Page 1: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

Created by MichaelCreated by Michael

Page 2: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

ABOUT THE SASABOUT THE SAS

A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line.

The SAS project will include a two-track line along second avenue from 125th street to the financial district in lower Manhattan.

The line will be built in four phases and contain two subway services: an extension of the existing Q subway line and the new T line.

Page 3: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

SAS PHASESSAS PHASES Phase 1 will be an extension of

the Q across 63rd street and north along second avenue to the upper east side at 96th street .

Phase 2 will be another extension of the Q to 125th street from 96th street.

Phase 3 will be from 63rd street to Houston street which will introduce the new T line.

Phase 4 will be from Houston street to Hanover square which completes the line.

Page 4: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

PAST OF THE SASPAST OF THE SAShttp://www.youtube.com/watch?v=ltwp-zU-CnA

Page 5: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

FUTURE OF THE SASFUTURE OF THE SAShttp://www.youtube.com/watch?v=LBpM7gc-mZA&feature=fvwhttp://www.youtube.com/watch?v=LBpM7gc-mZA&feature=fvw

Page 6: Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

BIBLIOGRAPHYBIBLIOGRAPHY ““Second Avenue Subway.” Second Avenue Subway.” MTA.info. MTA.info. MTA, 26 Jan. 2010. MTA, 26 Jan. 2010.

Web. 26 Jan. 2010. http://www.mta.info/capconstr/sas/Web. 26 Jan. 2010. http://www.mta.info/capconstr/sas/ Second Ave Subway Map. Second Ave Subway Map. 2006. Built Environment Blog.2006. Built Environment Blog.

Web. 25 Jan. 2010. Web. 25 Jan. 2010. http://farm1.static.flickr.com/85/236596050_c1bfd3feee_o.jpghttp://farm1.static.flickr.com/85/236596050_c1bfd3feee_o.jpg

Kabak, Benjamin. Kabak, Benjamin. Taking a Nostalgic holiday ride back in Taking a Nostalgic holiday ride back in time. time. 2007. 22007. 2ndnd Ave. Sagas. Ave. Sagas. Web. 25 Jan. 2010.Web. 25 Jan. 2010.

http://secondavenuesagas.com/wp-content/uploads/http://secondavenuesagas.com/wp-content/uploads/2007/11/car100.jpg2007/11/car100.jpg

Visually impaired riders inspect South Ferry station’s ADA Visually impaired riders inspect South Ferry station’s ADA signage. signage. 2009. PCAC. Web. 25 Jan. 2010.2009. PCAC. Web. 25 Jan. 2010.

http://www.pcac.org/wp-content/uploads/2009/12/south-ferry-station-and-34th-st-bus-010.jpg