Cumberland Mine Labelle Dock - WallacePancher Group · monitoring and permitting services for the...

1
SERVICES PROVIDED: Section 401/404 Permit Stream & Wetland Mitigation WallacePancher Group provided environmental, mitigation design, monitoring and permitting services for the proposed LaBelle Dock Site (also known as the Unloading and Transfer Facility and Rail Siding project) located in Luzerne Township, Fayette County, Pennsylvania. The project provided a critical stockpile, processing and transportation hub for refined coal coming from the Cumberland Underground Mine operations. The project encompassed a narrow rail siding corridor adjacent to the existing Norfolk Southern railroad along with a small pad area located within several existing mooring blocks on the Monongahela River. To offset stream and wetland impacts from the project, WallacePancher Group prepared mitigation stream and wetland mitigation plans and construction oversight and compliance monitoring for approximately 550 linear feet of stream restoration/stabilization and 2+ acres of PEM/PSS/PFO wetland creation at an adjacent site. MINING Cumberland Mine – LaBelle Dock Site E N V I R O N M E N T A L

Transcript of Cumberland Mine Labelle Dock - WallacePancher Group · monitoring and permitting services for the...

Page 1: Cumberland Mine Labelle Dock - WallacePancher Group · monitoring and permitting services for the proposed LaBelle Dock Site (also known as the Unloading and Transfer Facility and

SERVICES PROVIDED:

• Section 401/404 Permit

• Stream & Wetland

Mitigation

WallacePancher Group provided environmental, mitigation design,

monitoring and permitting services for the proposed LaBelle Dock

Site (also known as the Unloading and Transfer Facility and Rail

Siding project) located in Luzerne Township, Fayette County,

Pennsylvania.

The project provided a critical stockpile, processing and

transportation hub for refined coal coming from the Cumberland

Underground Mine operations. The project encompassed a narrow

rail siding corridor adjacent to the existing Norfolk Southern railroad

along with a small pad area located within several existing mooring

blocks on the Monongahela River. To offset stream and wetland

impacts from the project, WallacePancher Group prepared

mitigation stream and wetland mitigation plans and construction

oversight and compliance monitoring for approximately 550 linear

feet of stream restoration/stabilization and 2+ acres of

PEM/PSS/PFO wetland creation at an adjacent site.