Cv vineet rathi

3

Click here to load reader

Transcript of Cv vineet rathi

Page 1: Cv vineet rathi

B-14 Fire StationSec-6, Dwarka, Delhi, IndiaPin code - 110075

E-mail: [email protected]: +91-9911901965

OBJECTIVE Interested for abroad jobs

Seeking a fulfilling position in the Electrical industry that offers growth opportunitiesand allows me to utilize my leadership skills and experience. Project Execution 7 yearexperience in electrical engineering design for power utility projects as well as industrialand commercial facilities,

WORKEXPERIENCE

Sterling and Wilson Ltd , Noida,U.P, India

February 2011 — Present

Project Manager

Key Responsibilities:

Planning & Execution of Projects (Substation 33KV & Above, & Transmission Line) :

Familiar with Electrical Systems & Controls HT , LT Cable Joints, Installations &Maintenance, LT, HT Panel, Generators & Transformers, Relays, Switches &Circuit Breakers (ACB & VCB),Blueprints & Schematics, Safety & QA, Wiring &Conduit Diagrams etc Develop a team of efficient managers & engineers for successful and timelyexecution of projects without time and cost over runs. Planning overseeing of the engineering, quality, budgeting, management,information system, coordination monitoring of projects under execution. Provide advice and help in timely completion of the projects. Develop an efficient Planning, Scheduling and monitoring system forthe projects under execution based on the latest management tools likeM.S Project. Responsible for the administration, implementation, and management ofcontrol projects and accountable for assigned projects scope of work, schedule, andbudget Performs construction plan review to meet customer requirements Planning, Control and monitor the site activities as per schedule. Responsible for overall construction including procurement Co-ordination withsubcontractor, consultant and local authorities for smooth operation of workInstallation, testing & commissioning of Electrical Systems like Transformers,Cable Systems, Protection Systems, MV&LV Switchgear etc. Responsible for overall execution, included supervision of workman ensuring thesafety and quality aspects as per the requirement of the project specificationwithin the time schedule and monitoring the productivity as per the companynorms Estimates labour, material costs and draw up specifications for purchase ofmaterials and equipment. Coordination with Client/vendors. Experienced in developing project baselines, monitoring andcontrolling projects with respect to cost, time over-runs and quality compliance to

Vineet Kumar Rathi

Vine e t Kumar Rathi 1

Page 2: Cv vineet rathi

Unicorn Power Solution Noida,Delhi

August 2010 — January 2011

Jakson Engineer Ltd - Noida,Delhi

September 2008 — July 2010

DLF Gurgaon, Delhi June 2004 — July 2005

ensure satisfactory execution of projects

Sr. Project Engineer

Key Responsibilities:

Handled 2 substations with 15000 KVA DG and Control panel As-Built scheme drawing submission and test report Installation Testing & commissioning of DG Set for15 KVA to 2000 KVA 10 to 40 meters height Support Structure for exhaust Pipe Responsible for projectplanning, estimation and costingVery well knowledge of stringing activity Manage all construction activity includeplanning, cost estimates, site supervisionExperienced in developing project baselines, monitoring andcontrolling projects with respect to cost, time over-runs and quality compliance toensure satisfactory execution of projects

Project Engineer

Key Responsibilities:

Installation and commissioning of different types of power interface unit (DG Set ,LT HT Panel & Transformer) operation and maintenance of DG sub-station. Installation & commissioning of DGSet for 15 KVA to 1500KVA Planned and handled all the electrical & mechanical spares Parts. Involved in commissioning and maintenance of Control AMF Panel & DieselGenerator (CUMMINS). single line diagram and layout diagram for Foundation, DG Set and ControlPanel. Prepared Offer, Invoice, Order Summery, Dispatch Clearance for ExportCustomers and maintained all documents Coordinated and interacted with various customers across India, Nepal,Bangladesh & various other countries.

Site Engineer

Key Responsibilities:

Responsible for managing entire project activities including project planning,estimation and costing Handled Responsibly for all electrical installation equipment at site Involved in execution of D.G. set foundation, Shelter foundation Preparedequipment room. Installation Power cable routing from source to MDB & inside the equipmentRoom Executed earthling pits as per specification & routing of earthing strips.

QUALIFICATIONS

Vine e t Kumar Rathi 2

Page 3: Cv vineet rathi

Project Manager 7 Year exp in Project execution with Electrical engineering

EDUCATION MBA : Power Management 2012 — 2013

B. Tech : Electrical Engineering 2005 — 2008

Diploma : Electrical Engineering 2001 — 2004

United Business Institute of Brussels , Belgium

Radha Govind Engineering College U.P.T.U. Lucknow Meerut, U.P, India

D. N. Polytechnic U.P.B.T.E. Lucknow Meerut, U.P, India

INTERESTS Music, Reading, Painting,Tennis, baseball, running,

STRENGTHS Self confidence hard working strong interpersonal and communication skillswilling to learn and adapt new opportunities and challenges

IMMIGRATION &WORK STATUS

Valid Passport - Available Visa - Job seeker visa apply Interest in Germany and other country

SKILL Academic, AUTO CAD, Billing, drawing, Excel, MS Office , Power Point, 2000,Windows XP, Word, MS DOS, DB, SAP

LANGUAGE Hindi & English

Vine e t Kumar Rathi 3