M E M O R A N D U M
DATE: June 19, 2008 TO: Jimmie D. Jenkins, Director
Department of Public Works and Environmental Services
FROM: Ronald N. Kirkpatrick Planning and Design Division SUBJECT: Planning and Design Division Monthly Projects Status Report Attached is a copy of the May 2008 Monthly Projects Status Report. This report provides a status summary for capital projects managed within the Planning and Design Division (P&DD). A separate report will be issued by the Stormwater Planning Division for drainage related capital projects. If you have any questions, please call at 703-324-5800. RNK/ml/1257m Attachment: As Stated PUBLIC WORKS AND ENVIRONMENTAL SERVICES DISTRIBUTIONHoward J. Guba, Deputy Director, Department of Public Works and Environmental Services Shahram Mohsenin, Director, Wastewater Planning and Monitoring Division Gilbert Osei-Kwadwo, Branch Chief, Wastewater Planning and Monitoring Division Edgar R. Jones, Chief, Financial Management & Financial Planning Branch, Wastewater Planning & Monitoring Division Randy Bartlett, Director, Stormwater Management, DPWES Scott R. St.Clair, Director, Maintenance and Stormwater Management Division Steve Aitcheson, Stormwater Management Craig Carinci, Director, Stormwater Planning Division (SWPD) Don Demetrius, Chief, Watershed Projects Evaluation Branch (WPEB), SWPD Chad Crawford, Chief, Watershed Projects Implementation Branch (WPIB), SWPD Scott Ramsey, MA III, SWPD, DPWES Dale Glines, Engineering Technician III, MSMD, DPWES Nat Atapoor, Director, Construction Management Division Vickie McEntire, County Surveyor, CMD Bruce Goudarzi, Chief, Utilities Construction Branch, CMD Robin W. Patton, Director, Land Acquisition Division James Ratliff, Project Manager, Land Acquisition Division John Honnick, Senior Right-of-Way Agent, Land Acquisition Division Keith Wilson, Senior Right-of-Way Agent, Land Acquisition Division Walter T. Wozniak, Chief, Utilities Design Branch, P&DD Larry Ichter, Deputy Director, Transportation Design, P&DD Carey F. Needham, Deputy Director, Building Design, P&DD Jeff Kent, Chief, Administrative Support Branch, CAP Natalie Colley, Engineering Technician III, TDB, P&DD Anna Carlen, Administrative Support Branch, CAP OUTSIDE AGENCY DISTRIBUTION Carol Bondurant, VDOT, 14685 Avion Parkway, Chantilly, VA 20151 w/attachment Fund 304, 314, 315, HCD, & Misc.; [email protected] Dorothy Purvis, VDOT, 14685 Avion Parkway, Chantilly, VA 20151; [email protected] A. Miller, VDOT, [email protected] Jan Vaughan, VDOT, [email protected]
Jimmie D. Jenkins Planning and Design Division Monthly Projects Status Report Page 2 of 2
Charlene Whitfield, DVP, Manager Regional Projects, 171 Elden St., Herndon, Va. 20170; [email protected] John W. Dargle, Director, Fairfax County Park Authority Mike Lake, Department of Transportation w/attachment Fund 304, 305, & Misc. Katharine Ichter, Director, Department of Transportation Charlie Strunk, Department of Transportation Ellen Gallagher, Department of Transportation Karyn Moreland, Department of Transportation Chris Wells, Department of Transportation Tom Biesiadny, Department of Transportation Paul Mounier, Bus Stop Coordinator, Department of Transportation Jeffrey Hermann, Department of Transportation David B. Marshall, Assistant Director, Planning Division, Department of Planning and Zoning Paula C. Sampson, Director, Housing and Community Development (HCD), w/attachment 314 and 315 Harry Swanson, Director of Revitalization & Real Estate, HCD, w/attachment Fund 315 Barbara Byron, Director, Zoning Evaluation Division, Department of Planning and Zoning Sheng Leu, Department of Planning and Zoning Dave Guerra, Fairfax County Water Authority; [email protected] Jeannie Swim, Fairfax County Water Authority; [email protected] Scott, Fairfax County Water Authority; [email protected] Milgrim, Environmental Health Supervisor, Fairfax County Health Department Susanne Sotirchos, HCD, w/attachment Fund 308, 314, 315, HCD & Misc. Mark Canale, Department of Transportation Bill Harrell, Department of Transportation, [email protected] Todd Lawson, Verizon, 2980 Fairview Park Dr., 7th Floor, Falls Church, VA. 22042; [email protected] David A. Guillaudeu, Engineering Assistant, Verizon Communications, david.a.guillaudeu@verizon,com Jo Anne Sorenson, VDOT, 14685 Avion Parkway, Chantilly VA 20151, w/attachment Fund 308, 304, 305, 314, 315, HCD & Misc.; [email protected] William V. Johnson Jr. 14685 Avion Pkwy, Chantilly, VA 20151; [email protected] Burke, VDOT, [email protected] Charlotte E. Miller, VDOT, [email protected] Donald Ostrander, Traffic Engineering Section, VDOT Northern Va. District, [email protected] Melliza, Washington Gas; [email protected] Mullins, VDOT, [email protected] Javier Baldivieso, [email protected] Love, [email protected]
PLANNING & DESIGN DIVISION MONTHLY PROJECT STATUS REPORT
May 2008
TABLE OF CONTENTS PAGE . UTILITIES DESIGN BRANCH
FUND 102 - FEDERAL & STATE GRANT (BUS SHELTERS) 1 - 5 FUND 303 - COUNTY CONSTRUCTION 6 - 33 FUND 307 - SIDEWALK CONSTRUCTION 33 - 44 FUND 402 - SANITARY SEWER CONSTRUCTION 44 - 48
TRANSPORTATION DESIGN BRANCH
FUND 102 - FEDERAL & STATE GRANTS 1 - 2 FUND 301 - CONTRIBUTED ROADWAY IMPROVEMENT FUNDS 2 - 3 FUND 303 - COUNTY CONSTRUCTION 3 FUND 304 - PRIMARY & SECONDARY ROAD BOND CONSTRUCTION 3 - 27 FUND 307 - SIDEWALK CONSTRUCTION 28 FUND 312 - PUBLIC SAFETY CONSTRUCTION 29 FUND 315 - COMMERCIAL REVITALIZATION PROGRAM 28 - 29 FUND 340 - HOUSING ASSISTANCE PROGRAM 29
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
26002G
Bus Shelters-CMAQ02407
South Van Dorn St @Crown Royal Dr NB
$19,000
Installation of bus shelter Survey, utility designation, and design complete; NEPA document approved; environmental clearance to start land acquisition obtained; utility conflicts with Verizon and FCWA resolved; land acquisition in progress (authorization to begin negotiations issued 5/03); property owner concerned that shelter plans conflict with rezoning and development plan; coordinated with Supervisor's office; DOT coordinating with proposed rezoning application to obtain a proffer commitment to install the proposed bus shelter (development plan currently going through rezoning process); project on-hold pending the completion of this coordination (follow up memorandum to DOT 3/19/08 for a status update).
Lee Guarino, MichaelGlass, Lisa
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
04/04102 On-Hold
26002G
Bus Shelters-CMAQ02409
Franconia Rd @ Westchester St EB
$15,000
Installation of bench Survey, utility designation, and design complete; NEPA document approved; environmental clearance to start land acquisition obtained; additional property research revealed that land acquisition is required; land acquisition in progress (authorization to prepare VDOT Basic Acquisition Report and begin negotiations issued 10/1/03); property owner non-responsive - finally able to contact; property owner's revisions to easement language reviewed by County Attorney's office and forwarded back to property owner; subsequent negotiations unsuccessful; memo to DOT 9/26/06, recommending deletion of project; DOT coordinating with Supervisor's office (follow up memorandum to DOT 3/19/08 for a status update).
Lee Guarino, MichaelColeman, Michael
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/06TBDNA TBDTBD09/05
Monthly RemarksProject Description
04/06102 On-Hold
26002G
Bus Shelters-CMAQ02602
Ft Hunt Rd @ Belle View Blvd WB (N Side)
$19,000$0
Installation of bus shelter Survey, utility designation, and design complete; stop moved from location in initial federal environmental clearance - new NEPA document approved; environmental clearance to start land acquisition obtained; utility coordination in progress; land acquisition required (authorization to begin land acquisition issued 11/03); property owner requested changes in easement language made but subsequent negotiations unsuccessful; memo to DOT 9/26/06, recommending deletion of project; DOT coordinating with Supervisor's office and on 7/24/07 advised that Supervisor supports condemnation to acquire outstanding land rights (VDOT does not have any restrictiions for the use of grant funds for condemnation); LAD coordinating with District Supevisor's office.
Mount Vernon Guarino, MichaelColeman, Michael
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/10 01/06 08/1006/10NA 09/05
Monthly RemarksProject Description
04/06102 Land Acquisition
Thursday, June 19, 2008 Page 1 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
26002G
Bus Shelters-CMAQ02719
Arlington Boulevard EB @ Prosperity Ave
$45,000$0
Installation of bus shelter CMD authorized 5/2/08 to proceed with construction via the annual contractor; NTP issued 6/2/08 (scheduled completion 7/17/08).
Providence Royse, AndyColeman, MichaelFarsad, NahidMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0704/07 04/07 04/08 07/0805/0811/07
Monthly RemarksProject Description
102 Construction
26002G
Bus Shelter-CMAQ07001
BS#01730 Alban Road EB @ Springfield Oaks Drive
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey, utility designation, and preliminary site layout complete; negotiations in progress with the environmental consultant to obtain NEPA clearance (final comments being addressed); schedule to be determined once environmental contract is executed.
Lee Gallo, Michael
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
26002G
Bus Shelter-CMAQ07002
BS#01248 Hinson Farm WB @ Tis Well
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey, utility designation, and preliminary site layout complete; negotiations in progress with the environmental consultant to obtain NEPA clearance (final comments being addressed); schedule to be determined once environmental contract is executed.
Mount Vernon Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
Thursday, June 19, 2008 Page 2 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
26002G
Bus Shelter-CMAQ07003
BS#03020 Leesburg Pike EB @ Nevius Street
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey complete; ran preliminary sight distance calculations which may impact final shelter location; negotiations in progress with the environmental consultant to obtain NEPA clearance (final comments being addressed); schedule to be determined once survey complete and environmental contract executed.
Mason Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
26002G
Bus Shelter-CMAQ07004
BS#03129 Old Keene Mill EB @ Ainsworth Avenue
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey complete; sight distance requirements may prevent installation of shelter - coordination with VDOT required to resolve issue; coordination with DOT on overall project scope; negotiations in progress with the environmental consultant to obtain NEPA clearance (final comments being addressed); schedule to be determined once environmental contract is executed.
Springfield Gallo, Michael
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
26002G
Bus Shelter-CMAQ07005
BS#04042 Braddock Road EB @ Carriagepark Drive
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey, utility designation, and preliminary site layout complete; negotiations in progress with the environmental consultant to obtain NEPA clearance (final comments being addressed); schedule to be determined once survey complete and environmental contract executed.
Braddock Gallo, Michael
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
Thursday, June 19, 2008 Page 3 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
26002G
Bus Shelter-CMAQ07006
BS#04050 Braddock Road EB @ Nash Drive
$35,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey, utility designation, and preliminary site layout complete; negotiations with the environmental consultant in progress to obtain NEPA clearance (final comments being addressed); schedule to be determined once environmental contract executed.
Braddock Gallo, Michael
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
26002G
Bus Shelter-CMAQ07007
BS#05343 McClearen Road EB @ Towerview Road
$30,000$0
Installation of bus shelter Project funded with federal (CMAQ) dollars; field survey, utility designation, and preliminary site layout complete; negotiations with the environmental consultant in progress to obtain NEPA clearance (final comments being addressed); schedule to be determined once environmental contract executed.
Sully Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
102 Pre-Design
26006G
Richmond Hwy Public Transport Initiative: Intersections Phase 4
06004
Route 1 SB: Sacramento Drive: Southbound REX Bus Stop
$65,000
Installation of REX Bus Shelter and Bus Stop Improvements
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; CMD authorized 12/13/06 to proceed with construction via the annual contractor (NTP issued 1/3/07); construction 100% complete (reset of trash can so display can be opened in progress); material for solar lights received and installed; lighted sign pole solar light installation outstanding (P&DD coordinating with new manufacturer); trash can location to be changed.
Mount Vernon Zahirieh, Shahla
Minnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/06 12/06 02/07 01/0612/06NANA
Monthly RemarksProject Description
102 Post-Construction
Thursday, June 19, 2008 Page 4 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
26007G
Seven Corners Transit Center06000
$1,000,000$0
Design and construction of a transit center on the Seven Corners Shopping Center parking lot site
CMAQ funds approved for project; VDOT Project Agreement approved and VDOT authorization to initiate the Preliminary Engineering phase received; survey and design by Rinker Design Associates (task order NTP issued 1/31/07); preliminary design plans and submitted 3/24/08 to LDS for review; 60% design plans and final environmental documents submitted 4/8/08 to County and VDOT; AE is addressing comments (90% complete design plan submission scheduled for 8/08); current indications are that no land acquisition will be required.
Mason Adams, Shanna
Farsad, NahidHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/08 01/09 06/09 10/0903/09NANA
Monthly RemarksProject Description
102 Planning and Design
26008G
Countywide Trails07001
Soapstone Drive Walkway
$1,500,000$0
3,300 LF of walkway Project Agreement with VDOT approved; VDOT authorization to proceed with Preliminary Engineering received 11/26/07 (full length of project); feasibility study to be prepared and citizen coordination conducted to define scope of walkway improvements prior to initiating design; selection process for a consulting engineer complete and Request for a Proposal sent 6/4/08; contract negotiations in progress; completion schedule to be prepared after contract for the feasibility study is approved.
Hunter Mill Adams, ShannaPM PDD:PM LAD:PM CMDE:PM CMDS:
NATBD TBD TBDTBDNA
Monthly RemarksProject Description
102 Pre-Design
26008G
Countywide Trails07002
Columbia Pike Phase II Walkway
$500,000$0
600 LF of 8-foot wide walkway and installation of a bus shelter, eastbound lane Columbia Pike at Powell Lane
All necessary land rights for the project acquired 10/6/06; trail project to provide for the construction of the proposed bus shelter; additional CMAQ funds approved for the construction of the Phase II section of trail; Project Agreement with VDOT approved; DOT coordinating with VDOT to issue authorization to proceed (completion schedule to be prepared after VDOT issues a NTP).
Mason Guarino, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
NATBD TBD TBD TBDTBDNA
Monthly RemarksProject Description
11/07102 On-Hold
Thursday, June 19, 2008 Page 5 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
009471
Lee District Capital ProjectsWT002
Governor's Hill Drive Walkway
$240,000$0
750 LF of 5-foot wide concrete walkway along the south side of Franconia Road between Governor's Hill Road and Telegraph Road
Lee District Capital Project funds reassigned 7/17/06; survey and design by annual consultant (task order cost proposal approved 10/18/06); survey complete and design in progress (A/E is addressing pre-final plan review comments); citizen meeting conducted 3/1/07; LAD authorized 8/1/07 to acquire easements from HOA property (point of contact established and negotiations in progress ~ LAD coordinating with District Supervisor on difficult negotiations with the HOA and possible project deletion); LAD schedule adjustment 3/27/08.
Lee Royse, AndyBarnes, Dianne
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0806/07 08/07 10/08 02/0909/0805/08
Monthly RemarksProject Description
303 Land Acquisition
009472
Mason District Capital ProjectsWT002
Columbia Pike: Govnmnt Ctr to Dowing St
$570,000$0
500 LF of 5-foot wide concrete sidewalk
Project is part of the Second Four-Year Transportation Program and was approved by the BOS on 10/15/07; design complete and all land rights obtained; retaining wall design by annual consultant complete (application for a building permit submitted); VDOT final review complete and land use permit obtained; construction bid package prepared and will be processed for final authorization after receipt of building permit; additional funding required for construction included in the approved Fall 2007 Transportation Bond Referendum.
Mason Flowers, RandallBuckley, BethFarsad, NahidJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0602/07 11/07 12/08 12/0807/0702/07
Monthly RemarksProject Description
303 Planning and Design
009473
Mt. Vernon District Capital Projects
WT002
David Site Wayside Signage
$10,000$0
Installation of signage at historic site
District Supervisor 8/27/07 reassigned funds to project; sign graphics complete; coordination on going with citizen group and FCPA on scope of improvements.
Mount Vernon Flowers, RandallPM PDD:PM LAD:PM CMDE:PM CMDS:
NANA NA TBD TBDTBDNA
Monthly RemarksProject Description
303 Pre-Design
Thursday, June 19, 2008 Page 6 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
009474
Providence District Capital Projects
WT003
Allan Avenue Walkway
$7,000$0
Engineering survey to determine Allan Avenue right-of-way
Funds reassigned 11/30/06 from Providence Contingency to stake out Allen Avenue right of way to determine impact of proposed walkway on adjacent properties; survey work complete and citizen meeting conducted 4/26/07; coordination in progress between the District Supervisors office and the HOA for a determination on obtaining citizen support to proceed with design (anticipated resolution 7/08).
Providence Rayyan, Ahmed
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
NANA NA NA NANANA
Monthly RemarksProject Description
12/07303 On-Hold
009475
Springfield District Capital Projects
WT002
Tuttle Road
$441,200$175,000
2,100 LF of 5-foot wide asphalt walkway
Survey and design by Rinker Detwiller via a task order to an annual contract; field survey complete; design complete including addressing final review comments; final plans resubmitted 5/30/07 to VDOT for approval; LAD acquired land rights (easements and FCSB permit) 2/12/07); coordination on going with Verizon for pole adjustments; additional funds for construction requested at the FY 2007 Third Quarter Budget Review submission but not approved (to be resubmitted for consideration with the FY 2008 Carryover Budget Review); project on hold pending identification of addditonal funds to complete.
Springfield Flowers, RandallZore, Tasneem
Jozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0703/06 04/06 05/07 TBDTBD09/06
Monthly RemarksProject Description
10/07303 On-Hold
V00003
Road Viewer ProjectsRVP34
I-Street
$36,000
180 LF road improvements Preliminary punch list developed with VDOT; design phase behind schedule (approved due date 12/05); VDOT has verbally advised that they will accept prior BOS resolution for incorporation of this road into the State Secondary System; coordination with VDOT ongoing to finalize this understanding.
Mount Vernon Wozniak, WalterPM PDD:PM LAD:PM CMDE:PM CMDS:
12/06 06/08 NA NA NANANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 7 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
V00003
Road Viewer ProjectsRVP35
Woodburn Access Rd
$250,300
850 LF road improvements Negotiations between County and INOVA in progress on Woodburn Center for Community Mental Health site which may delete the need to proceed with the access road project; Building Design Branch to included access road issue with briefing of County Executive (deletion of road improvements deferred ~ project to remain on hold).
Providence Wozniak, WalterColeman, MichaelFarsad, NahidMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
NATBD TBD TBD TBDTBDNA
Monthly RemarksProject Description
04/03303 On-Hold
V00004
Road Maintenance ProgramRM101
Tilbury Road
$70,000$0
Acquisition of existing roadway right-of-way and minor maintenance of existing alley
Funds approved at the FY 2007 Third Quarter Budget Review to address the ownership of Tilbury Road right-of-way and to provide emergency access by the Fire Department; property and topographic survey complete; citizen meeting conducted 3/12/08; LAD authorized 3/20/08 to acquire the existing right-of-way via condemnation of an "owner unknown" (Administration Item scheduled 6/30/08 and public hearing scheduled 7/21/08);
Lee Schmidt, NatashaZore, Tasneem
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0804/08 04/08 10/08NANA08/08
Monthly RemarksProject Description
303 Land Acquisition
V00004
Road Maintenance ProgramRM185
Allen Street
$577,000
780 LF road improvements Construction 100% complete (addressing punch list items: Dominion Power removed guy wire; obtaining proposal from Verizon to raise overhead cable); administrative processing for acceptance of road by VDOT in progress (submitted paperwork to VDOT utility checklist approved and final package for VDOT; final site inspection approval obtained 10/18/06); additional field tests on asphalt (density and thickness) performed by the contractor (test result summary received 5/25/07 ~ passed); VDOT administrataive process continuing.
Providence Schmidt, NatashaColeman, MichaelMinnix, Wesley
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/04 09/0403/04NA
Monthly RemarksProject Description
303 Post-Construction
Thursday, June 19, 2008 Page 8 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
V00004
Road Maintenance ProgramRM188
Abbott Lane
$65,000$0
380 LF road improvements Design in progress; updated survey in progress; coordination with VDOT in progress to conduct a joint site inspection to define scope of corrective work; ECS geotechnical engineering of existing pavement structure completed 12/9/05; no land acquisition is anticipated; construction contingent upon availability of possible BORV funds that may be approved during FY 2006/FY 2007; project completion schedule to be approved after a funding source for construction is identified.
Providence Flowers, RandallPM PDD:PM LAD:PM CMDE:PM CMDS:
02/06 06/06NATBD TBDTBDNA
Monthly RemarksProject Description
303 Planning and Design
V00004
Road Maintenance ProgramRM190
Silverleaf Drive
$75,000$0
700 LF road improvements VDOT punch-list items obtained, geotechnical investigation complete, and preliminary VDOT comments on pavement design received; project in design; coordination with VDOT in progress to conduct a joint site inspection to define scope of corrective work; ECS conducting soil borings to determine existing pavement structure; updated survey complete; land acquisition may be required; construction contingent upon availability of FCRMIP funds after the completion of the project design; project completion schedule to be approved after a funding source for construction is identified.
Springfield Flowers, RandallPM PDD:PM LAD:PM CMDE:PM CMDS:
04/06 NATBD TBD TBDTBDNA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
01063
WB Little River Tnpk and Pinecrest Vista Dr
$24,000$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 9 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
01125
SB Fort Hunt Road near Gahant Road
$21,200$0
Loading pad Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review; land acquisition required (preparing schedule adjustment due to required easements).
Mount Vernon Utterback, BrianBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0803/08 06/08 07/08 03/0912/0811/08
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
01185
NB Fort Hunt Road and Gahant Road
$21,400$0
Loading pad, 35 LF trail, retaining wall, and pedestrian ramp
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 60% design plans received 4/4/08 and under review; test hole to locate a water line complete - no conflict; land acquisition required (preparing schedule adjustment due to required easements).
Mount Vernon Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
12/0803/08 07/08 07/08 04/0901/0912/08
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
01600
WB Arlington Dr near Windbreak Dr
$15,700$0
Loading pad and accesss improvements
Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Mount Vernon Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 10 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
01904
SB Colts Neck Road & Hunter Square Court
$29,000$0
Loading pad, sidewalk, and pedestrian ramp
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08; survey (by County) and utility designation complete; design in progress; easement required.
Hunter Mill Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0908/08 08/08 06/09 06/0902/0901/09
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
01906
NB Reston Parkway and South Lakes Dr
$19,900$0
Loading pad and curb and gutter extension
Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); relocation of existing stop required; survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
02022
SB Telegraph Road and Highland Meadows Ct
$29,200$0
Loading pad, 100' curb and gutter and concrete sidewalk, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review; land acquisition and VDOT plan review required (preparing schedule adjustment due to required easements and VDOT review).
Lee Utterback, BrianBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0903/08 09/08 07/08 06/0903/0902/09
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 11 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
02420
WB Arlington Boulevard Near Graham Road
$28,700$0
Loading pad, bus shelter, lighting, 20 LF sidewalk, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review; VDOT plan review required (preparing schedule adjustment due to required VDOT review).
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 08/08 07/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
02421
WB Arlington Boulevard and Allen St
$28,700$0
Loading pad, improved access, and curb cut ramp from frontage road.
Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress; expanding scope to improve accessibility per 4/15/08 meeting with DOT.
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
02465
SB Fairview Park Dr and Yancey Dr
$15,700$0
Loading pad Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 12 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
02471
NB Fairfview Park Dr and New Providence Dr
$20,000$0
Loading pad and bench Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 08/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03082
WB Old Keene Mill Road and Ainsworth Avenue
$33,000$0
Loading pad, sidewalk and curb and gutter improvements
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08; survey (by County) and utility designation complete; design in progress; easement required.
Springfield Utterback, Brian
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0908/08 08/08 06/09 06/0902/0901/09
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03083
WB Old Keene Mill Rd and Carrleigh Pkwy
Loading pad, 50' concrete sidewalk, 2 pedestrian ramps, 2 cross walks, and 6 pedestrian signals
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; NTP for traffic signal design issued 3/1/08; A/E preparing 60% design plans; land acquisition and VDOT plan review required (preparing schedule adjustment due to required easements, VDOT review, and signal design; preparing new TPE to incorporate signal work).
Springfield Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
05/0903/08 11/08 07/08 03/1010/0905/09
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 13 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03125
EB Old Keene Mill Rd @ Millwood Dr
$16,500$0
Loading Pad Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; project scope revised from a shelter to a loading pad due to field conditions; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Springfield Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03128
EB Old Keene Mill Rd and Carrleigh Pkwy
Loading pad, 175' asphalt trail, and pedestrian signals
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; NTP for traffic signal design issued 3/1/08; A/E preparing 60% design plans; land acquisition and VDOT plan review required (preparing schedule adjustment due to required easements, VDOT review, and signal design; preparing new TPE to incorporate signal work).
Springfield Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
05/0903/08 11/08 07/08 03/1010/0905/09
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03130
EB Old Keene Mill Road at Bardu Avenue
$42,500$0
Loading pad, 125' sidewalk, 125' culvert, & 125' retaining wall
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08; survey (by County) complete; project on hold pending further direction from DOT (may relocate stop and revise scope).
Springfield Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
303 On-Hold
Thursday, June 19, 2008 Page 14 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03131
EB Old Keene Mill Road and Jansen Drive
$33,000$0
Loading pad, sidewalk, curb and gutter, pedestrian ramp, and storm drainage improvements
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; design in progress; may require easements based on preliminary design.
Springfield Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03168
NB Frontier Dr near Franconia Rd
$39,400$0
Bus shelter Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Lee Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03173
EB Franconia Rd and Grovedale Dr
TBD Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; DOT following up on citizen request to define scope of work (bus shelter will require stop relocation); project on hold pending further direction from DOT.
Lee Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
12/07303 On-Hold
Thursday, June 19, 2008 Page 15 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03265
EB Edsall Road and Industrial Drive
$86,500$0
Loading pad, asphalt walkway, pedestrian ramps, crosswalk, and pedestrian signals
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; design in progress.
Mason Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03266
WB Edsall Road and Cherokee Avenue
$16,000$0
Loading pad Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; design in progress.
Mason Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03565
NB Industrial Road near Edsall Road
$28,000$0
Loading pad, sidewalk, and pedestrian ramp
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08; survey (by County) and utility designation complete; design in progress; easement required.
Mason Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0908/08 08/08 06/09 06/0902/0901/09
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 16 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03566
SB Industrial Road near Edsall Road
$16,000$0
Loading pad Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; design in progress.
Mason Utterback, BrianZore, Tasneem
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03673
EB Little River Turnpike and Elizabeth Drive
$23,400$0
Loading pad, drainage culvert, and cross walk
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 60% design plans received 4/4/08 and under review.
Braddock Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 06/08 07/08 10/0807/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03691
EB Little River Turnpike and Logsdon Dr
$20,900$0
Loading pad and sidewalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 17 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03692
EB Little River Turnpike and Conwell Dr
$20,000$0
loading pad and sidewalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03693
EB Little River Turnpike and Columbia Pike
$21,900$0
Loading pad, sidewalk connection, and relocate crosswalk
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03694
EB Little River Turnpike and Willow Run Dr
$19,000$0
Loading pad and sidewalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 18 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
03702
EB Lee Jackson Memorial Hwy and Galesbury Ln
$25,600$0
Loading pad, 15' retaining wall, 10' concrete sidewalk, pedestrian ramp, and cross walk
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; A/E preparing 60% design plans (extensive site improvements proposed; design delayed due to extra coordination on final scope; preparing schedule adjustment).
Sully Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 07/08 07/08 11/0808/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
03721
WB Lee Jackson Memorial Hwy near Galesbury Ln
$15,700$0
Loading pad Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; CMD authorized 5/1/08 to proceed with construction via the annual construction contract; construction NTP 6/9/08 (scheduled completion 7/7/08).
Sully Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 04/08 07/08 07/0805/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
04024
WB Braddock Rd and Redfox Dr
$26,300$0
Loading pad, 10 LF sidewalk, and drainage inlet
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review; VDOT plan review required (preparing schedule adjustment due to required VDOT review).
Braddock Utterback, BrianBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 08/08 07/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 19 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
04077
WB Little River Turnpike and Old Columbia Pike
$24,900$0
Loading pad, retaining wall, and sidewalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
04078
WB Little River Turnpike and Pinecrest Heights Dr
$21,000$0
Loading pad and sidwalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
04079
WB Little River Turnpike and Pinecrest Parkway
$20,200$0
Loading pad and sidewalk connection
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 20 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
04080
WB Little River Tnpk and Roberts Ave
$23,200$0
Loading pad, 15-foot wide asphalt trail, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review (redesigning due to safety concerns per 4/15/08 meeting with DOT; preparing schedule adjustment due to redesign).
Mason Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 06/08 07/08 10/0807/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
04099
WB Little River Turnpike and Glenbrook Road
$20,900$0
Ramps, cross walks and pedestrian signals
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; CMD authorized 5/1/08 to proceed with construction via the annual contruction contract; construction NTP 6/9/08 (scheduled completion 7/7/08). .
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 04/08 07/08 07/0805/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
04127
NB Pimmit Dr and Leesburg Pike
$25,600$0
Loading pad, trash can, and improved access
Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08; survey and utility designation in progress; relocation of stop location may be required to avoid conflicts with overhead utilities; easements required.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
12/0807/08 07/08 04/09 04/0902/0912/08
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 21 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
04157
WB Leesburg Pk and Idylwood Rd
$16,700$0
Loading pad and bench Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; CMD authorized 5/1/08 to proceed with construction via the annual contruction contract; construction NTP 6/9/08 (scheduled completion 7/7/08). .
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 04/08 07/08 07/0805/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
04323
SB Magarity Rd near Lusby Pl
$26,500$0
4 pedestrian ramps and 2 crosswalks
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; CMD authorized 5/1/08 to proceed with construction via the annual contruction contract; construction NTP 6/9/08 (scheduled completion 7/7/08). .
Providence Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 04/08 07/08 07/0805/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
04329
NB Magarity Rd and Lusby Pl
$20,400$0
20' concrete sidewalk, loading pad, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; CMD authorized 5/1/08 to proceed with construction via the annual contruction contract; construction NTP 6/9/08 (scheduled completion 7/7/08). .
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 04/08 07/08 07/0805/08NANA
Monthly RemarksProject Description
303 Construction
Thursday, June 19, 2008 Page 22 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
04378
SB Chain Bridge Rd near McLean Commons Ct
$15,200$0
Concrete pad Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
04379
SB Chain Bridge Rd and Montcalm Dr
$15,200$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
04380
NB Chain Bridge Rd and Hunting Avenue
$18,500$0
Loading pad, sidewalk connection, and drainage ditch regrading
Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 23 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05061
WB South Lakes Dr near Chestnut Burr Ct
$17,500$0
Loading pad, 2-pedestrian ramps, and cross walk
Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; addressing final review comments and preparing construction task order authorization package.
Hunter Mill Utterback, Brian
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05062
WB South Lakes Dr & Pine Cone Ct
$15,400$0
Loading pad Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; CMD authorized 6/11/08 to construct the project via the annual contractor.
Hunter Mill Utterback, Brian
Farsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
05063
WB South Lakes Drive & Soaptone Dr
$15,400$0
Loading pad Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; CMD authorized 6/11/08 to construct the project via the annual contractor.
Hunter Mill Utterback, Brian
Farsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Construction
Thursday, June 19, 2008 Page 24 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05064
WB South Lakes Dr & Green Watch Way
$15,800$0
1-pedestrian ramp Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; CMD authorized 6/11/08 to construct the project via the annual contractor.
Hunter Mill Utterback, Brian
Farsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
05072
NB Glade Dr and Cocquina Dr
$16,200$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05073
WB Sunrise Valley Dr and Glade Dr
$21,800$0
Bench Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 25 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05078
EB Sunset Hills Rd near Town Center Parkway
$19,900$0
Loading pad and bench Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/08 11/08 11/0809/08TBDTBD
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05082
EB Glade Drive near Breton Court
$22,000$0
Loading pad, sidewalk, and pedestrian ramp
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; 60% design plans received 4/15/08 and under review.
Hunter Mill Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05120
NB Soapstone and Hearthstone Ct
$20,200$0
20' concrete sidewalk, loading pad, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 60% design plan comments returned 3/19/08 (redesigning due to safety concerns per 4/15/08 meeting with DOT; preparing schedule adjustment due to redesign).
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 06/08 07/08 10/0807/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 26 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05137
SB Soapstone Dr near Hearthstone Ct
$15,400$0
Loading pad Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 60% design plan comments returned 3/19/08 (redesigning due to safety concerns per 4/15/08 meeting with DOT; preparing schedule adjustment due to redesign).
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 06/08 07/08 10/0807/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05144
WB Glade Drive & Breton Court
$15,000$0
Loading pad Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; 60% design plans received 4/15/08 and under review.
Hunter Mill Utterback, BrianFinnell, Richard
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05148
NB Colts Neck Road & Steeplechase Drive
$15,000$0
Loading pad Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; 60% design plans received 4/10/08 and under review.
Hunter Mill Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 27 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05149
NB Colts Neck Road near Insha Court
$15,000$0
Loading pad Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08 (completion schedule assumes no easement required); survey (by County) and utility designation complete; 60% design plans received 4/10/08 and under review.
Hunter Mill Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05165
EB South Lakes Dr & Springwood Dr
$15,400$0
Loading pad Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; CMD authorized 6/11/08 to construct the project via the annual contractor.
Hunter Mill Utterback, Brian
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Construction
Z00032
Safety Improvements at Bus Shelters/Stops
05167
EB South Lakes Dr & Soapstone Dr
$15,400$0
Loading pad Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; CMD authorized 6/11/08 to construct the project via the annual contractor.
Hunter Mill Utterback, Brian
Farsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Construction
Thursday, June 19, 2008 Page 28 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05168
EB South Lakes Dr & Chestnut Burr Ct
$16,900$0
Loading pad and 30 LF sidewalk Group 2; part of the Safety Enhancements @ Bus Shelters/Stops project; survey and (by County) and utility designation complete; addressing final review comments and preparing construction task order authorization package.
Hunter Mill Utterback, BrianFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/08 06/08 06/08 08/0806/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05216
EB Sunrise Valley Dr and Glade Dr
$16,200$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05217
SB Glade Dr and Cocquina Dr
$16,200$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 29 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05224
WB Sunrise Valley and South Lakes Dr
$16,200$0
load pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05226
EB Sunrise Valley Dr near Glade Dr
$16,400$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05227
EB Sunrise Valley Dr and South Lakes Dr
$18,300$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 30 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05536
NB Reston Parkway & Glade Drive
$30,000$0
Loading pad, sidewalk, and curb and gutter
Group 3; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 10/11/07; design task order approved and NTP issued 1/11/08; survey (by County) and utility designation complete; design in progress; easement required.
Hunter Mill Utterback, Brian
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0908/08 08/08 06/09 06/0902/0901/09
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05631
EB Great Falls Street and Aynsley Ln
$16,000$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
05632
WB Great Falls Street and Eldorado Ct
$16,200$0
Loading pad Group 5; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/12/07; survey and design task order approved and NTP issued 3/7/08 (completion schedule assumes no easements required); survey and utility designation in progress.
Dranesville Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 08/08 12/08 12/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Thursday, June 19, 2008 Page 31 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
05873
SB Telegragh Rd and Roxann Rd
$24,300$0
Loading pad, 10' retaining wall, and drainage culvert
Group 1; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 4/27/07; survey and design task order approved and NTP issued 8/2/07; survey and utility designation complete; 90% design plans received 4/4/08 and under review; land acquisition required (preparing schedule adjustment due to required easements).
Lee Utterback, BrianBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0803/08 06/08 07/08 03/0912/0811/08
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Enhancements - Bus Shelters/Stop
06013
SB Town Center Pkwy at Market St
$15,900$0
Loading pad Group 4; part of the Safety Enhancements @ Bus Shelters/Stops project; joint field review conducted 12/4/07; survey and design task order approved and NTP issued 2/21/08 (completion schedule assumes no easement required); survey and utility designation in progress.
Hunter Mill Utterback, BrianPM PDD:PM LAD:PM CMDE:PM CMDS:
07/08 07/02 11/08 11/0809/08NANA
Monthly RemarksProject Description
303 Planning and Design
Z00032
Safety Improvements at Bus Shelters/Stops
06037
SB Griffith Rd & Burfoot St
$20,500$0
Loading pad and 40' sidewalk DOT 8/10/07 requested Capital Facilities to relocate an existing bus stop; design complete (no land acquisition required); CMD authorized 3/31/08 to proceed with construction via the annual construction contract; constrution NTP 6/2/08 issued after addressing citizen opposition from the adjacent property owner (scheduled completion 7/7/08).
Dranesville Gallo, Michael
Farsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/08 03/08 05/08 07/0804/08NANA
Monthly RemarksProject Description
303 Construction
Thursday, June 19, 2008 Page 32 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
Z00032
Safety Improvements at Bus Shelters/Stops
06058
Janna Lee Ave & Tamarind St
$33,500$0
Bus shelter and walkway connections
Expedited project requested by DOT 6/21/07 based on coordination with the FCPD and the Lee District Supervisor; design complete and required land rights obtained; CMD authorized 6/10/08 to proceed with construction via the annual contractor (construction NTP will be issued upon receipt of the state building permit).
Lee Gallo, MichaelZore, TasneemFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0802/08 02/08 11/08 07/0806/0808/08
Monthly RemarksProject Description
303 Construction
D00448
Plaza America Pedestrian Improvements
PA02B
Sunset Hills Road: Reston Center to Town Center Parkway
$170,000$0
600 LF 8' wide asphalt trail100 LF 6' wide concrete walkway
Funding provided by Plaza America cash proffer contribution; field property and topographic survey complete; design complete; LAD directed 3/24/06 to acquire easements for 2-properties (titles and appraisals complete and offer letters sent); LAD second schedule extension approved 7/19/07; updated utility designation complete & coordination ongoing to address extensive utilities on-site; project scope has been changed by District Supervisor to an 8-foot wide trial based on citizen's and property owner's request; proceeding with redesign for 8-foot trail; test hole data received (utility coordination in progress); new fiber optic lines found on site - revising alignment to avoid costly relocation (schedule adjustment approved 6/2/08 due to additional redesign).
Hunter Mill Zahirieh, ShahlaBarnes, DianneGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0806/08 06/08 01/09 01/0911/0809/08
Monthly RemarksProject Description
307 Planning and Design
D00448
Plaza America Pedestrian Improvements
PA050
Sunset Hills Rd Trail: Rstn Pkwy-Wiehle
$195,000$0
350 LF 8' asphalt trail from Sunset Hills Road to W&OD Trail
Partial funding provided by Plaza America proffer contribution and funds from the Old Reston Avenue roadway improvement project; survey and utility designation complete; scope reduced to asphalt trail connection to W&OD trail; land acquisition authorized 4/25/08 to acquire easements; obtaining permit from NVRPA for connection to W&OD Trail (design revised based on NVRPA comments); building permit required for proposed retaining wall.
Hunter Mill Zahirieh, ShahlaBuckley, BethTopper, WilliamHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0804/06 04/08 09/07 06/0911/0801/07
Monthly RemarksProject Description
307 Land Acquisition
Thursday, June 19, 2008 Page 33 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
D00448
Plaza America Pedestrian Improvements
PA060J
Sunset Hills Road @ Target EB Bus Stop Improvements
$30,000
Installation of a bus shelter Funding provided by Plaza America proffer contribution; design complete; Land Acquisition authorized 10/13/05 to acquire land rights; negotiations (Reston legal council) unsuccessful; LAD recommended 1/3/07 that project be deleted (memorandum to DOT 1/11/07 recommending deletion ~ followup memorandum to DOT 4/9/08); proposed development may provide bus stop improvements and relocation of stop - DOT following up.
Hunter Mill Flowers, RandallBuckley, BethFarsad, NahidMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/05 10/05 10/06TBD TBDTBD06/06
Monthly RemarksProject Description
01/07307 On-Hold
D00448
Plaza America Pedestrian Improvements
PA060O
Sunset Hills Road @ WO&D Trail WB Bus Stop Improvements
$30,000
Installation of a bus shelter Partial funding provided by Plaza America proffer contribution; original design complete and land acquisition authorized 1/06 to acquire easement from NVRPA; NVRPA denied permit for bus shelter due to sight distance issues with trail users and is opposed to a possible scope change to a pad and bench facility only; LAD initiated discussions with the adjacent property (Postal Services) for a stop relocation, who requested more information on impact to property; completed utility designation, prepared preliminary design, and coordinated with property owner's representative; owner still undecided about granting easement; plat prepared and LAD authorized 1/17/08 to initiate formal easement negotiations; LAD 5/2/08 recommended that project be cancelled; project on hold pending resolution.
Hunter Mill Gallo, MichaelBuckley, BethFarsad, Nahid
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/08 01/08 12/08TBD TBDTBD08/08
Monthly RemarksProject Description
05/08307 On-Hold
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS211
Route 1 SB: South of Dogue Creek to Mobile Home Sales Park
300 LF 8' Asphalt Trail and Pedestrian Bridge over Dogue Creek
Project is part of the Four-Year Transportation Program approved by the BOS on 10/15/07; part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; design funded through a revenue sharing agreement with VDOT (additional county, state, and federal monies to be used); survey and utility designation complete; developing design scope for project; design to be performed by consultant; schedule to be determined once contract executed with design consultant; land acquisition required.
Mount Vernon Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Pre-Design
Thursday, June 19, 2008 Page 34 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS212
Route 1 SB: Mobile Home Sales Park to Sacramento Center
$40,000$0
300 LF of 5-foot wide concrete sidewalk
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; targeted project for expedited completion; design funded through a $700k revenue sharing agreement with VDOT (county funds identified for construction); CMD authorized 5/4/07 to proceed with construction (NTP 5/21/07); Fairfax Water relocated fire hydrant; Verizon and Dominion Virginia Power completed pedestrian guy wire installations; construction 100% complete 7/7/07 (pavement markings redone and awaiting VDOT permit release).
Mount Vernon Zahirieh, Shahla
Minnix, W. ToddTBD, To be Deter
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/07 05/07 04/07 07/0705/07NANA
Monthly RemarksProject Description
307 Post-Construction
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS213
Route 1 SB: Sacramento Drive to Engleside Plaza (North of Woodlawn Court)
$350,000$0
1400 LF of 5' Concrete Sidewalk Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4D
RS214
Route 1 SB: South of Sky View Drive
$42,500$0
170 LF 5' Concrete Sidewalk and Bus Stop Pad
Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
Thursday, June 19, 2008 Page 35 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS221
Route 1 NB: North of Reddick Avenue/Russell Road (towards Janna Lee Avenue)
$125,000$0
500 LF of 5' Concrete Sidewalk Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS222
Route 1 NB: South of Janna Lee Avenue to Buckman Road/Mt. Vernon Highway
$302,500$0
1210 LF of 5' Concrete Sidewalk Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4E
RS223
Route 1 NB: Mt. Vernon Highway/Buckman Road to North of Napper Road
$125,000$0
Pedestrian Crossing at Mt. Vernon Hwy. and 500 LF 5' Concrete Sidewalk
Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
Thursday, June 19, 2008 Page 36 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4F
RS232
Route 1 NB: South of Kings Village Road
$37,500$0
150 LF of 5' Concrete Sidewalk Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4F
RS233
Route 1 NB: South of Fordson Road to Woodlawn Trail
$410,000$0
1640 LF of 5' Concrete Sidewalk Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4G
RS241
Route 1 NB: Dart Drive to Grand View Drive - Phase 1
$150,000$0
1,200 LF of 5-foot wide concrete sidewalk
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; targeted project for expedited completion; design funded through a $700k revenue sharing agreement with VDOT (County funds identified for construction); CMD authorized 11/17/06 to proceed with construction via the annual contractor (NTP issued for 2/12/07); construction 100% complete 6/25/07 (punch list items addressed and awaiting a VDOT permit release).
Mount Vernon Zahirieh, ShahlaBarnes, DianneMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/06 11/06 01/07 06/0702/07NANA
Monthly RemarksProject Description
307 Post-Construction
Thursday, June 19, 2008 Page 37 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4G
RS242
Route 1 NB: Dart Drive to Grand View Drive - Phase 2
$30,000$0
Curb Ramps and Short Sections of 5' Concrete Sidewalk at Bus Stop at Route 1 NB @ Fordson Road/Holly Hill Road (Cherry Arms Apartments)
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; design funded through a revenue sharing agreement with VDOT (County funds identified for construction); survey, utility designation, and design complete; apartment complex signed letter of permission for construction in lieu of easements and agreed to maintain proposed facilities on their property; obtained VDOT approval to add on to Phase 1 of project - Project No. K00447 (RS241), and CMD authorized to proceed with construction as part of Phase 1 construction contract (construction to coincide with punch list items on Phase 1, but was delayed due to issue with VDOT utility vault); construction 99% complete (awaiting a VDOT permit release).
Mount Vernon Zahirieh, ShahlaBarnes, DianneMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/08 01/08NANA NA NANA
Monthly RemarksProject Description
307 Post-Construction
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS251
Route 1 NB: Quander Road - Phase 1
$60,000$0
275 LF of 5-foot wide concrete sidewalk north of Quander and 200 LF of 5-foot wide concrete sidewalk south of Quander
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; targeted project for expedited completion; design funded through a $700k revenue sharing agreement with VDOT (County funds identified for construction); Dominion Virginia Power complete pedestrian guy wire installation; CMD authorized 11/2/06 to proceed with constuction via the annual contractor; construction 100% complete 12/15/06 (awaiting a VDOT permit release).
Mount Vernon Zahirieh, Shahla
Minnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/06 11/06 01/07 12/0611/06NANA
Monthly RemarksProject Description
307 Post-Construction
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS252
Route 1 NB: Quander Road - Phase 2
$112,500$0
450 LF of 5' Concrete Sidewalk South of Quander
Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
Thursday, June 19, 2008 Page 38 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS253
Route 1 SB: Belle Haven Towers - Phase 1
$110,000$0
850 LF of 5-foot wide concrete sidewalk
Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; targeted project for expedited completion; design funded through a $700k revenue sharing agreement with VDOT (County funds identified for construction); survey, utility designation, and design complete; Dominion Virginia Power completed installation of conduit on existing electric lines; Cox Communications completed relocation of cable; does not require land acquisition (section that required easement removed from Phase I of project); CMD authorized 11/17/06 to proceed with construction via the annual contractor; construction task order approved and NTP issued for 1/16/07; construction 100%% complete 7/9/07 (awaiting a VDOT permit release).
Mount Vernon Zahirieh, ShahlaBuckley, BethMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/06 11/06 09/06 07/0701/07NANA
Monthly RemarksProject Description
307 Post-Construction
K00447
Richmond Hwy Public Transport Initiative: Walkways Phase 4H
RS254
Route 1 SB: Belle Haven Towers - Phase 2
$137,500$0
550 LF of 5' Concrete Sidewalk and Service Drive Crossing
Project is part of Four-Year Transportation Program; part of multi-phased Route 1 Corridor project (Ft. Belvoir to Huntington Metro) with $55 million TPE; design funded thru VDOT revenue sharing agreement (additional county, state, and federal funds to be used); survey and utility designation complete; utility coordination in progress; design public hearing (PH) conducted 9/25/07 in accordance with state and federal guidelines; BOS endorsed plans presented at PH 12/3/07; submitted PH documentation to VDOT for state approval; sending revised plans to VDOT and County agencies for review; land acquisition required (LAD authorized to order title research and begin preliminary contact with property owners 12/12/07; consultant authorized 4/22/08 to prepare plats); PH approval (required before initiating formal easement negotiations) pending VDOT approval of design waivers and exceptions for some of the plans presented at hearing; schedule to be determined once waivers, exceptions, and PH approved.
Mount Vernon Zahirieh, ShahlaBuckley, Beth
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Planning and Design
W00100
Braddock District WalkwaysW109
Roberts Road @ GMU
$570,000$0
1,700 LF 6' asphalt trail Project is part of the Second Four-Year Transportation Program and was approved by the BOS on 10/15/07; project funded for design and land acquisition only; design by annual consultant 95% complete; LAD authorized to acquire 1-easement (GMU Board has approved the project); LAD coordinating revisions to the easement document with GMU legal counsel (concurrence on wording obtained and will be signed by GMU in near future); coordinating with proposed Roberts Road/Braddock Road Intersection Improvements; additional funds for construction included in the approved Fall 2007 Transportation Bond Referendum; utility designation recertification and VDOT plan review comments obtained; negotiations in progress with design engineering to update the plans (RFP sent 6/9/08).
Braddock Popoola, LarryBarnes, DianneLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/08 12/08 12/0808/08NA 12/05
Monthly RemarksProject Description
307 Land Acquisition
Thursday, June 19, 2008 Page 39 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
W00200
Dranesville District WalkwaysW202
Georgetown Pike
$608,000$377,000
Total Project Scope: 2 mile 6-foot wide stone dust trail (Phase I: 1,260 LF of trail from Applewood Lane to the Village Center)
Project scope reduced to trail section west of the village center due to citizen opposition east of the village center to granting easement (2 of 14 easements acquired); land acquisition finalizing negotiations (2 of 3 easements acquired ~ easement at fire station in the process of being recorded) and design engineer finalizing the plans and updating the environmental recertification (pre-final plans to VDOT 10/31/07 for review); VDOT approved Project Agreement for Scenic Byway Grant (NVRC proceeding with Route Feasibility Study); negotiations continuing with VDOT on the approval of Supplemental Agreement to utilize the additional enhancement funds ($387,000) including evaluating new walkway scope (Seneca Road to Utterback Store Road); survey work on Krop property complete; design alternatives prepared and presented to the property owner.
Dranesville Flowers, RandallKresge, CarolFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/08 05/08 05/0910/08NA 05/07
Monthly RemarksProject Description
307 Land Acquisition
W00200
Dranesville District WalkwaysW212
Walker Road Phase I
$350,000$0
6-foot wide stone dust trail (Phase I: 1200 LF of trail north of Village Center to north end of Great Falls Elementary School property)
TEA-21 funding approved ($200K in VDOT funds); approval in progress for an additional $40,000 in Enhancement funds (BOS item proposed for 5/3/08 meeting); topographic and property site survey, design, and environmental reviews complete; property owners not receptive to granting easements (0 of 6 easements acquired); VDOT 12/5/06 approved reduced project scope; FCSB permit received 2/6/08; land acquisition continuing on outstanding easements but will not impact current construction scope; design engineer finalizing the design and updating the environmental recertification; Federal right of way authorization requested 5/19/08.
Dranesville Flowers, RandallKresge, CarolFarsad, NahidJensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/08 04/0909/08NATBD TBD 05/07
Monthly RemarksProject Description
307 Planning and Design
W00300
Hunter Mill District WalkwaysW304
Wiehle Avenue Walkway
$435,000$0
700 LF 5' wide walkway Design (including landscaping plan) and geotechnical engineering report complete and building permit obtained; Land Acquisition Division authorized to acquire easement 1/30/02; BOS 9/24/07 authorized acquiring the outstanding land rights from homeowners association via condemnation; P&DD presented project to Reston Design Review Board for approval at their 2/19/08 meeting (requested design changes including options for the facing of the retaining wall reviewed at a workshop conduced on 5/27/08).
Hunter Mill Guarino, MichaelZore, Tasneem
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/08 12/09 12/0902/09NA NA 12/08
Monthly RemarksProject Description
307 Land Acquisition
Thursday, June 19, 2008 Page 40 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
W00300
Hunter Mill District WalkwaysW308
Clarks Crossing Road Walkway
$108,000$0
250' 8-foot wide asphalt trail Original design complete; land acquisition complete 1/24/07 (FCPA easement obtained but one property owner refuses to grant the other easement); alternate walkway alignment design prepared to eliminate the need for the outstanding easement (guardrail proposed but subsequently deleted at request of VDOT); VDOT has installed the culvert extension; Cox authorized 3/1/07 to adjust their conflicting facilities; CMD authorized 7/6/07 to construct the project (construction NTP pending receipt of VDOT permit).
Hunter Mill Flowers, RandallZore, TasneemGharavi, Mo
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0705/06 11/06 08/06 08/0806/0801/07
Monthly RemarksProject Description
307 Planning and Design
W00300
Hunter Mill District WalkwaysW311
Beulah Road Trail
$165,000$0
830 ' 10 foot wide trail (Section D) Enhancement grant funds approved to prepare a trail feasibility study, including preliminary engineering survey, along Beulah Road in the vicinity of the Meadows Lark Gardens Regional Park; final report distributed 1/07; Phase I implementation of Section D in progress (830 LF 10-foot wide trail); Supplemental Project Agreement for additional Enhancement Funding signed 1/19/08 by VDOT and concurrence to use the annual task order consultant received; task order approved (NTP issued contact negotiations complete and in progress.
Hunter Mill Popoola, Larry
Murdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
NATBD TBD TBD TBDTBDNA
Monthly RemarksProject Description
307 Pre-Design
W00400
Lee District WalkwaysW413
Florence Lane Walkway
$155,739
850 LF of 5-foot wide concrete sidewalk along the east side of Florence Lane between Rebecca Jane Way and Beech Tree Drive
Original citizen survey notification letter sent 9/7/06; project was on hold due to property owner opposition to the site survey; coordination with District Supervisor and the community conducted and project to proceed as proposed per Lee District request; survey notification letters sent on 4/25/08 with survey to begin 5/15/08 (scheduled completion 7/1/08); project completion schedule to be prepared once survey is completed.
Lee Adams, Shanna
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
307 Pre-Design
Thursday, June 19, 2008 Page 41 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
W00500
Mason District WalkwaysW505
Old Col Pike-Elmdale
$290,000$272,000
700 LF of 6-foot wide walkway Funding for design only; survey and design (including geotechnical investigation and design for 2 pedestrian bridges) complete; citizen's meeting conducted (easements will be required); additional funding required; project on hold pending approval of additional funding.
Mason Guarino, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
08/03307 On-Hold
W00600
Mt. Vernon District WalkwaysW611
West Potomac High School Walkway
$576,969$0
500 LF of 5-foot wide concrete sidewalk with curb and gutter and storm drainage improvements
Project is part of the Second Four-Year Transportation Program and was approved by the BOS on 10/15/07; survey and design by annual consultant; design in progress; citizen meeting/field walk complete; VDOT review comments addressed and final plans distributed for review on 3/12/08; Traffic signal plans approved by VDOT; LAD authorized 6/29/07 to acquire easements (5 of 6 easements acquired ~ remaining easement obtained and being recorded) and a letter of permission from the FCSB; LAD schedule adjustment 3/37/08; utility relocations in progress; Fairfax Water plans completed; additional funds for construction included in the approved Fall 2007 Transportation Bond Referendum.
Mount Vernon Royse, AndyBarnes, DianneGharavi, MoJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0806/07 06/07 02/09 02/0908/0804/08
Monthly RemarksProject Description
307 Land Acquisition
W00600
Mt. Vernon District WalkwaysW612
Mount Vernon High School Walkway
$160,000$145,000
950 LF of 6-foot wide asphalt trail Project funded for design only; survey and design by annual design consultant; citizens' meetings to present preliminary design complete; coordinating with District Supervisor's office to determine if final design should proceed based on issues raised at the citizen's meeting.
Mount Vernon Guarino, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
12/04307 On-Hold
Thursday, June 19, 2008 Page 42 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
W00600
Mt. Vernon District WalkwaysW613
Mason Neck Trail Segment II
$1,906,000$1,163,718
2.3 miles of 8-foot wide asphalt trail
Funded for design and land acquisition only; final design in progress (90% plan submission received); wetlands and historic report approved; VDOT approved environmental report 7/28/06; Phase I Archeological Study complete; easement plats and LAD directed 4/28/06 to initiate pre-acquisition activities; VDOT approval to proceed with land acquisition negotiation activities outstanding pending VDOT approval of additional MS-19 engineering drainage calculations and environmental recertification; second contract addendum with A/E to address VDOT comments approved; Supplemental Agreement for additions Enhancement funds presented to the BOS on 11/19/07 and signed 1/19/08 by VDOT.
Mount Vernon Royse, AndyKresge, CarolNolan, BillJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/06 04/06 TBD TBD05/07
Monthly RemarksProject Description
307 Land Acquisition
W00700
Providence District WalkwaysW705
Woodford Rd @ Wolftrap
$110,000$75,000
270 LF of 6-foot wide walkway replacement including extensive site grading and drainage facilities
Funding approved for replacement of an existing walkway; site survey, design, utility designation, and geotechnical engineering report complete and VDOT permit obtained; easement from HOA acquired; HOA 9/29/06 withdrew support for the project; follow up meeting with HOA conducted 2/27/07 and site review meeting conducted 3/10/07 (citizens generally do not support the project, and HOA submitted letter 3/26/07 stating they do not support the proposed design); project on-hold pending resolution of HOA issues; coordinating with District Supervisor's office.
Providence Guarino, MichaelKresge, Carol
Jozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0610/05 10/05 09/06 TBDTBD04/06
Monthly RemarksProject Description
09/06307 On-Hold
W00700
Providence District WalkwaysW719
Lido Place Walkway
$194,500$0
600 LF of 4-foot wide sidewalk Survey and utility designation complete; alternative design concepts evaluated in coordination with the District Supervisor and community due to limited space and safety considerations; additional design work complete and VDOT review comments addressed; LAD 5/16/08 obtained all outstanding land rights; final VDOT plan review (addressing drainage comments) and utility coorindation in progress.
Providence Gallo, MichaelBarnes, Dianne
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0804/07 04/07 05/09 05/0912/0810/08
Monthly RemarksProject Description
12/05307 Planning and Design
Thursday, June 19, 2008 Page 43 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
X00826
Extension ProjectD014
Old Courthouse/Besley Road
$175,000$0
550 LF of 8-inch sanitary sewer to serve 6 dwellings
Initial citizen opposition encountered which required extensive follow-up coordination including the Health Department reevaluation of the area; project scope and alignment issues resolved; site survey and preliminary design complete; LAD directed on 10/25/05 to acquire easements (3 of 9 easements acquired); P&DD preparing revised plans and plats to address alignment change requested by property owner during easement negotiations (VDOT approved revised jack & bore alignment across Old Courthouse Road 10/23/07); new jump back schedule approved 1/4/08 due to the redesign and schedule adjustment approved 6/4/08 due to plat preparation.
Hunter Mill Gallo, MichaelBarnes, DianneKnizner, AnthonyHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0904/08 06/08 11/09 11/0906/0901/09
Monthly RemarksProject Description
402 Planning and Design
X00826
Extension ProjectD016A
Portland Place E & I, Phase I
$350,000$0
1,000 LF 8-inch sanitary sewer and 6 grinder pumps
BOS approved expansion of Sewer Service Area on February 27, 2006, to include additional properties with potentially failing septic systems; Phase I serves properties with potentially failing systems (including those in expansion area); scope of work revised to include the use of grinder pumps to address constructability issues associated with deep excavations (grinder pump easements will be required); design to be prepared by A/E (Dewberry); task order approved 12/5/07 (NTP issued 12/6/07); obtaining additional survey required for grinder pump design (notifications sent to property owners and obtaining authorizations to access properties) in progress; coordinating proposed grinder pump locations with property owners and follow up citizen meeting being scheduled.
Dranesville Gallo, MichaelBarnes, Dianne
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0910/08 10/08 06/10 06/1010/0905/09
Monthly RemarksProject Description
402 Planning and Design
X00826
Extension ProjectD016B
Portland Place - Phase II
$200,000$0
525 LF 8-inch sanitary sewer Phase II serves section of neighborhood south of Portland Place and requires easements; survey complete(updated information in progress); design to be prepared by A/E (Dewberry); task order approved 12/5/07 (NTP issued 12/6/07); coordinating proposed grinder pump locations with property owners and follow up citizen meeting being scheduled.
Dranesville Gallo, MichaelBarnes, Dianne
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0910/08 10/08 06/10 06/1010/0905/09
Monthly RemarksProject Description
402 Planning and Design
Thursday, June 19, 2008 Page 44 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
X00826
Extension ProjectE004
River Oaks
$7,300,000
3,266 LF 8-inch sanitary sewer, 69grinder pumps, and 18,570 LF force main
Construction NTP issued for 1/16/07 (construction 75% complete).
Dranesville Flowers, RandallColeman, MichaelKnizner, AnthonyMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/05 09/07 09/0810/06NA 12/05
Monthly RemarksProject Description
402 Construction
X00826
Extension ProjectE005
Saigon Subdivision E & I
$2,530,000$0
3,100 LF 8-inch sanitary sewer, 20 grinder pumps, and 1,800 LF force main
Feasibility study and site survey complete and design in progress; meeting with property owners on proposed grinder pump locations conducted; LAD authorized 6/21/06 to proceed with acquisition of easements (34 total plats including 20-grinder pumps and 1-off site easement); obtaining appraisals easements requiring compensation with negotiations in progress for non compensated easements; meeting with new District Supervisor conducted 3/26/08; Health Department scheduled to re-evaluate the condition of the existing on-site disposal systems in the project area in May 2008; land acquistion continuing concurrently with addressing outstanding project issues with the District Supervisor's office.
Dranesville Royse, AndyBuckley, Beth
Jozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/06 06/06 12/08TBD TBDTBD05/07
Monthly RemarksProject Description
05/07402 Land Acquisition
X00826
Extension ProjectEI01
Piney Run Drive
$381,000$0
1,450 LF of 8'' sanitary sewer Project to provide sanitary sewer service to 11 houses; coordinated with off site property owners to develop alignment plan; field survey 95% complete; general citizen's meeting conducted 2/15/06; coordination with DPZ completed to require an adjacent land development project to provide an alternate sanitary sewer outfall (possibly in late 2008) via a proffered development condition; project schedule to be prepared once alignment is finalized.
Lee Adams, Shanna
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
12/06402 On-Hold
Thursday, June 19, 2008 Page 45 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
X00826
Extension ProjectEI02
Stryker Avenue
$665,000
2,000 LF 8" sanitary sewer & 5 grinder pumps and modifications to an existing pump station
Design complete; LAD 2/20/07 acquired all required temporary construction easements, grinder pump easements, and 1-sanitary sewer lateral easement; Wastewater Planning requested that existing pump station be upgrade to accommodate the additional flow; Dewberry prepared grinder pump electrical design and pump station upgrade plan via two task orders (100% design plans received); addressed final CMD comments; CMD authorized 5/22/08 to proceed with construction bid advertisement; P&DD coordinating the acquisition of the VDOT permit (anticipated resolution 6/6/08); construction schedule includes both the gravity sewer and the pump station upgrade work; project status update letter to property owners 4/14/08.
Hunter Mill Adams, ShannaKresge, CarolKnizner, AnthonyHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0709/07 09/06 11/08 06/0907/0807/07
Monthly RemarksProject Description
402 Construction
X00826
Extension ProjectEI03
Kenmore Subdivision
$914,000$0
2,400 LF 8-inch sanitary sewer Project design complete and all land rights acquired; final CMD comments addressed and construction bid package prepared and CMD plan sign off obtained; design waiver approved; request for approval of a waiver to impact the RPA pending the resolution of tree removal issues in a conservation easement with the Northern VA Conservation Trust (NVCT); letter sent to NVCT on 4/18/08 requesting resolution to easement issue and negotiations in progress on the scope of the mitigation required to address this issue (site review meeting scheduled 6/12/08).
Dranesville Royse, AndyBarnes, DianneSteele, TerrenceJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0711/06 11/06 12/08 05/0908/0808/07
Monthly RemarksProject Description
402 Planning and Design
X00826
Extension ProjectEI04
Fairfax Acres Subivision
$2,500,000$0
6,450 LF of 8-inch sanitary sewer Property and topographic survey by Rice & Associates complete; proposed alignment coordinated with impacted citizens: design in progress (preliminary design complete and final review comments being addressed); LAD authorized 3/27/08 to acquire easements (9 of 20 easements acquired); project status update letter to property owners 4/14/08.
Providence Adams, ShannaFinnell, Richard
Jozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0812/07 03/08 12/09 12/0911/0809/08
Monthly RemarksProject Description
402 Land Acquisition
Thursday, June 19, 2008 Page 46 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
X00826
Extension ProjectEI05
Turkey Run Road Sewer E&I
$650,000$0
1,800 LF 8-inch sanitary sewer Project will service 11 lots with existing homes and 2 vacant lots; UDB authorized 7/27/06 to proceed with survey and design; project scope reviewed and alternative alignment plans coordinated with the impacted property owners; survey complete (additional survey will be required); citizen meeting conducted 6/19/07 and additional coordination in progress to define limits of project scope and alignment plan; additional survey work complete 10/5/07; briefing on new District Supervisor conducted 3/26/08; project on hold pending a further review of outstanding issues.
Dranesville Royse, AndyBuckley, Beth
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBDTBDTBD
Monthly RemarksProject Description
03/08402 On-Hold
X00826
Extension ProjectEI06
Colewood Street
$250,000$0
8" sanitary sewer (length TBD) BOS 9/24/07 approved expansion of the limits of sewer service area; project scope being reviewed; Total Project Estimate to be prepared after alignment plan is finalized; citizen meeting conducted 11/14/07; site survey and utility designation complete; design in progress.
Sully Schmidt, Natasha
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0903/09 03/09 04/10 04/1010/0908/09
Monthly RemarksProject Description
402 Planning and Design
X00826
Extension ProjectF017B
Langley Forest E&I Phase II
$200,000$0
700 LF 8-inch sanitary sewer Initial citizen's meeting conducted; survey and utility designation complete; design in progress; LAD authorized 12/5/07 to acquire easements (1 of 4 easements acquired); stream crossing permits (Army Corps of Engineers and Virginia DEQ) obtained; coordination with homeowners continuing.
Dranesville Zahirieh, ShahlaFinnell, Richard
Murdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0810/06 12/07 12/07 02/0909/0804/07
Monthly RemarksProject Description
402 Land Acquisition
Thursday, June 19, 2008 Page 47 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project NameTPE ($)FUT ($)
On HoldDesign DatesDistrict CAP Assignments
Project Managers
Land Acquisition DatesBid OpeningCurrentApproved
CompletionCurrentApproved
CompletionCurrent
CompletionApproved
Completion
Construction Dates
Project Status - Phase
Utilities Design BranchCAP UDB - Monthly Summary Status Report May 2008
X00826
Extension ProjectM050
Pine Ridge
$375,000
952 LF 8-inch sanitary sewer Project was on hold one approximately 5-years pending the receipt of an additional prepayment of availability fee which was received 8/07 (5 properties with 3 payments received from locations with non-failing systems); major design update required; site survey complete and FCPA concurrence received on proposed sewer alignment; design in progress (preliminary design plans being reviewed); 4 easements will be required.
Providence Royse, AndyBarnes, Dianne
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0911/08 11/08 03/10 03/1008/0905/09
Monthly RemarksProject Description
402 Planning and Design
X00826
Extension ProjectM058
Glenbrook Road E & I
$315,000$0
1,000 LF of 8-inch sanitary sewer Citizen's meetings conducted; survey and utility designation complete; LAD coordinated with County Attorney on the use of a combined sanitary sewer/storm sewer easement as requested by property owners; second citizen's meeting conducted; revised preliminary sanitary sewer alignment prepared and scope revised to include resolution of existing storm drainage issues, which is required to properly install the sanitary sewer; sanitary and storm drainage design to be completed by Dewberry via a task order authorization (design NTP issued 5/28/08).
Providence Zahirieh, ShahlaKresge, CarolSteele, TerrenceMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0903/09 03/09 02/11 02/1103/1012/09
Monthly RemarksProject Description
402 Pre-Design
Thursday, June 19, 2008 Page 48 of 48developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
26006G
Richmond Highway Intersection Improvement Phase 4D
06001
Intersection Design - Sacramento Drive, Southgate Drive, Lockheed Boulevard and Arlington Drive
$1,200,000$1,200,000
Engineering and construction of intersection improvements for express bus service stops at Sacremento Dr., Southgate Dr., Lockheed Blvd. and Arlington Dr.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases.
Mount Vernon Madhusudhan, GPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 07/06Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4B2
06002
Intersection Design - Lukens Lane and Frye Road (Phase2)
$600,000
Engineering and construction of intersection improvements for express bus service stops at Lukens Lane and Frye Road.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases. Land acquisition is required. Design exception and design waiver packages submitted to VDOT for review 6/11/08.
Mount Vernon Madhusudhan, GBarnes, DianneMinnix, ToddJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 07/06Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4C
06002
Intersection Design - Ladson Lane
$400,000
Engineering and construction of intersection improvements for an express bus service stop at Ladson Ln.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases. Land acquisition is required. Design waiver package submitted to VDOT for review 6/11/08.
Mount Vernon Madhusudhan, G
Minnix, Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 07/06Lee102Fund
26006G
Richmond Highway Intersection Improvement Phase 4B1
06002
Intersection Design Frye Road (Phase I)
$200,000
Engineering and construction of intersection improvements for express bus service stop at Frye Road.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Draft construction package submitted to CMD 5/23/08. Comments have been received and are being addressed. Minor traffic signal modification plans approved by VDOT on 5/2/08.
Mount Vernon Madhusudhan, GBarnes, DianneWolfe, MikeJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0605/06NA NA NA NA
Project Description Monthly Remarks
07/06 11/08 12/08 05/0908/0710/08
Lee102Fund
Thursday, June 19, 2008 Page 1 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
26006G
Richmond Highway Intersection Improvement Phase 4C1
06002
Intersection Design Kings Highway
$400,000
Engineering and construction of intersection improvements for express bus service stop at Kings Highway.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Draft construction package submitted to CMD 5/23/08. Comments have been received and are being addressed.
Mount Vernon Madhusudhan, G
Wolfe, MikeJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0605/06NA NA NA NA
Project Description Monthly Remarks
07/06 11/08 12/08 05/0908/0710/08
Lee102Fund
007701
Route 50 Interchange/Waples Mill Road
00000
$4,584,000
Design and construction of at-grade improvements.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. Construction substantially complete 12/18/06. Final signal inspection punch list completed. Signal accepted by City of Fairfax. Awaiting final inspection by VDOT.
Springfield Gharavi, MoFinnell, RichardGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0410/02 07/03 04/04 10/04NA
Project Description Monthly Remarks
10/04 05/05 06/05 12/0610/0604/05
Providence301Fund
007702
Tall Timbers Drive00000
$1,450,000$0
Construction of 700 linear feet of roadway connecting existing portions of Tall Timbers Drive.
Construction substantially complete 10/10/07. Preparing final Street Acceptance Package.
Springfield McCorkle, LisaBuckley, BethMinnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0706/06 12/05 02/07NA TBD
Project Description Monthly Remarks
08/06 02/07 03/07 10/0701/0801/07301Fund
008801
Stone Road00000
$2,084,000$0
Construct a raised median from Lee Hwy to Billingsgate Ln., widen roadway from Battery Ridge Ln. to Awbrey Patent Dr.
Construction substantially complete 4/25/08. VDOT inspection has been requested.
Sully Ayers, RobertBuckley, BethFarsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0711/02 10/04 05/05 08/05 05/06
Project Description Monthly Remarks
06/06 05/07 06/07 04/0803/0804/07301Fund
Thursday, June 19, 2008 Page 2 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
008803
Route 29 Widening00000
$4,400,000$985,000
Phase II: Trail improvements from Stevenson Street to Holly Avenue.
VDOT completed widening of westbound lane between Dixie Hill Road and Holly Avenue. TPE includes future phases to be identified. Environmental investigation is in progress. Consultant revising proposal for archaeological survey. Phase II Final design comments are being addressed. A meeting with Archstone Properties has been scheduled for 6/24/08 to discuss impact to property.
Springfield Madhusudhan, GFinnell, RichardMinnix, ToddJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/06 04/07TBD TBD TBD TBD
Project Description Monthly Remarks
11/07TBD TBD TBDTBDTBD
301Fund
009913
Dolley Madison Blvd. (Rt. 123)00000
$8,946,000
Widening Dolley Madison Blvd. to six lanes from I-495 to Dulles Toll Road.
Construction is complete. Final street acceptance package returned 4/24/07 with comments. A meeting was held with VDOT 9/18/07 to discuss redline composite plat issues. Plat has been returned to surveys to resolve formatting issues and is due back by end of June.
ProvidenceGlass, LisaGoudarzi, BehrooStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0002/00 11/00 11/00 03/01NA
Project Description Monthly Remarks
11/00 03/01 04/01 07/0207/0212/00301Fund
009444
Laurel Hill Development - Transportation Analysis
00000
$400,000
Preliminary design of 7 miles of roadway in Laurel Hill area includingdata collection, traffic analysis, and update Countywide transportation plan.
TPE is for preliminary design only. Final conceptual design plans and quantities were received 4/23/08 for Silverbrook Road, Furnace Road and Hooes Road.
Mount Vernon Madhusudhan, GPM PDD:PM LAD:PM CMDE:PM CMDS:
04/08NANA NA NA NA
Project Description Monthly Remarks
NA NA NA NANANA303Fund
006495
Wiehle Avenue Phase III00000
$7,399,000
Four lane road from Dranesville Road to Fairfax County Parkway.
Construction is complete. Preparing final Street Acceptance package. A meeting was held with VDOT 9/18/07 to discuss redline composite plat issues.
Dranesville Gharavi, MoKnutsson, RobertFarsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0003/89 07/90 11/99 11/99 06/00
Project Description Monthly Remarks
08/00 03/01 04/01 08/0208/0202/01304Fund
Thursday, June 19, 2008 Page 3 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
006495
Wiehle Avenue, Phase II00000
$7,933,000
Four lane road from Fairfax County Parkway to Reston Avenue.
Construction is complete. Final street acceptance package returned 4/24/07 with comments. A meeting was held with VDOT 9/18/07 to discuss redline composite plat issues. Plat has been returned to surveys to resolve formatting issues. Coordination with Colonial Pipeline is on going regarding Quitclaim package.
Hunter Mill Gharavi, MoKnutsson, RobertFarsad, NahidStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/9803/89 01/90 03/98 03/98 10/98
Project Description Monthly Remarks
10/98 05/99 06/99 04/0004/0001/99
Dranesville304Fund
064103
South Van Dorn/I-95, Phase II00000
$11,300,000
Design and construct a ramp from northbound South Van Dorn Street to eastbound I-95.
Construction is complete. Street Acceptance Package being prepared for submission to VDOT. Vacation of a Portion of Oakwood Road and a Dedication of a Temporary Drainage Easement and a Sanitary Sewer Easement was forwarded to DOT at the end of August 06. PDD is working to secure the easements with the property owners.
Lee Gharavi, Mo
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/9707/94 01/96NA NA NA
Project Description Monthly Remarks
09/97 01/98 02/98 01/9901/9901/98304Fund
064233
Spring Hill Road00000
$10,400,000
Widening Spring Hill Road between Route 7 and International Drive.
Funding provided by VDOT in accordance with its 6-year plan. Environmental documentation comments have been received and are being addressed. VDOT construction plan review comments are being addressed.
Providence Gharavi, MoKresge, CarolGharavi, MoMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0307/02 12/03 05/05 10/05NA
Project Description Monthly Remarks
09/03 08/08 09/08 03/1006/0807/08304Fund
064237
Roberts Road/Braddock Road00000
$644,000$0
Additional right turn-lane from southbound Roberts Road to Braddock Road.
Construction substantially complete 5/23/08.
Braddock Hojatzadeh, MaxBarnes, DianneFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0607/03 10/06 10/06 04/07NA
Project Description Monthly Remarks
11/04 07/07 09/07 05/0812/0706/07304Fund
Thursday, June 19, 2008 Page 4 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064240
Leesburg Pike at Glen Carlyn Road00000
$90,000
Extend left turn-lane on eastbound Leesburg Pike.
Project is part of the Governor's Congestion Relief Program, funded by VDOT. Construction complete 1/12/07. VDOT permit released.
Mason Roberson , Jean
Lim, SamJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0510/04NA NA NA NA
Project Description Monthly Remarks
02/05 11/06 12/06 01/0708/0710/06304Fund
064242
West Ox Road/Monroe Street00000
$600,000$0
Eastbound left turn-lane from West Ox Road to Monroe Street.
Construction substantially complete 4/7/08. VDOT permit released 5/29/2008.
Hunter Mill Chase, StevenKresge, CarolGharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/0705/06 01/07 01/07 08/07NA
Project Description Monthly Remarks
02/07 12/07 01/08 04/0808/0811/07304Fund
064243
Poplar Tree Road00000
$675,000
Additional left turn-lane on westbound Poplar Tree Road at the intersection with Stringfellow Road.
Project is part of the Governor's Congestion Relief Program, funded by VDOT. Construction substantially complete 8/22/07. Signal inspection has been completed. Addressing punch list items. VDOT permit revision received for additional drainage inlet at project limit. Contractor authorized to proceed with installation of additional inlet.
Sully Hojatzadeh, Max
Lim, SamStrecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0604/05NA NA NA NA
Project Description Monthly Remarks
01/06 11/06 12/06 08/0708/0710/06304Fund
064246
South Van Dorn/Franconia Interchange
00000
$7,574,399
Design of grade-separated interchange.
Project is funded for design and partial land acquisition only with $8 million in the VDOT Six-Year Improvement Program. Awaiting approved Value Engineering recommendations from VDOT. Revised traffic count completed by VDOT. Preliminary design is in progress.
Lee Salahuddin, KhaliFinnell, Richard
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0909/08 02/09TBD TBD TBD
Project Description Monthly Remarks
10/07TBD TBD TBDTBDTBD
304Fund
Thursday, June 19, 2008 Page 5 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064248
Fairfax County Parkway Widening00000
$3,325,000
Widening of Fairfax County Parkway to six lanes from Rugby Road to Dulles Toll Road for a total of 6.5 miles. Additional lane to be HOV lane.
Funding for preliminary engineering and environmental studies only. Traffic analysis extended south to include section between I-66 and Rugby Road. Air quality analysis is in progress. Draft noise report was received 5/29/08. Phase II archaeological and architectural survey is underway. A meeting with DOT is scheduled for 6/26/08 to discuss preliminary VISSIM results.
Sully Salahuddin, KhaliPreston, ClintonMinnix, Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/08TBDTBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBDHunter Mill304Fund
064251
Guinea Road/Falmead Road00000
$100,000
Extend sidewalk, drop inlet, drainage improvements, and install a crosswalk at Guinea Road and Falmead Road.
Final design is in progress. Construction to be completed by annual contractor.
Braddock Madhusudhan, GPreston, ClintonWolfe, MikeMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0806/05NA NA NA NA
Project Description Monthly Remarks
02/06 10/08 10/08 02/0907/0710/08304Fund
064257
Centreville Road Trail at Dulles Toll Road Phase II
00000
$250,000$0
Provide pedestrian improvements and traffic signal modifications to cross Centreville Rd. @ Dulles Toll Rd. Interchange.
Intermediate design is in progress.
Hunter Mill Madhusudhan, G
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/0907/08NA NA NA NA
Project Description Monthly Remarks
01/09 04/09 05/09 08/0908/0903/09304Fund
064258
Colts Neck Road Trail/Sidewalk00000
$100,000
Construct trail/sidewalk on Colts Neck Road/South Lakes Drive to Hunter Wood Shopping Center (west side).
Final design is in progress. Construction to be completed by annual contractor.
Hunter Mill Madhusudhan, GZore, TasneemWolfe, MikeMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0807/05 06/06 09/06NA NA
Project Description Monthly Remarks
03/06 12/08 12/08 04/0909/0712/08
Mason304Fund
Thursday, June 19, 2008 Page 6 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI001
Arlington Boulevard / Patrick Henry Drive
$150,000
Pedestrian improvements at the intersection of Arlington Boulevard and Patrick Henry Drive.
Pre-final design was submitted to VDOT 10/1/07. Final comments have been received and are being addressed. Environmental documents submitted to VDOT for review on 2/7/08.
Mason Hojatzadeh, Max
Lim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0806/07NA NA NA NA
Project Description Monthly Remarks
09/07 10/08 11/08 02/0907/0809/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI002
Leesburg Pike / Glen Carlyn Road
$150,000
Pedestrian improvements at the intersection of Leesburg Pike and Glen Carlyn Road.
Scope is being re-evaluated due to conflict with church sign located within the right-of-way. Project was put on hold at the request of the supervisors office until issues are resolved. Environmental documents submitted to VDOT for review on 2/7/08.
Mason Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/0806/07NA NA NA NA
Project Description Monthly Remarks
09/07 05/08 05/08 08/0807/0805/0802/08
304Fund
064267
Pedestrian Improvements - VDOT Funded
PI003
Arlington Boulevard / Graham Road
$200,000
Pedestrian improvements at the intersection of Arlington Boulevard and Graham Road.
Environmental documents submitted to VDOT for review on 2/7/08. Preliminary design is complete. Signal design is in progress.
Providence Hojatzadeh, Max
Lim, SamMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0907/08NA TBD TBD TBD
Project Description Monthly Remarks
02/09 10/09 11/09 02/1002/1009/09304Fund
064267
Pedestrian Improvements - VDOT Funded
PI005
Chain Bridge Road / International Drive
Pedestrian improvements at the intersection of Chain Bridge Road and International Drive.
Environmental investigation is required. Project on hold due to potential conflict with Metro Project.
Providence Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 08/07304Fund
Thursday, June 19, 2008 Page 7 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI006
Lee-Jackson Highway / Stringfellow Road
$150,000$0
Pedestrian improvements at the intersection of Lee-Jackson Highway and Stringfellow Road.
Construction is 85% complete.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/07NA NA NA NA
Project Description Monthly Remarks
08/07 03/08 03/08 06/0803/0803/08
Sully304Fund
064267
Pedestrian Improvements - VDOT Funded
PI007
Leesburg Pike / Magarity Road
$150,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Magarity Road.
Pre-final design submitted to VDOT 1/3/08. Partial comments received. Environmental documents submitted to VDOT for review on 2/7/08.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/08 12/08 03/0911/0810/08
Providence304Fund
064267
Pedestrian Improvements - VDOT Funded
PI008
Lee-Jackson Highway / Majestic Lane
$150,000$0
Pedestrian improvements at the intersection of Lee-Jackson Highway and Majestic Lane.
Construction is 90% complete.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/07NA NA NA NA
Project Description Monthly Remarks
08/07 03/08 03/08 06/0803/0803/08
Sully304Fund
064267
Pedestrian Improvements - VDOT Funded
PI010
Loisdale Road / Loisdale Court - Springfield Mall Entrance
Pedestrian improvements at the intersection of Loisdale Road/Loisdale Court and the Springfield Mall Entrance.
Environmental documents submitted to VDOT for review on 2/7/08. Project has been cancelled due to future redevelopment of Springfield Mall.
Lee Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 05/08304Fund
Thursday, June 19, 2008 Page 8 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI011
Leesburg Pike / Patrick Henry Drive
$500,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Patrick Henry Drive.
Environmental documents submitted to VDOT for review on 2/7/08. Preliminary design submitted to VDOT for review 6/10/08.
Mason Hojatzadeh, Max
Lim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0906/08 10/08 05/09NA TBD
Project Description Monthly Remarks
05/09 11/09 11/09 02/1002/1011/09304Fund
064267
Pedestrian Improvements - VDOT Funded
PI012
Lee Highway/Monument Drive
$150,000
Pedestrian improvements at the intersection of Lee Highway and Monument Drive.
Pre-final design was submitted to VDOT 10/1/07. Final comments have been received and are being addressed. Environmental documents submitted to VDOT for review on 2/7/08. .
Providence Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0806/07NA NA NA NA
Project Description Monthly Remarks
09/07 10/08 11/08 02/0907/0809/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI013
Old Keene Mill Road / Sydenstricker Road
$150,000$0
Pedestrian improvements at the intersection of Old Keene Mill Road and Sydenstricker Road.
Construction substantially complete 5/22/08.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/07NA NA NA NA
Project Description Monthly Remarks
08/07 03/08 03/08 05/0803/0803/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI014
Leesburg Pike / Dranesville Road
$150,000$0
Pedestrian improvements at the intersection of Leesburg Pike and Dranesville Road.
Pre-final design submitted to VDOT 1/3/08. Partial comments received. Environmental documents submitted to VDOT for review on 2/7/08.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/08 12/08 03/0911/0810/08304Fund
Thursday, June 19, 2008 Page 9 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI015
Centreville Road / Compton Road
$150,000
Pedestrian improvements at the intersection of Centreville Road and Compton Road.
Pre-final design was submitted to VDOT 10/1/07. Final comments have been received and are being addressed. Environmental documents submitted to VDOT for review on 2/7/08.
Springfield Hojatzadeh, Max
Lim, SamNA, Not Applicabl
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0806/07NA NA NA NA
Project Description Monthly Remarks
09/07 10/08 11/08 02/0907/0809/08
Sully304Fund
064267
Pedestrian Improvements - VDOT Funded
PI016
Centreville Road / Green Trails Boulevard
$150,000$0
Pedestrian improvements at the intersection of Centreville Road and Green Trails Boulevard.
Construction is 80% complete.
Sully Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/07NA NA NA NA
Project Description Monthly Remarks
08/07 03/08 04/08 06/0803/0803/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI018
Braddock Road / Wakefield Chapel Road
$150,000$0
Pedestrian improvements at the intersection of Braddock Road and Wakefield Chapel Road.
Environmental documents submitted to VDOT for review on 2/7/08. Preliminary design submitted to VDOT for review 3/14/08. Partial comments received 5/21/08.
Braddock Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0803/08 05/08 10/08NA NA
Project Description Monthly Remarks
08/08 01/09 02/09 05/0905/0912/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI019
Dolley Madison Boulevard / Great Falls Street - Lewinsville Road
$150,000$0
Pedestrian improvements at the intersection of Dolley Madison Boulevard/Great Falls Street and Lewinsville Road.
Pre-final design submitted to VDOT 1/3/08. Partial comments received. Environmental documents submitted to VDOT for review on 2/7/08.
Dranesville Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/08 12/08 03/0911/0810/08304Fund
Thursday, June 19, 2008 Page 10 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI020
Lewinsville Road / Balls Hill Road
$150,000$0
Pedestrian improvements at the intersection of Lewinsville Road and Balls Hill Road.
Pre-final design submitted to VDOT 1/3/08. Partial comments have been received. Environmental documents submitted to VDOT for review on 2/7/08. Land acquisition complete 4/10/08. Utility relocations are in progress.
Dranesville Hojatzadeh, MaxZore, TasneemLim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07 02/08 04/08NA NA
Project Description Monthly Remarks
04/08 11/08 12/08 03/0911/0810/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI022
Leesburg Pike / Baron Cameron Avenue - Springvale Road
$200,000$0
Pedestrian improvements at the intersection of Leesburg Pike/Baron Cameron Avenue and Springvale Road.
Environmental documents submitted to VDOT for review on 2/7/08. Survey is complete. Preliminary design is in progress. Signal design proposal was requested 6/10/08.
Dranesville Hojatzadeh, Max
Lim, SamMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0912/08NA TBD TBD TBD
Project Description Monthly Remarks
05/09 12/09 01/10 04/1004/1011/09
Hunter Mill304Fund
064267
Pedestrian Improvements - VDOT Funded
PI023
Fairfax County Parkway / Old Keene Mill Road
$150,000
Pedestrian improvements at the intersection of Fairfax County Parkway and Old Keene Mill Road.
Pre-final design was submitted to VDOT 10/1/07. Final comments have been received and are being addressed. Environmental documents submitted to VDOT for review on 2/7/08.
Springfield Hojatzadeh, Max
Lim, SamNA, Not Applicabl
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0806/07NA NA NA NA
Project Description Monthly Remarks
09/07 10/08 11/08 02/0907/0809/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI024
Old Keene Mill Road / Shiplett Boulevard
$150,000$0
Pedestrian improvements at the intersection of Old Keene Mill Road and Shiplett Boulevard.
Construction substantially complete 5/22/08.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/07NA NA NA NA
Project Description Monthly Remarks
08/07 03/08 03/08 05/0803/0803/08304Fund
Thursday, June 19, 2008 Page 11 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064267
Pedestrian Improvements - VDOT Funded
PI025
Braddock Road / Guinea Road
$150,000$0
Pedestrian improvements at the intersection of Braddock Road and Guinea Road.
Environmental documents submitted to VDOT for review on 2/7/08. Survey is complete. Preliminary design is in progress. Signal design proposal was requested 6/10/08.
Braddock Hojatzadeh, Max
Lim, SamTBD, To be Deter
PM PDD:PM LAD:PM CMDE:PM CMDS:
05/0912/08NA TBD TBD TBD
Project Description Monthly Remarks
05/09 12/09 01/10 04/1004/1011/09304Fund
064267
Pedestrian Improvements - VDOT Funded
PI026
Fairfax County Parkway / Hooes Road - Seabrook Lane
$150,000$0
Pedestrian improvements at the intersection of Fairfax County Parkway/Hooes Road and Seabrook Lane.
Due to the impact of project to existing bridge, further study is required. Feasibility study is in progress. Schedule to be developed upon completion of feasibility study. Environmental documents submitted to VDOT for review on 2/7/08.
Springfield Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
064267
Pedestrian Improvements - VDOT Funded
PI027
Little River Turnpike / Backlick Road
$150,000$0
Pedestrian improvements at the intersection of Little River Turnpike and Backlick Road.
Pre-final design submitted to VDOT 1/3/08. Partial comments received. Environmental documents submitted to VDOT for review on 2/7/08.
Mason Hojatzadeh, Max
Lim, Sam
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07NA NA NA NA
Project Description Monthly Remarks
04/08 11/08 12/08 03/0911/0810/08304Fund
064267
Pedestrian Improvements - VDOT Funded
PI028
Arlington Blvd - Olin Drive
$150,000$0
Pedestrian improvements on Arlington Boulevard near Olin Drive.
Preliminary design is in progress. Environmental documents submitted to VDOT for review on 2/7/08. Additional survey has been requested.
Mason Hojatzadeh, Max
Lim, SamMurdoch, Guy
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/0908/08NA NA NA NA
Project Description Monthly Remarks
09/08 05/09 06/09 09/0905/0904/09304Fund
Thursday, June 19, 2008 Page 12 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064270
Beverly Rd/Fleetwood Rd00000
$120,000$0
Provide raised concrete median on northbound and southbound approach of Beverly Road.
Intermediate design was submitted to VDOT for review 3/31/08. Partial comments have been received and are being addressed.
Dranesville Ayers, RobertZore, Tasneem
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0803/08 01/08 03/08NA NA
Project Description Monthly Remarks
02/08 10/08 11/08 03/0903/0909/08304Fund
064271
Annandale Rd/Kerns Rd00000
$225,000$0
Intersection improvements including left and right turn lanes.
Preliminary design submitted to VDOT 10/10/07 for review. Comments from DOT and VDOT have been received. A meeting was held with DOT on 1/10/08 to discuss comments that have the potential to change scope. A meeting with VDOT was held on 1/25/08 to discuss these issues. Due to numerous design exceptions, DOT is reviewing feasibility of project.
Mason Khorashadi, Broo
Gharavi, MoHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/0810/07NA TBD TBD TBD
Project Description Monthly Remarks
04/08TBD TBD TBDTBDTBD 01/08
304Fund
064272
South Van Dorn Street Walkway00000
$325,000$0
Concrete sidewalk along west side of South Van Dorn Street from Greendale Village Drive to Telegraph Road.
Design waiver package and final design plans were submitted to VDOT for review 6/5/08.
Lee El Kaissi, Moham
Gharavi, MoJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0809/07NA NA NA NA
Project Description Monthly Remarks
06/08 11/08 12/08 07/0905/0910/08304Fund
064273
Silverbrook Rd/Hooes Rd Intersection Imp.
00000
$350,000$0
Intersection improvement to configure turn lanes at Silverbrook Road and Hooes Road intersection.
Pre-final design is in progress. Geotechnical report received 5/20/08.
Mount Vernon Madhusudhan, G
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0812/07NA NA NA NA
Project Description Monthly Remarks
10/08 02/09 03/09 07/0907/0901/09304Fund
Thursday, June 19, 2008 Page 13 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
064274
Route 29 Walkway00000
$250,000$0
Provide 10' wide asphalt trail on south side of Route 29 between Shreve Road and Fairview Park Drive.
Intermediate design was submitted to VDOT for review 3/12/08. Partial comments have been received and are being addressed.
Providence Ayers, Robert
Housley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0803/08NA TBD TBD TBD
Project Description Monthly Remarks
08/08 11/08 12/08 09/0909/0910/08304Fund
064275
Braddock Rd/Rte 123 EB RTL00000
$300,000$0
Extension of eastbound Braddock Road right turn lane at Route 123.
Pre-final design submitted to VDOT for review 4/8/08.
Springfield Roberson , JeanPreston, Clinton
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0812/07NA NA NA NA
Project Description Monthly Remarks
05/08 11/08 12/08 04/0904/0910/08304Fund
064276
West Ox Rd/Fairfax County Parkway00000
$500,000$0
Extend right turn lane on southbound Fairfax County Parkway. Add dual left turn lanes on northbound Fairfax County Parkway.
Pre-final design and signal modification plans are in progress. Geotechnical report has been received.
Sully El Kaissi, Moham
Gharavi, MoJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0809/07NA NA NA NA
Project Description Monthly Remarks
04/08 03/09 04/09 01/1005/0902/09
Hunter Mill304Fund
064288
Fairfax County Parkway/Sunrise Valley Drive
00000
Fairfax County Parkway/Sunrise Valley Drive
$925,000$0
Addition of dual left-turn lane on northbound Fairfax County Parkway.
Second pre-final design was submitted to VDOT for review 5/28/08. Utility relocations are in progress. A meeting with Sprint was held on-site 5/14/08 to discuss land right issues.
Hunter Mill Salahuddin, KhaliPreston, ClintonMinnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0809/05 10/07 08/08NA NA
Project Description Monthly Remarks
10/07 11/08 12/08 05/0912/0810/08304Fund
Thursday, June 19, 2008 Page 14 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP012
South Kings Highway/Harrison Lane00000
$3,000,000
Addition of left-turn lane from South Kings Highway to Harrison Lane.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. Final design is in progress. Land acquisition public hearing is scheduled for 9/22/08. A meeting with Supervisor McKay and homeowners was held on-site 4/24/08 to discuss driveway drainage issues. VSMP permit has been received.
Lee Salahuddin, KhaliBarnes, DianneMinnix, ToddJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0803/06 08/06 03/07 07/07 09/08
Project Description Monthly Remarks
03/07 12/08 01/09 01/1012/0811/08304Fund
4YP013
Route 236/Beauregard Street00000
$1,000,000
Add a second left-turn lane from eastbound Route 236 to northbound Beauregard Street.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. Construction is 10% complete.
Mason Ayers, RobertZore, TasneemGharavi, MoHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0707/05 04/06 05/06 11/06NA
Project Description Monthly Remarks
01/07 03/08 03/08 01/0905/0802/08304Fund
4YP014
Braddock Road/Route 23600000
$1,440,000$0
Realign eastbound lanes through the intersection.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. Construction is 50% complete.
Mason Roberson , JeanPreston, ClintonFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0608/05 12/05 02/06 04/06 11/06
Project Description Monthly Remarks
05/06 05/07 06/07 07/0801/0803/07304Fund
4YP020
Hunter Mill Road Walkway00000
$840,000
Walkway along Hunter Mill Road from Chain Bridge Road to Corbalis Park for a total distance of approximately 1900 linear feet.
Project is part of the Four-Year Transportation Program and was approved by the BOS on 3/21/05. VDOT permit application was submitted on 6/11/08.
Providence El Kaissi, MohamKresge, CarolGharavi, MoHousley, Gregg
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0801/06 05/06 03/08NA NA
Project Description Monthly Remarks
09/06 08/08 09/08 01/0908/0807/08304Fund
Thursday, June 19, 2008 Page 15 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB002
Browns Mill Rd Walkway-Victoria Farms to Windstone
$460,000$0
Pedestrian improvements along the south side of Browns Mill Road from Victoria Farms Lane to Windstone Drive. Project is approximately 1,600 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being processed for approval. Schedule to be developed upon authorization of task order.
Dranesville Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB003
Lewinsville Rd Median
$150,000$0
Installation of a pedestrian safety median on Lewinsville Road at Spring Hill Elementary School. Project is approximately 975 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey has been received. Intermediate design is in progress.
Dranesville Shively, Erik
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0911/08NA NA NA NA
Project Description Monthly Remarks
12/09 04/10 05/10 10/1010/1003/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB004
Spring Hill Rd - Old Dominion to Pettit Ct
$480,000$0
Pedestrian improvements along the east side of Spring Hill Road from Old Dominion Drive to Pettit Court. Project is approximately 1,550 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Dranesville Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 03/09 10/09NA
Project Description Monthly Remarks
10/09 05/10 06/10 12/1012/1004/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB005
Turner Ave Walkway - Williamsburg Pond to Haycock
$50,000$0
Pedestrian improvements along the east side of Turner Avenue from Williamsburg Pond Court to Haycock Road. Project is approximately 200 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being revised. Survey is in progress. Schedule to be developed upon authorization of task order and completion of survey.
Dranesville Shively, Erik
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
Thursday, June 19, 2008 Page 16 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB006
Westmoreland St Walkway - Chain Bridge to Dillion
$230,000$0
Pedestrian improvements along the east side of Westmoreland Street from Chain Bridge Road to Dillon Avenue. Project is approximately 700 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. This project was put on hold pending completion of VDOT's project in this area. Project scope to be re-assessed upon VDOT's project completion.
Dranesville Shively, Erik
McMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 06/08304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB007
Westmoreland St Walkway - Haycock to Temple
$230,000$0
Pedestrian improvements along the west side of Westmoreland Street from Haycock Road to Temple Rodef Shalom. Project is approximately 845 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being revised. Survey is in progress. Schedule to be developed upon authorization of task order and completion of survey.
Dranesville Shively, Erik
McMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB008
Westmoreland St Walkway - Temple to Chesterbrook
$150,000$0
Pedestrian improvements along the west side of Westmoreland Street from Temple Rodef Shalom to Chesterbrook Presbyterian Church. Project is approximately 550 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being revised. Survey is in progress. Schedule to be developed upon authorization of task order and completion of survey.
Dranesville Shively, Erik
McMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB009
Beulah Rd Walkway - Abbotsford to Clarks Crossing
$1,000,000$0
Pedestrian improvements to alternate sides of Beulah Road from Abbotsford Drive to Coral Crest Lane and along Clarks Crossing Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey is in progress. Design proposal is being processed for approval. Schedule to be developed upon approval of design contract proposal.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
Thursday, June 19, 2008 Page 17 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB010
Colts Neck Rd Walkway - Lakes to Winterhur
$130,000$0
Pedestrian improvements along the east side of Colts Neck Road from South Lakes Drive to Winterthur Lane. Project is approx. 850 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey is in progress.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
09/0909/08 01/09 08/09NA TBD
Project Description Monthly Remarks
09/09 11/09 12/09 03/1003/1010/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB011
Fox Mill Rd Walkway - Pkwy to Mill Heights
$100,000$0
Pedestrian improvements along the south side of Fox Mill Road from Fairfax County Parkway to Mill Heights Drive. Project is approximately 600 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress. Utility designations have been completed.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 09/09NA TBD
Project Description Monthly Remarks
10/09 12/09 01/10 04/1004/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB012
Glade Dr Walkway - Colts Neck to Shire Ct
$110,000$0
Pedestrian improvements along the north side of Glade Drive from Colts Neck Road to Shire Court. Project is approx. 800 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey is in progress.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
07/0909/08 01/09 08/09NA TBD
Project Description Monthly Remarks
07/09 03/10 04/10 08/1008/1002/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB013
McLearen Rd Walkway - Quincy Adams to Reston Pkwy
$150,000$0
Pedestrian improvements along the north side of McLearen Road from Quincy Adams Drive to Reston Parkway. Project is approx. 600 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress. Utility designations have been completed.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
02/0908/08 12/08 07/09NA TBD
Project Description Monthly Remarks
02/09 09/09 09/09 12/0912/0909/09304Fund
Thursday, June 19, 2008 Page 18 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB015
Reston Ave Walkway - Southington to Shaker Dr
$110,000$0
Pedestrian improvements along the west side of Reston Avenue from Southington Lane to Shaker Drive. Project is approximately 700 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
06/0909/08 01/09 08/09NA TBD
Project Description Monthly Remarks
06/09 11/09 12/09 04/1004/1010/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB016
Soapstone Dr Walkway - Sweetbay to Glade
$20,000$0
Pedestrian improvements along the west side of Soapstone Drive from Sweetbay Lane to Glade Drive. Project is approximately 100 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Hunter Mill Chase, StevenPM PDD:PM LAD:PM CMDE:PM CMDS:
03/0908/08 12/08 01/09 08/09NA
Project Description Monthly Remarks
03/09 11/09 12/09 04/1004/1010/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB017
Sunset Hills Rd Walkway - W&OD to Michael Faraday
$240,000$0
Pedestrian improvements along the north side of Sunset Hills Road from W&OD Trail to Michael Faraday Court. Project is approx. 1,500 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey is in progress.
Hunter Mill Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 03/09 10/09NA
Project Description Monthly Remarks
10/09 05/10 06/10 12/1012/1004/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB018
Silverbrook Rd Walkway - Southrun to Monacan
$60,000$0
Pedestrian improvements along the north side of Silverbrook Road from Southrun Road to Monacan Road. Project is approximately 820 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Mount Vernon Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 09/09NA TBD
Project Description Monthly Remarks
10/09 12/09 01/10 04/1004/1011/09304Fund
Thursday, June 19, 2008 Page 19 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB019
Lee Jackson Hwy Walkway - Fair Ridge to Fire Station
$100,000$0
Pedestrian improvements along the south side of Lee Jackson Hwy from Fair Ridge Dr East to the police/fire station. Project is approx 675 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design submitted to VDOT for review 6/16/08.
Springfield Chase, StevenPreston, Clinton
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0906/08 01/09 08/09NA TBD
Project Description Monthly Remarks
07/09 11/09 12/09 06/1006/1010/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB020
Silverbrook Rd Walkway - Silverthorn to Bayberry Ridge
$220,000$0
Pedestrian improvements along the north side of Silverbrook Road from Silverthorn Road to Bayberry Ridge Road. Project is approximately 650 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Springfield Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 09/09NA TBD
Project Description Monthly Remarks
10/09 12/09 01/10 04/1004/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB021
Sydenstricker Rd Walkway - Briarcliff to Galgate
$180,000$0
Pedestrian improvements along the south side of Sydenstricker Road from Briarcliff Drive to Galgate Drive. Project is approximately 1,350 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Springfield Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 09/09NA TBD
Project Description Monthly Remarks
10/09 12/09 01/10 04/1004/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB022
Ashburton Ave Walkway - at Cedar Run
$476,000$0
Pedestrian improvements along the west side of Ashburton Avenue at Cedar Run. Project is approximately 250 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Sully Gilbert, JenniferPM PDD:PM LAD:PM CMDE:PM CMDS:
10/0910/08 02/09 09/09NA TBD
Project Description Monthly Remarks
10/09 12/09 01/10 04/1004/1011/09304Fund
Thursday, June 19, 2008 Page 20 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB023
Telegraph Rd Walkway - South Kings Hy to Lee District Park
$800,000$0
Pedestrian improvements along alternate sides of Telegraph Road from South Kings Highway to Lee District Park. Project is approximately 3,500 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been authorized and notice-to-proceed has been issued. Survey is in progress. Schedule to be developed upon completion of survey.
Lee Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB024
Backlick Rd Walkway - Wilburdale Comm to Braddock
$150,000$0
Pedestrian improvements along the west side of Backlick Rd from Wilburdale community to Braddock Rd. Project is approx. 1,100 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Mason Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/08 01/09 02/09 09/09NA
Project Description Monthly Remarks
08/09 12/09 01/10 06/1006/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB025
Backlick Rd Walkway - Opposite Wilburdale Comm
$150,000$0
Pedestrian improvements along the east side of Backlick Rd opposite the Wilburdale community. Project is approx. 360 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Mason Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/0909/08 01/09 02/09 09/09NA
Project Description Monthly Remarks
08/09 12/09 01/10 05/1005/1011/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB026
Columbia Pike Walkway - Downing St to Lincolnia
$430,000$0
Pedestrian improvements along the south side of Columbia Pike from Downing Street to Lincolnia Road. Project is approximately 900 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Survey is complete. Intermediate design is in progress.
Mason Shively, Erik
Harper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
01/1011/08 06/09 07/09 02/10NA
Project Description Monthly Remarks
01/10 05/10 06/10 12/1012/1004/10304Fund
Thursday, June 19, 2008 Page 21 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB027
Columbia Pike Walkway - Maple Ct to Blair
$200,000$0
Pedestrian improvements along the north side of Columbia Pike from Maple Court to Blair Road. Project is approximately 1,000 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Mason Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0907/08 11/08 12/08 07/09NA
Project Description Monthly Remarks
06/09 02/10 03/10 09/1009/1001/10304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB028
Columbia Pike Walkway - Gallows to Annandale Church
$190,000$0
Pedestrian improvements along the south side of Columbia Pike from Gallows Road at the Annandale Methodist Church. Project is approximately 450 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being revised. Schedule to be developed upon authorization of task order. A field meeting with VDOT and DOT was held on 5/6/08 to discuss design issues. Input from this meeting is pending from VDOT.
Mason Shively, ErikPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB029
Leesburg Pike Walkway - Falls Church to Alexandria
$4,000,000$0
Route 7 Pedestrian Initiative -construction of missing segments of pedestrian walkway along Leesburg Pike from Falls Church to Alexandria. Project is approximately 13,200 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design proposal is being revised. Survey is in progress. Schedule to be developed upon authorization of task order and completion of survey.
Mason Shively, ErikPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB030
Lincolnia Rd Walkway - Deming Ave to N Chambliss
$50,000$0
Pedestrian improvements along the north side of Lincolnia Road from Deming Avenue to North Chambliss Street. Project is approx. 240 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Mason Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0910/08 02/09 03/09 10/09NA
Project Description Monthly Remarks
09/09 01/10 02/10 06/1006/1012/09304Fund
Thursday, June 19, 2008 Page 22 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB031
Montrose St Walkway - Braddock to Grafton
$90,000$0
Pedestrian improvements along the west side of Montrose Street from Braddock Road to Grafton Street. Project is approximately 520 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress. Utility designations have been received.
Mason Shively, Erik
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
09/0910/08 02/09 03/09 10/09NA
Project Description Monthly Remarks
09/09 01/10 02/10 07/1007/1012/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB032
Tyler St Walkway - Columbia Pike to Lake St
$140,000$0
Pedestrian improvements along the east side of Tyler Street from Columbia Pike to Lake Street. Project is approximately 650 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been approved and notice to proceed was issued 3/27/08. Survey is in progress. Schedule to be developed upon completion of survey.
Mason Shively, Erik
Jones, Don
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB033
Annandale Rd Walkway - Brice to Falls Church City Line
$80,000$0
Pedestrian improvements along the east side of Annandale Road from Brice Street to Falls Church City line.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been approved and notice to proceed was issued 3/27/08. Survey is in progress. Schedule to be developed upon completion of survey.
Providence Shively, Erik
Jensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB034
Courthouse Rd Walkway - Chain Br to Plantation Ln
$140,000
Pedestrian improvements along the north side of Courthouse Rd from Chain Bridge Rd to Oakton Plantation Lane. Project is approx. 410 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress.
Providence Shively, Erik
Jozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/0907/08 11/08 06/09NA TBD
Project Description Monthly Remarks
04/09 09/09 10/09 03/1003/1008/09304Fund
Thursday, June 19, 2008 Page 23 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB035
Edgelea Rd Walkway - Oleander to Courthouse
$120,000
Pedestrian improvements along the east side of Edgelea Road from Oleander Avenue to Courthouse Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design was submitted to VDOT for review 6/10/08.
Providence Shively, ErikBuckley, Beth
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
04/0906/08 11/08 06/09NA TBD
Project Description Monthly Remarks
04/09 09/09 10/09 03/1003/1008/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB036
Jefferson Ave Walkway - Summerfield to Marshall St
$250,000
Pedestrian improvements along the south side of Jefferson Av from Summerfield Rd to Marshall St. Project is approx 1,300 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design has been distributed for in-house review on 5/12/08. Comments have been received and are being evaluated.
Providence Shively, Erik
McEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
07/0907/08NA TBD TBD TBD
Project Description Monthly Remarks
07/09 10/09 11/09 05/1005/1009/09304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB037
Lee Highway Walkway - at Blake Ln
$100,000$0
Construction of missing segment of pedestrian walkway along Lee Highway at Blake Lane.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been approved and notice to proceed was issued 3/27/08. Survey is in progress. Schedule to be developed upon completion of survey.
Providence Shively, Erik
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB038
Oak St Walkway - Sandburg to W Morgan Ln
$120,000$0
Pedestrian improvements along the south side of Oak Street from Sandburg Street to west of Morgan Lane.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Notice to proceed with design issued 6/2/2008. Intermediate design is in progress.
Providence Shively, Erik
Strecker, Mathias
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0911/08 04/09 12/09NA TBD
Project Description Monthly Remarks
12/09 03/10 04/10 09/1009/1002/10304Fund
Thursday, June 19, 2008 Page 24 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP201
Pedestrian Improvements - Bond Funded
PB039
Sutton Rd Walkway - at Marywood Rd
$50,000$0
Construction of missing segment of pedestrian walkway along Sutton Road at Marywood Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been approved and notice to proceed was issued 6/2/2008. Survey is in progress. Schedule to be developed upon completion survey.
Providence Shively, Erik
Tomlinson, Russ
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB040
Wolftrap Rd Walkway - Briarcliff Ct to G W Rd
$140,000$0
Pedestrian improvements along Wolftrap Road from Briarcliff Court to George Washington Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been approved and notice to proceed was issued 6/2/2008. Survey is in progress. Schedule to be developed upon completion survey.
Providence Shively, ErikPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP201
Pedestrian Improvements - Bond Funded
PB041
Franconia Rd Walkway - N side Governor's Hill Dr to Telegraph
Pedestrian improvements along the north side of Franconia Road from Governor's Hill Drive to Telegraph Road. Project is approximately 350 LF.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design task order has been authorized and notice-to-proceed has been issued. Survey is in progress. Schedule to be developed upon completion of survey.
Lee Shively, Erik
Jensen, Chris
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP203
Spot Improvements - Braddock Road/Backlick Road
$500,000$0
Install an additional left-turn lane on westbound Braddock Road to Southbound Backlick Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design is in progress. Received conceptual plans on 4/17/08. A meeting was held on 5/9/08 to discuss design alternatives. DOT coordinating with DPZ regarding land right issues.
Mason Madhusudhan, GPM PDD:PM LAD:PM CMDE:PM CMDS:
12/0908/08 03/09 05/09 06/09 01/10
Project Description Monthly Remarks
12/09 04/10 05/10 10/1010/1003/10304Fund
Thursday, June 19, 2008 Page 25 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP204
Spot Improvements - Shirley Gate Rd/Route 29
$1,000,000$0
Add additional left turn lane to northbound side.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design was submitted to VDOT for review 6/4/08. Signal design is in progress.
Braddock Khorashadi, BrooBarnes, Dianne
PM PDD:PM LAD:PM CMDE:PM CMDS:
02/1006/08 11/08 01/09 03/09 10/09
Project Description Monthly Remarks
02/10 05/10 06/10 01/1101/1104/10304Fund
4YP205
Spot Improvements - Zion Drive
$1,000,000$0
Reconstruct horizontal curve on Zion Drive east of Windsor Hill Drive.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design is in progress. Utility designations are complete.
Braddock Chase, StevenPM PDD:PM LAD:PM CMDE:PM CMDS:
11/0906/08 10/08 02/09 04/09 11/09
Project Description Monthly Remarks
11/09 03/10 04/10 12/1112/1101/10304Fund
4YP207
Spot Improvements - Braddock Rd/Randolph Dr
$500,000$0
Extension of left turn lane on eastbound Braddock Road from the entrance into Thomas Jefferson High School (TJHSS&T) to Randolph Drive.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design submitted to VDOT for review 5/2/08.
Mason El Kaissi, MohamPM PDD:PM LAD:PM CMDE:PM CMDS:
01/0905/08NA TBD TBD TBD
Project Description Monthly Remarks
01/09 04/09 05/09 08/0908/0903/09304Fund
4YP210
Poplar Tree Road Improvements
$5,500,000$0
Widening Poplar Tree Road to four lane divided section from Sully Station Drive to Braddock Ridge Drive.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design is in progress. Geotechnical report has been received. MACTEC to complete pavement design. Value Engineering study is scheduled for June 17-19, 2008. Signal warrant study to be completed by VDOT by mid-July.
Sully Khorashadi, BrooFinnell, RichardMinnix, W. ToddMcEntire, Vickie
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0910/07 08/08 10/08 11/08 06/09
Project Description Monthly Remarks
06/09 09/09 10/09 10/1010/1008/09304Fund
Thursday, June 19, 2008 Page 26 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
4YP212
Route 29 Widening
$4,000,000$0
Phase III: Widen northbound Route 29 to 3 lanes on from Legato Road to Shirley Gate Road.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. VDOT widened westbound lane between Dixie Hill Road and Holly Avenue. Design proposal was received 6/11/08 and is under review.
Springfield Madhusudhan, G
Minnix, W. Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
4YP213
Lorton Road
$40,000,000$20,000,000
Widen Lorton Rd. to 4 lanes from Rte. 123/Furnace Rd. to Silverbrook Rd. and from Rte. 123/Lorton Rd. to Furnace Rd.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design is in progress. Utility coordination in progress. On 3/26/08, requested VDOT for concurrence of LID practices in right-of-way. Coordinating lane configuration, turn lane lengths and bike lane typical section with DOT.
Mount Vernon Roberson , JeanPM PDD:PM LAD:PM CMDE:PM CMDS:
01/1109/08 08/09 01/10 02/10 09/10
Project Description Monthly Remarks
01/11 04/11 05/11 12/1212/1203/11304Fund
4YP214
Cinder Bed Road Improvements
$5,000,000$0
Improvements to the intersection of Cinder Bed Road and Newington Road. Relocate entrance to County vehicle maintenance facility.
Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Design contract to be presented to Board of Supervisors 6/30/2008. Schedule to be developed once design proposal is authorized.
Mount Vernon Chase, StevenPM PDD:PM LAD:PM CMDE:PM CMDS:
TBDTBD TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD304Fund
K00447
Richmond Hwy Public Transport Initiative Phase 4A
RS102
Intersection Design - Belford Drive Old Mill Road, and Mohawk Lane
$357,000
Engineering and construction of intersection improvements at express bus service stops for Belford Drive, Old Mill Road, and Mohawk Lane.
Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases. Land acquisition is required. Design waiver package submitted to VDOT for review on 6/11/08.
Mount Vernon Madhusudhan, GPreston, ClintonMinnix, W. ToddJozsa, Steve
PM PDD:PM LAD:PM CMDE:PM CMDS:
TBDNA TBD TBD TBD TBD
Project Description Monthly Remarks
TBD TBD TBD TBDTBDTBD 07/06Lee307Fund
Thursday, June 19, 2008 Page 27 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
W00900
Sully District WalkwaysW903
Rt 29/I66 Underpass Trail
$726,000
1,800 linear feet of 8' asphalt trail, including crossing under I-66 overpass.
Project is part of the Four-Year Transportation Program endorsed by the Board 2/9/04. Construction substantially complete 11/5/07. Awaiting final inspection.
Sully Foxx, Keith
Minnix, W. ToddHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
11/0505/05NA NA NA NA
Project Description Monthly Remarks
11/05 07/06 09/06 11/0707/0706/06307Fund
009217
Stonecroft Boulevard Widening00000
$500,000
Widen Stonecroft Boulevard to a six-lane section from Conference Center Drive to Westfields Boulevard.
Fairfax County responsible for 800 linear feet of improvements in front of Sully District Governmental Center with the remaining portions to be completed by developers. Construction to be managed by developers. Developer is in the process of soliciting bids from prospective contractors. Marriott dedication plat has been approved by LDS. Utility relocations are in progress. Construction agreement with WBOA is being drafted.
Sully Salahuddin, KhaliKresge, Carol
PM PDD:PM LAD:PM CMDE:PM CMDS:
08/05 04/07 10/07 01/08TBDNA
Project Description Monthly Remarks
03/06NA NA NANANA
312Fund
008909
Annandale Streetscape Columbia Pike - Annandale Fire Station
00000
$1,600,000$369,000
Streetscape improvements on north side of Columbia Pike from Backlick Road to Annandale Fire Station.
Enhancement Grant funding will be utilized to supplement project funds. Plans being updated. LAD is in the process of acquiring additional land rights. Proposal for due diligence and NEPA process was received 6/11/08 and is under review. Schedule to be developed upon receipt of funding agreement from VDOT.
Mason Ayers, RobertBuckley, BethLim, SamMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
06/0702/98 01/99 10/99 12/00 12/02
Project Description Monthly Remarks
09/06TBD TBD TBDTBDTBD
315Fund
008912
McLean CRP00001
McLean Streetscape Demonstration Project
$1,700,000
Streetscape improvements to Chain Bridge Road from Westmoreland Street to Cedar Avenue.
This project is funded with VDOT Transportation Enhancement Grants. Construction is 30% complete.
Dranesville Roberson , JeanBarnes, DianneFarsad, NahidHarper, Greg
PM PDD:PM LAD:PM CMDE:PM CMDS:
12/0501/04 06/04 08/04 03/06NA
Project Description Monthly Remarks
12/05 11/07 02/08 07/0807/0810/07315Fund
Thursday, June 19, 2008 Page 28 of 29developed by, Robert Hockersmith
Project #
Project NameSubProject #
Sub Project Name
TPE ($)
FUT ($)On Hold
Design Dates
Estimated Completion
District CAP Assignments
Project ManagersLand Acquisition Dates
Construction Award
IntermediatePreliminary Utility Plats
Project Plats
Bid OpenApproved Completion
Estimated Completion
Bid Advertisement
CurrentFinal
Approved Completion
Construction Dates
Summary Status ReportTransportation Design Branch
May 2008
008912
McLean CRP00002
McLean Utilities
$1,800,000
Underground utilities along Chain Bridge Road from Corner Lane to Laughlin Avenue.
Evaluating project budget. Anticipate additional funding required due to increased material and utilities costs. Final design is in progress. A meeting with McLean Revitalization Group, Supervisor's Office, and the Developer was held on 6/10/08 to discuss potential revision to duct bank layout. Developer will present their proposed revisions to Fairfax County for concurrence in the near future.
Dranesville Khorashadi, BrooFinnell, RichardMinnix, Todd
PM PDD:PM LAD:PM CMDE:PM CMDS:
03/04 12/05 09/06TBD TBD TBD
Project Description Monthly Remarks
06/06TBD TBD TBDTBDTBD
315Fund
013918
Jefferson Manor IIB00000
$2,000,000
Improvements to Fort Drive for a total of 1,550 linear feet.
Construction is 85% complete.
Lee Ayers, RobertColeman, MichaelMinnix, W. ToddMcMillen, Barry
PM PDD:PM LAD:PM CMDE:PM CMDS:
10/0611/94 12/04 08/05 08/05 02/07
Project Description Monthly Remarks
03/06 08/07 08/07 08/0801/0807/07340Fund
Thursday, June 19, 2008 Page 29 of 29developed by, Robert Hockersmith