Iain R M CameronIain R M Cameron
Presentation of Professional Presentation of Professional ExperienceExperience
IntroductionIntroduction
• This presentation is an attempt to demonstrate This presentation is an attempt to demonstrate my experience visually and pictorially.my experience visually and pictorially.
• I have apportioned my experience into a number I have apportioned my experience into a number of categories as shown on the following slide.of categories as shown on the following slide.
Experience CategoriesExperience Categories
• Project ManagementProject Management
• Construction ManagementConstruction Management
• Contract AdministrationContract Administration
• Highways and TransportationHighways and Transportation
• RailRail
• Water and DrainageWater and Drainage
• StructuresStructures
• Health & SafetyHealth & Safety
• EnvironmentalEnvironmental
• Education and TrainingEducation and Training
Employment ListEmployment List
• The following slides show details of my The following slides show details of my employment listed chronologically, starting from employment listed chronologically, starting from the present.the present.
• Each employment period is broken down into Each employment period is broken down into time spent on the various experience categories.time spent on the various experience categories.
Employment List
Period Duration
(mths)
Employer Post Projects Experience
Category mths
Feb 09 – to date
12ONTRACK, Auckland, NZ
Facilities Development Mgr (Snr Project Manager)
New Lynn Rail Trench
Rail 12
Project Management 12
Contract Administration 5
Nov 07 – Nov 08
12EC Harris, Abu Dhabi, UAE
Service Delivery Team Leader (Snr Project Manager)
Shopping Mall and Hotel Towers Development, Abu Dhabi
Project Management 12
Contract Administration 6
Oct 06 - Nov 07
13Hyder Consulting, Abu Dhabi, UAE
Construction Director
Responsible for over 200 site staff – Projects incl. 60 storey towers, marine works, infrastructure works
Construction Management 12
Project Management 10
Contract Administration 6
Health & Safety 6
Environmental 3
Education & Training 3
Jan 06 - Oct 06
10MWH, Hawkes Bay, NZ
Group Manager - Local Government
Responsible for teams involved in infrastructure works and environmental
Project Management 10
Contract Administration 5
Water & Drainage 6
Environmental 4
Oct 91 - Jan 06
170EES Ltd, Linlithgow, Scotland
Director
For details of EES Projects refer to next 2 slides.
Elwood Engineering Services Ltd – Own Ltd CompanyElwood Engineering Services Ltd – Own Ltd Company • Between Oct 1991 (on returning to Scotland from the Between Oct 1991 (on returning to Scotland from the
Middle East) and January 2006 when I took up the post in Middle East) and January 2006 when I took up the post in New Zealand I ran my own New Zealand I ran my own ConsultancyConsultancy (EES Ltd)(EES Ltd). I . I generally contracted my services out to one major client at generally contracted my services out to one major client at a time (as listed below). These appointments were a time (as listed below). These appointments were generally of a fairly senior nature with significant staff generally of a fairly senior nature with significant staff management responsibility. The length of time for each of management responsibility. The length of time for each of these posts was very much dependent on the clients’ these posts was very much dependent on the clients’ staffing needs and policy. staffing needs and policy.
• I also carried out work on an ongoing basis for a I also carried out work on an ongoing basis for a considerable number of smaller clients, particularly for considerable number of smaller clients, particularly for Structural and Civil DesignsStructural and Civil Designs. I received regular . I received regular commissions for commissions for Tender Preparation andTender Preparation and AssessmentAssessment and also for and also for Claims Evaluation and ReportingClaims Evaluation and Reporting..
EES Ltd Projects List
Period Duration
(mths)
Client Post Projects Experience
Category mths
May 04 – Jan 06
20West Lothian Council Roads Operations
Programme ManagerRoads Capital Programme
Highways & Transportation 20
Project Management 20
Contract Administration 10
Education & Training 4
Sept 03 – May 04
8Northern Ireland Rail
Resident Project Manager
Upgrade of 22 No. Stations in Northern Ireland
Project Management 8
Rail 8
Contract Administration 6
Construction Management 6
Health & Safety 6
Sept 00 –Aug 03
35
Babtie (Jacobs) Group, Glasgow for Railtrack Scotland
Bridge Engineering Project Manager
Rail Bridge Inspections and Assessments throughout Scotland
Project Management 35
Rail 35
Structures 8
Health & Safety 20
Jun 97 – Sept 00
39East of Scotland Water
Project Manager
Bonnybridge WWTW, Falkirk, Scotland
Project Management 39
Contract Administration 10
Water & Drainage 39
Health & Safety 8
Environmental 6
Sept 95 - Jun 97
21
Brand Leonard, Consulting Engineers, Scotland
Resident EngineerBuchanan Galleries, Glasgow
Construction Management 21
Contract Administration 15
Structures 9
Health & Safety 6
EES Ltd Projects List, Cont’d
Period Duration
(mths)
Client Post Projects Experience
Category mths
Oct 91 – Sept 95 47
Carl Bro Group, Stirling and Glasgow
Project Manager
D & B Project for 3 Water Treatment Plants
Project Management 36
Construction Management 24
Water & Drainage 30
Structures 20
Employment List, Cont’d
Jun 90 – Oct 91 16
Sir M MacDonald & Partners (MMP), Abu Dhabi, UAE
Water Manager
Infrastructure Projects for WED, Abu Dhabi; Leak detection
Project Management 12
Construction Management 6
Water & Drainage 16
Contract Administration 6
Oct 88 -Jun 90
20De Leuw Cather International Ltd, Abu Dhabi, UAE
Resident Engineer
Al Salaam St. upgrading project, Abu Dhabi
Construction Management 20
Contract Administration 12
Highways & Transportation 20
Jan 88 – Sept 88
10Asco Consulting Engineers, Doha, Qatar
Senior Design Engineer
Infrastructure Projects for Army Camps in Qatar
Water & Drainage 6
Highways & Transportation 4
Contract Administration 4
Jan 87 – Dec 87
12Bullen & Ptnrs, Glasgow, Scotland
Senior Highway Engineer
A96 Kintore Bypass, Scotland
Highways & Transportation 12
Environmental 4
Employment List, Cont’d
Period Duration
(mths)
Client Post Projects Experience
Category mths
Sept 84 – Jan 87
28Waterman & Ptnrs, Edinburgh, Scotland
Section Engineer
Structural and Infrastructure Projects for Ministry of Defence
Structures 14
Water & Drainage 12
Highways & Transportation 8
Aug 81 -Sept 84 37
Central Region Council Roads Dept, Scotland
Highway Engineer
Town Centre Relief Roads & Trunk Road Improvement Schemes
Highways & Transportation 37
Contract Administration 6
Construction Management 9
1976 - 1981
Paisley University, Scotland
Apr 74 -Sept 76
29
South-East Scotland Water Board
Civil Engineering Technician
Water Supply Projects
Water & Drainage 29
Structures 6
Contract Administration 6
Total Experience per CategoryTotal Experience per Category
CategoryCategory MonthsMonthsProject ManagementProject Management 194194
Construction ManagementConstruction Management 8484
Contract AdministrationContract Administration 9393
Highways and Highways and TransportationTransportation
101101
RailRail 5555
Water and DrainageWater and Drainage 138138
StructuresStructures 5757
Health & SafetyHealth & Safety 4646
EnvironmentalEnvironmental 1717
Education and TrainingEducation and Training 1313
ONTRACK - ONTRACK - PROJECT INTERFACE MANAGERPROJECT INTERFACE MANAGER
Employed by ONTRACK for the proposed Employed by ONTRACK for the proposed $40 million (NZ)$40 million (NZ) new Railnew Rail
Station at New Lynn, West Auckland as part of the New Lynn Station at New Lynn, West Auckland as part of the New Lynn Rail Rail
Duplication Project.Duplication Project.Duties & Responsibilities:Duties & Responsibilities:
• Draft and implement a legally binding Funding Agreement between Draft and implement a legally binding Funding Agreement between Principal Stakeholders.Principal Stakeholders.
• Interface with Principal Stakeholders to ensure continued input and Interface with Principal Stakeholders to ensure continued input and co-operation.co-operation.
• Draft NZS 3910 Professional Services Contract to procure a Contract Draft NZS 3910 Professional Services Contract to procure a Contract Administration Consultant.Administration Consultant.
• Provide co-ordination between Contractor and Stakeholders to Provide co-ordination between Contractor and Stakeholders to manage project risk, identify any scope creep and explore value manage project risk, identify any scope creep and explore value engineering opportunities.engineering opportunities.
• Set up a financial reporting mechanism for project.Set up a financial reporting mechanism for project.
• Carry out Hazard Identification and Risk Assessment for Station and Carry out Hazard Identification and Risk Assessment for Station and prepare Safety Case and Evacuation Plan.prepare Safety Case and Evacuation Plan.
NewNew Lynn Rail Station prior to commencement of Lynn Rail Station prior to commencement of project – single track, ground level.project – single track, ground level.
Memorial Ave
Station entry
Lynn Mall
OfficesMemorial Ave
Station entry
Lynn Mall
Offices
New Lynn Rail Trench during construction (Sept 09) New Lynn Rail Trench during construction (Sept 09) showing diaphragm walls, high level permanent showing diaphragm walls, high level permanent props, mid level temporary props and platform props, mid level temporary props and platform walls.walls.
First Train in Trench Milestone (March 2010)First Train in Trench Milestone (March 2010)
Artists Impression of Completed Station (due August Artists Impression of Completed Station (due August 2010)2010)
EC Harris - EC Harris - Senior Project ManagerSenior Project Manager
• ProposedProposed Marina Mall Extension and Hotel Towers Marina Mall Extension and Hotel Towers DevelopmentDevelopment
Hyder Consulting - Hyder Consulting - Construction DirectorConstruction Director
• Employed as Employed as Senior Project ManagerSenior Project Manager, responsible for the , responsible for the planning and execution of large high-rise residential / planning and execution of large high-rise residential / commercial development (commercial development (2 Billion AED)2 Billion AED) on Reem Island, on Reem Island, Abu Dhabi.Abu Dhabi.
18
Al Reem Infrastructure Plots 1, 2, 3
Project Organisation Chart
ClientTamouh Investments
LLC
Project CompanyGeneral Manager
Jim Salmon
Project ManagerColin Nicholls
Regional Support
Design ManagerOmer Mustafa
Water & IrrigationTeam Leader
Krzysztof Rzepczynski
Sr. Design EngineerKrishna Pillai
PowerTeam Leader
Amin A Rahman
Design EngineerJagadisha Babu
Roads & StormwaterTeam Leader
Ihab SabriSr. Design Road
EngineerPaul Conley
Sr. StormwaterEnginner
Attalla Abusayf
GasTeam LeaderAmin Rifai
Marine WorksTeam Leader
Halcrow
TelecommunicationTeam LeaderMohammed
Hussein
Design EngineerReem El- Bashatly
Sewerage Team LeaderMohammed
Sayhood
Sr. Design EngineerVincent Lim
Assistant P.M.Chan Lung
Al Reem Infrastructure Plots 1, 2, 3
Project Organisation Chart
ClientTamouh Investments
LLC
Project CompanyGeneral Manager
Jim Salmon
Project ManagerIain Cameron
Regional Support
Design ManagerOmer Mustafa
Water & IrrigationTeam Leader
Krzysztof Rzepczynski
Sr. Design EngineerKrishna Pillai
PowerTeam Leader
Amin A Rahman
Design EngineerJagadisha Babu
Roads & StormwaterTeam Leader
Ihab SabriSr. Design Road
EngineerPaul Conley
Sr. StormwaterEnginner
Attalla Abusayf
GasTeam LeaderAmin Rifai
Marine WorksTeam Leader
Halcrow
TelecommunicationTeam LeaderMohammed
Hussein
Design EngineerReem El- Bashatly
Sewerage Team LeaderMohammed
Sayhood
Sr. Design EngineerVincent Lim
Assistant P.M.Chan Lung
2. Utilities and Service Providers
19
The assignment to be carried out by Hyder Consulting includes the development of designs for implementation for the utilities listed in the table below. The relevant service providers are noted for each utility:
Utility Service Provider
District Cooling PAL Technologies
MV & LV Power Supply ADDC
ICT Systems UTT
Vacuum Solid Waste Disposal To be determined
Street Lighting To be determined
Sewerage ADSSC / Investor / Tamouh
Potable Water Supply ADDC
Natural Gas Supply ADNOC
Stormwater Drainage Tamouh
Tamouh CBD
Tamouh South
Sorouh 2
Sorouh 1
Najmat
SIMPLIFIED REGIONAL ROAD SCHEME
IP 36
IP 44
Saadiyyat
20
Invited to take up the above Construction Director post in Jan 2007 (responsible for over 200
staff supervising a variety of projects, including 60 storey towers, marine works, sewage
treatment plants, road works and infrastructure works)
Duties & Responsibilities:
• To provide advice and expertise to managers and staff on all civil engineering aspects of site operations and to develop and maintain the required technical support systems.
• Direct and manage all Abu Dhabi site staff to maintain motivation with a view to increasing staff retention levels;
• As Head of Construction I carried out Project Director duties for the construction of the afore-mentioned sewage treatment plant at Dubai Sports City and retained Project Management responsibility for the design and construction of temporary infrastructure works for Reem Island and for the marine works at Ruwais Oil Refinery (which required security clearance).
• I was also directly involved in producing a Standard Construction Manual to be used on all Hyder Consulting construction sites throughout the Middle East to ensure compliance with all quality standards.
HYDER ABU DHABI EMIRATE OFFICE STRUCTURE
December 2006
Chris VenemoreArea Director
Chris VenemoreArea Director
Water(John Parry)
TransportationJames Lynn
PropertyTBA
Al AinArea ManagerKen Hodkinson
Land DevelopmentDavid Metcalfe
ConstructionIain Cameron
AdvisoryStan Falconer(SCG)
StructuresWilliam Dudley
MEPOmar Mustafa
GeotechnicalKhalid Hassan
HighwaysZuhair Bardakji
ITSOmar Saeed
TrafficLim Eng Hwa
Rail
Water
Highways
Wastewater NetworksMohd Sayhood
Clean WaterKrzysztof Rzepczynski
Urban PlanningHoward Trett
LandscapeRichard Freeman
ADSSCEhab Abdul Azim
PGD SiteIbrahim Al Noor
Highway SiteHussein Hamza
Project SitesGraham Turner
Management Advisory Services
EnvironmentEmma Corbett
TechnologyJohn Willson
Oil &GasTBA
InfrastructureTBA
Reem ProjectsRoger Howard (SCG)
CAD Support
MarineHussein Kamel
Tourism(David Metcalfe)
O&M
MERO Support
PRO
Business ManagerTBA
Commercial Manager
IT ManagerFinance Team
CAD Manager
Treatment
Admin Manager
Standard Construction Standard Construction ManualManualSite Manual for NajmatSite Manual for Najmat – Site Administration ManualSite Administration Manual
The objective of the Site Administration Manual The objective of the Site Administration Manual
is to provide guidance on general is to provide guidance on general administration administration
matters to the Engineer’s Representative, matters to the Engineer’s Representative,
Resident Engineers, other site supervision staff Resident Engineers, other site supervision staff
and administrative staff.and administrative staff.
The Manual will establish procedures for:The Manual will establish procedures for:
• Dealing with incoming and outgoing mail;Dealing with incoming and outgoing mail;
• Layout and signature of correspondence;Layout and signature of correspondence;
• Communications with the press (via the Communications with the press (via the Employer);Employer);
• Confidentiality of documents;Confidentiality of documents;
• Notes of meetings;Notes of meetings;
• Document Transmittal (incoming & Document Transmittal (incoming & outgoing) outgoing)
• Filing and document security;Filing and document security;
• Use of computersUse of computers
• Control of standard specifications and Control of standard specifications and other documents.other documents.
MWH - MWH - Group Manager – Local GovernmentGroup Manager – Local Government
• Typical Organisation Chart for Local Government Projects
H a s tin g D istric t C o u n c ilE n g ine e ring C od e o f P ra ctice Re v iew
P e e r Re v iewD a v id Y o rke
S to rm W a terK ie re n O 'M a lley
S e w era geM att K n ee bo ne
S e we rag e P u m p ingS co tt M cD o n a ld
P o tab le W a terP e ter F ree
C A D S u p p o rt S p e c ia lis t Te ch n ica l S up p o rt
P ro je ct M an a g erG ra n t Ru sse ll
P ro je c t D ire c to rIa in R M C am e ron
West Lothian Council Roads Operations West Lothian Council Roads Operations -- Programme ManagerProgramme Manager
• In 2004 an additional £83m (Dh 500m) was identified by In 2004 an additional £83m (Dh 500m) was identified by WLC to eliminate backlog of repairs necessary to bring WLC to eliminate backlog of repairs necessary to bring roads, footways, street lighting and structures up to roads, footways, street lighting and structures up to standard. This resulted in the creation of a 3 year Capital standard. This resulted in the creation of a 3 year Capital Programme for road maintenance works.Programme for road maintenance works.
• I was appointed to advise the client on every aspect of I was appointed to advise the client on every aspect of delivering this project from the initial establishment of the delivering this project from the initial establishment of the project team, through the planning stage and on to project team, through the planning stage and on to delivery.delivery.
• This was a very ambitious programme but innovative ideas This was a very ambitious programme but innovative ideas and prudent management ensured successful delivery of and prudent management ensured successful delivery of 20% additional work over target for budget cost.20% additional work over target for budget cost.
• WLC were named as UK Council of the year in 2006 due to WLC were named as UK Council of the year in 2006 due to the success of this project.the success of this project.
West Lothian Council Roads Operations West Lothian Council Roads Operations -- Programme Manager – cont’dProgramme Manager – cont’d
Duties & Responsibilities:Duties & Responsibilities:
• Advising on Staff structures and establishment of teams for Advising on Staff structures and establishment of teams for design and supervision of contracts and to provide effective design and supervision of contracts and to provide effective managementmanagement and co-ordination of the Project and Project and co-ordination of the Project and Project TeamTeam
• Liaison with Statutory Undertakers and other Council Liaison with Statutory Undertakers and other Council Departments.Departments.
• Monitor progress and Monitor progress and financial targetsfinancial targets utilising excel utilising excel spreadsheets and Ms Project Gantt Charts.spreadsheets and Ms Project Gantt Charts.
• Monitor performance of Design Teams and Contractors against Monitor performance of Design Teams and Contractors against ProgrammeProgramme
• Management of Task Execution Contract to utilise 17 Management of Task Execution Contract to utilise 17 Contractors in the execution of the maintenance works.Contractors in the execution of the maintenance works.
• TrainingTraining of Council Staff – delivered a highway engineering of Council Staff – delivered a highway engineering course to the design teamscourse to the design teams
• TrainingTraining of staff in use of Ms project and excel. of staff in use of Ms project and excel.
Innovative ContractsInnovative Contracts
• Task Execution ContractTask Execution Contract
• Asphalt Supply ContractAsphalt Supply Contract
Model 1 Model 2 Model 3 Model 4 Total OverallContractor Value Value Value Value Value Position
Stirling Council 57,485.40£ 1 88,147.41£ 1 93,796.21£ 2 110,502.25£ 1 349,931.27£ 1
Crummock 60,949.06£ 2 103,082.69£ 2 100,062.10£ 3 120,560.66£ 3 384,654.51£ 2
Tayside Contracts 67,217.01£ 3 114,265.13£ 3 116,685.94£ 5 127,266.94£ 4 425,435.02£ 3
Falkirk Council 95,783.11£ 14 13,692.79£ 6 89,664.24£ 1 112,623.23£ 2 311,763.37£ 4
MacLay Civil Engineering 71,017.91£ 4 114,302.58£ 4 113,181.64£ 4 139,928.34£ 6 438,430.47£ 5
J H Civil Engineering 71,867.69£ 5 124,991.93£ 5 120,242.19£ 6 127,455.05£ 5 444,556.86£ 6
Farrens Construction Ltd 87,603.22£ 10 148,570.91£ 11 130,240.65£ 8 141,383.16£ 7 507,797.94£ 7
M&M Surfacing 79,983.40£ 6 134,426.64£ 7 144,628.77£ 12 157,135.57£ 9 516,174.38£ 8
Ritchie Brothers 93,733.19£ 13 145,719.09£ 10 141,304.43£ 10 156,630.10£ 8 537,386.81£ 9
Scottish Borders Council 87,115.60£ 9 140,465.89£ 8 144,543.68£ 11 169,593.46£ 10 541,718.63£ 10
Aggregate Industries 88,191.72£ 11 145,014.72£ 9 120,681.83£ 7 202,018.85£ 16 555,907.12£ 11
Tarmac 93,327.19£ 12 153,652.06£ 13 155,473.56£ 13 195,356.28£ 15 597,809.09£ 12
Potter Construction 86,843.56£ 8 171,313.75£ 14 171,122.58£ 16 175,875.52£ 11 605,155.41£ 13
Raynesway Construction 105,443.33£ 16 152,780.33£ 12 157,341.43£ 14 195,012.01£ 14 610,577.10£ 14
ERDC 98,277.34£ 15 172,263.52£ 15 163,990.86£ 15 188,528.89£ 12 623,060.61£ 15
Hanson 85,012.02£ 7 173,568.17£ 16 186,568.78£ 17 192,883.88£ 13 638,032.85£ 16
Luddon 139,985.72£ 17 204,406.44£ 17 133,066.58£ 9 206,914.58£ 17 684,373.32£ 17
West Lothian 69,713.78£ 4 106,229.30£ 3 102,036.02£ 4 144278.81 8 422,257.91£ 3
Key
Model 1 - Carriageway WorksModel 2 - Carriageway & Footway WorksModel 3 - Footway WorksModel 4 - Remote Footway Works
TEC - EVALUATION MODEL
Northern Ireland Rail - Northern Ireland Rail - Resident Project Resident Project ManagerManager
• Responsible for planning, administering and supervising the Responsible for planning, administering and supervising the Contract to upgrade 22 No. stations in Northern Ireland on Contract to upgrade 22 No. stations in Northern Ireland on behalf of Northern Ireland Rail.behalf of Northern Ireland Rail.
• Belfast Central – Platform Alterations
Moira Station – Moira Station – Platform ConstructionPlatform Construction
Belfast City Hospital – Belfast City Hospital – Platform ExtensionPlatform Extension
Antrim Station –Antrim Station –ReconstructionReconstruction
Lurgan Station – Lurgan Station – Platform Extension Platform Extension DetailDetail
Babtie Group - Babtie Group - Bridge Engineering Project Bridge Engineering Project ManagerManager
Carried out bridge inspections and assessments for Railtrack Scotland.
Dunblane Station FootbridgeSouth Elevation Corrosion to U/S X-
Bracing
Newmill Road Newmill Road Overbridge, Keith – Overbridge, Keith – General view of the General view of the West elevation.West elevation.
Characteristic freeze-Characteristic freeze-thaw damage at thaw damage at edges of the arch edges of the arch brickwork masonry.brickwork masonry.
Nelson St Nelson St Underbridge, Perth – Underbridge, Perth – General view of the General view of the southern elevationsouthern elevation
Detail view of Detail view of corrosion along corrosion along bottom flange of bottom flange of northern edge girdernorthern edge girder
East of Scotland Water - East of Scotland Water - Project ManagerProject Manager
• Upgrade to Bonny bridge WWTWUpgrade to Bonny bridge WWTW
Duties & Responsibilities:Duties & Responsibilities:
• Liaison with ESW Designers (Civil, Structural and Process) Liaison with ESW Designers (Civil, Structural and Process) and co-ordinate with ESW Operations (end users) to and co-ordinate with ESW Operations (end users) to develop and finalise scope of works.develop and finalise scope of works.
• Procurement of Lead Design Contractor.Procurement of Lead Design Contractor.
• Agree scope of work and fee with MEP Consultant.Agree scope of work and fee with MEP Consultant.
• Managing client’s Project Team.Managing client’s Project Team.
• Liaison with Environmental Authority and HSE in Liaison with Environmental Authority and HSE in development of Risk Assessment.development of Risk Assessment.
Construction of Pumping Chamber
Outlet from Pumping Chamber
Inlet Pipework
Inlet Works
Brand Leonard - Brand Leonard - Resident EngineerResident Engineer
£150m,£150m, Buchanan Galleries Project, Glasgow. This is now Buchanan Galleries Project, Glasgow. This is now Glasgow’s premier Glasgow’s premier shopping mallshopping mall, containing numerous , containing numerous large, top-brand department stores.large, top-brand department stores.
Duties & Responsibilities:Duties & Responsibilities:
• Design approval, supervision and checking of all piling, Design approval, supervision and checking of all piling, foundation, sub-structure and super-structure works.foundation, sub-structure and super-structure works.
• Monitored Quality and Progress of Construction and Monitored Quality and Progress of Construction and reported on same.reported on same.
• Overall approval of Contractor’s method statements.Overall approval of Contractor’s method statements.
South AreaConstruction of Tower Crane Base and Mini Piling Rigs for Piling adjacent to Railway Lines
North Area with Steel Framed Loading Area and Concrete Framed Shopping Mall
This was the largest crane in Scotland
4.5 m deep Girders to carry Multi Storey Car Park over Main Glasgow – Edinburgh Railway Line
Congratulations All Round after Successful Removal of 120 year old Cast Iron Road Bridge from over Main Glasgow – Edinburgh Railway Line
Large Diameter Piling Rig
Carl Bro Group - Carl Bro Group - Project ManagerProject Manager
Design and Build project in consortium with Trafalgar House to Design and Build project in consortium with Trafalgar House to construct construct 3 No. Water Treatment Plants3 No. Water Treatment Plants for Strathclyde for Strathclyde Water -value Water -value £14 million stg.£14 million stg.
Duties & Responsibilities:Duties & Responsibilities:
• Co-ordination between consortium partners.Co-ordination between consortium partners.
• Agree detailed scope of work and share of responsibilities Agree detailed scope of work and share of responsibilities for each party.for each party.
• Management of B/CE design and coordination of design Management of B/CE design and coordination of design teams in Carl Bro’s Edinburgh and Glasgow offices and teams in Carl Bro’s Edinburgh and Glasgow offices and procurement of external Architectural services.procurement of external Architectural services.
• Liaison with Water Authority, Statutory and Environmental Liaison with Water Authority, Statutory and Environmental Authorities and Planners.Authorities and Planners.
• Management of Programme.Management of Programme.
WTW at Neilston
WTW at South Moorhouse
WTW at Picketlaw
Sludge Treatment Building with Sludge Press
Sedimentation Tanks
Sir M MacDonald & Partners, Abu Dhabi - Sir M MacDonald & Partners, Abu Dhabi - Water Water ManagerManager
• Responsible for all design and site supervisory staff for Responsible for all design and site supervisory staff for various water supply, pipe laying and rehabilitation projects various water supply, pipe laying and rehabilitation projects for the Water and Electricity Department, Abu Dhabi. for the Water and Electricity Department, Abu Dhabi.
• Also involved in ‘leak detection’ studies for Abu Dhabi, a Also involved in ‘leak detection’ studies for Abu Dhabi, a dam rehabilitation project for the Dubai government, and dam rehabilitation project for the Dubai government, and preparation of prequalification document for Consultancy preparation of prequalification document for Consultancy Services for Al Ain City. Services for Al Ain City.
I worked closely with WED, Abu Dhabi to develop water policy I worked closely with WED, Abu Dhabi to develop water policy and write specifications. I visited the Bayard Fire Hydrant and write specifications. I visited the Bayard Fire Hydrant Factory in Lyon, France and the Vanadour Valve Factory in Factory in Lyon, France and the Vanadour Valve Factory in Pau, France to ensure compliance with the specification. Pau, France to ensure compliance with the specification.
Bayard Fire Hydrants Vanadour Butterfly Valves
De Leuw Cather, Abu Dhabi - De Leuw Cather, Abu Dhabi - Resident EngineerResident EngineerAl Salaam Street widening and upgrading project.
Al Salaam Street looking north.
Al Salaam Street – Pavement Construction
Al Salaam Street – Construction of Storm Water Drainage
Sh. Zayed II Street – Sub-base
Al Salaam Street – Service Ducts
Al Salaam Street – Asphalt Operations