CSC operation news

6
1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014

description

CSC operation news. M. Ignatenko UCLA group meeting CERN February 18, 2014. HV, LV and skew clear cables for ME-42 chambers installed. The last VME-4/4 crate cabled with skew clear cables. RPC gas tubes prevented us from finishing cable installation. ME+11 problems. - PowerPoint PPT Presentation

Transcript of CSC operation news

Page 1: CSC operation news

1

CSC operation newsCSC operation news

M. Ignatenko UCLA group meeting

CERNFebruary 18, 2014

Page 2: CSC operation news

2

HV, LV and skew clear cables for ME-42 chambers installed

HV, LV and skew clear cables for ME-42 chambers installed

RPC gas tubes prevented us from finishing cable installation

The last VME-4/4 crate cabled with skew clear cables

Page 3: CSC operation news

3

ME+11 problemsME+11 problems

1. ME+1/1/08 – swapped skew clear cables (fixed)2. ME+1/1/20 - swapped PPIB cables (fixed)3. ME+1/1/35 - LV terminal block problem (fixed)4. ME+1/1/26 – bad skew clear cables (replaced)5. ME+1/1/04 – missing 5.5 V for DCFEB 5 (not confirm on the surface).6. ME+1/1/22 – no ALCTtx/rx working area7. ME+1/1/33 – no ALCTtx/rx working area, no data from DCFEB7 (some ALCT problems seen on the surface, but DCFEB7 problem has not been confirm)

Page 4: CSC operation news

4

Near operation tasksNear operation tasks

1. Time in the readout of ME+42 chambers with 1000219 PC config.

2. Take a long CR run (or a few runs) with 4 stations of +Z endcap (without ME+11).

3. Repeat test of all installed ME+11.4. Start ME+11 LTT (6 chambers).5. New MPC test (CR local runs).6. As soon as LV and HV are ready on –Z

endcap start operating station -2 and -3 (include these station in the local runs).

Page 5: CSC operation news

5

2014 DOC volunteers2014 DOC volunteers

1. Amithabh Shrinivas UC Riverside experienced shifters2. Pieter Everaerts UCLA3. Senka Duric UW4. Jesse Heilman UC Riverside5. Indara Suarez TAMU6. Jessica Brinson OSU7. Kennedy Elizabeth UC Riverside8. Devin Taylor UW9. David Morse NU10. Xiaofeng Yang UCLA11. Jay Hauser UCLA12. Eric Takasugi UCLA (yes before August, ? after)

Page 6: CSC operation news

6