Current state of play in the NtS Expert Group Danube Commission RIS Workshop Budapest 11 th April...
-
Upload
shana-clarke -
Category
Documents
-
view
218 -
download
0
Transcript of Current state of play in the NtS Expert Group Danube Commission RIS Workshop Budapest 11 th April...
Current state of play in the NtS Expert Group
Danube Commission RIS WorkshopBudapest
11th April 2011
State of play
Agenda
• Legal background• Task Forces• RIS Index• Implementation status• Plans for 2011• Summary
Slide -2-11.04.2011.
Legal background
• Commission Regulation (EC) No 416/2007 (under amendment procedure)
• CCNR: Standard for Notices Skippers Edition 3.0
• Danube Commission referring to UNECE standard
• UNECE: International Standards for Notices to Skippers and for Electronic Ship Reporting in Inland Navigation - Resolution No. 60
Slide -3-11.04.2011.State of play
State of play
Task Forces
• XML Enhancement• Webservice• User friendly NtS• Joint Task Force on
the RIS Index
Slide -4-11.04.2011.
State of play
RIS Index
• Interoperable and open river information services
• Location codes in the RIS key technologies
• No regulatory framework for the RIS Index so far
• RIS Index enhanced and maintained by the NtS Expert Group
Slide -5-11.04.2011.
State of play
RIS Index
• European Reference Data Management System
• RIS Index Encoding Guide• Joint Task Force established:
– unambiguous encoding guide for the ISRS location code– elaborate a proposal for the unambiguous encoding of
waterway networks – provide a proposal based on the RIS Index for a revision
of the Annex I of Directive 2005/44/EC
Slide -6-11.04.2011.
State of play
Implementation status
• XSD version 3.0• National implementations• IRIS Europe II project– Fairway and traffic, water
level, ice, weather messages
–Webservice implementation
• NEWADA– Danube FIS Portal
Slide -7-11.04.2011.
State of play
Plans for 2011
• Supporting the European Commission in issuing the amended regulation
• Upgrading the RIS Index Encoding Guide and advise the European Commission on the relevant regulation
• Clarification and enhancement of the XML message
• Clarification and application of the NtS webservice technology
• Co-operation with the relevant projects such as PLATINA, IRIS Europe II, NEWADA etc.
Slide -8-11.04.2011.
State of play
Summary
• Legal framework – Commission regulation under amendment
• More than 80 members in the NtS Expert Group
• Ensuring high level of expertise
• Implementation works in several countries
• Webservice• RIS Index
Slide -9-11.04.2011.