.0 0 S L . 0 $ 2,384.50 $ 1 ,8 7 0 0 S 1 4 54.16 59.10 $ 11.49 ______~~
i
i Occupancy Project
1Type Sq. Ft.
Department ...5Qg oo-- ' 3,674.50 $ 1,125.00 $ 2,643.00 $ 2.179.50
$ 19.27 S3z!.. $ 10.08 512.73
Store 10.000 S4.638.00 $ 1.324.50
$ 3,147.0 0 _~~~,616.0 0 $ 15.01
5 2.63 ~ $ 6.03~ ~-.~-~--$ 11.20
Improvement S,O UO .,. $ 2.032.50 $ 703.50 1.15:.50 . , $ tL5j1.50 $ 10.69 - $ 2."9 $ 4.50 S8.91.~-. 1
10 ,0 0 0 S2.567.00 $ 826.00 $ 1,407.50 $ 1,987.00 $ 831. S1.65 52.65 $ 7.89
I
20 ,0 0 0 53,398.00 . ~ $ 993.00 ~ $ 1,672.5 0 . ~ .... ~ 52.776.00 $5.05 $ 0.63 $ 2.01 $ 4.00 .~ ~
I
Sprinklers No Sprinklers Sprinklers
Alanns
&Alarms or Alarms Only Only
Sprinklers
No Sprinklers
Sprinklers Alarms
&Alarms
or Alarms
Only Only
I Page 26 oi 43 city of San Diego lniormation Buiietin 501 Marcli 2006 1
I Table 501D - Fire Plan Check and Inspection 1
(FA) -ConstructionCategories I FR and II FR
Occupancy ProJecf
Type Sq. Ft.
1,000 $4,885.50 $3.220.50 $3,843.00 $3,828.00 $10.03 $14.95 5 5
Semi. $22.19 $11.96
c'nductor 5.000- _35E52 3!8 18 . 5 0 44L3050 .%3_0_650Sa6Z? ........ ?."L~L.. .. $18.03 $2?G .
Fabrication 10.000 $8.626.00 $4,417.00 $5.632.00 . $5,411.00_-$21.42 $10.13 $12.06 $20.62
20,000 $8,767.50 55.429.50 $6,837.50 $7.472.50 $12.94 $6.14 $8.53 $ l l L
~ ~ ~ - . ~ ~ ~ ~ ~ - ~
50,000 $12.649.50 $7,270.00 $9395.00 2 $10822.50 1 . ~. . S?.?? $5.50 510.67
200 $2.499.00 $1,656.00 $1z7= $2,082.50 $25.19 $41.38
l k n a n t $64.63 $32.56
50.EP. . . -23963. 00 .- X ~~Z?L?... 2iLELE. - . SLESIIL $3.58 . . i ? . $2r1 ! L_ $! .64 .
125,000 $8,614.50 $2.337.50 $6,772.50 $4.048.00 $3.32 ~ . ~ $0.35 $205 $1.76 _
Waodworking 1,000
- $ ~ O W ~ ~ O
~$1,037.50 .%.849.50
51.838.50 85.25$ 0
$14.98 $5.75
5.000 $3,280.00
$1,247.50 $2,448.50
$2.068.50 $18.95
$4.20 $9.33 $11.63
. . - , ~ ~ ~ ~ . ~ ~ ~ .~ ~ ~ ....
10,000
$4,107.50 - $1,457.50 $2,915.00 - $2,550.00
$13.29
, ,53.09
$5.78 $10.41
I 20,000
$5,436.50 $1,766.50 ~ . . ~ $3.493.00 $3,691.00
$8.06-
$1.69 - $4.26 $5.37
!
$0.84 53.45 $5.84
I .. . - 50,DOO . ?7,8?.50 .$22?%.L .~L7P-00 ..S?i30E 575S.. . . . , .
i
/
/
I
/
/
Base Fee
Sprlnklers No Sprinklers Sprinklers Alarms
&Alarms or Alarms Only Only
Improvement 1.000 --S2,700.50
$1,987.00 52,295.50 $2.34300
$69.50 $33.15
$43.75 $63.80
Other -~ 2,000 $3,395.50
$2.318.50 $2,733.00 .- $2.981.00
$54.90 S24.88 $27.83 $57.95
~
4.000 $4.493.50 $2.616.00 $3 ,289.9 $4.140.00 533.2 5 $13.80 520.21
$30.38 _
10,000 $6,488.50 $3,644.00 S4.502.00 S5.963.00 $30.25
~ . $6.63 $15.21 $31.65
Theater l,ooo S2,391.00 $7-2 ".3!6?O021.4L':0_0 . _2 ? .76 $3.64 ~ $11.58 $4.45
improvement 1.0oo ..S2,700.50
$1,987.00 52,295.50 $2.34300
$69.50 $33.15
$43.75 ~63 .80
Other - ~ 2,000 $3,395.50
$2.318.50 $2,733.00 .- $2.981.00
$54.90 S24.88 $27.83 $57.95
~
4.000 $4.493.50 $2.616.00 $3 ,289.9 $4.140.00 533.2 5 $13.80 520.21
$30.38 _
10,000 $6,488.50 $3,644.00 S4.502.00 S5.963.00 $30.25
~ . $6.63 $15.21 $31.65
Theater l,ooo S2,391.00 $7-2 ".3!6?O021.4L':0_0 . _2 ? .76 $3.64 ~ $11.58 $4.45
Plus Increment Per Each Additional
100 SF ar Fraction Thereof
Sprinlllers
No Sprinklers Sprinklers Alarms
&Alarms
or Alarms Only Only ,
5.000 $2,581.50 $658.00 __S1,859.50 $1.605.00 3 . 4 4
- - S 2 .9 0 - - $7.08 $9.09 ._
10,000 53,253.50 $1,003.00 52,213.50 S2,059.50 $10.53 $2.12 54.37 $8.12
_-_ _ _ _ _ - ~ ~
5.000 $2,581.50 $658.00 __S1,859.50 $1.605.00 3 . 4 4
- - S 2 .9 0 - - $7.08 $9.09 ._
l n n n " $3,253.50 $1,003.00
52,213.50 S2,059.50 $10.53 _-_ _ _ _ _ - ~ ~
$2.12 54.37 $8.12
1
March 2006
City of San Diego. Information Bulletin 501 Page 27 of 43
Table 501 D - Fire Plan Check and Inspection
(FB) - Construction Categories II 1-HR, ill 1-HR, and V 1-HR
1
Pills Increment Per Each Additional
I
Base Fee
100 SF or Fraction Thereof
i
Occupancy Project Sprinklers No Sprinklers Sprinklers Alarms Sprinklers NoSprinklers Sprinklers Alarms
Type sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only only i
I
.
20,000
$3,800.00
-$200.00 $2.243.50
$2,311.00 $5.64 $0.74 $2.72 $3.34
50.000
55,491.50
51.021.00 $3,060.50
$3,312.50
$5.35
$0.39 - . $ Eg. . . . -v73
.. ...
- -
Bank-Shell 1.000 $2.189.50 $772.50 $1.430.50 $1,217.50 $4.33 -- $4.14 512.93
- - 53LD_
5.000 $2.362.50 $938.00 $1,947.50 $1,368.50 512.37 $3.32 $7.42 $7.94
1
- .. .........
$3.93
/Dry Cleaning 1,000 $2,435.50 $790.50 $1,483.50 $1,458.50 $4.86 $11.60 $4.56
1Plant . 5,000 $2,G3OOO0 $947.50 $1,947.50 $1.641.00 $13.85 $3.13 57.42 $9.14
.....................
Center 5,000 $2.539.50 __-E8f300 $1,87700 $1,545.50 $~.13ss s s $3.03 , 87.15 _ 8 8 3 _ 1
10,000 $3.202.50 $1,034.50 $2,234.50-~~~... pl.tl7.00 $10.37 $2.15 54.37 $7.86
. ..
.... . ..... $1.14 $3.24 54.01 . ....
3E 'L E!!L~E?D S1:2_4(1:P! _S,%?C.P S2.773.0O 6.28 .- .
- - - 50.000 2 5E .E . ,511i569.5~3,644.00 53.975.00 $5.96 $061 $2.73 $4.47
I
I
I
I Page 28 of 43
City of San Diego. information Bulletin 501
March 2006
534.97
Gas Station 200 . . . % 9_39. 5 0 592220 ..... Z!;7B72? 32L17.5D-S1J.'LSs-....S!'13_4 . . .
2.000 $3,174.50 $1,ld4.00 $2,346.50 $1.93200 $76.90 - $13.20 O,-_--- ~
. -
4,000 $4,712.50 $1.366.00 $3.016.50--- W.0 0 50 $14.49 $8.39 $10.74
-.. 54.94
! 8.000 55,292.00 $1.565.50 $3,352.00 $3,435.00 519.61 $3.98 $10.25 $12.53
... ......-..-. ..
20.000 $7.645.00 $2,042.50 $4,581.50
$4.938.50 $18.26
$1.82 $8.10 513.42
Hazardous -_ 100
$2,848.00 $1,610.00
$2,155.00 $2.027.50
$56.00 $74.75 ...
$133.75 $63.38
.......
uses, other 500. $3,08000 . ~;1~!909:00 . $z16?0.00 . ~n?,2exo . 5!57:oo.~ $EEL ~ s ~ ~ ~ s o _ . ~ ~ ~ ~ ~ o _ o ~ ~
Table 5 01 0 -Fire Plan Check and Inspection
(FB) - Constructioll Categories If 1-HR, 111 1-HR, and V 1-HR
20,000 54.677.00 $1,591.50 $3 030.00 $3,238.00 56.94 $1.35 $3.67 $4.67
. . . ~.= _ .
%
50.000 56.759.00 $1,996.50 54.129.50 $4.638.00 58.62 $0.79
. . . .... .... $3.18 $5.27
Hotel & Motel - ~1,000 52.637.00 $1,012.00 $1.656.00 $1,679.00 $5.23 $5.29
$14.24 $5.26
..- . . . ... ... -
Partial Permit 5.000 52,646.00 $1,2 2 3.50 $2,226.50 $1,889.50 $14.85 $4.24 $8.49 $10.79
10,000 $3.588.50 $1,435.50 $2.650.00 $2.429.00 $11.62 _
-
$2.94 $5.17 $9.60
.?OB --~-.Ezso:~!... S!Z?@._~P
%z.~52- -23_.381 ! .~0 ..so . . . ~ ~ I Q ? . .... .$1:53 . . . . $?:84_ . _s?P_T?-
50,000 $6,863.50 $ 2 . 1 1 5 e $4,319.50 $4,858.50 $6.65 - - - ~ .. $0.85
53.25 55.46
Industrial/ . = $3,372.50 5762.00 $1,816.00 $1,981.50 52.83 sl& $6.14 $2.61
Occupancy Project
/Shell 5.000 $2.714.00 $1.315.50 $2,318.50 ~ .51.716.50 $14.16 $4.60
, -- $8.83 $92.4-1. .. ....
Base Fee
Sprinklers No Sprinklers Sprinklers Alarms
lType
Plus increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers No Sprinklers Sprinklers Alarms
Sq. Ft.
&Alarms or Alarms Only Only
&Alarms or Alarms Only Only
March 2006
City of San Dlego - Information Bulle tin 501
Page 29 of 43
!
Table 501D - Fire Plan Check and Inspection
(FB) - Construction Catesories I1 1-HR. I ll 1-HR. and V 1-HR
Occupancy Project Sprinlrlers No Sprinklers Sprinklers
I
Alarms /Sprinklers No Sprinklers Sprinklers Aiams
Ss. Ft. & Alarms or Alarms Onlv Onlv & Aiarms or Aianns Oniv Ontv
Base Fee
....
Nursing
.Home1
!Assisted
/L iving
Plus Increment Per Esch Additional
Partial 5,000 $3,727.00 $1,656.00 $2.898.00 $2.484.50 $19.32 $5.52
$11.05 513.80
........ . . . ......
.... 10,000 $4,693.00 $1.932.00 53,450.50 53,174.50 9.1 2
Perm(t 54.15 $ 6 . 9 c $ 1 2 . 4 3
100 SF or Fraction Thereof
-1
~ ~ ~
20,000 $6,211.50 $2,346.50 54,140.50 $4,417.00 S9.20 $2.30 $5.06 S 6 . 4 L
~ -
50,000 $8.972.50 $3,036.50 . . $5,659.00 $6,349.50 . $8.5
. . . . . .
Office, High - 1,000 $843.00
$1.63 nia
"la -
.. .. .... . .
1Rise 5,000 $908.00 nia nia nia 54.84 nia nia nia
I
I
I
10,000 51.150.00 - .n h . . nia . . . nla $3.73 nla nla
-
20.000 ~ . . -$1,522.50 nla nla nla
-
nla
$ 2 . 2 7 - -_ ....
nla
nla nla nia ~ 0 ~ 0 0 0 E . nia nla
52.25
Office. ~ l,ooO,~ .. $843.00 . nia .. ... nla $1.63 nla n/a
--. - ....... ...................
nla
High Rise 5.000 $908.0L1_-. ~ nla nla nla $4.84 nia nla
Part:a1 .. 10,000 .. .... nia nla nia $3.73 nla
$1,'50.00 nia nia_.
Permit ......... 20,000 . .5!.5?2.5! . . . . __n/a .. nia ......... nia . . . 2 : ! . L 'L ..... nie . . .
50.000 $2,202.00
,-
__ lnia nla " l a $2.25 nla .. . nla nla 1
I ~ a a e 3 0 of43 CI~V of San Diego -information Bulletin 501 March2006 I
Table 501 D -Fire Plan Check and Inspection
(FB) - Construction Categories ii 1-HR, ill 1-HR, and V 1-HR
1.000 $2,190.50 ._....... - i$551.50 $1,258.50 . ._ $1.224.50 $4.36 $2.76 $10.26 $3.83
Office,
. . . . . . . . . . - - .
Medical 5.000 $2,365.00 $662.00 m C 0 $1.377.50 $12.32 $2.21 56.36 $7.78
10,000 $2,981.00 $772.3 . S1.987.00 51,766.50 $9.65 ST.6G 53.94 $6.96 1
$0.92 $2.90 S3.5720.QOQ $3,946.00 ........... $938.00 .$2,3B_~So-$z.4~~--._$5_8_5__.~
50.000 S5.701.00 S1.214.50 $3,250.50 $3,53350 $5.50
.-
$0.44 $2.36 S3.92
.. ......................
1,000 S2.189.50 $77250 S1,430.50 $1.217.50 54.33
office, $4.14 $12.93 ~3 . 8 0
$3.32 $7.42 $7.94
Medic='-
2LE!L ... .S2,352,5(1_593800.-e1.s4L:%C -1!E!z...812137 - . 3 7 . 3 7 . 3 7 3 7 3 7 . ................. . -
Shell 10,000 S2.981.00 S1.1(14.00- $2.318.50 $1.766.50 $ 9 . 6 5 - 52.21 $4.4411_..,701_
Plus Increment Per Each Additional
I00 SF or FractionThereof
Sprinklers No SprinWsrs Sprinklers AlarmsOccupancy Project
$0.66 .
.... .....
/Office, 1,000 S2,190.50 $551.50 nia nia $4.36 $2.76 nia nla
1
Sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only Only
Base Fee
Sprinkiers No Sprinklers Sprinklers Alarms
Medical -, 5,000 S2.365.00 -5662.00 nia n/a $12.32 52.21 nia
w1OSHPD 10,000 S2.961.00 .... 5772.50 nla nla $1.66 nla nia
- .- - .- .. . sg:ss .. ..... - - ..
Cert. 20.000 $3.946.00 _ $938.00 nls nla $5.85 $0.92 "la nia
_ _ _
50,000 .. - - S5,701.00 $1.214.50 nla nia $5.50 50.44 nla
......................
"la
Office, . 1,000 $1,311.00 . $413.50 . $758.50 $966.00 . $6.90 . $3.45 .. ..... $6.90 $3.45 .
5.000 $1.587.00 S551.50 $1,034.50 $1,104.00 S G 4
Tenant $ 276-- -.. ____ $2.77 $11.04 I
j improvement 10,000 52,139.00 S6689.0 01,173.00 $1,656.00 $8.29 $5.52 $4.14 1
51.39
20,000
$2.967.50 $828.00 S1.725.00
..... $2,070.00 .. - $8.74
$0.92 $5.06
$4.60 .
50,000 S55.90.50
$1.104.00
S3.243.50 $3,45050_-S8.56
So,55
$4.69 ~ ~ .~ 54.42
1,000 $2,029.50 $659.00 51,236.50 $1,215.50 $4.05 $3.26
$9.66 $3.79
Parking . ........... .........
Garage 5,000 $2L1-,10_ - 5789.50 $1,623.00 $1,367.00 $11.37 $2.80 $6.18 $7.52
...... $2.00 - . $3.87 $6.85-
$4.04 S13.65 $4.98
l ,QQQ _~ $2,872.50 .............. 5804.50 . 5!:662:50 . . 81:SE:OO g2!? . - _ . . . . . _ -. . . .
Public
Building. 5,000 $3,036.50 $966.00 . $2,208.50 . $1.794.00 ._.. 515.81 $3.23 $8.41 $10.12
Fire 10,000 $3.827.00 $1,12750 $2,629,00 $2,300.00 $12.39 $2.41 $5.20 S9.05
- - -
......
$1.33 ........
... 53.83 $4.65 ...
I ?0,000.. Ss~o66.oL 5 '2s t iQo $3,148.5(L. Ci3Z05.00 $7.51
March 2006
City of San Diego. information Bulletin 501
Page 31 of 43
Table 501D - Fire Plan Check and Inspection
lFBI-Construction Cateoories I1 1-HR. I ll I-HR. and V I-HR
i
. . -
10,000 $4,969.00 $ 2 ,2 0 6 .5 0 _ - ~ i ~ ~ 1 0 ~ O 0 $3,450.50 $16.08
M Isc, $4.83 $7.56 $13.43
$2.76 $5.51 $7.03
20,000 56576.50. $;2:591~50_~~.S4,11830EeeeeS.4L93~~0oo~o~9'44~44444444~4444 _.. _ .
~ .~.
.- 5 O . O k $9,496.00
- ~ 5 1 9 .5 0 $6.134.50 --&9P1.50 $8.95 S124 54.16 57.35
Public 1.000 $3,655.50 $1.567.00
$2.418.00 $2.409=_ $7.34
s7.76 $17.61 $7.54
Base Fee
Ocoupancy Project
Office 10,000 $4,959.00 $2,208.50 $3,727.00 $3,450.50 -!&EL $16.08 .. ..............-p $7.56 $13.43
$2.76
20,000 $6,576.50 _S2,691.50 $4.463.00 -_- - $4.793.00 $9.74 ~
- $5.51 3 7 c
50,000 $9,496.00 $3,519.50 $6,134.50 $6,901.50 $6.95 $1.24 $4.18 $7.35
~ ~ ~ ~ ~ ~ ~ ~ ...... .- ~
Public 1,000 $3,450.50 $1,379.50 $2.206.50
$2,208.50
S6.9J $6.91
- -817.24 $6.90
Building- 5.000
$3,727.00 $1.656.00 $2.696.00
$2,464.50
219,32 $5.52
$11.05 ..-
10,000
$4.693.00 $1,932.00 $3,450.50 $3,174.50 $15.19
$4.15 $6.90
512.43
Police . ~. ~ ~
Plus Increment Per EachAdditional
100 SF or Frsctlon Thereof
Sprinklers No Sprlnklers Sprinklers Alarms Sprlnklers No Sprlnklers Sprinklers Alarms
1,000 $3,450.50 $1,379.50 $2,206.50 $2,208.50 $6.91 $6.91 $17.24 $6.90 1
i public .... _ . . ~ . ~.. ~ ...
/Building 5.000 $3,727.00 51,556.00 $ 0 $2,484.50 _ $19.32 i ! -.--.-.---
I
, $5.52 $11.05 $13.60
i Recreation 10.000 $4,693.00 $1.932.00 S3.450.50 $3.174.50 $15.19.
i
$6.90 $12.43
S 4 . E
I
IType sq. Ft. &Alarms or Alarms Only n i y 1* r a m s or I oniy only
Building- 5.000 $6,152.00 $4,739.00 $5Lt58.5 521.56 L 2z.61
- -
10.000 $7,730.00 $5,521.00 $6,736.00 56,515.00 $2500 $11.97_-.
Utility 513.63 -$252. - .
20.000 $10,229.50 $6.717.50 $8,118.50 $9,037.00 $15.13
P la n t ~ ~ ~ ~ ~ . $6.75 . $10.00 $13.31 ~
Repair 1,000 $3,146.50 $1,104.00 $1,993.00 $1,932.00 $6.34 55.16 $13.94 $6.05
$4.14 $9.72 $11.72
oarage ~ O P O .~~GL ...~~~~! J E_~~~- ~S_O ~~O ~~5 ~ ~ 0 5 1 1 : ~~ .
i
20,000 $4,677.00 $1 .SO $3,030.00 $3.23&00-. $6.94
-
$1.35 $3.67 $ 4.67
50.000 $6,759.00 $1,996.50 $4_112L5Do $4,638.00 - $6.62 s 0 . 7 9 _ - - - _ _ _ _ _ p $3.16 $5.27
nla nla nla nla
ResidentIal- LL.000 $843.00 .. . n !: ~ .. . . - E 6 3 .nia ~ -. ...
AptJCondo
I----
$908.00 nk... .- .~ nla nla $4.64 nla - - nla "'a_.-_
nla
/High Rise 10.000 $1,15!:00. nia nia $3.73 nla nia
I 20.000 $1,522.50 nla nla ~ . . ~ nla ...~ $2.27 nla nla ~ nla . ~
i
~
~ ~ . ~ ~ . - ~ ~
50.000 $2,202.00 nlL.-..- nla tila _ s2.25 .n ? - ~ "la ~ nla ~... _ ..
I
!
i
E g Z 2 o f 43
Citv of San Dieao. informat ion Bullet in 501
March 2 a
Table 5015 -Fire Plan Check and Inspection
(FB) -Construclion Categories I1 I-HR, Ill 1-HR, and V 1-H R
Residential 1 0 0 ~GEG.E_..$~~~~~.oo ,.... - $1,908.00 $1,846.50 5 28 . 8 1 . . S 3 5 6 9 . . $74.50 $28.94
1.000 $2.894.50 S1;102.50 $2,504.00 -$2.078.00 2< 4,9i,-_ $28.45
Care
$47.70 $57.20
2,000 S3.644.00 5i1,987.00 $2,981.00 $2,650.00 $58.95 -_ 521.20
~
$29.83 $51.70
4,000 S4.823.00 $2,411.00 $ 3 , 5 7 7 . 5 0 - $3,684.00
535.71~~~ ..., $_1 ? d_~
~ ...~ . - . ~ ~ - .
$21.87 ~ ..... $26.94 ~ ~ ~ .
- - - 10,000 $6.965.50 $3,110.00~ $410_8_915S $5.300.50 $ 3 3 . 05 $5.71 517.30 . . . % E L
Restaurant-I=. $2,199.50 5545.00 $1,214.50 $1,177.50 $4.35 52.93
$1 1 .a4 -.-$3:EiB_.
5.000 ~ . . ~ ~ $2.373.50 . - . -~ ~ $662.00 $1.656.00 ~ $1.324.50 $12.43 $6.31 $7.73
512.33 - . . . . .
10,000 S2.9g5.00 $778.50 $1,971.50 $1,711.00 $ 9 . 7 0 - $1.57
_$ 3. 79 . ? S : L
20,000 $3,964.50 $ E E L $2,350.00 $2,392.00 $5.88
~ $0.78.. $2.84 $3.44
50,000 S5,730.00 $1,170.00 $3,202.50 53.423.00 $5.61 $2.49 $3.94
- - - . - ~ ~ - - _ - - ~ ~ ~ v:47. - ~ ~ ~ ~
Occupancy Project
/Type Sq. Ft.
Department 5,000 53,062.00 $937.00 S2,202.50 -_$1,816.00 $16.06 $8.40 $10.61
$3.34 .-
Store 10,000 $3.%52L . $1,104.00 52.622.50 $2,346.50 $12.51 $5.02 $9.34
$2.19 ~ ~ ~ ~ .
20.000 $5,115.50 ~ $1,322.50 $3.124.50 ~ ~ $3,280.00 $7.59 $1.07 ~ $3.77 ~ $4.71 ~ - -
I
50,gLOo $7"50 $1,644.50 --54.256.50 $4,693.00 $7.28 $0.67 $3.33 $5.40
20.000 , S4,384,50 $1,324.50 5 2 . 7 6 5 . 0 0 $$P3_3.00 $6.51 51.11 $3.34 $4.2c_-
50,000 $6,337.00 $1,656.00 $3.768.00 $4,196.00 $6.22 $0.66 $2.92
, , 54,g
~ -
~
R e t a l b ~ t o r e , ~ ' $2,271.50 - $855.00 $1.514.50 $1,298.00 - $4.51
$4.49~-- $13.14 $4.06--
Shell 5,000 $2.452.00 -(F1,034.50 $2.040.00 $1,460.50 $3.60 $7.78 $8.33
1 2 U -
Base Fee
~ ~ ~ ~ ~ ~ ~
$2.58 86.91 $3.58
~ e~ a1 i - ~ enant.~ o_o~ ~ .- g; l,57o.i~ ~ 5e~soo -~709:e0 . 3 . ~ 4 1 2 ~ . . - .X LC- . .. . ... ~ ~
improvement 5.000 .$1,694.00 ,@6.00 $985.50 _ 3 ! 3 4 . . $8.90 $2.07 83.75 $7.43
Plus Increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers No Sprinklers Sprinklers Alarms
& Alarms
or Alarms Only
Only
Sprinklers
No Sprinklers Sprinklers Alarms
8% Alarms
or Alarms Onlv Onlv
ATTACHMENT - 4
FaPrication -10.000 55,521.00 53.680.50 $4,693.00- $4,509.00 517.85 $8.44 $10.05. $17.18
20.000 57.306.00 $4,524.00
$5.696.00 56,226.50
$10.78
_- 55.11
87.11 2 3 1 ~ ~ . -
50,000
S10,541.00 ~ . ~ $6,058.00 ~$7.829.50
$9.018.50
$9.38
$1.99 $4.58
38.90
~ ~ ~ ~ .~ ~ ~~ ~ . ~ . ....
Tenant 200 $2,082.00
$1,379.50
$1,1!82.00
$1 ,735.50
5 2 1 . 0 ~ ~ $34.56 $53.81
527.13
Improvement 1,000
52.250.50
$1,656.00 $1.912.50
$1.952.50
557.90 -.527,60
$36.45 $53.20-
Other 2,000 52.829.50
$1,932.00 $2,277.00
~ $2,484.50 ~
$45.75 $20.73 $23.20
548.28
....~
4.000 S3.!4% ....! L ,gsW_ $2,741.00 $3,450.00 S27.71 - 511.50
$16.84 325.32,
- 10.000 $5,407.00__&3L034:50 $!3,751.50 $4,969.00 $25.21 $5.52 $12.67 $26.38
1,000 .. . . $1,932.50 ~ - $593.50 $1,163.50 $1,189.00 $3.95 $3.03
-
~
5,000 52,150.50 ~ $714.50 $1.549.50 $1,337.50 _ % - 52.43 $5.90 S7.58 .
$1.76
10.000 S2.711.50 5836.00 $1,844.50 $1,716.50 58.77--
~ $3.64 $6.76
20.000 $3 588.50 $1,012.00 $2,208.50 $2 392.00 $5.32 $0.96 $2.69 53.47
~ ,
. . -
'
50,000 $5,185.00 $1.298.50 $3.014.50 $3,433.00 $5.3
-- $0.48 $2.21
$7.91 $7.87 $155 ,
Warehouse . . 3 0 -.S217'_911[1..- ~ - P _ ? L L s 3 3 P ! . 'I 2 3 0 P_~ . _S E .. ~ ~
I
City of San Diego * information Bulletin 501
page 33 of43 1
Table 501D - Fire Plan Check and Inspection
(FB) - Construction Categories I1 1-HR. I ll I-HR, and V 1-HR
Occupancy Project
Type Sq. Ft.
Only Only I
Base Fee
Sprinklers No Sprlnitlers Sprinklers Alarms
&Alarms orAlarm6 Only Only
Plus Increment Per Each Additional
100 SF Or FractionThereof
Sprinlrlers No Sprlnklsrs Sprinklers Alarms
&Alarms or Alarms
/ page 34 of4 3 Gitv of San Diecio = lnforrnatlon Bullet il l 501 March2006 1
Table 501 D - Fire Plan Check and Inspection
(FC1- Construction Categories !IN. 111N. IV, and V N
Occupancy Project Sprinklers No Sprinklers Sprinklers
I
Sprinklers No Sprinklers Sprinklers Alarms
!Type Sq. Ft. 5 Alarms or Alarm6 Only Onlv I5 Alarms or Alarms Onlv Onlv ,
Base Fee
Bank-Shell 1,000 $1.751.50 5818.00 $1,144.50 $973.50 $3.46 $3.31-- $10.34 $3.06 /
5,000 S1.890.00 $750.50 $1,558.00 $1,096.00 $9.89 $2.65 $5.94 $6.35
- -
10,000 $2,384.50 .. $883.00 $1,855.00 $1,413.50 $7.72 ...... $1.77 $3.57 $5.61
20,000 $3.155.50 $1,060.00 $2,211.50 $1,974.00 $4.69_- $0.88 $2.68 $2.84
Pius Increment Per Each Additional
100 SF or Fractlon Thereof
5,000 $2,318.50
$662.00 $1,655.00
$1,324.50
$12.04 $2.14
$6.31 $7.37
10,000
$2,920.50 $769.00
$1,971.50
$1.693.00 $9.46 ~ .~ $1.71
53.95 $8.63
........ . ~ .........
~. ~~ .~ ~ ~
$0.99 . . $2.80 ......... $3.44
20,000 $3,866.00 ............. .... 4839 .50, S?L~E.PO . ~2.355150 SZL
50,000 $5,584.50 $1,236.50 53.234.00 3,386.0 0 $5.35
- so.43 .. ....... $2.29 53.68
Church 1,000 $2.014.00 $699.00 $1,254.00 $1,231.00 W.04 $3.41 $9.45 S3.85
--
.
5.000 S2;175.50 $835.50
$1,632.00
$1.385.00
....... $11.25
~ . $2.71 . ~ ........... $6.22 $7.63 1
10,000 =.OO
$971.00 $1.943.00
$1,766.50 $8.86
$2.14 $3.93-86.9OD _ I
~ ~ ~ ~
50,000 $5.235.00 $1.553.00 $3.194.00 $3.533.50 $4.97 "0.55 . . %?! . Sa:!?~.
Dry Cleaning 1,000 $1,948.50
$633.00 $1,1~ 62 - . $1.167.00 $3.89
$3.11
$9.29 ~ $3,64
5.000 $2,104.00
$757.50 51,558.00 $1.312.50
510.92
$2.51 $5.94
$7.31
Plan' - _ _ _ . .
20,000 $3,507.50 $1.074.50 $2,225.50 $2,335.50 55.20 $1.08 52.72 $3.40-~
50.000 $5,087.00 S x 8 . 5 0 53.042.50 $3,356.50 $4.84
-- - .
$0.50 $2.15 $3.66
I
.... .
$3.04
I Fitness 1 , 0 0 0 $1:8!?20L . _ $58500_ EL! % . So $ ! LJ9!5EL~.$3.74 E58 $3.44
Center 5.000 $2,031.50 $706.50 S1,501.50 $1,236.50 _$10.61 $2.42 $5.71 $ 7 . 0 6
10,000 $2,562.00 .. $827.50 $1,787.00 $1,589.50 $8.29 $1.72 $3.50 $6.29 .
20.000 $3,391.00 $999.00 $2,136.50 $2.218.00 $5.03 $0.91 ..,
. . . . . ... -. ??SO. $3 : 2 1
.
- 50.000 $4,900.00 51.271.50 $2.915.00 S3.180.00 $0.49 $2.18 $3.57 1
March 2006
c i ty o i San Dieno information Bulletin 501
~ acce 3 5 T t a
Table 501 D - Fire Plan Check and Inspection
(FC) -Construction Categories I1 N, I iI N, IV, and V N
Hazardous 100 $ 2~~7_ 81 00_ ~~~,$ l,288.00 $1,724.00 $1.622.00 $46.63 $59.75 $107.00 $50.63
500 $2,464.50 $1.527.00 $2,152.00 $1,824.50 $125.40 $47.90 . . . $81.90 $94.40
Other . . . . . . .. . ....
1,000 ....... $3,091.50 $1.766.50 S2,561.50_- $2,296.50 $100.00-_- $40.45 $54.05 $87.75
. - -.
Occupancy Project
Health 1.000 $2.208.50 $863.00 $1,113.50- $1.~113.50 $4.40 $11.04 $4.40 /
$4.43 ~ ~ ~
TYPE Sq. Ft. & Alarms or Alarms Only Only &Alarms or Alarms Only Only ,
Base Fee
Sprinklers No Sprinklers Sprinklers Alarms
50,000 $5,742.00 $1.943.00 $3,622.00 $4,063.50 $5.48 $0.71
52Is ! ._$4.42
Hotel 8 Matd_l.DOD, - $2.0762 . $ 7 _ 4 3 1 0 0 0 0 - Sl.257.50 $1,279.00 $4.11 $3.96
$11.23 $4.00
.... .......... ..
Plus Increment Per Each Additional
100 SF or FractionThereof
Sprlnklers No Sprinirlers Sprinklers Alarms
~
Care 5,000 $2,384.50 . $1,060.00 $1.855.00 - 21 28 g . 5 0 $3.53 57.07 $8.84
10.000 $3,003.50 $1,236.50 $2,208.50 $2,031.50 $9.72 $2.65 ...... $4.42 $7.96
center - - .. _ - - - - - . . . .. _- ._
20.000 $3,975.00 $1,501.50 - - - . $2,650.00 $2,827.00 $5.89 $1.47
$3.24 $4.12-
Partial Permit 5.000 $2,277.00 5978.50 $1,780.50 $1,511.50 __$J.88 $ 339
$6.79 $ 8 , ~ . /
1
~ ~ -
Shell - 5.000 $2.171.00 $I,!%
10.000 $2,738.00 $1,236.50 52,206.50 51,766.50 $8.87 52.50 $4.28 $6.D9
20,000 $3.624.50 $1,486.50 . ........ $2.638.00 $2,485.50 $5.38 $1.26 . ....... . .......
33.19 $3.56
........... ' ., ..... ..................... ~ ...~ . ~ ... ....... . ..~ . .... ~ ~ ~ . ~
Page 36 of 43 City of San Diego. I nformationBulletin 501
March 2006
Table 501 D -Fire Plan Check and Inspection
(FC) - Construction Cateaories I t N. it1 N. IV. and V N
I T y pe Sa:~t. 1 &Alarms or hlerrns Ontv Onlv I &Alarms or hiarrns ' Oniv Onlv 1
. . .
!
. . -
50,000 $5,742.00 $1,943.00 $3.622.00 $4,063.50 $5.48 $0.71 $2.56 $4.42 1
.. ........ . ............................
Nursing 1,000 $2,077.50
5750.50 $1,279.00 $1,285.00 $4.13
53.86 _ _ _ _ _ _ _ -$10.69 $4.01
Home/
2!!? 0o%2!%2!L
~ ~ ~ . . ~ . ~ ! ? % L ~ ,. _
1,4%0-_$1! 8 9 $3.10
$6.50
$8.19
$2.21 $4.00 $7.31 .
.... .....
1"S"'StCad 14.400.-- W ~ I I ~ $'io_ se(10 3~io? ! S'? .. A8 _5soODD3s.1 5___ - -
/L iving 20,000 $3,741.50 $1.280.50 $2,431.00 $2.585.50 55.55 $1.18 $2.9.6 53.75
i Occupancy Project
~
10.000 $2.031.50
$529.50 $1.501.50- $1,080.00
56.58
S I C $2.67
$4.23 i
20.000 .... $2.689.50 $633.00 .
$1,768.00 ... ....
$1.482.50 .........
$3.99 $0.49 .
$2.16 $2.13
50,000 $3,887.00 $779.50 $2,434.50
$2,120.00
j43:K4 .............. $0.33
$1.93 $ 2 . 4 6
i
1,000 $2,760.00 51.104.00 51,766.50 $1,435.50 $5.53
1Office- ..~. $5.51 $13.80 $13.79
Base Fee
~ ~
20.000
S'1,969.00
S1,877.00
53.312.50
$3,533.50 $7.36 $1.84
$4.05 $5.15
50.000 $7,177.50 $2,429.00 54.527.00 55,079.50
$6.85 $0.88 52.21 $5.52
......... .. . .
Office, 1,000 $674.50 nla nia nia $1.30 nia
n/a nia
Plus Increment Per Each Additional
100 SF or Fraction Thereof
H igh -- 5,000 nla nla nla
.. .................
$3.66 nla
$720.50
n i L - - n/a
Rise 10,000 $919.50 nla nia nla nia nla . . . .
....... .. ... . 52 2 s . . . . n/ a .
nla nla nla $1.81
20.000 51:217.50 .... n/a nla- .. ...._ _ _ _ _ _ nia
50,000 S1,761.50 nla nla nin $1.80 - nla
................................. .
nla
" l a - . _ -
Office,
$726.50 nla nla
High Rise 5.000 .....
nla $3.86 nla nia
Partial - -10,000 nla S919.50
nla nia $2.96 nla nla " l a - . . -
20.000 $1,217.50 nla nla nla $1.61 nla nia . ...
.. .-...................-.... ............
nia
permit :- .. -- - .
50.000 51,761.50
. nlo nla nla .. $1.80 nla
Sprinklers No Sprinklers Sprinklers Alarms I ~ ~ r l nk i e r s No Serinklers SerinMers Alarms
/ March 2005 City of San Diego. informat ion Bulletin 501 P a g e 37 o f 43 1
Table 501 D -Fire Plan Check and Inspection
(FC) - Construction Categories II N, Ill N, IV, and V N
$0.35 $1.89 $3.13
50,000 54.561.00 $971.00 $2.600.00 S2.8n.00 $4.40 ( I . . . . ...... . . .
1,000 $1 751.50 %618.00 $1,144.50 ~ ,S % E $346
oflice. L
$3.31 W0.34 S1 J 6-
.... ............. ..... .....................
52.65 $5.94 $6.35
Medical. ,2000 .... 31890,oo 31.% ?2?_. s;r , j~ ~ ! o _ .~ ? ,0 9 6 1 0 O L gE .- . ....... - - ..
Shell 10.000 $2.384.50 $883.00 $1,855.00 $1.413.50 57.72 %I,77 . - . - _ _ _ - ~ ~$3.57 $5.61
20000 $3,156.50 S1.060.00 S2.211.50 $1.974.00 $4.69
A
$0.88 $2.68 - = -
50.000 $4,562.50 $1,324.50 ... $3,014.00 $2.827.00 . $4.47 $0.53 .............. $2.34 $3.22 .....
Office, 1.000 $1,752.50 5441.50 nia Ma S3.‘l9 _ _ _ - ..- $2.20 nia
5,000 $1,892.00 $529.50 nla nia $1.77 nia
Medical
49.85
____-_____---...-_.__
.
10,000 $2,384.50 $618.00 nia nla $7.72 $1.33 nin
VJ'QSHPD . _ . .- .... - - -
20,000 $3,156.50 $750.50 nla nia $4.69
ce*.
$0.7'1
- nia
. . .... ..... . -.
nia nia $4.40 $0.35 n/a nla
.. . 50,000 54,551.00 $971.00 . .
$5.53 $2.76$772.50 $5.51 $2.78
Office, L T D . 1.?!_9PO.~. . 53300 . ,560'E. ................... . .
5,000 $1,269.50 $441.50 $828.00 $883.00 $8.83 $2.20 S2.20 $8.83 -
Tensnt .. ... .
Improvement 10,000 $1 .7 1 1 .0 0 $551.50 5938.00 $1.324.50 $6.63
$4.42 $3.32 _
$1.11
$1 379.50 $1,656.00 $7.00 $0.74 54.05 83.68
-?OLE%- .-2,373.S_a E sE ! . ..... . .
$0.44
50,000 $4.472.00 $883.00 $2.594.50 $2,760.00 56.85 53.76 $3.53
1,000 $1.623.50 $527.00 5989.00 $972.00 $3.24 $2.60 57.74 $3.05
Parking ..... ........................ . . . . . .
Garage, 5,000 $1.753.00 $631.00 $1,298.50 $1,094.00 59.11 $2.09 $4.94 $6.09
$1 545.50 $1,398.50 $7.15 $1.60 53.10 55.46
Enclosed .2P_~0000~ -.$~S.sO~ ..so7~5~50.-.~ .................
$0.90 $2.27 $2.84
20,000 $2!8_2?.0_- . .S895 :! ? ! . .SilJ_855:!!. _s l i i%O ? ... $% .... ..
. - ~ ~ ~ - ~ - ~ ~
50.000 $4.222.00 $1.165.00 $2.535.00 $?= $4.04 So,4z 51.79 $3.05
52.15 S7.44 $2.70
1,000 $1,514.00 $416.50 --$877.00 $865.00 83.01 ..,
Parking I-
5,000 $1,634.50 $502.50 $1,174.5
/Garage, .- ........ ......................... ...... .. 48.-~5556..1
Plus increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers No Sprinklers Sprinklers
Alarms
&Alarms
or Alarms Only Only 1
Occupancy project
i T ~v e 59. Ft.
50.000 $3.942.00 $907.50 S2.282.00 S2.502.50 53.83 50.34 ~ . $!:7P .??.B! .~1
... ..... ....-...-...-.....
PreschooV _ - =
$2,434.00 $782.00 $1,457,50
$1,452.00 S1.84
$4.03
512.25 $4.54 ._
Oaycare _A ,E .......
$2,627.50 $943.00
$1,947.50
$1,633.50
9'13.70 Wz2
____---- $7.42 $9.29
10.000 $3,312.50 $1 104.00 $2,318.50 .. ..................................... $2,098.00 $10.72 $2.30 $4.56 $8.28
. L ..........
20,000 $4,384.50 -. $1,334.00 _ $2.774.00
$2,925.50 S6.50 51.23 $3.37 1 1 4
50.000 $6.335.00 $1.702.50 $3,785.00
$4.196.00 $6.14 Sq.64 $2.81 $4.69
$643.50
$1 330.00 $1,276.00
$4.48 $3.23
Public .. LEO ..... S2E-o0 .-oo-oo-oo-oo-oo-oo..... -_-_.-...so.. ...................... ... -510.91 . $3.99
Building - 5,000 52,429.00 $772.50 51.766.50 $1,435.50 512.66 s2.5g - - - _ _ $6.73 $8.09
Fire l0 .000 $3.062.00 5902.00 S 2 i l I ! 3 ? w 0 . _ 9 . 9 1 .. ............................................. $1.93 $4.16 $7.24
$1.06 $3.07 $3.?2-.
station
.% .E L. .$4,(1tiK?II ... SL.0940 .. . E Z S 5CI .. .$3E%!?a. ... . $6.01 ... .
...............
$3,439.00 .............. $3.680.50 $5.65 $0.52 $2.51 $4.07
. ............ z!oqO .. . .................... -
Base Fee
Sprinklers No Sprinklers Sprinklers Alarms
& Alarms or Alarms Only Only
ATTACHMENT -
I Page 38 of 43 City of San Diego. information Bulletin 501 March 2006 /
Table 501 D -Fire Plan Check and inspection
(FC) -Construction Categories I1 N, 111 N, IV, and V N
Building- .......... 5,000 $3.159.50 $1,518.00 -~ $2,504.00 .. ....... $2,168.00 $16.31 $4.97 $9.54 $11.54 .
10.000 S3.975.00 S1.766.50 $2,981.00 $2.760.00~_$12.86
Office A $6.06 $10.75
20.000 $5.261.00 $2.153.00 $3,586.50 $3.834.50 $7.79 $2.21 $4.40 $5.G2
- -
50,000 $7,596.00 52,616.00 $4,907.00 $5,521.00 $7.16 $0.99 53.34 $5.88
-- .....-.-... ~ . . ... ~ ~ . . ......... ~ ~ .
Occupancy Project
Type Sq. Ft.
10,000 $3.754.00 $1,545.50 $2,760.00 $2,539.50 $12.15 $3.32
Police .......... ...
20.000
- $4,969.00
$1.87/.00- $3,312.50 53,533.50
$7.36
$1.84 54.05
50,000 $7.177.50,
$2.429.00 S4.527.00 L ) L ) L ) $5.079.50 -
$6.85
$0.86 -.
Public 1,000 $2,760.00 $1,104.00 S1,766.50 $1,766.50 55.53 $5.51 S13.60 $5.51
.-.................. ...
Building- 5.000 $2,;z.s81.00 $1.324.50 S2.31180 $1,~87.00 $15.46 $ 4 . 4 ? _ _ _ _ $8.83 511.05
$3.32 $5.53 $9.94Recreation logo^..̂ ..,. g7543,&-._$1.545.50 52,760.00 . $2.539.50 $12.15
Base Fee
Sprinklers
No Sprinklers Sprinklers Alarms
&Alarms
or Alarms Only Only
1 ........... 30300 $7,177.50
$2,429.00
S4.527.00
5 5 , 0 7 9 . L S 6 . 8 5 s " . a s . . -$3.20 $5.52
1,000 $4,553.00 .
53,165.00 ........... 53.533.50
53.651.50 $9.21 . $15.85 . $24.81 . $11.40
Building- 5 , 0 0 0 - .- ~ , $4,921.50 53,791.00 $4.526.00 54,107.50 S25.24
$12.52
Ipubiic
$17.25 $22.09
,
Plus Increment Per Each Additional
100 SF or FractionThereof
Sprinklers No Sprinkiers Sprinklers Alarms
&Alarms or Alarms Only Only
/ ~ esidentiol- 1,000
$2,076.00 S743.00 51,257.50
$1,279.00
$ 4 . 5 53.96
$11.23 $4.00
j AptJCondo
5.000 S2,240.50 $901.50 _
$1,706.50 -$1,439.00
53.17 S l l i 3 $6.50 $8.32 -
....
10.000 $2,827.00 $1.050.00 $2.031.50 $1,855.00 49.15 52.13
_.---.--_..l.-.--..-.-.-- .F?3 5736L
20,000 $3,741.50 $1.273,00 $2,424.00 $2.590.50 $5.55___ $1.08 - . A3?? ....
i
$2.93
AptJCondo 5,000
$726.50 " l a n!a ... n!a
High 10,000 S919.50 nia nla nla
........... . -
I~ i s ~ ..20,000..~-_1$1,21750 !! !4 . nia n!a
. -
nla nla n/a
50,000 53.76150 ....
March 2006
City of San Diego 9 informationBulletin 501
Page 39 of 43
- 4
/Restaurant- .. 1,000 51,964.50 $ 8 5 6 , $1,173.00 S O $3.89 $3.46 $10.41 $3.68 j
~
Table 501 D -Fire Plan Check and Inspection
(FC) - Construction Categories I1 N. I ll N, IV, and V N
1Shell 5.000 $2,120.00 ~ . ~ $794.50 ~ ~ $1,589.50 $1,324.50 ~ $11.03 ~ $2.78 ~ .~ .$6.06 $7.66 1
Occupancy Project
Type Sq. Ft.
~ - ~ ~ ~ . -
1Shell 5.000 $1,961.50 $828.00 $1,832.00 $1.168.50 $10.24 ~ ~ ~ ~
~ . . ~ . ~ ~ ~ . ~ $2.6? 56.22 $6.66 1
1Tenant _- 5,000 $1,355.00 $468.50 $788.00 $1.027.00 $7.12 $1.66 $3.00 $5.95 1
~
Base Fee
Sprlniilers No Sprinklers Sprinklers Alarms
& Alarms or Alarms Only Only
Plus Increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers
No Sprinklers Sprinklers Alarms
&Alarms
or Alarms Only Only
/ Page40 of 43 City of San Diego. Information Bullet in 501 March 2 0 4
$29.20 S42.55
' lmPmVemenLl,OOD -..5 1.8EO _~.~~~_1,324sO so so S~-S~0100. .. SIISSI:SO_SEE ... .2 2 ? .1 0
1.
Other 2,000 $2.263.50 51,545.50 $1,822.00 $1,987.00--536.60 S16.58 $18.53 538.63
. 4,000 $2,995.50 51.877.00 - - $2,192.50 $2.759.50 $22.17 .... $9.20 $13.48 S20.26
$4.42 $10.14 $21.10
.- ...... --!O .OOo ...... $4!325 :5 0 . ! %: ~ ~ 9 . 0 0 _ $ ~~ : ~ 0 . - $3,975.00 . . . . $201L
_ . .........
Warehouse 2,500 $2,207.50 $712.50 $1,730.00 5938.50 $1.85 $1.53
$6.31 _ $1.23
.....
12,000
S2.383.0E $858.00
S2.329.00 ,-
$1,055.50
$4.77 , 51.12 _________
$3.42
25,000-
$3.003.00 $1 ,003.00
32.773.00 $1,349.00
$3.89 $0.85
$2.16
$2.11
... - . . . . . .... ~ ~ . ~ ~ ~
Table 501 D -Fire Plan Check and Inspection
(FC) -Construction Categories II N, IiI N, IV, and V N
Plus Increment Per Each Additional
100 SF or Fraction Thereof
Sprinklers
No Sprinhlers Sprinklers Alarms
&Alarms
or Alarms Only Only
Occupancy Project
Type Sq. F t
Base Fee
Sprinklers No Sprinklers Sprinklers Alarms
& Alarms or Alarms Only Only
1 March 2006 City of San Diego a information Bulletin 501 page 41 of 43 I
Table 501DMire Plan Cheek & I nspection
Miscelleneous Items
Fee
Fire Sprlnkier Systems-Retrofit:
1-50 Heads, per group $500
i 51-100 Heads,par group .................. ...
................. $701
101-200 Heads, per group ...................... ... ................. $902
Every 200 Heads above 200, per group ................. ........ .. $300
/Fire Sorlnlrler Svsterns -Tenant lmorovdments:
1-25 Heads,per group ................... .. ........................... $200
! '
26-100 Heads, per group ................. . . .
$300
Every 100 Heads above 100, per group . ..... $300
Fire Alarm System -Retrofit:
1-50 Devices, per group $601
51.100 Devices,per gio $902
Every 50 Devices above 100, per group ................ .. ........... $300
High Rise. par Ilooi .................... $801
Sprinkler Monitoring System, each $355
Fire Alarm System -Tenant Improvements:
1-50Devices, per group 6400
51-100 Devices. oei orouo $701
Other Suppression Systems:
701
Dry Chemical Sysle 400
Wet ChemicaliKitcli 400
Foam Systems, eac 701
Paint Spray Booth, e 701
Stand Alone Fire Fees:
Hydrantsilinderground Fire Sewice Plan Check, each ..... ... $400
Hydrant Flow Test (existing hydrants). ~ a c h .......................... $400
Fire Plans OHicer Review, eacii ........................ ... ..... ..... $300
ReinspectionFee, per hour
... ........ $99
Board 01 Appsals, each ............. $99
Emergency Call-Out (Nun-Scheduled), 4 Hours ................... $601
After Hours Cali-Out (Scheduled). 2 Houn ........................... 5300
!&xUmc Fee
REQUEST FOR ALTERNATE METHODS AND MATERIALS
Request for Alternate Methods:
Category 1 (repeals and minimal complexity) -
Category 3 -Assist, each
Research of Alternate Materials
Request to Use Alternate Materials
Application Review, each .................... .......,..,.......... $333
Alternate Materials Research
(in addition to fiat fee). per hour ........................ ... ......... $99
Board of Appeals, per hour ...................... .. $ 99
5-Year Certification, per hour ............... .. ..................... $99
Service Required in Excess of Standard, per lhour ................. $99