CREATIVE OFFICE REDEVELOPMENT 2105 COLORADO, …...COLORAO, SANTA ONICA CREATIE OFFICE REEELOPENT...
Transcript of CREATIVE OFFICE REDEVELOPMENT 2105 COLORADO, …...COLORAO, SANTA ONICA CREATIE OFFICE REEELOPENT...
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
BUILDING B ENTRYBUILDING B
BUILDING B FROM COLORADO AVENUE MAIN LARGE PATIO & COMMON AREA
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
SUBTERRANEAN PARKING ELEVATOR & STAIRSBUILDING B
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
2041-2115 COLORADO
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
SITE PLAN
±33,000 SF
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
APPROXIMATE AREA BREAKDOWNS
bldg. a - leaSe pending bldg. b
area rsfBuilding B ±33,000Total: ±33,000 SF
project parkingVehicle Spaces 172 (3.0/1,000 RSF)
Bicycle Spaces 42
bldg. d - leaSed
bldg. c - leaSed
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
project details
BUILDING SIZEBuilding B / 2105 Colorado / ±33,000 RSF
RENTAL RATETBD/RSF/month, NNN + 4.0% annual increases
OCCUPANCYQ1 2019
LEASE TERM10 - 15 years
PARKING3.0/1,000 RSF available; rates TBD New underground valet parking garage will feature stackers
project features and amenities
• Building and Project renovation underway• Exposed wood ceilings, concrete floors and skylights throughout• Expansive outdoor spaces (both private and common) and private terraces• Operable steel windows• Ceiling heights: Bldg. B. 10’5” - 16’2”• Prime location in the heart of the Santa Monica Special Office District, with
great proximity to downtown Santa Monica and surrounding submarkets• Excellent ingress/egress off Colorado Ave. between Cloverfield Blvd. & 20th St.• Waking distance to Expo Line and numerous restaurants• Electric vehicle charging stations• On-site bicycle parking• Dog friendly
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
MATERIALS AND FINISHES
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
Santa Monica Pier
Downtown Santa Monica
17th Street/SMC Station
26th Street/Bergamot Station
Santa Monica College
Santa Monica Business Park
Santa Monica Airport
Sepulveda Station
Third StreetPromenade
WaterGarden
TIATO
BACK ON BROADWAY
CASSIASIDECAR DONUTS
LA MONARCA BAKERYMELISSE
DUNKIN DONUTSSANTA MONICA PIZZA KITCHEN
EARTH WIND & FLOUR
STARBUCKS
CAFE 8 1/2
SM SEAFOOD MARKET
BELCAMPO
TAR & ROSES
NINJINFRITTO MISTO
REDS
SWEET ROSE CREAMERY
RED ROOSTER BAKERY
THYME CAFE
LOCAL KITCHEN & WINE BAR
CAFE BOLIVAR
UPLIFTERS KITCHEN
JUICE CRAFTERSVITO
SWINGERSSTARBUCKS
BAY CITIES DELI
FUNNEL MILL
SWEETFIN POKE
Fairmont HotelHuntley Hotel
Loews Santa Monica
ViceroyShutters
JW Marriott
POPS HOT DOGS
THE MAR VISTA
PHILZ COFFEE
LO/CAL COFFEE COFFEE BEAN
COFFEE BEAN
VENICE GRIND COFFEE
BONDI HARVEST
YAMAKASI
GARDEN CAFE
THE GREEK KABOBGOOD STUFF BURGERS
TACOS POR FAVOR
TEDDY’S CAFE
Exposition/Bundy StationSUSHI HOUSE
THE ARSENAL
LIME
SantaMonicaPlace
ColoradoCenter
KIMUYA SUSHIPACIFIC DINING CAR
MILO + OLIVECASA ESCOBAR WILSHIRE
THE WILSHIRE
SNUG HARBOR
BUTCHER’S DOGDAIKO KUYA
IL MORO
BILLINGSLEY’S
MORI SUSHI
DON ANTONIO’S
YABU
CHAN DARA
SHUNJI
THE CARVING BOARD
CHAMPAGNE FRENCH BAKERY
VALENTINOCAPRICE
UPPER WEST
MALBEC STEAKHOUSE
FORMAR+D KITCHEN
THE COURTYARD KITCHEN
LOCANDA PORTOFINOPOSH CAFE
MARMALADEESTATE RESTAURANT & BARVIENNA PASTRY KRISPY KREME
RUSTIC CANYONEL CHOLO
DAGWOODS
STARBUCKSSTARBUCKS
HERRINGBONEEL TEXATECAPO
SHAKE SHACKANTEQUERA BAKERY
STARBUCKSCRIMSON
EL TORITOTOKYO HOUSE
STARBUCKS
TRUXTON’S
IZZY’S DELI
SANTA MONICA BREW WORKS
DAILY GRILL
BIG JO’S
MONDO TACOHOLE IN THE WALL BURGER
STARBUCKS
2041-2105 COLORADO
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
PLAZA SITEWORK - NEW LANDSCAPING
2105 COLORADO, SANTA MONICACREATIVE OFFICE REDEVELOPMENT
FOR LEASING INQUIRIES, PLEASE CONTACT:
HUNT BARNETT, Principal (310) 407-3424 [email protected] RICK BUCKLEY, Principal (310) 407-3412 [email protected]
DEFINING FEATURESCREATIVE OFFICE CAMPUS -LARGECOMMONANDPRIVATEGARDENSANDTERRACES
ADAPTIVE REUSE OF EXISTING BUILDINGS -RE-PURPOSINGEXISTING“AUTHENTIC”BUILDINGS -PRIORITIZINGPRESERVATIONFROMPUBLICPERSPECTIVE
MULTI-MODAL ACCESS PEDESTRIAN FIRST -PEDESTRIANACCESSPOINT -SEPARATEPEDESTRIANSFROMVEHICLES EXPO COMMUTER- CENTRIC -8-12MINUTEWALKFROM2EXPOSSTOPS -CONNECTIVITYTOCITY-WIDETRANSPORTATION BICYCLE COMMUTING EMPHASIZED -4-5MINUTERIDEFROMEXPOSTOPS -LONGTERM/VALETEDBIKEPARKING -SHORTTERMATGRADEBIKEPARKING PARKING -NEWSUBTERRANEANGARAGE -STACKERPARKING -VALETSERVICED
SUSTAINABLE DIRECTIONS -NATURALLIGHTWITHINBUILDINGS -PASSIVE/NATURALVENTILATION -REPLACEHARDSCAPEWITHLANDSCAPE -SHADETREES/GREENSPACE -PERMEABLESURFACES -OPERATIONALDURABILITY -ELECTRICVEHICLECHARGING -ENCOURAGEALTERNATETRANSPORTATION
PUBLIC EXPERIENCE -LIGHTING/SAFE,SMART,LOWIMPACT -LANDSCAPE/LOWWATER,SHADE,SOFTENINGINTERFACEATSTREET -PEDESTRIANORIENTED -ACTIVECAMPUS -REORGANIZEDACCESS/PEOPLE,CARS,DELIVERIES