Plant crop :
2011-12
S.no Particulars Unit Unit cost
1 Land preparation 1 Ha
Harrowing Hr 2 900 1,800
Plough Hr 4 600 2,400
Ridging Hr 1 525 525
Total 4,725
2 Seed cane & Planting
Seed cane Laksha 4 5,000 20,000
Seed cane harvest&Loading Man days 6 150 900
Transport Trip 1,500
Seed treatment & Handling Man days 4 120 480
Lime application 1 mt/Ha Man days 4 150 600
Planting Ha 1 3,500 3,500
Total 26,980
3 Gap filling Man days 10 120 1,200
4 Weeding
1 st weeding at 45 days of planting Ha 1 2,750 2,750
2 st weeding at 75 days of planting Ha 1 2,750 2,750
3 st weeding at 150 days of planting Ha 1 2,750 2,750
Herbicide spray Man days 3 150 450
TOTAL 8,250
5 Fertiliser applicationBasal Bags 9 0 0
2 nd dose Fertiliser Man days 3 120 360
Total 360
6 Intercultivation
Off-barring ( 3 pass ) Carabov 2 1,500 3,000
Earthing up ( 2 pass ) Carabov 2 1,000 2,000
Total 5,000
7 Drainage Man days 5 150 750
8 Labour for pest & disease management Man days 2 150 300
9 Fertiliser & Chemicals
Kocide for seed treatment Gram 400 300 300
Lime Bags 20 150 3,000
14:14:14 Bags 9 1,030 9,270
Urea Bags 4 1,030 4,120
Potash Bags 2 1,420 2,840
Requiredqty
Amount( Peso)
-
8/6/2019 Copy of Package of Practice(1)
2/14
2,4-D Lit 2 250 500
Diuron Kg 1.5 570 855
Rodenticide 10 g 10 18 180
Total 21,065
10 Irrigation(3 Irrigation)
Diesel Lit/ha 24 47 1,128
Engine Oil 360
Labour Man days 6 150 900
Total 2,388
11 Fire breaker 200
Grand total 71,218
-
8/6/2019 Copy of Package of Practice(1)
3/14
Remarks
URC tractor
URC tractor
URC tractor
40000 cane points/Ha
30 man days/Ha @ 150 peso,
Depends on distance
(Including basal fert,soil covering&seed spreading
Contract basis / Ha
Contract basis / Ha
Contract basis / Ha
Contract basis / Ha
Depends on rain
Peso 750/Kg
Fertiliser dosage based on Casibang corporatefarm
-
8/6/2019 Copy of Package of Practice(1)
4/14
8 Hr/Irrigation/HaPeso 15/Hr
2 mandays/Irrigation/Ha
-
8/6/2019 Copy of Package of Practice(1)
5/14
Ratoon crop :
2011-12
RemarksS.no Particulars Unit Unit cost
1 Ratoon management practices
Stubble shaving Man days 10 120 1,200
Off barring Carabov 1 1,500 1,500Gap filling Man days 10 150 1,500
Total 4,200
2 Weeding
1 st weeding at 45 days of planting Ha 1 2,750 2,750
2 st weeding at 75 days of planting Ha 1 2,750 2,750
3 st weeding at 150 days of planting Ha 1 2,750 2,750
Herbicide spray Man days 3 150 450
TOTAL 8,250
3 Fertiliser application
1 st top dressing Man days 3 120 360 Contract basis
2 st top dressing Man days 3 120 360 Contract basis
Total 720
4 Intercultivation
Off-barring ( 3 pass ) Carabov 2 1,500 3,000
Earthing up ( 2 pass ) Carabov 2 1,000 2,000
Total 5,000
5 Drainage Man days 5 150 750
6 Labour for pest & disease management Man days 2 150 300
7 Fertiliser & Chemicals
14:14:14 Bags 9 1,030 9,270
Urea Bags 4 1,030 4,120
Potash Bags 2 1,420 2,840
2,4-D Lit 2 250 500
Diuron Kg 1.5 570 855
Rodenticide 10 g 10 18 180
Total 17,7658 Irrigation(3 Irrigation)
Diesel Lit/ha 24 47 1,128 8 Hr/Irrigation/Ha
Requiredqty
Amount( Peso)
As soil is wet in rainyseason,carabov only can be used
-
8/6/2019 Copy of Package of Practice(1)
6/14
Engine Oil 360 Peso 15/Hr
Labour Man days 6 150 900
Total 2,388
9 Fire breaker 200
Grand total 39,573
-
8/6/2019 Copy of Package of Practice(1)
7/14
Cost of Various fertiliser & Input
S.no Particulars Unit Cost(Peso) Remarks
1 Urea Bag 1030 50 Kg bags
2 MAP Bag 950 16;20;03 Amm. Sulfide Bag 550 21;0;0
4 Amm. Chloride Bag 730
5 DAP Bag 2000 18;46;0
6 14:14:14 Bag 1030
7 MOP Bag 1420 0;0;60
8 Lime Bag 150
9 Atrazine Kg 350 Weedicide
10 2,4-D Lit 250 Weedicide
11 Diuron Kg 500 Weedicide
12 Gramaxone Lit 450 Weedicide
13 Carmex Lit 520 Weedicide
14 Clearout Lit 350 Round up15 Benomil 100 g 140 Fungicide
16 Kocide Kg 750 Fungicide
17 Furadon Kg 80 Pesticide granule
18 Malathion Lit 230 Pesticide
19 Rodenticide 10 g 18 Zinc phosphide
20 Cane points Laksha 5000 10,000 = laksha
21 Labour Manday 120 For weeding & planting
22 Labour Ton 220 For Harvesting & loading
23 Diesel Lit 48
24 Petrol Lit 62
25 Electricity KW 7
26 Security Guard Manday 23027 Harrow Hr 900 1 Ha/Hr(URC Tractro)
28 Plough Hr 600 2 Hr/Hr(URC TRACTOR)
29 Ridging Hr 525 1 Ha/Hr(URC Tractro)
30 Harrow Ha 3000 Private tractor
31 Plough Ha 2700 Private tractor
32 Ridging Ha 1500 Private tractor
33 Transport cane 10 Km 170 Per ton
34 Transport cane 50 Km 300 Per ton
35 Carabov Pass/Ha 500
36 Tractor 100 HP 2.4 million Landinin
37 90 HP 2.5 million Kubata
38 Disc plough 4 disc 189,00039 Harrow 24 disc 250,000
40 Rotavator 517,000
-
8/6/2019 Copy of Package of Practice(1)
8/14
PACKAGE OF PRACTICES
S.no Particulars Operation
1 Planting season
2 Variety Most of the variety is 8013,Emalda & Marcos
3 Land preparation Harrow - 2 times
Plough - 2 times
Ridging - 1 times
4 Spacing 100 to 135 cm
5 Seed cane 35,000 to 40,000 three budded setts used/Ha
60,000 in machanical planting
6 Seed cane preparation
7 Furrow depth 15 to 20 cm
8 Planting Shallow planting is done like rayungan planting
9 No of budds/m 12 to 13 budds / m
10 Liming Few planters only liming 1 to 2 ton / Ha
11 Basal fertiliser 14:14:14 or 16 : 20 : 0 is applied basally
12 Weeding
13 Intercultivation
14 Earthing up
15 Fertiliser application
2 nd dose
16 Drainage
17 Fire breaker
18 Harvesting
Generally planting starts in Jan & it goes up toOct, Maximum planting takes place from May toJuly
seed cane made into pieces in the seed cutting
plot & bagged in the fertiliser bags &transported to the planters field.some planterssoaking the setts overnight in the water to getbetter germination
Some planters only doing deep planting duringfeb & mar month & compacting the soil withtractor to avoid loss of moisture
14 : 14 : 14 - 6 bag to 8 bag or 16 : 20 - 5 bagto 6 bags applied basally
Generally one manual weeding is done,Chemical is sparayed for weed control 2,4 - D -2 to 3 lit & Diuron - 1.5 Kg / Ha
Most of the intercultivation is done bycarabov ,generally -2 to 3 times intercultivationis done.
Earthing up is done by Carabov ,It is done 2times
Urea - 4 bags & potash - 2 bags applied
generally
Some planters making drainage canals insidethe field & around the field
Most of the planters making fire breaker byusing harrow or plough disc around the field.
Done manually, generaly plant cane harvested9 to 10 months age.
-
8/6/2019 Copy of Package of Practice(1)
9/14
19 TransportVehicles are allowed inside the field in all therow for loading cane,Vehicles having 10 tyres.
-
8/6/2019 Copy of Package of Practice(1)
10/14
OR PLANT CROP
Remarks
People having irrigation doing planting in Feb,Mar & Apr
Disc width is 65 cm
Plough disc width is 65 cm, NO deep plough
Irrespective of age,variety & quality
Some planters is using tractor for intercultivation & earthing up
Manual weeding is done between 45 to 60 days afterplanting,Chemical is sprayed on 3 to 5 month age.
Application done by manually depends on the soil moisture
availability & some planter appling fertiliser 15 cm deep by usingwooden stick
-
8/6/2019 Copy of Package of Practice(1)
11/14
-
8/6/2019 Copy of Package of Practice(1)
12/14
PACKAGE OF PRACTICES F
S.no Particulars Operation1 Ratoon management
2 Stubble shaving
3 Off- barring
4 Gap filling No gap filling practices is adopted
3 Weeding
13 Intercultivation
14 Earthing up
15 Fertiliser application 14:14:14 or 16 : 20 : 0 is applied - 4 to 6 bags
16 Drainage
17 Fire breaker
18 Harvesting Done manually
19 Transport
Trash burning is practiced generally, someplanters only doing trash racking
Some planters doing stubble shaving, mostlystubble shaving is not practiced
Some planters only doing off-barring by usingCARABOV.
Generally one manual weeding is done,Chemical is sparayed for weed control 2,4 - D -2 to 3 lit & Diuron - 1.5 Kg / Ha
Most of the intercultivation is done by
carabov ,generally -2 to 3 times intercultivationis done.
Earthing up is done by Carabov ,It is done 2times
Urea - 4 bags & potash - 2 bags appliedgenerally
Some planters making drainage canals insidethe field & around the field
Most of the planters making fire breaker byusing harrow or plough disc around the field.
Vehicles are allowed inside the field in all therow for loading cane,Vehicles having 10 tyres.
-
8/6/2019 Copy of Package of Practice(1)
13/14
R RATOON CROP
RemarksSome planters putting trash in alternate row for burning
Some planters is using tractor for intercultivation & earthing up
Manual weeding is done between 50 to 60 days afterharvest,Chemical is sprayed on 3 to 5 month age.
One dose only applied for ratoon crop ,application done bymanually depends on the soil moisture availability.
-
8/6/2019 Copy of Package of Practice(1)
14/14
S.no Particulars
1 Labour generally working for 8 hours.
2
3
4
Morning 8 o clock they starts work, take break for 15 minutes at 10 o clockand start work upto 12 o clock & resume the work at 1 o clock,take break at3 clock & continue work upto 5 clock.
Overtime to be paid if they work extre time( every 1 hour 25 % of paymentto be paid)
Labour to be brought from the villages by the planters by using small powertiller drawn trolly.