CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study...

36
CVP Analysis Cost, Volume, Profit

Transcript of CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study...

Page 1: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

CVP Analysis

Cost, Volume, Profit

Page 2: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

What is CVP?

• Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume and profit.

• Profit = (price – vcost/unit)*Volume – Total Fixed Costs.

• Price and vcost are per unit.

Page 3: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Developing the formula

• Profit = (price – vcost/unit)*Volume – Total Fixed Costs.

• price and vcost are per unit.• P = (p – c)V – F (Basic Formula)• P = profit• p = price (per unit)• c = Variable cost/unit• F = total Fixed Costs• V = Sales Volume (units sold)

Page 4: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Example Using Basic Formula

• P = (p – c)V – F• price (p) = $300/unit• vcost (c) = $100/unit• Total Fixed Costs = $50,000• If you sell 1,500 units, what is the profit?• P = (300 – 100)1500 – 50000• = (200)1500 – 50000• = 300000 – 50000• = $250,000

Page 5: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using CVP

• Breakeven analysis

• Profit, price, Volume analysis

Page 6: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using CVP for Breakeven

Breakeven is the situation where no profit or loss is generated.

• Income = Costs• In the Basic Formula, Profit = 0Two ways to use:• Breakeven Volume: VBE

• Breakeven price: pBE

Page 7: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Calculating Breakeven Volume• Breakeven Volume is the quantity that will

generate Profit = 0 for given costs and price.• Using the formula, we need to determine what V

is when P = 0.• P = (p – c)V – F• 0 = (p – c) VBE – F• F = (p – c) VBE

• F/(p – c) = VBE

• VBE is being use to denote specifically the Breakeven Volume.

Page 8: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Contribution Margin

• VBE = F/(p – c)

• The breakeven volume is calculated by Total Fixed costs divided by price minus variable costs.

• (p – c) is often called the Contribution Margin (per unit) or Unit Contribution Margin.

• Another way of looking at breakeven is it is the sales volume where Income = Costs.

Page 9: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Breakeven: Income = Costs

• Income = Costs• P = (p – c)V – F• 0 = (p – c) VBE – F

• 0 = p VBE – c VBE – F

• p VBE = c VBE + F

• p VBE is the income and c VBE + F are the total costs, Variable Costs + Fixed Costs.

Page 10: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Example of Breakeven Calculations

• VBE = F/(p – c)

• price (p) = $300/unit• vcost (c) = $100/unit• Total Fixed Costs = $50,000• What the Breakeven volume?• VBE = 50000/(300 – 100)

• VBE = 50000/200

• VBE = 250 units

Page 11: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Check & Validate…

• Check: Income = Total Costs• p VBE = c VBE + F ??

• 300(250) = 100(250) + 50000• 75000 = 25000 + 50000• 75000 = 75000

Page 12: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Breakeven Graph

INCOME = pV

FIXED COSTS + VARIABLE COSTS

FIXED COSTS

Breakeven: Income = Total Costs

VBE

Page 13: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Breakeven Price

• Let’s say you know the volume and you want to know the price that will generate a breakeven situation: i.e. P = 0

• 0 = pBE V – c V – F

• pBE V = c V + F

• pBE = (c V + F)/V

• Breakeven price is calculated by dividing the Total Costs by the Volume.

Page 14: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Example Breakeven price• pBE = (c V + F)/V or c + F/V• c = 100 (per unit)• F = 50000• V = 1500 units• pBE = [100(1500) + 50000]/1500• = [150000 + 50000]/1500• = [200000]/1500• = $133.33/unit• If you price the item at $133.33 then if you sell,

1500 units, you will Breakeven.

Page 15: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Example Breakeven price

• pBE = (c V + F)/V or c + F/V

• c = 100 (per unit)• F = 50000• V = 1500 units• pBE = $133.33

• If you price it higher than $133.33, and you sell 1500 units, you will make a profit.

Page 16: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using X5 from Tablet Sim• Default Values:• p = $265 (you can change this after SLP1)• c = $120 (does not change in the simulation)• Unit Contr. Margin = $145• From Default Run Year 2012:• R&D costs = 7,260,000 – (33% of 22,000,000 budget, you decide allocation %)

• Other Fixed Costs = 72,000,000 (does not change)• Total Fixed Costs = 79,260,000 (R&D + Other Fixed)• 2012 unit sales volume: 1,859,856

Page 17: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using X5 from Tablet Sim• Let’s validate the results in the Sim and

calculate Profit• P = (p – c)V – F• P = (265 – 145) 1,859,856 – 79,260,000• = (120) 1,859,856 – 79,260,000• = 223,182,720 - 79,260,000• = 143,922,720• Profit from Default Sim for X5 in 2012 =

143,922,720

Page 18: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using X5 from Tablet Sim

• Let’s estimate what will happen in 2013 if we lower R&D and we lower the price.

• R&D% = 10% (of 20,000,000)• R&D = 2,000,000• Price p = $225 (down from $250 by 15%)• Sales Volume V = 1,427,666 (from 2013 default run)• Profit = (225 – 145) 1,427,666 – 74,000,000• = (80) 1,427,666 – 74,000,000• = 114,213,280 – 74,000,000• = 40,213,280 • Profit = 92,059,892 from 2013, default run

Page 19: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using X5 from PDA Sim

• So if you lower your price to $225 and decrease R&D and the volume does not change from the default volume, you will earn less profit in 2013 that you did in the default run.

• BUT, if you lower the price will that help to increase the volume?

• Maybe, but what does the volume need to be to obtain the same profit that was earned in 2013, default run (92,059,892)

Page 20: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Using X5 from Tablet Sim• Profit, P = 92,059,892• Volume = ?• P = (p – c)V – F• (P + F)/(p – c) = V• (92,059,892 + 74,000,000)/(85) = V• 166,059,892/ 80 = 2,075,748.65• V = 2,075,749 units to achieve the same profit• If you lower the price to $225 and reduce the

R&D to 10%, does the reduced price cause an increase in Volume so that the profit is the same?

Page 21: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Determining Strategy: X5 Example

• Default run 2013• p = 265• c = 145• Unit Contr. Margin = 120• R&D (33%) = 7,260,000• Other Fixed = 72,000,000• Profit = 92,059,892 • Volume = 1,427,666

• Possible strategy 2013• p = 225• c = 145• ucm = 80• R&D (10%) = 2,000,000• Other Fixed = 70,000,000• Profit = 81,690,327 • Volume = 2,075,749

If you lower price from $250 to $225 in 2007, will volume go up to or higher than 81,690,327

Page 22: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Breakeven Formulas• P = (p – c)V – F• For Breakeven, set P = 0

Breakeven Volume• VBE = F/(p – c)

Breakeven Price• pBE = (c V + F)/V or

• pBE = c + F/V

• REMEMBER: in the Tablet Sim, you need to consider that R&D is part of Fixed Costs, so here F = Fo + R

Page 23: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Other CVP Formulas

Use F = Fo + R (sim fixed costs)

• Price, for a given Profit, Volume and Costs• p* = (P + Fo + R + cV) / V

• Volume, for a given price, Profit and Costs• V* = (P + Fo + R) / (p – c)

Page 24: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Application of CVP in the PDA Sim

• When should you use Breakeven?• How do you deal with multiple years?• How do you deal with multiple products?

• Give these questions some thought.• Experiment with CVP.

Page 25: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

USING THE CVP CALCULATOR

An Example for X5 in the Tablet SIM

Page 26: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Default X5 2012Price: $265R&D%: 33%X5 Financials for 2012

Page 27: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Default X5 Market Report for the year 2012

Page 28: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

USING CVP Calculator:

R&D Total Budget $ 22,000,000

R&D% Allocation 33%

R&D Costs $ 7,260,000

Fixed Costs $ 72,000,000

Total Fixed Costs $ 79,260,000

Target Profit $143,992,711

Variable Cost/Unit $ 145.00

Variable cost/unit: $145 Price $ 265.00

Volume 1,859,856

Sales Revenue $ 492,861,820

ROS 29.20%

Note that the results from the CVP Calculator are nearly the same as you get in the SIM. The only difference is because the SIM must be using 33.3333% for the R&D Allocation and the CVP Calculator is using 33%. So we will ignore the difference.

Page 29: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Now let’s develop a Revised Strategy

Now, let’s try to develop a different price and R&D allocation for 2012 for our Revised Strategy using the

• CVP Calculator. Should we lower R&D or increase it? Should we lower the price or increase it? How much profit do we want? How much will we sell?

• Let’s lower the R&D%, say down to 15% - why? I will leave that up to you decide why we might want to do this.

• Let’s leave the price the same for this first estimate: $265.

• And let’s shoot for the same profit: $143,922,711• If you put these into the CVP Calculator, this says you

need less volume: 1,826,856 units.

Page 30: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Price: $265R&D: 15% Volume: 1,826,856

R&D Total Budget $ 22,000,000 R&D% Allocation 15%

R&D Costs $ 3,300,000

Fixed Costs $ 75,300,000

Total Fixed Costs $ 75,000,000

Target Profit $143,922,711

Variable Cost/Unit $ 145.00

Price $ 265.00

Volume 1,826,856

Sales Revenue $ 484,116,820.00

ROS 29.73%

Page 31: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

What price if Volume does not change?

• Price = ?• Same volume as

default run• Same profit as

default run• R&D%: 15%

Volume 1,859,856

Price $ 262.87

Sales Revenue $ 488,901,831.00

ROS 29.44%

Price = $262.87

Page 32: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

What happens in SIM?• Let’s run the

sim with our revised strategy for X5 for 2012.

• Price: $263• R&D%:

15%

This Year Last Year % Change

RevenueSales Volume 1,928,810 1,535,407 26%

Revenue Volume

507,277,039 406,882,843 25%

Cost

Variable Costs 279,677,455 222,634,008 26%

Fixed Costs 72,000,000 72,000,000 0%

R & D Costs 3,300,000 7,260,000 -55%

Total Costs 354,977,455 301,894, 008 19%

Profit

Total Profit 152, 299,584 104,988,835 45%

Total Profitability

30% 23% 15%

X5 Financials for 2006

Page 33: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Results do not match!!• Volume sold: 1,928,810• Profit earned: 152,299,584• We don’t get the same results that were

predicted by the CVP!!In the CVP we used a Volume of: 1,859,856 But in the SIM, when we lowered the price just a

bit down to $263, we got a volume of: 1,928,810.

We will get this same result in the CVP calculator if we put in the actual profit earned in the SIM

Page 34: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

CVP Calculator with Revised Strategy Results

R&D Total Budget $ 22,000,000 R&D% Allocation 15%

R&D Costs $ 3,000,000 Fixed Costs $ 70,000,000 Total Fixed Costs $ 73,000,000

Target Profit $152,299,584

Variable Cost/Unit $ 145.00

Price $ 263

Volume 1,928,810

Sales Revenue $ 507, 277, 038.92

ROS 30.63%

Page 35: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Why does the SIM not match your predictions with the CVP Calculator?• The SIM gives you the results based on your

inputs of price and R&D%• It will determine how much you sell based on

the price – usually a lower price will generate a higher sales volume and vice versa, depending on the price elasticity.

• The CVP calculator does not know the price:demand curve – it is simply telling you how much you need to sell for a given Price and a Target Profit.

Page 36: CVP Analysis Cost, Volume, Profit. What is CVP? Uses a specific cost-profit-volume formula to study the relationship of the costs, price, sales volume.

Some final thoughts• So what is missing is the relationship between price and

demand.• Demand is based on based price and the performance (how

much is being spent on R&D).• You need to use CVP to help you determine or predict a price in

your revised strategy.• Then based on the results you get, you can begin to understand

the price:demand relationship.• That is why you get to run the SIM several times as you learn

more about price:demand.• And of course demand is related to how much you spend on

R&D.• And each product is more or less sensitive to price and product

development efforts.