Data center power and cooling calculations, while not the most stimulating of
conversation topics outside of the IT crowd, is an important and often discussed
component of data center design, efficiency, and scalability.
Examining the spec sheets we find that our servers operate at 2.375 Amps and
our network switches at 0.700 Amps when running at 240 Volts A/C.
Microsoft is closing the deal on a site for an enormous data center in Mecklenburg
County, Virginia. The facility had been proposed in both Texas and North Carolina,
but Virginia won the construction competition and will benefit from the business it
brings.
Our service offerings have expanded and now include all of the items Technical
Project Management Services, Technical Services Equipment Installation LLC,
technical equipment installation section, as well as many Custom Solutions.
SilverBack Migration Solutions, Inc.
290 Rickenbacker Circle
Suite 100
Livermore, CA 94551