Darwin Green
Darwin Green Local Centre - Illustrative Aerial View looking from the North
School Lane - Illustrative South Elevation of Health Centre Block
Local Centre
Darwin Green
The Square - Illustrative View looking towards the South showing Health Centre Block, Library Block and Retail Block
School Lane - Illustrative View looking towards The Square Darwin Street - Illustrative View looking towards The Square
Local Centre
Darwin Green
Library Block - Illustrative North Elevation looking at The Square
Central Park Gateway - Illustrative View looking towards The Square showing the Library Block and the Health Centre Block
Health Centre Block - Illustrative East Elevation looking at The Square
Local Centre
Darwin Green
BDW1 – Masterplan173 homes in total:• 16onebedroomapartments• 66twobedroomapartments• 15twobedroomhouses• 25threebedroomhouses• 19three/fourbedroomhouses• 32fourbedroomhouses
View of grand avenue into the scheme
Illustrative Map
Darwin Green
BDW1 – Landscape masterplan
Typical gable fronted house with associated landscaping
KEY
1 RAISED TABLE
2 ORBITAL CYCLEWAY
3 SHARED SURFACE
4 RESIDENTIAL PARKING COURT
5 ON STREET VISITOR PARKING
6 SUB STATION
7 PRIMARY STREET TREE
8 SECONDARY STREET TREE
9 TERTIARY STREET TREE
10 FEATURE TREE (TERTIARY SHARED SURFACE)
11 LAP (LOCAL AREA OF PLAY)
12 SWALE
13 RAIN GARDEN (TERTIARY SHARED SURFACE)
14 EXISTING NIAB GREENHOUSE (TO BE TEMPORARILY RETAINED)
15 PEDESTRIAN AND CYCLE LINKS TO FUTURE NIAB FRONTAGE DEVELOPMENT
Darwin Green
Construction updatePreparatoryworksonsiteinJanuary.Thisworkfocusesonlayingtheinfrastructuretosupporttherestofthedevelopment.
Insummarytheworkincludes:-Settingupthesitecompoundandoffices-TheextensionofLawrenceWeaverRoadfurtherintothesite-Provisionoffoulandsurfacewaterdrainageinfrastructure-Provisionofutilitiestoservethedevelopment.
ConstructionaccessisviaHuntingtonRoad.Allofthisinitialworkistakingplacewithinthesitesoshouldcauseminimaldisruptiontonearneighbours.
WewillcontactWindsorRoadresidentsseparatelywhenwehaveadateforwhenthefoulandservicewaterworkswillbecarriedout.
Hours of operationAs per the Outline Planning permission:
• Operations on site will take place from 8am to 6pm Monday to Friday and from 8am to 1pm on Saturdays.
• No construction work will take place on Sundays or Bank and Public holidays.
• Deliveries to the site will be between 10am and 2pm Monday to Saturday, with no deliveries on Sundays or Bank and Public holidays.
KEY
4m WIDE HAUL ROAD WITH FOOTPATH
ENHANED HAUL ROAD OVER APARTMENT FOOTPRINTS (USED AS THE PROPOSED PILLING MAT)
POTENTIAL FUTURE HAUL ROAD WITH FOOTPATH
HOARDING