CV- prem-rev 1

download CV- prem-rev 1

of 3

Transcript of CV- prem-rev 1

  • 8/8/2019 CV- prem-rev 1

    1/3

    Page 1 of3

    S. Prem Kumar, PMP, M. Tech, B. Tech (Civil Engg)

    : 00919895866511(M)

    : [email protected]

    DOB: 19/04/1976________________________________________________________________________________

    Seeking deserving position in Planning, Project Management, Co ordination with

    a reputed organisation in the civil engineering industry.

    Executive Snapshot Qualified Project Management Professional (PMP) and ProfessionalCivil Engineer (approved by

    Engineers Australia) with 10 years of experience in the areas of Planning, Project Management, Coordination, Civil Engineering, Site Operations and (Sub) Contract Management with reputed

    organizations in UAE and India.

    My last overseas position was with Qatari Diar Vinci Construction, in Doha, Qatar as Senior Plannerengaged in project planning activities (using Primavera 6.2) for Lusail Light Rail Transport

    project.

    Significant expertise in Project Management activities including planning, scope finalization, costestimation & finalization, resource scheduling and administration, contingency planning.

    Proficiency in handling planning, executing and spearheading construction projects involving methodengineering, contract administration, resource planning with a flair for adopting modern construction

    methodologies.

    An effective communicator with honed relationship management, man management, analytical,planning and coordination skills. Capacity to work under pressure situations and beat deadlines.

    Experience of working under cross-cultural and multi-lingual environments.SynopsisCompany Position Type of project Year

    Puravankara Projects

    Limited, India

    Manager-Engineering,

    procurement, coordination

    High rise residential

    building2010

    Qatari Diar Vinci

    Construction, Doha, QatarSenior Planner

    Light Rail Transport2009-2009

    Bovis Lend Lease, Dubai Planning ManagerVilla and Resort project

    2008-2009

    Driver Consult Ltd, Dubai Planning EngineerInfrastructure and Bridges

    2006-2008

    Al Futtaim Carillion LLC,Dubai Planning Engineer High rise hotel andresidential building 2005 - 2006

    Larsen & Toubro Limited,

    India

    Regional projects

    coordinator

    Nuclear and Hydro electric

    project2003 - 2005

    Lead Engineer Nuclear power plant 2001 - 2003

    Lead Engineer Water supply scheme 2000 - 2001

    Lead Engineer Thermal power plant 2000 - 2000

    Education & Professional Qualifications

    PMP - Project management Professional (PMP) in 2008Project Management Institute (PMI ) ,Four Campus Boulevard, Newtown Square,

    PA, USA., www.pmi.org

    M.Tech - Master of Technology (Construction Technology & Management)Indian Institute of Technology, IIT-Delhi, India in 2000

    B.Tech - Bachelor of Technology (Civil Engineering)Kerala University, kerala, India in 1998

    Technical Proficiency

    Primavera 3.1, 6.2, MS Project 2007, Pertmaster 8, MS Office, AutoCAD 2006, Visual basic

    Professional Affiliations

    Member - Project Management Institute (PMI ), USA Professional Civil Engineer - Engineers Australia.

  • 8/8/2019 CV- prem-rev 1

    2/3

    Page 2 of3

    Employment History

    Dec 2009

    Till date

    Mar 2009

    Aug 2009

    June 2008

    Mar 2009

    Jan 2008

    June 2008

    Nov 2006

    Jan 2008

    Puravankara Projects Limited, www.puravankara.comManager EPC

    (A) 4 residential projects spread over different location of the city, with total built up area of 2M sqfeet, with all modern amenities. Approx value of the project 100M USD

    Responsibilities Held

    Act as liaison with consultant in expediting drawings and related information. Obtain quotations for new contracts, evaluate and give recommendation to finalise the contract. Monitor contractor performance; insure adherence to terms and conditions of agreements Coordinate construction efforts through in-house and contract labor for construction Communicate with project managers regarding concern about construction progress Be familiar with specifications, shop drawings, and submittals Interface with general contractors and subs and be detail oriented with follow up skills. Responds to inquiries from department personnel regarding assigned project status Assists department personnel in organizing work relating to specific assigned project deadlines Research and recommend solutions to design document problems, including conflicts,

    interferences and errors/omissions.

    Review and recommend the claims submitted by the contractors.Qatari Diar Vinci Construction, www.vinci.comSenior Planner

    (A) LRT project consist of 17.8 km at grade and 6.6 km of underground double track tramway

    operating lines with 22 at grade stations and 7 underground stations. The first phase consist of cut andcover excavation of total value 100M USD

    Employer: Qatari Diar, www.qataridiar.comResponsibilities Held:

    Liaise with Client team and other team members to compile the Project Master Schedule andupdate as required.

    Prepare an outline design and construction programme. Develop other specialist programmes for design, procurement, construction and commissioning. Develop the work breakdown structure and identify key mile stone of the project. Review contract programmes for Client approval. Monitor design and construction progress for compliance with contract requirements. Assist in the contractor selection process by evaluation tender programme submissions. Review and approve Contractors resourced programme. Develop recovery programmes, for Clients approval, in the event of programme slippage.

    Bovis Lend Lease, www.bovislendlease.comPlanning Manager

    (A) Jumeirah Pointe and Frond N, Villa project. The project consist of 227

    villas at the Palm Jumeirah with average built up area ranging from 750 sq m to 1000 sq m. Project

    Cost 885M USDEmployer: Nakheel, www.nakheel.ase

    Driver consult Limited, www.driverconsult.comPlanning Engineer

    (A) Dubai Water Front, Canal Bridges. 75 million USD. Consists of 3 bridges of 210 m length with

    6 lane twin carriage way.

    Employer: Nakheel

    (B) Jumeirah Village South III , Infrastructure Project. 333 million USD master planned

    development, which will house 300,000 residents. Total plan area for JVS III approximately 811

    Hectares.

    Employer: Nakheel

    Responsibilities Held:

    Review and approve / comment on the Construction/Design/ Procurement schedules assubmitted by the contractors and ensure that it is in compliance with the overall project

    schedule.

    Review and continuously monitor the contractors major construction progress against approved

  • 8/8/2019 CV- prem-rev 1

    3/3

    Page 3 of3

    July 2005

    Oct 2006

    Mar 2003May 2005

    July 2000

    Mar 2003

    schedules. Ensure equipment and manpower is adequate or in case of any shortage report to

    Project Manager.

    Coordination between contractors to allow for hindrance free works execution. Review all daily, weekly, and monthly reports as submitted by contractor and report to the

    project manager any deficiency or non compliance.

    Review field design changes and trend notices and asses time impact, and recommendworkarounds.

    Advise the project manager of any foreseen slippage of progress and corrective actions to betaken.

    Chair weekly progress meeting, attend executive meetings and participate in preparing theagenda.

    Al Futtaim Carillion LLC, www.afcarillion.aePlanning Engineer

    Harbour Plaza, 173 million USD apartment complex, The project was a spectacular 36 levelbuilding, approximately 170m long with concave frontage, with 469 apartments in Dubai Festival

    City

    Responsibilities Held:

    Establish and maintain a full working knowledge of the project or specified scope of work. Preparation of critical path project programmes at a level of presentation, suitable for conveying

    an understanding of the project scope, targets and goals.

    Ensure the programmes are specific, comprehensive, understandable and realistic. Effectively communicate the requirements of the programme to project management,

    engineering, procurement and Construction staff.

    Produce resource histograms for each labour category, identify labour levels required to achievethe programme.

    Monitor and control the actual man-hour expenditure to identify labour shortages andproductivity ratings.

    Operate progress measurement and reporting systems to identify actual progress versus the plan. Produce resource and earned value trends. Identify long lead items Perform programme status and progress updates, ensuring progress reported is a true reflection

    of work achieved.

    Larsen & Toubro Limited, www.lntecc.comRegional Projects Co-ordinatorMumbai Regional Office

    Responsibilities Held:

    Co-ordination of projects operating in the Region (5 projects of value 130 million USD). Performance monitoring (financial & progress) of projects with target. Identify constraints and recommend corrective measures. Evaluation and selection of vendors and specialized agency Finalization. Contract management. Project cash flow monitoring, preparation of Revenue, Capital and Manpower Budget. Resource (plant & machinery) identification, allocation to project sites. Work order approval and ISO implementation.

    Larsen & Toubro LimitedLead Engineer

    Reactor No 3 of 540 MWe Nuclear Power Plant at Tarapur.( value 111 million USD)Ennore Thermal Power Plant, 5 million USD

    Dharmapuri Water supply project, 3million USD

    Responsibilities Held:

    Overall planning and execution of the concerned part of the project. Client invoicing and subcontractor billing