Creating a Continuous Improvement Culture

47
Creating a Continuous Improvement Culture Webinar August 13, 2013

Transcript of Creating a Continuous Improvement Culture

Page 1: Creating a Continuous Improvement Culture

Creating a Continuous Improvement Culture 

WebinarAugust 13, 2013

Page 2: Creating a Continuous Improvement Culture

Welcome!• Argentina• Australia• Bermuda• Brazil• Canada• Finland• France• Great Britain (UK)

• India• Latvia• Netherlands• New Zealand• Spain• United States• Uruguay

www.ksmartin.com/subscribe

Page 3: Creating a Continuous Improvement Culture

Coach / Facilitator / Consultant / Trainer: Lead Lean transformations & develop people across all industries.

Teacher: University of California, San Diego

Author & Speaker:

Karen Martin, PresidentThe Karen Martin Group, Inc.

www.ksmartin.com

3

October 2013 Shingo Prize winner!

Page 4: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 4

Upcoming Webinars

• How Outstanding is Your Organization?:  An Assessment– Tuesday, September 17, 2013 – 11:00 am‐12:15 pm– https://www2.gotomeeting.com/register/923117162

• Value Stream Mapping: Visualizing Work Flow and Aligning People for Organizational Transformation– Tuesday, October 8, 2013 – 11:00 am‐12:15 pm PT– https://www2.gotomeeting.com/register/151856458

• Improvement Facilitation & Coaching: An Open Forum– Tuesday, October 29, 2013 – 11:00 am‐12:15 pm PT– https://www2.gotomeeting.com/register/999232762

Page 5: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 5

After the webinar…

• All recordings are available on:– www.vimeo.com/karenmartingroup– www.youtube.com/karenmartingroup– www.slideshare.net/karenmartingroup– www.ksmartin.com/webinars

• The materials are available on– www.slideshare.net/karenmartingroup

Page 6: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 6

Key Topics

• The 4 conditions you need to create to build a continuous improvement culture.

• What continuous improvement looks and feels like.

• How to sell leadership on the management and leadership behaviors and skill development needs that lead to continuous improvement.

Page 7: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 7

Kaizen

Kai = Change Zen = Good

Continuous Improvement: A Way of Life

Page 8: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 8

Improvement needs to be part of        

doing the work.

Page 9: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 9

Continuous Improvement Classics

1982 1982 1986

Page 10: Creating a Continuous Improvement Culture

Recent “Daily Kaizen” Books

Page 11: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 11

The Toyota Way 2001• Respect for People

– Respect – We respect others, make every effort to understand each other, take responsibility, and build mutual trust.

– Teamwork – We stimulate professional growth, share the opportunities of development, and maximize individual and team performance.

• Continuous Improvement– Challenge – We form a long‐term vision meeting challenges with courage and 

creativity to realize our dream. – Kaizen – We improve our business operations continuously, always driving for 

innovation and evolution.– Genchi Genbutsu – We believe in going to the source to find the facts to make correct 

decisions, build consensus, and achieve goals at our best speed.

Page 12: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 12

Continuous Improvement: The Relentless 

Pursuit of Perfection

Page 13: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 1313

New Ideas Generated, Tested, Refined, and Implemented by Everyone, Everyday, Everywhere

Page 14: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 14

True Continuous Improvement

CHECK

CHECK

CHECK

ACT

ACT

ACT

Page 15: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 15

What does Continuous Improvement 

look and feel like?

Page 16: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 16

Meet Menlo Innovations

Page 17: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 17

One million ideas a year.

Page 18: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 18

What’s it take to create a true C.I. culture?

Page 19: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 19

Creating a C.I. Culture: Requirements

• Will• Skill• Authority• Guidance

Page 20: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 20

Page 21: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 21

You have to want it.

Page 22: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 22

You have to develop an intrinsic belief that good enough never is.

Page 23: Creating a Continuous Improvement Culture

We need to pass the improvement baton from the elite few 

to the common many

23

Page 24: Creating a Continuous Improvement Culture

Respect for People: Develop & EngageThe people who do the work are the experts.

24

Page 25: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 25

Foster an environment of curiosity

“Why?”“Why not?”“What if?”

Page 26: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 26

= Development

Page 27: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 27

Requisite Knowledge & Skills• Value‐adding vs. non‐value‐adding• Three conditions to eliminate:

– Mura ‐ unevenness– Muri ‐ overburden– Muda ‐ waste

• Eight types of waste• PDSA/PDCA (Plan‐Do‐Study‐Adjust or Check‐Act)

– Including root cause analysis

• Process metrics– Process time– Lead time– % Complete & accurate

• Process mapping & process documentation 

Page 28: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 28

Detailed Steps

  1.  Define and break down the problem.

  2.  Grasp the current condition.

  3.  Set a target condition.

  4.  Conduct root cause & gap analysis.

  5.  Identify potential countermeasures.

  6.  Develop & test countermeasure(s)

  7.  Refine and finalize countermeasure(s).

  8.  Implement countermeasure(s).

StudyEvaluate Results

  9.  Measure process performance.

10. Refine, standardize, & stabilize the process.

11. Monitor process performance.

12.  Reflect & share learning.

Adjust

Do

Clarifying the PDSA Cycle

PlanDevelop 

Hypothesis

Conduct Experiment

Refine Standardize Stabilize

Phase

Continuous Improvement

New Problem

50‐80% of the total time

Page 29: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 29

Root Cause Analysis: 4 Key Tools

CauseCause--andand--Effect DiagramEffect Diagram

Machine Measurement Environment

People Material / Info Method

Budgets Submitted Late

Lack of experience

Time availability

No sense of import

No stnd spread sheet

Email vs. FedEx

No standard work

Input rec’d late

Forecast in other system

Manual vs. PC

System avail.

No milestones

$ vs. units

Weather delays

Dispersed sales force

Changing schedule

Machine Measurement Environment

People Material / Info Method

Budgets Submitted Late

Lack of experience

Time availability

No sense of import

No stnd spread sheet

Email vs. FedEx

No standard work

Input rec’d late

Forecast in other system

Manual vs. PC

System avail.

No milestones

$ vs. units

Weather delays

Dispersed sales force

Changing schedule5 Why’s

Why?   Why?    Why? Why?    Why?

P a r e t o Cha r t Cr e di t Appl i c a t i on De l a y s

2 9 0 9

6 2 7 5 6 1

2 4 2 1 8 0

2 4 9 3

4 1 %

7 7 %8 6 %

1 0 0 %9 7 %9 4 %

0

500

1000

1500

2000

2500

3000

3500

N o S i g n a t u r e I n s u f f i c i e n t

B a n k I n f o

N o p r i o r

a d d r e s s

C u r r e n t

C u s t o me r

N o C r e d i t

H i s t o r y

O t h e r

Re a son f or D e l a y

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Check Sheets Quantify Occurrences

|Equipment failure

|||||||||||||Changing customer requirements w/ no adjustment to expected delivery

||||||||||Order entry error

|||Staffing/absenteeism

|||||Quality issue requiring rework

|||||||Material shortage

Tally Reason

|Equipment failure

|||||||||||||Changing customer requirements w/ no adjustment to expected delivery

||||||||||Order entry error

|||Staffing/absenteeism

|||||Quality issue requiring rework

|||||||Material shortage

Tally Reason

Page 30: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 30

Empowerment

Page 31: Creating a Continuous Improvement Culture

Work: Degrees of Granularity

Value Stream

Process Process Process

Step StepStep

31

Micro Perspective

• Identify the  tactical “how”

• Heavy frontline involvement

• Metrics‐Based  Process Mapping

Macro       Perspective

• Define strategic direction (“what”) 

• Heavy leadership involvement

• Value Stream Mapping

Page 32: Creating a Continuous Improvement Culture

You may need to draw them 

out.

Page 33: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 33

BoundariesLearning & development

Page 34: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 34

Give every team member“Freedom with Boundaries”

Page 35: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 35

Loosening the Reins

Page 36: Creating a Continuous Improvement Culture

36

C.I. Essentials:Supervisors & Managers must become proficient 

Process Managers & Improvement Coaches

Page 37: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 3737

How are you performing?

Gray – Highest industry quality scoresPurple – Median industry quality scoresBlue – Our quality scores

Page 38: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 38

Daily Kaizen vs. Breakthrough Kaizen 

(Kaikaku)

Page 39: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 39

1. Increase sales 5%.3. Achieve 10% profit.

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec IT Mktg Ops HR Bob Fin PE Pario COM Direct 

CDs / AMs

PD Rec

PD Mgmt

BMD SWS

23,500 units  sold by 12/31/2013 through al l  channels  (approx. $700K)

X X X X X X X X X X X X Bob Dana 2 3 3 3 2 3 3 1 1 3 3 1 3

11 Develop & del iver tra ining to top 50 Dealers X X X X X X Bob Rex/Tim  3 3 3

21 Revised course  materia ls  by 6/30/2013 X X X Bob Josh R? 2 3 3 2 2

5Education: 1 school  dis trict spec'd/underperforming COM dis tributor (25) by 12/31 valued at min $35K each

X X X X X X X X X X X X Howard Michael   S 1 3 2 3 3

810 new dea lers  on board (net) ($500K per dealer this  year)

X X X X X X X X X X X X Howard Mike  B 2 3

95 new dis tributors  bringing $200K annual  rev (& 5 terminated)

X X X X X X X X X X X X Howard Howard 1 1 1 2 3

17 10 projects  spec'd  by 12/31; $300K rev by 12/31 X X X X X X X X X X Howard Dana 1 3 3 3

29 20 by year‐end X X X X X X X X X X X X Howard Mark H 2 3 3 3

32 TBD X X X Howard Howard

33 TBD X X X X X X X X X Howard Howard

10Useful  reporting and metrics  are  establ i shed and in place  

X X Jim Randal l 3 1 1 1 1 1 1

30 TBD X X X X X Jim Josh 3

31 TBD X X X X X X Jim Josh 1 1 1 3 1 1 1 1 1 1 1 1 1 1

25 TBD Jim  Shannon  3 3 1 1 1 1 1

26 System 7.0's  in place X X X Jim  Randal l 3 2 1 2 1

15100% accurate  payrol l ; 100% management sati s faction at Apri l  mgmt. meeting

X X X Josh Phyl l is 1 3

20Internet task l i s t i s  s impl i fied and streaml ined for PDs  then plan i s  rol led out to PDs  

X X X X Michael  M Michael  M 2 3 2 3

22Des ign Calculator i s  updated success ful ly and rol led out

X X X Neal l Matt D 3 1 1 3 2 2 3

24 Competi tive  Analys is  complete  and distributed for use X X X Neal l Dana 2 3 3 3 3 3 3

1 Des ign changed to solve  delam i ssue   long‐term X X X X X Susan David R 3 2 3

1230 parts  sourced in U.S.; completed plan for managing China ‐sourced parts

X X X X X X Susan Shannon 3 3 2 2

13Warehouse  la id out; kanban revised; Syspro implemented

X X X Susan Shannon 3

14 Lay out complete; equipment ins ta l led X X X Susan David  R 3 3

X = Planned

2013 Priorities

2013 Goals & Objectives4. Improve morale (metric TBD).2. Achieve 50% gross margin. Created: 01‐14‐13

Revised: Level of Effort/Involvement Required

Priority Goal or Measurable Objective Exec Owner

Plan review dates:

Tactical Owner

● =  Actual

< Company Name >

Conten

trem

oved

 for con

fiden

tiality 

Tie Improvement to Annual Strategy Deployment Plans

Page 40: Creating a Continuous Improvement Culture

Tie Improvement to Future State          Value Stream Maps

Referring Physician

% C&A = 85 %

Send Reports

(Imaging)

Cycle Time = 3 mins.% C&A = 90 %

6

Hospital

Schedule apptPre-register

Cycle Time = 11 mins.Lead Time = 45 mins.% C&A = 98 %

6

CT=Cycle Time LT=Lead Time %C&A=% Complete & Accurate

0.0833 hrs.

1 mins.

0.583 hrs.

10 mins.

0.333 hrs.

10 mins.

0.0833 hrs.

2 mins.

2 hrs.

15 mins.

7 hrs.

1 mins.

0.0333 hrs.

1 mins.

0.5 hrs.

3 mins.

LT = 11.3 hrs.

CT = 43 mins.CT/LT Ratio = 6.32%

Lead Time = 45 mins.Lead Time = 15 days

PrepPatient(Tech)

Cycle Time = 10 mins.% C&A = 100 %

2

Check-inPatient

(Imaging)

Cycle Time = 1 mins.% C&A = 98 %

3

CompleteExam(Tech)

Cycle Time = 10 mins.% C&A = 90 %

2

TransmitImages(Tech)

Cycle Time = 2 mins.% C&A = 100 %

2

Read/DictateExam

(Radiologist)

Cycle Time = 15 mins.% C&A = 95 %

2

ReviewDraft/Sign

(Radiologist)

Cycle Time = 1 mins.% C&A = 95 %

2

PrintReports

(Imaging)

Cycle Time = 1 mins.% C&A = 99 %

220 mins. 5 mins. 120 mins. 420 mins. 2 mins. 30 mins.35 mins.

E Pay

Excel

Symposium

Internet

Waiting RoomManagement

System

Fax OrderSolutions

PACS

5 mins.

Set-upReduction

Remove Check in

and ReduceSystem Access

Work Balancing

StandardWork

Pull System(Supplies Kanban)

VisualWorkplace

Voice Recognition

Batch Reductions

5S

Co-locate

StandardWork

Work Balance

ContinuousFlow

Value StreamAlignment

Auto Fax 80% Us Mail 15%MD Mailbox 5%

Rolled First Pass yield = 40%

Rework Loop via Fax 10% of the time

Customer Demand:15 patients per Day

(Takt Time 1920 seconds)8 hours per day

123

4 5 6 7 8 9 10 11

Risk Reduction

(Joint Commision)

Meditech

Page 41: Creating a Continuous Improvement Culture

Tie Improvement to A3s

41

Page 42: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 42

Attaining Mastery

From The Outstanding Organization, p. 115

Page 43: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 43

Skill Development Progression*

Unconscious Incompetence

Conscious Incompetence

Conscious Competence

* Commonly attributed to Noel Burch, Gordon Training International

Start Goal

Unconscious Competence

Consciou

sness

Competence

1 4

32

Page 44: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 44

What you can do immediately no matter where you sit…

1. Make sure you know and are highly skilled in improvement basics.

2. Begin asking “why,” “why not?” and what if?” in every encounter/meeting.

3. Establish an improvement‐safe zone in your sphere of influence; quantify the number of ideas implemented.

4. Coach, coach, coach…and then coach some more.5. Quantify results when possible and broadcast, 

broadcast, broadcast.

Page 45: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 45

Upcoming Webinars

• How Outstanding is Your Organization?:  An Assessment– Tuesday, September 17, 2013 – 11:00 am‐12:15 pm– https://www2.gotomeeting.com/register/923117162

• Value Stream Mapping: Visualizing Work Flow and Aligning People for Organizational Transformation– Tuesday, October 8, 2013 – 11:00 am‐12:15 pm PT– https://www2.gotomeeting.com/register/151856458

• Improvement Facilitation & Coaching: An Open Forum– Tuesday, October 29, 2013 – 11:00 am‐12:15 pm PT– https://www2.gotomeeting.com/register/229489922

Page 46: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 46

Karen Martin, President7770 Regents Road #635San Diego, CA 92122

858.677.6799

[email protected]

For Further Questions

Blog & newsletter:  www.ksmartin.com/subscribe

Page 47: Creating a Continuous Improvement Culture

© 2013 The Karen Martin Group, Inc. 47

Your Questions1. Are there unique challenges that exist with establishing 

CI cultures in union workforces?2. Companies I worked for push Return on Investment as 

the metric for gauging CI activities and culture effectiveness. Is this the best metric, and are there others that we should be looking at?

3. How long does it take to change a 125‐year old culture? 4. How do you recommend broadcasting successes and 

making them relevant?5. Our division president wants to implement a long‐term 

vision, whereas corporate seeks quarterly results. How do I interact w/ president & direct reports to ensure buy‐in?

6. What are things that a middle manager can to do drive Lean culture?