Crane Loads & Wharf Structure Design: Putting the Two Together

79
1 of 77 Arun Bhimani, S.E. President Liftech Consultants Inc. Crane Loads & Wharf Structure Design: Putting the Two Together AAPA Facilities Engineering Seminar January 2006 – Jacksonville, Florida Erik Soderberg, S.E. Principal Liftech Consultants Inc. www.liftech.net

Transcript of Crane Loads & Wharf Structure Design: Putting the Two Together

Page 1: Crane Loads & Wharf Structure Design: Putting the Two Together

1 of 77

Arun Bhimani, S.E.PresidentLiftech Consultants Inc.

Crane Loads & Wharf Structure Design:Putting the Two TogetherAAPA Facilities Engineering SeminarJanuary 2006 – Jacksonville, Florida

Erik Soderberg, S.E.PrincipalLiftech Consultants Inc.www.liftech.net

Page 2: Crane Loads & Wharf Structure Design: Putting the Two Together

2 of 77

Crane Size Growth:1st Container Crane & Jumbo Crane

Page 3: Crane Loads & Wharf Structure Design: Putting the Two Together

3 of 77

Crane Service Wheel LoadsWaterside Operating Wheel Loads

Year Manufactured

Whe

el L

oad

(t)

0102030405060708090

100

1960 1970 1980 1990 2000

Page 4: Crane Loads & Wharf Structure Design: Putting the Two Together

4 of 77

Crane LoadsCrane loads increasingConsequences of misapplication more severeCodes becoming more complexChance of engineering errors increasing

Page 5: Crane Loads & Wharf Structure Design: Putting the Two Together

5 of 77

Presentation OutlineThe Problem – Overview Wharf Designer’s PerspectiveCrane Designer’s PerspectivePutting the Two TogetherQ&A and Feedback

Page 6: Crane Loads & Wharf Structure Design: Putting the Two Together

6 of 77

The Problem – Overview

Crane Purchaser

WharfDesigner

CraneSupplier

PortConsultant

Page 7: Crane Loads & Wharf Structure Design: Putting the Two Together

7 of 77

Crane Purchaser DifficultiesPurchaser specified

“Allowable wheel load: 200 kips/wheel”

Suppliers submitSupplier A 180 k/wheelSupplier B 200 k/wheelSupplier C 220 k/wheel

Which suppliers are compliant?

Page 8: Crane Loads & Wharf Structure Design: Putting the Two Together

8 of 77

Crane Supplier DifficultyPurchaser specified

Allowable wheel load: 200 kips/wheel

In some cases, linear load (kips/ft)

Not definedOperating or out-of-service?

Service or factored?

Wind profile?

Increase for storm condition?

Page 9: Crane Loads & Wharf Structure Design: Putting the Two Together

9 of 77

Wharf Designer DifficultyClient provides limited crane load data

No loading pattern

No basis given – Service or factored?

Same loads given for landside and waterside

No details of wind or seismic criteria

Page 10: Crane Loads & Wharf Structure Design: Putting the Two Together

10 of 77

Wharf Designer PerspectiveCodes and Design Principle

Crane Girder Design

Design for Tie-down Loads

Crane Stop Design

Seismic Design Considerations

Page 11: Crane Loads & Wharf Structure Design: Putting the Two Together

11 of 77

Codes and Design Principle

Page 12: Crane Loads & Wharf Structure Design: Putting the Two Together

12 of 77

Crane FEM, DIN, BS, AISC …, Liftech

Wharf StructuresACI 318 Building Code and Commentary ASCE 7-05 Minimum Design Loads for Buildings and

Other StructuresAISC Steel Construction

Manual

Design Codes & Standards

Page 13: Crane Loads & Wharf Structure Design: Putting the Two Together

13 of 77

Required Strength ≤ Design Strength

Required Strength = ∑ Service Loads * Load Factors

Design Strength = Material Strength * Strength Reduction Factor Ф

Design Principle - Wharf Structure DesignLoad Resistance Factored Design (LRFD)

Page 14: Crane Loads & Wharf Structure Design: Putting the Two Together

14 of 77

0.900.90Ten

Concrete Ф Factors

0.70/.65

0.75/.70

Comp

0.750.85

ShearLoad FactorsACI 318

1.6*1.61.2from 2002

1.31.71.4to 2001WLD

* 1.3 if directionality factor is not included

Load Factors & Ф Factors

Page 15: Crane Loads & Wharf Structure Design: Putting the Two Together

15 of 77

Generally use service loads

Factor of safety typically 2.0

Design Principle – Soil CapacityAllowable Stress Design

Page 16: Crane Loads & Wharf Structure Design: Putting the Two Together

16 of 77

Crane Girder Design

Page 17: Crane Loads & Wharf Structure Design: Putting the Two Together

17 of 77

Required Crane Geometry DataSill BeamTie-downs

Stowage pin

Bumper

(n-1) S

C craneLn = number of wheels per cornerS = average wheel spacing

Page 18: Crane Loads & Wharf Structure Design: Putting the Two Together

18 of 77

Typical Wheel Loading Geometry

7 at 5’

9’ 7 at 5’

40’ 4’ 40’

Typical Wheel Spacing

Recommended Wheel Design Load Geometry

Page 19: Crane Loads & Wharf Structure Design: Putting the Two Together

19 of 77

Wharf LoadsD – Wharf structure self weightL – Wharf live load, includes containers and yard equipment (does not control)

Crane Loads (ASCE 7-05)D – Weight of crane excluding lifted loadL – Lifted load or rated capacity

Dead Loads and Live Loads

Page 20: Crane Loads & Wharf Structure Design: Putting the Two Together

20 of 77

ACI Load Factors – Crane Loading

Load FactorsACI 318

1.301.61.2from 20021.451.71.4to 2001

CompositeLDYear

Some designers treat crane dead load as live load and use the 1.6 factor. This results in 23% overdesign; 1.6 / 1.3 = 1.23.

Page 21: Crane Loads & Wharf Structure Design: Putting the Two Together

21 of 77

Example Combination Table: Service Wheel LoadsMode Operating Stowed

WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.0 1.0 1.0 1.0 1.0 Trolley Load TL 1.0 1.0 1.0 1.0 1.0 Lift System LS 1.0 1.0 1.0 1.0 Lifted Load LL 1.0 1.0 1.0 Impact IMP 0.5 Gantry Lateral LATG 1.0 Op. Wind Load WLO 1.0 1.0 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.0 Earthquake Load EQ

50 x S 70 x S Allowable Wheel Loads (tons/wheel)

LS WS 65 x S 90 x S

S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable LS Operating = 50 t/m * 1.5 m = 75 t/wheel

Page 22: Crane Loads & Wharf Structure Design: Putting the Two Together

22 of 77

Example Combination Table: Factored Wheel LoadsMode Operating Stowed

WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.2 1.2 1.0 1.0 1.2 Trolley Load TL 1.2 1.2 1.0 1.0 1.2 Lift System LS 1.2 1.2 1.0 1.2 Lifted Load LL 1.6 1.6 1.0 Impact IMP 0.8 Gantry Lateral LATG 0.8 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.6 Earthquake Load EQ

60 x S 80 x S Allowable Wheel Loads (tons/wheel)

LS WS 75 x S 100 x S

S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable WS Storm = 100 t/m * 1.5 m = 150 t/wheel

Page 23: Crane Loads & Wharf Structure Design: Putting the Two Together

23 of 77

Design for Tie-down Loads

Page 24: Crane Loads & Wharf Structure Design: Putting the Two Together

24 of 77

Multiple Tie-downs at a Corner

Uneven tie-down forces

Page 25: Crane Loads & Wharf Structure Design: Putting the Two Together

25 of 77

Causes of Uneven Distribution Some reasons why forces are not evenly distributed:

Crane deflection

Contruction tolerances

Wharf pins not centered

Links not perfectly straight due to friction

Undeflected Shape

Deflected Shape

Page 26: Crane Loads & Wharf Structure Design: Putting the Two Together

26 of 77

Tie-down LoadsManufacturers typically provide the service corner uplift force

Needed data:

Factored corner uplift force

Distribution between tie-downs

Direction of force (allow for slight angle)

Page 27: Crane Loads & Wharf Structure Design: Putting the Two Together

27 of 77

Crane Stop Design

Page 28: Crane Loads & Wharf Structure Design: Putting the Two Together

28 of 77

0

1 0

2 0

3 0

4 0

5 0

6 0

7 0

-1 4 9 1 4 1 9 2 4

Bumper Load Provided by Manufacturer

Rated Bumper ReactionBumpers sized for collision at maximum gantry speed

Does not address runaway crane

H

Displacement

HV slow

V gantry

V runaway crane

Displacementmetering pin

gas

oil

Page 29: Crane Loads & Wharf Structure Design: Putting the Two Together

29 of 77

H= maximum load that can develop, i.e. the load at which the crane tips.

D = crane weight

H = approximately 0.25 x D per stop

Recommended Crane Stop Design Load

H

D

DH

Tipping Force

Stability Stool

Page 30: Crane Loads & Wharf Structure Design: Putting the Two Together

30 of 77

The mass of typical jumbo A-frame cranes can be ignored

For certain wharves and cranes, a time-history analysis may be necessary

Large, short duration wheel loads can be ignored

Localized rail damage may occur

The crane may derail

Wharf Seismic Design – Crane Loading

Page 31: Crane Loads & Wharf Structure Design: Putting the Two Together

31 of 77

Crane Designer PerspectiveBasic LoadsStorm Wind LoadLoad Combinations and FactorsTie-down Loads

Page 32: Crane Loads & Wharf Structure Design: Putting the Two Together

32 of 77

Basic Loads

Page 33: Crane Loads & Wharf Structure Design: Putting the Two Together

33 of 77

Dead and Live Loads

DL: Crane structure weightTL: Trolley structure weightLS: Lift System Weight

LL: Rated container load

Dead Loads Live Loads

Crane

Rated Load

Lift System

Trolley

Page 34: Crane Loads & Wharf Structure Design: Putting the Two Together

34 of 77

Inertial LoadsIMP: Vertical impact due to hoist

acceleration

LATT: Lateral due to trolley acceleration

LATG: Lateral due to gantry acceleration

Page 35: Crane Loads & Wharf Structure Design: Putting the Two Together

35 of 77

Overload

COLL: Crane Collision

SNAG: Snagging headblock

STALL: Stalling hoist motors

Normally do not control

Page 36: Crane Loads & Wharf Structure Design: Putting the Two Together

36 of 77

Environmental Loads

WLO: Wind load operating (In-Service)

WLS* : Wind load storm (Out-of-Service)

EQ: Earthquake load

*Often a major source of discrepancies

Page 37: Crane Loads & Wharf Structure Design: Putting the Two Together

37 of 77

Wind Load, Storm

Page 38: Crane Loads & Wharf Structure Design: Putting the Two Together

38 of 77

WLS: Out-of-Service WindWind Force = ∑A x Cf x qz

A = Area of crane elementCf = Shape coefficient (including shielding)

qz = Dynamic pressure, function of:

Mean recurrence interval (MRI)

Gust duration

, where Vref is a location-specific, code-specified reference wind speed

Exposure (surface roughness)

2refV Need to

clearly specify

From wind tunnel testing

Page 39: Crane Loads & Wharf Structure Design: Putting the Two Together

39 of 77

Shape Coefficient, Cf

Empirical values: FEM, BSI, etc.

Wind tunnel tests are more accurate

Boundary layer

Angled wind effects

Shielding effects

Page 40: Crane Loads & Wharf Structure Design: Putting the Two Together

40 of 77

Angled Wind

0 45 90 135 180Rea

ctio

n

Wind Direction, Degrees

Wind Tunnel Test Liftech Equations

Fx Fz

FxFz

Page 41: Crane Loads & Wharf Structure Design: Putting the Two Together

41 of 77

WLS: Out-of-Service WindWind Force = ∑A x Cf x qz

A = Area of elementCf = Shape coefficient (including shielding)

qz = Dynamic pressure, function of:

Mean recurrence interval (MRI)

Gust duration

, where Vref is a location-specific, code-specified reference wind speed

Exposure (surface roughness)

2refV Need to

clearly specify

From wind tunnel testing

Page 42: Crane Loads & Wharf Structure Design: Putting the Two Together

42 of 77

Mean Recurrence Interval

Years in Operation

.39

.64

.87

.9950

.01

.02

.04

.101

.10

.18

.34

.6410

.64.22100 yrs

.87.4050 yrs

.98.6425 yrs

.99997.9310 yrs10025MRI

Probability of Speed Being Exceeded

Example:Chance of 50-yr wind being exceeded in 25 years: 40%

Page 43: Crane Loads & Wharf Structure Design: Putting the Two Together

43 of 77

WLS: Out-of-Service WindWind Force = ∑A x Cf x qz

A = Area of crane elementCf = Shape coefficient (including shielding)

qz = Dynamic pressure, function of:

Mean recurrence interval (MRI)

Gust duration

, where Vref is a location-specific, code-specified reference wind speed

Exposure (surface roughness)

2refV Need to

clearly specify

From wind tunnel testing

Page 44: Crane Loads & Wharf Structure Design: Putting the Two Together

44 of 77

Gust Duration

Page 45: Crane Loads & Wharf Structure Design: Putting the Two Together

45 of 77

Wind Speed vs. Gust DurationV t

/ Vho

ur

Gust Duration (seconds)Ratio of probable maximum speed averaged over “t” seconds to hourly mean speed. Reference, ASCE 7-05.

( )

( )46.1

52.104.11

min103

min103

sec3

min10min103

VV

VV

VV

VV

VVhourly

hourly

=

⎟⎠⎞

⎜⎝⎛=

⎟⎟⎠

⎞⎜⎜⎝

⎛⎟⎟⎠

⎞⎜⎜⎝

⎛=

Example: converting 10-min speed to 3-sec speed

1.04

1.52

Page 46: Crane Loads & Wharf Structure Design: Putting the Two Together

46 of 77

Code Gust Durations

50 yrs3 secHK 2004

50 yrs3 secASCE 7-02

50 yrs10 minFEM 1.004

50 yrs10 minEN 1991-1-4

MRI Gust DurationCode

Code definitions of basic wind speed

Page 47: Crane Loads & Wharf Structure Design: Putting the Two Together

47 of 77

Typical Pressure Profiles

Shape of profile depends on surrounding surface roughness

0

25

50

75

100

125

150

175

200

500 1000 1500 2000Wind pressure, Pa

Hei

ght,

m

Smooth gradient

Stepped profile

Page 48: Crane Loads & Wharf Structure Design: Putting the Two Together

48 of 77

Variation in WLS

10-20%

113%15.6%

Effect on F *

5-10%

46%7.5%

Effect on V

Open terrain to ocean exposure

Profile

3 sec to 10 min

Gust duration

25 to 50 yrsMRIVariationVariable

*See later slides for effect on calculated tie-down load!

Page 49: Crane Loads & Wharf Structure Design: Putting the Two Together

49 of 77

Recommendations for Specifying WLS

Return Period Use 50-yr MRIBasic wind speedGust duration Use local civil codeProfileOther factorsShape coefficients Wind tunnel tests

Do not mix and match between codes for pressure and load factors !

Page 50: Crane Loads & Wharf Structure Design: Putting the Two Together

50 of 77

Corner Reactions – Angled Wind

Do not use spreadsheet !

Use frame analysis program

Frame stiffness is significant to reactions

Page 51: Crane Loads & Wharf Structure Design: Putting the Two Together

51 of 77

Load Combinations

Page 52: Crane Loads & Wharf Structure Design: Putting the Two Together

52 of 77

Load Combinations

Load combinationsOperatingOverloadStorm wind (out-of-service)

Design approaches Generally Allowable Stress Design (ASD)

Page 53: Crane Loads & Wharf Structure Design: Putting the Two Together

53 of 77

Operating Condition Loads

DL: Crane weight*

LL: Rated container load

IMP & LAT: Inertial loads

WLO: Wind load, in service

*Excluding Rated Load

Page 54: Crane Loads & Wharf Structure Design: Putting the Two Together

54 of 77

Out-of-Service & Overload

DL: Crane weight*

WLS: Wind load storm (out-of-service)

Overload Conditions (in and out-of-service)

*Including trolley and lift system

Page 55: Crane Loads & Wharf Structure Design: Putting the Two Together

55 of 77

RecommendationsRequesting crane data

Ask for basic loadsCombine per ACI load factors

Requesting tendersProvide factored load tablesAsk to fill in tablesSpecify allowable factored loads

Page 56: Crane Loads & Wharf Structure Design: Putting the Two Together

56 of 77

Tie-down Loads

Page 57: Crane Loads & Wharf Structure Design: Putting the Two Together

57 of 77

Tie-Down Failures

Page 58: Crane Loads & Wharf Structure Design: Putting the Two Together

58 of 77

Crane Tie-downs

Page 59: Crane Loads & Wharf Structure Design: Putting the Two Together

59 of 77

Wind Load & Crane Reactions

FD

wind

Fstow pin

F tie-down

Fgantry

AB

Page 60: Crane Loads & Wharf Structure Design: Putting the Two Together

60 of 77

Error in Calculated Tie-down Force

MomentRightingMomentgOverturnin

BD

hFwind ==

2

γ

( ) ( )1

11

21

211

,

,

−−+

=

⎥⎦⎤

⎢⎣⎡ −

⎥⎦⎤

⎢⎣⎡ −+

γeBDhF

A

BDhFeA

FF

Wind

Wind

CalculatedTiedown

ActualTiedown

Ratio of moments:

Error in calculated tie-down force:if “e” = error in wind force,

DFwind

Fstow pin

Ftie-down

Fgantry

AB

Page 61: Crane Loads & Wharf Structure Design: Putting the Two Together

61 of 77

Error in Tie-down ForceTi

edow

n Fo

rce

Rat

io(A

ctua

l/Cal

cula

ted)

, Overturning Moment / Righting Momentγ

0

1

2

3

4

5

1 2 3

20% error in V

10% error in V

5% error in V

No error in V

Page 62: Crane Loads & Wharf Structure Design: Putting the Two Together

62 of 77

Example:

Error in calculated tie-down force = 74% !

Tied

own

Forc

e R

atio

(Act

ual/C

alcu

late

d)

, Overturning Moment / Righting Momentγ

0

1

2

3

4

5

1 2 3

20% error in V

10% error in V

5% error in V

No error in V

Error in wind speed = 10%; γ = 1.4Error in wind pressure = 21%

Page 63: Crane Loads & Wharf Structure Design: Putting the Two Together

63 of 77

Stability Load Factors

1.3*0.90.9

ACIFactorLoad

1.21.2Wind Load, 50-year MRI

1.01.0TL + LS1.01.0Dead Load

FEMBSI

* 1.6 with ASCE 7-02 “directionality factor”

Page 64: Crane Loads & Wharf Structure Design: Putting the Two Together

64 of 77

Uplift: Factored vs. Service

FactoredService

x 1.3 =

x 0.9 =

Load Factor

“Uplift”“No Uplift”+135-50 Calculated Uplift+585+450Wind Load

-450-500Dead Load

Load

Page 65: Crane Loads & Wharf Structure Design: Putting the Two Together

65 of 77

Recommended Tie-down Strength RequirementsDesign using Factored Load

Turnbuckle B.S. = 1.6* x factored load

Proof test to 100% of factored load

Structural componentsAllowable stress of 0.9 x Fyield

* 2.5 for off-the-shelf turnbuckles.

Page 66: Crane Loads & Wharf Structure Design: Putting the Two Together

66 of 77

Putting the Two Together

Page 67: Crane Loads & Wharf Structure Design: Putting the Two Together

67 of 77

Problem OverviewCrane supplier and wharf designer work with incomplete and inconsistent data

Crane supplier generally uses Service Load approach

Wharf designer generally uses Factored Load approach

Neither knows what basis the other uses

Page 68: Crane Loads & Wharf Structure Design: Putting the Two Together

68 of 77

Solution

Page 69: Crane Loads & Wharf Structure Design: Putting the Two Together

69 of 77

Missing

Link

Crane Purchaser

WharfDesigner

CraneSupplier

Port

Crane purchaser provide or facilitate detailed information

Page 70: Crane Loads & Wharf Structure Design: Putting the Two Together

70 of 77

Obtain From Wharf DesignerAssumed wheel arrangement

Service or factored

Load factors

Load combinations for operating, overload, and out-of-service conditions

Complete wind criteria

Allowable wheel loads, kips/ft** Crane supplier tends to provide kips/wheel

Page 71: Crane Loads & Wharf Structure Design: Putting the Two Together

71 of 77

Example Combination Table: Service Wheel LoadsMode Operating Stowed

WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.0 1.0 1.0 1.0 1.0 Trolley Load TL 1.0 1.0 1.0 1.0 1.0 Lift System LS 1.0 1.0 1.0 1.0 Lifted Load LL 1.0 1.0 1.0 Impact IMP 0.5 Gantry Lateral LATG 1.0 Op. Wind Load WLO 1.0 1.0 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.0 Earthquake Load EQ

50 x S 70 x S Allowable Wheel Loads (tons/wheel)

LS WS 65 x S 90 x S

S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable LS Operating = 50 t/m * 1.5 m = 75 t/wheel

Page 72: Crane Loads & Wharf Structure Design: Putting the Two Together

72 of 77

Example Combination Table: Factored Wheel LoadsMode Operating Stowed

WOP1 WOP2 WOP3 WOP4 WS1 Dead Load DL 1.2 1.2 1.0 1.0 1.2 Trolley Load TL 1.2 1.2 1.0 1.0 1.2 Lift System LS 1.2 1.2 1.0 1.2 Lifted Load LL 1.6 1.6 1.0 Impact IMP 0.8 Gantry Lateral LATG 0.8 Stall Torque Load STL 1.0 Collision Load COLL 1.0 Storm Wind Load WLS 1.6 Earthquake Load EQ

60 x S 80 x S Allowable Wheel Loads (tons/wheel)

LS WS 75 x S 100 x S

S = Average spacing, in meters, between the wheels at each corner.Example: S = 1.5 m, Allowable WS Storm = 100 t/m * 1.5 m = 150 t/wheel

Page 73: Crane Loads & Wharf Structure Design: Putting the Two Together

73 of 77

Ask Crane Supplier ForWheel arrangement

Wheel loads for individual loads

Combined wheel loads for operating, overload, and out-of-service conditions

Complete wind criteria used and basis for shape factors

Individual and corner factored loads for tie-downs including direction of loading

Page 74: Crane Loads & Wharf Structure Design: Putting the Two Together

74 of 77

Example Design Basic Load Table Wharf Designer needs from Crane

Supplier

Page 75: Crane Loads & Wharf Structure Design: Putting the Two Together

75 of 77

Recap

Obtain detailed crane and wharf design dataStick to one crane design codeStick to one wharf design codeUse consistent design basis

Facilitate communication

Page 76: Crane Loads & Wharf Structure Design: Putting the Two Together

76 of 77

Q & A

Page 77: Crane Loads & Wharf Structure Design: Putting the Two Together

77 of 77

Arun Bhimani, S.E.PresidentLiftech Consultants Inc.www.liftech.net

Thank you

Erik Soderberg, S.E.PrincipalLiftech Consultants Inc.

This presentation will be available for download on Liftech’s website:

www.liftech.net

Crane Loads & Wharf Structure Design:Putting the Two Together

Page 78: Crane Loads & Wharf Structure Design: Putting the Two Together

78 of 77

Quality Assurance Review:

Principal: Arun Bhimani

Editor: Erik Soderberg

Author: Arun Bhimani

Liftech Consultants Inc. file data:N:\Papers & Presentations\!Working\AAPA 2006 \Crane_Loads_and_Wharf_Design_AAPA..ppt

Copyright 2006 by Liftech Consultants Inc. All rights reserved.The information included in this presentation may not be altered, copied, or used without written authorization from Liftech Consultants Inc. Anyone making use of the information assumes all liability arising from such use.

Page 79: Crane Loads & Wharf Structure Design: Putting the Two Together

79 of 77

Liftech Consultants Inc. Presentation Source Documentation:

Source documents will be stored in: Presentation\Waiting to Archive\AAPA 2006\Crane_Loads

FYI - Much content originally came from the TOC 2005 Europe presentation.