Data center migration services

6

Transcript of Data center migration services

Page 2: Data center migration services

Data center power and cooling calculations, while not the most stimulating of

conversation topics outside of the IT crowd, is an important and often discussed

component of data center design, efficiency, and scalability.

Examining the spec sheets we find that our servers operate at 2.375 Amps and

our network switches at 0.700 Amps when running at 240 Volts A/C.

Page 3: Data center migration services

Microsoft is closing the deal on a site for an enormous data center in Mecklenburg

County, Virginia. The facility had been proposed in both Texas and North Carolina,

but Virginia won the construction competition and will benefit from the business it

brings.

Page 4: Data center migration services

Our service offerings have expanded and now include all of the items Technical

Project Management Services, Technical Services Equipment Installation LLC,

technical equipment installation section, as well as many Custom Solutions.

Page 6: Data center migration services

SilverBack Migration Solutions, Inc.

290 Rickenbacker Circle

Suite 100

Livermore, CA 94551

[email protected]