Denza Street 11 VANDERBIJLPARK GAUTENG 1911 Phone 0837893658 Fax E-mail: [email protected] L.P. LINDE ID # 700403 5272 082 Personal Information Contact Details Name: Louis Phillipus Linde ID NO: 700403 5272 082 Date of Birth: 1970/04/03 Gender: Male Race: White Home Language: Afrikaans Other Language: English Marital status: Married Nationality: RSA Age: 45 Drivers Licence: 08 EB (Own vehicle) Address: Denza street 11 ,Vanderbijlpark, Gauteng ( do not want to relocate) Current Employment type: Permanent Current Employer: Kentz Pty. Ltd. Current Position: QA/QC Inspector (seeking for management post ) Ideal Industry: Engineering and Manufacturing Availability: 4 weeks’ notice period Tel No: 083 789 3658 Work No: 078 019 8392 Email Address: [email protected] (Private) Email Address: [email protected] (Work) Address: Denza street 11,Vaderbijlpark,Gauteng Company Based: Kentz Pty.Ltd. (South Africa)

Transcript of cv louis linde rev 13 2016-02-15 New

Page 1: cv louis linde rev 13  2016-02-15 New

Denza Street 11VANDERBIJLPARKGAUTENG1911

Phone 0837893658Fax E-mail: [email protected]

L.P. LINDE ID # 700403 5272 082

Personal Information

Contact Details

Name: Louis Phillipus LindeID NO: 700403 5272 082Date of Birth: 1970/04/03Gender: MaleRace: WhiteHome Language: AfrikaansOther Language: EnglishMarital status: MarriedNationality: RSAAge: 45Drivers Licence: 08 EB (Own vehicle)

Address: Denza street 11 ,Vanderbijlpark, Gauteng ( do not want to relocate)

Current Employment type: PermanentCurrent Employer: Kentz Pty. Ltd.Current Position: QA/QC Inspector (seeking for management post )Ideal Industry: Engineering and ManufacturingAvailability: 4 weeks’ notice period

Tel No: 083 789 3658Work No: 078 019 8392Email Address: [email protected] (Private)Email Address: [email protected] (Work)Address: Denza street 11,Vaderbijlpark,GautengCompany Based: Kentz Pty.Ltd. (South Africa)Project Based: Sasol Secunda, MpumalangaAlternative contact Details: A.M.Linde (Wife) 0837803659

Page 2: cv louis linde rev 13  2016-02-15 New

Summary of qualifications

1976 – 1988 Stilfontein High school, StilfonteinSchool Standard 10 - Academic Passed all SubjectsAfrikaansEnglishMathematicsGeographyMetal Work and Technical DrawingsBiology

Military Service

1989-1990 Mech 1 Upington - 1.5 years

Education

Accreditations

1991 – 1993 Technical college VanderbijlparkN3 To N4 - Technical study’sN4 Electro techs PassedN4 Maths PassedN4 Electronics PassedN4 Science Passed

N5 To N6 - Technical study’s Technical Collage Sasolburg To be scheduled

2001 Technical college VanderbijlparkInstallation Rules for Electrician

Installation Electrician ( Wireman’s licence) - Passed

This course covers the Electrical Installation Rules: SANS 010142-1 Electrical Code of Practice of South Africa. With this I am accredited to do Electrical installations and Certification of such Installations except Hazardous Area’s.( I have written the Master Installation Rules and Passed it but need to do my N5&N6 to obtain it.) This includes the authority to perform test and inspections on installations to see if it comply with the Standards of SANS010142-1 of South Africa and ensure that the installation is save to all consumers. I always ensure that the installations are safe to use by the consumer at all time.

This course was one semester at the Technical Collage ( 3 months)

Repairs on Modweld Welding Machines Module electric JohannesburgRepair course done at Module electric on inverter welding machines. This course was an introduction to do fault finding and repairs of the Inverter Welding machines of Modweld.

(3 day course with practical test)

Page 3: cv louis linde rev 13  2016-02-15 New

Repair for Metabo Metabo JohannesburgRepair course done at Metabo on portable equipment repairs. This course covered how to do fault finding and repairs on all makes of Metabo power tools.

(3 day course with Practical test and demonstrations)

PIC – Person In Charge - Bombela

Course completed on Permit Application on Gautrain Project. This course covered how to do the permit request to do work on the Gautrain Project under Bombela supervision.

( 5day course with a test at the end)

SAP – Arcelor Mittal Vanderbijlpark

Course completed on SAP System. This course covered the use of the SAP system on the planning side. This includes the purchasing of material. I used it when a relieved the planners post when they were on leave at times.

Acconex – NMPP - Ladysmith

Course completed on Acconex on NMPP Project. This course covered how to use the Acconex system for document retrieval on the Transnet Pump station project at Ladysmith.

C.O.C TRAINING – ECA - Midrand

Course completed on C.O.C. This course was a refresher course on the Installation rules and the Legal side of the certificate of compliance. It states what Legal obligation we as Installation Electrician or accredited people have on ensuring that installations comply with SANS 010142-1 Code of Standards of South Africa.

(1 day course arranged at Kentz Pty. Ltd. Offices in Midrand)

C.O.C LEGAL REQUIERMENTS TRAINING – ECA - JOHANNESBURG

Course completed on C.O.C. Legal Requirements. This course was a refresher course on the Installation rules and the Legal side of the certificate of compliance. It states what Legal obligation we as Installation Electrician or accredited people have on ensuring that installations comply with SANS 010142-1 Code of Standards of South Africa.

(2 day course in Midrand)

Basic TQM – Unisa - JOHANNESBURG

Basic Total Quality Management Course. Passed

This course covers the Basics of Total Quality Management in general. It teaches you the basic construction of a Quality system. How to develop setup,

Page 4: cv louis linde rev 13  2016-02-15 New

implement and maintain that systems. It teaches you the ISO systems as well and teaches you the different ISO systems you will meet in your career. This is also an introduction to the Year program of Unisa TQM Course.

(6 months course through Unisa correspondence)

TQM – Unisa - 1 year Program JOHANNESBURG

Busy with Total Quality Management Course. Final Year. Completed with the assignment and modules. Exams to complete– in progress.

(12 months course through Unisa correspondence)

Computer Skills: Microsoft Excel Microsoft Word Microsoft Access Microsoft Visio Microsoft Power Point Microsoft Projects Microsoft Windows ME/HP & Windows 7 SAP ACONEX

Professional experience

1991 - 1993 Iscor ltd VanderbijlparkApprenticeThree Year Training at Iscor ltd.In this 3 years training course I was trained in the following:Basic ElectricityBasic ElectronicsElectrical starter systemsElectrical control systemsElectrical Motors AC /DCElectrical DrivesElectrical TransformersPLC Systems ( Allen Bradley / Siemens )Basic Mechanical /Drive systemsBasic Pneumatics / HydraulicsFault findingElectrical Standards ( SANS010142-1 )SNC Control systemsAnd more…….

1993 - 1993 Olifantsfontein test centre OlifantsfonteinOlifantsfontein Trade test - ElectricianExams at Olifantsfontein - Passed with Symbol C

( 2 day Theory and Practical test with assessment on Electrical Installations )

Page 5: cv louis linde rev 13  2016-02-15 New

1994 - 1997 Iscor ltd VanderbijlparkElectrician – Iscor PTY LTD Electrical maintenance (Workshop equipment & Plant equipment)My worked as an Electrician was the following: The installation and maintenance of electrical network system up to 3, 3 KVA in the industrial environment. The switching of Control Panels with Inspections and Testing of Distribution systems. Repairs and service on power systems. The repairs and maintenance on all Machines in the workshops. (Overhead Cranes/Lathes/Welding Machines/Electrical Forklifts/CNC Machines/Boring Mills/Turn Tables, Ext. Including the repairs and upgrade of these machines for improvement measures. Continues Improvement and Technical upgrades on machines, to improve the Process.

Electrical distribution (Distribution up to 11KVA), this includes the maintenance and repair work on all 11KVA equipment that feeds the Power network in the industrial environment. This includes High Voltage Transformers / Oil Circuit Breakers and Switch Boards.

Electrical installations & Maintenance- Arcelor Mittal Plant, This is the Electrical Network Distribution over the whole Factory. This includes Preventative Maintenance and Breakdown repair work when needed. This is to improve production availability to the max.

Electrical Transformer repairs (11Kv Transformers & Cable work/jointing), this is the repairs and installation of all cable work that feeds up to 11KVA Distribution systems all over the factory. It includes repairs on High Voltage Transformers (Tap changers/Selector Switches and HT Links in Switch Yards. Looking over the Switch Gear (Oil Circuit Breakers). Service and repairs on breakers on a monthly basis.

Electrical repairs on lifting magnets & Inspections (lifting magnets at Arcelor Mittal); this includes service and repairs on Magnets that lifts up new steel profiles when they come out of ovens in the plant. This is for distribution of the products. This is critical equipment that is required on a full time basis so all work must be on a breakdown basis. This includes Magnet Lifters and Grabs that picks up the coils that is produced in the plant.

Electrical repairs on Overhead Cranes (Arcelor Mittal); this includes the service and repairs on all overhead cranes in the plant to ensure mobility and availability to the plant so all equipment can be moved whenever it is needed.

Electrical repairs on Battery Forklifts (Arcelor Mittal); this involves the service and repairs on Electrical Forklifts. This includes controller and motors and wiring on the Forklift. The battery system including the battery charger is part of the maintenance service.

1997 – 05/2005 Iscor ltd (ISPAT Iscor / Mittal Steel)VanderbijlparkMaster Electrician - Iscor Pty Ltd / Mittal Electrical maintenance (Workshop equipment & Plant equipment -

Industrial & Domestic) my worked as a Master Electrician was the following: The installation of the electrical network system up to 3, 3 KVA in the industrial environment but just under a specialized entity. My knowledge on work was of a high grade to be promoted to Master Electrician. The

Page 6: cv louis linde rev 13  2016-02-15 New

switching of Control Panels with Inspections and Testing of Distribution systems. Repairs and service on power systems. The repairs and maintenance on all Machines in the workshops. (Overhead Cranes/Lathes/Welding Machines/Electrical Forklifts/CNC Machines/Boring Mills/Turn Tables, Ext. Including the repairs and upgrade of these machines for improvement measures. Continues Improvement and Technical upgrades on machines, to improve the Process.

Electrical distribution (Distribution up to 11KVA), this includes the maintenance and repair work on all 11KVA equipment that feeds the Power network in the industrial environment. This includes High Voltage Transformers / Oil Circuit Breakers and Switch Boards.

Electrical installations & Maintenance- Arcelor Mittal Plant, This is the Electrical Network Distribution over the whole Factory. This includes Preventative Maintenance and Breakdown repair work when needed. This is to improve production availability to the max.

Electrical Transformer repairs (11Kv Transformers & Cable work/jointing), this is the repairs and installation of all cable work that feeds up to 11KVA Distribution systems all over the factory. It includes repairs on High Voltage Transformers (Tap changers/Selector Switches and HT Links in Switch Yards. Looking over the Switch Gear (Oil Circuit Breakers). Service and repairs on breakers on a monthly basis.

Electrical repairs on lifting magnets & Inspections (lifting magnets at Arcelor Mittal); this includes service and repairs on Magnets that lifts up new steel profiles when they come out of ovens in the plant. This is for distribution of the products. This is critical equipment that is required on a full time basis so all work must be on a breakdown basis. This includes Magnet Lifters and Grabs that picks up the coils that is produced in the plant.

Electrical repairs on Overhead Cranes (Arcelor Mittal); this includes the service and repairs on all overhead cranes in the plant to ensure mobility and availability to the plant so all equipment can be moved whenever it is needed.

Electrical repairs on Battery Forklifts (Arcelor Mittal); this involves the service and repairs on Electrical Forklifts. This includes controller and motors and wiring on the Forklift. The battery system including the battery charger is part of the maintenance service.

05/2005 – 08/2009 L-Tech General Trading CC VanderbijlparkMD / Owner of L-Tech General Trading CCI, the Owner / MD of this company for the period of 5 Years.In this period I was privilege in the role of running a business. The reason of the company closing down was because of the recession in 2008. 90% of my business work was done for Arcelor Mittal in Vanderbijlpark and the stopped all Contract work in there plant in Vanderbijlpark at that time. I was unable to keep the business going at that time so I was forced to close it down. I can say I also

Page 7: cv louis linde rev 13  2016-02-15 New

had the privilege on doing the following as well in that time of the business. This includes the management of all projects and services. Including the Initiation / Planning / Procurement / Installation and Verification/Testing side of the projects / Services. This is the execution of the project against price / Recruitment and Time. Ensuring that all projects is completed in a given time and ensuring with the best Quality at all times. Ensuring Customers Satisfaction all the time and exceeding Customers expectations. I also handled the Financial side of the business. My skills on the running of a business / Project are very good and I can be an asset in this field. Please see the field below what I specialized in my business that I have run for 5 Years and that I was proud of doing it.Specialist in the following fields: Panel Building & design. I have the ability of designing / manufacturing and

Commission custom made Control Systems to work a machine doing a certain work to perform and reach a certain goal. With my experience in the Electrical field I have picked up and learned a great deal and can handle myself and can be an asset to a company.

Welding machine repairs (Lincoln, Esab, ext.), In this field I am an expert and I specialized in the welding field for years. In this area I can blow my horn because I am good and have the knowledge in this field. By doing designing, manufacturing, service and repairing welding machines. Includes Roll Welding Machines. I can Calibrate these machines for ultimate Quality. I was used by WASA to do repairs on their machines from time to time

Industrial Machine repairs (lathes, boring mills, drills, and ext.)Service of machines –All makesMachine building (Subarc Welders, ID welders, and ext.), I had the privilege

on designing and manufacturing Roll welding machines that welds up Rolls by using Sub Arc System. I am a specialist on service and repairs on all makes of welding machines for years.

Electrical installations & Maintenance on buildings/industrial environment

Security solutions domestic/industrial – (gate/garage automation, CCTV, ext.), This only started out as a hobby but I was good at it and started installing security related equipment. I have a good back ground in this field.

Lightning protection systems domestic/industrialElectrical maintenanceElectrical distributionAC/DC DrivesProgrammable relaysMachine upgrades & designGenerator installations & repairsAMF panel design and manufacturing.C.O.C. on domestic and industrial area’sSteel fabrication (carports, Security gates, ect.)Security installations (gate motors, garage doors, ect.)And more ………………………….

08/2009 – 06/2011 Kentz Pty ltd VanderbijlparkQAQC Inspector on Gautrain Project - SC8014I started as a Quality Inspector on the Electrical side of the Gauteng Project. This includes the stations from Sandton up till Rosebank stations. We were responsible for the installation of all IOM panels and for the access control that is used to interface all other contractors with the control room. I started on learning the Quality System with all supporting documentation to ensure Quality is done to customers’ expectations. This includes Standards and procedures. I started to in a Quality environment and decided I will make it a

Page 8: cv louis linde rev 13  2016-02-15 New

success. I will be a specialist in this field and this is where my journey started. See list of duties I have performed below:Quality Control – Cable Installation for PLC Interfacing NetworkQuality Control – Installation of IOM Panels ( PLC )Quality Control – Installation of Access Control System on all StationsQuality Control – Infra Red Detectors on Train Stations at Track levelQuality Control – Control all drawings and Redlines for changes made to the

projectQuality Control – Inspect spares delivered to site storeCable Management – Control cables delivered to site. ( Cable Insulation test )Planning – Updates on planning programs for the client and Compiling 3

Week look aheadQuality Control – Document design, recording / completion of Inspections

reports on the equipment installed for the project.Quality Control - Manage the Quality Control Plan of the project.Quality Control – C.O.C. Certification on all Panels on the Project.Site Supervisor – Help out on Site Supervising to manage teams doing the

installations.Cable Management – run and control cables on site.Store Control – manage store & control stock levels on site.Inspections – inspect all installations for Quality standards and assure that

Quality standards are added eared to.

06/2011 – 02/2012 NMPP ALLANCE Ladysmith

Test Pack Coordinator on NMPP –PS5 Pump Station Ladysmith Kwazulu Natal Project – SC5057On this project I started on getting involved with the Petro Chemical Plants. I work on the client side in helping with the management of sub-contractors. We tracked the progress on contractor’s side to complete the installation. This was a new challenge for me and I loved it to get more experience. I made a big effort on becoming a role player in this field. I know that I am a big role player now in this field. Just by giving attention to detail, I took on and become I good Quality inspector in the field of Hazardous Area on a Petro Chemical Plant.Test Pack Coordinator – Control test packs on client side (NMPP) – confirms that test packs is compiled to client specifications and that all documentation is inserted in QC files.- Communicate with Contractors & Sub Contactors on site and inspect QC files

for completion to get AFC.(SMEIPC)- Compile spreadsheets (Tracker documents) to track each QC pack for

completion & status.- Track & Control Punch List on all Equipment on PS5 Pump Station.- Compile Weekly Reports on Progress.- Check Free Issue Equipment documentation.Petrochemical installation QA/QC checks.

02/2012 – 09/2014 KENTZ Pty. Ltd. MidrandQA/QC Inspector – ZAZC036 Sasol 1 –WAX Expansion Project.

Pack Control – Quality assurance on all packs – Insure the completeness of all packs and correct documents used.Tracking Control – Track all packs on completion and compiling reports &

Page 9: cv louis linde rev 13  2016-02-15 New

Signing of with Client (SASTECH & FWSA)Quality Checks – Inspections on site (Electrical only)Punch List – Updating of punch list and daily reporting to Top management.Inspections – inspect all installations for Quality standards and assure that

Quality standards are added eared to.Attend all necessary inspections as identified in the approved inspection and

test plan(ITP)Inspect the production quality to establish if the client requirements are being

achieved.Record and document any and all deviations from the Project Quality Program

and the Company Integrated Management System (IMS).Update the QEIL system with any deviations from the PQP and the IMS.Coordinate with the Client representative to ensure that inspections are carried

out expediently.Generate Client requests for inspection (RFI) where required providing

sufficient notices for Hold, Witness and Inspection points.Carry out inspections on Exemption Items (EI) as documented in the QEIL and

sign off a closed when activity is completed.Continually carry out surveillance inspections on the project recording and

documenting any and all deviations from the PQP and the IMS.Review the calibration status of any test equipment being utilized on the project

ensuring the equipment is within calibration prior to use.Provide support and advice to the construction personnel in relation to the PQP

and IMS.Maintain a good working relationship with all Kentz and Client personnel.Maintain good record keeping of activities carried out and inspection reports,

surveillance reports, etc.Maintain willingness to learn and support the inspector providing the on the job

training.Comply with Project HSE requirements i.e. PPE, Work Permits, etc.

09/2014 – 12/2014 KENTZ Pty. Ltd. MidrandQA/QC Inspector – ZAZE071 IUP Closing the Loop -Secunda.

Pack Control – Quality assurance on all packs – Insure the completeness of all packs and correct documents used.Tracking Control – Track all packs on completion and compiling reports &

Signing of with Client (SASTECH)

Page 10: cv louis linde rev 13  2016-02-15 New

Quality Checks – Inspections on site (Instrumentation & Electrical )Punch List – Updating of punch list and daily reporting to Top management.Inspections – inspect all installations for Quality standards and assure that

Quality standards are added eared to.Attend all necessary inspections as identified in the approved inspection and

test plan(ITP)Inspect the production quality to establish if the client requirements are being

achieved.Record and document any and all deviations from the Project Quality Program

and the Company Integrated Management System (IMS).Update the QEIL system with any deviations from the PQP and the IMS.Coordinate with the Client representative to ensure that inspections are carried

out expediently.Generate Client requests for inspection (RFI) where required providing

sufficient notices for Hold, Witness and Inspection points.Carry out inspections on Exemption Items (EI) as documented in the QEIL and

sign off a closed when activity is completed.Continually carry out surveillance inspections on the project recording and

documenting any and all deviations from the PQP and the IMS.Review the calibration status of any test equipment being utilized on the project

ensuring the equipment is within calibration prior to use.Provide support and advice to the construction personnel in relation to the PQP

and IMS.Maintain a good working relationship with all Kentz and Client personnel.Maintain good record keeping of activities carried out and inspection reports,

surveillance reports, etc.Maintain willingness to learn and support the inspector providing the on the job

training.Comply with Project HSE requirements i.e. PPE, Work Permits, etc.

02/2015 – 06/2015 KENTZ Pty. Ltd. (NMPP) DurbanE&I QC Interface– ZAZE050 TM1

E&I QC Interface – Control test packs on client side (NMPP) – confirm that test packs are compiled to client specifications and that all documentation is inserted in QC files and ready for CCMS upload. - Communicate with Contractors & Sub Contactors on site and inspect QC files

for completion to get AFC.- Compile spread sheets (Tracker documents) to track each QC pack for

Page 11: cv louis linde rev 13  2016-02-15 New

completion & status.- Ensure all documentation is included in pack and completed in full with all

signatures to be loaded on CCMS data basis.- Compile Weekly Reports on Progress.

07/2015 – 01/2016 KENTZ Pty. Ltd. SecundaQA \ QC Support \ Coordinator – AZAC021 C3 Expansion Project

&

07/2015 – Present KENTZ Pty. Ltd. SecundaQA \ QC Inspector – AZAC022 ASH Supply Upgrade.

This Project is running in paralleled with the one above and I am over seeing both Projects

Project Quality Coordinator

The Project Quality Coordinator shall report directly to the Project Manager, and be responsible for the preparation, implementation and maintenance of this Project Quality Plan, including the identification, preparation and implementation of work and administrative procedures, as deemed applicable.

The Projects Quality Coordinator shall represent the Project on all matters pertinent to the Project Quality Management System as established by the Projects Quality Plan and System Procedures including the following specific requirements:

• Validating the compliance of the Project Quality Plan in accordance with the applicable Contractual Codes and Standards, the Contract, Specification, IFC drawings and the Kentz Management Systems as requirements.

• Review Documentation Control in accordance with the Clients requirements (where required)

• Identifying any deficiencies within the system and validating, including any the Clients change approvals, which Corrective Action has been taken to eliminate and prevent recurrence of identified deficiencies.

• Review monthly the Document Control registers, as part of the PMI report

• Maintain registers of Punch-lists and NCR’s• Maintain registers of RFI’s • Maintain the Master Punch list• Validating that personnel operating in the Quality

Control Function are adequately trained and competent in performing their designated tasks.

• Ensure all Project Test Equipment is calibrated to SANAS standards, and copies of Calibration Certificates held on site.

• Review periodically the Assets Registers for welding equipment, to ensure calibration of this equipment is maintained.

• Validating by audit and/or surveillance inspections of the Project Quality Plan at Project level is being

Page 12: cv louis linde rev 13  2016-02-15 New

adequately implemented;• Ensuring Supplier / Manufacturers / Sub-Contractors

Assessments are being performed in accordance with the Kentz Management System and the Clients requirements, as detailed herein.

• Conduct surveillance inspections of key Sub-Contractors & Manufacturers

• Review periodically the material packaging, logistics, inspections and stock control requirements are being maintained, incompliance with the Project Procurement Execution Plan and Logistics requirements for both free-issued and purchased materials, as detailed Within the Project Procurement Execution Plan, and the Material Control Procedure.

• Progressively develop the projects Quality Data Packs requirements throughout the project, and associated Handover Dossier information, as per QMS 360P requirements.

• In conjunction with the Project Manager, review the Project Quality Plan for compliance with the Project Management System and changes thereto and to initiate changes to the Project Quality Plan for the Project as deemed necessary.

• Develop the Projects Work Packs, Inspection, and Test Plans for use on the project and confirm that the Quality and accuracy of all installations, inspections and tests, including Sub-Contractors works meet the requirements of the Kentz Management System, associated Contractual Codes and Standard requirements and in accordance with the Project current Drawings, and Specification requirements.

• Ensure all Inspection, Testing and Commissioning activities are being completed and comply with the nominated acceptance criteria’s.

• Ensure Technical Compliance and Material Preservation requirements on site.

• Maintain a Tracker register of all Project Work Packs and QCP’s, and shall review and approve Sub-Contractor QCP’s.

• Formally issue the Clients Quality representative a Request for Inspection (RFI) advice, to attend and witness the Projects Inspection Verification requirements. The detailed Quality Inspection and Testing processes for the Project are detailed in Section 7 of this plan.

• In conjunction with the Procurement Manager, verification that the Project Manufacturing activities are in accordance with the Project requirements and associated Project QCP requirements,

• Responsible for the final Handover Documentation including associated verifications and Certificates of Compliance and Safety.

• Issue Inspection notification to the Clients for audits, inspections etc. in accordance with the subcontractor(s) QCP requirements, and sign-off on the associated Witness and Hold Points.

On the successful completion of all QCP’s, the Project Quality Coordinator is responsible for ensuring they interface

Page 13: cv louis linde rev 13  2016-02-15 New

with the Clients representatives, to ensure The Clients acceptance has been obtained for all Inspection and Tests performed, As-Built documentation and drawings are updated, and the Quality Handover Dossier files are completed prior to handover.

Patents and publications

SUB ARC welding machine

ID welding machine

Lengte welding machine

AMF Panel design to shoot applications

Carport Design & Fabrication ( D.I.Y Units )

And more…………

References Gerhard Hennop – Manager Electrical Engineering (Arcelor Mittal)

Page 14: cv louis linde rev 13  2016-02-15 New

Ian Lakey – Supt. Electrical installation & maintenance (083 235 5904) (Arcelor Mittal)

Fanie Le Roux – Supt. Roll shop (083 304 1043) (Arcelor Mittal)

Gareth – Maintenance Foreman – 0834681192(Arcelor Mittal)

Willie Booysen – Planner Roll shop – 0833047772 (Arcelor Mittal)

Ewert – Workshop Foreman SES Workshop- 0823356761 (Arcelor Mittal)

N.Odendal - Project Manager (Gautrain) – 0832846167 ( Kentz Pty Ltd )

L.Jooste – Site Manager (Gautrain) - 0788949197 ( Kentz )

Gerhard Van Der Merwe – 0823163113 (NMPP)

John Sharp – 0825631902 –(NMPP)

Darren Jackson – 0794902899 – (NMPP)

Q De Wet – Team Leader – 0788011648 - (NMPP –PS5 Pump Station) – Ladysmith Kwazulu Natal.

Reform Mathe – Site Manager 0832846317 (Kentz) AZAC036

Les Harper – Quality Manager (Kentz) - 0832680597 ([email protected])

Dawie Steyn – E & P Operations Manager - + 27 82 655 4375 (Kentz) Secunda

Willem Combrink –Site Manager (TM1)Terminal -0838461458

([email protected]) AZAE050

Andrew Bell –Project Manager Secunda -0832846183

([email protected]) AZAC021 & AZAC022

Page 15: cv louis linde rev 13  2016-02-15 New
Page 16: cv louis linde rev 13  2016-02-15 New
Page 17: cv louis linde rev 13  2016-02-15 New
Page 18: cv louis linde rev 13  2016-02-15 New
Page 19: cv louis linde rev 13  2016-02-15 New
Page 20: cv louis linde rev 13  2016-02-15 New
Page 21: cv louis linde rev 13  2016-02-15 New
Page 22: cv louis linde rev 13  2016-02-15 New