Tech recruiting 101 how to recruit engineers to your startup
Create your future at Hillington Park · Discuss your specialist requirements A flagship building...
Transcript of Create your future at Hillington Park · Discuss your specialist requirements A flagship building...
Pre Let • Design and Build • Turnkey Packages • Bespoke Development
Create your future at Hillington ParkIndustrial / warehouse and office accommodation built to your specifications
2 www.hillingtonpark.com
We look after what we build too. Ongoing refurbishment, proactive building management and leadership in environmental practice demonstrate our commitment to continuous improvement.
We’ve built our reputation on understanding customers’ needs. We’ve always recognised the need to give our customers the best platform for success, not just for today but for tomorrow as well.
TOGETHER
GROWINGWE ARE
We have unrivalled experience in accommodating the needs of business and people. Our tradition is to build with the future in mind, from innovative new developments to adaptable spaces that can answer changing requirements.
TOGETHER WE ARE GROWING 3
Scotland’s first Simplified Planning Zone
We are home to Scotland’s first Simplified Planning Zone. With approved guidelines firmly in place there is now pre-defined planning permission in place for the entire Park.
These clear development parameters mean that from an initial meeting, we can deliver a new custom-built building in less than 10 months.
With every organisation having its own unique property and business needs, our development expertise allows us to provide an exact match that includes choice of location, build requirements and interior environment. This flexibility extends to our lease terms as well, giving our design and build customers all the security they need to plan for the future with confidence.
4 www.hillingtonpark.com
The Park is a safe, well maintained environment with two train stations linked directly to Glasgow’s city centre, is two minutes from the motorway network and only two miles from Glasgow International Airport. Companies are able to stay and grow because of the range of property options and Hillington Park’s flexible approach.
Your business will benefit from a secure, well maintained business environment and with the support of our professional on-site team your current needs and plans for the future will be met.
Your staff will benefit from a range of amenities including cafés, restaurants, a fully resourced modern gym, a five star rated nursery and a travel for work plan.
Hillington Park is a well established business park providing over 2M sq ft of commercial property for a diverse range of businesses, from established stock market listed companies to start-ups, and from high-tech to light industrial.
Companies benefit from
• Great transport links - convenient and accessible for staff and visitors
• Full range of property options - flexibility to meet a company’s needs now and in the future
• Park Management Team - to respond to customers’ needs and deliver value-adding initiatives
• Amenities - to help with work/life balance and to motivate staff
• Sustainability- to support companies to achieve green credentials
TOGETHER
SUPPORTEDWE ARE
Park Amenities
Amenities to motivate staff and help with work/life balance are available on the Park to serve your staff and your customers:
• Post Office • Nursery• Gym• Laundry service• Harvester pub/restaurant• Bocadillo coffee shop• Subway• Greggs• Burger King• Two petrol stations• Urban garden with allotment plots
for businesses• CCTV and on-site security
TOGETHER WE ARE SUPPORTED 5
Hillington Park is a safe, well maintained environment with two train stations, two minutes from the motorway and two miles from Glasgow International Airport.
6 www.hillingtonpark.com
We have unrivalled experience in accommodating the needs of businesses and people. Our tradition is to build with the future in mind, from innovative new developments to adaptable spaces that can answer changing requirements.
Our status as a Simplified Planning Zone (SPZ) allows existing or prospective occupiers to plan confidently. With its pre-approved guidelines, our SPZ will accelerate any new development planning that falls within the parameters agreed by both Glasgow City and Renfrewshire Councils’ planning departments. This makes Hillington Park an immediate draw for organisations looking to plan and grow with confidence.
TOGETHER
DEVELOPINGWE ARE
TOGETHER WE ARE DEVELOPING 7
We understand our customers and know they need deliverability and flexibility. We have a track record of providing that.Roddy ProudfootHead of Asset Management,Hillington Park
Evolution 1 28 Up to 450,000 Various
Evolution 2 4.14 Up to 69,600 5 & 6
Evolution 3 4.86 Up to 8,000 5 & 6
Evolution 4 1.25 Up to 15,000 5 & 6
Evolution 5 4.64 Up to 62,108 Various
Evolution 5 2.21 Up to 62,108 Various
Evolution 6 22.8 Up to 318,316 Various
Evolution 7 4.0 Up to 64,029 5 & 6
Evolution 8 2.4 Up to 1,475 5 & 6
Evolution 9 0.75 Up to 10,000 4, 5 & 6
Size Indicative Suitable uses Site (acres) floor area (sq ft) / Class
8 www.hillingtonpark.com
Evolution 6
Evolution 5
Evolution 7
Evolution 8Evolution 9
TOGETHER WE ARE HILLINGTON PARK 9
Evolution 2
Evolution 3
Evolution 4
Evolution 1
10 www.hillingtonpark.com
Bespoke solutions
If you can’t find a building that is suitable for you, we have the available land and expertise to create a customised building and because we retain ownership of the assets we develop, customers are assured that developments are of the highest standards. Our success is also based on our ability to manage developments efficiently within pre-agreed timeframes.
Industrial
Our fully serviced plots offer flexibility for a range of manufacturing and distribution units of up to 450,000 sq ft. They can be tailored to meet the specific requirements of your organisation and its business operations. Our experienced team will lead you through the development process from initial requirement to handover.
Retail
Adjacent to a major motorway junction and with visibility to the M8 we have prominent, high profile locations on the Park ideally suited for retail and leisure use. We can deliver bespoke units by working in partnership with operators to ensure brand consistency and quality.
Office
We create offices and environments that meet each company’s individual requirements. Working closely with customers through every stage of the development process allows us to develop lasting relationships and innovative solutions. Our buildings are designed to provide exceptionally flexible accommodation enabling occupiers to acquire the right amount of floorspace to suit their needs with the ability to grow over time.
Evolution 3 indicative image
indicative imageindicative image
TOGETHER WE ARE HILLINGTON PARK 11
Patrizia UK Ltd, a subsidiary of Patrizia Immobilien AG, is a highly experienced real estate business covering acquisitions, development, portfolio and asset management, structured finance/funding and reporting.
With a team of experts in all real estate sectors, including residential, office, retail and industrial, and single or mixed-use investment/development opportunities, Patrizia UK holds a strong record in core and opportunistic asset and investment management making in excess of €1bn of investments since the beginning of 2013.
Its growing portfolio covers a range of commercial property in Glasgow, Warrington, Birmingham, Basingstoke and metropolitan London including offices and large mixed-use business parks.
12 www.hillingtonpark.com
The range and flexibility of property options allows our business to grow and flourish.
Mark GriffithsManaging Director, Power Systems,Balfour Beatty Construction Services UK
TOGETHER WE ARE HILLINGTON PARK 13
Evolution 2
Evolution 2
Speculative Industrial Development
We expect work on the new 90,000 sq ft scheme to begin towards the end of 2015.
It’s four purpose built units – ranging from 13,000 sq ft to 30,000 sq ft – will appeal to the logistics, distribution and manufacturing industry due to its close proximity and highly visible position facing the busy motorway network.
Prospective occupiers with an interest in this exciting development, please contact our management team on 0141 883 5760.
indicative image
indicative image
14 www.hillingtonpark.com
SPZ
The Simplified Planning Zone (SPZ) simplifies and streamlines planning regulations allowing construction projects to be fast tracked to reduce the planning process to 2 weeks.
We have the potential to deliver around 750,000 sq ft of new commercial floor space across 75 acres so if you are looking to expand or perhaps build your own premises from scratch the SPZ should be a major factor in your decision making.
SPZ allows development of the following ues:
• Business/ office
• General industrial
• Storage and distribution
• Motor vehicles sales
• Retail
• Financial and Professional Services
• Food & Drink
Aside from all of the other attractive reasons for being based at Hillington Park the pre-approved guidelines within the SPZ lets every astute business owner and property adviser plan with confidence.
An exciting process, a proven method
Visit Hillington Park, Scotland’s largest Business Park
Easy to access and set in over 417 acres with a gym, nursery, café and 24 hour security.
Discuss your specialist requirements
A flagship building with facilities to suit your company’s style and character.
Jointly recruit the Design Team
A bespoke design by a team you can trust.
Construction of your building
Construction of your building to ensure quality and flexibility.
We have unrivalled experience in accommodating the needs of businesses and people. From small industrial units to global headquarters, Hillington Park has the land and expertise to deliver individual property solutions in a prime location.
Jamie Cumming Commercial Director
1
2
3
4
TOGETHER WE ARE HILLINGTON PARK 15
The Hillington Park team includes:
Funding
Hillington Park lies within an area qualifying for Tier 2a Regional Selective Assistance. Subject to meeting certain criteria, occupiers could be eligible for a contribution of up to 35% of the capital investment made in establishing a new facility on site.
Further information is available from www.scottish-enterprise.com
Smart ProjectProgramme
Agreement for leaseAppointment of consultants
Design• SPZ Applications• Architectural Design• Purpose tender documentation• Legal agreement
Construction• Mobilisation• Occupier fit out
Tender Action• Tender issue, evaluation, approval• Appointment of contractors
Jamie CummingCommercial [email protected]
Roddy ProudfootHead of Asset [email protected]
Tel: 0141 883 5760
indicative image
Misrepresentation Act 1967: At the time of printing the contents of this brochure were believed to be correct but cannot be guaranteed and are expressly excluded from any contract.
May 2015
A761
A736
A8
A8
A739
A814
Clydeside Expressway
A82
J26
J28a
J20
J22
M8
M8
M77
M74
Glasgow Central Station
GLASGOW CITY CENTRE
Paisley
Renfrew
ClydeTunnel
Hillington West
Hillington East
r i v e r c l y d eBraeheadShopping Centre
Glasgow International
Airport
N
Kelso
Edinburgh
Glasgow
Ayr
Irvine
Stranraer
Dumfries
Carlisle
Peebles
Kirkcaldy
St. Andrews
DundeePerth
Crieff
Stirling
Oban
M80 M9
M8
M77
M74
M90
M6
A76
A75
A68
A720
A9A84
A82
A7
A721A83
A78
A696
A1A77
A72
Primary roads
Motorway
Drive time (mins)0-40
Drive time (mins)40-80
Drive time (mins)80-120
Hillington Park is at Junction 26 of the M8 motorway between Glasgow City to the east and the towns of Paisley and Renfrew to the west.
The location is well served by the M8, M74 and M77 motorway networks and interconnecting arterial routes. The A736 runs through the centre of the park and connects the A8 north and A761 south.
For Satellite Navigation use postcode: G52 4RU
For further information contact the Management Team at:
The Innovation Centre 1 Ainslie Road Hillington Park Glasgow G52 4RU
0141 883 [email protected]
Des
igne
d a
nd p
rod
uced
by
po
d-c
reat
ive.
com
www.hillingtonpark.com
follow us @HillingtonPark
For further information on development opportunities contact:
Office development Industrial development
Hillington Park Drive Times
Marketing Agents