D0 PMG6/15/00
PMG AgendaPMG AgendaJune 15, 2000June 15, 2000
Overview (Tuts) Detector status Reportable milestones Financial status Summary
Response to DOE review (Womersley)
![Page 2: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/2.jpg)
DD
D0 PMG6/15/00
Status OverviewStatus Overview
Silicon Just reported at DOE review
needed sensors hdi's detectors ladders
have/ to go have/ to go (ladders) tested
3- chip0' single
sided72 72 / 0 72 / 0 55 52
6- chip DSDM, 90' 144 95 / 49 144 / 0 95 72
9- chip 0',2' DS 216 166 / 50 176 / 40 132 112
F-
wedge144 144 / 0 144 / 0 80 46
H-
wedge192 170 / 22 192 / 0 169 155
![Page 3: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/3.jpg)
DD
D0 PMG6/15/00
Status OverviewStatus Overview
Forward Preshower Both detectors installed
ICD North & South Installed
Luminosity monitor North & South Installed
Fiber tracker Just reported at DOE review Some update Preparing the move to DAB
![Page 4: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/4.jpg)
DD
D0 PMG6/15/00
Fiber Tracker StatusFiber Tracker Status
Waveguide QC going well Final acceptance criteria are still
being developed Likely to accept two bad channels per
wavguide (256)
Falling off production schedule Priming “pipelines”.
Waveguide Production
0
50
100
150
200
250
300
350
5/19/00 6/2/00 6/16/00 6/30/00 7/14/00 7/28/00 8/11/00
Project Plan
Actual
![Page 5: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/5.jpg)
DD
D0 PMG6/15/00
Fiber Tracker StatusFiber Tracker Status
VLPC Cassettes Sub-component assembly
65-80% complete Final production cassette
test/characterization not quite started
Cassette Production
0
20
40
60
80
100
120
140
Dec-99 Jan-00 Mar-00 May-00 Jun-00 Aug-00 Oct-00 Nov-00 Jan-01 Feb-01
Actual
Schedule projection
![Page 6: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/6.jpg)
DD
D0 PMG6/15/00
Status Overview Status Overview
Central Muons Commissioning continues
Forward Muon detectors Trig Pixels
All octants assembled & tested & starting to move to DAB
HV commissioning complete VME crate installation started A layer supports in production
MDTs A layer octants installed B octants all parts on hand C octants: 15 done C layer supports in production
![Page 7: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/7.jpg)
DD
D0 PMG6/15/00
Status OverviewStatus Overview
Trigger & DAQ progressing – far from critical path
Online No schedule concerns, not on
critical path Good progress on internal
commissioning milestones ( pushing on subsystems)
Supporting silicon 10% test
Solenoid and beam pipe No changes since last time
![Page 8: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/8.jpg)
DD
D0 PMG6/15/00
Status Overview; Status Overview; ElectronicsElectronics
Electronics Calorimeter
Preamps 99% complete BLS delayed – solving coherent noise
problem Muon
PDT electronics - done Scintillator
– Front end• Found missing part, done by end of
month
– Readout card - done MDT - done Readout electronics
– Readout 100%– Fanout 15%; released for production
![Page 9: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/9.jpg)
DD
D0 PMG6/15/00
Status Overview ; Status Overview ; ElectronicsElectronics
Tracking Electronics Released Si interface card production
bid process– Still have final changes to make
Concerned about low mass cable cross talk– Being studied– Understanding how to speed up
production – possible $ exposure Analog Front End boards
– Release order for 10 pcs (4 wks) MCM yields lower than anticipated
– Based on small sample– May have $ risk (contracted for 15%
loss)
![Page 10: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/10.jpg)
DD
D0 PMG6/15/00
InstallationInstallation
Installation Shielding articulated on North Truss Surveyed A layer chambers A Pixel sheets being assembled on
wall VLPC cryostat have leaks (near lids)
2 week delay (remachine) Anticipate getting in before platform
moves Started cabling
Interface card – sequencer – ok
![Page 11: D0 PMG 6/15/00 PMG Agenda June 15, 2000 Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary Response to DOE review.](https://reader036.fdocuments.us/reader036/viewer/2022082518/5697bfdc1a28abf838cb14cc/html5/thumbnails/11.jpg)
DD
D0 PMG6/15/00
SummarySummary
Concerns Silicon continues……. Waveguides are concern
Use of contingency: we are using it Both kinds: schedule and funding