UMass Cadence 2020 · 2020-05-12 · R R L R R L R L R L r l r l r l r R L R R L r L r r l l R L r R
CONTRACT PLANS · 2020. 4. 24. · Charter / Spectrum / Bright House Networks RGB's \r\rManager :...
Transcript of CONTRACT PLANS · 2020. 4. 24. · Charter / Spectrum / Bright House Networks RGB's \r\rManager :...
-
3
10
34
9 10
2122
2728
33
34
32
3
4
36
32
456
7
8
9
1415
1617
18
19 20
30 29
31
13
2
12
10
119
1314
15
24
22
23
2526
27
3634
3
Lou
41
Exit 42
Exit
44
Exit
45
Exit
46A
Exit
46B
Exit
Exit 47
Exit 1 Exit 2
Exit 3
Exit 5
LeRoy
Sel
mon
Expy.
(Toll)
9
Exit
4
Exit
2
Exit
3
Exit
Exit 1
22nd St. Causeway
Tamiami
Hillsborough Ave.
Nebraska
Florida
John F. Kennedy Blvd.
Harney
Bellows
L.
aney
Cr.
RR.
Sutton
port
Rock-
Gary
CSX
T.
PETER O.
KNIGHT
TAMPAPop. 303,447
Orient
BlackPt.
Port Sutton
McKayBay
PE
NI
NS
UL
A
IS.
DAVIS
ISLAND
Hooker
Pt.
Ballast
93
400
TOLL
618
TOLL
618
41
41
41
92
92
92
600
600
45
ALT
41
599
599
599
45
685
ALT
41
685
685
574 574
583
569
60
45
60
574
676A
275
4
Hillsborough
AIRPORT
Ewing
SEDDON Palm
SO
UT
HER
NT
AM
PADel
22nd St.
21st
St.
PROJECT ID: O-00419
NT-28-S
T-29-S
R-1
8-E
R-1
9-E
ROADWAY PLANS
T-28-S
T-29-S
T-29-S
T-30-S
T-29-S
T-30-S
R-1
8-E
R-1
9-E
MULBERRY
TO
BRADENTON
TO
ST. PETERSBURG
TO
OCALA
TO
PLANT CITY
TO
LOCATION OF PROJECT
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
NTS
CERTIFICATE OF AUTHORIZATION NO.: 6091
(813) 574-3190
SUITE 375, TAMPA, FL 33607
3111 W. DR. MARTIN LUTHER KING JR. BLVD.,
WANTMAN GROUP, INC.
MEGAN M. TETRO, P.E. NO.: 76120
4 - 5
UTV-1
3
2
1
TAMPA HILLSBOROUGH
EXPRESSWAY AUTHORITY
CONTRACT PLANS
NO.
SHEET
YEAR
FISCAL
6:01:21 PM c:\pwworking\wgi\megan.miller\d1443940\KEYSRD01.DGNMegan.Tetro 7/15/2019
HILLSBOROUGH COUNTY (10002)
1
E. TWIGGS STREET UTILITY ADJUSTMENTS
EXPRESSWAY
TU
RNPIK
E
10
PENSACOLA FORT WALTON
BEACH
PANAMACITY
CHIPLEY
TALLAHASSEE
75
10
295
95
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND4
NEW PORT RICHEY
TAMPA
754
LAKELAND
MELBOURNE -COCOA
ORLANDO
BARTOWST PETERSBURG
275
SARASOTA -
BRADENTON
75
95
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
75
75
NAPLES
KEY WEST
CITY
LAKE
FLO
RID
A'S
BEACH LINE
CONTRACT NO.
CONSTRUCTION
SHEET DESCRIPTIONSHEET NO.
DAVID MAY, P.E.
THEA PROJECT MANAGER:
INDEX OF ROADWAY PLANS
GOVERNING STANDARD PLANS:
GOVERNING STANDARD SPECIFICATIONS:
CONTRACT PLANS COMPONENTS
ENGINEER OF RECORD:
ROADWAY PLANS
http://www.fdot.gov/programmanagement/Implemented/SpecBooks
for Road and Bridge Construction at the following website:
Florida Department of Transportation, July 2018 Standard Specifications
following website: http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction and associated IRs are available at the
Bridge Construction and applicable Interim Revisions (IRs).
Florida Department of Transportation, FY2018/19 Standard Plans for Road and
https://goo.gl/maps/h4xSHeDs7Sk5X6eJA
ROADWAY PLAN*
TYPICAL SECTION*
UTILITY ADJUSTMENT
SUMMARY OF VERIFIED UTILITIES
GENERAL NOTES
SIGNATURE SHEET
KEY SHEET
* PLAN SHEETS PROVIDED FOR INFORMATION ONLY
£ SURVEY TWIGGS ST
STA. 18+05.18
BEGIN PROJECT
£ SURVEY TWIGGS ST
STA. 24+13.60
END PROJECT
P2167503Text BoxCharter / Spectrum / Bright House Networks RGB's
Manager : Mike Decroix
Supervisor : Scott Creasy
Coordinator : Mark Giurbino
813-436-2118
-
CERTIFICATE OF AUTHORIZATION NO. 6091
SUITE 375, TAMPA, FL 33607
3111 W. MARTIN LUTHER KING JR. BLVD.,
WANTMAN GROUP, INC.
FLORIDA PE NO. 76120
MEGAN M. TETRO, P.E.EXPRESSWAY AUTHORITY
TAMPA HILLSBOROUGH
c:\pwworking\wgi\megan.miller\d1443944\UTADRD01.dgnUSER: Megan.Tetro 7/12/2019 3:42:18 PM Default
O00419 HILLSBOROUGHTWIGGS
ROAD CONTRACT NO.COUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
WATER
WATER
SD
SD
SD
ELEC
SD
SD
SD
WATER
SD SD
SD
TEL
WATER
WATER
TELTEL
TEL
WATER
ELEC
SAN
TEL
WATER
SAN
GAS
GAS
GAS
EOI
GAS
WATER
SAN
WATER
SAN
EOI
TEL
GAS
GASGAS
GAS
TEL
WATER
TEL
WATER
TEL
EOI
ELEC
SAN
CURVE DATA SR45-1
PI STA. = 106+46.41
T = 44.62
L = 88.18
R = 234.89
PC STA. = 106+01.79
PT STA. = 106+89.98
103
104
105
106 PC STA. 106+01.79
16 17 18 19 20 21 22
N
10 40
Feet
0
TH-ML10
TH-ML08
TH-ML09
TH-ML11
TH-ML01
TH-ML02
TH-ML03
BRIGHTHOUSE
CABLE TELEVISION / TO REMAIN
6" PVC BURIED
CITY OF TAMPA WASTEWATER
WASTEWATER / TO REMAIN
12" VCP
CITY OF TAMPA WASTEWATER
WASTEWATER / TO REMAIN
8" CIP
CITY OF TAMPA WASTEWATER
WASTEWATER / TO REMAIN
12" VCP
CITY OF TAMPA WATER
WATER / TO REMAIN
12" DIP
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
12" CAS WATER
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
4" CONDUIT
CITY OF TAMPA WATER
WATER / TO REMAIN
12" DIP
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
12" CLAY COVER
CENTURY LINK (LEVEL 3)
FIBER OPTIC CABLE / TO REMAIN
UNKNOWN SIZE, PE
CITY OF TAMPA WASTEWATER
OUT OF SERVICE / TO REMAIN
15" VCP WASTEWATER
CITY OF TAMPA TRAFFIC
BURIED FIBER OPTIC / TO REMAIN
UNKNOWN SIZE & MATERIAL
CITY OF TAMPA TRAFFIC
FIBER OPTIC CABLE / TO REMAIN
4" PE BURIED
E. TWIGGS ST.
N.
NE
BR
AS
KA
AV
E.
N.
NE
BR
AS
KA
AV
E.
STA. 16+25.00
BEGIN CONSTRUCTION
FIBERNET DIRECT (CROWN CASTLE)
BURIED FIBER OPTIC / TO REMAIN
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
4" CONDUIT
STA. 18+05.18
& RESURFACING
BEGIN MILLING
BEGIN PROJECT
£ SURVEY SR 45
STA. 104+25.16
£ SURVEY TWIGGS ST. =
STA. 18+65.00
STA. 18+90.80
BEGIN WIDENING
FRONTIER COMMUNICATION
BURIED TELEPHONE / TO REMAIN
4x4" PVC
TECO PEOPLES GAS
6" STEEL GAS MAIN / TO REMAIN
TECO PEOPLES GAS
6" STEEL GAS MAIN / TO REMAIN
TECO PEOPLES GAS
6" STEEL GAS MAIN / TO REMAIN
HILLSBOROUGH COUNTY SHERIFF'S OFFICE
FIBER OPTIC CABLE / TO REMAIN
4" PE BURIED
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
8" CI WATER
CITY OF TAMPA WATER
WATER / TO REMAIN
12" DIP
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
8" CI WATER
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
8" CI WATER
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
7x4" PVC
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
8x4" CONDUIT
VERIZON BUSINESS (MCI)
BURIED TELEPHONE / TO REMAIN
UNKNOWN SIZE & MATERIAL
BRIGHTHOUSE
FIBER OPTIC CABLE / TO REMAIN
6x2" PE BURIED
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
(2) 4X4" CONDUIT
CITY OF TAMPA WATER
WATER / TO REMAIN
12" DIP
CITY OF TAMPA WATER
WATER / TO REMAIN
6" DIP
BRIGHTHOUSE
BTV/BFO / TO REMAIN
4x2" PIPES
FIBERLIGHT
3x1.5" BURIED FIBER OPTIC CABLE / TO REMAIN
CITY OF TAMPA WASTEWATER
WASTEWATER / TO REMAIN
15" VCP
VERIZON BUSINESS (MCI)
BURIED TELEPHONE / TO REMAIN
UNKNOWN SIZE & MATERIAL
BRIGHTHOUSE
FIBER OPTIC CABLE TV / TO REMAIN
6-2" PIPES
CENTURY LINK (LEVEL 3)
FIBER OPTIC CABLE / TO REMAIN
UNKNOWN SIZE, PE
TECO
120V OE / TO REMAIN
TECO
13KV OE / TO REMAIN
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
4x4" PVC
TECO
13KV OE / TO REMAIN
TECO
120V OE / TO REMAIN
HILLSBOROUGH COUNTY SHERIFF'S OFFICE
BURIED FIBER OPTIC / TO REMAIN
UNKNOWN SIZE & MATERIAL
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
12" CAS WATER
TECO
OE / TO REMAIN
13KV & 69KV
TECO
OE / TO REMAIN
13KV & 69KV
BRIGHTHOUSE
CABLE TELEVISION / TO REMAIN
6" PVC BURIED
TECO
120V OE / TO REMAIN
TECO
13KV OE / TO REMAIN
BRIGHT HOUSE
FIBER OPTIC CABLE TV / TO REMAIN
6X2" PIPES
FIBERLIGHT
BURIED FIBER OPTIC CABLE / TO REMAIN
3x1.5" PE/DBC
4
UTILITY ADJUSTMENT (1)
expressway authority
tampa hillsborough
P2167503Polygon Line
P2167503Polygon Line
P2167503Rectangle
P2167503Polygon Line
P2167503Polygon Line
P2167503Polygon Line
P2167503CalloutTo be removed and relocated
P2167503Polygon Line
P2167503Rectangle
P2167503Rectangle
P2167503Rectangle
P2167503Line
P2167503Rectangle
P2167503CalloutProposed Relocation of Large and Small Pedestal 3' to the North
P2167503CalloutAdjust in Place During Construction
-
CERTIFICATE OF AUTHORIZATION NO. 6091
SUITE 375, TAMPA, FL 33607
3111 W. MARTIN LUTHER KING JR. BLVD.,
WANTMAN GROUP, INC.
FLORIDA PE NO. 76120
MEGAN M. TETRO, P.E.EXPRESSWAY AUTHORITY
TAMPA HILLSBOROUGH
c:\pwworking\wgi\megan.miller\d1443944\UTADRD02.dgnUSER: Megan.Tetro 7/12/2019 3:42:19 PM Default
O00419 HILLSBOROUGHTWIGGS
ROAD CONTRACT NO.COUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
WATER
WATER
SD
SD
WATER
WATER
SD
WATER
ELEC
SD
WATER
WATER
WATERWATER
TEL
SD
NPW
BACK FLOW
SD
SD
SD
TEL
C
ELEC
WATER
WATER
WATER
WATER
WATER
WATER
BACK FLOW
WATER
WATER
EOI
GAS
WATER
SAN
WATER
WATER
WATER
GAS
TEL
CURVE DATA TWIGGS-1
PI STA. = 23+62.90
T = 76.87
L = 151.93
R = 405.38
PC STA. = 22+86.04
PT STA. = 24+37.96
23
24
PT STA. 24+37.96
25
26
27
28
PC STA. 22+86.04
N
10 40
Feet
0
TH-ML06
TH-ML05
TH-ML04
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
12" CAS WATER
CITY OF TAMPA WATER
ABANDONED / TO REMAIN
8" CI WATER
BRIGHTHOUSE
FIBER OPTIC CABLE TV / TO REMAIN
6X2" PIPES
FIBERLIGHT
BURIED FIBER OPTIC CABLE / TO REMAIN
3x1.5" PE/DBC
FRONTIER COMMUNICATIONS
BURIED TELEPHONE / TO REMAIN
12" CLAY COVER
SPRINT
OPTIC CABLE / TO REMAIN
4" BIP BURIED FIBER
CENTURY LINK (LEVEL 3)
FIBER OPTIC CABLE / TO REMAIN
UNKNOWN SIZE, PE
CITY OF TAMPA TRAFFIC
BURIED FIBER OPTIC / TO REMAIN
UNKNOWN SIZE & MATERIAL
E. TWIGGS ST.
N.
ME
RIDIA
N A
VE.
CR
OS
ST
OW
N E
XP
RE
SS
WA
Y
CR
OS
ST
OW
N E
XP
RE
SS
WA
Y
N.
ME
RIDIA
N A
VE.BRIGHTHOUSE
FIBER OPTIC CABLE TV / TO REMAIN
2X2" PIPES
CITY OF TAMPA WATER
WATER / TO REMAIN
8" CI
STA. 23+68.49
END MILLING & RESURFACING
STA. 24+13.60
END WIDENING
END CONSTRUCTION
END PROJECT
CENTURY LINK (LEVEL 3)
FIBER OPTIC CABLE / TO REMAIN
UNKNOWN SIZE, PE
CITY OF TAMPA WATER
WATER / TO REMAIN
8" DIP
HILLSBOROUGH COUNTY SHERIFF'S OFFICE
BURIED FIBER OPTIC / TO REMAIN
UNKNOWN SIZE & MATERIAL
FIBERNET DIRECT (CROWN CASTLE)
BURIED FIBER OPTIC / TO REMAIN
CITY OF TAMPA WATER
WATER / TO REMAIN
12" DIP
TECO
OE / TO REMAIN
13KV & 69KV
TECO
OE / TO REMAIN
13KV & 69KV
5
UTILITY ADJUSTMENT (2)
EXPRESSWAY AUTHORITY
TAMPA HILLSBOROUGH
P2167503Polygon Line
P2167503Rectangle
P2167503Polygon Line
P2167503Polygon Line
P2167503Polygon Line
P2167503Polygon Line
P2167503Rectangle
P2167503Polygon Line
P2167503CalloutVault to be Removed
P2167503CalloutVault to be Relocated Here 10' to the North East
P2167503CalloutAdjust in Place - Will need to be Buried Deeper
P2167503Line
P2167503CalloutAdjust in Place During Construction Bury Deeper
P2167503Line