Summary
• Tenaris & TenarisDalmine
• Production
• Energy Management in TenarisDalmine
Corso formazione per EM
TenarisDalmine Presentation 3 April 29, 2015
Agostino Rocca
Corso formazione per EM
TenarisDalmine Presentation 4 April 29, 2015
Techint Group
Corso formazione per EM
TenarisDalmine Presentation 5 April 29, 2015
Tenaris Global industrial System (Feb. 2014)
Corso formazione per EM
TenarisDalmine Presentation 6 April 29, 2015
• Drilling, completion and production of oil and gas
• Transportation of oil and gas
• Process and power plants
• Specialized industrial and automotive applications
Market Segments
Premium Connections
Offshore Line Pipe
Onshore Line Pipe
Hidrocarbon Processing
Power Generation
Industrial & Automotive
OCTG
Leading global manufacturer and supplier of tubular products and services used in:
Corso formazione per EM
TenarisDalmine Presentation 7 April 29, 2015
TenarisDalmine (August 31, 2013)
Corso formazione per EM
TenarisDalmine Presentation 8 April 29, 2015
Summary
• Tenaris & TenarisDalmine
• Production
• Energy Management in TenarisDalmine
Corso formazione per EM
TenarisDalmine Presentation 9 April 29, 2015
Tenaris production cycle
Corso formazione per EM
TenarisDalmine Presentation 10 April 29, 2015
TenarisDalmine - production (seamless and welded pipes)
29/04/2015
Corso formazione per EM
TenarisDalmine Presentation 11 April 29, 2015
Products/clients differentiation (data refers to 31/12/2013 on turnover)
Corso formazione per EM
TenarisDalmine Presentation 12 April 29, 2015
Summary
• Tenaris & TenarisDalmine
• Production
• Energy Management in TenarisDalmine
Corso formazione per EM
TenarisDalmine Presentation 13 April 29, 2015
Energy Efficiency 2006 a strategic choice! Why?
Energy is a third component of TenarisDalmine product cost, after Raw material and Labour. Reduce energy costs was essential to ensure the competitiveness and business sustainability at TenarisDalmine.
Corso formazione per EM
TenarisDalmine Presentation 14 April 29, 2015
Energy Efficiency 2006 a strategic choice! How?
PRODUCTION
OPERATION MSTE
PRODUCTION
OPERATION
ENMA
MSTE
Before After
Focus on energy aspects
yousaveGruppo innowatio
• Metering
• Energy Assessment
• Priority list of Energy projects
• Investments
• Training and communications
• Continuous Improving Groups
• Operative Practice and Procedure
New organization New activities
Cultural change!
Corso formazione per EM
TenarisDalmine Presentation 15 April 29, 2015
Energy Efficiency
• 2006: An Energy Saving Plan was launched.
Objectives 7% and 6% in specific consumption reduction in natural gas and electricity.
Planned activities were:
−Metering, Controlling,
−Training & Communication,
−Standardization,
−Investment plan and Waste reduction plan.
Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 16 April 29, 2015
•2007: A 120 MWe high efficiency Combined Cycle Power Plant started the
operation to self-production of electricity, steam and hot water both inside and outside the plant (district heating).
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 17 April 29, 2015
•2008: The first high efficiency combustion system has been installed in a
reheating furnace. (45% methane saving)
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 18 April 29, 2015
•2009: A global Energy Efficiency Plan was launched in Tenaris, also creating an R&D
department for Energy Efficiency.
The crisis “Help” ENMA to implement a new program oriented to reduce Energy losses, thanks to:
−New Courses
−internal inspection program
−A first standardization of operating procedure for reduce energy consumption, mainly during a non production period.
−A first step of Compressed air reduction plan has been conclused
−Tenaris Dalmine receives external recognitions:
-10.000 “Titoli di Efficienza Energetica TEE” (1 TEE= 1 ton of oil saved) have been assigned by the Italian authorities for the main high technology investments.
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 19 April 29, 2015
•2010: Joint activity between Dalmine and Lloyd’s for
obtaining:
• EN 16001 “Energy Management System” certification for Dalmine
• Accreditation as EN 16001 certifier for Lloyd’s Register
- It was reinforced activities of audit, inspection, and opportunity identification.
- In three areas was installed new Lighting system
- Nitrogen/air conversion program has been completed
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 20 April 29, 2015
•2011: New regenerative burners has been installed in a major Rotative fournace.
Decrease of Natural Gas specific
consumption (20% methane saving)
•Decrease of consumption during non operative period
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 21 April 29, 2015
•2012: April 2012 Tenaris Dalmine & CTE got the ISO 50001 certification.
As conseguence of EnPI analisys, a new program of pump systems efficiency improuvement has started.
At Tenaris level was written “BAT” - Best Available Tecnologies – in order to define “Optimal way» for every specific application
Continuous Improvement Groups (GMC) methodology was structurally applied to energy management.
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 22 April 29, 2015
•2013: A big project of Heat recovery, based on 2 Steps, was launched.
- Installation a new HRSG in major hot rolling mill.
- Heat recovery in EAF (Electrical Arc Furnace).
Continuous penetration of energy policy in every business functions:
-Design of new lines according to Best Available Technologies
- Inclusion of energy efficiency as a criterion of purchasing components (Pumps, electric motors)
- Installing VSD to better regulate the water flows.
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 23 April 29, 2015
•2014: May 2014 Dalmine Obtained the ISO 50001 certification for all the Italian
sites.
•Closed 12 Continuous Improvement Groups in energy consumption reduction
Dalmine
Sabbio
Piombino
Costa Volpino
Arcore
SGE
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
Corso formazione per EM
TenarisDalmine Presentation 24 April 29, 2015
•And Now??
•Looking for some big investment (difficult in terms of return of investment)
•HRSG in a major hot rolling mill will start up at the and of 2014
•Heat recovery project in Steel Shop (EFER) is on going
•Optimization of energy use thanks to implementation of strong EnPI, audit, inspection, new Continuous improvement Groups
Dalmine
Sabbio
Piombino
Costa Volpino
Arcore
SGE
Energy Efficiency Tenaris Dalmine steps for energy efficiency.
•2014
Corso formazione per EM
TenarisDalmine Presentation 34 April 29, 2015
Thank you!!!
Leonardo Olivari Energy Management TENARIS DALMINE Piazza Caduti 6 luglio 1944, 1 24044 – Dalmine (BG) 035 / 5602491 329 65 48 540 * [email protected]