CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE AMOUNT DUR (C.D.) STARTED COMP Granby Trading And Construction 27554 L Balai Bantayan 1 Brgy. Kabac, Bantayan, Cebu 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. New Corella, Davao del Norte 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Km.1822+821, Apokon Sect. Tagum City, Davao del Norte 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - "R.R. Seismundo Construction & Supply" / Davao Concrete Products Joint Venture JV-12-116 L A MA GE2 Const. of Flood Control Structure (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan Monkayo, COMVAL Province 11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - "R.R. Seismundo Construction & Supply" / Double J Construction And Supply Joint Venture JV-16-948 L A MA GE Rechanneling and Construction of Dike in Kingking River, Mosahamat Section ( Left Side) Pantukan 2nd LD, Compostela Valley Province 3/20/18 1st/Final Compostela Valley DEO LF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory (Cavdeal) Cavite Ideal International Construction And Development Corp. 5599 L AAA Procurement of Fully Developed Lots and Complete Housing Units Basey Pointe, Brgy. Tingib, Basey, Samar 01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.29 84.13% Satisfactory (Cavdeal) Cavite Ideal International Construction And Development Corp. 5599 L AAA Basey Pointe 2 Brgy. Tingib, Basey, Samar 2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 - 0405 Construction & Supply 34735 L B SB GE Repair/Rehab. of Drainage Canal along Sorsogon-Bacon- Manito Road, Bibincahan, Sorsogon City Bibincahan, Sorsogon City 5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30 *83.3% Satisfactory 0405 Construction & Supply 34735 L D SB GE Construction of Flood Mitigation Structures (Baybay Dagat Dike) Sitio Bacolod along Bito River, San Fernando, Masbate San Fernando, Masbate 6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - 0405 Construction & Supply 34735 L B SB GE Construction / Repair / Rehabilitation of Multi-Purpose Building (Municipal Hall), Monreal, Masbate Monreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 - 11-16 Construction 29646 L AAA MA GE Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac Bamban, Tarlac 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90 *92.9% Very Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 L D SB GE Improvement/Concreting with Drainage System along Ballesteros Street Brgy. Zaniga, Mandaluyong City 11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% 84.30% Satisfactory 128 Dragon Construction And Supplies 35408 L B SB GE Construction of Flood Control Structure, Brgy. Kanluran, San Vicente, Camarines Norte, 2nd Legislative District Brgy. Kanluran, San Vicente, Camarines Norte, 2nd Legislative District 3/14/2016 1st Camarines Norte DEO LF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60% 89.6% Very Satisfactory 2M Construction & Enterprises 33331 L C SB GE2 Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., Matarling Sect. at K15+190-K15+249 Basilan Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - 2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II at Lubigan Vitali District Zamboanga City 3/7/2016 1st Zamboanga City DEO LF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50% 87.5% Satisfactory 2M Construction & Enterprises 33331 L B MA GE Road Widening Including Drainage along Ipil-Magdaup Wharf Road (S01143MN) (K2014+800 - K2015+297) Ipil, Zamboanga Sibugay 3/13/18 2nd/Final Zamboanga Sibugay 2nd DEO LF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory 2-R Construction & Supply 15304 L B MA GE Concreting of Barangay Camanggaan - Calapugan, FMR, Brgy. Camanggaan-Calapugan Natividad, Pangasinan 3/19/18 1st/Final Pangasinan 3rd DEO LF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory 2-R Construction & Supply 15304 L C SB GE Raising of Grade of Dike Agno River Basin Flood Control Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan Asingan, Pangasinan 11/16/2015 1st PANGASINAN 3RD DEO LF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% 91.1% Very Satisfactory 2-R Construction & Supply 15304 L C SB GE Off Carriageway Improvement at Lingayen Capitol Loop, K0364+(-219) to K0364+836, Lingayen, Pangasinan K0364+(-219) to K0364+836, Lingayen, Pangasinan 9/2/2016 Final Pangasinan 2nd DEO LF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60% *87.36% Satisfactory 301 Engineers 38364 L B - GE Indv. Project - Rehab./Reconst. of National Roads w/ Slips, Slope Collapse and Landslide along Iriga City-Masoli Road Iriga City, KO 479+700-KO 479+923 11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70 *92.7% Very Satisfactory 301 Engineers 38364 L B SB GB Construction of School Building, Brgy. Caranan, Pasacao, Camarines Sur Brgy. Caranan, Pasacao, Camarines Sur 8/25/2016 1st & Final Camarines Sur 1st DEO LF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300 93% Very Satisfactory 3C'Sl Construction And Supply 36393 L D SB GB Construction of One Storey Two Classroom (Toilet Attached) Tolosa CES, Cabadbaran City, Agusan del Norte Cabadbaran City, Agusan del Norte 3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40% 87.4% Satisfactory 3Diamonds Construction Corporation 35457 L B SB GE Rehabilitation of San Francisco River Control (San Francisco- Maguiron Section) Guinobatan, Albay 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40 *93.4% Very Satisfactory 3G A Construction & Supply 35033 L D SB GE Construction of Flood Control along Cabugao River, Brgy. Turod - Patac Cabugao, Ilocos Sur 3/16/18 1st/Final Ilocos Sur 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory 3K Rock Engineering 27908 L A MB GE Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan San Pascual, Tuba, Benguet-LU Road, K0273+707 - K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613, K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba, Benguet Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.8830 86.32% Satisfactory NAME OF CONSTRUCTOR LICENSE NO. L/F CATEGORY PROJECT PROJECT LOCATION DATE OF EVALUATION NO. of VISIT *IMPL. AGENCY FUNDING SOURCE CONTRACT DATE SLIPPAG E (%) STATUS WMS FINAL RATING/ QUALITATIVE DESCRIPTION QUALITATIVE DESCRIPTION MTL TIME FAC ESH RDR CPES VISIT RATING *1st/Final * For DPWH, only the region and PMO office are listed 29th Release Page 1 of 33

Transcript of CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports...

Page 1: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

Granby Trading And Construction 27554 L Balai Bantayan 1Brgy. Kabac,

Bantayan, Cebu6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory

"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

New Cortez-San Jose Carcor Panas Rd.Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -

"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

New Cortez-San Jose Carcor Panas Rd.

New Corella, Davao

del Norte3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -

"R.R. Seismundo Construction & Supply" 10961 L A MA GE1Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-

Km.1822+821, Apokon Sect.

Tagum City, Davao

del Norte3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -

"R.R. Seismundo Construction & Supply" /

Davao Concrete Products Joint VentureJV-12-116 L A MA GE2

Const. of Flood Control Structure (Sheet Piles & Grouted

Riprap) Agusan River, Brgy. Inambatan

Monkayo, COMVAL

Province11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -

"R.R. Seismundo Construction & Supply" /

Double J Construction And Supply Joint

Venture

JV-16-948 L A MA GERechanneling and Construction of Dike in Kingking River,

Mosahamat Section ( Left Side)

Pantukan 2nd LD,

Compostela Valley

Province

3/20/18 1st/FinalCompostela Valley

DEOLF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory

(Cavdeal) Cavite Ideal International

Construction And Development Corp.5599 L AAA

Procurement of Fully Developed Lots and Complete Housing

Units

Basey Pointe, Brgy.

Tingib, Basey,

Samar

01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.2984.13%

Satisfactory

(Cavdeal) Cavite Ideal International

Construction And Development Corp.5599 L AAA Basey Pointe 2

Brgy. Tingib, Basey,

Samar2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 -

0405 Construction & Supply 34735 L B SB GERepair/Rehab. of Drainage Canal along Sorsogon-Bacon-

Manito Road, Bibincahan, Sorsogon City

Bibincahan,

Sorsogon City5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30

*83.3%

Satisfactory

0405 Construction & Supply 34735 L D SB GE

Construction of Flood Mitigation Structures (Baybay Dagat

Dike) Sitio Bacolod along Bito River, San Fernando, MasbateSan Fernando,

Masbate6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% -

0405 Construction & Supply 34735 L B SB GEConstruction / Repair / Rehabilitation of Multi-Purpose

Building (Municipal Hall), Monreal, MasbateMonreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 -

11-16 Construction 29646 L AAA MA GE

Construction/ Maintenance of Flood Mitigation Structures

and Drainage Systems-Rehabilitation/ Improvement of

Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta.

0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta.

0+129, Bamban, Tarlac

Bamban, Tarlac 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90*92.9%

Very Satisfactory

121 Construction Corporation (Formerly: 121

Construction)21686 L D SB GE

Improvement/Concreting with Drainage System along

Ballesteros Street

Brgy. Zaniga,

Mandaluyong City11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%

84.30%

Satisfactory

128 Dragon Construction And Supplies 35408 L B SB GEConstruction of Flood Control Structure, Brgy. Kanluran, San

Vicente, Camarines Norte, 2nd Legislative District

Brgy. Kanluran, San

Vicente, Camarines

Norte, 2nd

Legislative District

3/14/2016 1stCamarines Norte

DEOLF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60%

89.6%

Very Satisfactory

2M Construction & Enterprises 33331 L C SB GE2Slope Protection (Grouted Riprap) along Isabela-Maluso Rd.,

Matarling Sect. at K15+190-K15+249Basilan Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -

2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II

at Lubigan Vitali

District Zamboanga

City

3/7/2016 1stZamboanga City

DEOLF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50%

87.5%

Satisfactory

2M Construction & Enterprises 33331 L B MA GERoad Widening Including Drainage along Ipil-Magdaup Wharf

Road (S01143MN) (K2014+800 - K2015+297)

Ipil, Zamboanga

Sibugay3/13/18 2nd/Final

Zamboanga

Sibugay 2nd DEOLF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory

2-R Construction & Supply 15304 L B MA GEConcreting of Barangay Camanggaan - Calapugan, FMR,

Brgy. Camanggaan-Calapugan

Natividad,

Pangasinan 3/19/18 1st/Final

Pangasinan 3rd

DEOLF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory

2-R Construction & Supply 15304 L C SB GE

Raising of Grade of Dike Agno River Basin Flood Control

Project (Phase III), Brgy. Cabalitian, Asingan, PangasinanAsingan,

Pangasinan11/16/2015 1st

PANGASINAN 3RD

DEOLF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10%

91.1%

Very Satisfactory

2-R Construction & Supply 15304 L C SB GEOff Carriageway Improvement at Lingayen Capitol Loop,

K0364+(-219) to K0364+836, Lingayen, Pangasinan

K0364+(-219) to

K0364+836,

Lingayen,

Pangasinan

9/2/2016 FinalPangasinan 2nd

DEOLF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60%

*87.36%

Satisfactory

301 Engineers 38364 L B - GE

Indv. Project - Rehab./Reconst. of National Roads w/ Slips,

Slope Collapse and Landslide along Iriga City-Masoli Road

Iriga City, KO

479+700-KO

479+923

11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70*92.7%

Very Satisfactory

301 Engineers 38364 L B SB GB

Construction of School Building, Brgy. Caranan, Pasacao,

Camarines Sur

Brgy. Caranan,

Pasacao,

Camarines Sur

8/25/2016 1st & FinalCamarines Sur 1st

DEOLF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300

93%

Very Satisfactory

3C'Sl Construction And Supply 36393 L D SB GBConstruction of One Storey Two Classroom (Toilet Attached)

Tolosa CES, Cabadbaran City, Agusan del Norte

Cabadbaran City,

Agusan del Norte3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40%

87.4%

Satisfactory

3Diamonds Construction Corporation 35457 L B SB GE

Rehabilitation of San Francisco River Control (San Francisco-

Maguiron Section) Guinobatan, Albay 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40*93.4%

Very Satisfactory

3G A Construction & Supply 35033 L D SB GEConstruction of Flood Control along Cabugao River, Brgy.

Turod - Patac

Cabugao, Ilocos

Sur 3/16/18 1st/Final Ilocos Sur 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory

3K Rock Engineering 27908 L A MB GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan

San Pascual, Tuba, Benguet-LU Road, K0273+707 -

K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613,

K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba,

Benguet

Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.883086.32%

Satisfactory

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 1 of 33

Page 2: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

3K Rock Engineering 27908 L A MB GE

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads including drainage based on Pavement

Management System/Highway-4 Kennon KO 238 + 880-KO 239

+ 048, KO237 + 123- KO238 + 000, KO228 + 791-KO229+000,

KO228+080-KO228+440, Tuba, Benguet

Tuba, Benguet 11/16/2016 1st Regional Office LF 46.620 282 2/19/2016 11/26/2016 -0.03 O 0.331 0.289 0.121 0.03 0.055 0.033 0.8590 -

3K Rock Engineering 27908 L A MB GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis) Asin (Km 8) - Nangalisan

San Pascual, Tuba, Benguet, K0273+707 to K0273+728;

K0273+790 to K0274+127; K0275+531 to K0275+631;

K0275+629 to K0275+1014; K0275+1050 to K0275+1240, Tuba,

Benguet

Tuba, Benguet 3/29/2017 1st & Final Benguet 1st DEO LF 33.303 195 2/17/2016 8/29/2016 0.00 C 0.437 0.132 0.300 - - - 86.90*86.9%

Satisfactory

3K Rock Engineering 27908 L A MB GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) (Intermittent Sections) of

Kabugao - Pudtol - Luna - Cagayan Bdry. Road, K0611+917 to

K0612+961, K0612+973 to K0613+699, K0613+723 to

K0614+500, Apayao

Apayao 8/27/2015 1st CAR LF 75.709 221 5/26/15 1/1/16 -16.41% O 0.363 0.241 0 0.03 0.061 0.033 72.80% -

3K Rock Engineering 27908 L A MB GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis) Asin Km. 8 - Naglisan - San

Pascual, Tuba, Benguet-La Union Road, K0273+707 to

K0273+728, K0273+790 to K0274+

Tuba, Benguet 8/23/2016 1stBENGUET 1ST

DEOLF 33.303 195 2/16/16 8/28/16 0.01 O 0.339 0.24 0.15 0.02 0.051 0.05 0.8500 -

3K Rock Engineering/Rvc Construction (J.V.) 27908 L B MA GE

Road Upgrading (Gravel to Concrete) of Asin -Nanganban -

San Pascual Road K0270+594 - K0272+220 ; K0275+5311 -

K0275+7178

8/16/2014 1st CAR LF 91.358 237 3/28/14 11/19/14 7.20 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -

3-L Construction 16745 L B MA GEConcreting of Barangay Road, Barangay Salvacion, Del

Gallego, Camarines Sur

Del Gallego,

Camarines Sur8/16/2017 1st

Camarines Sur 5th

DEOLF 1.410 40 5/25/2017 7/3/2017 0.02 O 0.496 0.133 0.300 - - - 92.90 -

3-L Construction 16745 L D SB GE

Construction/Improvement of Roads and Concreting of

Roads, Brgy. Alianza, San Fernando, Camarines Sur

Brgy. Alianza, San

Fernando,

Camarines Sur

6/8/2016 1st & FinalCamarines Sur 1st

DEOLF 1.844 45 3/7/16 4/20/16 0.00 C 0.475 0.149 0.3 0 0 0 92.40%

92.4%

Very Satisfactory

3-L Construction 16745 L B MA GEConcreting of Mataoroc (Zone 3- Zone 5 FMR) Barangay

Mataoroc

Minalabac,

Camarines Sur4/6/2018 1st/Final

Camarines Sur 1st

DEOLF 4.723 90 9/29/2017 1/26/2017 0.00 C 0.490 0.146 0.300 - - - 94.50 *94.50% Very Satisfactory

3N Construction & Supply 37872 L D SB GBCluster 5-Local Infrastructure Program-Repair/Rehab. of Multi-

Purpose Building, Barangay Sweetland, Buenavista, Bohol

Barangay

Sweetland,

Buenavista, Bohol

3/10/2016 1st Bohol 2nd DEO LF 0.7682 75 10/12/15 12/26/15 (+)1.33% C 0.467 0.133 0.3 0 0 0 90.00%90%

Very Satisfactory

3Rb Construction And Supply 19541 L B MA GE

Cluster 6 - Network Development - Improvement/Widening of

National Roads - Secondary Road along DM- Jct.-Legazpi-Sto.

Domingo-Tabaco-Cam. Sur Bdry. Roads, Malinao, Albay and

along Ligao-Tabaco Roads, Buang, Tabaco City, Albay 1st LD

Malinao, Albay and

along Ligao-

Tabaco Roads,

Buang, Tabaco City,

Albay 1st LD

6/8/2017 1st Albay 1st DEO LF 92.711 190 3/6/2017 9/11/2017 0.02 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 -

3Rb Construction And Supply 19541 L B MA GE

Cluster 6- Network Development - Improvement/ Widening of

National Roads - Secondary Roads along DM- Junction -

Legazpi - Sto. Domingo- Tabaco - Camarines Sur Bdry Roads,

Malinao, Albay and along Ligao- Tabaco Roads, Buang ,

Tabaco City, Malinao and Tabaco City

Malinao and

Tabaco City8/24/2017 1st Albay 1st DEO LF 92.771 190 3/6/2017 9/11/2017 (+) 4.37% O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -

3Rb Construction And Supply 19541 L B MA GE

Construction/ Maintenance of Flood Mitigation Structures and

Drainage Systems - Construction of Revetment along Pooc

Creek, Barangay Balibago and Barangay Macabling, Sta. Rosa

City, Laguna

Sta. Rosa City,

Laguna3/19/2017 1st & Final Laguna 2nd LF 19.002 140 1/28/2016 6/15/2016 0.00 C 0.344 0.200 0.300 - - - 84.40

*84.4%

Satisfactory

3Rb Construction And Supply 19541 L B MA GE

Extension of River Control, Sta. 0+112.50 - Sta. 0+232.50,

Bongabong, Tabaco City, AlbaySta. 0+112.50 - Sta.

0+232.50,

Bongabong,

Tabaco City, Albay

3/13/2017 1st & Final Albay 1st DEO LF 16.705 128 3/21/2016 7/26/2016 0.00 C 0.485 0.141 0.300 - - - 92.60*92.6%

Very Satisfactory

3Rb Construction And Supply 19541 L B MA GE

Widening of National Roads Outside N1 DM Jct-Legazpi-Sto.

Domingo-Tabaco-Camarines Sur Bdry. K0552+532-

K0553+660, K0554+600-K0555+400, Malilipot, Albay and

Tabaco City

Malilipot, Albay and

Tabaco City3/7/2016 1st Albay 1st DEO LF 43.1972 147 3/25/15 8/18/15 - C 0.448 0.196 0.3 0 0 0 94.40%

94.4%

Very Satisfactory

3Rb Construction And Supply 19541 L B MA GE-5 Prieto Diaz Port Development ProjectPrieto Diaz,

Sorsogon8/19/2015 1st DOTC LF 8.512 124 05/01/15 09/01/15 1.12 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -

3Rb Construction And Supply 19541 L B MA GECluster 9-Construction/Rehabilitation/Improvement of River

Control Section, Estancia, Estancia, Malinao, Albay

Estancia, Malinao,

Albay3/7/2016 1st Albay 1st DEO LF 3.9755 218 6/22/15 1/25/16 - C 0.48 0.133 0.3 0 0 0 91.30%

91.3%

Very Satisfactory

3Rb Construction And Supply 19541 L B MA GE

Cluster 9-Construction/Rehabilitation/Improvement of River

Control, San Antonio and San Vicente, Tabaco City and Diaro

and Estancia, Malinao,, Albay

San Antonio and

San Vicente,

Tabaco City and

Diaro and Estancia,

Malinao,, Albay

6/11/2016 1st & Final Albay 1st DEO LF 29.927 218 6/22/15 1/25/16 0.00 C 0.485 0.133 0.3 0 0 0 91.80%91.8%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 2 of 33

Page 3: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

3R'S Builders And Resources 35922 L D SB GB Construction of Multi-Purpose BuildingMuseum, Tudela,

Misamis Occidental3/16/2016 1st

MISAMIS

OCCIDENTAL 2ND

DEO

LF 1.937 120 4/13/15 8/11/15 0 C 0.458 0.133 0.3 0 0 0 89.10%89.1%

Very Satisfactory

4 A'S Construction 9446 L B SB GBConstruction of 2STY 4CL School Building at Andabuen

National High School Benito Soliven, Isabela

Benito Soliven,

Isabela3/18/2017 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 -0.20 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 -

4 A'S Construction 9446 L B SB GB

Construction of Two (2) Storey Four (4) Classroom School

Building at Andabuen National High School Benito Soliven,

Isabela

Benito Soliven,

Isabela11/19/2016 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 0.02 O 0.389 0.2 0.15 0.02 0.052 0.05 0.8610 -

4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,

Pampanga2/5/2015 2nd BCDA L 18.951 120 09/03/14 12/31/14 21.45 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -

4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,

Pampanga11/20/2014 1st BCDA L 18.951 120 09/03/14 12/31/14 0.00 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -

4B Construction Corporation L2014 heavy maintenance works along SCTEX lot 2 - Bridge

revetment, slope and drainage repair works

Bataan and

Pampanga/Region

3

10/31/2014 1st BCDA L 12.430 90 08/03/14 11/01/14 0.00 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -

525 Construction 28532 L B MA GE

Repair/ Maintenance of Flood Control Structure along

Balagtas River, San Juan Section, Balagtas, Bulacan Balagtas, Bulacan 5/31/2017 1st & Final Bulacan 1st DEO LF 18.325 150 10/5/2016 3/3/2017 0.00 C 0.469 0.133 0.300 - - - 90.20*90.2%

Very Satisfactory

525 Construction 28532 L B MA GEConstruction of Flood Control Structure along Balagtas at

Dalig, Balagtas, BulacanBalagtas, Bulacan 8/25/2017 1st & Final Bulacan 1st LF 4.628 90 4/25/2017 7/23/2017 0.33 C 0.367 0.200 0.300 - - - 86.70

*86.7%

Satisfactory

525 Construction 28532 L B MA GERehabilitation of Roads Brgy. Igulot - Brgy. Binang - Brgy.

TuroBocaue, Bulacan 9/19/2016 1st Bulacan 1st DEO LF 34.143 210 4/3/16 10/29/16 0.00 O 0.312 0.3 0.15 0.03 0.042 0.05 0.8840 -

525 Construction 28532 L B MA GE

Valenzuela-Obando-Meycauayan Flood Control Project-

Meycauayan, Construction of River wall Protection,

Meycauayan-Valenzuela Boundary Phase I, RS , (Sta. 3+475.40-

Sta. 3+567.00), Right Side, Meycauayan, Bulacan

(Sta. 3+475.40-Sta.

3+567.00), Right

Side, Meycauayan,

Bulacan

3/8/2016 1stBulacan Second

DEOLF 24.1599 201 8/24/15 3/11/16 0.31% C 0.398 0.207 0.15 0.03 0.06 0.05 89.50%

89.5%

Very Satisfactory

525 Construction 28532 L A MB GE

Valenzuela-Obando-Meycauayan Flood Control Project -

Meycauayan - Construction of Riverwall Protection,

Meycauayan-Valenzuela Boundary Phase I, RS (Sta. 3+475.40 -

Sta. 3+567.00), Right Side

Meycauayan,

Bulacan6/7/2016 2nd & Final Bulacan 2nd LF 24.159 201 8/24/15 3/11/16 0.00 C 0.491 0.102 0.3 0 0 0 89.30%

89.42%

Very Satisfactory

525 Construction 28532 L B MA GE

Construction of Flood Control Structure along Angat River,

Pulilan, Bulacan Pulilan, Bulacan 11/17/17 1st & Final DPWH LF 10.880 150 6/8/17 11/4/17 6.21 C 0.472 0.133 0.300 - - - 90.50*90.5%

Very Satisfactory

5'S Construction & Supply 32404 L D SB GB

Local Infrastructure Program - Improvement of Multi-Purpose

Building (Public Market) Iloilo 4th Legislative District , Brgy.

Poblacion, Banate Iloilo

Banate, Iloilo 3/9/2016 1st Iloilo 2nd DEO LF 1.969 259 7/16/15 3/31/16 (+) 6.91% C 0.457 0.133 0.3 0 0 0 89.00%89%

Satisfactory

5'S Construction & Supply 32404 L D SB GBImprovement of Multi-Purpose Building/ Barangay Hall,

Barangay Punong Lapuz, Iloilo CityIloilo City 3/23/18 1st/Final Iloilo City DEO LF 1.914 118 6/13/17 10/8/17 0.20 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory

6 Jewels Construction 34737 L C SB GE

MFO 1 - National Road Network Services, Network

Development Off-Carriageway Improvement including

Drainage, Secondary Roads Batangas Quezon Road, K0134+(-

664) - K0134+(-414), K0134+100 - K0134+407, Batangas City,

Batangas

Batangas City,

Batangas8/25/2017 1st & Final

Batangas 2nd

DEOLF 5.287 45 2/9/2017 3/25/2017 0.17 C 0.483 0.133 0.300 - - - 91.60

*91.6%

Very Satisfactory

6 Jewels Construction 34737 L D SB GE

Local Infrastructure Program - Construction/ Improvement of

Draiange FacilititesBrgy. Calicanto,

Batangas City9/21/2016 1st & Final Batangas 2nd LF 1.880 56 3/27/16 5/21/16 0.00 C 0.479 0.133 0.3 0 0 0 0.9120

91.2%

Very Satisfactory

626 Construction & Trading, Inc. 34990 L D SB GERehabilitation & Improvement of Bustos Dam and Picnic

GroundsBustos, Bulacan 9/27/18 2nd TIEZA LF 7.500 90 10/19/16 9/9/18 -2.07 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going

626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Hot and Cold Spring ResortBalungao,

Pangasinan10/9/2015 2nd TIEZA LF 12.000 240 01/21/15 09/19/15 -4.710 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -

626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Balungao Hot and Cold Spring ResortBalungao,

Pangasinan5/27/2015 1st TIEZA LF 11.800 180 01/21/15 07/19/15 -17.71 O 0.397 0.299 0 0.030 0.045 0.017 78.74

722 Construction, Inc.(Formerly: 722

Construction)21923 L A MA GE

Repair/Rehabilitation/Improvement along Baliuag-Candaba

Road K0054+000 to K0057+000Baliuag, Bulacan 11/24/2014 1st III LF 12.104 72 9/27/14 12/7/14 0.69% O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%

78.50%

Unsatisfactory

739 Builders 31174 L B MA GB

Provision of Techvoc Workshop Buildings/Laboratories for

Senior High School, Narvacan NCHS Narvacan, Ilocos

Sur6/4/2017 1st & Final

Ilocos Sur 2nd

District Engineering

Office

LF 2.307 85 12/1/2016 2/23/2017 -0.02 C 0.484 0.199 0.240 - - - 92.30*92.3%

Very Satisfactory

739 Builders 31174 L B MA GEConstruction of Drainage Canal, Vigan-Sta. Catalina Road,

K0407+405-K0408+288Vigan, Ilocos Sur 8/17/2017 1st & Final Ilocos Sur 1st DEO LF 11.177 120 3/10/2017 7/7/2017 -0.02 C 0.488 0.172 0.228 - - - 88.80

*88.8%

Satisfactory

739 Builders 31174 L B MA GB

Provision of Techvoc Workshop Building/Laboratories for

Senior High School, Narvacan National High School,

Narvacan, Ilocos Sur

Narvacan, Ilocos

Sur3/18/2017 1st

Ilocos Sur 2nd

DEOLF 2.306 115 12/1/2016 3/25/2017 -0.10 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 -

739 Builders / Arthit Corporation31174 /

40667L MA SB

Upgrading and Improvement of Sta. Lucia - Nagrebcan -

Ronda Road

Sta. Lucia, Ilocos

Sur / Region 110/9/2018 1st

Provincial

Government of

Ilocos Sur

LF 44.784 211 9/20/2018 4/26/2018 0.63 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going

811 Trading & Construction 21215 L A MA GBConstruction of Two (2) Storey, Four Classroom Building for

Punong NHS, Sta. Cruz, MarinduqueSta. Cruz, Marinduq 8/25/2017 1st & Final Marinduque DEO LF 7.115 262 6/1/2016 2/17/2017 - C 0.473 0.200 0.154 - - - 82.70

*82.7%

Satisfactory

811 Trading & Construction 21215 L A MA GB

Construction of 2 Storey/ 8 Classrooms at Doroteo S.

Mendoza SR Memorial National High School, Naujan, Oriental

Mindoro

Naujan, Oriental

Mindoro8/17/2017 1st & Final

Mindoro Oriental

DEOLF 10.769 210 8/22/2016 3/19/2017 - C 0.488 0.200 0.000 - - - 68.80

*68.8%

Poor

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 3 of 33

Page 4: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

811 Trading & Construction 21215 L A MA GB

Construction of 2 Storey/8 Classrooms at Doroteo S.

Mendoza, Sr., Memorial National High School, Naujan, Oriental

Mindoro

Naujan, Oriental

Mindoro11/17/2016 1st

Mindoro Oriental

DEOLF 10.821 150 8/22/2016 1/18/2017 -0.04 O 0.349 0.3 0.109 0.03 0.058 0.033 0.8790 -

811 Trading & Construction/ Great Lakes

Enterprises, Joint VentureJV-15-1249 L A B GE

Construction of Wawa Seawall, Calapan City, Oriental Mindoro Calapan City,

Oriental Mindoro8/26/2016 2nd

Mindoro Oriental

DEOLF 18.576 181 3/9/16 9/5/16 0.15 O 0.382 0.2 0.3 0 0 0 0.8820 -

876 Construction 24224 L D B GEPaving of Shoulder with Drainage and Slope Protection,

Calapan North Road (CNR)

San Teodoro,

Oriental Mindoro8/26/2016 2nd

Mindoro Oriental

DEOLF 1.293 75 1/27/16 4/10/16 0.00 O 0.455 0.158 0.3 0 0 0 0.9130 -

888 Acy Enterprises 32898 L B MA GE

Cluster-Road Widening along Daang Maharlika (S00223LT),

K1024+443-K1024+699, K1024+721-K1025+607 Southern Leyte 11/6/17 1st DPWH LF 33.567 240 3/19/17 11/13/17 -3.75 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 -

888 Acy Enterprises 32898 L B MA GE

Off-Carriageway Improvement Along Jct. Taft-Oras-San

Policarpio-Arteche Road (S00167SM) K0939+500-K0940+744;

K0942+280-K0943+344, K0943+432-K0944+1087, Eastern

Samar

K0939+500-

K0940+744;

K0942+280-

K0943+344,

K0943+432-

K0944+1087,

Eastern Samar

8/15/2017 1stEastern Samar

DEOLF 39.857 210 3/8/2017 10/3/2017 (+)0.37% O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 -

888 Acy Enterprises 32898 L B MA GE

Rehab./Major Repair of Permanent Bridges, Canlawis Bridge

along Lilo-an-San Ricardo Road (B00368LT), Pintuyan,

Southern Leyte

- 3/30/2017 1st & FinalSouthern Leyte

DEOLF 19.585 247 1/27/2016 9/29/2016 0.00 C 0.412 0.133 0.300 - - - 84.50

*84.5%

Satisfactory

888 Acy Enterprises 32898 L B MA GE

Rehab./Major Repair of Permanent Lo-oc Bridge along Bdry.

So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika

(B00330LT), Lo-oc, Tomas Oppus, Southern Leyte

Lo-oc, Tomas

Oppus, Southern

Leyte

11/14/2016 1st & FinalSouthern Leyte

DEOLF 9.699 170 1/27/2016 7/14/2016 0.00 C 0.442 0.133 0.3 0 0 0 0.8750

87.5%

Satisfactory

888 Acy Enterprises 32898 L B MA GE

Rehab./Major Repair of Permanent Dinahugan Bridge along

Bdry. So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika

(B003011LT)

Padre Burgos,

Southern Leyte6/26/2016 1st

Southern Leyte

DEOLF 19.148 202 1/27/16 8/15/16 0.00 O 0.367 0.24 0.15 0.03 0.056 0.05 89.30% -

888 Acy Enterprises 32898 L A MA GE

Rehab/Major Repair of Permanent Bridges, Pandan Bridge,

Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang

Maharlika

Along Brdy, S. leyte-

Maasin-Macrohon-

Sogod-Daang

Maharlika

6/3/2015 1stSouthern Leyte

DEOLF 8.812 150 3/4/15 7/31/15 - O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -

888 Acy Enterprises 32898 L B MA GE

Off-Carriageway Improvement along Taft - Oras - San

Policarpio - Arteche Road, K0939+500 - K0940+744,

K0942+280 - K0943+344, K0943+432 - K0944+490, K0944+672 -

K0944+1087

Eastern Samar 4/10/18 2nd/FinalEastern Samar

DEOLF 39.857 210 3/8/17 10/3/17 0.00% C 0.481 0.186 0.3 - - - 96.70 91.48% Very Satisfactory

888 Acy Enterprises 32898L B MA GE

Road Widening along Daang Maharlika, K1024+443-

K1024+699.00; K1024+721-K1025+607.000Southern Leyte 04/09/18

1st/Final

Southern Leyte

DEOLF 33.567 240 42,813 43,052 0 C 0.482 0.133 0.300 - - - 91.50 *91.50% Very Satisfactory

8G Construction And General Services 35783 L B SB GB

Construction of 4 STY, 8-CL at Amlan NHSAmlan 2nd District,

Negros Oriental11/18/2016 1st & Final

Negros Oriental

2nd DEOLF 14.868 230 10/26/2015 6/11/2016 0.00 C 0.491 0.133 0.3 0 0 0 0.9240

92.4%

Very Satisfactory

8G Construction And General Services 35783 L B SB GE

Rehabilitation/Improvement of Farm to Market Road at

Jandalamanon, Kilaban, Gomentoc and Candanaay,

Ayungon, Negros Oriental

Ayungon, Negros

Oriental3/11/2016 1st

Negros Oriental

First DEOLF 3.7437 50 6/26/15 8/14/15 0 C 0.435 0.133 0.3 0 0 0 86.80%

86.8%

Satisfactory

8G Construction And General Services 35783 L B SB GB

Rehabilitation of Multi-Purpose Building, Barangay

Manalungon,

Sta. Catalina,

Negros Oriental 3rd

LD

8/24/2016 1st & FinalNegros Oriental

3rd DEOLF 1.940 180 2/2/16 7/30/16 0.00 C 0.436 0.133 0.3 0 0 0 0.8690

86.9%

Satisfactory

8R'S Construction 22997 L B A GE

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Rd. including Drainage (Marinduque Circumferencial

Road), K0004+000-K0004+600, K0005+300-K0005+486, and

K0005+670-K0005+832, Boac-Mogpog, Marinduque

Boac-Mogpog,

Marinduque8/27/2016 1st Marinduque DEO LF 26.202 257 2/22/16 11/4/16 0.02 O 0.347 0.259 0.15 0.03 0.025 0.033 0.8440 -

969 Construction & Supplies 35818 L D or C SB GBBarangay San Roque, Delfin Albano, Isabela Delfin Albano,

Isabela6/2/2017 1st & Final Isabela 1st DEO LF 1.410 91 2/14/2017 5/15/2017 0.00 C 0.442 0.138 0.300 - - - 88.00

*88%

Satisfactory

A B Aponesto Construction, Parts & Supply 22998 L A MA GE

Repair/Rehab of Agusan River Flood Control, Osmena

Section, Compostela along Montevista – Compostela – New

Bataan – Maragusan – Mati Bdry. Road.

Compostela Valley 8/9/2014 1st XI LF 30.533 183 12/27/13 7/27/14 -2.74 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -

A De Guia Construction 18228 L AA MA GEConstruction of River Bank Protection, Siffu Flood Control

Project, Sittio Gabit Section, Roxas, IsabelaRoxas, Isabela 8/28/2015 1st Isabela 2nd DEO LF 18.346 215 2/24/15 9/26/15 0.32% O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% -

A J Taylan Construction & Development/Jlp

Construction & Supply Joint VentureJV-14-518 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Roads including Drainage Based on Pavement

Management System/Highway Development and Management-

4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-K0454+1013,

K0455+884-K0456+433, Pinili Road, Ilocos Norte

Pinili-Nueva Era

Road, K0453+(-

224)-K0454+1013,

K0455+884-

K0456+433, Pinili

Road, Ilocos Norte

8/26/2015 1stIlocos Sur 2nd

DEOLF 37.519 219 4/29/15 12/4/15 (+)2.27 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% -

A. B. Taylan Construction & Development /

North Tech Builders And Construction Supply

Joint Venture

JV-14-115 L AAA - GE

MFO-1 National Road Network Services: Network

Development: Widening of National Roads (Arterial)-along N1,

Bangag-Magapit Road, K0686+(-512) - K0687+980, Bangag-

Magapit, Allacapan, Cagayan

Allacapan,

Cagayan6/1/2017 1st & Final

Regional Office No.

IILF 74.138 294 2/15/2016 12/4/2016 0.00 C 0.452 0.134 0.300 - - - 88.60

*88.6%

Satisfactory

A. C. Rivero Development Corporation 5122 L A MB GEReplacement/ Raising of PHHC Bridge (S00130NR) along

Bacolod Circumferential Road, Bacolod CityBacolod City 11/16/17 1st DPWH LF 19.600 255 4/26/17 1/5/18 0.34 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 4 of 33

Page 5: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A. C. Soliven Construction * General

Merchandise19278 L B MA GE

Rehabilitation/ Improvement of Existing Dike along Lucung

River, Upstream of Sta. Maria Section, Left Side, Sta. (-)2+050

to Sta. (-)2+132 and Sta. (-)2+200 to Sta. (-)2+619.60,

Concepcion, Tarlac

Concepcion, Tarlac 8/20/2017 1st & Final Tarlac 2nd DEO LF 37.231 147 2/16/2017 7/12/2017 0.00 C 0.421 0.133 0.300 - - - 85.40*85.4%

Satisfactory

A. D. Pendon Construction & Supply, Inc.

(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE

Asset Preservation of National Roads Preventive Maintenance

- Asset Preservation of National Roads -

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Roads Including Drainage, Odiong - Sibalom - San

Remigio - Leon Road, San Remigio, Antiq

San Remigio,

Antique6/9/2016 1st ANTIQUE DEO LF 29.476 223 8/14/15 3/23/16 0.00 O 0.23 0.291 0.121 0.008 0.022 0 67.20% -

A. D. Pendon Construction & Supply, Inc.

(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved

National Roads including Drainage, Iloilo-Capiz Road (Pavia

Diversion), K0010+449 to K0010+824.30, IloiloIloilo 11/16/2016 1st ILOILO 4TH DEO LF 7.258 170 6/30/2016 12/16/2016 0.04 O 0.341 0.24 0.15 0.03 0.05 0.05 0.8610 -

A. D. Pendon Construction & Supply, Inc.

(Formerly: A. D. P. Construction & Supply) 3466 L A MB GE

Upgrading of Delgado St. K0001+(-402)-K0001+(-100), K0001+(-

100)-K0001+080, Iloilo CityIloilo City 9/1/2016 1st ILOILO DEO LF 22.611 22.611 3/26/00 4/16/00 0.00 O 0.275 0.3 0.05 0.03 0.058 0 0.7130 -

A. De Guia Construction 18228 L AA MA GEConstruction/ Rehabilitation of Flood Control Projects,

Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+224

Nagassican,

Santiago City8/12/2014 1st II LF 19.500 184 4/3/14 10/3/14 13.19 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -

A. De Guia Construction 18228 L AA MA GE

Construction of Drainage System / Protection Works along

Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350, San

Luis - Caquilingan

Cordon, Isabela 10/27/2014 1st II LF 19.403 231 3/26/14 11/11/14 0.96% O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%

Satisfactory

A. DE GUIA CONSTRUCTION 18228 L AA MB GE

Concreting of San Pablo-Salvacion Road, Barangay San Pablo

Alicia, IsabelaBarangay San

Pablo Alicia, Isabela11/11/17 1st & Final DPWH LF 6.930 122 2/28/17 6/29/17 0.00 C 0.470 0.133 0.300 - - - 90.30

*90.3%

Very Satisfactory

A. DE GUIA CONSTRUCTION 18228 L AA MB GE

Network Development - Improvement/ Widening of National

Roads Primary Roads - Other Primary Roads along National

Roads along Santiago - Tuguegarao Road, K0369+000 -

K0371+000, K0373+000 - K0374+000, K0374+947 - K0376+000,

Aurora and San Miguel, Isabela

Aurora and San

Miguel, Isabela8/19/2017 1st Isabela 2nd DEO LF 91.157 251 2/27/2017 11/4/2017 0.02 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 -

A. DE GUIA CONSTRUCTION 18228 L AA MB GE

MFO 1 - National Road Network Services: Network

Development: Improvement/Widening of National Roads,

Primary Roads along N1 Daang Maharlika (LZ) - K0382+977-

K0383+450 L/S, K0383+830-K0386+182 L/S, K0386+291-

K0387+215 L/S, K0382+977-K0383+450 R/S, K0383+83

K0382+977-

K0383+450 L/S,

K0383+830-

K0386+182 L/S,

K0386+291-

K0387+215 L/S,

K0382+977-

K0383+450 R/S,

K0383+830-

K0385+006 R/S,

K0385+220-

K0386+014 R/S,

K0386+102-

K0386+193 R/S,

K0386+375-

K0387+215 R/S

6/15/2016 1st Regional Office LF 79.349 248 2/4/16 10/8/16 0.02 O 0.393 0.24 0.15 0.03 0.047 0.05 91.00% -

A. DE GUIA CONSTRUCTION 18228 L AA MB GE

Network Development-Improvement/Widening of National

Roads-Primary Roads-Other Primary Roads along National

Roads along Santiago-Tuguegarao Road, K0369+000-

K0371+000, K0373+000-K0374+000 & K0374+947-K0376+000

Aurora and San

Manuel, Isabela04/09/18

2nd/Final

Isabela 2nd DEO LF 91.157 281 42,793 43,073 0 C 0.363 0.200 0.300 - - - 86.30 91.40% Very Satisfactory

A. DE GUIA CONSTRUCTION 18228 L AA MA GE

Network Development, Improvement/Widening of National

Roads, Santiago-Tuguegarao Road, K0342+(-039)-

K0343+884, Oscar, Ramon

Isabela-Sinamar

Sur, San Mateo,

Isabela

3/20/18 1st/Final Isabela 3rd DEO LF 45.847 179 4/4/17 9/29/17 0.00% C 0.461 0.176 0.300 - - - 93.70 *93.70% Very Satisfactory

A. Dela Cruz Builders Inc. 38836 L D SB GBConstruction of Multi-Purpose Building at Dona Aurora

Elementary School, Brgy. Doña Aurora, Quezon CityQuezon City 3/17/18 1st/Final

Quezon City 2nd

DEOLF 14.724 250 7/14/17 3/20/18 0.06 C 0.490 0.132 0.300 - - - 92.20 *92.20% Very Satisfactory

A. J. Lava Builders Corp. (Formerly: A. J. Lava

Builders)22265 L B MA GE

Flood Management Services Construction/Maintenance of

Flood Mitigation Structures and Drainage System

Improvement/Riprapping of Sitio Kapatagan River

(Downstream), Brgy. San Jose, Antipolo City, 2nd LD

Brgy. San Jose,

Antipolo City11/11/2015 1st RIZAL 1ST DEO LF 27.612 180 6/10/15 12/6/15 0.0018 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00%

92%

Very Satisfactory

A. J. Taylan Construction Corporation 2336 L B MA GEConstruction of Apatot Bridge and Approaches, Pinili, Ilocos

NortePinili, Ilocos Norte 11/15/2016 1st & Final

Ilocos Norte 2nd

DEOLF 27.042 270 3/23/2013 12/17/2013 0.05 C 0.35 0.3 0.101 0.03 0.055 0.033 0.8690

86.9%

Satisfactory

A. J. Taylan Construction Corporation 2336 L B MA GE

Laoag River Basin Flood and Sabo Project, Concrete

Revetment along Bongo River, Brgy. Sta Monica, Sitio 2, San

Nicolas, Ilocos Norte

Brgy. Sta Monica,

Sitio 2, San Nicolas,

Ilocos Norte

3/9/2016 2ndILOCOS NORTE

2ND DEOLF 9.649 194 8/12/15 2/22/16 0 C 0.42 0.2 0.3 0 0 0 91.10%

91.1%

Very Satisfactory

A. M. Oreta and Co., Incorporated 108 L AAA LB Region 2-PIDP-CBIMO Sta. Ana, Cagayan 9/19/2015 1st NIA LF 80.788 690 04/01/14 10/09/15 -1.58 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -

A. M. P. Construction 16574 L B MA GEConstruction of Flood Control Wall along Agbalili River,

Altavas, AklanAltavas, Aklan 8/28/2016 1st AKLAN DEO LF 34.428 34.428 12/14/00 1/16/01 0.00 O 0.388 0.3 0.003 0.03 0.058 0 0.7790 -

A. M. P. Construction 16574 L B MA GEConstruction of Flood Control Revetment Wall along Agbalili

River, Altavas, AklanAltavas, Aklan 6/11/2016 2nd AKLAN DEO LF 34.428 274 9/29/15 6/28/16 0.00 O 0.385 0.3 0.104 0.023 0.055 0.033 90.00% -

A. M. P. Construction/ Forthright Construction

Joint VentureJV-16-1612 L A MA GE

Construction/ Maintenance of Flood Mitigation Structures and

Drainage System, Rehabilitation/ Improvement of Pampanga

River Control, Brgy. Sapang Buho, Palayan City, Nueva EcijaPalayan City, Nueva

Ecija8/23/2017 1st

Nueva Ecija 2nd

DEOLF 39.200 161 5/10/2017 10/17/2017 0.02 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 5 of 33

Page 6: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A. P. B. Construction 17055 L B MA GE

Network Development/ Widening of National Roads-

Secondary Road-Abra-Ilocos Norte Road K0409+000-

K0409+100, K0409+115-K409+178, K0409+307-K0409+404,

K0409+531-K0409+648, K0409+748-K0410+139, K0410+159-

K0410+360, K0410+369-K0410+777, K0411+050-K0411+220,

K0412+122-K0412+499, K0413+000-K0414+354, K0414+764-

K0415+747, K0416+175-K0416+445, K041

Abra 11/20/2015 1st Regional Office LF 81.971 286 6/25/15 4/5/16 2.15% O 0.318 0.29 0.15 0.022 0.045 0.033 85.80%85.8%

Satisfactory

A. P. Consebido Construction And Trading 33616 L D SB GB

Construction of Barangay Hall/Evacuation Center, Brgy.

Salvacion, Roxas, PalawanBrgy. Salvacion,

Roxas, Palawan11/23/2016 1st & Final Palawan First DEO LF 1.982 100 3/7/2016 6/14/2016 0.10 C 0.481 0.179 0.3 0 0 0 0.9600

96%

Very Satisfactory

A. P. Consebido Construction And Trading 33616 L D SB GEConstruction of Barangay Road, Barangay Dumarao, Sta.

00+012.70-Sta. 0+149.00, Roxas, Palawan

Sta. 00+012.70-Sta.

0+149.00, Roxas,

Palawan

3/10/2016 1st Palawan First DEO LF 1.9478 100 7/20/15 10/27/15 -1.00% C 0.429 0.2 0.27 0 0 0 89.90%89.9%

Very Satisfactory

A. P. D. Construction 17467 L A MB GE

Retrofitting/Strengthening of Disiluad Br. (B01939LZ) along

Cordon-Aurora Boundary Road (Isabela Boundary - Jct.

Dumabato)

Disiluad, Aglipay,

Quirino3/17/2016 1st Quirino LF 29.4724 180 7/12/15 1/7/16 62.00% C 0.486 0.133 0.3 0 0 0 91.90%

91.9%

Very Satisfactory

A. R. Lustre Jr. Construction 7680 L AAA LA GBConstruction of Multi-Purpose Building, Barangay Sta.

Monica, Inagawan Sub. And San Miguel, Puerto Princesa City

Barangay Sta.

Monica, Inagawan

Sub. And San

Miguel, Puerto

Princesa City

3/11/2016 1st Palawan 3rd DEO LF 1.9142 156 2/7/15 7/12/15 - C 0.483 0.177 0.3 0 0 0 96.00%96%

Very Satisfactory

A. Sandoval Construction & Supply 35991 L B SB GB

Local Infrastructure Program - Construction of 2 Storey, 4

Classroom School Building, Luyos NHS, Brgy. Luyos,

Tanauan City, Batangas 3rd LD

Brgy. Luyos,

Tanauan City,

Batangas 3rd LD

6/30/2016 1st & Final Batangas 3rd LF 8.464 180 6/30/15 12/26/15 0.00 C 0.461 0.133 0.3 0 0 0 89.40%89.4%

Very Satisfactory

A. Y. U. Engineering And Construction 25632 L B MA GERoad Concreting, Bato to Likate Road, Brgy. Bato and Kilate,

Toril, Davao CityToril, Davao City 9/2/2016 2nd & Final

Davao City 2nd

DEOLF 9.800 105 4/14/16 7/27/16 0.00 C 0.483 0.133 0.3 0 0 0 0.9160

88.3%

Satisfactory

A.B Taylan Construction & Development 25273 L A MB GE

Netwrork Development, Improvement of National Roads along

Manila North Road, K0508+050-K0508+125; K0508+140-

K0508+250; K0508+329; K0508+410-K0509+755; K0509+760-

K0510+501; K0519+000-K0520+200; K0521+000-K0522+500;

K0522+500-K0523+060

Pasuguin, Ilocos

Norte11/8/17 1st & Final DPWH LF 144.750 255 2/24/17 11/5/17 0.00 C 0.473 0.133 0.300 - - - 90.60

*90.6%

Very Satisfactory

A.B. Opeña Builders 33996 L D SB GB

Construction of Multi-Purpose Building, Brgy. North Centro,

Sipocot, Camarines Sur

Brgy. North Centro,

Sipocot, Camarines

Sur

6/6/2016 1st & FinalCamarines Sur 1st

DEOLF 1.881 120 3/10/15 7/7/15 0.00 C 0.484 0.147 0.3 0 0 0 93.10%

93.1%

Very Satisfactory

A.B. Opeña Builders 33996 L D SB GB

Construction of Multi-Purpose Building at Colacling National

High SchoolLupi, Camarines

Sur11/15/17 1st & Final DPWH LF 0.955 60 7/27/17 9/24/17 3.33 C 0.488 0.133 0.300 - - - 92.10

*92.1%

Very Satisfactory

A.B. Opeña Builders 33996 L D SB GE

Concreting of Barangay Road at Brgy. Mabini, Del Gallego,

Camarines Sur

Brgy. Mabini, Del

Gallego, Camarines

Sur

6/1/2017 1st & FinalCamarines Sur 5th

DEOLF 1.410 40 2/23/2017 4/3/2017 0.00 C 0.443 0.134 0.300 - - - 87.70

*87.7%

Satisfactory

A.B. Opeña Builders 33996 L D SB GEConcreting of Barangay Road, Barangay Sta. Cruz, Cabusao,

Camarine Sur

Cabusao,

Camarine Sur8/16/2017 1st

Camarines Sur 5th

DEOLF 1.881 45 5/25/2017 7/8/2017 0.02 O 0.489 0.134 0.300 - - - 92.30 -

A.B. Opeña Builders 33996 L D SB GB

Cluster: Completion/Construction of Multi-Purpose Building at

Brgy. Ragay, Camarines SurBrgy. Ragay,

Camarines Sur11/24/2016 1st & Final

Camarines 5th

DEOLF 2.883 90 6/22/2016 9/19/2016 0.03 C 0.466 0.133 0.3 0 0 0 0.8990

89.9%

Very Satisfactory

A.B. Taylan Construction & Development 28233 L A MB GE

Improvement/Widening of National Road along N1, Manila

North Roads, K0494+396-K0495+024; K0496+164-K0496+423;

K0496+775-K0497+444; K0497+834-K0498+000; K0499+200-

K0500+676; K0500+676-K0500+698; K0500+676-K0500+756;

K0503+380-K0506+084; K0503+380-K0506+048, Bacarra,

Ilocos Norte

K0494+396-

K0495+024;

K0496+164-

K0496+423;

K0496+775-

K0497+444;

K0497+834-

K0498+000;

K0499+200-

K0500+676;

K0500+676-

K0500+698;

K0500+676-

K0500+756;

K0503+380-

K0506+084;

K0503+380-

K0506+048,

Bacarra, Ilocos

Norte

11/16/2016 1stRegional Office No.

ILF 146.250 325 1/27/2016 12/16/2016 0.04 O 0.49 0.133 0.3 0 0 0 0.9230 -

A.B. Taylan Construction & Development/

Badoc Builders & Supply Joint VentureJV-16-621 L B MA GE

Construction of Final Mitigation Structure along Badoc River,

U/S and D/S of Badoc Bridge Badoc, Ilocos Norte 8/16/2017 2nd & FinalIlocos Norte 2nd

DEOLF 44.100 225 2/24/2017 10/6/2017 0.12 C 0.457 0.200 0.300 - - - 95.70

*92.4%

Very Satisfactory

A.B. Taylan Construction & Development/

Badoc Builders & Supply Joint VentureJV-15-404 L AAA MB GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4) along Batac-Pinili via Maipalig Road

(S04765LZ)

K0481+643-

K0482+046;

K0482+186-

K0485+624

8/17/2017 1st & FinalRegional Office No.

ILF 146.249 300 1/26/2016 11/20/2016 0.00 C 0.491 0.145 0.292 - - - 92.80

*92.8%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 6 of 33

Page 7: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.C Rivero Development Corporation 5122 L A MA GEUpgrading of Drainage System Along El Dorado Street,

Barangay Bosco, District II

Parañaque City,

Manila11/21/17 1st DPWH LF 14.035 261 3/20/17 12/5/17 -7.06 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 -

A.C Rivero Development Corporation 5122 L A MB GE

Rehabilitation/Reconstruction of Proposed Slope Protection

along Sta. Felomina-Bonbonon-Digkilaan-Rogongon Road

K1526+000-K1526+200 R/S

Iligan City, Lanao

del Norte Lone

District

11/14/17 1st & Final DPWH LF 33.582 193 3/9/17 9/17/17 10.35 C 0.448 0.175 0.300 - - - 92.30*92.3%

Very Satisfactory

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Agno River Basin & Allied Rivers Flood Control Project -

Heightening of Villasis-Alacala Earth Dike Phase I, Agno River

Control

Brgy. Gualsic,

Alcala, Pangasinan11/14/17 1st & Final DPWH LF 44.687 220 3/13/17 10/18/17 0.00 C 0.438 0.133 0.300 - - - 87.10

*87.1%

Satisfactory

A.C. Mojares Construction, Inc. 1771 L AAA MA GEConcreting and Sidewalk Improvement of Phase 2, Scout

Tobias St., Brgy. Laging Handa, Quezon CityQuezon City 6/3/2014 1st

Quezon City 2nd

DEOLF 10.018 207 2/20/15 9/14/15 (+) 41.00 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE

Rehabilitation/ Reconstruction of National Roads with Slips,

Slope Collapse and Landslide along Tomas Oppus StreetK1135+300 to

K1136+000,

Maasin City,

Southern Leyte

6/3/2017 1st & FinalSouthern Leyte

DEOLF 27.915 260 2/5/2016 10/21/2016 0.00 C 0.499 0.133 0.300 - - - 93.20

*93.2%

Very Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GB

CY 2016 Basic Education Facilities Fund (BEFF), Provision of

Tech Voc. Laboratores, Batch 12, Merida Vocation School,

Merida, Leyte

- 4/1/2017 1st & Final Leyte 4th Deo LF 2.556 90 9/14/2016 12/12/2016 (+)7.78% C 0.462 0.133 0.300 - - - 89.50*89.5%

Very Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Indv. Project - Concreting of Monte-Calvario-Igbac-Barangay

Road, Brgy. Monte-Calvario and Igbac Buhi, Camarines 11/16/17 1st & Final DPWH LF 9.860 83 4/26/17 7/17/17 0.00 C 0.484 0.132 0.300 - - - 91.60*91.6%

Very Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Off-Carriageway Improvement including Drainage along

Liloan-San Ricardo Road (S00218LT), K1070+685 to

K1072+000

Southern Leyte 11/6/17 1st DPWH LF 45.307 270 3/19/17 12/13/17 10.00 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Replacement of PHHC Bridge along Bacolod Circumferential

RoadBacolod City 6/6/2017 2nd Bacolod City LF 34.299 330 3/4/2016 1/27/2017 -0.12 O 0.373 0.200 0.029 0.03 0.058 0.033 72.33 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Replacement of PHHC Bridge along Bacolod Circumferential

Road, Bacolod CityBacolod City 8/23/2017 2nd & Final Bacolod City LF 34.299 330 3/4/2016 1/27/2017 - C 0.490 0.134 0.000 - - - 62.40

*68.34%

Poor

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB C

MFO-1: National Road Network Services Off-Carriageway

Improvement including Drainage-Secondary Roads Flaring of

Intersection along Carrmen-Patag-Bulua Road K1440+(-272)

and K1441+370

Cagayan de Oro

City03/16/18 1st/Final

Cagayan de Oro

City 1st DEOLF 9.221 195 02/20/17 09/02/17 -0.06 C 0.477 0.200 0.120 - - - 79.70 *79.70% Unsatisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB C

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) along Sta. Felomina-

Bonbonon-Digkilaan-Rogongon Road K1535+891-K1536+457

Iligan City 3/22/18 1st/FinalLanao del Norte

2nd DEOLF 33.269 202 3/9/17 9/26/17 0.08% C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Construction and Maintenance of Bridges along National

Roads (Replacement of Weak Bridge) at Olingan Bridge

Olingan, Dipolog

City3/15/2017 1st & Final

Zamboanga del

Norte 1st DEOLF 21.622 355 5/29/2015 5/17/2016 -0.05 C 0.459 0.199 0.152 - - - 81.00

*81%

Unsatisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE1

Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,

K0913+721.75-K0917+915.72, w/ exceptionsBasey, Samar 8/7/2012 1st VIII LF 47.065 200 04/27/12 11/12/12 23.72 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE1

Const./Completion of Subang Daku Bridge, Subang Daku

River, San Miguel

Sogod, Southern

Leyte8/17/2012 1st VIII LF 42.820 220 02/20/12 09/26/12 0.24 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE1

Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika

Rd (Km1207+000 - Km1209+454.40)

Sogod, Southern

Leyte8/19/2012 1st VIII LF 35.731 220 02/20/12 09/26/12 0.24 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE

Const./Completion of Maasin Flood Control along Tomas

Oppus Street (Road ID S00222LT)

Maasin City,

Southern Leyte6/26/2016 1st

Southern Leyte

DEOLF 25.281 180 2/5/16 8/2/16 0.00 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)1 L A MA GE

Construction of River Control, Brgy. Calico-an, Borongan City,

Eastern Samar

Borongan City,

Eastern Samar8/30/2016 1st & Final

Eastern Samar

DEOLF 9.794 95 2/10/16 5/14/16 0.00 C 0.415 0.133 0.3 0 0 0 0.8480

84.8%

Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Construction and Maintenance of Bridges along National

Roads (Widening of Permanent Bridges to more than 2 lanes)

Miputak Bridge along Dipolog-Oroquieta Road

Zamboanga Del

Norte11/21/2016 1st & Final

Zamboanga del

Norte 1st DEOLF 22.247 295 5/29/2015 3/18/2016 0.00 C 0.436 0.2 0.3 0 0 0 0.9360

93.6%

Very Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Widening of Permanent Bridges from 1 Lane to 2 Lanes

Malatgao Bridge (B00168PW) along Quezon, Punta, Baja Rd.,

Quezon, Palawan

Quezon, Palawan 11/22/2016 1stPalawan Second

DEOLF 18.408 220 6/26/2016 1/31/2017 0.12 O 0.388 0.176 0.15 0.03 0.04 0.05 0.8340 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Completion of Dodiongan Bridge along Sta. Felomina-

Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,

Iligan City K01526+058-K01526+118, K01526+910-K01526+297

Brgy. Bonbonon,

Iligan City

K01526+058-

K01526+118,

K01526+910-

K01526+297y

9/3/2015 1stLanao del Norte

2nd DEOLF 37.105 236 2/18/15 10/11/15 1.32% O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Off-Carriageway Improvement along Jct. Taft - Oras - San

Policarpio-Arteche Road, K0950+000 - K0955+000

K0950+000 -

K0955+0006/29/2015 1st

Eastern Samar

DEOLF 33.355 150 3/17/15 8/13/15 - O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Replacement of Permanent Weak Bridge, Ramon Magsaysay

Bridge (B00469MN) Along Jct. Switch-Jct. Monte Alegre Road Ramon Magsaysay,

Zamboanga del Sur8/30/2016 2nd & Final

Zamboanga del

Sur 1st DEOLF 29.101 290 5/11/15 2/24/16 0.00 C 0.467 0.133 0.3 0 0 0 0.9000

88.074%

Satisfactory

A.C. RIVERO DEVELOPMENT CORPORATION

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Replacement of Permanent Weak Bridge, Ramon Magsaysay

Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road

Ramon Magsaysay,

Zamboanga del Sur8/29/2015 1st

Zamboanga del

Sur 1stLF 29.101 230 5/11/15 12/26/15 (+)19.46 O 0.288 0.2989 0.15 0.03 0.051 0.05 86.79% -

A.C. RIVERO DEVELOPMENT CORPORATION

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Construction and Maintenance of Bridges along National

Roads - (Widening of Permanent Bridges to more than 2

lanes), Miputak Bridge (BO1192MN) along Dipolog-Oroquieta

National Road

Zamboanga del

Norte6/11/2016 1st

Zamboanga del

Norte 1st DEOLF 22.574 250 5/29/15 2/2/16 0.00 O 0.388 0.24 0.12 0.03 0.04 0.033 85.10% -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 7 of 33

Page 8: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Construction and Maintenance of Bridges along National

Roads (Replacement of Permanent Weak Bridge), Olingan

Bridge (B01193MN)

Dipolog-Oroquieta

National Road8/25/2016 2nd

Zamboanga del

Norte 1st DEOLF 21.559 340 5/29/15 5/2/16 0.00 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 -

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MB GE

Construction and Maintenance of Bridges along National Rd.

(Replacement of Permanent Weak Bridge) at Olingan Bridge

along Dipolog-Oroquieta National Road, Olingan, Dipolog City,

Zamboanga del Norte

Olingan, Dipolog

City, Zamboanga

del Norte

11/16/2015 1stZamboanga Del

Norte 1st DEOLF 21.218 220 5/29/15 1/3/16 0.16% O 0.371 0.22 0.15 0.022 0.042 0.05 85.50%

85.5%

Satisfactory

A.C. Rivero Development Corporation

(Formerly: A.C. Rivero Construction)5122 L A MA GE

Construction/ Maintenance of Flood Control Mitigation

Structure and Drainage, Construction of Sibugay Flood

Control Brgy. Poblacion, Albuera, Leyte

Brgy. Poblacion,

Albuera, Leyte8/22/2017 1st & Final Leyte 4th DEO LF 9.299 90 2/15/2017 5/15/2017 - C 0.403 0.200 0.300 - - - 90.30

*90.3%

Very Satisfactory

A.C. Rivero Development Corporation / Jqd

Construction And General Services Joint

Venture

JV-15-513 L A MB GE

Const./Impv't./Concreting of Access Road Leading to

Napantao Dive Site (Napantao Road), San Franciso, Southern

Leyte

San Franciso,

Southern Leyte11/15/2016 1st & Final

Southern Leyte

DEOLF 37.270 220 3/20/2016 10/25/2016 0.00 C 0.424 0.154 0.3 0 0 0 0.8780

87.8%

Satisfactory

A.C. Rivero Development Corporation / Jqd

Construction And General Services Joint

Venture

JV-14-1038 L A MB GE

Rehabilitation/Major Repair of Permanent Weak Bridges,

Otikon Bridge Along Daang Maharlika (B00598LT), Libagon,

Southern Leyte

Libagon, Southern

Leyte11/16/2015 1st

Southern Leyte

DEOLF 31.056 195 6/24/15 1/4/16

(+)22.63

%O 0.249 0.3 0.15 0.03 0.06 0.05 83.90%

83.9%

Satisfactory

A.C. Rivero Development Corporation / Jqd

Construction And General Services Joint

Venture

0 L A MB GERehabilitation/Major Repair of Permanent Weak Bridge, Otikon

Bridge along Daang Maharlika, Libagon, Southern Leyte

Libagon, Southern

Leyte3/7/2016 2nd Southern Leyte LF 31.056 195 6/24/15 1/4/16 0 C 0.45 0.194 0.3 0 0 0 88.10%

88.1%

Satisfactory

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Flood Management Services: Construction/ Maintenance of

Flood Mitigation Structures and Drainage System,

Construction of Flood Control Facilities at Paranum Creek,

Sta. 0+000 - Sta. 0+110 and Sta. 0+390 - Sta. 1+170, (L/S), Brgy.

Camias, Magalang, Pampanga

Magalang,

Pampanga6/8/2017 1st

Pampanga 3rd

DEOLF 17.784 150 2/12/2017 7/11/2017 0.10 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 -

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Flood Management Services: Construction/ Maintenance of

Flood Mitigation Structures and Drainage System;

Construction of Flood Facilities at Paranum Creek, Barangay

Camias, Sta. 0+000 to Sta. 0+110, Magalang, Pampanga

Magalang,

Pampanga8/19/2017 2nd & Final

Pampanga 3rd

DEOLF 17.784 150 2/12/2017 7/11/2017 0.00 C 0.392 0.199 0.300 - - - 89.10

*89.04%

Very Satisfactory

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Construction/Maintenance of Flood Mitigation Structure &

Drainage Systems - Agno River Basin Flood Control Project-

Extension/ Construction of Bank Protection of River Course,

Brgy. Mabanogbog, Namcamaliran Pinmaludpod, Urdaneta

City, Pangasinan

Brgy. Mabanogbog,

Namcamaliran

Pinmaludpod,

Urdaneta City,

Pangasinan

11/25/2016 1stPangasinan 3rd

DEOLF 34.299 250 5/26/2016 1/30/2017 0.00 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 -

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Construction/Maintenance of Flood Mitigation Structures &

Drainage Systems - Agno River Basin Flood Control Project -

Extension/Construction of Bank Protection of River Course,

Brgy. Mabanogbog, Nancamairan, Pinmalupod, Urdaneta City,

Pangasinan

Urdaneta City,

Pangasinan3/23/2017 2nd

Pangasinan 3rd

DEOLF 34.299 250 5/26/2016 1/30/2017 -0.09 O 0.400 0.300 0.060 0.03 0.04 - 83.00 -

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Construction of Bank Protection Works, Agnooo River Basin

Flood Control Project (Phase III) Brgy. Bantog, Asingan,

Pangasinan

Asingan,

Pangasinan11/16/2015 1st

PANGASINAN 3RD

DEOLF 18.336 180 8/26/15 2/23/16 0.025 O 0.389 0.24 0.15 0.03 0.055 0.05 91.40%

91.4%

Very Satisfactory

A.C Soliven Construction & General

Merchandise19278 L B MA GE

Construction of Bank Protection, Agno River Basin Flood

Control Project (Phase III), Barangay Bantog, Asingan,

Pangasinan

Barangay Bantog,

Asingan,

Pangasinan

3/18/2016 2ndPANGASINAN 3RD

DEOLF 18.335 180 8/28/15 2/23/16 0.0444 C 0.414 0.197 0.3 0 0 0 91.28%

91.28%

Very Satisfactory

A.C Soliven Construction & General

Merchandise19278 L B SB GE

Construction/Rehabilitation of Drainage along National

Roads, Villasis-Malassiqui-San Carlos Road, K0190+785-

K0192+800 with Exception (B/S), Malasiqui, Pangasinan

Malasiqui,

Pangasinan3/15/2016 1st

PANGASINAN 4TH

DEOLF 34.3 226 3/13/15 10/24/15 0 C 0.362 0.2 0.3 0 0 0 86.20%

86.2%

Satisfactory

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L - MA GE

Construction of Drainage along Mandurriao-Jaro

Road,K0006+100-K0007+082, K0007+082, Mandurriao, Iloilo

City

K0006+100-

K0007+082,

K0007+082,

Mandurriao, Iloilo

City

8/24/2017 1st Iloilo City DEO LF 38.376 191 2/27/2017 9/5/2017 0.00 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 -

A.D.L. Constrak 26442 L B B GE

Concreting of Ipil-Sagana Bridge Approaches "A" and "B" and

Sta. Cruz Road, Brgy. Ipil and Sagan and Sta. Cruz,

Bongabong, Oriental Mindoro

Bongabong,

Oriental Mindoro8/24/2016 1st

Southern Mindoro

DEOLF 3.290 35 3/27/16 4/30/16 0.00 O 0.424 0.164 0.3 0 0 0 0.8880 -

A.D.L. Constrak 26442 L B SB GERehabilitation/Reconstruction of Paclasan Seawall, Roxas,

Oriental Mindoro

Roxas, Oriental

Mindoro3/18/2017 1st

Southern Mindoro

DEOLF 3.627 67 9/19/2016 11/24/2016 0.02 O 0.438 0.200 0.300 - - - 93.80 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MA GE2

Const. of Slope Protection along Jct. Bancal-Leon-Antique

Boundary Rd., K0031+722-K0031+891Leon, Iloilo 3/22/2013 1st VI LF 13.802 188 11/05/12 05/11/13 0.59 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MA GB Construction of Multi-Purpose Building

Poblacion, Pavia,

Iloilo10/28/2014 1st VI LF 4.227 120 6/17/14 10/14/14 -2.91% O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%

82.60%

Satisfactory

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE

Construction/Rehab. Of Drainage System along Balasan-

Carles Road, Brgy. BarosbosCarles, Iloilo 10/29/2014 1st VI LF 43.954 274 4/24/14 1/22/15 6.46% O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%

87.50%

Satisfactory

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE

Road Upgrading (Gravel to Paved) along Davao-Sarangani

Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao

Section

Davao del Sur 8/7/2014 2nd XI LF 40.082 208 3/7/13 9/30/13 0.00 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE1

Rd. Upgrading (Gravel to Paved) along Davao-Sarangani

Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect.Davao del Sur 8/6/2013 1st XI LF 40.082 179 03/07/13 09/01/13 -19.55 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE

Malag-it Box Culvert along Iloilo East Coast-Capiz Road

(Construction of Malag-it Bridge along Iloilo East Coast-Capiz

Road)

Pontevedra, Capiz 10/29/2014 1st VI LF 35.132 240 5/23/14 1/17/15 -37.28% O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%75.40%

Unsatisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 8 of 33

Page 9: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE

Widening of Caradio-an Bridge alog Bacolod South Road,

Barangay Caradio-an

Himamaylan City,

Negros Occidental10/23/2014 1st VI LF 24.804 273 2/16/14 11/15/14 -11.60% O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%

74.10%

Poor

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 6/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466

Rehab./Reconst./Upgrading of Damaged Paved National

Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road,

Capiz (KM.112+750-Km.122+705) with exception

8/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MA GE

Construction of Drainage System along Iloilo East Coast

Capiz Road

K0204+106, Sara,

Iloilo6/9/2015 1st Iloilo Third DEO LF 44.467 252 2/18/15 10/27/15 2.63% O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE Widening of Sara-San Dionisio Road

K0203+(-882) to

K0203+243, Sara,

Iloilo

6/9/2015 1st Iloilo Third DEO LF 26.054 175 2/16/15 8/9/15 29.00% O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% -

A.D. Pendon Construction & Supply, Inc.

(Formerly: Adp Construction & Supply 3466 L A MB GE

Network Development, Widening of National Road, Secondary

Road along Roxas City, Cagay-Sibaguan Balijuangan-Cudian-

Ijisan Road

Chainage 0-200,

Chainage 942-

1182 10-200

(0+304.80)

(K0104+760-

K0105+000),

Pontevedra, Capiz

6/6/2015 1st Capiz First DEO LF 10.341 121 3/12/15 7/10/15 -4.53% O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% -

A.F.G Construction & Construction Supply 17161 L A MA GB

Construction of Standard One (1) Unit - 2 Sty 10-CL School

Building, Eustacio Lopez NHS, Silay City, Negros Occidental - 3/22/2017 2nd & FinalNegros Occidental

1st DEOLF 17.397 235 4/3/2016 11/23/2016 0.00 C 0.476 0.132 0.300 - - - 90.80

*87.23%

Satisfactory

A.F.G Construction & Construction Supply 17161 L A MA GBRepair/Imporvement of Multi Purpose Building, Barangay

Kasambagan Cebu City 4/12/18 1st/Final Cebu City DEO LF 2.908 75 7/20/17 10/2/17 4.00% C 0.499 0.133 0.300 - - - 93.20 *93.20% Very Satisfactory

A.F.G Construction & Construction Supply 17161 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Road including Drainage Based on Pavement

Management System / Highway Development and

Management - 4 (HDM-4) (Intermittent Section) along

Hinigaran - Isabela Road, K0058+263 - K0059+000

Barangay Paticui,

Hinigaran, Negros

Occidental

8/27/2015 1stNegros Occidental

2ndLF 12.674 127 5/6/15 9/9/15 0.25% O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% -

A.F.G Construction & Construction Supply 17161 L A MB GEConcreting of Barangay Road, Brgy. Sta. Teresa, Dumalag,

CapizDumalag, Capiz 11/10/17 1st & Final DPWH LF 9.407 97 2/6/17 5/13/17 0.00 C 0.420 0.135 0.300 - - - 85.50

*85.5%

Satisfactory

A.F.G Construction & Construction Supply 17161 L A MA GE1 Const. of Tangalan-Ibajay Rd. Aklan 3/19/2013 1st VI LF 45.834 179 01/15/13 07/12/13 7.79 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -

A.F.G Construction & Construction Supply 17161 L A MA GE1Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel to

Paved), Km. 129+328-Km. 131+275

San Remigio,

Antique8/15/2013 1st VI LF 40.453 179 02/22/13 08/19/13 15.36 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -

A.F.G Construction & Construction Supply 17161 L A MA GE

Construction of Standard One (1) Unit - 2 Sty 10-CL School

Building at Brgy. Eustaquio Lopez NHS, Silay City, Negros

Occidental

Silay City, Negros

Occidental6/16/2016 1st

Negros Occidental

First DEOLF 17.396 175 4/3/16 9/24/16 0.00 O 0.304 0.3 0.15 0.03 0.023 0.05 85.70% -

A.F.G Construction & Construction Supply 17161 L A MA GB1Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora

Salapantan NHSSan Miguel, Iloilo 8/22/2013 1st VI LF 8.949 150 04/03/13 08/30/13 -4.25 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -

A.F.G Construction & Construction Supply 17161 L A MA GE1 Replacement/Const. of Tubog Bridge, Brgy. Tubog Hamtic, Antique 8/15/2012 1st VI LF 7.587 180 02/29/12 08/26/12 5.13 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -

A.F.G Construction & Construction Supply 17161 L A MA GB

Construction of Multi-Purpose Building at Brgy. Candumarao,

Hinigaran, Negros OccfidentalHinigaran, Negros

Occfidental6/15/2016 1st & Final

Negros Occidental

Second DEOLF 1.965 60 2/2/16 4/1/16 0.00 C 0.497 0.107 0.3 0 0 0 90.40%

90.4%

Very Satisfactory

A.F.G Construction & Construction Supply 17161 L A MA GBConstruction of 2-CL Alimanguan National High School Brgy.

Alimanguan

San Vicente,

Palawan6/5/2015 1st Palawan 1st DEO LF 1.721 120 2/17/15 6/16/15 0.00% O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -

A.F.G Construction & Construction Supply 17161 L A MB GB

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Road Including Drainage Based on Pavement

Management System/Highway Development and Management-

4 (HDM-4) (Intermittent Section) along Hinigaran-Isabela Road,

K0058+263 to K0059+000Barangay

K0058+263 to

K0059+000Barang

ay Paticui,

Hinigaran, Negros

Occidental

3/14/2016 1stNegros Occidental

Second DEOLF 12.6742 157 5/6/15 10/9/15 0 C 0.451 0.133 0.3 0 0 0 88.40%

88.4%

Satisfactory

A.F.G Construction & Construction Supply 17161 L A GE

Preventive Maintenance Based on Pavement Management

System/Highway Development and Management -4 (HDM-4)

Jct Bagonawa-La Castellana-Isabela Road, K0057+244 to

K0072+800

La Castellana and

Isabela03/14/18 1st/Final

Negros Occidental

2nd DEOLF 46.210 221 04/16/17 11/22/17 -0.05 C 0.485 0.134 0.161 - - - 78.00 *78.00% Unsatisfactory

A.F.G. Construction And Construction

Supply/Yurich Builders And Construction

Supplu Joint Venture

JV-15-1239 L A MA GE

Off-Carriageway Improvement including Drainage of Puerto

Princesa North Road, K0090+000-K0090+600, K0091+100-

K0091+350, K0095+200-K0096+246, K0103+600-K0103+961,

K0107+600-K0107+720, Roxas, Palawan

K0090+000-

K0090+600,

K0091+100-

K0091+350,

K0095+200-

K0096+246,

K0103+600-

K0103+961,

K0107+600-

K0107+720, Roxas,

Palawan

3/13/2017 2nd & Final Palawan 1st DEO LF 45.859 280 8/4/2016 5/10/2017 0.00 C 0.380 0.200 0.300 - - - 88.00*89.38%

Very Satisfactory

A.H. Raga Construction 36952 L - SB GE

MFO1-National Road Network Services-Construction and

Maintenance of Bridge along National Roads-

Rehabilitation/Major Repair of Permanent Bridges-Zapote Br.

(BO2887LZ) Manila-Cavite (NCR Bdry-Jct Cavite City Section),

Bacoor City, Cavite

Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 9.593 180 7/17/17 1/12/18 29.00 C 0.500 0.133 0.300 - - - 93.30*93.3%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 9 of 33

Page 10: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.I.P Construction 32458 L A MA GE

Construction/Improvement of Access Roads leading to

Declared Tourism Destinations; Guisset-Binga-Baloy-

Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for

International Sky Running Event

Itogon, Benguet 11/8/17 1st DPWH LF 96.500 386 4/10/17 4/30/18 11.63 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 -

A.I.P Construction 32458 L A MA GE

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Roads including Drainage Based on Pavement

Management System/Highway Development and Management-

4 (HDM-4) (Intermittent Section), Lt. Takay Road, K0308+(-599)

to K0308+000 & K0308+616 to K0308+754, Baguio City

Baguio City 9/4/2015 1st Baguio City DEO LF 13.442 104 6/15/15 9/26/15 2.59% O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -

A.I.P Construction 32458 L A MA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide, Marcos Highway, K0280+(-725)

to K0280+(-640), Baguio City

Baguio City 9/1/2016 1st & Final BAGUIO CITY DEO LF 5.509 84 2/19/16 5/12/16 0.00 C 0.418 0.133 0.3 0 0 0 0.851085.1%

Satisfactory

A.J Taylan Construction Corporation 2336 L A MB GE1Road Opening/Const. of Missing Links of National Road,

Solsona-Kabugao Road, Ilocos Norte Side9/9/2009 1st I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

A.J. Lava Builders Corp. (Formerly: A.J. Lava

Builders)22265 L C SB GE2

Repair & Maint. of Flood Control & Drainage Structures along

Rofriguez-San Jose-Quezon City Rd.Rodriguez, Rizal 11/19/2012 1st IVA LF 2.449 90 09/11/12 12/09/12 29.23 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -

A.J. Lava Builders Corp. (Formerly: A.J. Lava

Builders)22265 L B SB GE

Flood Management Services, Construction/ Maintenance of

Flood Mitigation Structures and Drainage System

Improvement/ Riprapping of Siito Kapatagan River

(Upstream), Brgy. San Jose, Antipolo City, 2nd LD

Brgy. San Jose,

Antipolo City, 2nd

LD

6/21/2016 1st & Final Rizal 1st LF 46.503 240 6/22/15 2/16/16 0.00 C 0.43 0.133 0.3 0 0 0 86.30%86.3%

Satisfactory

A.J. Lava Builders Corp. (Formerly: A.J. Lava

Builders)22265 L B MA GE

MFO2-Flood Management Services, Construction/

Maintenance of Flood Mitigation Structure and Drainage

Systems - Construction/ Maintenance of Flood Mitigation

Structures Drainage Systems - Construction of Flood Control

Structures along Montalban, Rizal

Montalban, Rizal 3/12/18 1st/Final Rizal 2nd DEO LF 28.350 212 2/20/17 9/19/17 0.00% C 0.497 0.133 0.300 - - - 93.00 *93.00% Very Satisfactory

A.J. Lava Builders Corp. (Formerly: A.J. Lava

Builders)22265 L B MA GE

MFO-1 National Road Network Services-Asset Preservation of

National Roads Preventive Maintenance Based on Pavement

Management System/Highway Development and Management-

4 (HDM-4) Cabrera - Antipolo Road, K0026+(-554) to

K0026+000, Taytay, Rizal

Taytay, Rizal 11/21/17 1st & Final DPWH LF 14.260 60 2/20/17 4/20/17 36.46 C 0.410 0.196 0.300 - - - 90.60*90.6%

Very Satisfactory

A.J. Taylan Construction Corp/FR Espiritu Jr.

Builders (JV)JV-14-074 L B MA GE Additional Priority Flood Control Project

San Isidro,

Dumalneg, Ilocos

Norte

10/21/2014 1st I LF 41.179 163 9/11/14 2/20/15 0.36% O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%86.10%

Satisfactory

A.J Taylan Construction Corporation 2336 L B MA GE

Laoag River Basin Flood and Sabo Project, Concrete

Revetment along Bongo River Brgy. Sta. Monica, Sitio 2, San

Nicolas, Ilocos Norte

San Nicolas, Ilocos

Norte11/13/2015 1st

ILOCOS NORTE

2ND DEOLF 9.650 194 8/12/15 2/21/16 0.016 O 0.38 0.24 0.15 0.03 0.055 0.05 90.50%

90.5%

Very Satisfactory

A.J. Taylan Construction Corporation/ J.L.P

Construction And Supply Joint VentureJV-16-1092 L B MA GE

Improvement/Concreting of Sand Dunes Access RoadPaoay, Ilocos Norte 8/16/2017 1st

Ilocos Norte 2nd

DEOLF 39.688 210 2/16/2017 9/13/2017 0.10 O 0.381 0.214 0.150 0.03 0.058 0.05 88.30 -

A.J. Taylan Construction Corporation/ J.Q.C.

Summit Construction And Development

Corporation

JV-15-1238 L B MA GE

Construction/Maintenance of Flood Control Mitigation

Structures and Drainage Systems, Damaged Flood Control

Facilities/Structures under the Laoag River Basin and Flood

Control and Sabo Project (LRBDCSP)-Batac City Flood

Control, Quiaoit River, Eroded Bank Embankment

Laoag, Ilocos Norte 8/16/2017 1st & FinalIlocos Norte 2nd

DEOLF 14.700 396 3/21/2016 4/20/2017 0.02 C 0.466 0.133 0.300 - - - 89.90

*89.9%

Very Satisfactory

A.J. Taylan Construction Corporation/Djcm

Construction Corporation Joint VentureJV-15-412 L B MA GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) along Batac-Pinili via

Maipalig Road, K0485+624 o K0485+978; K0486+023 to

K0486+304; K0+486+389 to K0488+039

Ilocos Norte 8/26/2016 1st & FinalRegional Office No.

ILF 83.728 211 1/27/16 8/24/16 0.07 C 0.489 0.133 0.3 0 0 0 0.9220

92.2%

Very Satisfactory

A.J. Taylan Construction Corporation/ J.Q.C.

Summit Construction And Development

Corporation

JV-15-1238 L B MA GE

Construction/Maintenance of Flood Mitigation Structures and

Drainage System, Damaged Flood Control

Facilities/Structures under the Laoag River Basin Flood

Control and Sabo Project (LRBDCSP) Batac City Flood

Control, Quiaoit River, Eroded Bank Embankment, Ilocos

Norte

Ilocos Norte 3/15/2017 1stIlocos Norte 2nd

DEOLF 14.699 396 3/22/2016 4/21/2017 0.04 O 0.390 0.239 0.150 0.03 0.04 0.033 88.20 -

A.J. Taylan Construction Corporation/Zedik

Builders (JV)JV-13-345 L B MA GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved

Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu)

Road

Ilocos Norte 8/8/2014 1st I LF 28.942 236 2/14/14 10/7/14 27.99 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 -

A.J.Taylan Construction Corp./Jlp Construction

& Supply, Joint Venture JV-16-1092 L B MA GE Improvement/Concreting of Sand Dunes Access Road Paoay, Ilocos Norte 3/15/18 2nd/Final

Ilocos Norte 2nd

DEOLF 39.688 236 2/17/17 2/17/17 2.58% C 0.46 0.12 0.3 - - - 88.00 89.00% Satisfactory

A.L Acharon Construction & Supply 33068 L B SB GE

Off-Carriageway Improvement Paving Shoulders/Construction

along Makar-Kiamba Road K1667+270 to K1667+720 General Santos City 11/15/17 1st & Final DPWH LF 13.150 150 6/4/17 10/31/17 0.00 C 0.473 0.145 0.300 - - - 91.80*91.8%

Very Satisfactory

A.L Acharon Construction & Supply 30872Construction of the Diversion Works and Canal System of

Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

A.L Acharon Construction & Supply 30872 L C SB GE2 Benolho CIS 10/6-10/08 1st NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

A.L Acharon Construction & Supply 33068 L D SB GB

Construction of Classroom in Areas Experiencing Classroom

Shortage - Construction of Two (2) Storey, Two (2) Classroom

School Building, Bawing Elementary School Brgy. Bawing,

General Santos City

Brgy. Bawing,

General Santos City3/18/2016 -

South Cotabato

2ndLF 4.3497 120 3/26/15 7/24/15 (+)0.95% C 0.473 0.116 0.3 0 0 0 88.90%

88.9%

Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 10 of 33

Page 11: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.L Acharon Construction & Supply 33068 L B B GEOff-Carriageway Improvement - Paving of Shoulders/

Construction Along Makar-Kiamba Road

K1667+270 -

K1667+720,

General Santos City

3/22/18 1st/FinalSouth Cotabato

2nd DEOLF 11.019 120 6/4/17 10/1/17 0.00% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory

A.L. Dare Construction 11932 L B MA GE

Rehabilitation/ Improvement of Sepung Ilog, Sta. Lucia, Sta.

Ana By Pass Road, Sta. 0+000 to Sta. 1+227, Sta. Ana,

Pampanga

Sta. Ana,

Pampanga11/27/17 1st & Final DPWH LF 25.187 135 2/16/17 6/30/17 0.00 C 0.493 0.133 0.300 - - - 92.60

*92.6%

Very Satisfactory

A.L. Dare Construction 11932 L B MA GE1Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.

Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+184

Candaba,

Pampanga7/29/2013 1st III LF 11.909 139 03/25/13 08/10/13 -1.40 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30

A.L. Salazar Construction, Inc. 3899 L AAA LA GEDrainage Improvement of Commonwealth Avenue Drive to

Zuzuaregui, Brgy. Batasan Hills, Quezon City

Brgy. Batasan Hills,

Quezon City8/25/2015 1st QC 1st DEO LF 17.562 270 4/7/15 1/1/16 22.77% O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% -

A.L. Salazar Construction, Inc. 3899 L AAA LA GE1Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-

Bantulan Port (Km.210+000-Km.214+211)Taytay, Palawan 3/12/2013 2nd IVB LF 89.312 450 03/28/12 06/20/13 -11.99 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -

A.L. Salazar Construction, Inc. 3899 L AAA LA GE1Const./Widening/Upgrading/Rehab. of Access Road

(Km.210+000-Km.214+211)Taytay, Palawan 8/3/2012 1st IVB LF 81.362 349 03/28/12 02/19/13 2.82 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -

A.L. Salazar Construction, Inc. 3899 L AAA LA GEDrainage Improvement of Commonwealth Avenue Drive to

Zuzuaregui, Brgy. Batasan Hills, Quezon City

Brgy. Batasan Hills,

Quezon City4/12/2016 2nd

Quezon City 1st

DEOLF 17.5621 270 4/7/15 1/1/16 0 C 0.465 0.133 0.3 0 0 0 89.20%

89.2%

Very Satisfactory

A.L. Salazar Construction, Inc. 3899 L AAA LA GERehabiliation/Improvement of drainage System along C-3

RoadCaloocan City 11/22/2014 1st NCR LF 17.425 209 5/2/14 11/26/14 0.36% O 0.380 0.240 0.150 0.030 0.045 0.033 87.80%

87.80%

Satisfactory

A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 2/24/2010 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

A.M Oreta & Co ., Inc / Ibc International Builders

Corporation (Joint Venture)JV-07096 L AAA B Kalibo Airport Development Project Kalibo,Aklan 8/22/2017 Final DOTC LF 309.889 450 04/04/10 02/03/17 0.000 C 0.483 0.200 0.300 - - - -

95.00%

Satisfactory

A.M. Ayunan Construction 13983 L AAA SB GBConstruction/Rehabilitation of Brgy Hall Brgy. Langkong,

M'lang, Cotabato11/11/2015 1st Cotabato First DEO LF 0.924 75 8/12/15 11/24/15 (-) 9.80% O 0.363 0.16 0.052 0.03 0 0.016 62.10%

62.1%

Poor

A.M. Ayunan Construction 13983 L AA SB GBConstruction/Rehabilitation of Barangay Hall Barangay

Langkong, M'lang, Cotabato

Barangay

Langkong, M'lang,

Cotabato

3/10/2016 - Cotabato 1st LF 0.924 75 8/12/15 10/26/15 (-)9.80% C 0.496 0.2 0.006 0 0 0 64.53%64.53%

Poor

A.M Oreta & Co ., Inc / Ibc International Builders

Corporation (Joint Venture)JV-07096 L AAA LB Kalibo Airport Development Project Pook, Kalibo, Aklan 6/17/2015 1st DOTC LF 287.056 360 04/04/10 09/24/15 4.92 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 -

A.M. Oreta / IBC (Joint Venture) JV-11-210 L AAA LB GE2Const. of Drainage System along Iloilo-Capiz Rd. (Old Route)

Nat'l Rd. CPU Sect., Iloilo CityJaro, Iloilo City 8/6/2012 1st VI LF 42.875 240 01/04/12 08/30/12 6.12 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -

A.M.P. Construction 16574 L B MA GERepair/Maintenance of Flood Control Talavera River Control,

Brgy. Sicsican Matanda, Talavera, Nueva Ecija

Talavera, Nueva

Ecija6/2/2017 1st & Final

Nueva Ecija 1st

DEOLF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.419 0.135 0.300 - - - 85.40

*85.4%

Satisfactory

A.M.P. Construction 16574 L B MA GEConstruction of Flood Control Revetment Wall along Agbalili

RiverAltavas, Aklan 3/15/2016 1st Aklan DEO LF 34.428 244 9/29/15 4/29/16 (-) 4.87% O 0.328 0.3 0.101 0.03 0.045 0.033 83.70%

83.7%

Satisfactory

A.M.P. Construction/ Forthright Construction

Joint VentureJV-16-1612 L A MA GE

Construction/ Maintenance of Flood Mitigation Structures and

Drainage Systems, Rehabilitation/ Improvement of Pampanga

River Control, Brgy. Sapang Buho, Palayan City, Nueva Ecija

Palayan City, Nueva

Ecija3/15/18 2nd/Final

Nueva Ecija 2nd

DEOLF 39.200 161 5/10/17 10/17/17 0.00% C 0.472 0.133 0.3 - - - 90.50 88.46% Satisfactory

A.M.P. Construction/ Forthright Construction

Joint VentureJV-16-933 L A MA GE

Improvement/ Rehabilitation of Revetment along Talavera

River Barangay Basang Hamog, Talavera, Nueva Ecija

Talavera, Nueva

Ecija3/13/18 1st/Final

Nueva Ecija 1st

DEOLF 31.723 240 7/10/17 3/6/18 25.94% C 0.413 0.141 0.3 - - - 85.40 *85.40% Satisfactory

A.P Palacios Construction 29021 L C SB GE1 Rehab./Impvt. of Dikidit-Suguit FTMR 9/8/2009 1st III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

A.P. Consebido Construction And Trading 33616 L D SB GB

Construction of Two (2) Units Technical-Vocational Livelihood

(TVL) Laboratories/Worshop Roxas National Comprehensive

High School, Roxas, Palawan

Roxas, Palawan 3/13/2017 1st Palawan 1st DEO LF 5.347 140 7/3/2016 11/19/2016 0.01 O 0.451 0.200 0.300 - - - 95.10 -

A.P.B. Construction 17055 L B MA GEConcreting of Ore West Capangdanan Road

Bantay, Ilocos Sur 11/9/17 1st & Final DPWH LF 24.500 175 4/12/17 10/3/17 0.00 C 0.407 0.133 0.300 - - - 84.00*84%

Satisfactory

A.P.B. Construction 17055 L B MA GE

Improvement/Widening of National Roads along Pangasinan-

Nueva Ecija Roa, K0180+417-K0181+745; K0183+129-

K0184+062

Pangasinan-Nueva

Ecija Road8/21/2017 1st & Final

Pangasinan 3rd

DEOLF 46.372 300 4/4/2017 1/28/2018 0.54 C 0.479 0.135 0.300 - - - 91.40

*91.4%

Very Satisfactory

A.P.B. Construction 17055 L B MA GE

Improvement/Upgrading of Naguilian-Bagulin Road Leading

to Tudingan Falls and Kedlap Burial Cave, Sta. 266+980-Sta.

271+279 with Exception, Naguilian-Bagulin, La Union

Naguilian-Bagulin,

La Union3/14/2016 2nd

LA UNION 2ND

DEOLF 41.295 179 5/22/15 11/16/15 0.1117 C 0.261 0.2 0.3 0 0 0 83.36%

83.36%

Satisfactory

A.P.B. Construction 17055 L B MA GE

Construction/Improvement of Access Roads Leading to

Airports, Seaports and Declared Tourism Destinations, Chaya -

Nagchayan leading to Barangays Chaya and Nagchayan,

Mayoyao, Ifugao

Mayoyao, Ifugao 8/27/2016 1st & Final IFUGAO 2ND DEO LF 35.857 386 5/9/15 5/28/16 0.00 C 0.362 0.176 0.3 0 0 0 0.838083.8%

Satisfactory

A.P.B. Construction 17055 L B MA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide: Magsaysay Ave. (Trinidad Rd.),

K0251+996 to K0251+1024; K0252+255 to K0252+270;

K0252+350 to K0252+444, Baguio City

Baguio City 9/1/2016 1st BAGUIO CITY DEO LF 19.805 177 3/14/16 9/6/16 -0.03 O 0.387 0.3 0.118 0.03 0.04 0.017 0.8920 -

A.P.B. Construction 17055 L B MA GE

Off-Carriageway Improvement along Baguio-Bontoc Road,

K0253+(-586) to K0253+000, K0259+450 to K0259+600,

K0260+500 to K0262+000

La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 18.999 150 2/20/15 7/19/15 (-) 0.02% O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% -

A.P.B. Construction 17055 L B MB GE

Improvement/Upgrading of Naguilian-Bagulin Road Leading

to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to Sta.

271+279, Naguilian, La Union

Naguilian, La Union 8/30/2015 1st La Union 2nd DEO LF 41.295 179 5/22/15 11/17/15 (+)0.69 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% -

A.P.B. Construction 17055 L C SB GE1Rehab./Reconst./Upgrading of Damaged Paved National

Road, PMA cut-off Road 2 K0+000-K0+360Baguio City 8/18/2011 1st CAR LF 5.610 102 05/06/11 08/15/11 - O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 11 of 33

Page 12: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.P.O. General Construction 7010 L B MA GE

MFO-1: National Road Network Services - Asset Preservation

of National Roads - Rehabilitation/ Reconstruction/ Upgrading

Tertiary - Reconstruction from Concrete to Concrete - Mt.

Province - Ifugao Road (Kiling-Paracelis Section), K0456+753-

K0457+000, K0459+300-K0460+000

Paracelis, Mountain

Province11/11/17 1st DPWH LF 28.581 250 4/17/17 12/22/17 2.62 O 0.351 0.240 0.150 0.03 0.061 0.05 88.20 -

A.P.O. General Construction 7010 L B MA GB

Construction of 4 Storey 12 Classroom School Building

Senior High School in AringayAringay, La Union 6/6/2017 2nd

La Union 2nd

District Engineering

Office

LF 21.893 255 10/10/2016 6/21/2017 -0.01 O 0.397 0.239 0.138 0.03 0.065 0.033 90.20 -

A.P.O. General Construction 7010 L B MA GE

Road Upgrading (Unpaved to Paved) based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis) Junction-Talubin-Barlig-

Natonin-Paracelis-Calaccad Road, K0443+054 - K0446+000

Natonin, Mt.

Province6/3/2017 1st & Final

Cordillera

Administrative

Region, R.O.

LF 97.500 455 3/18/2016 6/15/2017 0.00 C 0.428 0.133 0.300 - - - 86.10*86.1%

Satisfactory

A.P.O. General Construction 7010 L A MA GBConstruction of 4 Storey 12 Classroom School Building

Senior High School, Aringay, La UnionAringay, La Union 3/18/2017 1st La Union 2nd DEO LF 21.481 195 10/10/2016 4/22/2017 -0.04 O 0.285 0.300 0.112 0.03 0.041 0.033 80.10 -

A.P.O. General Construction 7010 L B MA GE

Road Upgrading (Gravel to Paved) along Acop-Kapangan-

Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -

K0287+685, K0289+214 - K0289+473, K0289+549 - K0289+709,

K0290+901 - K0291+000, K0292+016 - K0292+114, K0298+781 -

K0299+514, K0299+531 - K0299+816

Kapangan, Benguet 11/20/2014 1st CAR LF 72.026 267 6/9/14 3/2/15 10.93% O 0.362 0.240 0.150 0.030 0.061 0.050 89.30%89.30%

Very Satisfactory

A.P.O. General Construction 7010 L B MA GE1

Rd. Upgrading (gravel to concrete) along Acop-Kapangan-

Kibungan-Bakun Rd., K0285+444-K0286+840 V.S. (K0285+423-

K0286+836 as per RBIA) & K0345+470-K0348+000 V.S.

(K0345+500-K0348+000 as per RBIA)

Benguet 11/21/2012 1st CAR LF 59.896 237 04/26/12 12/18/12 0.78 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -

A.P.O. General Construction 7010 L B MA GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis)(Intermittent Sections)

along Mountain Province - Ifugao Road (Kiling - Paracelis

Section), K0460+508 to K0460+868, K0467+904 to K0469+000,

K0471+451 to K0472+061, K0473+155 to K0473+582,

K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis,

Mountain Province

Paracelis, Mountain

Province3/13/2016 2nd Regional Office LF 57.843 248 4/7/15 12/10/15 0.0255 C 0.35 0.186 0.3 0 0 0 87.08%

87.08%

Satisfactory

A.P.O. General Construction 7010 L B MA GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) (Intermittent Sections)

along Mt. Province - Ifugao Road (Kiling - Paracelis Section),

K0460+508 to K0460+868, K0467+904 to K0469+000,

K0471+451 to K0472+061, K0473+155 to K0473+582,

K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis,

Mt. Province

Paracelis, Mt.

Province8/29/2015 1st CAR LF 54.883 237 4/7/15 11/29/15 1.01% O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% -

A.P.O. General Construction 7010 L B MA GE1Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan-

Kibungan-Bakun Rd., K0348+000-K0349+000Benguet 8/1/2013 1st CAR LF 23.654 207 02/05/13 08/30/13 0.91 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 -

A.R. & Mark Builders 31673 L C SB GB Const. of Multi-Purpose Building, BUSECO CompoundManolo Fortich,

Bukidnon10/21/2014 1st X LF 7.920 124 7/28/14 11/28/14 -13.35% O 0.304 0.240 0.017 0.010 0.022 0.033 62.60%

62.60%

Poor

A.R. & Mark Builders 31673 L D SB GB1Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag

South PS, Pob.

Maramag,

Bukidnon8/8/2013 1st X LF 1.448 187 03/25/13 09/27/13 -2.86 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 -

A.R. Lustre, Jr. Construction 7680 L AAA LA GE

Asphalt Overlay of Puerto Princesa South Road, K000+000 -

K000+420, K001+420 - K002+300 Puerto Princesa City 11/17/17 1st & Final DPWH LF 29.860 105 3/24/17 7/6/17 0.00 C 0.429 0.200 0.300 - - - 92.90*92.9%

Very Satisfactory

A.R. Lustre, Jr. Construction 7680 L AAA LA GE

Asphalt Overlay of Puerto Princesa South Road K0000+000 to

K000+420, K000+420 to K002+300, Puerto Princesa City,

Palawan

K0000+000 to

K000+420,

K000+420 to

K002+300, Puerto

Princesa City,

Palawan

6/5/2017 1st Palwan 3rd LF 29.884 90 3/23/2017 6/20/2017 0.03 O 0.385 0.298 0.150 0.03 0.037 0.033 93.30 -

A.R. Lustre, Jr. Construction 7680 L AAA LA GE

Asphalt Overlay of Puerto Princesa South Road, K0000+000 to

K0000+420, K0000+420 to K0002+300, Puerto Princesa City,

Palawan

Puerto Princesa

City, Palawan8/24/2017 1st Palawan 3rd DEO LF 29.860 105 3/23/2017 7/5/2017 - O 0.489 0.133 0.300 - - - 92.20 -

A.R. Lustre, Jr. Construction 7680 L AAA LA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide Puerto Princesa South Road,

K0139+214 to K0139+245, K0139+292 to K0139+397,

K0140+033 to K0140+111, K0141+807 to K0141+880,

K0142+000 to K0142+300, Espanola, Palawan

K0139+214 to

K0139+245,

K0139+292 to

K0139+397,

K0140+033 to

K0140+111,

K0141+807 to

K0141+880,

K0142+000 to

K0142+300,

Espanola, Palawan

3/14/2017 1st & Final Palawan 2nd DEO LF 47.859 266 10/7/2016 6/29/2017 0.06 C 0.402 0.200 0.300 - - - 90.20*90.2%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 12 of 33

Page 13: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.R. Lustre, Jr. Construction 7680 L AAA LA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide, Puerto Princesa South Road,

K0139+214-K0139+245, K0139+292-K0139+397, K0140+033-

K0140+111, K0141+807-K0141+880, K0142+000-K0142+300,

Española, Palawan

K0139+214-

K0139+245,

K0139+292-

K0139+397,

K0140+033-

K0140+111,

K0141+807-

K0141+880,

K0142+000-

K0142+300,

Española, Palawan

11/22/2016 1stPalawan Second

DEOLF 47.859 266 7/10/2016 4/1/2017 0.46 O 0.34 0.3 0.15 0.03 0.05 0.033 0.9030 -

A.R. Lustre, Jr. Construction 7680 L AAA MB GE1Conc. of Puerto Princesa South Rd. (Aborlan Sect.

Km.60+024.80-Km.64+000 w/ exceptions)Aborlan, Palawan 3/15/2013 1st IVB LF 62.614 240 12/14/12 08/10/13 -10.01 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -

A.R. Lustre, Jr. Construction 39263 L C 0 GE

Asphalt Overlay along Malvar Road and Puerto Princesa

South Road K0002+1005 - K0002+1784 & K0002+300 -

K0002+567, Puerto Princesa City, Palawan

Puerto Princesa

City, Palawan9/2/2016 1st Palawan 3rd DEO LF 10.092 40 3/17/16 4/25/16 0.00 O 0.437 0.135 0.3 0 0 0 0.8720 -

A.R. Lustre, Jr. Construction 7680 L AAA MB GE1Const. of Taguliat Bridge along PPSR-JCT-Napsan-Apurawan

Rd., K0037+675Puerto Princesa City 8/15/2013 1st IVB LF 18.839 515 05/17/12 10/14/13 -10.34 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 -

A.R.T. Dwell Lifestyle Store And Eco Builders 38284 L B SB GB

Construction of Multi-Purpose Building, Villa Dolores Subd. Barangay Sto.

Domingo, Angeles

City, Pampanga

9/21/2016 1st & FinalPampanga 3rd

DEOLF 4.652 150 3/18/16 8/14/16 0.00 C 0.395 0.133 0.3 0 0 0 0.8280

82.8%

Satisfactory

A.S. Obquia Construction 19844 L D SB GE

Construction/ Repair/ Rehabilitation/ Improvement of Various

Infrastructure including Local Projects - Concreting of Brgy.

Poblacion Road leading to Sarangani Ricefield and Boongon

Dam, Candijay, Bohol

Candijay, Bohol 11/10/17 1st & Final DPWH LF 9.344 108 3/30/17 7/15/17 2.78 C 0.428 0.161 0.300 - - - 88.90*88.9%

Satisfactory

A.S.S. Construction 31509 L B Design & Build of Site Development Phase 2 - Road Network

Lily Hill Street, Clark

Freeport,

Pampanga

9/27/18 1st & Final DOST LF 6.965 275 7/7/17 4/7/18 0.00 C 0.45 0.19 0.30 - - - 94.04 *94.04% Very Satisfactory

A.S.S. Construction 31509 L B Construction of Academic Building III Phase 2

Lily Hill Street, Clark

Freeport,

Pampanga

09/27/18 1st & Final DOST LF 17.888 230 09/01/17 04/18/18 0.00 C 0.48 0.19 0.30 - - - 96.80 *96.80% Outstanding

A.S.S. Construction 31509 L D MA GB1 Completion of ACA Building II 05/14-15/09 1st DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

A.S.V. Construction Supply And Services 13490 L C SB GE

Asset Preservation of National Roads Rehab./ Reconst./

Upgrading of Damaged Paved National Roads including

Drainage Based on Pavement Management System/ Highway

Development and Management - 4 (HDM-4) of Jct. Layac Bal.-

Mar. Port Road, K0128+048 - K0128+126, K0128+706 -

K0128+842, Bataan Province

Orion, Bataan 3/16/18 1st/Final Bataan 2nd DEO LF 3.388 48 8/9/17 9/25/17 0% C 0.418 0.2 0.3 - - - 91.80 *91.80% Very Satisfactory

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide along NRJ Cuevas-Bislig Road,

K1378+327 - K1378+443 (RBIA Chainage), K1378+320 -

K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)

Trento, Agusan del

Sur11/11/2015 1st

Agusan del Sur

2nd DEOLF 25.215 208 6/24/15 1/17/16 (+) 11.11 O 0.383 0.252 0.15 0.03 0.045 0.05 91.00%

91%

Very Satisfactory

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE

Construction/Widening of Adlayan Bridge along Daang

Maharlika (Agusan - Davao Section) K1307+585 - K1307+614.8

San Francisco,

Agusan del Sur8/8/2014 1st XIII LF 36.650 196 2/20/14 9/3/14 -9.08 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 -

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1

Replacement of San Pedro Bridge along Daang Maharlika

(Surigao-Agusan Rd.) Brgy. San Pedro

Alegria, Surigao del

Norte11/21/2012 2nd XIII LF 14.945 390 01/13/12 02/06/13 -2.26 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE

Replacement of Lengigon Bridge (Temporary to Permanent)

along Argao - Moalboal Road, Municipality of ArgaoArgao, Cebu 10/24/2014 1st VII LF 12.230 270 2/26/14 11/22/14 -44.15% O 0.400 0.300 0.000 0.030 0.055 0.000 78.50%

78.50%

Unsatisfactory

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1

Reconst. of Timamana Bridge along Daang Maharlika

Highway (Surigao-Agusan Rd.), Brgy. Timamana

Tubod, Surigao del

Norte3/14/2013 1st XIII LF 24.213 496 12/16/11 04/24/13 0.29 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L A MA GE

Construction/ Maintenance of Permanent Bridges along

National Roads Widening of Reyes Bridge (B00851MN) along

Daang Maharlika

Km. 1130+839.50 -

Km. 1130+869.5011/21/2016 1st & Final

Surigao del Norte

1st DEOLF 29.100 325 4/17/2015 3/6/2016 0.00 C 0.478 0.2 0.3 0 0 0 0.9780

97.8%

Outstanding

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1

Rehab./Reconst. of Hubang Bridge along Daang Maharlika

(Agusan-Davao Rd.) Km.1307+369-Km.1307+536

San Francisco,

Agusan del Sur3/9/2013 1st XIII LF 19.141 380 01/27/12 02/10/13 - O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L B MA GE1

Replacement of San Pedro Bridge along Daang Maharlika

(Surigao-Agusan Rd.), Brgy. San Pedro

Alegria, Surigao del

Norte3/14/2013 3rd XIII LF 15.781 435 01/13/12 03/23/13 0.42 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -

A.T. Dumlao Construction, Inc. (Formerly:

Andoni T. Dumlao, Civil Engineer-Contractor)34028 L A MA GE

Rehabilitation of the Reinforced Concrete Deck Girder (RCDG)

Bridge

Bayabas, Surigao

del Sur3/16/18 1st/Final

Regional Office No.

XIIILF 58.373 427 4/27/16 6/27/17 0.22% C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory

A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project

Brgy. Poblacion,

Bislig City, Surigao

del Sur

10/24/2014 1st NHA L 19.225 330 10/04/13 03/06/15 5.49 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 -

A.Y.U Engineering And Construction 25632 L B MA GE

Road Concreting Bato-Kilate Road, Barangay Bato and Kilate,

Toril District, Davao City

Barangay Bato and

Kilate, Toril District,

Davao City

6/15/2016 1stDavao City 2nd

DEOLF 9.799 105 4/14/16 7/27/16 0.27 O 0.362 0.218 0.15 0.03 0.051 0.05 86.10% -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 13 of 33

Page 14: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

A.Y.U Engineering And Construction 0 L 0 0 GB

Construction of Two (2) Storey Six (6) Classroom School

Building at Mintal NCHS-Sto. Niño High School, Sto. Niño

Tugbok District, Davao City

Sto. Niño Tugbok

District, Davao City3/11/2016 1st

Davao City Second

DEOLF 8.0138 150 9/10/15 2/6/16 - C 0.493 0.191 0.3 0 0 0 98.40%

98.4%

OutstandingOutstanding

A.Y.U Engineering And Construction 25632 L B MB GERehabilitation/Reconstruction/Improvement of Quezon

Boulevard, K1509+(-060) to K1509+280, Davao City

K1509+(-060) to

K1509+280, Davao

City

3/17/2016 1st Davao City DEO LF 27.4042 170 5/1/15 10/17/15 - C 0.434 0.2 0.3 0 0 0 93.40%93.4%

Very Satisfactory

A.Y.U Engineering And Construction 25632 L B MA GE

Concreting of Sitio Mohon - Sitio Kauswagan, Brgy. Langub

(Phase 2) FMR, Brgy. Langub, Talomo District, Davao CityTalomo District,

Davao City11/17/2016 1st

Davao City First

DEOLF 9.850 90 9/19/2016 12/17/2016 0.00 O 0.44 0.133 0.3 0 0 0 0.8730 -

A5R Dynamic Const. Corp. ARN Builders Inc.

(JV)L AA Abra De Ilog Port Expansion Project

Brgy. Matabang

Abra De Ilog

Occidental Mindoro

04/18/18 1st PPA LF 76.000 360 10/02/17 09/27/18 1.07 O 0.40 0.30 0.15 0.03 0.07 0.00 95.00 - On - Going

Aarcon Builders 28336 L A MA GE

MFO 2-Flood Management Services, Construction/

Maintenance of Flood Mitigation Structures and Drainage

Systems, Construction of Revetment along Maliksi River,

Phase II, Bacoor, Cavite, 2nd Legislative District

Bacoor, Cavite 11/29/17 1st & Final DPWH LF 37.227 177 5/4/17 10/27/17 0.00 C 0.400 0.133 0.300 - - - 83.30*83.3%

Satisfactory

Aarcon Builders 28336 L A MA GE

MFO 2 - Flood Management Services, Construction/

Maintenance of Flood Mitigation Structures and Drainage

Systems, Construction of Revetment along Maliksi River,

Phase II, Bacoor, Cavite 2nd LD

Bacoor, Cavite 8/18/2017 1st Cavite 2nd DEO LF 37.228 177 5/4/2017 10/27/2017 0.26 O 0.388 0.240 0.150 0.03 0.07 0.05 92.80 -

Aarcon Builders 28336 L A MA GE

Improvement of Parañaque River Mouth Sheet Piling (Phase

III), Sta. 0+186 to Sta. 0+630 with Exception North Side,

Parañaque City, Manila

Parañaque City,

Manila9/15/2016 1st

METRO MANILA

2ND DE0LF 45.262 210 3/15/16 10/10/16 -0.05 O 0.345 0.3 0.095 0.03 0.04 0.033 0.8430 -

AB Aponesto Construction, Parts & Supply 22998 L A MA GE

Construction of River Bank Protection, Brgy. Naboc,

Monkayo, Compostela Valley

Brgy. Naboc,

Monkayo,

Compostela Valley

3/17/2017 1stCompostela Valley

DEOLF 96.500 324 8/24/2015 7/12/2016 0.00 O 0.488 0.133 0.300 - - - 92.10 -

AB Aponesto Construction, Parts & Supply 22998Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-

Km.278+7119/5/2010 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -

AB Aponesto Construction, Parts & Supply /

FFJJ Construction Joint VentureJV-15-1869 L A SB GB

Construction of One (1) Unit Two (2) Storey Six (6) Classroom

Building with Toilet at Mangayon National High School,

Compostela

Compostela 3/18/2017 1stCompostela Valley

DEOLF 8.880 200 8/24/2016 3/11/2017 0.00 O 0.482 0.135 0.300 - - - 91.70 -

Abada Construction And Supply 37005 L A MD GB

Provision of TechVoc Workshop Building- Patin-ay National

High SchoolProsperidad,

Agusan del Sur3/13/2017 1st & Final

Agusan del Sur 1st

DEOLF 2.596 90 10/17/2016 1/14/2017 0.00 C 0.462 0.133 0.300 - - - 89.50

*89.5%

Very Satisfactory

Abada Construction And Supply 37005 L D SB GBConstruction of One (1) Storey Six (6) CL with Toilet Attached

@ Lingayao National High School

Las Nieves,

Agusan del Norte11/24/2016 1st Butuan City DEO LF 5.813 170 9/7/2016 2/23/2017 (+)15.75 O 0.383 0.3 0.15 0.03 0.041 0.05 0.9540 -

Abe General Contractor 33982 L D SB GEConcreting of Santor - Andarayan Barangay Road, Delfin,

Albano, IsabelaAlbano, Isabela 8/18/2017 1st & Final Isabela 1st DEO LF 9.404 110 3/20/2017 7/7/2017 0.00 C 0.412 0.134 0.300 - - - 84.60

*84.6%

Satisfactory

Abulug Construction Company, Inc. 5593 L B MA GE1 Const. of Colony Road 11/13/2008 1st II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

Abulug Developers And Builders Co., Inc.

(Formerly: F. Vargas Construction)2366 L AAA LB GE1

Reblocking along Manila North Road (Fugu Bdry.-Bangag

Section)5/21/2009 1st II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

Abulug Developers And Builders Co., Inc.

(Formerly: F. Vargas Construction)2366 L AA MB GE

Construction of Flood Control System (Gabion with Steel

Sheet Piles), Dugayung, Amulung Cagayan

Dugayung,

Amulung Cagayan3/8/2016 1st Cagayan 3rd LF 39.1985 300 4/28/15 2/21/16 - C 0.417 0.133 0.3 0 0 0 85.00%

85%

Satisfactory

AC Rivero Development Corporation (Formerly:

AC Rivero Construction)5122 L A MB GE

Const./Imprv't of Access Road to Sabsaban Falls & Eco Park Aribungos,

Brooke's Point,

Palawan

11/10/2015 1st Palawan 2nd Deo LF 31.345 172 6/1/15 11/19/15 0 O 0.308 0.3 0.15 0.006 0.035 0.033 83.20%83.2%

Satisfactory

AC Rivero Development Corporation (Formerly:

AC Rivero Construction)5122 L A MB GE

Const. of Bridge at Dodiongan Box Culvert along Sta.

Felomina-Bonbon-Digkilaan-Rogongon RoadIligan City 10/29/2014 1st X LF 24.567 295 1/30/14 11/20/14 7.27% O 0.339 0.278 0.150 0.010 0.051 0.050 87.80%

87.80%

Satisfactory

Acamada Builder's & Construction Supply 39355 L C SB GB

Construction/ Rehabilitation of Multi-Purpose Buildings of

Cabatuan Iloilo 3rd LD, Brgy. Jelicuon, Montinola, Cabatuan,

Iloilo

Montinola,

Cabatuan, Iloilo6/4/2017 1st & Final

Iloilo 2nd District

Engineering OfficeLF 3.955 125 9/21/2016 1/23/2017 0.00 C 0.478 0.201 0.300 - - - 97.90

*97.9%

Outstanding

Accuracy Builders Enterprise 27507 L B MA GE Rehabilitation of Banaue Hotel Roofing Banaue, Ifugao 1/13/2014 1st TIEZA LF 19.880 180 06/19/13 12/18/13 -9.81 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 -

ACJ Construction Resources 10635 L B MA GE1Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd., K1657+(-

247)-K1659+824 along Paco-Roxas-Arakan Valley Rd.Arakan, Cotabato 8/10/2012 1st XII LF 46.844 384 08/11/11 08/29/12 0.90 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 -

ACJ Construction Resources 10635 L B MA GE1

Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l

Secondary Rd., Km.1628+584-Km.1630+803 along Kidapawan-

Magpet-Pangao-an Rd.

Magpet, Cotabato 8/17/2011 1st XII LF 24.178 180 04/06/11 10/03/11 -34.26 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -

ACJ Construction Resources 10635 L B MA GE1Concreting of Poblacion Magpet-Nowa Road (Nowa Basak

Sect.) 3/10/2009 1st XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

ACJ Construction Resources 10635 L B MA GEConcreting/Rehabilitation of Takepan -Saranay Farm to

Market Road, Takepan, Pikit, Cotabato

Takepan, Pikit,

Cotabato6/12/2016 1st & Final

COTABATO 2ND

DEOLF 3.980 51 7/31/15 9/19/15 0.00 C 0.45 0.133 0.3 0 0 0 88.30%

88.3%

Satisfactory

ACJ Construction Resources 10635 L B MB GE1Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section

(Km. 1648+300-Km.1649+385.63)9/5/2009 1st XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

Acme Builders Corporation 6442 L A MA GEImprovement/Widening of Daang Maharlika Road, K0897+000

to K0897+820, K0903+-(077) to K0903+133 Tacloban City 4/11/2018 1st/Final Tacloban City DEO LF 23.316 166 7/10/2017 12/22/2017 0.00 C 0.476 0.148 0.300 - - - 92.40 *92.40% Very Satisfactory

Acme Builders Corporation 6442 L A MA GE

Construction of Slope Protection (Retaining Wall) along

Tigbao Sta. Fe San Miguel Road (S00033LT), K0905+586 to

K0905+655, Tacloban City

- 4/3/2017 1st & Final Tacloban City DEO LF 2.793 90 7/28/2016 10/25/2016 (+)22% C 0.396 0.200 0.300 - - - 89.60*89.6%

Very Satisfactory

Acme Builders Corporation 6442 L A MA GE1Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000-

K0911+500 & K0913+000-K0913+900Tacloban City 8/22/2013 1st VIII LF 55.416 270 02/27/13 11/23/13 2.49 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 -

Acme Builders Corporation 6442 L B MA GE1 Construction of Bagacay Bridge 3/2/2009 1st VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 14 of 33

Page 15: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Acme Builders Corporation 6442 L A MA GE1Rehab./Strengthening of Rosales Bridge along Daang

Maharlika (SM) (San Isidro-San Juanico Bridge)

Calbayog City,

Samar8/14/2013 1st VIII LF 25.251 165 02/06/13 08/16/13 3.00 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 -

Acme Builders Corporation 6442 L A MB GE

Road Upgrading along Tigbao-Sta. Fe-San Miguel Road K0913+940-

K0914+764

(S00030LT),

K0907+455-

K097+638

(S00033LT),

Tacloban City

4/3/2017 1st & Final Tacloban City DEO LF 41.625 179 7/28/2016 1/22/2017 (+)10% C 0.490 0.133 0.300 - - - 92.30*92.3%

Very Satisfactory

Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of Damaged Pavement,

Tacloban Baybay South Rd.6/17/2010 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -

Acme Builders Corporation / B. Vicencio

ConstructionJV-07-066 L A MB GE1

Const. of Palo East By Pass Road (Const. of Bernard Reed II

Bridge)8/31/2009 3rd VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

Acme Builders Corporation / MWJ Construction

(JV)JV-08-243 L A MB GE1

Const. of Albuera-Burauen Road including Bridges, Burauen

Sect.9/2/2009 1st VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

Acme Builders Corporation/ B. Vicencio

Construction Joint VentureJV-15-1423 L AA LA GE

Road Widening Including Drainage along Daang Maharlika

(SM), San Isidro-San Juanico Bridge, K0691+(-570) to

K0691+000, K0694+000 to K0694+192, K0694+300 to

K0695+020, K0704+000 to K0705+000, K0706+000 to

K0707+000 and K0710+(565) to K0711+101

Calbayog, Samar 11/14/17 2nd & Final DPWH LF 138.704 359 6/16/16 6/9/17 2.95 C 0.453 0.132 0.300 - - - 88.50*89.89%

Very Satisfactory

Adad Engineering Services And Supply 25477 L C SB GE

Rehabilitation/ Improvement of Calauag Seawall Calauag,

Quezon Calauag, Quezon 6/3/2017 1st & Final Quezon 4th DEO LF 9.552 60 11/21/2016 1/19/2017 0.00 C 0.400 0.200 0.300 - - - 90.00*90%

Very Satisfactory

ADB Dynamic Builders & Supply 33359 L B MA GE

Local Infrastructure Program, Concrete Paving of Road

Shoulder, Rawis (Junction)-Catubig Road, Dango-Oleras

Section, K0798+000-K0798+200, Northern Samar

Northern Samar 3/16/2016 1stNorthern Samar

2ndLF 3.7339 30 2/25/15 3/26/15 0 C 0.459 0.133 0.3 0 0 0 89.20%

89.2%

Very Satisfactory

ADB Dynamic Builders & Supply 33359 L B SB GERepair/Maintenance of Cawayan Revetment II, Brgy. Cawayan,

Catarman, Northern Samar

Catarman, Northern

Samar3/15/2016 1st

Northern Samar

1stLF 3.8965 108 11/3/15 1/31/16 0 C 0.45 0.133 0.3 0 0 0 88.30%

88.3%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1Rehab./Reconst. of Damaged Paved National Roads Gingoog-

Calveria-Villanueva Road9/10/2009 1st X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1

Rehab./Reconst. of Damaged Paved National Rd. along

Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental

Sect.)Libertad-Bancasi Sect.

9/16/2009 1st XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GB1Const./Completion/Continuation of Unfinished Bridge and

Approaches, Brgy. Libertad9/16/2009 1st XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1 Concreting of NRJ-Bahbah-Talacogon Rd. 9/13/2009 1st XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConstruction of Agusan - Bukidnon Road, Sta. 1262+260 - Sta.

1265+120

Buenavista, Agusan

del Norte8/5/2014 1st XIII LF 40.140 209 2/4/14 9/1/14 0.51 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE

Rehab./Reconstruction/Replacement/Retrofitting of

Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan

(Agusan - Misamis Oriental)

Butuan City 8/15/2014 1st XIII LF 36.843 234 2/14/14 10/5/14 12.89 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConst./Improvement of Road to Support River Rhine Cruise

leading to Banza Ruins, Barangay Banza

Brangay Banza,

Butuan City8/14/2014 1st XIII LF 26.706 148 4/25/14 9/19/14 0.58 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 -

Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab. of Magsaysay Bridge along Iligan City 9/9/2010 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -

Adfil Corporation (Formerly: Adfil Construction) 14437Repair/Maintenance with Asphalt Overlay of Tabon-Tabon Slip

along Agusan- Davao Road6/17/2010 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GEImprovement of Taguibo Riverbank Protection Sta. 0+000 to

Sta.0+200Butuan City 3/22/18 1st/Final Butuan City DEO LF 24.125 155 7/3/17 12/4/17 0.00% C 0.499 0.143 0.3 - - - 94.20 *94.20% Very Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GE

Improvement/Widening of National Roads, Daang Maharlika

(Agusan-Davao Section) K1313+077 to K1314+401, K1314+625

to K1314+830, K1315+052 to K1317+523, K1319+960 to

K1320+444, K1320+665 to K1321+532

San Isidro - Pasta

Rosario, Agusan

del Sur

3/20/18 1st/FinalRegional Office No.

XIIILF 193.207 420 5/4/16 6/27/17 0% C 0.465 0.135 0.3 - - - 90.00 *90.00% Very Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GERoad Upgrading (Gravel to Paved) of Butuan City-Pianing-

Tandag Road, K1237+055 - K1240+040, with exceptionsButuan City 10/30/2014 1st XIII LF 127.287 270 5/15/14 2/8/15 0.02% O 0.346 0.240 0.150 0.024 0.056 0.050 86.60%

86.60%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening/Conc. of Add'l. Lane Both Directions along Butuan

City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.50

Buenavista, Agusan

del Norte8/6/2013 1st XIII LF 86.661 240 03/25/13 11/19/13 14.58 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GEConstruction of Agusan-Bukidnon Road, Sta. 1262+260 - Sta.

1265+120

Buenavista, Agusan

del Norte10/21/2014 1st XIII LF 40.140 271 2/4/14 11/1/14 0.46% O 0.387 0.182 0.150 0.024 0.065 0.050 85.80%

85.80%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GERehab./Reconst./Replacement/Retrofitting of Salvacion Bridge

along NRJ Cuevas - Bislig Road, K1374+670 - K1374+731

Trento, Agusan del

Sur8/8/2014 1st XIII LF 36.656 196 2/18/14 9/2/14 10.85 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE

Reconstruction/Replacement/Completion of Minusong Bridge

along Butuan-Cagayan de Oro-Iligan Road (Agusan--Misamis

Oriental), Km1269+217

Agusan del Norte 10/21/2014 1st XIII LF 34.627 270 2/4/14 10/30/14 0.05% O 0.343 0.286 0.150 0.030 0.065 0.050 92.40%92.40%

Very Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 8/23/2013 2nd XIII LF 19.207 219 1/30/13 09/05/13 1.87 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Widening of Permanent Bridges to more than 2 Lanes, Wawa

Bridge (B00896MN)along Daang Maharlika (Agusan-Davao

Section)

Brgy. Wawa,

Sibagat, Agusan del

Sur

11/23/2016 1st & FinalRegional Office No.

XIIILF 219.820 400 8/26/2015 9/28/2016 (+)2.56% C 0.489 0.2 0.3 0 0 0 0.9890

98.9%

Outstanding

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 15 of 33

Page 16: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Completion of East-West Lateral Road Connecting Agusan

del Sur/Agusan del Norte to Bukidnon, Simbalan-Dulag

Section

Agusan del Norte

1st LD11/11/17 1st DPWH LF 76.093 270 4/3/17 12/28/17 0.01 O 0.383 0.300 0.150 0.03 0.055 0.033 95.10 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Widening of Minalum Bridge (B00817MN) Along dAang

Maharlika (Surigao-Agusan Section) (Phase II) Butuan City 11/11/17 1st & Final DPWH LF 11.972 96 4/3/17 7/7/17 0.00 C 0.488 0.134 0.300 - - - 92.20*92.2%

Very Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Construction of By-Passes/ Diversion Road, Including ROW,

NRJ Daang Maharlika, Taguibo-Masao Port, (Pagatpatan-

Lumbocan-Masao Section)

Agusan del Norte 6/27/2017 1stRegional Office No.

XIIILF 125.444 409 9/8/2016 10/21/2017 0.09 O 0.394 0.300 0.150 0.03 0.07 0.05 99.40 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Widening of Daang Maharlika (Agusan- Davao Section K1304, K130+(-

4040 to K1307 +

471, K1309+

138.10 to

K1312+810, San

Francisco, Agusan

del Sur

3/15/2017 2nd & FinalRegional Office No.

XIIILF 169.798 390 5/20/2015 6/12/2016 0.00 C 0.478 0.133 0.300 - - - 91.10

*87.56%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Widening of Permanent Bridges to more than 2 lanes, Wawa

Bridge (B00896MN) along Daang Maharlika (Agusan-Davao

Road Section), Brgy. Wawa, Sibagat, Agusan del Sur

Brgy. Wawa,

Sibagat, Agusan del

Sur

11/9/2015 1st Regional Office LF 207.695 340 8/26/15 7/30/16 (+) 19.17 O 0.317 0.24 0.15 0.03 0.055 0.033 82.50%82.5%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Widening of Daang Maharlika (Agusan-Davao Section),

K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San

Francisco, Agusan del Sur

San Francisco,

Agusan del Sur11/11/2015 1st Regional Office LF 169.799 300 5/20/15 3/14/16 (+) 29.68 O 0.257 0.3 0.15 0.03 0.065 0.033 83.50%

83.5%

Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE

Construction of Road Slip Along Butuan City-Malaybalay

Road, Brgy. Bit-os, Butuan CityBrgy. Bit-os, Butuan

City9/2/2016 1st & Final Butuan City DEO LF 18.330 160 3/10/16 8/16/16 0.00 C 0.481 0.138 0.3 0 0 0 0.9190

91.9%

Very Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE2 Rehab. of Salvacion (Crossing Luna Flood Control)Esperanza, Agusan

del Sur8/20/2012 1st XIII LF 16.733 285 03/07/12 12/17/12 47.69 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1

Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro-

Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692-

K1499+712; c)K1500+678-K1500+902; d)K1501+905-

K1507+000; e)K1508+000-K1508+919

Misamis Oriental 3/12/2013 2nd X LF 48.167 285 06/13/12 03/24/13 3.06 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1

Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds.,

Butuan City-Cagayan de Oro City-Iligan City Rd.: a.)K1494+049-

K1495+240; b.)K1499+692-K1499+712; c.)k1500+678-

K1500+902; d.)K1501+905-K1507+000; e.)K1508+000-

K1508+919

Misamis Oriental 11/23/2012 1st X LF 44.537 255 06/13/12 02/23/13 7.85 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1Conc. of Agusan-Malaybalay Road, Km. 1283+183.50-

Km.1284+780

Esperanza, Agusan

del Sur3/31/2012 1st XIII LF 39.495 300 08/26/11 06/20/12 0.49 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Const./Impv't of Rd. to Support River Rhine Cruise, Banza

RuinsButuan City 3/21/2013 1st XIII LF 29.509 155 01/30/13 07/03/13 2.48 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1

Widening/Conc. of Add'l Lane along Daang Maharlika

(Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540-

Sta.1215+520

Cabadbaran,

Agusan del Norte3/11/2013 1st XIII LF 29.059 142 02/08/13 06/29/13 24.99 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1

Rehab./Reconst./Strengthening of Minusong Bridge along

Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental)

Km.1269+217, Aclan, Nasipit

Agusan del Norte 8/6/2012 2nd XIII LF 28.848 270 01/12/12 10/22/12 3.53 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob.,

Cabadbaran Sect.Agusan del Norte 8/6/2012 2nd XIII LF 27.390 255 01/12/12 09/22/12 1.10 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan-

Misamis Oriental Sect.) Pob., Buenavista Sect.Agusan del Norte 8/6/2012 1st XIII LF 24.129 255 01/12/12 09/22/12 0.77 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Rehab./Reconst./Strengthening of Minusuang Bridge along

Daang Maharlika (Surigao-Agusan Rd.) Km.1206+561

Tubay, Agusan del

Norte8/7/2012 2nd XIII LF 23.512 270 01/11/12 10/22/12 0.80 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1

Rehab./Reconst./Strengthening of Maraput Bridge along

Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy.

Victory

Tubay, Agusan del

Norte8/7/2012 2nd XIII LF 23.512 285 01/12/12 10/22/12 1.45 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 3/21/2013 1st XIII LF 18.426 171 01/30/13 07/19/13 11.89 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Completion of La Union Bridge along Pandanon-Magallanes

Rd.

Cabadbaran,

Agusan del Norte3/11/2013 1st XIII LF 15.889 150 01/23/13 06/21/13 37.30 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 -

Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1Completion of Maraput Bridge along Daang Maharlika

(Surigao-Agusan Rd.), Sta.1207+192

Tubay, Agusan del

Norte3/11/2013 1st XIII LF 9.115 120 12/26/12 04/24/13 21.54 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 -

Adfil Corporation/Ramises Construction (Joint

Venture)JV-16-785 L AAA LB GE

Construction of Lower Agusan River Bank Protection Butuan City, Agusan

del Norte 1st LD11/11/17 1st & Final DPWH LF 46.438 159 4/3/17 9/8/17 17.77 C 0.500 0.133 0.300 - - - 93.30

*93.3%

Very Satisfactory

Adfil Corporation/JQG Builders Joint Venture JV-15-1822 L AAA LA GE

Construction of By-Passes/ Diversion Roads, Including ROW

NRJ Daang Maharlika, Taguibo-Masao Port, (Banza-Muag

Section)

Butuan City, Agusan

del Norte6/27/2017 1st

Regional Office No.

XIIILF 144.680 428 9/29/2016 11/30/2017 -0.01 O 0.347 0.300 0.141 0.03 0.07 0.033 92.10 -

Adfil Corporation/Ramises Construction (Joint

Venture)JV-14-491 L AAA MB GE

Upgrading of NRJ Butuan Cuty - Mayor Democrito D. Plaza II

Ave. Road Leading to Mt. Mayapay (Delta Discovery Park),

Sitio Matin-ao, Bonbon, Butuan City

Sitio Matin-ao,

Bonbon, Butuan

City

3/15/2016 1st Butuan City DEO LF 36.833 317 3/3/15 1/13/16 0.0074 C 0.485 0.133 0.3 0 0 0 91.80%91.8%

Very Satisfactory

Adige Sta. Clara (JV) JV-06-032 L AAA LB GE1DPWH Component Project under the Help for Catubig

Agricultural Advancement Proj.5/30/2009 5th VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 16 of 33

Page 17: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Adige Sta. Clara (JV) JV-06-032 FA/LF AAA LB GE1DPWH Component Project under the HELP for Catubig

Agricultural Project (HCAAP)8/25/2008 3rd VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

Adimre Construction 25534 L B MA Region III-San Fernando, Pampanga LTFRB Regional OfficeSan Fernando,

Pampanga7/5/18 1st and Final DOTr LF 2.381 120 1/25/18 5/24/18 0.00 C 0.50 0.20 0.30 99.50 *99.50% Outstanding

Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project

Puerto Princesa,

Palawan, Region IV-

B

3/9/2017 3rd & Final DOTC L 65.90 460 10/07/2015 11/30/2016 0.00 C 0.497 0.200 0.300 - - - 99.71

Adimre Construction 25534 B MA Puerto Princesa Airport Development Project

Puerto Princesa,

Palawan/ Region

4B

3/29/2016 1st DOTC LF 64.553 420 10/07/15 11/29/16 4.24 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 -

Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project

Puerto Princesa,

Palawan/ Region

4B

9/20/2016 2nd DOTC LF 64.553 420 10/07/15 11/30/16 -8.79 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 -

Adimre Construction 25534 L B MA Taytay Airport Development Project Taytay, Palawan 07/22/15 1st DOTC LF 10.794 154 02/27/15 09/01/15 -11.75 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 -

Adimre Construction 25534 L B MA GB1 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS Bustos, Bulacan 8/14/2013 1st III LF 7.027 180 04/02/13 09/28/13 3.82 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 -

Adimre Construction 25534 L B MA GB-1 Marinduque Airport Development Project Gasan, Marinduque 8/7/2015 1st DOTC LF 6.293 120 07/05/15 11/01/15 27.87 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 -

Adimre Construction 25534 L B SB GE2Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan

Section Km. 46+000-Km. 47+200Pulilan, Bulacan 8/2/2012 1st III LF 11.886 170 05/08/12 10/24/12 1.71 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 -

Adimre Construction 25534 L B SB GE-5 Malolos Port Development Project

Brgy. Panasahan &

Brgy. Namayan,

Malolos, Bulacan

8/19/2014 1st DOTC LF 9.625 254 03/12/14 11/20/14 29.72 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 -

Adimre Construction 25534 L B SB GE-5 Meycauayan Port Development ProjectMeycauayan,

Bulacan7/9/2014 1st DOTC LF 8.300 150 03/12/14 08/09/14 0.68 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 -

Adimre Construction 25534 L B SB GE-5 Obando Port Development Project

Brgy. Paliwas &

Bargy. Binuangan,

Obando, Bulacan

8/18/2014 1st DOTC LF 8.109 194 03/13/14 10/22/14 7.73 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 -

Adimre Construction 25534 L B SB GE-5 Balagtas Port Development Project Balagtas, Bulacan 7/10/2014 1st DOTC LF 7.802 180 03/13/14 09/09/14 0.61 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 -

Adimre Construction 25534 L B Lawigan Port Development Project

Brgy. Lawigan,

Catarman Camigiun

/Region X

9/14/2017 1st DOTC LF 8.399.916 150 05/04/15 10/24/17 1 C 0.399 0.300 0.150 0.010 0.023 0.050 93.20 -

ADP Construction & Supply 3466 L A Const. of Sta. Barbara Catching DAM and Canal Struc. Legares, Iloilo 4/5/2014 1st NIA LF 16.962 150 04/17/13 04/30/14 0.00 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 -

ADP Construction & Supply 3466 L GE2 Const. of Various CIP's Package 1 - Badbaran CIP Badbaran CIP,

Dumarao, Capiz 4/13/2013 1st NIA LF 24.770 210 02/13/13 09/22/13 26.15 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 -

ADP Construction & Supply 3466 L A MB GE

Reconstruction/Improvement of Dumalag Municipal Road,

Brgy. Poblacion, Dumalag, Capiz (Section I)

Brgy. Poblacion,

Dumalag, Capiz

(Section I)

11/13/2015 1st Capiz 2nd LF 35.960 224 7/2/15 2/11/16 14.45% O 0.366 0.232 0.15 0.03 0.07 0.05 89.80%89.8%

Very Satisfactory

Adroit Construction 11169 L A - GBConstruction of a 4STY 8CL Sschool Building, Bonfal National

High School Bayombong, Nueva Vizcaya

Bayombong, Nueva

Vizcaya3/15/2017 1st Nueva Vizcaya 1st LF 15.914 331 6/28/2016 5/24/2017 0.00 O 0.390 0.240 0.150 0.03 0.051 0.033 89.40 -

Adroit Construction 11169 L B MA GB

Construction of 4 Sty. 8 CL. School Building, Bonfal National

High School Bayombong, Nueva VizcayaBayombong, Nueva

Vizcaya11/8/17 2nd & Final DPWH LF 0.043 331 6/28/16 5/24/17 0.00 C 0.466 0.135 0.300 - - - 90.10

*89.61%

Very Satisfactory

Adroit Construction 11169 L B MA GE

Off-Carriageway Improvement Including Drainage,

K0139+382.50 to K0139+993.50, Nueva Ecija-Pangasinan

Road

Nueva Ecija-

Pangasinan Road11/22/17 1st & Final DPWH LF 4.687 60 7/3/17 8/31/17 0.00 C 0.386 0.200 0.300 - - - 88.60

*88.6%

Satisfactory

Adroit Construction 11169 L B MA GB

Construction of a 4STY 8CL School Building, Bonfal National

High School Boyombong, Nueva VizcayaBoyombong, Nueva

Vizcaya8/24/2017 2nd & Final

Nueva Vizcaya 1st

DEOLF 15.914 331 6/28/2016 5/24/2017 0.00 C 0.471 0.134 0.300 - - - 90.50

*89.79335%

Very Satisfactory

Adroit Construction 11169 L B MA GB

Construction of a 2STY 8CL School Building Ganduz National

High School, Pantabangan, Nueva Ecija, 2nd LDPantabangan,

Nueva Ecija8/21/2017 1st & Final

Nueva Ecija 1st

DEOLF 11.565 150 11/22/2016 4/20/2017 0.00 C 0.493 0.132 0.300 - - - 92.50

*92.5%

Very Satisfactory

Adroit Construction 11169 L B Building Improvement / RenovationWangal, La

Trinidad, Benguet11/09/18 1st NIA LF 28.830 210 5/29/18 6/7/18 10.21 O 0.39 0.24 0.15 0.02 0.04 0.05 89.52 - On - Going

Advance Foundation Const. System Corp. /

Abulug Developer Builders Const. Inc. (JV)JV-09-289 L AAA LB GE1

Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao

RoadRizal, Cagayan 3/30/2011 1st II LF 112.029 240 09/13/10 05/10/11 -63.60 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -

Advance Tech Construction and Trading

Corporation35288 L B SB GE-5 Cabucgayan Seaport Construction

Sitio Lakay, Brgy.

Bunga,

Cabuacgayan,

Biliran

8/11/2015 1st DOTC LF 8.606 240 04/29/15 12/24/15 20.87 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 -

Advance Tech Construction and Trading

Corporation35288 L B SB Antique Airport Port Development

Brgy. Funda-Dalipe,

San Jose, Antique/

Region VI

3/23/2017 1st & Final DOTC L 7.47 180 09/21/2016 03/19/2017 (-) 1.37 C 0.438 0.200 0.300 - - - 93.75*93.75%

V. Satisfactory

Advance Tech Construction and Trading

Corporation35288 L B SB Miag-ao Feeder Port Development

Miag-ao, Iloilo/

Region VI2/16/2017 2nd & Final DOTC L 7.16 120 09/21/2015 01/18/2017 0.00 O 0.500 0.200 0.300 - - - 100.00 -

Advance Tech Construction and Trading

Corporation35288 L B SB Miag-ao Feeder Port Development

Miag-ao, Iloilo/

Region 611/16/2016 1st DOTC LF 7.161 120 09/21/16 01/18/17 1.09 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 -

Advance Tech Construction and Trading

Corporation35288 B SB Construction of Brgy. Iquiran Wharf

Brgy. Iquiran,

Daram, Western

Samar/ Region VIII

10/14/2015 1st DOTC LF 9.438 180 06/03/15 11/29/15 18.64 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 -

Advance Tech Construction and Trading

Corporation35288 SB Construction of Iquiran Wharf

Brgy. Iquiran,

Daram, Western

Samar/ Region VIII

1/21/2016 2nd & Final DOTC LF 9.438 180 06/03/15 11/25/15 0.00 C 0.492 0.200 0.300 - - - 99.1595.91%

V. Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 17 of 33

Page 18: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Advance Tech Construction and Trading

Corporation35288 B SB Cabucgayan Port Development Project

Brgy. Bunga,

Canucgayan, Biliran2/16/2016 2nd & Final DOTC LF 8.602 240 04/29/15 07/25/16 57.13 C 0.467 0.200 0.300 - - - 96.70

95.30%

V. Satisfactory

Advance Tech Construction and Trading

Corporation35288 L B MA Badoc Port Development Project Badoc, Ilocos Norte 5/17/2018 1st & Final DOTC LF 9.147 150 11/1/2017 3/30/2018 0.00 C 0.462 0.200 0.300 - - - 96.20

*96.20%

Outstanding

Advance Tech Construction and Trading

Corporation35288 L B MA Mongpong Port Development Project

Sta. Cruz,

Marinduque5/31/2018 1st & Final DOTC LF 8.530 150 11/1/2017 3/30/2018 0.00 C 0.471 0.200 0.300 - - - 97.10

*97.10%

Outstanding

Advance Tech Construction and Trading

Corporation35288 L B SB Volcano Island Port Development Project

Volcano Island,

Talisay, Batangas08/30/18 1st and Final DOTr LF 9.077 155 1/22/18 6/25/18 0.00 C 0.48 0.20 0.30 97.70 *97.70% Outstanding

Advance Tech Construction and Trading

Corporation35288 L B SB Caminawit Port Development Project

Caminawit, San

Jose, Occidental

Mindoro

11/06/18 1st and Final DOTr LF 7.382 180 1/22/18 07/20/18 0.00 C 0.44 0.20 0.30 93.90 *93.90% Very Satisfactory

Advance Tech Construction and Trading

Corporation35288 L B SB Tuguegarao LTFRB Regional Office Building Project Tacloban City, Leyte 4/12/2018 1st & Final DOTC LF 4.904 120 1/11/2018 5/10/2018 23.33 C 0.473 0.200 0.300 - - - 97.30

*97.30%

Outstanding

Advanced Foundation Construction System

Corp./Pulsar Construction (JV)JV-13-601 L AAA LB GE

Construction and Maintenance of Bridges along National

Roads-Construction of Bridges-On-going, Lucban Bridge

along Manila North Road

Abulug, Cagayan

Province6/1/2015 2nd

Regional Office No.

ILF 278.183 674 3/18/14 1/20/16 16.94% O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% -

Advanced Foundation Construction System,

Corp.15449 L AAA LB GE1 Lucban Bridge & Approaches Phase I along Manila North Rd. Abulug, Cagayan 8/1/2013 1st II LF 153.067 450 03/26/13 06/18/14 23.14 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 -

Advanced Foundation Construction Systems

Corp./ Pulsar Construction (JV)JV-16-1596 L AAA LB GE

Locally Funded Projects: Construction/ Repair/ Rehabilitation/

Improvement of Various Infrastructure including Local

Projects, Roads and Bridges - Local Bridges: Construction of

Pigalo Bridge and Approaches along Alicia-Angadanan-San

Guillermo Provincial Road Angadanan, Isabela

Angadanan,

Isabela11/11/17 1st DPWH LF 437.067 750 4/10/17 4/29/19 20.53 O 0.335 0.240 0.150 0.03 0.06 0.05 86.50 -

Advanced Foundation Construction System

Corp./ R.U. Aquino Construction And

Development Corporation Joint Venture

JV-

15449

L AAA LB GE

Construction and Maintenance of Bridges along National

Roads-Widening of Permanent Bridges to more than 2-lanes,

Sto. Domingo Bridge (B01480LZ) along Jose Abad Santos

Avenue Road (formerly GSO), Mexico, Pampanga

Mexico, Pampanga 11/27/17 1st DPWH LF 83.123 420 11/23/16 1/16/18 1.29 O 0.348 0.240 0.150 0.03 0.061 0.033 86.17 -

Advanced Foundation Construction System

Corp./Pulsar Construction(JV)JV-13-601 F AAA LB GE

Construction and Maintenance of Bridges along National

Roads - Construction of Bridges - On going; Lucban Bridge

along Manila North Road

Abulug, Cagayan 10/22/2014 1st II LF 253.267 650 3/18/14 12/27/15 23.35% O 0.456 0.225 0.150 0.030 0.033 0.033 92.70%92.70%

Very Satisfactory

Advanced Matrix Construction Inc. 32873 L MA Structural Retrofitting of Buildings at PICC Phase 1PICC Complex,

Pasay City1/27/2016 Final BSP LF 36.535 240 12/18/13 07/31/16 0.00 C 0.481 0.200 0.300 - - - 98.10

92.50%

Very Satisfactory

Advanced Matrix Construction Inc. 32873 L MA Full Upgrading of Toilets at PICCPICC Complex,

Pasay City1/26/2016 Final BSP LF 29.298 210 02/20/14 07/18/15 0.00 C 0.481 0.200 0.300 - - - 98.10

93.50%

Very Satisfactory

Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E RoofdeckSecurity Plant

Complex3/2/2016 Final BSP LF 23.296 321 02/06/14 12/23/14 3.54 C 0.469 0.200 0.194 - - - 86.30

84.30%

Satisfactory

Advanced Matrix Construction Inc. 32873 L MARehabilitation of Common Maintenance Shop (CMS) at BSP,

SPCBuilding A, SPC 1/27/2016 Final BSP LF 19.053 188 10/29/13 10/01/14 6.02 C 0.466 0.200 0.119 - - - 78.50

86.90%

Satisfactory

Advanced Matrix Construction Inc. 32873 L AA Replacement of Ceiling at the Skywalk

Security Plant

Complex, Quezon

City

9/30/2016 1st & Final BSP LF 3.900 70 12/23/15 03/01/16 0.00 C 0.427 0.200 0.300 - - - 92.7092.70%

Very Satisfactory

Advanced Matrix Construction Inc. 32873 L A Rehabilitation of Building B Lighting System

BSP, Security Plant

Complex, East Ave.,

Quezon City

10/8/2013 1st BPS LF 2.000 60 03/26/13 11/20/13 4.50 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 -

Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E RoofdeckSecurity Plant

Complex11/19/2014 1st BSP L 22.300 120 02/06/14 06/05/14 7.87 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 -

Advanced Matrix Construction Inc. 32873 L MAImprovement of BSP-SPC Parking Lot at BSP Security Plant

Complex

BSP, Security Plant

Complex, Cor BIR

Road, East Ave.,

Quezon City

3/31/2013 1st BSP LF 13.800 180 03/22/13 09/07/13 0.00 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 -

AE Belleza Builders 35594 L B SB GB

Construction of One (1) Unit Senior High School Unique

Workshop Building (Under DepEd CY 2016 BEFF Technical

Vocational Laboratory Batch 10), Carayan National High

School, Naga City, Camarines Sur

Naga City,

Camarines Sur3/18/2017 1st & Final

Camarines Sur

2nd DEOLF 2.624 90 9/19/2016 12/17/2016 0.00 C 0.482 0.166 0.300 - - - 94.80

*94.8%

Very Satisfactory

AEJ Hardware Construction & Enterprises 34740 L D SB GEConstruction of Revetment along Ayala River at Calle San

Miguel SiteZamboanga City 11/23/2016 1st

Zamboanga City

DEOLF 3.851 295 2/8/2016 11/28/2016 0.00 O 0.417 0.2 0.3 0 0 0 0.9170 -

AEJ Hardware Construction & Enterprises 34740 L D SB GEConstruction/Rehabilitation of Flood Control Mitigation

Facilities along Tumaga River Basin

Tugbungan,

Zamboanga City3/7/2016 1st

Zamboanag City

DEOLF 9.3975 274 11/12/14 8/12/15 0 C 0.362 0.2 0.3 0 0 0 86.20%

86.2%

Satisfactory

AEJ Hardware Construction & Enterprises 34740 L D SB GE1

Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria

Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500-

K1851+600

Zamboanga City 3/11/2013 1st IX LF 1.880 64 02/26/13 05/01/13 -2.60 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 -

AEJ Hardware Construction & Enterprises 34740 L B SB GE

Retrofitting/Strengthening of Permanent Bridge of Tictapul

Bridge (B00557MN) along Pagadian City-Zamboanga City

Road

Zamboanga City 03/19/18 1st/FinalZamboanga City

DEOLF 5.615 89 03/22/17 06/18/17 0.00 C 0.369 0.169 0.300 - - - 83.80 *83.80% Satisfactory

AEJ Hardware Construction & Enterprises/

Mamsar Construction And Industrial

Corporation Joint Venture

JV-16-459 L AAA MA GE

Construction of Flood Control at Labuan River, Labuan

Section, (Including Right of Way Acquisition), Zamboanga

City 1st LD

- 11/7/17 1st DPWH LF 25.217 304 7/19/18 5/18/19 3.56 O 0.369 0.240 0.150 0.03 0.06 0.05 89.90 -

Agafer Construction 7912 L B SB GE2 Const. of Cagayan River Control 11/11/2008 2nd II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 18 of 33

Page 19: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Aguero Construction 23338 L B MA GE

Construction of Two (2) Storey Six (6) Classroom School

Building Tambing National High SchoolBarobo, Surigao del

Sur11/11/17 1st & Final DPWH LF 8.100 200 10/13/16 4/30/17 2.71 C 0.500 0.133 0.300 - - - 93.30

*93.3%

Very Satisfactory

Aguero Construction 23338 L B MA GB

Construction of Two (2) Storey Eight (8) CL at La Trinidad

Integrated Secondary School Butuan City 7/7/2017 1st & Final Butuan City LF 12.373 210 10/19/2016 5/16/2017 0.00 C 0.499 0.144 0.300 - - - 94.30*94.3%

Very Satisfactory

Aguero Construction 23338 L B MA GB

Construction of Two (2) Storey Eight (8) Classrooms School

Building at Manobo National High School, Magpet, Cotabato Magpet, Cotabato 3/16/2017 1stCOTABATO FIRST

DEOLF 10.618 165 8/18/2016 1/29/2017 -0.70 O 0.331 0.300 0.000 0.03 0.058 - 71.90 -

Aguero Construction 23338 L A MA GE

Repair/ Maintenance Road Slip along NRJ Cuevas-Bislig Road K1388+820 to

K1388+870(S0046

4MN) Trento,

Agusan del Sur

3/14/2017 1st & FinalAgusan del Sur

2nd DEOLF 6.616 123 10/3/2016 2/2/2017 0.00 C 0.444 0.133 0.300 - - - 87.70

*87.7%

Satisfactory

Aguero Construction 23338 L B MA GE

Concreting of Lemsinolon Farm to Market, Brgy. Lemsinolon,

T'Boli, South Cotabato 0 11/19/2016 1st & FinalSouth COTABATO

1ST DEOLF 2.951 80 4/7/2016 6/25/2016

(+)10.66

%C 0.382 0.171 0.3 0 0 0 0.8530

85.3%

Satisfactory

Aguero Construction 23338 L B MA GB

Construction of Two (2) Storey, 6 CL Senior High School

Building at Esperanza NHS Koronadal City South Cotabato South Cotabato 8/30/2016 1st & Final South Cotabato LF 8.172 150 11/9/15 4/6/16 0.00 C 0.487 0.133 0.3 0 0 0 0.920092%

Very Satisfactory

Aguero Construction 23338 L B SA GBConstruction of 2-Storey, 6-CL Senior High School Building at

Esperanza NHS Koronadal City, South Cotabato

Koronadal City,

South Cotabato3/7/2016 1st South Cotabato 1st LF 8.172 150 11/9/15 4/7/16 (+)0.26% O 0.349 0.24 0.15 0.03 0.035 0.05 85.40%

85.4%

Satisfactory

Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road

Prosperidad,

Agusan del Sur /

Caraga (13)

12/19/17 1st

Provincial

Government of

Agusan del Sur

LF 62.645 270 08/29/17 05/25/18 -4.46 O 0.39 0.23 0.11 0.03 0.06 0.05 86.80 - On - Going

Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road

Prosperidad,

Agusan del Sur /

Caraga (13)

04/06/18 2nd

Provincial

Government of

Agusan del Sur

LF 62.645 270 08/29/17 05/25/18 -3.70 O 0.40 0.23 0.11 0.03 0.06 0.05 88.50 - On - Going

Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road

Prosperidad,

Agusan del Sur /

Caraga (13)

11/13/18 Final

Provincial

Government of

Agusan del Sur

LF 63.910 429 08/29/17 10/31/18 3.13 C 0.49 0.20 0.30 - - - 98.50 92.00% Very Satisfactory

Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary

Road

San Francisco,

Agusan del Sur /

Caraga (13)

1/7/19 Final

Provincial

Government of

Agusan del Sur

LF 60.938 409 8/29/17 10/11/18 0.22 C 0.47 0.20 0.30 - - - 97.00 93.55% Very Satisfactory

Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary

Road

San Francisco,

Agusan del Sur /

Caraga (13)

2/20/18 2nd

Provincial

Government of

Agusan del Sur

LF 60.533 270 8/29/17 5/25/18 21.00 O 0.39 0.24 0.15 0.03 0.05 0.05 91.20 -

Aguero Construction 23338 L AConcreting of NRJ Barangay 1-Das agan-Barobo Boundary

Road

San Francisco,

Agusan del Sur /

Caraga (13)

12/18/17 1st

Provincial

Government of

Agusan del Sur

LF 60.533 270 8/29/17 5/25/18 4.58 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30 -

Aguero Construction 23338 L A MB GBConstruction of Two (2) Storey Six (6) Classroom School

Building Tambis National High School

Barobo, Surigao del

Sur03/19/18 2nd/Final

Surigao del Sur

2nd DEOLF 8.100 200 10/13/16 04/30/17 0.00 C 0.481 0.160 0.300 - - - 94.10 *94.03% Very Satisfactory

Aguero Construction 24880 L A MA GERepair/ Rehabilitation of Bolok River Bank Protection,

Poblacion Section

Koronadal City,

South Cotabato 11/7/17 1st & Final DPWH LF 13.150 150 3/9/17 8/5/17 8.00 C 0.456 0.133 0.300 - - - 88.90

*88.9%

Satisfactory

Aguero Construction 23338 L B MA GBConstruction of Two Storey Six Classroom School Building

Tambis National High School

Barobo, Surigao del

Sur11/17/2016 1st

Surigao del Sur

2nd DEOLF 8.100 140 10/13/2016 3/1/2017

(+)15.40

%O 0.392 0.3 0.15 0.03 0.035 0.033 0.9400 -

Aguinsod General Construction 34741 L B SB GE

Construction of Slope Protection/Retaining Wall along Pico-

Lamtang Road, K0256+300 - K0256+420, K0258+163 -

K0258+235, K0259+670 - K0259+700, K0260+665 - K0260+725,

K0262+500 - K0262+585

La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 8.292 120 2/20/15 6/19/15 (+) 1.00% O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% -

Ahe Construction 33486 L S SB GB

Construction of Two (2) Storey Six Classroom School

Building at Guiwan ES Guiwan,

Zamboanga City 3/22/2017 1st & Final

Zamboanga City

DEOLF 7.696 275 3/30/2016 12/29/2016 0.00 C 0.484 0.137 0.300 - - - 92.10

*92.1%

Very Satisfactory

Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1Widening of Governors Drive (Carmona-Dasmariñas-Trece

Martires City Rd.) inc. Drainage System

G.M.A. and

Carmona, Cavite8/15/2012 1st IVA LF 38.813 190 02/07/12 08/14/12 -6.91 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 -

Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 Imus, Cavite 11/23/2012 1st IVA LF 30.797 369 02/07/12 02/08/13 -4.41 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 -

Aina Construction 30026 LProcurement of Fully Developed Lots and Completed

Housing Units (510 units)

Green Park Ville,

Brgy. Takas,

Valderrama,

Antique

11/23/18 1st NHA LF 147.000 602 7/29/17 3/22/19 4.54 O 0.39 0.30 0.15 0.03 0.06 0.05 98.29 - On - Going

Aina Construction/Eddmari Construction And

Trading - JvL

Procument of 1000 Fully Developed House and Lot Packages

(St, Peter and Paul Housing Project)

Bgry. Bagacay, San

Dionisio, Iloilo2/2/2018 1st NHA LF 289.600 604 09/22/16 03/18/18 1.03 D 0.368 0.300 0.150 0.030 0.056 0.050 95.41 -

AJ Lava Builders Corp. 22265 L B MA GE

MFO-1 National Road Network Services - Asset Preservation

of National Roads Preventive Maintenance Based on

Pavement Management System/ Highway Development and

Management-4 (HDM-4), Marikina-Infanta Road, K0031+426 to

K0035+658, Antipolo City, 2nd LD

Antipolo City, 2nd

LD6/8/2017 1st & Final Rizal 1st DEO LF 29.351 90 2/23/2017 5/23/2017 0.54 C 0.437 0.133 0.300 - - - 87.00

*87%

Satisfactory

AJ Lava Builders Corp. 22265 L B MA GERehabilitation of Drainage System Including Curbs and Gutter

and Sidewalk, Imelda AvenuePasig City 3/16/18 1st/Final

Metro Manila 1st

DEOLF 13.700 332 4/11/17 3/8/18 7.78% C 0.489 0.134 0.3 - - - 92.30 *92.30% Very Satisfactory

AJ Lava Builders Corp. 22265 L B MA GERehabilitation of Drainage System Including Curbs and Gutter

and Sidewalk

Imelda Avenue,

Pasig City11/23/17 1st DPWH LF 13.700 270 4/11/17 1/5/18 1.89 O 0.397 0.240 0.150 0.03 0.06 0.033 91.00 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 19 of 33

Page 20: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

AJ Taylan Construction Corporation / Badoc

Builders & Supply Joint Venture2336 L B MA GE

Construction of Flood Mitigation Structure along Badoc River,

U/S and D/S of Badoc BridgeBadoc, Ilocos Norte 6/2/2017 1st

Ilocos Norte 2nd

District Engineering

Office

LF 41.895 195 2/24/2017 9/6/2017 0.19 O 0.372 0.240 0.150 0.03 0.06 0.05 90.20 -

AJ Taylan Construction Corporation / DJCM

Construction Corporation Joint VentureJV-16-1034 L B MA GE

Construction of Flood Control Structure along Bislak River

Brgy. Dagupan,

Vintar, Ilocos Norte5/31/2017 1st

Ilocos Norte 1st

District Engineering

Office

LF 42.424 220 2/24/2017 10/1/2017 0.48 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 -

AJ Taylan Construction Corporation/DJCM

Construction Corporation (Formerly: Djcm

Construction) Joint Venture

JV-16-1034 L B MA GE

Construction of Flood Control Structure along Bislak RiverBrgy. Dagupan,

Vintar, Ilocos Norte8/15/2017 2nd & Final

Ilocos Norte 1st

DEOLF 44.093 220 2/24/2017 10/1/2017 0.18 C 0.498 0.133 0.300 - - - 93.10

*91.102%

Very Satisfactory

AJ Tylan Const., Corp./DJCM Const/VVH Const.,

Corp./ZEDIK Builders (DAVZ JV)JV-13-702 L A MA GE

Construction and Maintenance of Bridges along National

Roads-Widening of Permanent Bridges, Subec Bridge along

MNR

Pagudpud, Ilocos

Norte10/21/2014 1st I LF 36.706 304 5/9/14 3/8/15 0.01% O 0.330 0.249 0.150 0.030 0.056 0.050 86.50%

86.50%

Satisfactory

Ajan Jeada, Inc. (Formerly: Jeada

Construction)17869 L A MB GB1 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 1st NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -

Ajan Jeada, Inc. (Formerly: Jeada

Construction)17869 L A MB GE1 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) Bacacay, Albay 8/3/2011 1st V LF 18.989 221 01/03/11 08/11/11 0.63 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 -

Ajan Jeada, Inc. (Formerly: Jeada

Construction)17869 L A MA GE

Cluster 4-Local Infrastructure Program-Construction of Local

Road (Road Opening) and Drainage Canal and Slope

Protection, Camalig, Albay

Camalig, Albay 3/8/2016 1st Albay 2nd DEO LF 4.2732 114 2/9/15 6/2/15 (+)6.514 C 0.484 0.133 0.3 0 0 0 91.70%91.7%

Very Satisfactory

AJYSC Marketing 26924 L A MA GE

Midsayap-Marbel Road K1777+353 to K1779+553.16 with

exception Luayan-Dumadalig Section, Tantangan South

Cotabato, 2nd LD

Tantangan, South

Cotabato11/9/2015 1st

South Cotabato

First DEOLF 47.958 234 3/31/15 11/19/15 (+) 0.09% O 0.36 0.248 0.15 0.03 0.042 0.05 88.00%

88%

Satisfactory

AJYSC Marketing 26924 L A MA GE

Midsayap-Marbel Road, K1777+409 - K1780+120 (with

exceptions), Luayan-Dumadalig Section Tantangan, South

Cotabato Modified To: MFO1 - Widening of National

Secondary Road, - Midsayap - Marbel Road, K1777+353 -

K1779+553.16 (with exceptions), Luayan-Dumadalig Section

Tantangan, South Cotabato

Tantangan, South

Cotabato3/8/2016 - South Cotabato 1st LF 47.9577 234 11/19/15 7/10/16 0.00% C 0.362 0.2 0.3 0 0 0 87.28%

87.28%

Satisfactory

AJYSC Marketing 26924 L A MA GE

Midsayap-Marbel Road, K1777+409-K1780+1020 ( with

exceptions), Luayan-Dumadalig Section, Tantangan, South

Cotabato Modified to: MF01- Widening of Secondary Road-

Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with

exceptions), Luayan-Dumadalig Section

Tantangan, South

Cotabato6/2/2015 1st

South Cotabato

DEOLF 43.944 174 3/31/15 9/20/15 15.05% O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% -

AJYSC Marketing 26924 L A MA GE

Construction and Namleaning of Bridges along National

Roads- Widening of Permanent Bridges to more than 2 lanes,

Bawing Bridge along Makar-Kiamba Road

General Santos City 11/18/2015 1stSouth Cotabato

Second DEOLF 25.481 176 4/1/15 10/12/15

(-)

24.00%O 0.346 0.3 0 0 0.023 0 66.90%

66.9%

Poor

AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawan-Marbel Rd. (New

Carment Sect.)Tacurong City 3/11/2013 3rd XII LF 17.419 214 05/19/12 12/28/12 - O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 -

AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawan-Marbel Rd., New

Carmen Sect. Tacurong City 11/24/2012 2nd XII LF 17.419 214 05/19/12 12/28/12 -4.81 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 -

AJYSC Marketing 26924 L A MA GE2Completion of Drainage Canal along Dulawqan-Marbel Rd.

(New Carment Sect.)

Tacurong City,

Sultan Kudarat8/8/2012 1st XII LF 17.419 196 05/29/12 12/10/12 -6.47 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 -

AJYSC Marketing 26924 L A MA GE2Rehab./Improvement of Bulok Bridge along Marbel-Makar

Road6/5/2009 1st R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -

AJYSC Marketing 26924 L A MB GE

Construction/Rehabilitation of Flood Control Mitigation

Facilities Major River Basins-Mindanao River Basin:

Construction of Bank Protection along Cotabato-Marbel Road,

Km. 1723+100 Banga, South Cotabato

Banga, South

Cotabato3/7/2016 1st South Cotabato 1st LF 16.5484 160 9/30/15 3/8/16 (-)8.61% O 0.201 0.248 0.064 0.022 0.04 0.017 59.20%

59.2%

Poor

AJYSC Marketing 26924Const./Replacement of Banga Bridge and Approaches Phase

II3/8/2010 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -

AJYSC Marketing 26924 L AImprovement of NHW Jct. Lomutan - Upper Kalaneg Farm to

Market Road

Maitum, Sarangani

Province 3/20/19 1st

Provincial

Government of

Sarangani

LF 41.336 480 1/8/18 9/13/18 -9.37 O 0.02 0.30 0.14 0.24 0.06 0.02 77.29 - On - Going

AJYSC Marketing 26924 L A MA GEConstruction of River Control along Alah River (Panas-

Bambad-Section) K0+000 - K0+210

Isulan, Sultan

Kudarat 11/8/17 1st DPWH LF 18.503 259 3/6/17 11/19/17 0.00 O 0.355 0.235 0.150 0.03 0.042 0.033 84.50 -

AKH Construction and Trading Corporation 20759 L A MA GE

Rehabilitation/Reconstruction/Upgrading of Damaged South

Super Highway East Service Road, K13+890 to K16+793,

Parañaque City

Parañaque City 9/3/2015 1st NCR LF 27.364 165 5/15/15 10/26/15 8.29% O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% -

AKH Construction and Trading Corporation 20759 L A MA GE

Preventive Maintenance Based on Pavement Management

System/Highway Development and Management-4 (HDM-4)

along V. Mapa Street

Sta. Mesa, Manila 11/24/2014 1st NCR LF 22.598 206 5/28/14 12/19/14 0.17% O 0.381 0.240 0.150 0.030 0.045 0.033 87.90%87.90%

Satisfactory

AKH Construction and Trading Corporation 20759 L A MA GE

Concrete Reblocking along commonwealth Ave., Quezon City,

K0017+061 - K0020+(-262), K0016+938 - K0019+731, Quezon

City

Quezon City 6/6/2015 1st NCR LF 17.988 273 10/29/14 7/28/15 (+) 21.83 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% -

AKH Construction and Trading Corporation 20759 L A MA GEProposed Repair/Rehab. Of Road along Jalandoni St., CCP

ComplexPasay City 8/17/2014 1st NCR LF 8.100 90 5/21/14 8/18/14 14.30 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 -

AKH Construction and Trading Corporation 20759 L AAA MB GE1

Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.

Sect.) of Mendiola Extension (Chainage 0000-Chainage 0119,

A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-085)

Manila 3/13/2013 1st NCR LF 2.678 69 02/20/13 04/29/13 10.22 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 20 of 33

Page 21: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

AKN Construction Corporation (Formerly: Akn

Construction)11845 L AAA LB GE

Construction of Drainage System along PNR Railroad Track in

Cupang, Muntinlupa City, Metro Manila

Muntinlupa City,

Metro Manila11/24/2016 1st & Final

Las Piñas-

Muntinlupa DEOLF 24.116 180 9/4/2015 3/1/2016 0.00 C 0.425 0.133 0.3 0 0 0 0.8580

85.8%

Satisfactory

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA - GE

Construction of Flood Control StructureUpper Paliko Creek,

Brgy. Cupang,

Muntinlupa City

8/15/2017 1st & FinalLas Piñas-

Muntinlupa DEOLF 17.690 318 8/2/2016 6/15/2017 0.00 C 0.439 0.145 0.300 - - - 88.40

*88.4%

Satisfactory

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA LB GE

Dredging of Parañaque River Mouth (Phase II), Parañaque

City, Metro ManilaParañaque City,

Metro Manila6/8/2016 2nd & Final

METRO MANILA

2ND DE0LF 86.132 240 5/12/15 1/6/16 0.01 C 0.433 0 0.5 0 0 0 93.30%

93.48%

Very Satisfactory

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA LB GE Slope Protection of Estero Tripa De Gallina, Barangay Bangkal

District I, Makati City,

M.M.11/19/2014 1st NCR LF 17.321 150 6/18/14 11/14/14 -9.07% O 0.357 0.300 0.059 0.030 0.049 0.050 84.50%

84.50%

Satisfactory

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA MA GE1

Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at

corner Pacheco)Tondo, Manila 4/15/2011 1st NCR LF 17.977 248 06/25/10 02/27/11 1.67 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA MB GE1

Rehab./Reconstruction of Muntinlupa Insular Prison Road

and its Vicinity, Brgy. Poblacion9/9/2009 1st NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -

AKN Construction Corporation (Formerly: AKN

Construction)11845 L AAA MA GE

Dredging of Paranaque River Mouth (Phase I), Paranaque City,

Metro Manila Metro Manila 12/3/2015 1stMetro Manila 2nd

DEOLF 86.133 240 5/12/15 1/1/16 (+)6.05% O 0.4 0.2 0.05 0.036 0.25 - 93.60%

93.6%

Very Satisfactory

AL Chris Construction 12406 L B B GE

Repair/Maintenance of Flood Control- Sta.00+723.80-

Sta.00+840 (Downstream), Sagasa, Balilihan, BoholSagasa, Balilihan,

Bohol3/14/2017 1st & Final Bohol 1st DEO LF 3.932 60 10/27/2016 12/25/2016 0.07 C 0.479 0.133 0.300 - - - 91.20

*91.2%

Very Satisfactory

AL Chris Construction 12406 L B MA GB

Construction of Multi-Purpose Building, Municipality of

Alburquerque, Bohol

Municipality of

Alburquerque,

Bohol

6/1/2017 1st & FinalBohol 1st District

Engineering OfficeLF 9.777 150 6/30/2016 11/26/2016 0.00 C 0.494 0.132 0.300 - - - 92.60

*92.6%

Very Satisfactory

AL Chris Construction 12406 L B MB GE

MFO-1-National Road Network Services-Asset Preservation of

the Road, Rehabilatation/Reconstruction/Upgrading of

Damaged Paved National Roads Including Drainage Based on

Pavement Management System /Highway Development and

Management System-4 (HDM-4), Secondary P00102023VS,

Tagbilaran North Road, K0024+120 - K0025+000 and

K0028+330 - K0028+393

Loon, Bohol 8/20/2017 1st Bohol 1st DEO LF 28.924 181 4/29/2017 10/26/2017 0.11 O 0.391 0.300 0.150 0.018 0.045 0.05 95.40 -

AL Chris Construction 12406BERRRP-Candumayao (Catigbian) - Cabanugan (San Isidro)

rd.

Catigbian-San

Isidro, Bohol1/19/2015 1st

Provincial

Government of

Bohol

L 8.874 209 06/05/14 01/14/15 -0.59 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 -

AL Chris Construction 12406 L B MA GE

MFO-1- National Road Network Service-Asset Preservation of

National Roads - Rehabilitation/ Reconstruction/ Upgrading of

Damaged Paved National Roads Including Drainage Based on

Pavement Management System/Highway Development

Management-4 (HDM-4) Secondary at Tagbilaran North Road

(Tagbilaran-Jetafe Section)-S00030BH, 1) K0024+120-

K0025+000 and K0028+330-K0028+393

Loon, Bohol 4/3/18 2nd/Final Bohol 1st DEO LF 30.457 186 4/29/17 10/31/17 0.00 C 0.465 0.133 0.3 - - - 89.80 93.16% Very Satisfactory

AL Handasa Construction 0 L 0 0 GBConstruction of 1 Unit 1-Storey, 3 CL School with Toilet

Attached, Jose T. Arranguez Sr. ES, Kiblawan, Davao del Sur

Jose T. Arranguez

Sr. ES, Kiblawan,

Davao del Sur

3/14/2016 1stDavao del Sur

Second DEO1 2.9325 150 11/23/15 4/20/16 (+)11.67 O 0.4 0.3 0.15 0.03 0.041 0.05 97.10%

97.1%

OutstandingOutstanding

AL Handasa Construction 36974 L D SB GB

Construction of One (1) Unit, One (1) Storey, Three (3)

Classroom School with Toilet Attached at Jose T. Arrangues

SR., Elementary School, Kiblawan, Davao del SurKiblawan, Davao

del Sur6/13/2016 2nd & Final

Davao del Surd

2nd DEOLF 2.932 120 11/23/15 3/21/16 0.00 C 0.461 0.18 0.3 0 0 0 94.10%

96.2%

Outstanding

AL Handasa Construction 36974 L D SB GB

Construction of TechVoc Workshop Building, Sulop NHS,

Sulop, Davao del SurSulop, Davao del

Sur11/21/2016 1st & Final

Davao del Sur

Second DEOLF 2.580 90 3/15/2016 6/12/2016 0.01 C 0.483 0.133 0.3 0 0 0 0.9160

91.6%

Very Satisfactory

AL Handasa Construction 36974 L D SB GB

Locally funded projects-Local Infrastructure Program-

Buildings and other Structures-Multipurpose/Facilities-

Construction of Multi-Purpose Building of Demoloc ES

Brggy. Demoloc,

Malita, Davao

Ocidental

3/14/18 1st/FinalDavao Occidental

DEOLF 1.479 105 4/19/17 8/1/17 0% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory

AL Hussein Construction 18438 L A MA GE

Rehabilitation/Reconstruction of National Road with Slip,

Slope Collapse and Landslides, Lanao del Norte

Circumferential Road (LDNICR)

Tagoloan, Lanao

del Norte,

K1536+610 -

K1536+750;

K1544+120 -

K1544+725

3/14/2016 1stLANAO DEL

NORTE 1ST DEOLF 44.7894 235 2/25/15 10/18/15 0 C 0.473 0.199 0.3 0 0 0 97.20%

97.2%

Outstanding

AL Hussein Construction 18438 L A MA GE

Rehabilitation/Reconstruction of National Road with Slips,

Collapse and Landslides, Lanao del Norte Interior

Circumferential Road (LDN1CR), K1536+610-K1536+750;

K1544+120-K1544+725, Tagoloan, Lanao del Norte

K1536+610-

K1536+750;

K1544+120-

K1544+725,

Tagoloan, Lanao

del Norte

9/3/2015 1stLanao del Norte

1st DEOLF 44.744 205 2/25/15 9/17/15 0.34% O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% -

AL Hussein Construction / NDP Construction

Development Joint VentureJV-16-514 L A MB GE

Network Development Off-Carriageway Improvement

Including Drainage Tertiary Road: Lanao del Norte Interior

Circumferential Road (LDNICR) S00941MN, K1535+(-560)-

K1539+000

Tagoloan, Lanao

del Norte3/22/18 1st/Final

Lanao del Norte

1st DEOLF 39.240 250 2/13/17 10/20/17 0 C 0.418 0.133 0.3 - - - 85.10 *85.10% Satisfactory

Al Niño Construction & Supply 18378 L B 0 GERehab./Retrofitting of Pili Bridge along Cumadcad-San Isidro-

Poblacion Road, Castilla, SorsogonCastilla, Sorsogon 5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 120 11/17/2016 3/16/2017 0.00 C 0.445 0.134 0.300 - - - 87.90

*87.9%

Satisfactory Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 21 of 33

Page 22: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Al Niño Construction & Supply 18378 L B MA GE

Concreting of Capuy Road, Sorsogon City

Sorsogon City 11/18/2016 1st & Final Sorsogon 1st DEO LF 2.875 120 3/7/2016 7/4/2016 0.00 C 0.482 0.133 0.3 0 0 0 0.915091.5%

Very Satisfactory

Al Niño Construction & Supply / Steven

Construction & Supply Joint VentureJV-16-249 L B MA GB

Cluster II - Const. of Various School Bldg. Projects under FY

2016 Basic Educational Facilities Fund (BEFF) Batch 11, Pilar

& Castilla, Sorsogon City

Pilar & Castilla,

Sorsogon City5/30/2017 1st Sorsogon 1st DEO LF 40.187 210 11/23/2016 6/20/2017 0.15 O 0.376 0.205 0.150 0.03 0.054 0.05 86.50 -

Alagon Construction 32626 L D SB GB

Construction of Multi-Purpose Covered Court, Brgy. Dambo,

Pangil, Laguna Pangil, Laguna 11/23/17 1st & Final DPWH LF 4.498 120 2/9/17 6/8/17 0.00 C 0.498 0.133 0.300 - - - 93.10*93.1%

Very Satisfactory

Al-B Development Corporation (Formerly: Al-B

Construction)11740

Rehab./Reconst./Upgrading along Angeles-Porac-

Floridablanca-Dinalupihan Rd.6/1/2010 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -

Al-B Development Corporation (Formerly: Al-B

Construction)11740 L A MA GE

Network Development, Widening of National Roads, (Arterial

Roads-Outside N1), Angeles-Porac-Floridablanca-Dinalupihan

Road at KO084+(-615) to KO085+(-024), Angeles City,

Pamapanga 1st LD

Angeles City,

Pamapanga 1st LD8/29/2015 1st

Pampanga Third

DEOLF 34.069 210 4/29/15 11/24/15 1.90% O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% -

Al-B Development Corporation (Formerly: Al-B

Construction)11740 L A MA GE

Network Development, Widening of National Roads, (Arterial

Roads-Outside N1, Angeles-Porac-Floridablanca-Dinalupihan

Road), K0084+(-615) to K0085+(-024), Angeles City, Pampanga

1st LD

K0084+(-615) to

K0085+(-024),

Angeles City,

Pampanga 1st LD

3/17/2016 2ndPampanga Third

DEOLF 34.0666 232 4/29/16 12/16/16 0.43% C 0.485 0.133 0.3 0 0 0 91.86%

91.86%

Very Satisfactory

Al-B Development Corporation (Formerly: Al-B

Construction)11740 L A MA GE

Flood Management Services; Construction/ Maintenance of

Flood Mitigation Structures & Drainage System;

Repair/Rehabilitation of Slope Protection along Taug River

Angeles City, Pampanga

Angeles City,

Pampanga11/20/2016 1st & Final Pampanga 3rd LF 37.124 150 3/18/2016 8/14/2016 0.00 C 0.338 0.2 0.3 0 0 0 0.8380

83.8%

Satisfactory

Al-B Development Corporation (Formerly: Al-B

Construction)11740 L A MA GE

Locally Funded Projects: Construction/ Repair/ Rehabilitation/

Improvement of Various Infrastructure including Local

Projects: Roads and Bridges, Local Roads, Improvement/

Rehabilitation of Ayala - Sto. Niño - Turu, Magalang,

Pampanga

Magalang,

Pampanga3/21/18 1st/Final

Pampanga 3rd

DEOLF 27.574 180 6/25/17 12/21/17 0% C 0.452 0.133 0.3 - - - 88.50 *88.50% Satisfactory

AL-B Dev't Corp./ Ping-Ann's Construction and

Trading (JV)JV-14-075 L A MA GE Reconstruction of Loboc River Terminal Loboc, Bohol 6/24/2015 1st TIEZA LF 19.550 240 11/04/14 07/01/15 -5.350 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 -

Al-Badr Construction 11387 L B MA GE

Road Upgrading (Unpaved to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) (Intermittent Section)

Tertiary Road:Lanao del Norte Interior Circumferential Road

(LDNICR), K1553+729 -K15

Pantao Ragat,

Lanao del Norte6/13/2016 1st & Final

LANAO DEL

NORTE 1ST DEOLF 24.483 131 2/19/16 6/28/16 0.31 C 0.411 0.124 0.3 0 0 0 83.50%

83.5%

Satisfactory

Alberto Uy Construction & Development 20924 L B MA GERehabilitation/Upgrading of Mapang (Taas) Formon Road,

Bongabong, Oriental Mindoro

Bongabong,

Oriental Mindoro8/28/2015 1st

Southern Mindoro

DEOLF 14.477 149 4/7/15 9/2/15 1.64% O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% -

Alberto Uy Construction & Development 20924 L B MA GE Concreting of Sitio Sulbod Road

Barangay Anilao,

Bongabong,

Oriental Mindoro

03/21/18 1st/FinalSouthern Mindoro

DEOLF 10.617 175 04/25/17 10/16/17 0.01 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding

Alcel Construction 15129 L A MA GE

MFO-1: National Road Network Services: Various Projects

under Asset Preservation of National Roads within DPWH-

Benguet Second District Engineering Office (Cluster I-2016),

Acop-Kapangan-Kibungan-Bakun Road,

Buguias, Benguet 6/7/2017 1st & Final

Benguet 2nd

District Engineering

Office

LF 26.161 325 2/7/2006 12/28/2006 0.00 C 0.445 0.134 0.300 - - - 87.90*87.9%

Satisfactory

Alcel Construction 15129 L A MA GE

Road Upgrading (Gravel-Paved) Along Gurel-Bokod-Kabayan-

Buguias-Abatan Road, K0338+481-K0339+838, Kabayan,

Benguet

Kabayan, Benguet 8/14/2014 1st CAR LF 46.461 240 1/31/14 9/27/14 0.13 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 -

Alcel Construction 15129 L A MA GE1 Const. of Access Rd. for Alaminos Airport (Phase I)Alaminos City,

Pangasinan8/16/2012 1st I LF 17.991 253 12/13/11 08/21/12 6.64 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 -

Alcel Construction 15129 L A MA GE1 Const. of Access Rd. to Airport, Alaminos City AirportAlaminos,

Pangasinan3/15/2013 1st I LF 1.821 45 02/22/13 04/07/13 18.23 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 -

Alcel Construction 15129 L AAA MB GE

Construction and Maintenance of Bridges along National

Roads (Magalong Br.) Pangasinan-Zambales Road Mabini, Pangasinan 8/24/2017 1st & FinalPangasinan 1st

DEOLF 8.149 120 2/20/2017 6/19/2017 0.03 C 0.500 0.133 0.300 - - - 93.30

*93.3%

Very Satisfactory

Alcel Construction 15129 L A MB GE

MFO-1 Various Projects:

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Roads including Drainage Based on Pavement

Management System/Highway Development and Management-

4 (HDM-4) (Intermittent Sections), Acop - Kapangan -Kibungan

- Bakun Road

Benguet 3/30/2017 1st & Final Benguet 2nd DEO LF 10.316 280 3/9/2016 12/13/2016 0.00 C 0.455 0.200 0.300 - - - 95.50*95.5%

Very Satisfactory

Alcel Construction 15129 L A MB GE

Construction/Improvement of Access Roads Leading to

Airports, Seaports and Declared Tourism Destinations - Turod

- San Gregorio - Shalom - Lusok Road Leading to Lusok Cave,

Luna, Apayao

Luna, Apayao 8/30/2016 1st & Final CAR LF 96.499 389 4/13/15 5/5/16 0.00 C 0.369 0.2 0.3 0 0 0 0.869086.9%

Satisfactory

Alcel Construction 15129 L A MB GE

Construction/Improvement of Access Roads leading to

Airports, Seaports and Declared Tourism Destination

Poblacion - Lappa - Marag leading to Marag Valley, Luna,

Apayao

Luna, Apayao 8/30/2016 1st & Final CAR LF 96.491 389 4/13/15 5/5/16 0.00 C 0.333 0.2 0.3 0 0 0 0.833083.3%

Satisfactory

Alcel Construction 15129 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao

Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133,

Alaminos City, Pangasinan

Alaminos City,

Pangasinan6/14/2016 1st & Final

PANGASINAN 1ST

DEOLF 46.011 270 5/22/15 2/15/16 0.14 C 0.385 0.2 0.3 0 0 0 88.50%

88.5%

Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 22 of 33

Page 23: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Alcel Construction 15129 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao

Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133,

Alaminos City, Pangasinan

K0325+000 to

K0326+000,

K0321+(-204) to

K0323+133,

Alaminos City,

Pangasinan

9/1/2015 1stPangasinan 1st

DEOLF 43.823 240 5/22/15 1/17/16 (+)29.75 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% -

Alcel Construction 15129 L A MB GE

National Road Network Services: Various Projects under

Asset Preservation of National Roads within DPWH - Benguet

2nd, Buguias and Kapangan, Benguet

Buguias and

Kapangan, Benguet8/24/2016 1st

BENGUET 2ND

DEOLF 26.335 222 3/9/16 10/16/16 -0.04 O 0.334 0.3 0.105 0.03 0.051 0.033 0.8530 -

Alcel Construction 15129 L A MB GE

Construction of Road Baywalk, Brgy. Baybay Lopez,

Binmaley, PangasinanBinmaley,

Pangasinan9/2/2016 1st & Final

PANGASINAN 2ND

DEOLF 18.617 180 7/14/15 1/9/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910

89.1%

Very Satisfactory

Alcel Construction 15129 L A MB GE

Installation/Application/Construction of Road Safety Devices

along Odiong-Sibalom-San Remigio-Leon Road, KO104+(-448)-

KO134+000, Sibalom-Alangan Road, KO107+(-555)-

KO110+175, San Remigio-Bugo Road, KO118+(-448)-

KO126+223, Bantayan-San Pedro-Cubay Road, KO

Hamtic, San Jose,

Sibalom & San

Remigio, Antique

6/9/2016 1st & Final ANTIQUE DEO LF 10.431 70 12/16/15 2/23/16 0.00 C 0.478 0.2 0.3 0 0 0 97.80%97.8%

Outstanding

Alcel Construction 15129 L MB Rehabilitation of Banaoang - Mapandan RoadSta. Barbara,

Pangasinan1/22/18 1st

Provincial

Government of

Pangasinan

LF 45.449 195 7/12/17 5/28/18 2.74 O 0.36 0.30 0.15 0.03 0.05 0.05 93.20 - On - Going

Alcel Construction L Rehabilitation of Banaoang-Mapandan Road

Sta. Barbara,

Pangasinan /

Region 1

1/22/18 1st

Provincial

Government of

Pangasinan

LF 45.449 195 7/12/17 8/14/17 2.74 O 0.39 0.30 0.15 0.03 0.047 0.05 96.70 - On - Going

Alcel Construction/ DJCM Construction

Corporation (Formerly: Djcm Construction)

Joint Venture

JV-16-1033 L A MA GE

Network Development Construction of Missing Gaps

connecting National Roads, including RROW along Ilocos

Norte-Apayao Road

K0537+554 -

K0540+050, Nueva

Era, Ilocos Norte

11/8/17 2nd & Final DPWH LF 144.715 299 2/14/17 12/9/17 28.61 C 0.474 0.134 0.300 - - - 90.80*91.94%

Very Satisfactory

Alcel Construction/Oriental Sales Center and

Contractor (J.V.)JV-12-432 L A MA GE1

Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/

exception w/n the District

Carmen, Rosales,

Pangasinan8/9/2013 1st I LF 34.285 150 03/27/13 08/23/13 0.44 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 -

Alcel Construction/Rodekom General

Construction And Enterprise Joint VentureJV-15-680 L A MB GE

Off-Carriageway Improvement Including Drainage along

Benguet - Nueva Vizcaya Road, K0290+000 to K0293+662,

K0293+703 to K0297+792, K0297+852 to K0302+000, Bokod,

Benguet

Bokod, Benguet 8/23/2016 1st & FinalBENGUET 1ST

DEOLF 44.022 165 2/7/16 7/20/16 0.00 C 0.407 0.191 0.3 0 0 0 0.8980

89.8%

Very Satisfactory

Alcel Construction/Rodekom General

Construction And Enterprise Joint VentureJV-15-797 L A MB GE

Replacement of Permanent Weak Bridges along Gurel-Bokod-

Kabayan-Buguias-Abatan Road Alanod Bridge (B02667LZ) K0337+760,

Kabayan, Benguet5/30/2017 1st & Final

Benguet 1st District

Engineering OfficeLF 26.162 250 2/7/2016 10/13/2016 0.00 C 0.442 0.134 0.300 - - - 87.60

*87.6%

Satisfactory

Alebon Genuine Merchandising Incorporated 26300 L B MA GEWidening of Butuan City - Cagayan de Oro City - Ilagan City

Road Km1425+500 - Km.1426+500

Cagayan de Oro

City8/4/2014 1st X LF 18.578 191 1/31/14 8/10/14 0.00 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 -

Alebon Genuine Merchandising Incorporated 26300 L B MA GE

Rehab/Reconst/Upgrading of Damaged Paved National Roads

Including Drainage Based on Pavement Management

System/Highway Development and Management-4 (HDM-4)

(Intermittent Section) CDO-Cadre Circumferential Ext., Rd.,

Chainage 0-556.00, Cagayan de Oro City

CDO-Cadre

Circumferential Ext.,

Rd., Chainage 0-

556.00, Cagayan

de Oro City

6/11/2015 1stCagayan de Oro

City First DEOLF 8.865 170 2/9/15 7/28/15 - O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% -

Alebon Genuine Merchandising Incorporated 26300 L B MA GE1 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect.Cagayan de Oro

City3/11/2013 1st X LF 4.198 37 01/15/13 02/20/13 6.52 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 -

Alebon Genuine Merchandising Incorporated 26300 L B SB GEConstruction of Concrete Revetment along Kinoguitan By-

Pass Road

Brgy. Poblacion,

Kinoguitan, Misamis

Oriental

8/11/2014 1st X LF 13.482 210 1/20/14 8/17/14 0.18 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -

Alebon Genuine Merchandising Incorporated 26300 L B A GB

Concreting of Barangay Macasandig FMR, Macasandig,

Cagayan de Oro City

Macasandig,

Cagayan de Oro

City

3/24/2017 1stCagayan de Oro

City 2nd DEOLF 4.350 150 11/8/2016 4/6/2017 0.00 O 0.393 0.300 0.115 0.03 0.054 0.017 90.90 -

Alebon Genuine Merchandising Incorporated 26300 L B MA GE

Concreting of Barangay Macasandig FMRCagayan De Oro

City11/6/17 1st & Final DPWH LF 3.728 150 11/8/16 4/6/17 0.00 C 0.431 0.200 0.300 - - - 93.10

*93.1%

Very Satisfactory

Alfahad Builders And Enterprises 40063 L D SB GEOff-Carriageway Improvement Including Drainage along

Overton-Abaga Boundary Road KO 1531+176-KO 1532+675

Brgy. Ma. Cristina,

Iligan City03/22/18 1st/Final

Lanao del Norte

2nd DEOLF 6.224 37 03/09/17 04/14/17 0.00 C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory

Al-Fahdel Const. and Eng'g. 17953 L B MA GB

Construction of 3-storey, 9-classroom School Building at

Iligan City East High School-Hinaplanon Annex, Iligan City Iligan City 8/27/2016 1stLanao del Norte

2nd DEOLF 15.003 210 7/29/16 2/23/17 0.00 O 0.317 0.246 0.15 0.03 0.054 0.05 0.8470 -

Al-Fahdel Const. and Eng'g. 17953 L B MA GE

Road Project (Concreting), Brgy. Poblacion, Kapatagan-

Sapad, Tertiary: Kapatagan-Sapad Road, Sta. 0+000-Sta.

2+037.36 with Box Culvert, Kapatagan-Sapad, Lanao del Norte Lanao del Norte 11/23/2016 1st & Final

LANAO DEL

NORTE 1ST DEOLF 49.442 224 1/25/2016 9/4/2016 0.00 C 0.468 0.139 0.3 0 0 0 0.9070

90.7%

Very Satisfactory

Al-Fahdel Const. and Eng'g. 17953 L B MA GE1Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta.

1602+000-Sta. 1603+000 with exception6/5/2009 1st X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -

Al-Fahdel Const. and Eng'g. 17953 L B A GB

Construction of 3-Storey, 9-Classroom School Building at

Iligan City East High School, Hinaplanon Annex, Iligan City Iligan City 3/20/2017 2nd & FinalLanao del Norte

2nd DEOLF 15.003 240 5/23/2016 1/17/2017 0.00 C 0.500 0.142 0.300 - - - 94.20

*87.55%

Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 23 of 33

Page 24: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Al-Fahdel Const. and Eng'g. 17953 L B MA GE1Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon

Nat'l Rd. (Secondary Rd.), K2007+860-K2007+900

Butadon,

Kapatagan, Lanao

del Norte

11/28/2012 1st X LF 3.790 59 10/04/12 12/01/12 0.23 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 -

Al-Fahdel Const. and Eng'g. 17953 L B MA GE

Network Development: Improvement/Widening of National

Roads: Primary Roads: Malabang-Dobleston-Tukuran Road

SND, Lanao del

Norte K2001+244-

K2002+244

11/15/17 1st & Final DPWH LF 32.233 162 2/13/17 7/24/17 0.00 C 0.409 0.190 0.300 - - - 89.90*89.9%

Very Satisfactory

Alfalfa Construction 29712 L A MA GB

Construction of 2-Storey, 6-Classroom School Building, Lawig

National High School (Main) Lamut, Ifugao 6/1/2017 1st & FinalIfugao 1st District

Engineering OfficeLF 8.947 140 6/27/2017 11/13/2017 0.00 C 0.492 0.133 0.300 - - - 92.50

*92.5%

Very Satisfactory

Alfalfa Construction 29712 L B MA GE1Road Upgrading of Banaue-Hungduan Benguet Bdry. Road

Hapao-Abatan SectionHungduan, Ifugao 4/8/2011 1st CAR LF 16.560 177 01/20/11 07/02/11 -6.00 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -

Alfalfa Construction 29712 L A MA GB

Construction/Repair/Rehabilitation/Improvement of Various

Infrastructure Including Local Projects - Construction of

Office of the Vice President (OVP)-Office of Senior Citizens

Affairs (OSCA), (Multi-Purpose Building Center), Hungduan,

Ifugao

Hungduan, Ifugao 3/11/2016 1st Ifugao 1st DEO LF 1.855 150 8/12/15 1/8/16 0 C 0.434 0.133 0.3 0 0 0 86.70%86.7%

Satisfactory

Alfalfa Construction 29712 L A MA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide along Banaue-Hungduan-

Benguet Boundary Road, Hungduan, Ifugao

Hungduan, Ifugao 8/25/2016 1st & Final IFUGAO 1ST DEO LF 1.849 89 3/28/16 6/24/16 0.00 C 0.417 0.133 0.3 0 0 0 0.850085%

Satisfactory

Alfalfa Construction 29712 L A MB GE

Construction/ Improvement/ Rehabilitation of Barangay

Tanap, Lawig FMR, Lamut, Ifugao Lamut, Ifugao 11/20/2016 1st & Final Ifugao 1st DEO LF 1.889 36 6/30/2016 8/4/2016 0.00 C 0.48 0.133 0.3 0 0 0 0.913091.3%

Very Satisfactory

Alfalfa Construction 29712 L A MB GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslide, Banaue-Mayoyao-A. Lista-

Isabela Bdry Rd., K0354+544 to K0354+567, K0361+813 to

K0361+863, K0363+680 to K0363+702, K0363+702 to

K0363+730, K0364+350 to K0364+630, K03

Banaue, Mayoyao

& Aguinaldo, Ifugao8/27/2016 1st IFUGAO 2ND DEO LF 28.461 180 3/18/16 9/13/16 0.04 O 0.324 0.293 0.15 0.022 0.037 0.05 0.8760 -

Alfalfa Construction/Carlyz Construction Joint

VentureJV-15-870 L B MB GE

Repair/Rehabilitation/Improvement (Reblocking, Additional

Pavement Width with Drainage Improvement), K0315+(-147) to

K0318+000 with Exception, Kiangan-Tinoc-Buguias, Kiangan,

Ifugao

Kiangan, Ifugao 8/26/2016 1st & Final IFUGAO 1ST DEO LF 9.497 156 1/29/16 7/2/16 -0.01 C 0.448 0.133 0.278 0 0 0 0.859085.9%

Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 3/5/2009 2nd VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Completion of Binalbagan Bridge 2 - Km. 66+910 along

Hinigaran-Isabela Road3/5/2009 4th VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Const. of Access Rd. for Himoga-an Bridge, Bacolod North

Rd., Sta. 71+035.20-Sta. 74+557.20

Sagay City, Negros

Occidental8/12/2013 1st VI LF 109.290 310 01/15/13 11/20/13 10.51 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Road Upgrading of Villahermoso-Canla-on City-La Castellana

Road, K0074+205-K0074+995

La Castellana,

Negros Occidental8/10/2013 1st VI LF 23.131 182 01/28/13 07/28/13 -3.18 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MA GE

Widening of Catabla Bridge 3 along Bacolod Silay Airport

Access Road

Talisay City, Negros

Occidental3/20/18 1st/Final

Negros Occidental

1st DEOLF 30.061 180 5/9/17 12/4/17 0.00 C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis - Intermittent Sections)

National Secondary Road, Kabankalan Jct. Salong Tapi

Dacongcogon Bantayan Road - Package B

Kabankalan City,

Negros Occidental10/24/2014 1st VI LF 48.461 209 5/29/14 12/23/14 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40%

0%

Poor

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061-

K0088+003

Kabankalan City,

Negros Occidental8/11/2012 1st VI LF 32.631 222 01/27/12 09/04/12 0.31 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-

Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception,

Brgy. Salong & Batayan

9/17/2009 2nd VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Construction/ Improvement of Junction National Road -

Talisay - Concepcion-Mucia Road with exception Leading to

Campuestohan Resort, Talisay City, Negros OccidentalTalisay City, Negros

Occidental8/25/2017 1st & Final

Regional Office No.

VILF 197.818 450 3/15/2016 6/7/2017 - C 0.479 0.133 0.300 - - - 91.20

*91.2%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Improvement/Widening of Bacolod Silay Airport Access Road, K0012+403 -

K0012+623,

Talisay, Negros

Occidental

9/3/2016 1st & FinalNegros Occidental

1st DEOLF 9.848 96 3/28/16 7/1/16 0.00 C 0.478 0.133 0.3 0 0 0 0.9110

91.1%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Repair/Rehabilitation/Improvement of Bacolod South Road,

K0046+(-910) - K0047+700 with exception Hinigaran, Negros

Occidental, NIR

K0046+(-910) -

K0047+700 with

exception

Hinigaran, Negros

Occidental, NIR

6/14/2016 1st & FinalNegros Occidental

Second DEOLF 6.934 151 6/14/16 11/11/16 0.00 C 0.42 0.138 0.3 0 0 0 85.80%

85.8%

Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Widening of Guihalaran (B00494NR) Bridge 2 along Bacolod

Silay Airport Access Road

Silay City, Negros

Occidental3/20/18 1st/Final

Negros Occidental

1st DEOLF 23.734 200 5/9/17 11/24/17 0.00% C 0.487 0.133 0.3 - - - 92.00 *92.00% Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 24 of 33

Page 25: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Widening of National Roads along Bacolod South Road,

K0048+542-K0051+468; K0052+444-K0053+600; K0064+250-

K0065+360, Hinigaran, Negros Occidental

Hinigaran, Negros

Occidental11/16/2015 1st

Regional Office,

NIRLF 119.102 310 5/20/15 3/24/16 (+)7.18% O 0.373 0.238 0.15 0.03 0.055 0.05 89.60%

89.6%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Widening of Bacolod Circumferential Road (South) with

Drainage (including RROW), K0006+451 - K0011+476, Bacolod

City, Negros Occidental

Bacolod City,

Negros Occidental11/9/2015 1st

Regional Office,

NIRLF 81.443 255 3/16/15 11/25/15 (-)7.23% O 0.337 0.3 0.078 0.03 0.06 0.033 83.80%

83.8%

Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Damaged Paved

National Road along Bacolod North Road, K0039+771-

K0040+288; K0061+420-K0062+000; K0075+903-K0075+953;

K0076+620-K0077+000; K0080+060-K0081+000; K0081+558-

K0082+000; K0082+000-K0083+000; K0036+902-K0036+952;

K0038+200-K0038+406; K0041+843-K0042+300; K0042+500-

K0043+000, Manapla, Negros Occidental

Manapla, Negros

Occidental11/19/2015 1st

Regional Office,

NIRLF 75.626 265 4/8/15 12/28/15 (+)0.75% O 0.34 0.214 0.15 0.03 0.055 0.05 83.90%

83.9%

Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Bacolod North

Road, K0086+000 - K0087+000, K0087+540 - K0088+327,

K0088+362 - K0090+933, Sagay City, Negros OccidentalSagay City, Negros

Occidental11/19/2015 1st

Regional Office,

NIRLF 68.500 280 3/11/15 12/15/15 (+)0.04% O 0.371 0.237 0.15 0.03 0.055 0.05 89.30%

89.3%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Rehabilitation/Reconstruction/Upgrading of Bacolod North

Road,

K0086+000 -

K0087+000,

K0087+540 -

K0088+327,

K0088+362 -

K0090+933

8/25/2015 1stRegional Office

No.VILF 65.069 250 3/11/15 11/15/15 17.60% O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% -

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Construction/Replacement of Permanent Weak Bridges along

National Road, Tapi Bridge (B00211NR), along Kabankalan

Jct. Salong Tapi Dacongcogon Bantayan Road, Brgy. Tapi,

Kabankalan City, Negros Occidental

Brgy. Tapi,

Kabankalan City,

Negros Occidental

11/14/2015 1stNegros Occidental

3rd DEOLF 10.094 286 2/26/15 12/8/15 (+)11.0% O 0.363 0.241 0.15 0.03 0.045 0.05 87.90%

87.9%

Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Construction/Replacement of Permanent Weak Bridges along

National Road Tapi Bridge (B00211NR), K0115+044 along

Kabankalan Junction Salong Tapi, Dacongcogon Bantayan

Road, Barangay Tapi, Kabankalan City, Negros Occidental

Barangay Tapi,

Kabankalan City,

Negros Occidental

3/8/2016 2ndNegros Occidental

Third DEOLF 10.094 306 2/26/15 12/28/15 0 C 0.48 0.133 0.3 0 0 0 89.26%

89.26%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Improvement/Widening of National Roads along Bacolod

South RoadK0057+740-

K0059+781,

Binalbagan, Negros

Occidental

11/22/2016 2nd & Final NIR LF 45.720 179 3/30/2016 9/24/2016 0.00 C 0.485 0.133 0.3 0 0 0 0.918089.94%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Rehabilitation/Major Repair of Tan-ao Bridge (B00175MN)

along Bacolod North RoadSaga City, Negros

Occidental11/25/2016 1st & Final

Negros Occidental

1st DEOLF 13.861 88 3/30/2016 6/25/2016 0.00 C 0.5 0.133 0.3 0 0 0 0.9330

93.3%

Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE1

Const. of the Remaining Structures: Himogaan Bridge, Sta.

71+035.20-Sta. 74+557.20

Sagay City, Negros

Occidental8/12/2013 1st VI LF 116.246 505 05/14/12 09/30/13 0.66 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 -

Alfies Construction & Construction Supply,

Inc./Aqua Dragon Construction & Supply17162 L A MB GE

Preventive Maintenance Based on Pavement Management

System/Highway Development and Management -4 (HDM-4) of

Bacolod South Road, K0046+(-910) to K0081+486

Hinigaran,

Binalbagan and

Himamaylan

3/15/18 1st/FinalNegros Occidental

2nd DEOLF 29.692 207 4/16/17 11/8/17 -3.00% C 0.456 0.133 0.21 - - - 79.90 *79.90% Unsatisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly:

Alfie's Construction & Const. Supply)17162 L A MB GE

Improvement/Widening of National Roads along Bacolod

South Road, K0057+740 - K0059+781,Binalbagan, Negros

Occidental8/30/2016 1st

Regional Office,

NIRLF 45.720 209 3/30/16 10/24/16 0.00 O 0.357 0.239 0.15 0.03 0.061 0.05 0.8870 -

Alfie'S Construction And Construction Supply/

Aqua Dragon Construction & Supply Joint

Venture

JV-16-1465 L A MB GE

Preventive Maintenance based on Pavement Management

System/Highway Development and Management-4 (HDM-4) of

Bacolod South Road, K0046+(-910)-K0046+ (-045),

K0049+830-K0050+090, K0058+275-K0058+500, K0060+600-

K0060+389, K0063+303-K0063+747, K0071+042-K0071+632,

K0072+000-K0072+075, K0072+901.50-K0073+430, K0081+121-

K0081+486, Hinigaran, Binalbagan and Himamaylan City,

Negros Occidental

Hinigaran,

Binalbagan and

Himamaylan City,

Negros Occidental

8/20/2017 1stNegros Occidental

2nd DEOLF 28.152 166 4/16/2017 9/28/2017 0.01 O 0.375 0.240 0.150 0.03 0.061 0.05 90.60 -

Alfrego Builders & Supply 19284 L D SB GE2Improvement/Riprapping of Sasa Creek Second

Congressional District6/11/2009 1st XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -

Algamon Construction 30704 L B MA GERehabilitation/Reconstruction of National Roads with Slip,

Slope Collapse and Land Slide Along Dinagat-Loreto Road

Dinagat-Loreto

Road, San Jose,

Province of Dinagat

Islands

8/31/2015 2nd Dinagat Island LF 6.385 180 3/20/15 9/15/15 (+) 0.17% O 0.366 0.234 0.15 0.03 0.046 0.05 87.60% -

Algamon Construction 30704 L C SB GE2Protection Works along Daang Maharlika, (Surigao-Ipil-Lipata

Rd.) Kinabutan Bridge II, Brgy. RizalSurigao City 11/21/2012 1st XIII LF 4.735 120 08/16/12 12/13/12 -7.90 O 0.395 0.268 0.071 0.020 0.045 0.017 81.60 -

Algamon Construction 30704 L B MA GERehabilitation/ Reconstruction of National Roads with Slip,

Slope Collapse and Land Slide along Dinagat - Loreto Road

San Jose, Province

of Dinagat Islands6/11/2015 1st

DINAGAT

ISLANDS DEOLF 6.385 180 3/20/15 9/15/15 (+) 0.92% O 0.366 0.234 0.15 0.03 0.045 0.033 85.80% -

Algimar Construction 15232 L A MA GE1Conc. of Tablas Circumferential Road (Doña Juana-Binunga-

an Section)8/27/2009 1st IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -

Algimar Construction 15232 L A MA GE1Concreting of Tablas Circumferential Road (Hinugasan-

Camantaya Section)5/21/2009 1st IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 25 of 33

Page 26: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Algimar Construction 15232 L A MA GE1Repair of Damaged Rd. Sect. along Looc-Odiongan-San

Andres Rd., Km.104+400-Km.122+400 (IS)

Tablas Island,

Romblon11/29/2012 1st IVB LF 15.860 210 09/20/12 04/17/13 26.67 O 0.306 0.291 0.150 0.030 0.040 0.033 85.00 -

Algimar Construction 15232 L A MA GE1 Const. of Bridge Approaches @ Maingaran Bridge 2/27/2009 1st V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -

Algimar Construction 15232 L AA MB GE

Rehabilitation/Reconstruction of Puerto Princesa South Road,

K0154+460-K0156+369.50, K0168+685-K0169+338.70,

K0173+714-K0173+919.50, K0184+479.00-K0184+532.98,

Espanola, Palawan

K0154+460-

K0156+369.50,

K0168+685-

K0169+338.70,

K0173+714-

K0173+919.50,

K0184+479.00-

K0184+532.98,

Espanola, Palawan

3/8/2016 1st Regional Office LF 75.5646 258 7/24/15 4/6/16 0.20% O 0.272 0.3 0.15 0.03 0.05 0.05 85.20%85.2%

Satisfactory

Algimar Construction 15232 L AA MB GERoad Upgrading Based on Gravel Road Strategies Traffic

Benchmark for Upgrading to Paved Road Standard

San Fernando,

Masbate6/11/2015 1st Masbate 3rd LF 37.877 178 3/9/15 9/6/15 3.50% O 0.352 0.253 0.15 0.018 0.051 0.05 87.40% -

Algimar Construction 15232 L AA MB GE

Road Upgrading(Gravel to Paved) Based on Gravel Road

Strategies Traffic Benchmark for Upgrading to Paved Road

Standard (HDM-4 Project Analysis) San Fernando-Talisay

Road, San Fernando, Masbate

San Fernando,

Masbate9/3/2015 2nd

Masbate Third

DEOLF 37.877 200 3/11/15 9/26/15 0.21% O 0.321 0.281 0.15 0.03 0.06 0.05 89.20% -

Algimar Construction 15232 L AA MB GE

Road Upgrading (Gravel to Paved) Based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved the

Road Standard (HDM-4 Project Analysis) San Fernando-

Talisay Road, San Fernando, Masbate

San Fernando,

Masbate6/11/2016 3rd & Final Masbate 3rd DEO LF 37.876 179 3/11/15 9/5/15 0.00 C 0.383 0.2 0.3 0 0 0 88.30%

88.3%

Satisfactory

Algimar Construction 15232 L AA MB GERoad Upgrading ( Gravel to Paved) Quezon-Aramaywan Road,

K0154+950-K0156+851.20 with ExceptionQuezon, Palawan 11/22/2014 1st IV LF 34.958 209 5/28/14 12/22/14 -2.00% O 0.360 0.240 0.130 0.030 0.054 0.050 86.40%

86.40%

Satisfactory

Algimar Construction 15232 L AA MB GE

Road Upgrading (Unpaved to Paved) of Tablas

Circumferential Road, K0029+765-K0029+990, K0112+196.60-

K00112+281, K0115+190-K0115+219, K0115+392-K0115+838,

K0116+300-K0116+674, Re-aligned to Road Upgrading

(Unpaved to Paved) of Tablas Circumferential Road,

K0029+765-K0029+990, K0115+090-K0115+219, K0115+392-

K0115+838, K0116+300-K0116+674.

Tablas Island,

Romblon6/12/2015 1st Romblon DEO LF 29.682 145 4/15/15 9/6/15 0.00% O 0.381 0.24 0.15 0.03 0.051 0.05 90.20% -

Algimar Construction 15232 L A SB GB1Const. of 1 Unit 7x7 S/B at Teofilo Tamabago E/S, Palanas

South realigned to Dimasalang C/S5/26/2009 1st V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -

Algimar Construction 15232 L A MA GE1Upgrading of Balud-Tawad-Milagros-Aroroy Road (Bangad

Sect.) Masbate 8/9/2011 1st V LF 96.100 360 11/23/10 11/17/11 17.47 O 0.382 0.237 0.150 0.030 0.061 0.033 89.30 -

Algon Engineering Construction Corporation 270 L AAA LB GB1 Construction of Overhead Water Tank with Cistern 4/29/2009 Final DOST 3.153 124 O 0.373 0.291 0.12 0.03 0.07 0.05 93.40 -

Algon Engineering Construction Corporation 270 L A A GB

Construction of Tugas Bridge, Camp 1, Maramag, BukidnonCamp 1, Maramag,

Bukidnon3/14/2017 2nd

Bukidnon 2nd

DEOLF 20.424 266 3/6/2016 11/26/2016 -0.03 O 0.393 0.300 0.050 0.03 0.07 0.033 87.60 -

Algon Engineering Construction Corporation 270 L AAA LB GE

Widening (2 into 4 lanes) of Davao-Cotabato Road (Jct. Digos-

Cotabato Section) including RROW (Brgy. Sinawilan-Brgy.

Tubod Section), K1575+610-K1576+000, K1576+419-

K1578+776, K1579+294-K1581+398, K1581+434-K1581+814,

K1582+553-K1583+884

Davao del Sur Lone

District11/13/17 1st DPWH LF 174.689 300 4/11/17 2/4/18 0.11 O 0.385 0.239 0.150 0.022 0.047 0.05 89.30 -

Algon Engineering Construction Corporation 270 L AAA LB GE

Widening (with Reblocking) of Davao-Cotabato Road (Jct.

Digos-Cotabato Section), K01564+(-278) to K01564+800,

K01567+(-364) to K01567+448, K01567+448 to K01568+200

(LS), K01570+000 to K01571+500, K01572+198 to K01573+893,

including Road-Right of-Way, Davao del Sur

Davao del Sur 3/15/2017 1stDavao del Sur 1st

DEOLF 140.776 383 4/12/2016 4/29/2017 0.01 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 -

Algon Engineering Construction Corporation 270 L AAA LB GE

Widening (with Reblocking) of Davao-Cotabato Road (Jct.

Digos Cotabato Section), K1564+(-278)-K1564+800, K1567+(-

364)-K1567+448, K1567+448-K1568+200(LS), K1570+000-

K1571+500, K1572+198-K1573+893, Davao del Sur, Including

Road Right-of-Way (RROW) (as per RBIA Station Limits),

Davao del Sur

K1564+(-278)-

K1564+800,

K1567+(-364)-

K1567+448,

K1567+448-

K1568+200(LS),

K1570+000-

K1571+500,

K1572+198-

K1573+893, Davao

del Sur, Including

Road Right-of-Way

(RROW) (as per

RBIA Station Limits),

Davao del Sur

11/19/2016 1stDavao Del Sur First

DEOLF 140.776 331 4/12/2016 3/8/2017 0.00 O 0.351 0.24 0.15 0.03 0.037 0.05 0.8580 -

Algon Engineering Construction Corporation 270 L AAA LB GE1Conc. of NRJ Bayugan-Calaitan-Tandag Rd. (Km.1273+491.80-

Km.1281+040 w/ exception)

Bayugan, Agusan

del Sur3/20/2013 2nd XIII LF 159.496 495 12/26/11 05/03/13 4.25 O 0.312 0.300 0.150 0.030 0.051 0.050 89.30 -

Algon Engineering Construction Corporation 270 L AAA LB GE1Widening of Davao-Bukidnon Rd., Davao City, Tugbok-Mintal

Sect., Km.1693+400-Km.1697+335.40Davao City 8/7/2013 1st XI LF 46.965 209 02/26/13 09/22/13 -0.69 O 0.352 0.298 0.143 0.030 0.025 0.033 88.10 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 26 of 33

Page 27: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Algon Engineering Construction Corporation 270 L AAA LB GE1

Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. along

Davao-Cotabato Rd. (Davao City-Jct. Digos) Sta.1556+000-

Sta.1561+249

Davao del Sur 3/24/2012 1st XI LF 46.285 249 07/21/11 03/25/12 -4.97 O 0.360 0.300 0.100 0.030 0.041 0.033 86.40 -

Algon Engineering Construction Corporation 270 L AAA LB GE1 Widening of Davao-Bukidnon Rd. Davao City 8/17/2012 1st XI LF 36.342 210 01/31/12 08/27/12 -0.29 O 0.379 0.213 0.147 0.030 0.055 0.033 85.70 -

Algon Engineering Construction Corporation 270 L AAA LB GE1

Prev. Maint. (Int. Sects.) along Pres. Diosdado Macapagal

Highway, a)Km.1712+000-Km.1712+802.90; b)Km.1713+303-

Km.1713+815.64

Davao Oriental 3/20/2013 1st XI LF 24.973 52 01/25/13 03/17/13 7.83 O 0.319 0.299 0.150 0.030 0.040 0.050 88.80 -

Algon Engineering Construction Corporation 270 L AAA LB GE1Conc. of NRJ Bayugan-Lalaitan-Tandag Rd. Km. 1273+491.80-

Km. 1281+040 (w/ exceptions)

Bayugan, Agusan

del Sur11/29/2012 1st XIII LF 159.496 435 12/26/11 03/04/13 12.50 O 0.332 0.289 0.150 0.030 0.060 0.050 91.10 -

Al-Hussein Construction 18438 L A MA GE

Rehabilitation/Recons-truction of National Roads with Slips,

Slope Collapse and Landslide, Iligan City - Marawi City via Bito-

Abaga Road, Tertiary: Bito-Abaga Road, Balo-I, Lanao del

Norte, Km. 1539+ (-1805)-K1539+(1745); K1539+ (-1350)-

K1539+(-1283);

Balo-I, Lanao del

Norte, Km. 1539+ (-

1805)-

K1539+(1745);

K1539+ (-1350)-

K1539+(-1283);

K1539+(-720)-

K1539+ (-590);

K1539+(-571)-

K1539+(-498);

K1539+ (-244)-

K1539+000

8/28/2016 1st & FinalLanao del Norte

1st DEOLF 8.667 122 1/25/16 5/25/16 0.00 C 0.465 0.133 0.3 0 0 0 0.8980

89.8%

Very Satisfactory

Alj Construction And Supply 30571 L D SB GE

Rehabilitation/ Major Repair of Joovellar Bridge (B00039PN)

along Guimbal -Igbaras - Tubungan - Leon Road, K0036+728,

Igbaras, Iloilo

Igbaras, Iloilo 11/24/2016 1st & Final ILOILO 1ST DEO LF 0.949 30 2/5/2016 3/5/2016 0.07 C 0.5 0.172 0.3 0 0 0 0.972097.2%

Outstanding

Alj Construction And Supply 30571 L D SB GBConstruction of Multi-Purpose Building, Brgy. Poblacion

(Purok IV), Pavia, IloiloPavia, Iloilo 8/24/2016 1st & Final ILOILO 4TH DEO LF 1.921 1.9205 3/30/00 3/30/00 0.00 C 0.5 0.2 0 0 0 0 0.7000

70%

Poor

Aljon Construction & Supply / Rolco

Construction & Development CorporaJV-16-1613 L B MA GE

Construction/Maintenance of Flood Mitigation Structure &

Drainage Systems, Const. of Flood Control/Drainage Jct

National Road to Cavinitan Barangay Road-Sto. Domingo

River Sta. 0+854-Sta. 2+700

Virac, Catanduanes 11/17/17 1st DPWH LF 32.584 131 7/30/17 12/7/17 -4.00 O 0.337 0.240 0.110 0.03 0.05 0.033 80.00 -

Allado Construction Company, Inc / Quadcore

Construction - J.VL Bacay Peoples Village

Brgy. Bacay,

Dumangas, Iloilo9/1/2017 Final NHA LF 289.90 613 02/03/2016 10/01/2017 2.76 O 0.427 0.194 0.300 - - - -

92.13% Very

Satisfactory

Allado Construction Company, Inc. 073-667 L AAA GE1Rehabilitation of Jct Sayre Highway (Kibawe) - Natulongan -

Bukangliwayway Footbridge P1CKibawe Bukidnon/X 11/23/2011 1st

Provincial

Government of

Bukidnon

LF 19.145 226 04/05/11 01/16/12 -5.65 O 0.310 0.290 0.090 0.030 0.060 0.050 83.00 -

Allen Construction 12584 L B MA GB

Construction of Multi-Purpose Building (Cooperative

Building), Brgy. Calabalabaan, Muñoz, Nueva Ecija Muñoz, Nueva Ecija 11/22/17 1st & Final DPWH LF 1.430 60 7/9/17 9/6/17 0.00 C 0.475 0.134 0.300 - - - 90.90*90.9%

Very Satisfactory

Allen Construction 12584 L MB Casecnan Multipurpose Irrigation & Power Project - IC PH IITalavera, Nueva

Ecija 5/22/2018 1st NIA LF 7.968 610 9/22/2016 5/24/2018 0.00 O 0.32 0.3 0.15 0.03 0.06 0.05 90.70 - On - Going

Allen Construction 12584 L SB GE2Restoration of Embankment @ D-Main & Const. of Thresher

Crossing with Turn-out @ Div II Service Area

Talavera, Nueva

Ecija7/21/2012 1st NIA LF 8.653 90 07/11/12 8.80 O 0.358 0.293 0.150 0.030 0.057 0.050 93.77 -

Allencon Development Corporation 12302 L D SB GE

Preventive Maintenance of Iloilo East Coast Capiz Road,

K0195+395 - K0196+000 and K0250+545 - K0250+669, San

Dionisio and Barotac Viejo, Iloilo

San Dionisio and

Barotac Viejo, Iloilo3/27/2017 1st & Final Iloilo 3rd DEO LF 8.700 75 8/1/2016 10/14/2016 0.00 C 0.450 0.134 0.300 - - - 88.40

*88.4%

Satisfactory

Allencon Development Corporation 12302 L D SB GE2Const. of Coastal Protection Works along Iloilo-Antique Rd.

K0026+700-K0027+151Guimbal, Iloilo 8/14/2013 1st VI LF 7.301 244 12/28/12 08/28/13 0.48 O 0.269 0.300 0.150 0.030 0.037 0.050 83.60 -

Allencon Development Corporation 12302 L D SB GE1 Reconst. of Cabasi Bridge along Iloilo-Antique Rd., Km.30+534 Guimbal, Iloilo 8/14/2012 1st VI LF 4.978 240 01/20/12 09/15/12 1.68 O 0.279 0.300 0.150 0.030 0.040 0.050 84.90 -

Alleyway Construction 15310 L A MA GE

MFO 1-National Road Network Services-Asset Preservation of

National Roads-Rehabilitation/ Reconstrtuction/Upgrading of

Damaged Paved National Roads including Drainage based on

PMS/HDM-4 Tertiary-Reconstruction from Concrete to

Concrete-Delpan Ext. Road-Chainage 010.80-Chainage 347.78

(S02380LZ); Chainage (-)24.60-Chainage 309.15 (S02381LZ)

Manila City 8/19/2017 1st North Manila DEO LF 14.699 120 5/24/2017 9/20/2017 0.19 O 0.397 0.242 0.150 0.02 0.027 0.033 86.90 -

Alleyway Construction 15310 L A MA GE

Construction/Maintenance of Flood Mitigation Structures and

Drainage System (RCBC) along Raxabago Chainage 285.00 to

Chainage 504.00, Tondo, Manila City 2nd LD

Tondo, Manila 6/11/2015 1st North Manila DEO LF 33.638 200 3/20/15 10/5/15 (-) 4.40 O 0.37 0.24 0.106 0.012 0.06 0.033 82.10% -

Alleyway Construction 15310 L A MA GE

Construction/Maintenance of Flood Mitigation Structures and

Drainage Systems-Construction of Flood Control/Drainage at

Pureza St. crossing Lardizabal and Arevalo, Sampaloc, ManilaSampaloc, Manila 6/10/2016 1st

NORTH MANILA

DEOLF 13.954 180 2/1/16 7/29/16 0.02 O 0.381 0.24 0.15 0.022 0.035 0.05 87.80% -

Alleyway Construction 15310 L A MA GE

Construction/Repair/Rehabilitation/Improvement of Various

Infrastructure including Local Projects-

Construction/Rehabilitation of various Projects in Manila City

2nd LD - Rehabilitation with Drainage Improvement of Torres

Bugallon St. And Vicinity

Manila City 2nd

Legislative District11/24/2014 1st NCR LF 9.099 120 9/9/14 1/6/15 13.40% O 0.365 0.229 0.150 0.030 0.045 0.033 85.20%

85.20%

Satisfactory

Alleyway Construction 15310 L A MA GE

Construction/Maintenance of Flood Mitigation Structures and

Drainage Systems-Construction of Flood Control/Drainage at

Pureza Street crossing Lardizabal and Arevalo, Sampaloc,

Manila

Sampaloc, Manila 11/28/2016 1st & Final North Manila DEO LF 13.954 180 2/1/2016 7/29/2016 0.00 C 0.463 0.133 0.3 0 0 0 0.896089.6%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 27 of 33

Page 28: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Allied Trade Resources Multi-Purpose

Cooperative 31667 L B MA GB1 DOTC CARAGA Regional Office Development Project

Capitol Drive,

Butuan City 8/27/2013 1st DOTC L 10.258 180 04/22/13 10/18/13 38.26 O 0.389 0.300 0.150 0.015 0.004 0.050 90.71 -

Allied Trade Resources Multi-Purpose

Cooperative 31667 L B MA GB1 PATIN-AY LTO District Office Development Project

Patin-ay,

Prosperidad,

Agusan del Sur

8/28/2013 1st DOTC L 5.147 180 04/08/13 10/04/13 2.99 O 0.391 0.240 0.150 0.015 0.030 0.050 87.64 -

Almakar Builders and Metal Works 21929 L B MA GB

Construction of Four (4) Storey, Eight (8) Classroom School

Building, Aniban Central School, Bacoor City, Cavite Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 15.956 251 5/31/16 2/5/17 0.00 C 0.480 0.134 0.300 - - - 91.40*91.4%

Very Satisfactory

Almakar Builders and Metal Works 21929 L B MA GEConstruction of Revetment along Bacoor River, Banalo

Section, Phase III, Bacoor, CaviteBacoor, Cavite 3/22/2018 1st/Final Cavite Sub DEO LF 37.274 192 9/4/2017 3/14/2018 0.00 C 0.480 0.133 0.300 - - - 91.30 *91.30% Very Satisfactory

Almakar Builders and Metal Works 21929 L B MA GE

MFO 2-Flood Management Services, Construction,

Maintenance of Flood Mitigation Structures and Drainage

System, West River Bank Stabilization Project along Imus

River (Phase I and II) Cavite 4th LD, Dasmariñas City, Cavite

Dasmariñas City,

Cavite4/5/2016 1st Cavite 1st DEO LF 27.0325 281 6/6/15 3/12/16 0 C 0.455 0.2 0.3 0 0 0 95.50%

95.5%

Very Satisfactory

Almakar Builders and Metal Works 21929 L C SB GB1 Const. of MPB in Poblacion I-A Imus, Cavite 11/23/2012 1st IVA LF 0.681 135 07/18/12 11/29/12 1.20 O 0.342 0.300 0.150 0.020 0.041 0.033 88.60 -

Almana Construction And Dev't Corporation 38859 L AAA MB GB

Construction of Unit Four (4) Storey Eight (8) Classroom

School Building at Manjuyod NHSManjuyod, Negros

Oriental5/30/2017 1st & Final

Negros Oriental 1st

DEOLF 14.577 180 8/15/2016 2/10/2017 0.00 C 0.485 0.133 0.300 - - - 91.80

*91.8%

Very Satisfactory

Alnino Construction & Supply 18378 L D MA GEConstruction of Pili River Control, Poblacion, Castilla,

Sorsogon, First District of Sorsogon

First District of

Sorsogon3/11/2016 1st Sorsogon 1st DEO LF 9.5035 150 2/3/15 7/2/15 - C 0.467 0.133 0.3 0 0 0 90.00%

90%

Very Satisfactory

Alnino Construction & Supply/Steven

Construction & Supply Joint Venture3 L 0 0 GB

Cluster V-Const. of Various Sch. Building Project under FY

2015 Basic Educational Facilities Fund (BFFF) Batch 6, Const.

of Two Storey Four (4) Classroom 7mx9m Sch. Bldg, Cabidan

ES, East Dist., Sorsogon City

East Dist., Sorsogon

City8/31/2016 1st & Final Sorsogon 1st DEO LF 6.126 150 11/23/15 4/20/16 0.00 C 0.487 0.133 0.3 0 0 0 0.9200

92%

Very Satisfactory

Alonzo Construction 32145 L MBUpgrading/Improvement of Nabunturan-Nuevo Iloco

Provincial Road Phase II

Nabunturan,

Compostel Valley3/27/18 Final

Provincial

Government of

Compostela Valley

LF 75.900 140 10/21/17 3/6/18 0.00 C 0.50 0.20 0.30 - - - 100.00 *100.00% Outstanding

Alonzo Construction 32145 LUpgrading/Improvement of Nabunturan-Nuevo Iloco

Provincial Road Phase II

Nabunturan &

Mawab, Laak,

Compostela Valley

7/25/18 1st

Provincial

Government of

Compostela Valley

LF 75.713 140 10/18/17 8/19/18 0.93 O 0.38 0.29 0.15 0.03 0.06 0.05 96.08 - On - Going

Alonzo Construction / Gemma Construction

and SupplyL

Rehabilitation of Cabinuangan - Magangit FMR with 3 units

Bridge Retrofitting Works

New Bataan,

Compostela Valley

Province, Region XI

6/3/19 1st

Provincial

Government of

Compostela Valley

LF 190.825 450 12/21/18 2/28/20 11.49 O 0.36 0.26 0.15 0.03 0.06 0.05 90.90 - On - Going

Alpha & Omega Gen. Contractor &

Development Corp.38958 L A - GE

Improvement/Repair/Rehabilitation of Existing Flood Control

Structures Angat River Tanauan Section, Bustos, Bulacan Bustos, Bulacan 11/28/17 1st & Final DPWH LF 9.311 60 10/18/17 12/16/17 26.47 C 0.456 0.133 0.300 - - - 88.90*88.9%

Satisfactory

Alpha Ryder Construction And Supplies 12197 L A MA GE

Asset Preservation of National Roads - Rehabilitation/

Reconstruction/ Upgrading of Damaged Paved National

Roads Including Drainage Based on Pavement Management

System - Highway Development Management (HDM-4) Tertiary

Reconstruction from Concrete to Concrete Junction Donsol-

Banuang Gurang Road, K0578+800 - K0579+732, K0580+604 -

K0580+906, K0583+540 - K0583+832 Donsol, Sorsogon

K0578+800 -

K0579+732,

K0580+604 -

K0580+906,

K0583+540 -

K0583+832 Donsol,

Sorsogon

8/15/2017 1st Sorsogon 1st DEO LF 47.040 240 5/11/2017 1/5/2018 0.10 O 0.386 0.237 0.150 0.022 0.03 0.033 85.80 -

Alpha Ryder Construction And Supplies 12197 L A MA GE

Rehab./Reconst. National Roads with Slips, Slope Collapse &

Landslide Jct. Donso-Banuang Gurang Road, K0582+000-

K0584+000, K0856+050-K0587+000, w/ excpetions, Donsol,

Sorsogon

Donsol, Sorsogon 11/18/2016 1st Sorsogon 1st DEO LF 55.519 260 3/13/2016 11/27/2016 0.01 O 0.351 0.227 0.15 0.03 0.056 0.05 0.8640 -

Alpha Ryder Construction And Supplies 12197 L A MB GE

Construction of Flood Control Structure along San Isidro

River including the removal of old bridge (obstruction to river

flow), Brgy. San Isidro, Bulan, Sorsogon

Brgy. San Isidro,

Bulan, Sorsogon6/3/2017 1st & Final

Sorsogon 2nd

DEOLF 58.500 260 3/23/2016 12/7/2016 0.00 C 0.426 0.200 0.300 - - - 92.60

*92.6%

Very Satisfactory

Alpha Ryder Construction And Supplies 12197 L A MB GE

Rehab./Reconstruction of Anahaw River Control, Macabog,

Sorsogon CityMacabog,

Sorsogon City5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 76 3/23/2017 6/6/2017 0.00 C 0.462 0.133 0.300 - - - 89.50

*89.5%

Very Satisfactory

Alphatec Chemical Corporation 39938 L B MA GE

Construction and Maintenance of Bridges along National

Roads - Rehabilitation/ Major Repair of Permanent Bridges,

Panas Bridge (B00190BH) along Tagbilaran North Road (

Tagbilaran - Getafe Section), Talibon, Bohol

Talibon, Bohol 11/9/17 1st & Final DPWH LF 8.781 172 5/16/17 11/3/17 0.00 C 0.496 0.155 0.300 - - - 95.10*95.1%

Very Satisfactory

Alphatec Chemical Corporation 39938 L B SB GE

Contract ID No. 16FBD122: Construction and Maintenance of

Bridges along National Roads: Rehabilitation/ Major Repair of

Permanent Bridge Primary along Daang Maharlika at Upi

Bridge (B01174LZ) Upi, Gamu, IsabelaUpi, Gamu, Isabela 11/13/17 1st & Final DPWH LF 13.230 81 2/7/17 4/28/17 0.34 C 0.500 0.133 0.300 - - - 93.30

*93.3%

Very Satisfactory

Alphatec Chemical Corporation 39938 L B SB GE

Retrofitting/Major Repair of Permanent Bridges Overpass

Bridge 1 (B03221lLZ) along Manila North RoadLaoag City 6/1/2017 1st & Final

Ilocos Norte 1st

District Engineering

Office

LF 1.997 45 3/13/2017 4/26/2017 0.06 C 0.499 0.133 0.300 - - - 93.20*93.2%

Very Satisfactory

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 28 of 33

Page 29: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Alphatec Chemical Corporation 39938 L B SB GE

Retrofitting/ Major Repair of Permanent Bridges Overpass

Bridge 2 (B03224LZ) along Manila North RoadLaoag City 6/1/2017 1st & Final

Ilocos Norte 1st

District Engineering

Office

LF 1.996 45 3/13/2017 4/26/2017 0.06 C 0.498 0.133 0.300 - - - 93.10*93.1%

Very Satisfactory

Alphatec Chemical Corporation 39928 L B MA GE

Construction and Maintenance of Bridges along National

Roads-Rehabilitation/ Major Repair of Permanent Bridges,

Panas Bridge (B00190BH) along Tagbilaran North Road

(Tagbilaran-Getefe Section)

Talibon, Bohol 4/5/18 2nd/Final Bohol 2nd DEO LF 8.781 172 5/16/17 11/3/17 0% C 0.437 0.133 0.3 - - - 87.00 91.86% Very Satisfactory

Alphin Trading & Construction 26260 L B MA GB

Construction of 3-Storey Daniel Maramba National High

School Alumni Association MPB-Education CenterSta. Barbara,

Pangasinan 11/15/17 1st & Final DPWH LF 9.690 240 3/21/17 11/15/17 0.00 C 0.484 0.131 0.300 - - - 91.50

*91.5%

Very Satisfactory

Alphin Trading & Construction 26260 L B MA GE

Construction/ Rehabilitation of River Dike along Sinucalan

RiverBrgy. Banzal, Sta.

Barbara,

Pangasinan

6/8/2017 1st & Final

Pangasinan 4th

District Engineering

Office

LF 13.997 146 10/4/2016 2/26/2017 0.04 C 0.420 0.133 0.300 - - - 85.30*85.3%

Satisfactory

Alphin Trading & Construction 26260 L A MA GE

Construction/Rehabilitation of River Dikes along Sinucalan

River Brgy. Banzal, Sta. 0+000 to Sta. 0+601, Sta. Barbara,

Pangasinan

Sta. Barbara,

Pangasinan3/24/2017 1st & Final

Pangasinan 4th

DEOLF 13.997 146 9/28/2016 2/20/2017 0.04 C 0.400 0.133 0.300 - - - 83.30

*83.3%

Satisfactory

Alphin Trading & Construction/Aquino De La

Cruz Eng'G & Construction Joint Venture- L D SB GE

Improvement/ Widening of Sta. Barbara Old Road, K0.199+(-

096) - K0.199+904, Sta. Barbara, PangasinanK0.199+(-096) -

K0.199+904, Sta.

Barbara,

Pangasinan

11/24/2016 1st & FinalPangasinan 4th

DEOLF 29.400 196 1/21/2016 8/3/2016 0.00 C 0.439 0.133 0.3 0 0 0 0.8720

87.2%

Satisfactory

Alphin Trading & Construction 26260 L B SB GE Improvement of Mangaldan Municipal PlazaMangaldan,

Pangasinan3/14/19 Final TIEZA LF 15.000 202 5/8/18 12/4/18 0.00% C 0.475 0.193 0.3 96.80 96.80% Outstanding

Alpiz Construction And Development Corp. 11039 L B MA GERehabilitation of Flood Control Structures and Tributaries at

Brgy. PayatasQuezon City 8/24/2017 1st & Final

Quezon City 1st

DEOLF 24.399 300 3/23/2016 1/16/2017 0.00 C 0.333 0.200 0.300 - - - 83.30

*83.3%

Satisfactory

Alpiz Construction And Development Corp. 11039 L B MA GERehabiltitation/Improvement of Flood Control Structures and

Tributarities, Brgy. Payatas, Quezon CityQuezon City 9/16/2016 1st

QUEZON CITY

1ST DEOLF 22.195 270 3/23/16 12/17/16 0.20 O 0.359 0.3 0.15 0.022 0.035 0.033 0.8990 -

Alpiz Construction And Development Corp. 11039 L B MA GERehabilitation of Flood Control Structures and Tributaries,

Brgy. Payatas, Quezon CityQuezon City 6/8/2017 1st

Quezon City 1st

DEILF 27.482 210 3/2/2017 9/27/2017 0.00 O 0.400 0.240 0.150 0.022 0.037 0.05 89.90 -

Alqaod Construction And Supply 39078 L D B GB

Construction of One (1) Storey, 2-Classroom School Building

at Servillano G. Reuyan Memorial Elementary School, Iligan

City

Iligan City 3/20/2017 1st & FinalLanao del Norte

2nd DEOLF 2.042 90 8/8/2016 11/5/2016 0.02 C 0.492 0.128 0.300 - - - 92.00

*92%

Very Satisfactory

Alraf Construction & Enterprises 17297 L AAA LA GE1Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with

Intermittent Section)9/2/2009 3rd IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -

Alraf Construction & Enterprises 17297 L AAA LA GE1 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 5/26/2009 2nd IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -

Alraf Construction & Enterprises 17297 L AAA MA GE

Construction/Upgrading/Rehabilitation of Drainage along

National Roads pagadian-Zamboanga City Road, K1929+700-

K1932+540 (Boalan-Dvisoria-Putik Section), Zamboanga City

Zamboanga City 9/3/2015 1st Zamboanga City LF 16.984 218 6/22/15 1/25/16 (+)0.31% O 0.351 0.24 0.15 0.03 0.054 0.05 87.50% -

Alraf Construction & Enterprises 17287 L AAA MA GE

Construction/Upgrading/ Rehabilitation of Drainage along

National Roads Pagadian-Zamboanga City RoadK1929+700 to

K1932+540

(Boalan-Divisoria

Putik Section),

Zamboanga City

9/2/2016 2nd & FinalZamboanga City

DEOLF 16.983 248 6/22/15 2/24/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910

88.14%

Satisfactory

Alraf Construction & Enterprises 17297 L AAA MB GE

Widening of National Roads along Pagadian-City-Zamboanga

City Road, Manicahan-Cabaluay-Culianan Section, K1916+560-

K1923+396.70, Zamboanga City

K1916+560-

K1923+396.70,

Zamboanga City

8/24/2015 1stRegional Office No.

IXLF 148.858 280 4/20/15 1/25/16 (+)7.42 O 0.354 0.24 0.15 0.022 0.056 0.05 87.20% -

Alraf Construction & Enterprises 17297 L AAA MB GE1Upgrading/Concrete Paving of Nat'l Rd. along Liloy-Siocon

Rd., Kipit-La Libertad-Loay-Imelda San Roque Sect.

Zamboanga del

Norte11/27/2012 1st IX LF 64.478 244 04/10/12 12/09/12 -0.50 O 0.264 0.300 0.145 0.030 0.059 0.033 83.10 -

Alraf Construction & Enterprises 17297 L AAA MB GE1

Settled/Collapsed PCCP along Maria Clara L. Lobregat H-way

(Pagadian ZC Road) w/n Km.1867+000 to K1868+000,

Mangusu Sect.

Zamboanga City 3/12/2013 1st IX LF 2.514 78 02/22/13 05/11/13 -0.60 O 0.400 0.240 0.144 0.030 0.038 0.033 88.50 -

Alraf Construction & Enterprises/Wee Builders

(Joint Venture)JV-15-1371 L AAA MA GE

Construction of the RCDG Bridge and Approaches along

Lamisahan Road, Sta.0 + 000- Sta.2 + 800 Modified to

Construction of Steel Brideg and Approaches along

Lamisahan Road

sta.2 + 602 - sta.2

+ 741 Brgy.

Lamisahan,

Zamboanga City

3/23/2017 1stZamboanga City

DEOLF 39.052 420 3/30/2016 5/23/2017 (+)0.32% O 0.366 0.212 0.150 0.03 0.05 0.05 85.80 -

Alraf Construction & Enterprises/Wee Builders

(Joint Venture)JV-15-1371 L AAA LA GE

Construction of RCDG Bridge and Approaches along/Modified

to Construction of Steel Bridge and Approaches along

Lamisahan Road, Lamisahan Road

Sta. 0+000-Sta.

2+800, Lamisahan,

Zamboanga City

2nd LD/Sta. 2+602-

Sta. 2+741, Brgy

Lamisahan,

Zamboanga City

2nd LD

11/24/2016 1stZamboanga City

DEOLF 39.052 420 3/30/2016 5/23/2017 0.00 O 0.367 0.276 0.15 0.024 0.05 0.05 0.9170 -

Alro Construction & Development Corporation 18361 L A MA GE

Construction/Maintenance of Flood Control Mitigation

Structures and Drainage System - Rehabilitation of Flood

Control System along Busay River (Left Side), Daraga, AlbayDaraga, Albay 3/20/2017 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.450 0.133 0.300 - - - 88.30

*88.3%

Satisfactory

Alro Construction & Development Corporation 18361 L A MA GE1Guicadale Rd. Network to Int'l Airport, Albay (Comun-Cotmon-

Del Rosario Rd. Sect.)Camalig, Albay 8/11/2013 1st V LF 46.044 215 02/06/13 09/08/13 4.90 O 0.362 0.245 0.150 0.030 0.052 0.033 87.20 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 29 of 33

Page 30: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Alro Construction & Development Corporation 18361 L A MA GE

Construction/Rehabilitation of Flood Control Mitigation

Facilities along Major River basins and Prinicipal Rivers-

Kabilugan/Velasco/Batu River Basin (Lake Bicol ,

Const./Improvement of Salugan Flood Control, Camalig, AlbayCamalig, Albay 9/2/2016 1st & Final Albay 2nd DEO LF 34.530 158 6/15/16 11/19/16 0.51 C 0.5 0.188 0.3 0 0 0 0.9880

98.8%

Outstanding

Alro Construction & Development Corporation 18361 L A MB GE

Rehabilitation/ Reconstruction of National Roads with Slips,

Slope Collapse and Landslide along Pili - Tigaon - Albay

Boundary Road (Construction of Slope Protection),

K0500+300 to K0500+400, K0504+500 to K0504+673,

K0504+800 to K0504+900, Patitinan Section, Sagñay,

Camarines Sur

Patitinan Section,

Sagñay, Camarines

Sur

6/7/2017 1st & FinalCamarines Sur 3rd

DEOLF 28.310 256 3/13/2016 11/23/2016 0.00 C 0.426 0.200 0.300 - - - 92.60

*92.6%

Very Satisfactory

Alro Construction & Development Corporation 18361 L A MB GE

Camarines Sur-Albay Diversion Road, Asn Fernando-Oas-

Daraga Section of the PAN Philippine Highway including

Bridges-Camarines Sur Section, Upgrading of Bula-Nabua

(ACC-PCCP) including Slope Protection, Bula, Camarines Sur

Bula, Camarines

Sur6/6/2016 1st & Final Regional Office LF 97.498 258 6/24/16 3/8/17 0.00 C 0.491 0.183 0.3 0 0 0 97.40%

97.4%

Outstanding

Alro Construction & Development Corporation 18361 L A MB GE

Camarines Sur-Albay Diversion Road, San Fernando-Oas-

Daraga Section of the PAN Philippine Highway Including

Bridges-Camarines Sur Section, Upgrading of Bula-Nabua

(ACC-PCCP) Including Slope Protection, Bula, Camarines Sur

Bula, Camarines

Sur9/5/2015 1st

Regional Office No.

VLF 92.618 196 6/24/15 1/5/16 1.06% O 0.391 0.24 0.15 0.03 0.06 0.05 92.10% -

Alro Construction & Development Corporation 18361 L A MB GE

Rehabilitation/Reconstruction of National Roads with Slip,

Slope Collapse and Landslide along Pili-Tigaon-Albay

Boundary Road, K0497+000-K0497+370

Sagnay, Camarines

Sur 4/5/18 1st/Final

Camarines Sur 3rd

DEOLF 23.095 246 3/5/17 11/5/17 41.99% C 0.483 0.2 0.3 - - - 98.30 *98.30% Outstanding

Alro Construction & Development Corporation 18361 L A MA GE

Construction/Maintenace of Flood Mitigation Structures and

Drainage System Rehabilitation of Flood Control System

along Busay River (Left Side), Daraga, Albay

Daraga, Albay 11/16/2016 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.471 0.142 0.3 0 0 0 0.913091.3%

Very Satisfactory

Al's Enterprise and Construction 9721 L A MA GB1 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 3/17/2009 2nd VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -

Alta Negros Industrial Supply Corporation 33806 L C SB GE1 Repair/Rehab. of Lacson Street Bacolod City 8/13/2012 1st VI LF 6.465 145 04/10/12 09/01/12 3.89 O 0.332 0.297 0.150 0.015 0.029 0.033 85.60 -

Althea Construction 18717 L B SB GB

Improvement/Rehabilitation of Multi-Purpose Building, Brgy.

16 San Jacinto, Laoag City, Ilocos Norte

Brgy. 16 San

Jacinto, Laoag City,

Ilocos Norte

11/16/2016 1st Ilocos Norte DEO LF 5.346 170 6/23/2016 12/9/2016 -0.05 O 0.384 0.263 0.104 0.03 0.047 0.033 0.8610 -

Alxm Construction 33436 L B MA GE

Concreting of Farm to Market (FMR) in First District of Albay:

Ocncreting of San Carlos- San Vicente (San Carlos Section)

FMR, Brgy. San Carlos, Tabaco City, Albay

Brgy. San Carlos,

Tabaco City, Albay 11/15/2016 1st & Final Albay 1st DEO LF 9.234 103 6/27/2016 10/7/2016 0.00 C 0.448 0.133 0.3 0 0 0 0.8810

88.1%

Satisfactory

Alxm Construction 33436 L B MA GE Construction of Flood Control Structure along Danlog River

Brgy. San Isidro,

Barcelona,

Sorsogon

6/10/2015 1st Sorsogon 2nd LF 21.347 171 2/16/15 8/5/15 -3.84% O 0.379 0.3 0.112 0.03 0.06 0.05 93.10% -

Alxm Construction/Meta Construction Joint

VentureJV-14-911 L B MA GE

Widening of National Roads along Santiago-Tuguegarao

RoadK0329+165-

K0329+389 (RS),

K0329+155-

K0329+428 (LS),

K0330+000 -

L0330+205,

K0330+215-

K0331+661.8,

Rizal, Santiago City-

Raniag, Ramon,

Isabela

6/15/2016 1st & Final Isabela Fourth LF 45.255 239 4/29/15 12/23/15 0.02 C 0.469 0.2 0.3 0 0 0 96.90%96.9%

Outstanding

Alzam Enterprises 19113 L A MA GE

Road Upgrading (Gravel to Concrete) of Inawayan-Baracatan

Road, Davao City Davao City 11/24/2016 1st & FinalRegional Office No.

XILF 128.713 260 4/29/2015 1/13/2016 0.00 C 0.488 0.133 0.3 0 0 0 0.9210

92.1%

Very Satisfactory

Alzam Enterprises 19113 L A MA GE1

Rd. Upgrading (Gravel/Asphalt to Concrete) of Mintal (Davao-

Bukidnon Rd.) Bago Oshiro-Bago Gallera (Old Davao-

Cotabato Rd.)

Davao City 8/21/2013 1st XI LF 72.933 269 03/06/13 11/29/13 -2.68 O 0.374 0.300 0.123 0.030 0.025 0.030 88.20 -

Alzam Enterprises 19113 L A MA GE1

Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (IS)/

Imprv't./Widening of Davao-Bukidnon Rd. leading to Phil.

Eagle Foundation, Km.1698+780-Km.1701+828

Davao City 8/21/2012 1st XI LF 45.680 250 01/25/12 09/30/12 1.46 O 0.387 0.221 0.150 0.030 0.055 0.033 87.60 -

Alzam Enterprises 19113 L A MA GE1 Widening of Davao-Cotabato Rd. Davao City 8/21/2012 1st XI LF 43.791 250 01/24/12 09/29/12 6.06 O 0.292 0.287 0.150 0.030 0.045 0.050 85.40 -

Alzam Enterprises 19113 L A MA GE1Widening of Davao-Cotabato Rd., Davao City, Lizada Sect.,

Km.1525+920-Km.1527+800

Toril District, Davao

City8/5/2013 1st XI LF 37.443 179 02/26/13 08/23/13 -0.29 O 0.343 0.292 0.147 0.030 0.025 0.033 87.00 -

Alzam Enterprises 19113 L A MA GE2 Const. of Davao River Control Proj. Davao City 3/21/2013 1st XI LF 22.942 221 12/02/12 07/10/13 39.30 O 0.377 0.240 0.150 0.020 0.045 0.050 88.20 -

Alzam Enterprises 19113 L A MA GE1Rd. Upgrading (Gravel to Paved) of Inawayan-Baracatan Rd.,

Km.1538+770-Km.1539+110Toril, Davao City 3/12/2013 1st XI LF 6.854 55 01/22/13 03/17/13 0.00 O 0.269 0.235 0.150 0.030 0.045 0.050 77.90 -

Alzam Enterprises 19113 L A MB GE

Off-carriageway Improvement of Davao City Diversion Road

Including Improvement of Drainage K01498+(-349) to

K01499+871, Davao City

K01498+(-349) to

K01499+871,

Davao City

3/24/2017 2nd & FinalDavao City 1st

DEOLF 19.601 185 2/15/2016 8/17/2016 0.00 C 0.456 0.134 0.300 - - - 89.00

*90.2%

Very Satisfactory

Alzam Enterprises 19113 L A MB GE

Off-Carriageway Improvement of Davao City Diversion Road

Including Improvement of Drainage, K1498+(-349)-K1499+871,

Davao City

K1498+(-349)-

K1499+871, Davao

City

6/16/2016 1st Davao City DEO LF 19.008 170 2/15/16 8/2/16 0.00 O 0.374 0.262 0.15 0.03 0.047 0.05 91.30% -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 30 of 33

Page 31: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto. Tomas Farm to Market Road

Brgy. Esperanza to

Municipality of Sto.

Tomas, Davao del

Norte

4/13/18 1st

Provincial

Government of

Davao del Norte

LF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.30 0.06 82.40 - On - Going

Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto Tomas Farm to Market Road

Brgy. Esperanza to

Municipality of Sto.

Tomas, Davao del

Norte

4/13/18 1stProvincial of Davao

del NorteLF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.3 0.056 82.40 - On - Going

Alzen Engineering & Construction Supplies/

Borderline Construction & Supply Joint

Venture

13911 L A MA GE

Road Upgrading (Unpaved to Paved) of Matalam-Lampayan-

Antipas Road, K1663+687.36-K1668+658; K1668+658-

K1670+260, Matalam, North Cotabato

Matalam, North

Cotabato3/17/2017 1st & Final

REGIONAL

OFFICE NO. XIILF 146.055 235 2/26/2016 10/17/2016 0.00 C 0.446 0.152 0.300 - - - 89.80

*89.8%

Very Satisfactory

Amarro Construction & Realty Developer 34562 L D SB GERoad Upgrading Gravel to Paved at Baranga, Sta. 0+000 to

Sta. 0+200Zamboanga City 3/20/18 1st/Final

Zamboanga City

DEOLF 2.916 149 3/22/17 8/17/17 0.05 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory

Amazing Builders And Construction 32932 L D SB GB

Local Infrastructure Program-Construction of Multi-Purpose

Building (Covered Court), Lumangog Ubay, Bohol 8/21/2017 2nd & Final Bohol 2nd DEO LF 2.965 90 4/3/2017 7/1/2017 - C 0.499 0.180 0.300 - - - 97.90*94.274%

Very Satisfactory

Amazing Builders And Construction 32932 L C SB GB

Local Infrastructure Program - Construction of Multi-Purpose

Building (Covered Court), Lomangog, Ubay, BoholLomangog, Ubay,

Bohol6/3/2017 1st

Bohol 2nd District

Engineering OfficeLF 2.822 90 4/3/2017 7/1/2017 0.25 O 0.398 0.240 0.150 0.03 0.059 0.05 92.70 -

Ammar Construction And Enterprises 35325 L B SB GB

Construction of 2-Storey 6-Classroom School Building at

Binuni-Demologan NHS, Bacolod, Lanao del NorteBacolod, Lanao del

Norte11/17/2015 1st

Lanao del Norte

2ndLF 8.186 150 8/25/15 1/22/16 (+) 8.00% O 0.386 0.24 0.15 0.03 0.047 0.05 90.30%

90.3%

Very Satisfactory

Amp Construction 16574 L B MA GE

Repair/ Maintenance of Flood Control, Talavera River Control,

Brgy. Sicsican Matanda Talavera, Nueva EcijaTalavera, Nueva

Ecija3/23/2017 1st & Final Nueva Ecija 1st LF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.400 0.200 0.300 - - - 90.00

*90%

Very Satisfactory

Amphil Construction & Consulting Services 33716 L B SB GE

Repair/Rehabilitation (Upgrading) Bacolod City Boundary

Road,Brgy. Alangilan,

Bacolod City,

K0017+190 to

K0019+586 w/

exceptions

9/2/2016 1st & Final Bacolod City DEO LF 8.692 120 1/5/16 5/3/16 0.00 C 0.478 0.133 0.3 0 0 0 0.911091.1%

Very Satisfactory

Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1Replacement of San Pedro Bridge along Daang Maharlika

(Surigao-Agusan Rd.), Brgy. San Pedro

Alegria, Surigao del

Norte8/8/2012 1st XIII LF 14.945 375 01/13/12 01/22/13 1.71 O 0.328 0.290 0.150 0.030 0.060 0.050 90.80 -

Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1

Repair/Reconst. Of Boan Bridge along Daang Maharlika

(Agusan-Davao Rd.) Km.1331+632-Km.1380+775 w/

exceptions

Rosario, Agusan

del Sur8/18/2012 1st XIII LF 12.163 240 01/27/12 09/24/12 1.25 O 0.312 0.262 0.150 0.030 0.050 0.033 83.70 -

Angel & Sam Construction & General

Merchandise19968 L B MA GE

Concreting of Sinomoc Camanse Tipan Road, Sinacaban,

Misamis OccidentalSinacaban,

Misamis Occidental8/31/2016 1st & Final

Misamis

Occidental 2nd

DEO

LF 23.188 190 6/15/15 12/21/15 0.00 C 0.397 0.128 0.3 0 0 0 0.825082.5%

Satisfactory

Angel & Sam Construction & General

Merchandise19968 L B MA GE1 Rehab. of ICBR Puerto-Cugman Section 3/2/2009 1st X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -

Angel & Sam Construction & General

Merchandise19968 L B MA GB

Const. of 2 units, 1 Storey, 1 Classroom School Building,

Aglayan ES

Aglayan,

Malaybalay City10/24/2014 1st X LF 2.022 105 7/28/14 11/9/14 0.35% O 0.250 0.278 0.150 0.010 0.016 0.033 73.70%

73.70%

Poor

Angel & Sam Construction & General

Merchandise19968 L B Concreting of Miglamin-Cabulohan-Iba Road

Cabanglasan,

Bukidnon1/16/19 1st

Provincial

Government of

Bukidnon

LF 53.682 271 7/26/18 4/22/19 4.46 O 0.28 0.29 0.15 0.02 0.06 0.05 84.87 - On - Going

Animas Bros Construction 35002 L B SB GE

Concreting of Delapa-Sipaloc Road Section (FMR) Brgy. Delapa

Sibutad,

Zamboanga del

Norte

2/6/2017 1st & FinalZamboanga Del

Norte 3rd DEOLF 9.601 60 10/5/2016 12/3/2016 0.00 C 0.463 0.133 0.300 - - - 89.60

*89.6%

Very Satisfactory

Animas Bros Construction 35002 L B SB GB

Construction of One (1) Unit Technical & Vocational

Workshop/ Building Laboratory

Dapitan City,

Zamboanga del

Norte

3/16/2017 1st & FinalZamboanga Del

Norte 3rd DEOLF 2.562 60 10/20/2016 12/18/2016 (+)2.31% C 0.433 0.133 0.300 - - - 86.60

*86.6%

Satisfactory

Anncon Builders 36097 L D SB GEConcreting of Barangay Palola Farm to Market Road

Barangay Palola, Lucban, Quezon

Barangay Palola,

Lucban, Quezon11/17/2016 1st & Final Quezon 1st LF 1.910 21 4/4/2016 4/24/2016 0.00 C 0.444 0.133 0.3 0 0 0 0.8770

87.7%

Satisfactory

Antonio V. Nidea Construction 6382Const. of Iriga Flood Control Project (Consolidation Dam,

Ground Sill, Slope Protection & Damage Canal)2/28/2010 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -

Antonio V. Nidea Construction, Inc. (Formerly:

Antonio V. Nidea Construction)6382 L A MB GE

Cluster 9 - Construction / Maintenance of Flood Mitigation

Structures and Drainage System: Rehabilitation/

Construction/ Estension of Seawall at Fatima, San Roque And

Sto. Cristo, Tabaco City

Tabaco City 8/24/2017 1st Albay 1st DEO LF 93.004 243 3/13/2017 11/10/2017 0.00 O 0.391 0.292 0.150 0.022 0.033 0.033 92.10 -

Antonio V. Nidea Construction, Inc. (Formerly:

Antonio V. Nidea Construction)6382 L A MB GE Construction of Access Road, Brgy. Gapo Daraga, Albay 04/02/18 1st/Final Albay 2nd DEO LF 19.418 151 42,879 43,029 0 C 0.480 0.135 0.300 - - - 91.50 *91.50% Very Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly:

Antonio V. Nidea Construction)6382 L A MB GE

Construction/Maintenance of Flood Mitigation Structures and

Drainage Systems Rehabilitation/Construction/ Extension of

Seawall at Fatima, San Roque and Sto. Cristo

Tabaco City, Albay 04/12/18 2nd/FinalAlbay 1st District

DEOLF 96.500 288 03/13/17 12/25/17 0.00 C 0.478 0.133 0.300 - - - 91.10 87.90% Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly:

Antonio V. Nidea Construction)6382 L A MA GB1 Const./Repair/Rehab. of MPB, Albay III DEO Paulog, Ligao City 8/9/2013 1st V LF 3.679 90 06/25/13 09/22/13 6.65 O 0.334 0.286 0.150 0.030 0.040 0.033 87.30 -

Antonio V. Nidea Construction, Inc. (Formerly:

Antonio V. Nidea Construction)6382 L A MB GE1

Guicadale Platform Rd., Cotmon-Maninila-Taplacon-Taloto

Rd., (Cotmon-Maninila Sect.)Camalig, Albay 8/10/2013 1st V LF 22.843 206 02/01/13 08/25/13 -3.26 O 0.366 0.241 0.117 0.030 0.041 0.033 82.80 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 31 of 33

Page 32: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

APD Construction 180 L AA LA GE

Road Upgrading (Unpaved to Paved) based on Gravel Road

Strategies, Traffic Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) along Jct. Victoria -

Maddela - Alicia - Kasibu Boundary Road (Jct. Victoria -

Kasibu Boundary Road), K0385+661 to K0386+000 and

K0397+720 to K0397+1599, Maddela, Quirino

Maddela, Quirino 8/23/2017 1st & Final Quirino DEO LF 46.707 180 2/8/2017 8/6/2017 0.00 C 0.485 0.134 0.300 - - - 91.90*91.9%

Very Satisfactory

APD Construction 17467 L AA MB GE

MFO 1 - National Road Upgrading (Unpaved to Paved) Based

on Gravel Road Strategies, Traffic Benchmark for Upgrading

to Paved Road Standards (HDM-4 Project Analysis)

(Intermittent Sections), Jct. Abbag Guingin Boundary Road

K0393+558-

K0395+000,

K0395+915-

K0396+084,

K0398+101-

K0398+478,

K0399+316-

K0400+000,

K0400+564-

K0403+243.5

6/14/2016 1st & Final Regional Office LF 159.196 300 3/30/15 1/23/16 0.37 C 0.454 0.2 0.3 0 0 0 95.40%95.4%

Very Satisfactory

APD Construction 17467 L A MB GE

Preventive Maintenance based on Pavement Management

System / Highway Development and Management-4 (HDM-4)

Asphalt Overlay along Cordon-Aurora Boundary Road

(Isabela Boundary-Jct. Dumabato), K0330+000-K0331+640,

K0337+653-K0337+694, K0337+739-K0338+319, K0

Diffun &

Cabarroguis,

Quirino

6/14/2016 1st & Final Quirino LF 41.217 137 2/25/16 7/10/16 0.36 C 0.479 0.133 0.3 0 0 0 91.20%91.2%

Very Satisfactory

APD Construction 17467 L AA LA GE

Asset Preservation of National Roads -

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse and Landslike - Tertiary Roads along Jct.

Abbag-Guingin Bdry. Road - (Construction of Road Slope

Protection Struture)

K0405+160-

K0405+185,

Nagtipunan, Quirino

3/21/18 1st/Final Quirino DEO LF 24.284 200 7/4/17 1/29/18 0.01 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory

Aqua Dragon Construction & Supply 36405 L C SB GE

Retrofitting/ Strenghtening of Ingay Bridge (B00168 PN) along

Gumbal - Tubungan Road, Iloilo City Iloilo City 11/13/17 1st & Final DPWH LF 7.715 140 3/14/17 7/31/17 29.11 C 0.500 0.134 0.300 - - - 93.40*93.4%

Very Satisfactory

Aqua Dragon Construction & Supply 36405 L C SB GE

Retrofitting/ Strengthening of Permanent Bridges, Moog

Bridge (B00219NR) Along Bacolod South Road (Kabankalan-

Hinoba-an Section)

K0096+759, Brgy.

Vista Alegre, Ilog,

Negros Occidental

6/2/2017 1st & FinalNegros Occidental

3rd DEOLF 4.651 67 2/21/2017 4/28/2017 0.00 C 0.332 0.133 0.300 - - - 76.50

*76.5%

Unsatisfactory

Aqua Dragon Construction & Supply 36405 L C SB GE

Retrofitting/ Strengthening of Lanutan Bridge (B00136PN)

along Iloilo - Antique Road, Miag-ao, Iloilo, Miag-ao, Iloilo Miag-ao, Iloilo 6/6/2017 1st & FinalIloilo 1st District

Engineering OfficeLF 5.776 106 3/14/2017 6/27/2017 0.48 C 0.497 0.200 0.300 - - - 99.70

*99.7%

Outstanding

Aqua Dragon Construction & Supply 36405 L C SB GE

Retrofitting/ Strengthening of Ingay Bridge along Guimbal-

Tubungan Road, Tubungan, Iloilo Tubungan, Iloilo 8/23/2017 1st & Final Iloilo 1st DEO LF 7.715 140 3/14/2017 7/31/2017 0.29 C 0.500 0.134 0.300 - - - 93.40*93.4%

Very Satisfactory

Aqua Dragon Construction & Supply 36405 L C SB GBConstruction of Level II Water System at Brgy. Manlucahoc,

Sipalay City, Negros Occidental

Sipalay City, Negros

Occidental3/8/2016 1st

Negros Occidental

Third DEOLF 2.475 60 9/8/16 11/6/16 0 C 0.471 0.133 0.3 0 0 0 90.40%

90.4%

Very Satisfactory

Aqualand Engineering and Construction 38209 L D Malitubog Maridagao Irrigation Project Stage IIPikit, Cotabato /

Region XII5/12/18 1st NIA LF 2.172 474 11/11/2016 2/28/2018 -58.70 O 0.40 0.30 0.00 0.02 0.06 0.05 82.10 - On - Going

Aqualine Construction 11555 L AA MA GE

Construction of Bantayan River Control, Bantayan River

Basin, San Roque, Northern SamarSan Roque,

Northern Samar11/14/17 1st & Final DPWH LF 24.399 180 2/17/17 8/15/17 2.16 C 0.486 0.133 0.300 - - - 91.90

*91.9%

Very Satisfactory

Aqualine Construction 11555 L A MA GE

Rehabilitation/Reconstruction of National Roads with Slips,

Slope Collapse, and Landslide along Palo - Carigara - Ormoc

Road

KO970+670 -

KO970+685,

KO972+300-

KO972+352,

KO972+380 -

KO972+415,

KO+972+500 -

KO972+338,

KO972+538 -

KO972+ 577,

KO972+900 -

KO972+918,

KO977+480 -

KO977+495,

KO977+505 -

KO977+520,

Section ID:

S00074LT and

S000075LT,

Capoocan, Leyte

2nd District

4/7/2017 1st & FinalRegional Office No.

VIIILF 43.625 265 7/6/2016 3/27/2017 0.00 C 0.488 0.134 0.300 - - - 92.20

*92.2%

Very Satisfactory

Aqualine Construction 11555 L AAA MB GEConstruction of Pambujan River Control Brgy. Dale, San

Roque, Northern Samar

San Roque,

Northern Samar8/17/2017 1st

Northern Samar

2nd DEOLF 41.612 195 4/3/2017 10/14/2017 -0.01 O 0.375 0.235 0.141 0.03 0.035 0.033 84.90 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 32 of 33

Page 33: CPES Reports On-going and Completed Projects from July 1, 2016 … · 2019. 12. 6. · CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 PCAB ARC TYPE

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

PCAB ARC TYPE AMOUNTDUR

(C.D.)STARTED COMP

NAME OF CONSTRUCTOR LICENSE NO. L/F

CATEGORY

PROJECTPROJECT

LOCATION

DATE OF

EVALUATIONNO. of VISIT *IMPL. AGENCY

FUNDING

SOURCE

CONTRACT DATESLIPPAG

E (%)STATUS WMS

FINAL RATING/

QUALITATIVE

DESCRIPTION

QUALITATIVE

DESCRIPTIONMTL TIME FAC ESH RDR

CPES VISIT

RATING

Aqualine Construction 11555 L AA MB GE

Construction/Mainte-nance of Flood Mitigation Structrures

and Drainage Systems, Construction of Bantayan River

Control Structures (Bantayan River Basin), San Roque,

Northern Samar

San Roque,

Northern Samar11/23/2016 1st & Final

Northern Samar

Second DEOLF 48.075 201 2/12/2016 8/30/2016 0.01 C 0.371 0.2 0.3 0 0 0 0.8710

87.1%

Satisfactory

Aqualine Construction 11555 L AA MB GE

Repair/Improvement of Bantayan River Control along

Catarman (Boundary)-Rawis Road Bantayan-San Roque

Section, K0768+100-K0768+200, Bantayan, San Roque

Bantayan, San

Roque3/16/2016 1st

Northern Samar

2ndLF 16.3142 180 6/24/15 12/20/15 (+) 4.08 C 0.47 0.133 0.3 0 0 0 90.30%

90.3%

Very Satisfactory

Aqualine Construction 11555 L AANational Irrigation System Rehabilitation & Improvement

Project

Narra,

Palawan/Region IV-

B

8/6/2016 1st NIA LF 189.364 730 08/26/15 08/24/17 -12.77 O 0.316 0.300 0.022 0.030 0.051 0.033 75.27 -

Aqualine Construction 11555 L AAA LA GEImprovement/Widening of National Roads along Daang

Maharlika K0931+509-K0932+945, K0932+952-K0933+659

Opong, San

Rioque, Tolosa,

Leyte

4/2/18 1st/Final Leyte 1st DEO LF 57.286 150 7/17/17 12/13/17 0.00% C 0.478 0.133 0.3 - - - 91.10 *91.10% Very Satisfactory

Aqualine Construction - ITP Construction, Inc.

(Joint Venture)

11555 /

9392 L

AA /

AAA

National Irrigation Sector Rehabilitation and Improvement

Project

Manaoag, San

Jacinto, San

Fabian,

Pangasinan

11/10/2017 1st NIA FA 92.79 608 10/5/2016 6/4/2018 1.17 O 0.367 0.237 0.150 0.030 0.070 0.050 90.39 -

Aqualine Construction /C.R Domingo

Construction, Inc. (Jv)2992 L A Nueva Viscaya bagabag Irrigation System

San Geronimo

,Bagabag ,Nueava

Viscaya

9/20/2017 Final NIA LF 79.364 1,225 05/17/13 10/27/16 0 C 0.410 0.200 0.300 - - - -86.81%

Satisfactory

Aqualine Construction/C.R. Domingo

Construction, Inc. (JV)2992 L A Nueva Viscaya Bagabag Irrigation System

San Geronimo,

Bagabag, Nueva

Viscaya

9/29/2015 1st NIA LF 74.478 866 05/17/13 09/30/15 -10.30 O 0.373 0.296 0.047 0.030 0.045 0.050 84.05 -

Aquaterra Konstrukt Inc. 15929 L A MB GE

Construction of Flood Control Structures, Tumaga River

Basin at Pasonanca-Luyuhan (Including Right of Way

Acquisition )

Zamboanga City 1st

LD3/23/2017 1st

Zamboanga City

DEOLF 43.496 465 3/30/2016 7/7/2017 -0.06 O 0.274 0.300 0.089 0.03 0.04 0.033 76.60 -

Aquaterra Konstrukt Inc. 15929 L AA MA GE

Construction/ Repair/ Rehabilitation/ Improvement of Various

Infrastructure including Local Projects, Construction of Water

Supply Project

Panay, Capiz 3/16/18 First Capiz 1st DEO LF 55.003 277 7/9/17 4/11/18 0.72% OG 0.389 0.220 0.150 0.030 0.070 0.050 90.90 - On - Going

Aquaterra Konstrukt Inc. / Mcgabriel

Construction Joint VentureJV-16-449 L A MB GE

Construction of Flood Control Structure at Maasin Creek

(Including ROW Acquisition)

Maasin,

Zamboanga City3/20/18 Second

Zamboanga City

DEOLF 22.504 487 3/22/17 7/21/18 1% OG 0.3 0.3 0.15 0.03 0.05 0.05 88.00 - On - Going

Aquaterra Konstrukt Inc. 15929 L A MA GE

Construction of Flood Control Structure, Tumaga River Basin

at Pasonanca-Luyahan Section (Including Right of Way

Acquisition), Zamboanga City

- 11/6/17 3rd & Final DPWH LF 43.716 525 3/30/16 9/5/17 0.00 C 0.420 0.133 0.300 - - - 85.30*82.6%

Satisfactory

Aquaterra Konstrukt Inc. 15929 L A MB GE

Construction/Repair/ Improvement of Flood Control at

Tumaga River, Pasomanca Section, Tumaga, Zamboanga CityTumaga,

Zamboanga6/15/2016 3rd & Final

Zamboanga City

DEOLF 10.547 311 3/30/15 2/3/16 0.00 C 0.461 0.133 0.3 0 0 0 89.40%

86.64%

Satisfactory

Aquaterra Konstrukt Inc. 15929 L A MB GEConstruction/Repair/Improvement of Flood Control at Tumaga

River, Pasonanca Section, Zamboanga CityZamboanga City 9/3/2015 1st Zamboanga City LF 9.766 191 3/30/15 10/7/15 (+)0.18% O 0.34 0.24 0.15 0.03 0.051 0.05 86.10% -

Aquaterra Konstrukt Inc. 15929 L A MB GEConstruction/Repair/Improvement of Flood Control at Tumaga

River, Pasonanca Section, Zamboanga CityZamboanga City 11/9/2015 2nd

Zamboanga City

DEOLF 9.766 161 3/30/15 9/6/15 5.43% O 0.268 0.3 0.15 0.02 0.047 0.05 83.50%

83.5%

Satisfactory

Aquaterra Konstrukt Inc. 15929 L A MC GE

Construction of Flood Control Structure Tumaga River Basin

at Pasonanaca-Luyahan (Including Right-of-Way Acquisition) Zamboanga City 11/24/2016 1stZamboanga City

DEOLF 43.496 465 3/30/2016 7/7/2017 -0.02 O 0.339 0.3 0.128 0.015 0.035 0.033 0.8500 -

Aquaterra Konstrukt, Inc./ Mcgabriel

Construction Joint VentureJV-16-449 L AAA MB GE

Construction of Flood Control at Maasin Creek (Including

Right of Way Acquisition), Zamboanga City- 11/7/17 1st DPWH LF 22.504 487 3/22/17 7/21/18 -0.01 O 0.392 0.240 0.150 0.03 0.059 0.05 92.10 -

Aquino-Dela Cruz Engineering & Construction 16751 L B MA GEWidening of Urdaneta Jct. - Dagupan Road, K0192+650 to

K0194+680, Sta. Barbara, Pangasinan

Sta. Barbara,

Pangasinan8/30/2016 1st & Final

PANGASINAN 4TH

DEOLF 49.000 236 3/9/15 10/30/15 0.03 C 0.44 0.133 0.3 0 0 0 0.8730

87.3%

Satisfactory

Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE

Widening of Carmen Jct.-Bayambang-Manat Road,

K0.190+169 - K0.193+864.60 (Bayambang Section),

Bayambang, Pangasinan

Bayambang,

Pangasinan11/26/2015 1st

PANGASINAN 4TH

DEOLF 49.000 264 3/11/15 11/29/15 0.0114 O 0.372 0.24 0.15 0.03 0.055 0.05 89.70%

89.7%

Very Satisfactory

Aquino-Dela Cruz Engineering & Construction 16751 L B MA GERehabilitation/Reconstruction/Upgrading of Damaged Paved

National Road including Drainage along Manila North Road

KO202+695 -

KO203+060

(Bobonan Section)

6/8/2015 1stPangasinan 3rd

DEOLF 12.518 131 2/20/15 6/30/15 -7.60% O 0.351 0.3 0.074 0.03 0.045 0.033 83.30% -

Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE

Construction/ Improvement of Access Roads Leading to

Airports, Seaports & Declared Tourism Destinations,

Concreting/Rehabilitation/Improvement of Peralta Road to

Mabini - San Andres Barangay Road Leading to Mt. Balungao

Hilltop Adventure

Balungao,

Pangasinan6/7/2017 1st & Final

Pangasinan 3rd

District Engineering

Office

LF 34.447 279 5/17/2016 2/19/2017 0.00 C 0.489 0.134 0.300 - - - 92.30*92.3%

Very Satisfactory

Aquino-Dela Cruz Engineering & Construction 16751 L B MA GEWidening of Permanent Bridges to more than two lanes

including ROW at Mitura Bridge (B00726LZ)

Urdaneta City,

Pangasinan8/21/2017 1st

Pangasinan 3rd

DEOLF 25.962 289 3/13/2017 12/26/2017 0.11 O 0.367 0.181 0.150 0.022 0.045 0.05 81.50 -

*1st/Final

* For DPWH, only the region and PMO office are listed 29th Release Page 33 of 33