CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019 Granby Trading And Construction 27554 Balai Bantayan 1 Brgy. Kabac, Bantayan, Cebu 6/8/2018 Final NHA 130.310 882 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-New Cortez-San Jose Carcor Panas Rd. Davao Del Norte 8/12/2013 2nd XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-New Cortez-San Jose Carcor Panas Rd. New Corella, Davao del Norte 3/18/2013 1st XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - "R.R. Seismundo Construction & Supply" 10961 Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-Km.1822+821, Apokon Sect. Tagum City, Davao del Norte 3/18/2013 1st XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - "R.R. Seismundo Construction & Supply" / Davao Concrete Products Joint Venture JV-12-116 Const. of Flood Control Structure (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan Monkayo, COMVAL Province 11/27/2012 1st XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - "R.R. Seismundo Construction & Supply" / Double J Construction And Supply Joint Venture JV-16-948 Rechanneling and Construction of Dike in Kingking River, Mosahamat Section ( Left Side) Pantukan 2nd LD, Compostela Valley Province 3/20/2018 1st/Final Compostel a Valley DEO 44.251 185 C 0.48 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory (Cavdeal) Cavite Ideal International Construction And Development Corp. 5599 Procurement of Fully Developed Lots and Complete Housing Units Basey Pointe, Brgy. Tingib, Basey, Samar 01/26/18 Final NHA 290.000 862 D 0.399 0.200 0.244 - - - 84.29 84.13% Satisfactory (Cavdeal) Cavite Ideal International Construction And Development Corp. 5599 Basey Pointe 2 Brgy. Tingib, Basey, Samar 2/3/2018 1st NHA 225.387 636 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 - 0405 Construction & Supply 34735 Repair/Rehab. of Drainage Canal along Sorsogon-Bacon-Manito Road, Bibincahan, Sorsogon City Bibincahan, Sorsogon City 5/30/2017 1st & Final Sorsogon 1st DEO 2.841 90 C 0.400 0.133 0.300 - - - 83.30 *83.3% Satisfactory 0405 Construction & Supply 34735 Construction of Flood Mitigation Structures (Baybay Dagat Dike) Sitio Bacolod along Bito River, San Fernando, Masbate San Fernando, Masbate 6/14/2016 1st Masbate 3rd DEO 4.653 115 O 0.38 0.24 0.15 0.022 0.04 0.05 88.40% - 0405 Construction & Supply 34735 Construction / Repair / Rehabilitation of Multi- Purpose Building (Municipal Hall), Monreal, Masbate Monreal, Masbate 8/19/2017 1st Masbate 3rd DEO 3.881 150 O 0.488 0.133 0.300 - - - 92.10 - 11-16 Construction 29646 Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems- Rehabilitation/ Improvement of Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac Bamban, Tarlac 11/21/2017 1st & Final DPWH 45.616 147 C 0.496 0.133 0.300 - - - 92.90 *92.9% Very Satisfactory NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES *1st/Final * For DPWH, only the region and PMO office are listed 29th Release Page 1 of 866

Transcript of ...CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019 Granby Trading And...

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    Granby Trading And

    Construction27554 Balai Bantayan 1

    Brgy. Kabac,

    Bantayan, Cebu6/8/2018 Final NHA 130.310 882 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory

    "R.R. Seismundo

    Construction & Supply"10961

    Const./Widening/Upgrading/Rehab. of Del Pilar

    (San Juan)-New Cortez-San Jose Carcor

    Panas Rd.

    Davao Del Norte 8/12/2013 2nd XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -

    "R.R. Seismundo

    Construction & Supply"10961

    Const./Widening/Upgrading/Rehab. of Del Pilar

    (San Juan)-New Cortez-San Jose Carcor

    Panas Rd.

    New Corella,

    Davao del Norte3/18/2013 1st XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -

    "R.R. Seismundo

    Construction & Supply"10961

    Widening of Surigao-Davao Coastal Rd.,

    Km.1822+(-423)-Km.1822+821, Apokon Sect.

    Tagum City,

    Davao del Norte3/18/2013 1st XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -

    "R.R. Seismundo

    Construction & Supply" /

    Davao Concrete Products

    Joint Venture

    JV-12-116

    Const. of Flood Control Structure (Sheet Piles

    & Grouted Riprap) Agusan River, Brgy.

    Inambatan

    Monkayo,

    COMVAL

    Province

    11/27/2012 1st XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -

    "R.R. Seismundo

    Construction & Supply" /

    Double J Construction And

    Supply Joint Venture

    JV-16-948

    Rechanneling and Construction of Dike in

    Kingking River, Mosahamat Section ( Left

    Side)

    Pantukan 2nd

    LD, Compostela

    Valley Province

    3/20/2018 1st/Final

    Compostel

    a Valley

    DEO

    44.251 185 C 0.48 0.133 0.3 - - - 90.80 *90.8% Very

    Satisfactory

    (Cavdeal) Cavite Ideal

    International Construction

    And Development Corp.

    5599Procurement of Fully Developed Lots and

    Complete Housing Units

    Basey Pointe,

    Brgy. Tingib,

    Basey, Samar

    01/26/18 Final NHA 290.000 862 D 0.399 0.200 0.244 - - - 84.2984.13%

    Satisfactory

    (Cavdeal) Cavite Ideal

    International Construction

    And Development Corp.

    5599 Basey Pointe 2Brgy. Tingib,

    Basey, Samar2/3/2018 1st NHA 225.387 636 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 -

    0405 Construction & Supply 34735

    Repair/Rehab. of Drainage Canal along

    Sorsogon-Bacon-Manito Road, Bibincahan,

    Sorsogon City

    Bibincahan,

    Sorsogon City5/30/2017

    1st &

    Final

    Sorsogon

    1st DEO2.841 90 C 0.400 0.133 0.300 - - - 83.30

    *83.3%

    Satisfactory

    0405 Construction & Supply 34735

    Construction of Flood Mitigation Structures

    (Baybay Dagat Dike) Sitio Bacolod along Bito

    River, San Fernando, MasbateSan Fernando,

    Masbate6/14/2016 1st

    Masbate

    3rd DEO4.653 115 O 0.38 0.24 0.15 0.022 0.04 0.05 88.40% -

    0405 Construction & Supply 34735

    Construction / Repair / Rehabilitation of Multi-

    Purpose Building (Municipal Hall), Monreal,

    Masbate

    Monreal,

    Masbate8/19/2017 1st

    Masbate

    3rd DEO3.881 150 O 0.488 0.133 0.300 - - - 92.10 -

    11-16 Construction 29646

    Construction/ Maintenance of Flood Mitigation

    Structures and Drainage Systems-

    Rehabilitation/ Improvement of Existing Dike

    along Marimla River, Left Bank, Sta. 0+258 to

    Sta. 0+630; Sta. 0+033 to Sta. 0+089.90 and

    Sta. 0+033 to Sta. 0+129, Bamban, Tarlac

    Bamban, Tarlac 11/21/20171st &

    FinalDPWH 45.616 147 C 0.496 0.133 0.300 - - - 92.90

    *92.9%

    Very

    Satisfactory

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 1 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    121 Construction Corporation

    (Formerly: 121 Construction)21686

    Improvement/Concreting with Drainage System

    along Ballesteros Street

    Brgy. Zaniga,

    Mandaluyong

    City

    11/29/2014 1st NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%84.30%

    Satisfactory

    128 Dragon Construction

    And Supplies35408

    Construction of Flood Control Structure, Brgy.

    Kanluran, San Vicente, Camarines Norte, 2nd

    Legislative District

    Brgy. Kanluran,

    San Vicente,

    Camarines

    Norte, 2nd

    Legislative

    District

    3/14/2016 1st

    Camarines

    Norte

    DEO

    0.949 30 C 0.4 0.2 0.3 0 0 0 89.60%

    89.6%

    Very

    Satisfactory

    2M Construction &

    Enterprises33331

    Slope Protection (Grouted Riprap) along

    Isabela-Maluso Rd., Matarling Sect. at

    K15+190-K15+249

    Basilan Province 3/13/2013 1st IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -

    2M Construction &

    Enterprises33331 Construction of Water System Level II

    at Lubigan Vitali

    District

    Zamboanga City

    3/7/2016 1st

    Zamboang

    a City

    DEO

    1.945 75 C 0.43 0.147 0.3 0 0 0 87.50%87.5%

    Satisfactory

    2M Construction &

    Enterprises33331

    Road Widening Including Drainage along Ipil-

    Magdaup Wharf Road (S01143MN)

    (K2014+800 - K2015+297)

    Ipil, Zamboanga

    Sibugay3/13/18 2nd/Final

    Zamboang

    a Sibugay

    2nd DEO

    16.187 177 C 0.49 0.201 0.278 - - - 96.60 92.92%Very

    Satisfactory

    2-R Construction & Supply 15304

    Concreting of Barangay Camanggaan -

    Calapugan, FMR, Brgy. Camanggaan-

    Calapugan

    Natividad,

    Pangasinan 3/19/2018 1st/Final

    Pangasina

    n 3rd DEO3.977 119 C 0.46 0.133 0.3 - - - 89.40 *89.40%

    Very

    Satisfactory

    2-R Construction & Supply 15304

    Raising of Grade of Dike Agno River Basin

    Flood Control Project (Phase III), Brgy.

    Cabalitian, Asingan, PangasinanAsingan,

    Pangasinan11/16/2015 1st

    PANGASI

    NAN 3RD

    DEO

    9.167 120 O 0.39 0.24 0.15 0.03 0.05 0.05 91.10%

    91.1%

    Very

    Satisfactory

    2-R Construction & Supply 15304

    Off Carriageway Improvement at Lingayen

    Capitol Loop, K0364+(-219) to K0364+836,

    Lingayen, Pangasinan

    K0364+(-219) to

    K0364+836,

    Lingayen,

    Pangasinan

    9/2/2016 Final

    Pangasina

    n 2nd

    DEO

    9.34 105 C 0.47 0.133 0.3 - - - 90.60%*87.36%

    Satisfactory

    301 Engineers 38364

    Indv. Project - Rehab./Reconst. of National

    Roads w/ Slips, Slope Collapse and Landslide

    along Iriga City-Masoli Road

    Iriga City, KO

    479+700-KO

    479+923

    11/16/20171st &

    FinalDPWH 5.071 132 C 0.493 0.134 0.300 - - - 92.70

    *92.7%

    Very

    Satisfactory

    301 Engineers 38364

    Construction of School Building, Brgy.

    Caranan, Pasacao, Camarines SurBrgy. Caranan,

    Pasacao,

    Camarines Sur

    8/25/20161st &

    Final

    Camarines

    Sur 1st

    DEO

    1.937 90 C 0.5 0.133 0.3 0 0 0 0.9300

    93%

    Very

    Satisfactory

    3C'Sl Construction And

    Supply36393

    Construction of One Storey Two Classroom

    (Toilet Attached) Tolosa CES, Cabadbaran

    City, Agusan del Norte

    Cabadbaran

    City, Agusan del

    Norte

    3/14/2016 1st ADN DEO 1.927 90 C 0.44 0.133 0.3 0 0 0 87.40%87.4%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 2 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    3Diamonds Construction

    Corporation35457

    Rehabilitation of San Francisco River Control

    (San Francisco-Maguiron Section) Guinobatan,

    Albay11/6/2017

    1st &

    FinalDPWH 9.328 105 C 0.500 0.134 0.300 - - - 93.40

    *93.4%

    Very

    Satisfactory

    3G A Construction & Supply 35033Construction of Flood Control along Cabugao

    River, Brgy. Turod - Patac

    Cabugao, Ilocos

    Sur 3/16/2018 1st/Final

    Ilocos Sur

    1st DEO9.304 140 C 0.48 0.133 0.3 - - - 91.20 *91.20%

    Very

    Satisfactory

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on

    Gravel Road Strategies, Traffic Benchmark for

    Upgrading to Paved Road Standard (HDM-4

    Project Analysis) Asin (KM 8)-Nangalisan San

    Pascual, Tuba, Benguet-LU Road, K0273+707 -

    K0273+728, K0273+790 - K0274+127,

    K0275+351 - K0275+613, K0275+629 -

    K0275+1014, K0275+1050 - K0275+1240,

    Tuba, Benguet

    Tuba, Benguet 11/17/20162nd &

    Final

    Benguet

    1st DEO33.303 196 C 0.41 0.175 0.3 0 0 0 0.8830

    86.32%

    Satisfactory

    3K Rock Engineering 27908

    Rehabilitation/ Reconstruction/ Upgrading of

    Damaged Paved National Roads including

    drainage based on Pavement Management

    System/Highway-4 Kennon KO 238 + 880-KO

    239 + 048, KO237 + 123- KO238 + 000,

    KO228 + 791-KO229+000, KO228+080-

    KO228+440, Tuba, Benguet

    Tuba, Benguet 11/16/2016 1stRegional

    Office46.620 282 O 0.33 0.289 0.121 0.03 0.055 0.033 0.8590 -

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on

    Gravel Road Strategies, Traffic Benchmark for

    Upgrading to Paved Road Standard (HDM-4

    Project Analysis) Asin (Km 8) - Nangalisan San

    Pascual, Tuba, Benguet, K0273+707 to

    K0273+728; K0273+790 to K0274+127;

    K0275+531 to K0275+631; K0275+629 to

    K0275+1014; K0275+1050 to K0275+1240,

    Tuba, Benguet

    Tuba, Benguet 3/29/20171st &

    Final

    Benguet

    1st DEO33.303 195 C 0.437 0.132 0.300 - - - 86.90

    *86.9%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 3 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    3K Rock Engineering 27908

    Road Upgrading (Unpaved to Paved) Based on

    Gravel Road Strategies, Traffic Benchmark for

    Upgrading to Paved Road Standards (HDM-4

    Project Analysis) (Intermittent Sections) of

    Kabugao - Pudtol - Luna - Cagayan Bdry.

    Road, K0611+917 to K0612+961, K0612+973

    to K0613+699, K0613+723 to K0614+500,

    Apayao

    Apayao 8/27/2015 1st CAR 75.709 221 O 0.36 0.241 0 0.03 0.061 0.033 72.80% -

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on

    Gravel Road Strategies, Traffic Benchmark for

    Upgrading to Paved Road Standard (HDM-4

    Project Analysis) Asin Km. 8 - Naglisan - San

    Pascual, Tuba, Benguet-La Union Road,

    K0273+707 to K0273+728, K0273+790 to

    K0274+

    Tuba, Benguet 8/23/2016 1st

    BENGUE

    T 1ST

    DEO

    33.303 195 O 0.34 0.24 0.15 0.02 0.051 0.05 0.8500 -

    3K Rock Engineering/Rvc

    Construction (J.V.)27908

    Road Upgrading (Gravel to Concrete) of Asin -

    Nanganban - San Pascual Road K0270+594 -

    K0272+220 ; K0275+5311 - K0275+7178

    8/16/2014 1st CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -

    3-L Construction 16745

    Concreting of Barangay Road, Barangay

    Salvacion, Del Gallego, Camarines SurDel Gallego,

    Camarines Sur8/16/2017 1st

    Camarines

    Sur 5th

    DEO

    1.410 40 O 0.496 0.133 0.300 - - - 92.90 -

    3-L Construction 16745

    Construction/Improvement of Roads and

    Concreting of Roads, Brgy. Alianza, San

    Fernando, Camarines Sur

    Brgy. Alianza,

    San Fernando,

    Camarines Sur

    6/8/20161st &

    Final

    Camarines

    Sur 1st

    DEO

    1.844 45 C 0.48 0.149 0.3 0 0 0 92.40%

    92.4%

    Very

    Satisfactory

    3-L Construction 16745Concreting of Mataoroc (Zone 3- Zone 5 FMR)

    Barangay Mataoroc

    Minalabac,

    Camarines Sur4/6/2018 1st/Final

    Camarines

    Sur 1st

    DEO

    4.723 90 C 0.490 0.146 0.300 - - - 94.50 *94.50%Very

    Satisfactory

    3N Construction & Supply 37872

    Cluster 5-Local Infrastructure Program-

    Repair/Rehab. of Multi-Purpose Building,

    Barangay Sweetland, Buenavista, Bohol

    Barangay

    Sweetland,

    Buenavista,

    Bohol

    3/10/2016 1stBohol 2nd

    DEO0.7682 75 C 0.47 0.133 0.3 0 0 0 90.00%

    90%

    Very

    Satisfactory

    3Rb Construction And Supply 19541

    Cluster 6 - Network Development -

    Improvement/Widening of National Roads -

    Secondary Road along DM- Jct.-Legazpi-Sto.

    Domingo-Tabaco-Cam. Sur Bdry. Roads,

    Malinao, Albay and along Ligao-Tabaco

    Roads, Buang, Tabaco City, Albay 1st LD

    Malinao, Albay

    and along Ligao-

    Tabaco Roads,

    Buang, Tabaco

    City, Albay 1st

    LD

    6/8/2017 1stAlbay 1st

    DEO92.711 190 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 4 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    3Rb Construction And Supply 19541

    Cluster 6- Network Development -

    Improvement/ Widening of National Roads -

    Secondary Roads along DM- Junction -

    Legazpi - Sto. Domingo- Tabaco - Camarines

    Sur Bdry Roads, Malinao, Albay and along

    Ligao- Tabaco Roads, Buang , Tabaco City,

    Malinao and Tabaco City

    Malinao and

    Tabaco City8/24/2017 1st

    Albay 1st

    DEO92.771 190 O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -

    3Rb Construction And Supply 19541

    Construction/ Maintenance of Flood Mitigation

    Structures and Drainage Systems -

    Construction of Revetment along Pooc Creek,

    Barangay Balibago and Barangay Macabling,

    Sta. Rosa City, Laguna

    Sta. Rosa City,

    Laguna3/19/2017

    1st &

    Final

    Laguna

    2nd19.002 140 C 0.344 0.200 0.300 - - - 84.40

    *84.4%

    Satisfactory

    3Rb Construction And Supply 19541

    Extension of River Control, Sta. 0+112.50 -

    Sta. 0+232.50, Bongabong, Tabaco City, AlbaySta. 0+112.50 -

    Sta. 0+232.50,

    Bongabong,

    Tabaco City,

    Albay

    3/13/20171st &

    Final

    Albay 1st

    DEO16.705 128 C 0.485 0.141 0.300 - - - 92.60

    *92.6%

    Very

    Satisfactory

    3Rb Construction And Supply 19541

    Widening of National Roads Outside N1 DM

    Jct-Legazpi-Sto. Domingo-Tabaco-Camarines

    Sur Bdry. K0552+532-K0553+660, K0554+600-

    K0555+400, Malilipot, Albay and Tabaco City

    Malilipot, Albay

    and Tabaco City3/7/2016 1st

    Albay 1st

    DEO43.1972 147 C 0.45 0.196 0.3 0 0 0 94.40%

    94.4%

    Very

    Satisfactory

    3Rb Construction And Supply 19541 Prieto Diaz Port Development ProjectPrieto Diaz,

    Sorsogon8/19/2015 1st DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -

    3Rb Construction And Supply 19541

    Cluster 9-

    Construction/Rehabilitation/Improvement of

    River Control Section, Estancia, Estancia,

    Malinao, Albay

    Estancia,

    Malinao, Albay3/7/2016 1st

    Albay 1st

    DEO3.9755 218 C 0.48 0.133 0.3 0 0 0 91.30%

    91.3%

    Very

    Satisfactory

    3Rb Construction And Supply 19541

    Cluster 9-

    Construction/Rehabilitation/Improvement of

    River Control, San Antonio and San Vicente,

    Tabaco City and Diaro and Estancia, Malinao,,

    Albay

    San Antonio and

    San Vicente,

    Tabaco City and

    Diaro and

    Estancia,

    Malinao,, Albay

    6/11/20161st &

    Final

    Albay 1st

    DEO29.927 218 C 0.49 0.133 0.3 0 0 0 91.80%

    91.8%

    Very

    Satisfactory

    3R'S Builders And

    Resources35922 Construction of Multi-Purpose Building

    Museum, Tudela,

    Misamis

    Occidental

    3/16/2016 1st

    MISAMIS

    OCCIDEN

    TAL 2ND

    DEO

    1.937 120 C 0.46 0.133 0.3 0 0 0 89.10%

    89.1%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 5 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    4 A'S Construction 9446

    Construction of 2STY 4CL School Building at

    Andabuen National High School Benito

    Soliven, Isabela

    Benito Soliven,

    Isabela3/18/2017 1st

    Isabela

    2nd5.996 150 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 -

    4 A'S Construction 9446

    Construction of Two (2) Storey Four (4)

    Classroom School Building at Andabuen

    National High School Benito Soliven, IsabelaBenito Soliven,

    Isabela11/19/2016 1st

    Isabela

    2nd5.996 150 O 0.39 0.2 0.15 0.02 0.052 0.05 0.8610 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,

    Pampanga2/5/2015 2nd BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,

    Pampanga11/20/2014 1st BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -

    4B Construction Corporation

    2014 heavy maintenance works along SCTEX

    lot 2 - Bridge revetment, slope and drainage

    repair works

    Bataan and

    Pampanga/Regio

    n 3

    10/31/2014 1st BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -

    525 Construction 28532

    Repair/ Maintenance of Flood Control Structure

    along Balagtas River, San Juan Section,

    Balagtas, BulacanBalagtas,

    Bulacan5/31/2017

    1st &

    Final

    Bulacan

    1st DEO18.325 150 C 0.469 0.133 0.300 - - - 90.20

    *90.2%

    Very

    Satisfactory

    525 Construction 28532

    Construction of Flood Control Structure along

    Balagtas at Dalig, Balagtas, BulacanBalagtas,

    Bulacan8/25/2017

    1st &

    Final

    Bulacan

    1st4.628 90 C 0.367 0.200 0.300 - - - 86.70

    *86.7%

    Satisfactory

    525 Construction 28532Rehabilitation of Roads Brgy. Igulot - Brgy.

    Binang - Brgy. TuroBocaue, Bulacan 9/19/2016 1st

    Bulacan

    1st DEO34.143 210 O 0.31 0.3 0.15 0.03 0.042 0.05 0.8840 -

    525 Construction 28532

    Valenzuela-Obando-Meycauayan Flood

    Control Project-Meycauayan, Construction of

    River wall Protection, Meycauayan-Valenzuela

    Boundary Phase I, RS , (Sta. 3+475.40-Sta.

    3+567.00), Right Side, Meycauayan, Bulacan

    (Sta. 3+475.40-

    Sta. 3+567.00),

    Right Side,

    Meycauayan,

    Bulacan

    3/8/2016 1st

    Bulacan

    Second

    DEO

    24.1599 201 C 0.4 0.207 0.15 0.03 0.06 0.05 89.50%

    89.5%

    Very

    Satisfactory

    525 Construction 28532

    Valenzuela-Obando-Meycauayan Flood

    Control Project - Meycauayan - Construction of

    Riverwall Protection, Meycauayan-Valenzuela

    Boundary Phase I, RS (Sta. 3+475.40 - Sta.

    3+567.00), Right Side

    Meycauayan,

    Bulacan6/7/2016

    2nd &

    Final

    Bulacan

    2nd24.159 201 C 0.49 0.102 0.3 0 0 0 89.30%

    89.42%

    Very

    Satisfactory

    525 Construction 28532

    Construction of Flood Control Structure along

    Angat River, Pulilan, BulacanPulilan, Bulacan 11/17/2017

    1st &

    FinalDPWH 10.880 150 C 0.472 0.133 0.300 - - - 90.50

    *90.5%

    Very

    Satisfactory

    5'S Construction & Supply 32404

    Local Infrastructure Program - Improvement of

    Multi-Purpose Building (Public Market) Iloilo

    4th Legislative District , Brgy. Poblacion,

    Banate Iloilo

    Banate, Iloilo 3/9/2016 1stIloilo 2nd

    DEO1.969 259 C 0.46 0.133 0.3 0 0 0 89.00%

    89%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 6 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    5'S Construction & Supply 32404

    Improvement of Multi-Purpose Building/

    Barangay Hall, Barangay Punong Lapuz, Iloilo

    City

    Iloilo City 3/23/2018 1st/FinalIloilo City

    DEO1.914 118 C 0.49 0.133 0.3 - - - 92.50 *92.50%

    Very

    Satisfactory

    6 Jewels Construction 34737

    MFO 1 - National Road Network Services,

    Network Development Off-Carriageway

    Improvement including Drainage, Secondary

    Roads Batangas Quezon Road, K0134+(-664) -

    K0134+(-414), K0134+100 - K0134+407,

    Batangas City, Batangas

    Batangas City,

    Batangas8/25/2017

    1st &

    Final

    Batangas

    2nd DEO5.287 45 C 0.483 0.133 0.300 - - - 91.60

    *91.6%

    Very

    Satisfactory

    6 Jewels Construction 34737

    Local Infrastructure Program - Construction/

    Improvement of Draiange Facilitites Brgy. Calicanto,

    Batangas City9/21/2016

    1st &

    Final

    Batangas

    2nd1.880 56 C 0.48 0.133 0.3 0 0 0 0.9120

    91.2%

    Very

    Satisfactory

    626 Construction & Trading,

    Inc.34990

    Rehabilitation & Improvement of Bustos Dam

    and Picnic GroundsBustos, Bulacan 9/27/18 2nd TIEZA 7.500 90 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going

    626 Construction & Trading,

    Inc.34990 Improvement of Hot and Cold Spring Resort

    Balungao,

    Pangasinan10/9/2015 2nd TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -

    626 Construction & Trading,

    Inc.34990

    Improvement of Balungao Hot and Cold Spring

    Resort

    Balungao,

    Pangasinan5/27/2015 1st TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74

    722 Construction,

    Inc.(Formerly: 722

    Construction)

    21923

    Repair/Rehabilitation/Improvement along

    Baliuag-Candaba Road K0054+000 to

    K0057+000

    Baliuag, Bulacan 11/24/2014 1st III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%

    78.50%

    Unsatisfacto

    ry

    739 Builders 31174

    Provision of Techvoc Workshop

    Buildings/Laboratories for Senior High School,

    Narvacan NCHSNarvacan, Ilocos

    Sur6/4/2017

    1st &

    Final

    Ilocos Sur

    2nd

    District

    Engineerin

    g Office

    2.307 85 C 0.484 0.199 0.240 - - - 92.30

    *92.3%

    Very

    Satisfactory

    739 Builders 31174

    Construction of Drainage Canal, Vigan-Sta.

    Catalina Road, K0407+405-K0408+288 Vigan, Ilocos Sur 8/17/20171st &

    Final

    Ilocos Sur

    1st DEO11.177 120 C 0.488 0.172 0.228 - - - 88.80

    *88.8%

    Satisfactory

    739 Builders 31174

    Provision of Techvoc Workshop

    Building/Laboratories for Senior High School,

    Narvacan National High School, Narvacan,

    Ilocos Sur

    Narvacan, Ilocos

    Sur3/18/2017 1st

    Ilocos Sur

    2nd DEO2.306 115 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 -

    739 Builders / Arthit

    Corporation

    31174 /

    40667

    Upgrading and Improvement of Sta. Lucia -

    Nagrebcan - Ronda Road

    Sta. Lucia, Ilocos

    Sur / Region 110/9/2018 1st

    Provincial

    Governme

    nt of

    Ilocos Sur

    44.784 211 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going

    811 Trading & Construction 21215

    Construction of Two (2) Storey, Four

    Classroom Building for Punong NHS, Sta.

    Cruz, Marinduque

    Sta. Cruz,

    Marinduq8/25/2017

    1st &

    Final

    Marinduqu

    e DEO7.115 262 C 0.473 0.200 0.154 - - - 82.70

    *82.7%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 7 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    811 Trading & Construction 21215

    Construction of 2 Storey/ 8 Classrooms at

    Doroteo S. Mendoza SR Memorial National

    High School, Naujan, Oriental MindoroNaujan, Oriental

    Mindoro8/17/2017

    1st &

    Final

    Mindoro

    Oriental

    DEO

    10.769 210 C 0.488 0.200 0.000 - - - 68.80*68.8%

    Poor

    811 Trading & Construction 21215

    Construction of 2 Storey/8 Classrooms at

    Doroteo S. Mendoza, Sr., Memorial National

    High School, Naujan, Oriental MindoroNaujan, Oriental

    Mindoro11/17/2016 1st

    Mindoro

    Oriental

    DEO

    10.821 150 O 0.35 0.3 0.109 0.03 0.058 0.033 0.8790 -

    811 Trading & Construction/

    Great Lakes Enterprises,

    Joint Venture

    JV-15-

    1249

    Construction of Wawa Seawall, Calapan City,

    Oriental MindoroCalapan City,

    Oriental Mindoro8/26/2016 2nd

    Mindoro

    Oriental

    DEO

    18.576 181 O 0.38 0.2 0.3 0 0 0 0.8820 -

    876 Construction 24224

    Paving of Shoulder with Drainage and Slope

    Protection, Calapan North Road (CNR)San Teodoro,

    Oriental Mindoro8/26/2016 2nd

    Mindoro

    Oriental

    DEO

    1.293 75 O 0.46 0.158 0.3 0 0 0 0.9130 -

    888 Acy Enterprises 32898

    Cluster-Road Widening along Daang Maharlika

    (S00223LT), K1024+443-K1024+699,

    K1024+721-K1025+607Southern Leyte 11/6/2017 1st DPWH 33.567 240 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 -

    888 Acy Enterprises 32898

    Off-Carriageway Improvement Along Jct. Taft-

    Oras-San Policarpio-Arteche Road

    (S00167SM) K0939+500-K0940+744;

    K0942+280-K0943+344, K0943+432-

    K0944+1087, Eastern Samar

    K0939+500-

    K0940+744;

    K0942+280-

    K0943+344,

    K0943+432-

    K0944+1087,

    Eastern Samar

    8/15/2017 1st

    Eastern

    Samar

    DEO

    39.857 210 O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 -

    888 Acy Enterprises 32898

    Rehab./Major Repair of Permanent Bridges,

    Canlawis Bridge along Lilo-an-San Ricardo

    Road (B00368LT), Pintuyan, Southern Leyte- 3/30/2017

    1st &

    Final

    Southern

    Leyte

    DEO

    19.585 247 C 0.412 0.133 0.300 - - - 84.50*84.5%

    Satisfactory

    888 Acy Enterprises 32898

    Rehab./Major Repair of Permanent Lo-oc

    Bridge along Bdry. So. Leyte-Maasin-

    Macrohon-Sogod-Daang Maharlika

    (B00330LT), Lo-oc, Tomas Oppus, Southern

    Leyte

    Lo-oc, Tomas

    Oppus, Southern

    Leyte

    11/14/20161st &

    Final

    Southern

    Leyte

    DEO

    9.699 170 C 0.44 0.133 0.3 0 0 0 0.875087.5%

    Satisfactory

    888 Acy Enterprises 32898

    Rehab./Major Repair of Permanent Dinahugan

    Bridge along Bdry. So. Leyte-Maasin-

    Macrohon-Sogod-Daang Maharlika

    (B003011LT)

    Padre Burgos,

    Southern Leyte6/26/2016 1st

    Southern

    Leyte

    DEO

    19.148 202 O 0.37 0.24 0.15 0.03 0.056 0.05 89.30% -

    888 Acy Enterprises 32898

    Rehab/Major Repair of Permanent Bridges,

    Pandan Bridge, Along Brdy, S. leyte-Maasin-

    Macrohon-Sogod-Daang Maharlika

    Along Brdy, S.

    leyte-Maasin-

    Macrohon-Sogod-

    Daang Maharlika

    6/3/2015 1st

    Southern

    Leyte

    DEO

    8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 8 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    888 Acy Enterprises 32898

    Off-Carriageway Improvement along Taft -

    Oras - San Policarpio - Arteche Road,

    K0939+500 - K0940+744, K0942+280 -

    K0943+344, K0943+432 - K0944+490,

    K0944+672 - K0944+1087

    Eastern Samar 4/10/2018 2nd/Final

    Eastern

    Samar

    DEO

    39.857 210 C 0.48 0.186 0.3 - - - 96.70 91.48% Very

    Satisfactory

    888 Acy Enterprises 32898

    Road Widening along Daang Maharlika,

    K1024+443-K1024+699.00; K1024+721-

    K1025+607.000

    Southern Leyte 04/09/18

    1st/Final

    Southern

    Leyte

    DEO

    33.567 240 C 0.482 0.133 0.300 - - - 91.50 *91.50% Very

    Satisfactory

    8G Construction And General

    Services35783

    Construction of 4 STY, 8-CL at Amlan NHSAmlan 2nd

    District, Negros

    Oriental

    11/18/20161st &

    Final

    Negros

    Oriental

    2nd DEO

    14.868 230 C 0.49 0.133 0.3 0 0 0 0.9240

    92.4%

    Very

    Satisfactory

    8G Construction And General

    Services35783

    Rehabilitation/Improvement of Farm to Market

    Road at Jandalamanon, Kilaban, Gomentoc

    and Candanaay, Ayungon, Negros Oriental

    Ayungon, Negros

    Oriental3/11/2016 1st

    Negros

    Oriental

    First DEO

    3.7437 50 C 0.44 0.133 0.3 0 0 0 86.80%86.8%

    Satisfactory

    8G Construction And General

    Services35783

    Rehabilitation of Multi-Purpose Building,

    Barangay Manalungon,Sta. Catalina,

    Negros Oriental

    3rd LD

    8/24/20161st &

    Final

    Negros

    Oriental

    3rd DEO

    1.940 180 C 0.44 0.133 0.3 0 0 0 0.869086.9%

    Satisfactory

    8R'S Construction 22997

    Rehabilitation/ Reconstruction/ Upgrading of

    Damaged Paved National Rd. including

    Drainage (Marinduque Circumferencial Road),

    K0004+000-K0004+600, K0005+300-

    K0005+486, and K0005+670-K0005+832,

    Boac-Mogpog, Marinduque

    Boac-Mogpog,

    Marinduque8/27/2016 1st

    Marinduqu

    e DEO26.202 257 O 0.35 0.259 0.15 0.03 0.025 0.033 0.8440 -

    969 Construction & Supplies 35818

    Barangay San Roque, Delfin Albano, IsabelaDelfin Albano,

    Isabela6/2/2017

    1st &

    Final

    Isabela

    1st DEO1.410 91 C 0.442 0.138 0.300 - - - 88.00

    *88%

    Satisfactory

    A B Aponesto Construction,

    Parts & Supply22998

    Repair/Rehab of Agusan River Flood Control,

    Osmena Section, Compostela along

    Montevista – Compostela – New Bataan –

    Maragusan – Mati Bdry. Road.

    Compostela

    Valley8/9/2014 1st XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -

    A De Guia Construction 18228

    Construction of River Bank Protection, Siffu

    Flood Control Project, Sittio Gabit Section,

    Roxas, Isabela

    Roxas, Isabela 8/28/2015 1stIsabela

    2nd DEO18.346 215 O 0.35 0.3 0.15 0.03 0.04 0.05 92.40% -

    A J Taylan Construction &

    Development/Jlp

    Construction & Supply Joint

    Venture

    JV-14-518

    Rehabilitation/Reconstruction/Upgrading of

    Damaged Paved National Roads including

    Drainage Based on Pavement Management

    System/Highway Development and

    Management- 4(HDM-4), Pinili-Nueva Era

    Road, K0453+(-224)-K0454+1013, K0455+884-

    K0456+433, Pinili Road, Ilocos Norte

    Pinili-Nueva Era

    Road, K0453+(-

    224)-

    K0454+1013,

    K0455+884-

    K0456+433,

    Pinili Road,

    Ilocos Norte

    8/26/2015 1stIlocos Sur

    2nd DEO37.519 219 O 0.36 0.209 0.15 0.03 0.051 0.05 84.50% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 9 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A. B. Taylan Construction &

    Development / North Tech

    Builders And Construction

    Supply Joint Venture

    JV-14-115

    MFO-1 National Road Network Services:

    Network Development: Widening of National

    Roads (Arterial)-along N1, Bangag-Magapit

    Road, K0686+(-512) - K0687+980, Bangag-

    Magapit, Allacapan, Cagayan

    Allacapan,

    Cagayan6/1/2017

    1st &

    Final

    Regional

    Office No.

    II

    74.138 294 C 0.452 0.134 0.300 - - - 88.60*88.6%

    Satisfactory

    A. C. Rivero Development

    Corporation5122

    Replacement/ Raising of PHHC Bridge

    (S00130NR) along Bacolod Circumferential

    Road, Bacolod CityBacolod City 11/16/2017 1st DPWH 19.600 255 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 -

    A. C. Soliven Construction *

    General Merchandise19278

    Rehabilitation/ Improvement of Existing Dike

    along Lucung River, Upstream of Sta. Maria

    Section, Left Side, Sta. (-)2+050 to Sta. (-

    )2+132 and Sta. (-)2+200 to Sta. (-)2+619.60,

    Concepcion, Tarlac

    Concepcion,

    Tarlac8/20/2017

    1st &

    Final

    Tarlac 2nd

    DEO37.231 147 C 0.421 0.133 0.300 - - - 85.40

    *85.4%

    Satisfactory

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D.

    P. Construction & Supply)

    3466

    Asset Preservation of National Roads

    Preventive Maintenance - Asset Preservation

    of National Roads -

    Rehabilitation/Reconstruction/Upgrading of

    Damaged Paved National Roads Including

    Drainage, Odiong - Sibalom - San Remigio -

    Leon Road, San Remigio, Antiq

    San Remigio,

    Antique6/9/2016 1st

    ANTIQUE

    DEO29.476 223 O 0.23 0.291 0.121 0.008 0.022 0 67.20% -

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D.

    P. Construction & Supply)

    3466

    Rehabilitation/ Reconstruction/ Upgrading of

    Damaged Paved National Roads including

    Drainage, Iloilo-Capiz Road (Pavia Diversion),

    K0010+449 to K0010+824.30, IloiloIloilo 11/16/2016 1st

    ILOILO

    4TH DEO7.258 170 O 0.34 0.24 0.15 0.03 0.05 0.05 0.8610 -

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D.

    P. Construction & Supply)

    3466

    Upgrading of Delgado St. K0001+(-402)-

    K0001+(-100), K0001+(-100)-K0001+080, Iloilo

    CityIloilo City 9/1/2016 1st

    ILOILO

    DEO22.611 22.6 O 0.28 0.3 0.05 0.03 0.058 0 0.7130 -

    A. De Guia Construction 18228

    Construction/ Rehabilitation of Flood Control

    Projects, Nagassican Flood Control Projects,

    Sta. 0+000 to Sta. 0+224

    Nagassican,

    Santiago City8/12/2014 1st II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -

    A. De Guia Construction 18228

    Construction of Drainage System / Protection

    Works along Daang Maharlika, Isabela 4th LD

    K0311+590 - K0314+350, San Luis -

    Caquilingan

    Cordon, Isabela 10/27/2014 1st II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%

    Satisfactory

    A. DE GUIA

    CONSTRUCTION18228

    Concreting of San Pablo-Salvacion Road,

    Barangay San Pablo Alicia, IsabelaBarangay San

    Pablo Alicia,

    Isabela

    11/11/20171st &

    FinalDPWH 6.930 122 C 0.470 0.133 0.300 - - - 90.30

    *90.3%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 10 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A. DE GUIA

    CONSTRUCTION18228

    Network Development - Improvement/

    Widening of National Roads Primary Roads -

    Other Primary Roads along National Roads

    along Santiago - Tuguegarao Road,

    K0369+000 - K0371+000, K0373+000 -

    K0374+000, K0374+947 - K0376+000, Aurora

    and San Miguel, Isabela

    Aurora and San

    Miguel, Isabela8/19/2017 1st

    Isabela

    2nd DEO91.157 251 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 -

    A. DE GUIA

    CONSTRUCTION18228

    MFO 1 - National Road Network Services:

    Network Development: Improvement/Widening

    of National Roads, Primary Roads along N1

    Daang Maharlika (LZ) - K0382+977-

    K0383+450 L/S, K0383+830-K0386+182 L/S,

    K0386+291-K0387+215 L/S, K0382+977-

    K0383+450 R/S, K0383+83

    K0382+977-

    K0383+450 L/S,

    K0383+830-

    K0386+182 L/S,

    K0386+291-

    K0387+215 L/S,

    K0382+977-

    K0383+450 R/S,

    K0383+830-

    K0385+006 R/S,

    K0385+220-

    K0386+014 R/S,

    K0386+102-

    K0386+193 R/S,

    6/15/2016 1stRegional

    Office79.349 248 O 0.39 0.24 0.15 0.03 0.047 0.05 91.00% -

    A. DE GUIA

    CONSTRUCTION18228

    Network Development-Improvement/Widening

    of National Roads-Primary Roads-Other

    Primary Roads along National Roads along

    Santiago-Tuguegarao Road, K0369+000-

    K0371+000, K0373+000-K0374+000 &

    K0374+947-K0376+000

    Aurora and San

    Manuel, Isabela04/09/18

    2nd/Final

    Isabela

    2nd DEO91.157 281 C 0.363 0.200 0.300 - - - 86.30 91.40%

    Very

    Satisfactory

    A. DE GUIA

    CONSTRUCTION18228

    Network Development, Improvement/Widening

    of National Roads, Santiago-Tuguegarao

    Road, K0342+(-039)-K0343+884, Oscar,

    Ramon

    Isabela-Sinamar

    Sur, San Mateo,

    Isabela

    3/20/2018 1st/FinalIsabela

    3rd DEO45.847 179 C 0.461 0.176 0.300 - - - 93.70 *93.70%

    Very

    Satisfactory

    A. Dela Cruz Builders Inc. 38836

    Construction of Multi-Purpose Building at Dona

    Aurora Elementary School, Brgy. Doña Aurora,

    Quezon City

    Quezon City 3/17/2018 1st/Final

    Quezon

    City 2nd

    DEO

    14.724 250 C 0.490 0.132 0.300 - - - 92.20 *92.20% Very

    Satisfactory

    A. J. Lava Builders Corp.

    (Formerly: A. J. Lava

    Builders)

    22265

    Flood Management Services

    Construction/Maintenance of Flood Mitigation

    Structures and Drainage System

    Improvement/Riprapping of Sitio Kapatagan

    River (Downstream), Brgy. San Jose, Antipolo

    City, 2nd LD

    Brgy. San Jose,

    Antipolo City11/11/2015 1st

    RIZAL

    1ST DEO27.612 180 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00%

    92%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 11 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A. J. Taylan Construction

    Corporation2336

    Construction of Apatot Bridge and Approaches,

    Pinili, Ilocos NortePinili, Ilocos

    Norte11/15/2016

    1st &

    Final

    Ilocos

    Norte 2nd

    DEO

    27.042 270 C 0.35 0.3 0.101 0.03 0.055 0.033 0.869086.9%

    Satisfactory

    A. J. Taylan Construction

    Corporation2336

    Laoag River Basin Flood and Sabo Project,

    Concrete Revetment along Bongo River, Brgy.

    Sta Monica, Sitio 2, San Nicolas, Ilocos Norte

    Brgy. Sta

    Monica, Sitio 2,

    San Nicolas,

    Ilocos Norte

    3/9/2016 2nd

    ILOCOS

    NORTE

    2ND DEO

    9.649 194 C 0.42 0.2 0.3 0 0 0 91.10%

    91.1%

    Very

    Satisfactory

    A. M. Oreta and Co.,

    Incorporated108 Region 2-PIDP-CBIMO

    Sta. Ana,

    Cagayan9/19/2015 1st NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -

    A. M. P. Construction 16574Construction of Flood Control Wall along

    Agbalili River, Altavas, AklanAltavas, Aklan 8/28/2016 1st

    AKLAN

    DEO34.428 34.4 O 0.39 0.3 0.003 0.03 0.058 0 0.7790 -

    A. M. P. Construction 16574Construction of Flood Control Revetment Wall

    along Agbalili River, Altavas, AklanAltavas, Aklan 6/11/2016 2nd

    AKLAN

    DEO34.428 274 O 0.39 0.3 0.104 0.023 0.055 0.033 90.00% -

    A. M. P. Construction/

    Forthright Construction Joint

    Venture

    JV-16-

    1612

    Construction/ Maintenance of Flood Mitigation

    Structures and Drainage System,

    Rehabilitation/ Improvement of Pampanga

    River Control, Brgy. Sapang Buho, Palayan

    City, Nueva Ecija

    Palayan City,

    Nueva Ecija8/23/2017 1st

    Nueva

    Ecija 2nd

    DEO

    39.200 161 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 -

    A. P. B. Construction 17055

    Network Development/ Widening of National

    Roads-Secondary Road-Abra-Ilocos Norte

    Road K0409+000-K0409+100, K0409+115-

    K409+178, K0409+307-K0409+404,

    K0409+531-K0409+648, K0409+748-

    K0410+139, K0410+159-K0410+360,

    K0410+369-K0410+777, K0411+050-

    K0411+220, K0412+122-K0412+499,

    K0413+000-K0414+354, K0414+764-

    K0415+747, K0416+175-K0416+445, K041

    Abra 11/20/2015 1stRegional

    Office81.971 286 O 0.32 0.29 0.15 0.022 0.045 0.033 85.80%

    85.8%

    Satisfactory

    A. P. Consebido

    Construction And Trading33616

    Construction of Barangay Hall/Evacuation

    Center, Brgy. Salvacion, Roxas, Palawan Brgy. Salvacion,

    Roxas, Palawan11/23/2016

    1st &

    Final

    Palawan

    First DEO1.982 100 C 0.48 0.179 0.3 0 0 0 0.9600

    96%

    Very

    Satisfactory

    A. P. Consebido

    Construction And Trading33616

    Construction of Barangay Road, Barangay

    Dumarao, Sta. 00+012.70-Sta. 0+149.00,

    Roxas, Palawan

    Sta. 00+012.70-

    Sta. 0+149.00,

    Roxas, Palawan

    3/10/2016 1stPalawan

    First DEO1.9478 100 C 0.43 0.2 0.27 0 0 0 89.90%

    89.9%

    Very

    Satisfactory

    A. P. D. Construction 17467

    Retrofitting/Strengthening of Disiluad Br.

    (B01939LZ) along Cordon-Aurora Boundary

    Road (Isabela Boundary - Jct. Dumabato)

    Disiluad, Aglipay,

    Quirino3/17/2016 1st Quirino 29.4724 180 C 0.49 0.133 0.3 0 0 0 91.90%

    91.9%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 12 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A. R. Lustre Jr. Construction 7680

    Construction of Multi-Purpose Building,

    Barangay Sta. Monica, Inagawan Sub. And

    San Miguel, Puerto Princesa City

    Barangay Sta.

    Monica,

    Inagawan Sub.

    And San Miguel,

    Puerto Princesa

    City

    3/11/2016 1stPalawan

    3rd DEO1.9142 156 C 0.48 0.177 0.3 0 0 0 96.00%

    96%

    Very

    Satisfactory

    A. Sandoval Construction &

    Supply35991

    Local Infrastructure Program - Construction of

    2 Storey, 4 Classroom School Building, Luyos

    NHS, Brgy. Luyos, Tanauan City, Batangas

    3rd LD

    Brgy. Luyos,

    Tanauan City,

    Batangas 3rd LD

    6/30/20161st &

    Final

    Batangas

    3rd8.464 180 C 0.46 0.133 0.3 0 0 0 89.40%

    89.4%

    Very

    Satisfactory

    A. Y. U. Engineering And

    Construction25632

    Road Concreting, Bato to Likate Road, Brgy.

    Bato and Kilate, Toril, Davao City Toril, Davao City 9/2/20162nd &

    Final

    Davao

    City 2nd

    DEO

    9.800 105 C 0.48 0.133 0.3 0 0 0 0.916088.3%

    Satisfactory

    A.B Taylan Construction &

    Development 25273

    Netwrork Development, Improvement of

    National Roads along Manila North Road,

    K0508+050-K0508+125; K0508+140-

    K0508+250; K0508+329; K0508+410-

    K0509+755; K0509+760-K0510+501;

    K0519+000-K0520+200; K0521+000-

    K0522+500; K0522+500-K0523+060

    Pasuguin, Ilocos

    Norte11/8/2017

    1st &

    FinalDPWH 144.750 255 C 0.473 0.133 0.300 - - - 90.60

    *90.6%

    Very

    Satisfactory

    A.B. Opeña Builders 33996

    Construction of Multi-Purpose Building, Brgy.

    North Centro, Sipocot, Camarines SurBrgy. North

    Centro, Sipocot,

    Camarines Sur

    6/6/20161st &

    Final

    Camarines

    Sur 1st

    DEO

    1.881 120 C 0.48 0.147 0.3 0 0 0 93.10%

    93.1%

    Very

    Satisfactory

    A.B. Opeña Builders 33996

    Construction of Multi-Purpose Building at

    Colacling National High School Lupi, Camarines

    Sur11/15/2017

    1st &

    FinalDPWH 0.955 60 C 0.488 0.133 0.300 - - - 92.10

    *92.1%

    Very

    Satisfactory

    A.B. Opeña Builders 33996

    Concreting of Barangay Road at Brgy. Mabini,

    Del Gallego, Camarines Sur Brgy. Mabini, Del

    Gallego,

    Camarines Sur

    6/1/20171st &

    Final

    Camarines

    Sur 5th

    DEO

    1.410 40 C 0.443 0.134 0.300 - - - 87.70*87.7%

    Satisfactory

    A.B. Opeña Builders 33996

    Concreting of Barangay Road, Barangay Sta.

    Cruz, Cabusao, Camarine SurCabusao,

    Camarine Sur8/16/2017 1st

    Camarines

    Sur 5th

    DEO

    1.881 45 O 0.489 0.134 0.300 - - - 92.30 -

    A.B. Opeña Builders 33996

    Cluster: Completion/Construction of Multi-

    Purpose Building at Brgy. Ragay, Camarines

    SurBrgy. Ragay,

    Camarines Sur11/24/2016

    1st &

    Final

    Camarines

    5th DEO2.883 90 C 0.47 0.133 0.3 0 0 0 0.8990

    89.9%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 13 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.B. Taylan Construction &

    Development28233

    Improvement/Widening of National Road along

    N1, Manila North Roads, K0494+396-

    K0495+024; K0496+164-K0496+423;

    K0496+775-K0497+444; K0497+834-

    K0498+000; K0499+200-K0500+676;

    K0500+676-K0500+698; K0500+676-

    K0500+756; K0503+380-K0506+084;

    K0503+380-K0506+048, Bacarra, Ilocos Norte

    K0494+396-

    K0495+024;

    K0496+164-

    K0496+423;

    K0496+775-

    K0497+444;

    K0497+834-

    K0498+000;

    K0499+200-

    K0500+676;

    K0500+676-

    K0500+698;

    K0500+676-

    K0500+756;

    11/16/2016 1st

    Regional

    Office No.

    I

    146.250 325 O 0.49 0.133 0.3 0 0 0 0.9230 -

    A.B. Taylan Construction &

    Development/ Badoc

    Builders & Supply Joint

    Venture

    JV-16-621

    Construction of Final Mitigation Structure along

    Badoc River, U/S and D/S of Badoc Bridge Badoc, Ilocos

    Norte 8/16/2017

    2nd &

    Final

    Ilocos

    Norte 2nd

    DEO

    44.100 225 C 0.457 0.200 0.300 - - - 95.70

    *92.4%

    Very

    Satisfactory

    A.B. Taylan Construction &

    Development/ Badoc

    Builders & Supply Joint

    Venture

    JV-15-404

    Road Upgrading (Unpaved to Paved) Based on

    Gravel Road Strategies, Traffic Benchmark for

    Upgrading to Paved Road Standards (HDM-4)

    along Batac-Pinili via Maipalig Road

    (S04765LZ)

    K0481+643-

    K0482+046;

    K0482+186-

    K0485+624

    8/17/20171st &

    Final

    Regional

    Office No.

    I

    146.249 300 C 0.491 0.145 0.292 - - - 92.80

    *92.8%

    Very

    Satisfactory

    A.C Rivero Development

    Corporation5122

    Upgrading of Drainage System Along El

    Dorado Street, Barangay Bosco, District IIParañaque City,

    Manila11/21/2017 1st DPWH 14.035 261 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 -

    A.C Rivero Development

    Corporation5122

    Rehabilitation/Reconstruction of Proposed

    Slope Protection along Sta. Felomina-

    Bonbonon-Digkilaan-Rogongon Road

    K1526+000-K1526+200 R/S

    Iligan City, Lanao

    del Norte Lone

    District

    11/14/20171st &

    FinalDPWH 33.582 193 C 0.448 0.175 0.300 - - - 92.30

    *92.3%

    Very

    Satisfactory

    A.C Soliven Construction &

    General Merchandise19278

    Agno River Basin & Allied Rivers Flood Control

    Project - Heightening of Villasis-Alacala Earth

    Dike Phase I, Agno River Control

    Brgy. Gualsic,

    Alcala,

    Pangasinan

    11/14/20171st &

    FinalDPWH 44.687 220 C 0.438 0.133 0.300 - - - 87.10

    *87.1%

    Satisfactory

    A.C. Mojares Construction,

    Inc.1771

    Concreting and Sidewalk Improvement of

    Phase 2, Scout Tobias St., Brgy. Laging

    Handa, Quezon City

    Quezon City 6/3/2014 1st

    Quezon

    City 2nd

    DEO

    10.018 207 O 0.39 0.24 0.15 0.015 0.028 0.05 87.70% -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Rehabilitation/ Reconstruction of National

    Roads with Slips, Slope Collapse and

    Landslide along Tomas Oppus Street

    K1135+300 to

    K1136+000,

    Maasin City,

    Southern Leyte

    6/3/20171st &

    Final

    Southern

    Leyte

    DEO

    27.915 260 C 0.499 0.133 0.300 - - - 93.20

    *93.2%

    Very

    Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    CY 2016 Basic Education Facilities Fund

    (BEFF), Provision of Tech Voc. Laboratores,

    Batch 12, Merida Vocation School, Merida,

    Leyte

    - 4/1/20171st &

    Final

    Leyte 4th

    Deo2.556 90 C 0.462 0.133 0.300 - - - 89.50

    *89.5%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 14 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Indv. Project - Concreting of Monte-Calvario-

    Igbac-Barangay Road, Brgy. Monte-Calvario

    and IgbacBuhi, Camarines 11/16/2017

    1st &

    FinalDPWH 9.860 83 C 0.484 0.132 0.300 - - - 91.60

    *91.6%

    Very

    Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Off-Carriageway Improvement including

    Drainage along Liloan-San Ricardo Road

    (S00218LT), K1070+685 to K1072+000Southern Leyte 11/6/2017 1st DPWH 45.307 270 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Replacement of PHHC Bridge along Bacolod

    Circumferential Road Bacolod City 6/6/2017 2ndBacolod

    City34.299 330 O 0.373 0.200 0.029 0.03 0.058 0.0333 72.33 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Replacement of PHHC Bridge along Bacolod

    Circumferential Road, Bacolod City Bacolod City 8/23/20172nd &

    Final

    Bacolod

    City 34.299 330 C 0.490 0.134 0.000 - - - 62.40

    *68.34%

    Poor

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    MFO-1: National Road Network Services Off-

    Carriageway Improvement including Drainage-

    Secondary Roads Flaring of Intersection along

    Carrmen-Patag-Bulua Road K1440+(-272) and

    K1441+370

    Cagayan de Oro

    City03/16/18 1st/Final

    Cagayan

    de Oro

    City 1st

    DEO

    9.221 195 C 0.477 0.200 0.120 - - - 79.70 *79.70% Unsatisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Road Upgrading (Unpaved to Paved) Based on

    Gravel Road Strategies Traffic Benchmark for

    Upgrading to Paved Road Standards (HDM-4

    Project Analysis) along Sta. Felomina-

    Bonbonon-Digkilaan-Rogongon Road

    K1535+891-K1536+457

    Iligan City 3/22/2018 1st/Final

    Lanao del

    Norte 2nd

    DEO

    33.269 202 C 0.492 0.133 0.300 - - - 92.50 *92.50% Very

    Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Construction and Maintenance of Bridges

    along National Roads (Replacement of Weak

    Bridge) at Olingan BridgeOlingan, Dipolog

    City3/15/2017

    1st &

    Final

    Zamboang

    a del

    Norte 1st

    DEO

    21.622 355 C 0.459 0.199 0.152 - - - 81.00

    *81%

    Unsatisfacto

    ry

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Upgrading/Conc. of San Juanico-Basey-

    Sohoton Rd., K0913+721.75-K0917+915.72,

    w/ exceptions

    Basey, Samar 8/7/2012 1st VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122Const./Completion of Subang Daku Bridge,

    Subang Daku River, San Miguel

    Sogod,

    Southern Leyte8/17/2012 1st VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Const./Impv't. of San Miguel-Jct. Buac Rd.,

    Daang Maharlika Rd (Km1207+000 -

    Km1209+454.40)

    Sogod, Southern

    Leyte8/19/2012 1st VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Const./Completion of Maasin Flood Control

    along Tomas Oppus Street (Road ID

    S00222LT)

    Maasin City,

    Southern Leyte6/26/2016 1st

    Southern

    Leyte

    DEO

    25.281 180 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    1

    Construction of River Control, Brgy. Calico-an,

    Borongan City, Eastern SamarBorongan City,

    Eastern Samar8/30/2016

    1st &

    Final

    Eastern

    Samar

    DEO

    9.794 95 C 0.42 0.133 0.3 0 0 0 0.848084.8%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 15 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Construction and Maintenance of Bridges

    along National Roads (Widening of Permanent

    Bridges to more than 2 lanes) Miputak Bridge

    along Dipolog-Oroquieta Road

    Zamboanga Del

    Norte11/21/2016

    1st &

    Final

    Zamboang

    a del

    Norte 1st

    DEO

    22.247 295 C 0.44 0.2 0.3 0 0 0 0.9360

    93.6%

    Very

    Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Widening of Permanent Bridges from 1 Lane to

    2 Lanes Malatgao Bridge (B00168PW) along

    Quezon, Punta, Baja Rd., Quezon, PalawanQuezon,

    Palawan11/22/2016 1st

    Palawan

    Second

    DEO

    18.408 220 O 0.39 0.176 0.15 0.03 0.04 0.05 0.8340 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Completion of Dodiongan Bridge along Sta.

    Felomina-Bonbonon-Digkilaan-Rogongon

    Road, Brgy. Bonbonon, Iligan City

    K01526+058-K01526+118, K01526+910-

    K01526+297

    Brgy. Bonbonon,

    Iligan City

    K01526+058-

    K01526+118,

    K01526+910-

    K01526+297y

    9/3/2015 1st

    Lanao del

    Norte 2nd

    DEO

    37.105 236 O 0.38 0.285 0.15 0.02 0.045 0.05 93.40% -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Off-Carriageway Improvement along Jct. Taft -

    Oras - San Policarpio-Arteche Road,

    K0950+000 - K0955+000

    K0950+000 -

    K0955+0006/29/2015 1st

    Eastern

    Samar

    DEO

    33.355 150 O 0.3 0.3 0.15 0.03 0.04 0.033 85.00% -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Replacement of Permanent Weak Bridge,

    Ramon Magsaysay Bridge (B00469MN) Along

    Jct. Switch-Jct. Monte Alegre Road

    Ramon

    Magsaysay,

    Zamboanga del

    Sur

    8/30/20162nd &

    Final

    Zamboang

    a del Sur

    1st DEO

    29.101 290 C 0.47 0.133 0.3 0 0 0 0.900088.074%

    Satisfactory

    A.C. RIVERO

    DEVELOPMENT

    CORPORATION (Formerly:

    A.C. Rivero Construction)

    5122

    Replacement of Permanent Weak Bridge,

    Ramon Magsaysay Bridge (B0469MN) along

    Jct. Switch-Jct.Monte Alegre Road

    Ramon

    Magsaysay,

    Zamboanga del

    Sur

    8/29/2015 1st

    Zamboang

    a del Sur

    1st

    29.101 230 O 0.29 0.2989 0.15 0.03 0.051 0.05 86.79% -

    A.C. RIVERO

    DEVELOPMENT

    CORPORATION (Formerly:

    A.C. Rivero Construction)

    5122

    Construction and Maintenance of Bridges

    along National Roads - (Widening of

    Permanent Bridges to more than 2 lanes),

    Miputak Bridge (BO1192MN) along Dipolog-

    Oroquieta National Road

    Zamboanga del

    Norte6/11/2016 1st

    Zamboang

    a del

    Norte 1st

    DEO

    22.574 250 O 0.39 0.24 0.12 0.03 0.04 0.033 85.10% -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Construction and Maintenance of Bridges

    along National Roads (Replacement of

    Permanent Weak Bridge), Olingan Bridge

    (B01193MN)

    Dipolog-

    Oroquieta

    National Road

    8/25/2016 2nd

    Zamboang

    a del

    Norte 1st

    DEO

    21.559 340 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 -

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Construction and Maintenance of Bridges

    along National Rd. (Replacement of

    Permanent Weak Bridge) at Olingan Bridge

    along Dipolog-Oroquieta National Road,

    Olingan, Dipolog City, Zamboanga del Norte

    Olingan, Dipolog

    City, Zamboanga

    del Norte

    11/16/2015 1st

    Zamboang

    a Del

    Norte 1st

    DEO

    21.218 220 O 0.37 0.22 0.15 0.022 0.042 0.05 85.50%85.5%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 16 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.C. Rivero Development

    Corporation (Formerly: A.C.

    Rivero Construction)

    5122

    Construction/ Maintenance of Flood Control

    Mitigation Structure and Drainage,

    Construction of Sibugay Flood Control Brgy.

    Poblacion, Albuera, Leyte

    Brgy. Poblacion,

    Albuera, Leyte8/22/2017

    1st &

    Final

    Leyte 4th

    DEO9.299 90 C 0.403 0.200 0.300 - - - 90.30

    *90.3%

    Very

    Satisfactory

    A.C. Rivero Development

    Corporation / Jqd

    Construction And General

    Services Joint Venture

    JV-15-513

    Const./Impv't./Concreting of Access Road

    Leading to Napantao Dive Site (Napantao

    Road), San Franciso, Southern LeyteSan Franciso,

    Southern Leyte11/15/2016

    1st &

    Final

    Southern

    Leyte

    DEO

    37.270 220 C 0.42 0.154 0.3 0 0 0 0.878087.8%

    Satisfactory

    A.C. Rivero Development

    Corporation / Jqd

    Construction And General

    Services Joint Venture

    JV-14-

    1038

    Rehabilitation/Major Repair of Permanent

    Weak Bridges, Otikon Bridge Along Daang

    Maharlika (B00598LT), Libagon, Southern

    Leyte

    Libagon,

    Southern Leyte11/16/2015 1st

    Southern

    Leyte

    DEO

    31.056 195 O 0.25 0.3 0.15 0.03 0.06 0.05 83.90%83.9%

    Satisfactory

    A.C. Rivero Development

    Corporation / Jqd

    Construction And General

    Services Joint Venture

    0

    Rehabilitation/Major Repair of Permanent

    Weak Bridge, Otikon Bridge along Daang

    Maharlika, Libagon, Southern Leyte

    Libagon,

    Southern Leyte3/7/2016 2nd

    Southern

    Leyte31.056 195 C 0.45 0.194 0.3 0 0 0 88.10%

    88.1%

    Satisfactory

    A.C Soliven Construction &

    General Merchandise19278

    Flood Management Services: Construction/

    Maintenance of Flood Mitigation Structures and

    Drainage System, Construction of Flood

    Control Facilities at Paranum Creek, Sta.

    0+000 - Sta. 0+110 and Sta. 0+390 - Sta.

    1+170, (L/S), Brgy. Camias, Magalang,

    Pampanga

    Magalang,

    Pampanga6/8/2017 1st

    Pampanga

    3rd DEO17.784 150 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 -

    A.C Soliven Construction &

    General Merchandise19278

    Flood Management Services: Construction/

    Maintenance of Flood Mitigation Structures and

    Drainage System; Construction of Flood

    Facilities at Paranum Creek, Barangay

    Camias, Sta. 0+000 to Sta. 0+110, Magalang,

    Pampanga

    Magalang,

    Pampanga8/19/2017

    2nd &

    Final

    Pampanga

    3rd DEO17.784 150 C 0.392 0.199 0.300 - - - 89.10

    *89.04%

    Very

    Satisfactory

    A.C Soliven Construction &

    General Merchandise19278

    Construction/Maintenance of Flood Mitigation

    Structure & Drainage Systems - Agno River

    Basin Flood Control Project-Extension/

    Construction of Bank Protection of River

    Course, Brgy. Mabanogbog, Namcamaliran

    Pinmaludpod, Urdaneta City, Pangasinan

    Brgy.

    Mabanogbog,

    Namcamaliran

    Pinmaludpod,

    Urdaneta City,

    Pangasinan

    11/25/2016 1stPangasina

    n 3rd DEO34.299 250 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 17 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.C Soliven Construction &

    General Merchandise19278

    Construction/Maintenance of Flood Mitigation

    Structures & Drainage Systems - Agno River

    Basin Flood Control Project -

    Extension/Construction of Bank Protection of

    River Course, Brgy. Mabanogbog,

    Nancamairan, Pinmalupod, Urdaneta City,

    Pangasinan

    Urdaneta City,

    Pangasinan3/23/2017 2nd

    Pangasina

    n 3rd DEO34.299 250 O 0.400 0.300 0.060 0.03 0.04 - 83.00 -

    A.C Soliven Construction &

    General Merchandise19278

    Construction of Bank Protection Works,

    Agnooo River Basin Flood Control Project

    (Phase III) Brgy. Bantog, Asingan, PangasinanAsingan,

    Pangasinan11/16/2015 1st

    PANGASI

    NAN 3RD

    DEO

    18.336 180 O 0.39 0.24 0.15 0.03 0.055 0.05 91.40%

    91.4%

    Very

    Satisfactory

    A.C Soliven Construction &

    General Merchandise19278

    Construction of Bank Protection, Agno River

    Basin Flood Control Project (Phase III),

    Barangay Bantog, Asingan, Pangasinan

    Barangay

    Bantog, Asingan,

    Pangasinan

    3/18/2016 2nd

    PANGASI

    NAN 3RD

    DEO

    18.335 180 C 0.41 0.197 0.3 0 0 0 91.28%

    91.28%

    Very

    Satisfactory

    A.C Soliven Construction &

    General Merchandise19278

    Construction/Rehabilitation of Drainage along

    National Roads, Villasis-Malassiqui-San Carlos

    Road, K0190+785-K0192+800 with Exception

    (B/S), Malasiqui, Pangasinan

    Malasiqui,

    Pangasinan3/15/2016 1st

    PANGASI

    NAN 4TH

    DEO

    34.3 226 C 0.36 0.2 0.3 0 0 0 86.20%86.2%

    Satisfactory

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Construction of Drainage along Mandurriao-

    Jaro Road,K0006+100-K0007+082,

    K0007+082, Mandurriao, Iloilo City

    K0006+100-

    K0007+082,

    K0007+082,

    Mandurriao, Iloilo

    City

    8/24/2017 1stIloilo City

    DEO38.376 191 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 -

    A.D.L. Constrak 26442

    Concreting of Ipil-Sagana Bridge Approaches

    "A" and "B" and Sta. Cruz Road, Brgy. Ipil and

    Sagan and Sta. Cruz, Bongabong, Oriental

    Mindoro

    Bongabong,

    Oriental Mindoro8/24/2016 1st

    Southern

    Mindoro

    DEO

    3.290 35 O 0.42 0.164 0.3 0 0 0 0.8880 -

    A.D.L. Constrak 26442

    Rehabilitation/Reconstruction of Paclasan

    Seawall, Roxas, Oriental MindoroRoxas, Oriental

    Mindoro3/18/2017 1st

    Southern

    Mindoro

    DEO

    3.627 67 O 0.438 0.200 0.300 - - - 93.80 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Const. of Slope Protection along Jct. Bancal-

    Leon-Antique Boundary Rd., K0031+722-

    K0031+891

    Leon, Iloilo 3/22/2013 1st VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466 Construction of Multi-Purpose BuildingPoblacion, Pavia,

    Iloilo10/28/2014 1st VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%

    82.60%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 18 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Construction/Rehab. Of Drainage System

    along Balasan-Carles Road, Brgy. BarosbosCarles, Iloilo 10/29/2014 1st VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%

    87.50%

    Satisfactory

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Road Upgrading (Gravel to Paved) along

    Davao-Sarangani Coastal Road km. 1671+600

    to km. 1673+060, Biton-Lanao Section

    Davao del Sur 8/7/2014 2nd XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Rd. Upgrading (Gravel to Paved) along Davao-

    Sarangani Coastal Rd., Km.1671+600-

    Km.1673+060, Biton-Lanao Sect.

    Davao del Sur 8/6/2013 1st XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Malag-it Box Culvert along Iloilo East Coast-

    Capiz Road (Construction of Malag-it Bridge

    along Iloilo East Coast-Capiz Road)

    Pontevedra,

    Capiz10/29/2014 1st VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%

    75.40%

    Unsatisfacto

    ry

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Widening of Caradio-an Bridge alog Bacolod

    South Road, Barangay Caradio-an

    Himamaylan

    City, Negros

    Occidental

    10/23/2014 1st VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%74.10%

    Poor

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Impvt./Conc. of Access Road, Tubalan Port,

    Tubalan6/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Rehab./Reconst./Upgrading of Damaged

    Paved National Road, Roxas City Boundary-

    Panitan Road-Jct. Bailan Road, Capiz

    (KM.112+750-Km.122+705) with exception

    8/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Construction of Drainage System along Iloilo

    East Coast Capiz Road

    K0204+106,

    Sara, Iloilo6/9/2015 1st

    Iloilo Third

    DEO44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466 Widening of Sara-San Dionisio Road

    K0203+(-882) to

    K0203+243,

    Sara, Iloilo

    6/9/2015 1stIloilo Third

    DEO26.054 175 O 0.34 0.252 0.15 0.022 0.035 0.05 85.30% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 19 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Network Development, Widening of National

    Road, Secondary Road along Roxas City,

    Cagay-Sibaguan Balijuangan-Cudian-Ijisan

    Road

    Chainage 0-200,

    Chainage 942-

    1182 10-200

    (0+304.80)

    (K0104+760-

    K0105+000),

    Pontevedra,

    Capiz

    6/6/2015 1stCapiz First

    DEO10.341 121 O 0.37 0.251 0.105 0.03 0.035 0.033 82.20% -

    A.F.G Construction &

    Construction Supply17161

    Construction of Standard One (1) Unit - 2 Sty

    10-CL School Building, Eustacio Lopez NHS,

    Silay City, Negros Occidental- 3/22/2017

    2nd &

    Final

    Negros

    Occidental

    1st DEO

    17.397 235 C 0.476 0.132 0.300 - - - 90.80*87.23%

    Satisfactory

    A.F.G Construction &

    Construction Supply17161

    Repair/Imporvement of Multi Purpose Building,

    Barangay Kasambagan Cebu City 4/12/2018 1st/Final

    Cebu City

    DEO2.908 75 C 0.499 0.133 0.300 - - - 93.20 *93.20%

    Very

    Satisfactory

    A.F.G Construction &

    Construction Supply17161

    Rehabilitation/Reconstruction/Upgrading of

    Damaged Paved National Road including

    Drainage Based on Pavement Management

    System / Highway Development and

    Management - 4 (HDM-4) (Intermittent Section)

    along Hinigaran - Isabela Road, K0058+263 -

    K0059+000

    Barangay

    Paticui,

    Hinigaran,

    Negros

    Occidental

    8/27/2015 1st

    Negros

    Occidental

    2nd

    12.674 127 O 0.36 0.239 0.15 0.03 0.05 0.033 86.00% -

    A.F.G Construction &

    Construction Supply17161

    Concreting of Barangay Road, Brgy. Sta.

    Teresa, Dumalag, Capiz Dumalag, Capiz 11/10/20171st &

    FinalDPWH 9.407 97 C 0.420 0.135 0.300 - - - 85.50

    *85.5%

    Satisfactory

    A.F.G Construction &

    Construction Supply17161 Const. of Tangalan-Ibajay Rd. Aklan 3/19/2013 1st VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -

    A.F.G Construction &

    Construction Supply17161

    Odiong-Sibalom-San Remegio-Leon Rd.

    Upgrading (Gravel to Paved), Km. 129+328-

    Km. 131+275

    San Remigio,

    Antique8/15/2013 1st VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -

    A.F.G Construction &

    Construction Supply17161

    Construction of Standard One (1) Unit - 2 Sty

    10-CL School Building at Brgy. Eustaquio

    Lopez NHS, Silay City, Negros Occidental

    Silay City,

    Negros

    Occidental

    6/16/2016 1st

    Negros

    Occidental

    First DEO

    17.396 175 O 0.3 0.3 0.15 0.03 0.023 0.05 85.70% -

    A.F.G Construction &

    Construction Supply17161

    Const. of Two (2) Storey, Eight (8) Cl Sch.

    Bldg., Leonora Salapantan NHSSan Miguel, Iloilo 8/22/2013 1st VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -

    A.F.G Construction &

    Construction Supply17161

    Replacement/Const. of Tubog Bridge, Brgy.

    TubogHamtic, Antique 8/15/2012 1st VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -

    A.F.G Construction &

    Construction Supply17161

    Construction of Multi-Purpose Building at

    Brgy. Candumarao, Hinigaran, Negros

    OccfidentalHinigaran,

    Negros

    Occfidental

    6/15/20161st &

    Final

    Negros

    Occidental

    Second

    DEO

    1.965 60 C 0.5 0.107 0.3 0 0 0 90.40%

    90.4%

    Very

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 20 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.F.G Construction &

    Construction Supply17161

    Construction of 2-CL Alimanguan National

    High School Brgy. Alimanguan

    San Vicente,

    Palawan6/5/2015 1st

    Palawan

    1st DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -

    A.F.G Construction &

    Construction Supply17161

    Rehabilitation/Reconstruction/Upgrading of

    Damaged Paved National Road Including

    Drainage Based on Pavement Management

    System/Highway Development and

    Management-4 (HDM-4) (Intermittent Section)

    along Hinigaran-Isabela Road, K0058+263 to

    K0059+000Barangay

    K0058+263 to

    K0059+000Bara

    ngay Paticui,

    Hinigaran,

    Negros

    Occidental

    3/14/2016 1st

    Negros

    Occidental

    Second

    DEO

    12.6742 157 C 0.45 0.133 0.3 0 0 0 88.40%88.4%

    Satisfactory

    A.F.G Construction &

    Construction Supply17161

    Preventive Maintenance Based on Pavement

    Management System/Highway Development

    and Management -4 (HDM-4) Jct Bagonawa-

    La Castellana-Isabela Road, K0057+244 to

    K0072+800

    La Castellana

    and Isabela03/14/18 1st/Final

    Negros

    Occidental

    2nd DEO

    46.210 221 C 0.485 0.134 0.161 - - - 78.00 *78.00% Unsatisfactory

    A.F.G. Construction And

    Construction Supply/Yurich

    Builders And Construction

    Supplu Joint Venture

    JV-15-

    1239

    Off-Carriageway Improvement including

    Drainage of Puerto Princesa North Road,

    K0090+000-K0090+600, K0091+100-

    K0091+350, K0095+200-K0096+246,

    K0103+600-K0103+961, K0107+600-

    K0107+720, Roxas, Palawan

    K0090+000-

    K0090+600,

    K0091+100-

    K0091+350,

    K0095+200-

    K0096+246,

    K0103+600-

    K0103+961,

    K0107+600-

    K0107+720,

    Roxas, Palawan

    3/13/20172nd &

    Final

    Palawan

    1st DEO45.859 280 C 0.380 0.200 0.300 - - - 88.00

    *89.38%

    Very

    Satisfactory

    A.H. Raga Construction 36952

    MFO1-National Road Network Services-

    Construction and Maintenance of Bridge along

    National Roads-Rehabilitation/Major Repair of

    Permanent Bridges-Zapote Br. (BO2887LZ)

    Manila-Cavite (NCR Bdry-Jct Cavite City

    Section), Bacoor City, Cavite

    Bacoor City,

    Cavite11/28/2017

    1st &

    FinalDPWH 9.593 180 C 0.500 0.133 0.300 - - - 93.30

    *93.3%

    Very

    Satisfactory

    A.I.P Construction 32458

    Construction/Improvement of Access Roads

    leading to Declared Tourism Destinations;

    Guisset-Binga-Baloy-Tinongdan Road leading

    to Binga Dam and Mt. Ugo, Site for

    International Sky Running Event

    Itogon, Benguet 11/8/2017 1st DPWH 96.500 386 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 21 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.I.P Construction 32458

    Rehabilitation/Reconstruction/Upgrading of

    Damaged Paved National Roads including

    Drainage Based on Pavement Management

    System/Highway Development and

    Management-4 (HDM-4) (Intermittent Section),

    Lt. Takay Road, K0308+(-599) to K0308+000 &

    K0308+616 to K0308+754, Baguio City

    Baguio City 9/4/2015 1stBaguio

    City DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -

    A.I.P Construction 32458

    Rehabilitation/Reconstruction of National

    Roads with Slips, Slope Collapse and

    Landslide, Marcos Highway, K0280+(-725) to

    K0280+(-640), Baguio City

    Baguio City 9/1/20161st &

    Final

    BAGUIO

    CITY DEO5.509 84 C 0.42 0.133 0.3 0 0 0 0.8510

    85.1%

    Satisfactory

    A.J Taylan Construction

    Corporation2336

    Road Opening/Const. of Missing Links of

    National Road, Solsona-Kabugao Road, Ilocos

    Norte Side

    9/9/2009 1st I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

    A.J. Lava Builders Corp.

    (Formerly: A.J. Lava

    Builders)

    22265

    Repair & Maint. of Flood Control & Drainage

    Structures along Rofriguez-San Jose-Quezon

    City Rd.

    Rodriguez, Rizal 11/19/2012 1st IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -

    A.J. Lava Builders Corp.

    (Formerly: A.J. Lava

    Builders)

    22265

    Flood Management Services, Construction/

    Maintenance of Flood Mitigation Structures and

    Drainage System Improvement/ Riprapping of

    Siito Kapatagan River (Upstream), Brgy. San

    Jose, Antipolo City, 2nd LD

    Brgy. San Jose,

    Antipolo City,

    2nd LD

    6/21/20161st &

    FinalRizal 1st 46.503 240 C 0.43 0.133 0.3 0 0 0 86.30%

    86.3%

    Satisfactory

    A.J. Lava Builders Corp.

    (Formerly: A.J. Lava

    Builders)

    22265

    MFO2-Flood Management Services,

    Construction/ Maintenance of Flood Mitigation

    Structure and Drainage Systems -

    Construction/ Maintenance of Flood Mitigation

    Structures Drainage Systems - Construction of

    Flood Control Structures along Montalban,

    Rizal

    Montalban, Rizal 3/12/2018 1st/FinalRizal 2nd

    DEO28.350 212 C 0.497 0.133 0.300 - - - 93.00 *93.00%

    Very

    Satisfactory

    A.J. Lava Builders Corp.

    (Formerly: A.J. Lava

    Builders)

    22265

    MFO-1 National Road Network Services-Asset

    Preservation of National Roads Preventive

    Maintenance Based on Pavement

    Management System/Highway Development

    and Management-4 (HDM-4) Cabrera -

    Antipolo Road, K0026+(-554) to K0026+000,

    Taytay, Rizal

    Taytay, Rizal 11/21/20171st &

    FinalDPWH 14.260 60 C 0.410 0.196 0.300 - - - 90.60

    *90.6%

    Very

    Satisfactory

    A.J. Taylan Construction

    Corp/FR Espiritu Jr. Builders

    (JV)

    JV-14-074 Additional Priority Flood Control Project

    San Isidro,

    Dumalneg, Ilocos

    Norte

    10/21/2014 1st I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%86.10%

    Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 29th Release Page 22 of 866

  • CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019

    NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES

    A.J Taylan Construction

    Corporation2336

    Laoag River Basin Flood and Sabo Project,

    Concrete Revetment along Bongo R