ST. TAMMANY PARISH MICHAEL B. COOPER PARISH PRESIDENT PROCUREMENT DEPARTMENT P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | [email protected] | 985-898-2520 WWW.STPGOV.ORG February 26, 2021 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 21-4-2 Project Name: Soult Street Road Improvements Bid Due Date: Wednesday, March 3, 2021 GENERAL INFORMATION: 1.Delete Sheet 2B entirety and replace with Sheet 2B included with this Addendum. 2.Add Sheet 2D included with this Addendum. 3.Delete Sheet 20 entirety and replace with Sheet 20 included with this Addendum. 4.Delete Sheet 21 entirety and replace with Sheet 21 included with this Addendum. 5.Delete Sheet 64 entirety and replace with Sheet 64 included with this Addendum. QUESTIONS & ANSWERS: Question 1: PLAN SHEET 2B TYPICAL DISCRIPTION 11 refers to a 12” THICK AVERAGE ASPHALT CONCRETE PATCHING (LEVEL 2); however, there is a note “SEE NOTE 4” referencing that section in the typical drawing. The note states CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPHALT PATCHES…. Etc. My question is isn’t 12” asphalt patching REQUIRED? Is there a CLASS II BASE COURSE REPAIR OPTION that can be used in place of the ASPHALT PATCHING indicated in description 11? Answer 1. No, class II base course repairs are not allowed for patching locations. Asphalt concrete is required for roadway patching. For widened roadway sections and full reconstruction areas, class II base course is required; however, the Contractor has the option to use full depth asphalt concrete in lieu of the class II base course with written approval from St. Tammany Parish Department of Public Works. The asphalt concrete to class II base course substitution shall be achieved with a 1:2 ratio (i.e. for every 2 inches of class II base, a minimum of 1 inch of asphalt shall be substituted).

Transcript of CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is...

Page 1: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

ST. TAMMANY PARISH

MICHAEL B. COOPER PARISH PRESIDENT

PROCUREMENT DEPARTMENT

P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | [email protected] | 985-898-2520

WWW.STPGOV.ORG

February 26, 2021

Please find the following addendum to the below mentioned BID.

Addendum No.: 1

Bid#: 21-4-2

Project Name: Soult Street Road Improvements

Bid Due Date: Wednesday, March 3, 2021

GENERAL INFORMATION:

1.Delete Sheet 2B entirety and replace with Sheet 2B included with this Addendum.

2.Add Sheet 2D included with this Addendum.

3.Delete Sheet 20 entirety and replace with Sheet 20 included with this Addendum.

4.Delete Sheet 21 entirety and replace with Sheet 21 included with this Addendum.

5.Delete Sheet 64 entirety and replace with Sheet 64 included with this Addendum.

QUESTIONS & ANSWERS:

Question 1: PLAN SHEET 2B TYPICAL DISCRIPTION 11 refers to a 12” THICK AVERAGE ASPHALT CONCRETE PATCHING (LEVEL 2); however, there is a note “SEE NOTE 4” referencing that section in the typical drawing. The note states CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPHALT PATCHES…. Etc. My question is isn’t 12” asphalt patching REQUIRED? Is there a CLASS II BASE COURSE REPAIR OPTION that can be used in place of the ASPHALT PATCHING indicated in description 11?

Answer 1. No, class II base course repairs are not allowed for patching locations.

Asphalt concrete is required for roadway patching.

For widened roadway sections and full reconstruction areas, class II base course is required; however, the Contractor has the option to use full depth asphalt concrete in lieu of the class II base course with written approval from St. Tammany Parish Department of Public Works. The asphalt concrete to class II base course substitution shall be achieved with a 1:2 ratio (i.e. for every 2 inches of class II base, a minimum of 1 inch of asphalt shall be substituted).

Page 2: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

PROCUREMENT DEPARTMENT

P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | [email protected] | 985-898-2520

WWW.STPGOV.ORG

Version 2020 Q1

Sheet Number 2B has been revised and is included with this Addendum.

Question 2. PLAN SHEET 2B - CONCERNING ASPHALT PATCHING – (LEVEL 2) is

in description 11. Was “LEVEL 2” a typo? Or is the intent to require the contractor to patch with LEVEL 2?

Answer 2. “LEVEL 2” requirement is shown in error on Sheet Number 2B. The

contractor shall use Level 1F for asphalt wearing course and Level 1 for the 12” asphalt pavement patching. Sheet Number 2B has been revised and is included with this Addendum.

Question 3. For this project, does the Contractor retain all of the Reclaimed

Asphalt Pavement or is the Parish going to keep a portion of this material (and if so where is it to be delivered)?

Answer 3. The Contractor can keep 50% of the Reclaimed Asphalt Pavement

(RAP). The remaining 50% shall be delivered to either the Hwy 59 Maintenance Barn or the Keller Barn. Location to be determined at time of milling by project manager.

Question 4. Can you please provide roadway borings? Answer 4. Geotechnical Report is included with this Addendum. Question 5. SHEET 2C – TYPICALS reference station 1+00 to 1+32.32, 1+32.38 to

6+00.44, & 6+00.44 to 6+14.09. What roads are those stations located?

Answer 5. These stations correspond to the Soult St. proposed

centerline/adopted baseline 1 shown on plan sheet numbers 20 and 21. Sheet numbers 20 and 21 have been updated to show the baseline in plain view and are included with this Addendum.

Question 6. Please provide sheet 2D for the Typical for Station 186+75 to 190+60. Answer 6. Sheet Number 2D is added with this Addendum. Question 7. Can we get a copy of the borings?

Page 3: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

PROCUREMENT DEPARTMENT

P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | [email protected] | 985-898-2520

WWW.STPGOV.ORG

Version 2020 Q1

Answer 7. Geotechnical Report is included with this Addendum. Question 8. Will the Engineer allow LEVEL 1 Wearing Course to be used for

leveling? Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs / Intersecting roads get paid under item 502-01-

00200? If so can LEVEL A be used for paving these areas? Answer 9. Driveways are paid under item 502-01-00200. Intersecting roads are

paid for under 502-01-00100. The wearing course for both 502-01-00200 and 502-01-00100 pay items require Level 1F asphalt concrete.

Question 10. SEE NOTE below. Plan does not state what asphalt mix design will be

allowed in the substitute. Please let us know what mix design we are to plan to use.

Answer 10. The required asphalt mix for base course is Level 1.

ATTACHMENTS:

End of Addendum # 1

1. Sheet 2B. 2. Sheet 2D. 3. Sheet 20. 4. Sheet 21. 5. Sheet 64. 6. Geotechnical Report.

Page 4: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

BY

DA

TE

NO.

PR

OJE

CT

PA

RIS

HD

ESIG

NE

D

CH

EC

KE

D

DE

TAIL

ED

CH

EC

KE

D

SHEET

NUMBER

Ty

pical

Secti

on.

dg

n

100

% FIN

AL P

LA

NS

X

2:

39:

20

PM

2/

23/

20

21

RE

VISIO

N

OR

CH

AN

GE

OR

DE

R

DE

SC

RIP

TIO

NN

UM

BE

R

SE

RIE

S

CO

NT

RO

L

SE

CTIO

N

ST.

TA

MM

AN

Y

EN

18

00

00

11

S

OU

LT S

T.

RO

AD I

MP

RO

VE

ME

NT

S

00

0-5

2

53.30' EXISTING R/W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIST. RIGHT-OF-WAY (VARIES)EXIST. RIGHT-OF-WAY (VARIES)

10.50' LIMITS OF MILLING10.50' LIMITS OF MILLING

10.00' TRAVEL LANE10.00' TRAVEL LANE

º MATCH EXISTING CROSS SLOPE

º º

º º

SOULT STREET PROJ. & ADOPT. £

53.30' EXISTING R/W

EXIST. RIGHT-OF-WAY (VARIES)EXIST. RIGHT-OF-WAY (VARIES)

10.50' LIMITS OF MILLING10.50' LIMITS OF MILLING

10.00' TRAVEL LANE10.00' TRAVEL LANE

SOULT STREET PROJ. & ADOPT. £

2:1 (MAX) 3:1 (M

AX)

2:1 (M

AX)3:1 (MAX)

1A1

TO REMAIN AFTER MILLING

EXISTING ASPHALT CONCRETE

TYPICAL GRADING SECTION (N.T.S)

2:1 (MAX) 3:1 (M

AX) 3:1 (MAX) 2:1 (M

AX)

2 9 1010

TYPICAL FINISHED SECTION (N.T.S)

2B

CE

H

RJ

B

BB

S

CR

H

TY

PIC

AL S

EC

TIO

NS

2

OF 6

4 46

11

STA. 196+66.00 TO STA. 203+11.00

STA. 183+15.69 TO STA. 186+75.00

STA. 110+90.00 TO STA. 178+00.00APPLIES:

STA. 196+66.00 TO STA. 203+11.00

STA. 183+15.69 TO STA. 186+75.00

STA. 110+90.00 TO STA. 178+00.00APPLIES:

VARIES 2.00' VARIES

1.00'

VARIES2.00'VARIES

1.00'

VARIES 2.00' VARIES

1.00'

VARIES2.00'VARIES

1.00'

10

9

8

7

6

5

4

3

2

1

2" THICK ASPHALT CONCRETE WEARING COURSE (LEVEL 1F)

REQUIRED FULL DEPTH SAWCUT OF ASPHALT CONCRETE PAVEMENT

EMBANKMENT

PAVEMENT STRIPING & REFLECTORIZED MARKER

PAVEMENT STRIPING

1A

NOT USED THIS SHEET.¼

¼

REMOVE EXISTING PAVEMENT AND BASE COURSE FOR PAVEMENT PATCHING

2' CONCRETE COMBINATION CURB & GUTTER (BARRIER TYPE) (SEE DOTD STD. PLAN CP-01 FOR DETAILS)¼

¼

12" THICK ASPHALT CONCRETE PATCHING

EXISTING PAVEMENT SECTION (3" AVG. ASPHALT CONCRETE PAVEMENT)

MILLING ASPHALT PAVEMENT (SEE NOTE 2)

¤

2A ASPHALT CONCRETE LEVELING COURSE (AS NEEDED) ¤

2A

2B 3" THICK ASPHALT CONCRETE BINDER COURSE (LEVEL 1)

3A 8" THICK CLASS II BASE COURSE (CRUSHED STONE OR RECYCLED PORTLAND CONCRETE)

12" THICK CLASS II BASE COURSE (CRUSHED STONE OR RECYCLED PORTLAND CONCRETE)

SEE NOTE 4.

OPERATIONS.

DETERMINED FOLLOWING MILLING

ASPHALT LEVELING LOCATIONS TO BE

SUBSTITUTED).

FOR EVERY 2 INCHES OF CLASS II BASE COURSE, A MINIMUM OF 1 INCH OF ASPHALT SHALL BE

CONCRETE TO CLASS II BASE COURSE SUBSTITUTION SHALL BE ACHIEVED WITH A 1: 2 RATIO (i.e.

BASE COURSE REPAIR WITH WRITTEN APPROVAL FROM ST. TAMMANY PARISH DPW. THE ASPHALT

CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPHALT PATCHES IN LIEU OF THE CLASS II 4.

SEE PLAN AND PROFILE SHEETS FOR LIMITS OF DITCH GRADING.3.

FIELD AS DIRECTED BY PROJECT ENGINEER. SEE CPR-07 FOR PAVEMENT PATCHING DETAILS.

SCRATCH MILL EXISTING ASPHALT CONCRETE. PATCH LOCATIONS TO BE DETERMINED IN THE 2.

ITEM NO. 203-04-00200 NONPLASTIC EMBANKMENT (SAND)

ITEM NO. 203-02-00100 DRAINAGE EXCAVATION

THE EXISTING DITCH INVERT. THIS WORK WILL BE UNDER THE FOLLOWING ITEMS:

SHALL EXTEND TO A POINT ON THE DITCH SIDE SLOPE APPROXIMATELY 1'-0" ABOVE

WITH NON PLASTIC EMBANKMENT AS NECESSARY. THE LIMITS OF MUCK EXCAVATION

SHOULDER LIMITS SHALL BE MUCK EXCAVATED TO A DEPTH OF 1'-0" AND BACKFILLED

AREA OF EXISTING DRAINAGE DITCH WHICH FALLS WITHIN REQ'D ROADWAY 0R1.

NOTES:

11 12" THICK AVERAGE ASPHALT CONCRETE PATCHING (LEVEL 2)

¼

¼

1C

AL

LO

UT

AN

D

LE

GE

ND

RE

VISIO

NS

2/2

3/2

02

1

1

1

1

Page 5: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

BY

DA

TE

NO.

PR

OJE

CT

PA

RIS

HD

ESIG

NE

D

CH

EC

KE

D

DE

TAIL

ED

CH

EC

KE

D

SHEET

NUMBER

Ty

pical

Secti

on.

dg

n

100

% FIN

AL P

LA

NS

X

8:

35:

50

AM

2/

25/

20

21

RE

VISIO

N

OR

CH

AN

GE

OR

DE

R

DE

SC

RIP

TIO

NN

UM

BE

R

SE

RIE

S

CO

NT

RO

L

SE

CTIO

N

ST.

TA

MM

AN

Y

EN

18

00

00

11

S

OU

LT S

T.

RO

AD I

MP

RO

VE

ME

NT

S

00

0-5

2

SOULT STREET PROJ. & ADOPT. £

1A

TYPICAL GRADING SECTION (N.T.S)

EXIST. RIGHT-OF-WAY VARIESEXISTING RIGHT-OF-WAY VARIES

º º

3:1 (MAX) 2:1 (M

AX.)

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

STA. 186+75.00 TO STA. 190+60.00APPLIES:

TURN LANE

VARIES (0.00' TO 9.00')

TRAVEL LANE

10.00'

TRAVEL LANE

10.00'

º

14

2.5%

3.00'

VARIES

LIMITS OF MILLING

10.50'

LIMITS OF MILLING

VARIES (10.50' TO 19.00')

0.50'±

LIMITS OF ASPHALT

10.50'

º ºº

SOULT STREET PROJ. & ADOPT. £

EXIST. RIGHT-OF-WAY VARIESEXISTING RIGHT-OF-WAY VARIES

0.50'

3:1 (MAX)

2:1 (MAX.)

EXIS

TIN

G

R/

W

SHLD.

2.00'1.00'

1.00'

910

STA. 186+75.00 TO STA. 190+60.00APPLIES:

TYPICAL FINISHED SECTION (N.T.S)

TURN LANE

VARIES (0.00' TO 10.00')µ

TRAVEL LANE

10.00'

TRAVEL LANE

10.00'

STA. 187+55.00 TO 190+05.00

10.00' TRAVEL LANE APPLIESµ

MATCH EXISTING CROSS SLOPEº

3

1010

EXIS

TIN

G

R/

W

2

LIMITS OF ASPHALT CONCRETE OVERLAY

VARIES (12.50' TO 22.50')

CONCRETE OVERLAY

0.9

7'

2D

CE

H

RJ

B

BB

S

CR

H

TY

PIC

AL S

EC

TIO

NS

4

OF 6

1.00'

LIMITS OF HYDROSEEDING

VARIES2.00'VARIES1.00'

0.5'

VARIES2.00'VARIES

10

9

8

7

6

5

4

2

1

2" THICK ASPHALT CONCRETE WEARING COURSE (LEVEL 1F)

REQUIRED FULL DEPTH SAWCUT OF ASPHALT CONCRETE PAVEMENT

EMBANKMENT

PAVEMENT STRIPING & REFLECTORIZED MARKER

PAVEMENT STRIPING

1A

NOT USED THIS SHEET.¼

¼

REMOVE EXISTING PAVEMENT AND BASE COURSE FOR PAVEMENT PATCHING

2' CONCRETE COMBINATION CURB & GUTTER (BARRIER TYPE) (SEE DOTD STD. PLAN CP-01 FOR DETAILS)

PROFILE SHEETS)

DRAINAGE PLAN AND

PIPE, AS REQUIRED (SEE

DRAINAGE INLET AND

¼

¼ 12" THICK ASPHALT CONCRETE PATCHING

EXISTING PAVEMENT SECTION (3" AVG. ASPHALT CONCRETE PAVEMENT)

MILLING ASPHALT PAVEMENT (SEE NOTE 2)

¤

2A ASPHALT CONCRETE LEVELING COURSE (AS NEEDED) ¤

2A

3

2B 3" THICK ASPHALT CONCRETE BINDER COURSE (LEVEL 1)

3A 8" THICK CLASS II BASE COURSE (CRUSHED STONE OR RECYCLED PORTLAND CONCRETE)

12" THICK CLASS II BASE COURSE (CRUSHED STONE OR RECYCLED PORTLAND CONCRETE)

1.4

7'

2B

SEE NOTE 4.

OPERATIONS.

DETERMINED FOLLOWING MILLING

ASPHALT LEVELING LOCATIONS TO BE

PATCHING (12" MINIMUM THICKNESS).

12" THICK ASPHALT CONCRETE SHALL BE PAID UNDER ITEM 510-01-00200 PAVEMENT3.

A MINIMUM OF 1 INCH OF ASPHALT SHALL BE SUBSTITUTED).

ACHIEVED WITH A 1: 2 RATIO (i.e. FOR EVERY 2 INCHES OF CLASS II BASE COURSE,

DPW. THE ASPHALT CONCRETE TO CLASS II BASE COURSE SUBSTITUTION SHALL BE

CLASS II BASE COURSE REPAIR WITH WRITTEN APPROVAL FROM ST. TAMMANY PARISH

CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPHALT PATCHES IN LIEU OF THE4.

5%

8

6"

5%

5%

THE FIELD AS DIRECTED BY PROJECT ENGINEER. SEE CPR-07 FOR PAVEMENT PATCHING DETAILS.

2. SCRATCH MILL EXISTING ASPHALT CONCRETE. PATCH LOCATIONS TO BE DETERMINED IN

ITEM NO. 203-04-00200 NONPLASTIC EMBANKMENT (SAND)

ITEM NO. 203-02-00100 DRAINAGE EXCAVATION

THE EXISTING DITCH INVERT. THIS WORK WILL BE UNDER THE FOLLOWING ITEMS:

SHALL EXTEND TO A POINT ON THE DITCH SIDE SLOPE APPROXIMATELY 1'-0" ABOVE

WITH NON PLASTIC EMBANKMENT AS NECESSARY. THE LIMITS OF MUCK EXCAVATION

SHOULDER LIMITS SHALL BE MUCK EXCAVATED TO A DEPTH OF 1'-0" AND BACKFILLED

AREA OF EXISTING DRAINAGE DITCH WHICH FALLS WITHIN REQ'D ROADWAY 0R1.

NOTES:

¼

Page 6: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

BY

DA

TE

NO.

PR

OJE

CT

PA

RIS

HD

ESIG

NE

D

CH

EC

KE

D

DE

TAIL

ED

CH

EC

KE

D

SHEET

NUMBER

69

44

0_

00

4p

_2

0.

dg

n

100

% FIN

AL P

LA

NS

X

8:

32:

34

AM

2/

25/

20

21

RE

VISIO

N

OR

CH

AN

GE

OR

DE

R

DE

SC

RIP

TIO

NN

UM

BE

R

SE

RIE

S

CO

NT

RO

L

SE

CTIO

N

ST.

TA

MM

AN

Y

EN

18

00

00

11

S

OU

LT S

T.

RO

AD I

MP

RO

VE

ME

NT

S

00

0-5

2

VERT. 0.5" = 1'HORIZ. 1" = 20'SCALE:

RJ

B

BB

S

CR

H

CR

H

S C

S C

WV

WV

WV

WV

T

T

GV

S

S

UT

E

E

E

E

TV

A

17

9+0

0

17

7+0

0

17

8+0

0 181

+00

PR

OJ.

&

AD

OP

T.

AD

OP

T.

BA

SE

LIN

E 1

P.C.

ST

A.

17

9+7

2.3

8

P.C.

ST

A.

18

0+0

5.4

2

ST

A.

2+7

2.3

8

P.T.

ST

A.

181+29.0

0

P.I.

ST

A.

17

8+2

2.5

8

PR

OJ.

&

AD

OP

T.

EXISTING |

EL

EV.

18.9

5'

ST

A.

18

0+

08.9

5

EL

EV.

17.9

8'

ST

A.

10

8+

65.1

1

EL

EV.

17.9

8'

ST

A.

17

8+

00.0

0

0.0%0.67%

REQUIRED RDWY |

FULL SUPERELEVATION e=+2.7% (153.66') REQ'D ASPHALT OVERLAY

EXISTING AND REQUIRED |

R=30'

40.00', LT.

+32.09

NORMAL CROWN SUPERELEVATION TRANSITION (158.00')

R=

20'

R=20'

DEMO TO NEAREST JOINT

10.0

7', L

T.

+11.9

6

APPARENT R/W

APPARENT R/W

PROJ. & ADOPT. £

20

S

TA.

17

7+

00

TO S

TA.

18

1+

50

PL

AN

AN

D P

RO

FIL

E S

HE

ET

17

7+0

0M

AT

CH

LIN

E S

TA.

17

7+

00

SOULT ST.

Scale : 1

" =

20'

20

10.5'

10.5'

21.0'

82.2'

R/

W |

RD

WY

£

£

PR

OJ.

&

AD

OP

T.

PROPOSED | CURVE DATA

TRANSITION (158.00')SUPERELEVATION

+3

2.3

8

+9

0.3

8

+4

4.0

4

2+7

2.3

8

AD

OP

T.

BA

SE

LIN

E 1

AD

OP

T.

BA

SE

LIN

E 1

2+7

2.3

8

18

16

14

20

18

16

14

181+50181+00180+00179+00178+00177+00

R = 350.00 FT.

L = 188.06 FT.

T = 96.36 FT.

D = 16°22'12.8"

¤ = 30°47'9" LT.

P.I. STA. 180+67.21 / STA. 3+66.41

R = 230.00 FT.

L = 123.58 FT.

T = 63.32 FT.

D = 24°54'40.4"

¤ = 30°47'9" LT.

STA. 3+66.41

P.I. STA. 180+67.21 /

N29°26'36"E

N00°44'25"W

(34.3 S

Y)

RE

Q'D

CO

NC.

DRIV

EW

AY

ST

A.

18

0+

98

LT.

PROPOSED ­ / ADOPT. BASELINE 1

1

1

BE

GIN

DIT

CH

RE

GR

ADIN

G

ST

A.

17

7+

75,

LT.

EN

D

DIT

CH

RE

GR

ADIN

G

ST

A.

17

8+

25,

LT.

BE

GIN

DIT

CH

RE

GR

ADIN

G

ST

A.

17

8+

60,

LT.

(52

LF)

15"

X 2

1"

RC

PA

RE

MO

VE

EXIS

TIN

G

ST

A.

17

8+

32,

LT.

2

2

£

0.34%

PROJ. & ADOPT. £

N30°02'44"E

EASTBOUND PROFILE

RE

MO

VE

EXIS

TIN

G SIG

NS

& P

OS

T

ST

A.

18

0+

39,

RT.

RE

MO

VE

EXIS

TIN

G SIG

NS

& P

OS

T

ST

A.

18

0+

47,

RT.

(12

38.1 S

Y)

PA

VE

ME

NT

RE

MO

VA

L

BE

GIN

RE

Q'D

AS

PH

AL

T

ST

A.

17

8+

00,

LT.

(91.5 S

Y)

PA

VE

ME

NT

RE

MO

VA

L

RE

Q'D

CO

NC

RE

TE

ST

A.

17

8+

12

TO 1

78

+7

2,

LT.

(90.2 S

Y)

RE

Q'D 8"

CO

NC.

PA

VE

ME

NT

ST

A.

17

8+

12

TO 1

78

+7

2,

LT.

R=30'

(6.3 S

Y)

AN

D FIL

LE

D

W/S

AN

D

EXIS

T.

DIT

CH

TO

BE

MU

CK

ED

ST

A.

17

8+

60

TO S

TA.

17

8+

76,

RT.

(6.1 S

Y)

AN

D FIL

LE

D

W/S

AN

D

EXIS

T.

DIT

CH

TO

BE

MU

CK

ED

ST

A.

17

8+

01

TO S

TA.

17

8+

23,

RT.

22 22

24 24

(25

LF)

RE

MO

VE

EXIS

TIN

G 1

8"

EQ.

RC

PA

ST

A.

17

8+

32,

RT.

(17

LF)

RE

MO

VE

EXIS

TIN

G 1

8"

EQ.

RC

PA

ST

A.

17

8+

55,

RT.

RE

MO

VE

EXIS

TIN

G

DR

OP IN

LE

T

ST

A.

17

8+

44,

RT.

(24

LF) -

CH

EV

RE

UIL S

T.

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

3"

AV

G.

DE

PT

H

ST

A.

17

8+

30

TO S

TA.

17

8+

54,

RT.

(60

LF) -

CH

EV

RE

UIL S

T.

3"

AV

G.

DE

PT

H

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

ST

A.

17

8+

32

TO S

TA.

17

8+

52

RE

MO

VE

EXIS

TIN

G

DR

OP IN

LE

T

ST

A.

18

0+

47,

LT.

RE

MO

VE

EXIS

TIN

G

DR

OP IN

LE

T

ST

A.

18

0+

84,

LT.

(21

LF)

3"

AV

G.

DE

PT

H

SA

WC

UT

EXIS

TIN

G P

AV

EM

EN

T,

ST

A.

17

8+

00,

LT.

SU

PP

OR

T (1

EA

CH)

R/R

MAIL

BO

X

&

MAIL

BO

X

ST

A.

18

0+

81.6

0,

LT.

REALIGNMENT (15 LF)

REQ'D DITCH

10.5'

10.5'

| R

DW

Y21.0'

RE

LO

CA

TE

EXIS

TIN

G SIG

NS

& SIG

N P

OS

T

ST

A.

17

9+

21,

RT.

RE

LO

CA

TE

EXIS

TIN

G SIG

NS

& SIG

N P

OS

T

ST

A.

17

8+

58,

RT.

17 0

F 2

3

AS

PH

AL

T

RE

SU

RF

ACIN

G

EN

D

RE

Q'D

MIL

LIN

G

&

ST

A.

17

8+

00

(45.5 S

Y)

RE

Q'D

CO

NC.

DRIV

EW

AY

RE

MO

VA

L

ST

A.

18

0+

81

TO S

TA.

18

1+

13,

RT.

(1,3

17.5

8 S

Y)

RE

Q'D

AS

PH

AL

T P

AV

EM

EN

T

ST

A.

17

8+

00

TO S

TA.

18

3+

16

1

1

AD

DE

D

CE

NT

ER

LIN

E 1

LIN

EW

OR

K2/2

4/2

02

1

38.61', RT.

+53.8035.75', RT.

+30.39

10.50', LT.

+71.84

40.00', LT.

+52.31

CH

EV

RE

UIL S

T.

64.9'

R/

W

10.11', RT.

+00.72

REQ'D DITCH REALIGNMENT (25 LF)

10.16', RT.

+83.66

MA

TC

H LIN

E S

TA.

181+50

181+5

0

STA. 178+00 PROJ. & ADOPT. £ =

EQUATION:

STA. 1+00 ADOPTED BASELINE 1

Page 7: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

BY

DA

TE

NO.

PR

OJE

CT

PA

RIS

HD

ESIG

NE

D

CH

EC

KE

D

DE

TAIL

ED

CH

EC

KE

D

SHEET

NUMBER

69

44

0_

00

4q

_2

1.

dg

n

100

% FIN

AL P

LA

NS

X

8:

33:

47

AM

2/

25/

20

21

RE

VISIO

N

OR

CH

AN

GE

OR

DE

R

DE

SC

RIP

TIO

NN

UM

BE

R

SE

RIE

S

CO

NT

RO

L

SE

CTIO

N

ST.

TA

MM

AN

Y

EN

18

00

00

11

S

OU

LT S

T.

RO

AD I

MP

RO

VE

ME

NT

S

00

0-5

2

VERT. 0.5" = 1'HORIZ. 1" = 20'SCALE:

RJ

B

BB

S

CR

H

CR

H

WV

WM

WV

WV

WS

18

4+0

0

18

2+0

0

18

3+0

0

18

5+0

0

18

6+0

0

PR

OP

OS

ED ­

AD

OP

T.

BA

SE

LIN

E 1

P.T.

ST

A.

18

1+6

2.0

4S

TA.

4+6

0.4

4

21

S

TA.

18

1+

50

TO S

TA.

18

6+

00

PL

AN

AN

D P

RO

FIL

E S

HE

ET

18

1+50

18

6+0

0M

AT

CH

LIN

E S

TA.

18

6+0

0

SOULT ST.

Scale : 1" = 20'

21.0'

APPARENT R/W

APPARENT R/W

N00°44'25"W

181+50 182+00 183+00 184+00 185+00 186+00

64.9'

R/

W

62.2'

R/

W

|

RD

WY

21.0'

|

RD

WY

PROJ. & ADOPT. £

+1

5.6

9

+0

2.0

4

10.5'

10.5'

EL

EV.

19.5

8'

ST

A.

18

1+

93.5

5

0.34%

EL

EV.

19.7

7'

ST

A.

18

3+

14.0

9

0.16%

20

18

16

1414

16

18

20

REQUIRED RDWY |

10.5'

10.5'

RE

MO

VE

EXIS

TIN

G SIG

N

& P

OS

T

ST

A.

18

3+

93,

RT.

RE

MO

VE

EXIS

TIN

G SIG

NS

ST

A.

18

4+

19,

RT.

GRADE AT TIE-INS

MATCH EXISTING

22 22

24 24

RE

MO

VE

EXIS

TIN

G

CO

NC.

HE

AD

WA

LL

ST

A.

18

2+

09,

RT.

(33.9 S

Y) - S

YC

AM

OR

E P

L.

MIL

L

EXIS

TIN

G

AS

PH

AL

T

OV

ER

LA

Y,

ST

A.

18

2+

13.0

8

TO 1

83

+1

5.6

9,

RT.

(23

9.8 S

Y)

(MA

TC

H

EXIS

TIN

G

GR

AD

E)

EX

TE

ND

TO

NE

AR

ES

T J

OIN

T

RE

Q'D

AS

PH

AL

T

OV

ER

LA

Y S

HA

LL

ST

A.

18

2+

13

TO S

TA.

18

3+

16,

RT.

(10

4

LF) - S

YC

AM

OR

E P

L.

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

3"

AV

G.

DE

PT

H

ST

A.

18

2+

13

TO S

TA.

18

3+

16,

RT.

RE

MO

VE

EXIS

TIN

G

CO

NC.

HE

AD

WA

LL

ST

A.

18

2+

09,

RT.

REQUIRED ASPHALT OVERLAYSUPERELEVATION TRANSITION (158.00') NORMAL

CROWN

18 0

F 2

3

1

1

AD

DE

D

CE

NT

ER

LIN

E 1

LIN

EW

OR

K2/2

4/2

02

1

SY

CA

MO

RE P

L.

BU

TT

ER

NU

T

LN.

& P

OS

T

RE

MO

VE

EXIS

TIN

G SIG

N

ST

A.

18

4+

16,

LT.

(88

LF) -

BU

TT

ER

NU

T

LN.

3"

AV

G.

DE

PT

H

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

ST

A.

18

2+

28

TO S

TA.

18

3+

16,

LT.

(69

LF) -

BU

TT

ER

NU

T

LN.

3"

AV

G.

DE

PT

H

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

ST

A.

18

3+

16

TO S

TA.

18

3+

84,

LT.

(20

LF)

3"

AV

G.

DE

PT

H

SA

WC

UT

EXIS

T.

PA

VE

ME

NT,

ST

A.

18

3+

16,

LT.

EN

D

DIT

CH

RE

GR

ADIN

G

ST

A.

18

2+

50,

LT.

(5,2

84.2 S

Y.)

&

AS

PH

AL

T

RE

SU

RF

AC

E

BE

GIN

RE

Q'D

MIL

LIN

G

ST

A.

18

3+

16

PA

VE

ME

NT

RE

MO

VA

L

EN

D

RE

Q'D

AS

PH

AL

T

ST

A.

18

3+

16

EXISTING |

EXISTING AND REQUIRED |

MA

TC

H

LIN

E S

TA.

10

4+0

0

Page 8: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

SUGGESTED SEQUENCE OF CONSTRUCTION

1. THE SUGGESTED SEQUENCE OF CONSTRUCTION SHOULD GENERALLY CONSIST OF THE FOLLOWING:

MAINTAINING TRAFFIC IN AT LEAST ONE LANE ADJACENT TO HIS WORK.

WITH HIS APPROVED WORK PLAN, CONSTRUCTING THE REQUIRED REPAIRS, AND PROGRESSING ALONG THE PROJECT WHILE

3. THE CONTRACTOR MAY CHOOSE TO CLOSE A PORTION OF THE ROADWAY AS WITH MOVING OPERATIONS AND IN ACCORDANCE

TRAFFIC CONTROL PLAN SHALL INCLUDE DETOUR SIGNS AND ADVANCED WARNING SIGNAGE FOR ALL SIDEROADS.

FOR REVIEW, COORDINATION, AND APPROVAL BY THE DEPARTMENT OF PUBLIC WORKS PRIOR TO THE START OF CONSTRUCTION.

2. THE CONTRACTOR SHALL SUBMIT A SEQUENCE OF CONSTUCTION AND TRAFFIC CONTROL PLAN TO THE PROJECT ENGINEER

DURATION.

WHEN A CLOSURE IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER TO SCHEDULE CLOSURE TIME AND

4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL RESIDENTIAL STREETS FOR THE DURATION OF THE PROJECT.

64

CR

H

RJ

B

BB

S

RJ

B

1

OF 1

OF

CO

NS

TR

UC

TIO

N

S

UG

GE

ST

ED S

EQ

UE

NC

E

ABRUPT ELEVATION CHANGES.

WEARING SURFACE. STOCKPILED MATERIALS SHALL BE STORED AWAY FROM TRAFFIC, AND ROADWAY WEDGES SHALL BE PROVIDED TO ELIMINATE

TO AN ASPHALT PAVEMENT PATCH AND THE CONTRACTOR IS PROVIDING ASPHALT, THEN IT SHALL BE LAID TO THE BOTTOM OF THE PROPOSED

MAINTENANCE AGGREGATE AS NECESSARY TO PREVENT PONDING OF WATER AND PROVIDE A SAFE TRAVELED WAY. IF THE EXCAVATED AREA IS DUE

PROVIDE TWO-WAY TRAFFIC ON SOULT STREET WITH MINIMUM LANE WIDTHS OF 10'. THE CONTRACTOR SHALL BACKFILL WITH SAND AND/OR TRAFFIC

DAY, THE CONTRACTOR SHALL CLOSE ALL OPEN TRENCHES AND EXCAVATIONS. ADDITIONALLY, DURING NON-WORKING HOURS, THE CONTRACTOR SHALL

PROJECT ENGINEER. THE CONTRACTOR SHALL USE A MOVING OPERATION WITH FLAGGERS WHILE PERFORMING THE WORK. AT THE END OF EACH WORK

DEPTH PAVEMENT REPLACEMENT, MILL AND OVERLAY, ASPHALT PAVEMENT PATCHING AND REPAIRS AS SHOWN IN THE PLANS OR AS DIRECTED BY THE

SOULT STREET: WHILE MAINTAINING A MINIMUM OF ONE LANE, ONE WAY TRAFFIC ADJACENT TO HIS WORK, THE CONTRACTOR SHALL COMPLETE FULL

ELIMINATE ABRUPT ELEVATION CHANGES.

OF THE PROPOSED WEARING SURFACE. STOCKPILED MATERIALS SHALL BE STORED AWAY FROM TRAFFIC, AND ROADWAY WEDGES SHALL BE PROVIDED TO

EXCAVATED AREA IS DUE TO AN ASPHALT PAVEMENT PATCH AND THE CONTRACTOR IS PROVIDING ASPHALT, THEN IT SHALL BE LAID TO THE BOTTOM

WITH SAND AND/OR TRAFFIC MAINTENANCE AGGREGATE AS NECESSARY TO PREVENT PONDING OF WATER AND PROVIDE A SAFE TRAVELED WAY. IF THE

SHALL PROVIDE TWO-WAY TRAFFIC ON STREETS INTERSECTING SOULT STREET WITH MINIMUM LANE WIDTHS OF 10'. THE CONTRACTOR SHALL BACKFILL

WORK DAY, THE CONTRACTOR SHALL CLOSE ALL OPEN TRENCHES AND EXCAVATIONS. ADDITIONALLY, DURING NON-WORKING HOURS, THE CONTRACTOR

THE PROJECT ENGINEER. THE CONTRACTOR SHALL UTILIZE FLAGGERS TO SAFELY MAINTAIN TRAFFIC PAST THE WORK AREA. AT THE END OF EACH

FULL DEPTH PAVEMENT REPLACEMENT, MILL AND OVERLAY EXISTING ASPHALT CONCRETE AND REPAIRS AS SHOWN IN THE PLANS OR AS DIRECTED BY

MINOR STREETS INTERSECTING SOULT STREET: WHILE MAINTAINING ONE LANE OF TRAFFIC ADJACENT TO HIS WORK, THE CONTRACTOR SHALL COMPLETE b.

a.

LANE SHALL REMAIN OPEN ON ALL STREETS WITH MOVING OPERATIONG AND FLAGGERS TO SAFELY MAINTAIN TRAFFIC PAST THE WORK AREA.

THE ROADWAYS DESIGNATED FOR ASPHALT PAVEMENT OR OVERLAYS SHALL BE OVERLAID WITH TWO INCHES (AVG. DEPTH) OF ASPHALT CONCRETE. ONE

REQUIRED) OR AS DIRECTED BY THE PROJECT ENGINEER SHALL BE DONE.

THE CROSS SLOPE OR LONGITUDINAL GRADE OF THE PAVEMENT SURFACE. DURING THIS PHASE, ADJUSTMENTS OF ALL UTILITY STRUCTURES (IF

AFTER MILLING AND PATCHING OPERATIONS ARE COMPLETE, THE PROJECT ENGINEER SHALL IDENTIFY ANY AREAS THAT REQUIRE LEVELING TO ADJUST

BY THE PROJECT ENGINEER.

PATCHING. THE PAVEMENT PATCHING REPAIRS WILL CONSIST OF PAVEMENT REPAIR AS PRESENTED IN THE PLANS AND SPECIFICATIONS OR AS DIRECTED

THE PROJECT ENGINEER OR HIS DESIGNEE SHALL INSPECT, IDENTIFY AND ADEQUATELY MARK PAVEMENT AREAS TO BE REPAIRED BY PAVEMENT

TO LOCATE UNSTABLE AREAS.

AFTER COMPLETION OF THE MILLING OPERATIONS, PROOF ROLLING OF THE ROADWAY SURFACE MAY BE REQUIRED AT THE DISCRETION OF THE ENGINEER

AT THE CONTRACT UNIT PRICE FOR MILLING ASPHALT PAVEMENT ITEM 509-01-00100.

SHALL BE MILLED TO REMOVE ADDITIONAL ASPHALT CONCRETE. THE CONTRACTOR SHALL REMOVE THE REMAINING ASPHALT CONCRETE AS INSTRUCTED

SHOULD AREAS EXIST WITH ONE INCH OR LESS OF ASPHALT CONCRETE, THE PROJECT ENGINEER SHALL INSTRUCT THE CONTRACTOR AS TO WHICH AREAS

AFTER THE CONTRACTOR MILLS THE EXISTING SURFACE, THE PROJECT ENGINEER SHALL INSPECT THE REMAINING ASPHALT CONCRETE THICKNESS. c.

d.

e.

f.

g.

RE

VISIO

N

SU

GG

ES

TE

D S

EQ

UE

NC

E

OF

CO

NS

TR

UC

TIO

N

NO

TE

S2/1

8/2

02

11

1

BY

DA

TE

NO.

PR

OJE

CT

PA

RIS

HD

ESIG

NE

D

CH

EC

KE

D

DE

TAIL

ED

CH

EC

KE

D

SHEET

NUMBER

69

44

0_

_Se

que

nce.

dg

n

100

% FIN

AL P

LA

NS

X

4:

19:

06

PM

2/

18/

20

21

RE

VISIO

N

OR

CH

AN

GE

OR

DE

R

DE

SC

RIP

TIO

NN

UM

BE

R

SE

RIE

S

CO

NT

RO

L

SE

CTIO

N

ST.

TA

MM

AN

Y

EN

18

00

00

11

S

OU

LT S

T.

RO

AD I

MP

RO

VE

ME

NT

S

00

0-5

2

Page 9: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Premier Geotech and Testing, LLC. – 9434 Interline Avenue, Baton Rouge, Louisiana 70809 – Office – 225-416-0700

August 19, 2019 HNTB Corporation 2021 Lakeshore Drive, Suite 230 New Orleans, La 70122 Attention: Mr. Rick Hathaway Re: Geotechnical Engineering Study

Soult Street Improvements St. Tammany Parish, Louisiana Premier File No.: 18-0082

Dear Mr. Hathaway: This letter report provides recommendations for pavement design and fill placement required for the proposed turn lanes and roadway rehabilitation of Soult Street in Mandeville, Louisiana. The recommendations provided herein are based on the subsurface soil conditions encountered at various test locations. We appreciate the opportunity to offer our services and look forward to working with you and the design team on this project. Please call with any questions you may have, or if Premier can be of additional service. Respectfully submitted, PREMIER GEOTECH AND TESTING, LLC Mike Juneau, P.E., MBA Tyler Roberts President Project Manager Attachments: Pavement Design Calculation Sheet

Boring Location Plan Sheet Key to Boring Log Sheet Boring Logs Sheets

Page 10: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 2 - Premier File No.: 19-0114

FURNISHED INFORMATION

The proposed project will consist of rehabilitation of Soult Street from US190/Florida Blvd. to LA 1088 in St. Tammany Parish, Louisiana. It is understood that milling, patching and resurfacing of the existing road with asphalt pavement and widening of portions to construct three (3) new turn lanes will be performed. The road will be widened to accommodate turn lanes at the US 190 intersection, the Mandeville Middle School entrance and the LA 1088 intersection. PAVEMENT RECOMMENDATIONS Three (3) soil borings were drilled and sampled within the footprint of the proposed three (3) turn lane additions to a depth of about six (6) feet below existing grade, and five (5) asphalt cores/soil borings were drilled and sampled at specific locations along the existing roadway to a depth of about two (2) feet below existing asphalt pavement. The subsurface soils encountered at the project site consist of medium stiff to stiff sandy lean and fat clays with occasional silt and sand stratums within the roadway alignment. Generally, the subsurface soils encountered generally exhibited good strength characteristics with relatively high moisture contents. The table below summarizes the subsurface soil encountered in the soil borings performed for the proposed new turn lanes (i.e., B-1, B-2 and B-3), and the existing pavement thickness, basecourse and subgrade encountered in test locations C-4 through C-8.

Test

Location Pavement Base Sub-Base

Type Asp Qty. Depth Type Depth Type Depth

B-1 None na na None na Tn & Gr CL 0"-6' B-2 None na na None na Lt. Gr & Gr SI 0"-2'

Gr & Tn CL 2'-6' B-3 None na na None na Gr & Tn CL 0"-2'

Gr & Tn SA 2'-4' Gr & Tn CL 4'-6'

C-4 Asphalt Fair 0"-3" Soil Cement 3"-8" Gr & Tn CL 8"-2' C-5 Asphalt Fair 0"-3" Soil Cement 3"-11" Gr CL 11"-2' C-6 Asphalt Fair 0"-3" Soil Cement 3"-10" Gr. & Tn CL 10"-2' C-7 Asphalt Poor 0"-3" None na Tn & Gr CL 3"-2' C-8 Asphalt Poor 0"-3" None na Tn & Gr CL 3"-2'

CL – Low Plasticity Clay; CH – High Plasticity; SI – Silt; SA - Sand Pavement Section Actual traffic type and frequency anticipated was not known at the time of this report. However, Premier assumed that the average daily traffic (ADT) will consist of mostly passenger vehicles and occasional truck traffic (e.g. Garbage trucks, school busses, etc.) and used the recommended Residential streets, rural farm and residential roads values in St. Tammany’s Roadway Design Standards (Sec. 125-60) - Anticipated Heavy Trucks Per Design Period table

Page 11: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 3 - Premier File No.: 19-0114

to determine the Load Equivalence Factor (LEF) and Total Design ESALs. The pavement subgrade, subbase, base and pavement shall be prepared as described in St. Tammany Parish Code of Ordinances (Part-II, Sec. 125-59 & 60). The recommended pavement thicknesses presented below are considered typical and minimum for the assumed parameters at the site. We understand that budgetary considerations sometimes warrant thinner pavement sections than those presented. However, the client, the owner, and the project designers should be aware that thinner pavement sections may result in increased maintenance costs and lower than anticipated pavement life. The specific design parameters used to develop the recommended pavement section are as follows. More specific design parameters and details are shown on the attached Pavement Design Calculations sheet generated using PaveXpress software.

Design Period 20 Years Total Design ESALs (W18) 1,288,000 Load Equivalency Factor (LEF) 0.0194 Resilient Modulus, MR 6500 psi Reliability 85% Deviation 0.47 Flexible Initial Serviceability 4.2 Terminal Serviceability 2.0 Drainage Coefficient 1.0 Pavement; 0.8 Base

With the aforementioned assumptions and in accordance with the St. Tammany Parish Roadway Design Standards for Residential Subdivisions, the following pavement section is recommended for Soult Street:

FLEXIBLE PAVEMENT

Pavement Material Residential Street

Minimum Thickness, Inches Asphaltic Concrete 5.0 Class II Base Course 12 Compacted and Proof Rolled Subgrade yes

The base course shall meet the requirements of the latest edition of the St. Tammany Parish Code of Ordinances (Part-II, Sec. 125 – 59-60) and the Louisiana Standard Specifications for Roads and Bridges Manual (LSSRB), Section 1003.3D. The base and subbase course should be compacted to at least 95 percent of maximum dry density near the optimum moisture content in accordance with ASTM D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)). Pavement materials may be placed after the subgrade or structural fill has been properly proof rolled or compacted, and fine-graded. These activities shall be accomplished following the

Page 12: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 4 - Premier File No.: 19-0114

Louisiana Department of Transportation and Development Standard Specifications for Road and Bridge Construction guidelines. Asphaltic concrete should meet the requirements of the latest edition of the St. Tammany Parish Roadway Testing and Inspection Standards for Residential and Commercial Subdivisions (Sec. 40-032.03), and the requirements of Part V of the latest edition of the LSSRB. The aggregate base should meet the requirements of the latest edition of the St. Tammany Parish Code of Ordinances (Part-II, Sec. 125 – 59-60) and Sub-Section 1003 of the LSSRB. The base and structural fill should be compacted to at least 95 percent of the maximum dry density near the optimum moisture content in accordance with ASTM D698. Water should not be allowed to pond behind curbs and saturate the base. In down grade areas, the limestone base shall extend through the slope to provide an exit path for any water accumulating under the pavement. Base and Sub-Base Recommendations Crushed Stone/Recycled Concrete Aggregate Material Properly graded crushed stone or recycled crushed concrete meeting the requirements of Section 1003.03.1 and 1003.03.2 should be utilized beneath the pavements where specified in the Recommended Pavement Sections table presented in this report. The aggregate base material should be placed in accordance with the St. Tammany requirements and the latest edition of the LSSRB, and compacted to at least 95 percent of the maximum dry density as determined by ASTM D698. Placement and compaction of the aggregate material should be near optimum moisture. Cement Stabilization For cement stabilization, a minimum of 10% by volume of cement is recommended for preliminary consideration. Untreated soil with a LL greater than 35 and a PI greater than 15, or an organic content greater than 2 percent shall not be used for cement stabilization. Laboratory tests should be conducted on soil samples that are being considered for treatment at the time of or prior to construction to determine the optimum cement content. Cement treatment shall meet the requirements of Section 303 of the latest edition of the LSSRB. The cement treated base course shall yield a compressive strength of at least 300 psi as determined by a mix design in accordance with DOTD TR 432, Method B or C Standard Procedure. The moisture content of the stabilized soil should be monitored throughout the curing process and moisture should be added as needed to ensure proper hydration and stabilization. Cement/lime stabilized clay should be placed in horizontal loose lifts not exceeding 8 inches in thickness, or less if necessary, to obtain adequate compaction. Each lift should be thoroughly and uniformly moisture-conditioned to within +1% to +3% of the optimum moisture content.

Please note that caution should be used when in-place cement treatment/stabilization is

Page 13: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 5 - Premier File No.: 19-0114

performed in closely populated areas. EARTHWORK RECOMMENDATIONS Site Preparation Premier recommends that all topsoil, stumps, vegetation, roots, soft, organic, or unsuitable soils in the construction areas of the proposed turn lanes be stripped from the site and either wasted or stockpiled for later use in non-structural areas. After stripping operations are completed, proof rolling of the subgrade is recommended as discussed later in this report. It should also be noted that it is not unusual for topsoil thickness to vary from these values in the open field. Oftentimes the topsoil can be deeper in low-lying areas, where erosion, wind and precipitation can deposit this material. There may be areas of the site that require additional, or possibly less stripping for the reasons discussed above. A representative of the Premier should determine and document the depth of removal at the time of construction. The lean and fat clays can undergo a significant loss of stability when construction activities are performed during wetter portions of the year. Premier anticipates that the soils in the project area can become easily disturbed if subjected to conventional rubber tire or narrow track-type equipment and excessive moisture. Soils that become disturbed would need to be excavated and replaced; however, this remedial excavation may expose progressively wetter soils with depth, thus compounding the problem condition. Thus, a normal approach to subgrade preparation may not be possible. Appropriate wide-track equipment selection should aid in minimizing potential disturbance. In addition, and for these reasons, it will be advantageous to perform earthwork and foundation construction activities during dry weather. Proof Rolling After stripping to the proposed subgrade level, as required, the structure(s) area should be proof-rolled, where practical, with a 20-25-ton half-loaded tandem axle dump truck or similar heavy rubber-tired vehicle (typically with an axial load greater than nine (9) tons). Soils that are observed to rut or deflect excessively (greater than one (1) inch) under the moving load should be undercut and replaced with properly compacted structural fill material or rendered stable by using a combination of lime/ fly ash/ kiln dust. The proof-rolling and undercutting activities should be witnessed by a representative of Premier and should be performed during a period of dry weather. Care should be taken during construction activities not to allow excessive drying or wetting of exposed soils. The subgrade soils should be scarified and compacted to at least 95% of the materials’ standard Proctor maximum dry density, in general accordance with ASTM procedures, to a depth of at least twelve (12) inches below the surface. If achieving compaction or passing a proofroll where highly plastic fat clays are encountered, replacing this material with a low plasticity compacted soil or a dense positively drained graded crushed stone/concrete may be required. Alternatively, class “C” flyash or lime-treatment of the high plastic clay can be accomplished to reduce the plasticity index, improve workability, promote drying, and reduce shrink/swell potential. A representative of Premier’s geotechnical

Page 14: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 6 - Premier File No.: 19-0114

engineer should observe the subgrade soils, perform plasticity index tests, and estimate the approximate extent of the exposed fat clays. If it is desirable to modify the fat clays with a commercially available class “C” flyash or lime product, Premier recommends the actual application percent be determined by conducting a laboratory class “C” flyash or lime series test. The geotechnical engineer’s representative should observe the remediation procedures for compliance with the project plans and specifications. Structural Clay Fill Structural clay fill materials placed beneath the structural features or slabs should be free of organic or other deleterious materials and have a maximum particle size of less than three (3) inches. Structural clay fill soils are defined as having a liquid limit (LL) less than forty (40) and plasticity index (PI) between 12 and 22, and plots below the A-line on the plasticity chart, or as accepted by the Geotechnical Engineer of Record. Utility Trench Backfill Excavation for utility trenches shall be performed in accordance with OSHA regulations as stated in 29 CFR Part 1926. It should be noted that utility trench excavations have the potential to degrade the properties of the adjacent fill materials. Utility trench walls that are allowed to move laterally can lead to reduced bearing capacity and increased settlement of adjacent structural elements and overlying slabs. Backfill for utility trenches is as important as the original subgrade preparation or structural fill placed to support either a foundation or slab. Therefore, it is imperative that the backfill for utility trenches be placed to meet the project specifications for the structural fill of this project. Premier recommends that flowable fill or lean mix concrete be utilized for utility trench backfill. If on-site soils are placed as trench backfill, the backfill for the utility trenches should be placed in four (4) to six (6) inch loose lifts and compacted to a minimum of 95% of the maximum dry density achieved by the standard Proctor test. The backfill soil should be moisture conditioned to be within 2% of the optimum moisture content as determined by the standard Proctor test. Up to four (4) inches of bedding material placed directly under the pipes or conduits placed in the utility trench can be compacted to the 90% compaction criteria with respect to the standard Proctor. Backfill of utility trenches should not be performed with water standing in the trench. If granular material is used for the backfill of the utility trench, the granular material should have a gradation that will filter protect the backfill material from the adjacent soils. If this gradation is not available, a geosynthetic non-woven filter fabric should be used to reduce the potential for the migration of fines into the backfill material. Granular backfill material shall be compacted to meet the above compaction criteria. The clean granular backfill material should be compacted to achieve a relative density greater than 75% or as specified by the geotechnical engineer for the specific material used. Excavations In Federal Register, Volume 54, Number 209 (October 1989), the United States Department of

Page 15: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 7 - Premier File No.: 19-0114

Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better enhance the safety of workers entering trenches or excavations. It is mandated by this federal regulation that excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new OSHA guidelines. It is Premier’s understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's "responsible person", as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. Premier is providing this information solely as a service to our client. Premier does not and will not assume responsibility for construction site safety or the contractor's or other parties’ compliance with local, state, and federal safety or other regulations. LIMITATIONS The concept of risk is an important aspect of the geotechnical evaluation. The primary reason for this is that the analytical methods used to develop geotechnical recommendations do not comprise an exact science. The analytical tools which geotechnical engineers use are generally empirical and must be used in conjunction with engineering judgment and experience. Therefore, the solutions and recommendations presented in the geotechnical evaluation should not be considered risk-free and, more importantly, are not a guarantee that the interaction between the soils and the proposed structure will perform as planned. The engineering recommendations presented in the preceding section constitutes Premier’s professional estimate of those measures that are necessary for the proposed structure to perform according to the proposed design based on the information generated and referenced during this evaluation, and Premier’s experience in working with these conditions. The recommendations submitted in this report are based on furnished project information by the design team and the subsurface information obtained from borings drilled by Premier. If there are any revisions to the plans for this project, or if deviations from the subsurface conditions noted in this report are encountered during construction, Premier must be notified immediately to determine if changes in the foundation recommendations are required. If Premier is not notified in writing of such changes, Premier will not be responsible for the impact of those changes on the project. The geotechnical engineer warrants that the findings, recommendations, specifications, or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are

Page 16: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Soult Street Rehabilitation and Pavement Section Design August 19, 2019 Mandeville, Louisiana Page | - 8 - Premier File No.: 19-0114

implied or expressed. After the plans and specifications are complete, the Geotechnical Engineer should be retained and provided the opportunity to review the final design plans and specifications to check that our engineering recommendations have been properly incorporated into the design documents. The scope of Premier’s services did not include any environmental assessment or investigation for the presence or absence or hazardous or toxic materials in the soil, groundwater, or surface water within or beyond the site studied. Any statements in this report regarding odors, staining of soils, or other unusual conditions observed are strictly for the information of our client. This report has been prepared for the exclusive use by HNTB Corporation and their design team for the specific application to the proposed Soult Street Rehabilitation project located in Mandeville, Louisiana. The information and data obtained (i.e., Instrument of Service) and prepared by Premier Geotech and Testing, LLC may not be used or relied on by any other entity, now or at any point in the future, without the express, written consent from Premier Geotech and Testing, LLC.

Page 17: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

��������� ��� ����������� �������������������������

� � �����������!���"#������$%&'()�'*�+)�,�-�.+%/ 0���$1234�� ���5�41��4267��41�.4!����41��4���,� ���������412�8 ���

9:;<=>?�@AB;:CD?E;AF=GEHA�9D:DC=?=:GI:DBBE>�FD?D9DJ=C=A?�K?:L>?L:=F=GEHA�MLENDA>=F=GEHA�O;?=G

K>=AD:E;�ODC= PQRST�PTUVVTK>=AD:E;�F=G>:EW?E;AXG?ECD?=N�Y;CWZ=?E;A�[=D: \]̂_K?D?= Q̀Rabacdce;DNfDg�YZDGGEBE>D?E;A Q̀hcS9DJ=C=A?�IgW= iVj�k�lbmncSTF=GEHA�9=:E;N�o[=D:Gp \]�qVcUbe=ZEDrEZE?g�s=J=Z�oep tu�vwk̂x]yz{yy|Y;CrEA=N�K?DAND:N�X::;:oK}p ]x{~@AE?EDZ�K=:JE>=DrEZE?g�@AN=�oWEp {x\I=:CEADZ�K=:JE>=DrEZE?g@AN=��oW?p \x]Y�DAH=�EA�K=:JE>=DrEZE?go�9K@p \x\]Y;CWZ=?E;A�[=D:�I:DBBE> \�ytz�]]us;DN�X�LEJDZ=A>g��D>?;: ]x]̂_{Y;CWZ=?E;A�[=D:�XK�sG {z�]]]F=GEHA�9=:E;N \]�L?L:=�I:DBBE>�M:;f?��eD?=o�p yx{XK�s�M:;f?��eD?=�o�p ]I;?DZ�F=GEHA�XK�sG�o���p �̂\tt�]]]KL:BD>=�sEB?G iQdV�DG=�sDg=:G IgW= sDg=:�Y;=BF:DEADH=I�E>�A=GG�V�VdT�QU�̀a�V�TUVcTV���cbV ]x̂{ ]x_ ]̂e=GEZE=A?��;NLZLG�o�ep zu]]�mbaKL:BD>=Y=C=A?�;:�sEC=�?:=D?=N�rDG=KLrH:DN=e=�LE:=N�CEAECLC�N=GEHAKO�����}sDg=:�I�E>�A=GG=G�oEApKL:BD>=��uxu]Y=C=A?�;:�sEC=�?:=D?=NrDG=��̂]x]]I;?DZ�KO������dVV��TQ��VTTVU��Va�dV�TnV�bR��Uc�V��Q�RSRbx�Tnab�ab��Qad��TQ�c��VhT�TnV�hcSb�TnV�QbTx�lSbQ��dVV��TQ�hcShRScTV�UVcSabTah��Pl̀bx

Page 18: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

TEST LOCATION PLAN

PROPOSED SOULT STREET IMPROVEMENTS

MANDEVILLE, LOUISIANAPREMIER FILE NO.: 18-0082

N

APPROXIMATE TEST LOCATION

Page 19: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

Type Asp Qty. Depth (in) Type Depth (in) Type Depth B-1 None na na None na Tn & Gr CL 0"-6'B-2 None na na None na Lt. Gr & Gr SI 0"-2'

Gr & Tn CL 2'-6'B-3 None na na None na Gr & Tn CL 0"-2'

Gr & Tn SA 2'-4'Gr & Tn CL 4'-6'

C-4 Asphalt Fair 0"-3" Soil Cement 3"-8" Gr & Tn CL 8"-2'C-5 Asphalt Fair 0"-3" Soil Cement 3"-11" Gr CL 11"-2'C-6 Asphalt Fair 0"-3" Soil Cement 3"-10" Gr. & Tn CL 10"-2'C-7 Asphalt Poor 0"-3" None na Tn & Gr CL 3"-2'C-8 Asphalt Poor 0"-3" None na Tn & Gr CL 3"-2'

Test Location

DESIGN INFORMATION(EXISTING ROADWAY)

Premier File No.: 18-0082Date: August 19, 2019

Project: Soult Street ImprovementsDescription: Pavement Rehabilitation Parish: St. Tammany

Pavement Base Sub-Base

CL - Low Plasticity Clay; CH - High Plasticity Clay; SI - Silt; Sa - Sand; Org - Organics

Page 20: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

1. Exploratory borings were drilled on

2. Boring locations were located using handheld GPS technology.

3. These logs are subject to the limitations, conclusions, and recommendations in this report.

4. Results of tests conducted on samples recovered are reported on the logs.

Notes:

Symbol Description

Strata symbols

Low plasticityclay

Silt

Clayey sand

Misc. Symbols

Unconfined Shear Strength

Triaxial Shear Strength

Soil Samplers

Undisturbed thin wallShelby tube

KEY TO SYMBOLS

Page 21: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

0

2

4

6

8

10

12

14

N=6

N=14

Medium, Tan and Light Gray LEAN CLAY with fine sand (CL)

Medium, Light Gray and Tan LEAN CLAY with fine sand (CL)

Stiff, Light Gray and Tan LEAN CLAY (CL)

Boring Terminated at 6 Feet 6.0

103.9 19.6

17.6

17.5

40

49

18

15

22

34

PREMIER FILE# 18-0082

NOTES: DRILLED DATE: 8/16/19

DRILLER: PREMIER GEOTECH

LOGGER: WW

TOTAL DEPTH (Ft): 6

WATER LEVEL: NE

BACKFILL: NATIVE SOIL CUTTINGS

LOG OF BORING B1Soult Street Rehabilitation

PLATE

DE

PT

H, F

T

WA

TE

R L

EV

EL

SY

MB

OL

SA

MP

LE

S

BL

OW

S P

ER

FO

OT

STRATUM DESCRIPTION

LOCATION: Mandeville, LACOORDINATES: 30021'19.52"N 900 2'42.35"W

SURFACE EL.: EXISTING ROADWAY GRADE

ST

RA

TU

MD

EP

TH

, FT

UN

IT D

RY

WT

,P

CF

CLASSIFICATION

PA

SS

ING

NO

200

SIE

VE

, %

WA

TE

RC

ON

TE

NT

, %

LIQ

UID

LIM

IT

PL

AS

TIC

LIM

IT

PL

AS

TIC

ITY

IND

EX

(P

I)

SHEAR STRENGTH

0.5 1 1.5 2 2.5

Miniature Vane

Triaxial

Unconfined

Field Vane

Torvane

Penetrometer

TONS PER SQ FT

Page 22: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

0

2

4

6

8

10

12

14

N=5

N=7

Dense, Light Gray and Gray SILT with fine sand and trace clay (ML)

Medium, Gray and Tan LEAN CLAY with fins sand (CL)

Medium, Gray and Tan LEAN CLAY with fine sand (CL)

Boring Terminated at 6 Feet

2.0

6.0

109.8 17.9

19.4

20.9

19

39

18

15

1

24

PREMIER FILE# 18-0082

NOTES: DRILLED DATE: 8/16/19

DRILLER: PREMIER GEOTECH

LOGGER: WW

TOTAL DEPTH (Ft): 6

WATER LEVEL: NE

BACKFILL: NATIVE SOIL CUTTINGS

LOG OF BORING B2Soult Street Rehabilitation

PLATE

DE

PT

H, F

T

WA

TE

R L

EV

EL

SY

MB

OL

SA

MP

LE

S

BL

OW

S P

ER

FO

OT

STRATUM DESCRIPTION

LOCATION: Mandeville, LACOORDINATES: 30 22' 40.34"N 90 1' 56.48"W

SURFACE EL.: EXISTING ROADWAY GRADE

ST

RA

TU

MD

EP

TH

, FT

UN

IT D

RY

WT

,P

CF

CLASSIFICATION

PA

SS

ING

NO

200

SIE

VE

, %

WA

TE

RC

ON

TE

NT

, %

LIQ

UID

LIM

IT

PL

AS

TIC

LIM

IT

PL

AS

TIC

ITY

IND

EX

(P

I)

SHEAR STRENGTH

0.5 1 1.5 2 2.5

Miniature Vane

Triaxial

Unconfined

Field Vane

Torvane

Penetrometer

TONS PER SQ FT

Page 23: CONTRACTOR HAS THE OPTION TO USE FULL DEPTH ASPH …...Feb 26, 2021  · Answer 8. The Contractor is required to use Level 1F wearing course for leveling. Question 9. Do the Turn outs

0

2

4

6

8

10

12

14

N=12

Medium, Gray and Tan LEAN CLAY with fine sand (CL)

Dense, Tan and Gray clayey SAND (SC)

Stiff, Light Gray and Tan LEAN CLAY with sand layers and lenses (CL)

Boring Terminated at 6 Feet

2.0

4.0

6.0

102.3

111.0

20.9

18.8

13.5

20

20

12

15

8

5

PREMIER FILE# 18-0082

NOTES: DRILLED DATE: 8/16/19

DRILLER: PREMIER GEOTECH

LOGGER: WW

TOTAL DEPTH (Ft): 6

WATER LEVEL: NE

BACKFILL: NATIVE SOIL CUTTINGS

LOG OF BORING B3Soult Street Rehabilitation

PLATE

DE

PT

H, F

T

WA

TE

R L

EV

EL

SY

MB

OL

SA

MP

LE

S

BL

OW

S P

ER

FO

OT

STRATUM DESCRIPTION

LOCATION: Mandeville, LACOORDINATES: 30 22' 54.87"N 90 1' 56.36"W

SURFACE EL.: EXISTING ROADWAY GRADE

ST

RA

TU

MD

EP

TH

, FT

UN

IT D

RY

WT

,P

CF

CLASSIFICATION

PA

SS

ING

NO

200

SIE

VE

, %

WA

TE

RC

ON

TE

NT

, %

LIQ

UID

LIM

IT

PL

AS

TIC

LIM

IT

PL

AS

TIC

ITY

IND

EX

(P

I)

SHEAR STRENGTH

0.5 1 1.5 2 2.5

Miniature Vane

Triaxial

Unconfined

Field Vane

Torvane

Penetrometer

TONS PER SQ FT