Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem
-
Upload
arry-rahmawan -
Category
Education
-
view
127 -
download
6
Transcript of Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem
![Page 1: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/1.jpg)
SYSTEM MODELLING PROJECT- Aisha Adilla- Givanny Permata Sari- Hanny Riana- Latifa Ayu Lestari- Salma Nabila Hadi- Sarah Marsha Davinna
SquadBPJ
![Page 2: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/2.jpg)
• BPJSquad consists of 6 female students from the Department of Industrial Engineering, Universitas Indonesia. This team was formed for the project of Systems Modeling class taught by Mr. Arry Rahmawan. In this project, we were asked to do research on the system of the BPJS Program in a public hospital, in our case RSUD Pasar Minggu.
Salma Nabila
Givanny Permata
Latifa Ayu
Aisha Adilla
Sarah Marsha
Hanny Riana
TEAM PROFILESquadBPJ
![Page 3: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/3.jpg)
DETERMINETHEPROBLEM
MODELCONCEPTUALIZATION
DATAGATHERINGANDANALYSISIS
MODELCONSTRUCTION
VALIDATIONANDVERIFICATION
QUESTIONS
ANSWERS
CONCLUSIONAND
SUGGESTIONOUTPUTANALYSIS
OUTLINE
![Page 4: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/4.jpg)
01
• Definingtheproblem,objectives,actualcondition,andscopeofourresearchproject
DEFINE THE PROBLEM
![Page 5: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/5.jpg)
What?Serviceandqueuesystem
PROBLEM DEFINITION
Who?BPJSPatients(Bothnewandoldmembers)
When?Duringpeaktime
(Monday,Wednesday,andThursday)
Where?RSUDPasarMinggu
Why?Massivenumberof BPJSpatientsin
Jakarta
5
• Definingtheproblemwith5Wtools
![Page 6: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/6.jpg)
6
PROBLEM DEFINITION• Definingthehypothesisoftheproblem
And how it will affects?If the management of RSUD Pasar
Minggu ignores this problem, the BPJS patient will feel uncomfortable while treating their disease in this hospital due to dissatisfaction of the hospital’s
BPJS system.
What are the symptoms?
Since RSUD Pasar Minggu has accepted BPJS patients, there have been problems in
the form of a massive amount of BPJS patients resulting in a long queueing time
in the registration, polyclinic, and pharmacy lines that makes patients
dissatisfied.
![Page 7: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/7.jpg)
7
RESEARCH OBJECTIVES• Definingtheobjectivesofourresearchproject
• ReducingthequeuingtimeofBPJSatRSUDPasarMinggu
• ReducingtheservicetimeofBPJSatRSUDPasar Minggu
• Increasingcustomersatisfaction
• Answeringthequestionsthathavebeengiveninclass
![Page 8: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/8.jpg)
02
• RepresentingtherealBPJSsystematRSUDPasar Minggu asaflowchart
MODELCONCEPTUALIZATION
![Page 9: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/9.jpg)
MODEL CONCEPTUALIZATION• Usingaflowchartasarepresentationoftherealsystem
9
![Page 10: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/10.jpg)
03
• Explainingthemethodusedfordatacollection,thetypesofdata,andanalysisofthedatausingStatFit
DATA GATHERINGAND ANALYSIS
![Page 11: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/11.jpg)
DATA COLLECTION
![Page 12: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/12.jpg)
DATA COLLECTION• Explainingthedatacollectionmethodandthedatatypes
12
Directobservation
Interview DirectMeasurement
Books /Journals
![Page 13: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/13.jpg)
Inter-arrivalTime
13
DATA COLLECTION• Explainingaboutthedatathatwecollected
ArrivalRate
Service TimeandServiceRate
QueueTime
RegistrationTime
![Page 14: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/14.jpg)
DATA COLLECTION• Explaininghowweknowthepeakdaysofthesystemandthesamplingmethod
14
We used direct observation and interview to know what the peak days are of the BPJS system at RSUD PasarMinggu
From direct observation, we got Monday, Wednesday, and Thursday as a peak day. This was also proven by the result of interviews with hospital management. The average population observed in Monday, Wednesday, and Thursday is 222 patients (the population from polyclinics are most influential). We get 144 samples from Slovin’s Formula.
We used stratified random sampling because the difference of cumulative from each registration and polyclinic.
Stratified Random SamplingFrom 144 samples, Registration Samples • BPJS Lama= 84% from population (121 patients)• BPJS Baru= 16% from population (23 patients)Polyclinics Samples• Penyakit Dalam= 44% from population (63 patients)• Jantung= 36% from population (51 patients)• Syaraf= 20% from population (29 patients)
![Page 15: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/15.jpg)
• Based on direct observation (service time and arrival rate), 80% of the service time and arrival rate comes from 20% of the polyclinics: Penyakit Dalam, Jantung, and Syaraf
DATA COLLECTION• Usingpareto diagramtoknowwhichpolyclinicshouldbeobserved
15
0%20%40%60%80%100%120%
0%5%
10%15%20%25%30%35%40%
Jumlah Kedatangan Per Periode Waktu
% Kumulatif %
0%
20%
40%
60%
80%
100%
120%
0%
5%
10%
15%
20%
25%
Waktu Pelayanan
% Kumulatif %
![Page 16: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/16.jpg)
DATA COLLECTION• Summingupalldatatofindmeanandstandarddeviation
16
REGBPJSLAMA Mean StandarDevDetik Menit Detik Menit
WaktuantarKedatangan 27.3 0.46 20 0.33Waktu Pelayanan (4server) 65.1 1.09 20.2 0.34
WaktuTunggu 6694 111.57 278.8 4.65
REGBPJSLAMA JumlahOrang/JamMean
WaktuantarKedatangan 131.87WaktuPelayanan 55.30
REGBPJSBARU Mean StandarDevDetik Menit Detik Menit
Waktu antar Kedatangan 224.30 3.74 213.30 3.56WaktuPelayanan(3server) 199.3 3.32 58.7 0.98WaktuTunggu 1413.9 23.565 766.6 12.78
REGBPJSBARU JumlahOrang/JamMean
WaktuantarKedatangan 16.05WaktuPelayanan 18.06
FARMASI Mean StandarDevDetik Menit Detik Menit
WaktuantarKedatangan 163.5 2.73 154.4 2.57WaktuPelayananScanBarcode 9.201 0.15 4.091 0.07PelayananMemberiObat 139.6 2.33 30.16 0.50WaktuTunggu 5890 98.16667 2482 41.37
FARMASI JumlahOrang/JamMean
TingkatKedatangan 22.02TingkatPelayananServer1 391.26Server2 25.79
![Page 17: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/17.jpg)
DATA COLLECTION• Summingupalldatatofindmeanandstandarddeviation
17
POLIJANTUNG Mean StandarDevDetik Menit Detik Menit
WaktuantarKedatangan 178 2.97 116 1.93WaktuPelayanan(2server) 330.4 5.51 56.8 0.95Waktu Tunggu 9204 153.4 1796 29.93
POLIJANTUNG JumlahOrang/JamMean
TingkatKedatangan 20.22TingkatPelayanan 10.90
POLIPENYAKITDALAM Mean StandarDevDetik Menit Detik Menit
WaktuantarKedatangan 160.1 2.67 163.6 2.73Waktu Pelayanan (2server) 578.7 9.65 192.1 3.20WaktuTunggu 4349 72.48 1893 31.55
POLIPENYAKITDALAM JumlahOrang/JamMean
WaktuantarKedatangan 22.49WaktuPelayanan 6.22
POLISYARAF Mean StandarDevDetik Menit Detik Menit
WaktuantarKedatangan 233.28 3.89 197.66 3.29WaktuPelayanan(2server) 333.3 5.56 55.57 0.93WaktuTunggu 4526.0 75.43 695.80 11.60
POLISYARAF JumlahOrang/JamMean
TingkatKedatangan 15.43TingkatPelayanan 10.80
![Page 18: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/18.jpg)
DATA ANALYSIS
![Page 19: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/19.jpg)
DATA ANALYSIS• Identifyingthetypeofdistributionofeachdata
19
Normal
Normal
BPJS Lama
Inte
r-ar
rival
Ti
me
Serv
ice
Tim
e
![Page 20: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/20.jpg)
DATA ANALYSIS• Identifyingthetypeofdistributionofeachdata
20
Normal
Wai
ting
Tim
e
![Page 21: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/21.jpg)
DATA ANALYSIS
21
Exponential
Exponential
BPJS Baru
• Identifyingthetypeofdistributionofeachdata
Inte
r-ar
rival
Ti
me
Serv
ice
Tim
e
![Page 22: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/22.jpg)
DATA ANALYSIS• Identifyingthetypeofdistributionofeachdata
22
Normal
Wai
ting
Tim
e
![Page 23: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/23.jpg)
DATA ANALYSIS
23
Normal
Normal
Poli Penyakit Dalam
• Identifyingthetypeofdistributionofeachdata
Wai
ting
Tim
eSe
rvic
e Ti
me
![Page 24: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/24.jpg)
DATA ANALYSIS• Identifyingthetypeofdistributionofeachdata
24
Normal
Normal
Poli Jantung
Wai
ting
Tim
eSe
rvic
e Ti
me
![Page 25: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/25.jpg)
DATA ANALYSIS
25
Normal
Normal
• Identifyingthetypeofdistributionofeachdata
Wai
ting
Tim
eSe
rvic
e Ti
me
Poli Syaraf
![Page 26: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/26.jpg)
DATA ANALYSIS
26
Normal
Normal
Farmasi
• Identifyingthetypeofdistributionofeachdata
Wai
ting
Tim
eSe
rvic
e Ti
me
of S
cann
ing
Bar
code
![Page 27: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/27.jpg)
DATA ANALYSIS
27
Normal
• Identifyingthetypeofdistributionofeachdata
Serv
ice
Tim
e of
Giv
ing
Med
icin
e
![Page 28: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/28.jpg)
04
• IllustratingabouthowaProModel modelisbuilttorepresenttherealsystem
MODEL CONSTRUCTION
![Page 29: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/29.jpg)
MODEL CONSTRUCTIONIllustratinghowaProModel modelisbuiltrepresenttherealsystem
29
ENTITIES
![Page 30: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/30.jpg)
MODEL CONSTRUCTION
30
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
LOCATIONS
![Page 31: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/31.jpg)
MODEL CONSTRUCTION
31
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
ARRIVALS
![Page 32: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/32.jpg)
MODEL CONSTRUCTION
32
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
PROCESSING
![Page 33: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/33.jpg)
MODEL CONSTRUCTION
33
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
ARRIVALCYCLES
![Page 34: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/34.jpg)
MODEL CONSTRUCTION
34
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
ATTRIBUTES
![Page 35: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/35.jpg)
MODEL CONSTRUCTION
35
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
USERDISTRIBUTION
![Page 36: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/36.jpg)
MODEL CONSTRUCTION
36
IllustratinghowaProModel modelisbuiltrepresenttherealsystem
• Final ProModel for the BPJS system of RSUD Pasar Minggu
When model pause When model run
![Page 37: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/37.jpg)
05
• Thevalidationandverificationofmodelconceptualizationandcomputermodel
VALIDATION AND VERIFICATION
![Page 38: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/38.jpg)
VALIDATION
![Page 39: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/39.jpg)
VALIDATION• Modelconceptualizationvalidation
39
Trace Validity Face Validity
Trace in PromodelUsing a feature in ProModel(trace) to trace the truth of the model logic and computer model (debugging)
Validity in Real LifeChecking the validity of model conceptualization by asking people who know the system well and trusted
Determining the truth of model flow diagram or model logic mechanism
![Page 40: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/40.jpg)
VALIDATION• Modelconceptualizationvalidation
40
Trace Validity
![Page 41: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/41.jpg)
VALIDATION• Modelconceptualizationvalidation
41
Weinterviewedpeoplefrominformationcentreandalsosecurity
whoisondutyandalwaysobservethequeuingsystemofBPJSpatientsin
RSUDPasar MingguFace Validity
Interviewrecordingattached
![Page 42: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/42.jpg)
VALIDATION• ProModel validation
42
Comparing with Queuing Theory
Watching theAnimation
ExtremeCondition Test
RunningTraces
Comparing output from the simulation with queuing theory
Watching the computer model that has conducted
Testing the model using 2 extreme conditions
Stage of processes are traced using the processing logic model to be compared with the actual model
![Page 43: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/43.jpg)
VALIDATION• ProModel validation
44
Comparing with Queuing Theory
VALIDATIONOF BPJSBARUPROMODELWITHQUEUINGTHEORYCALCULATION
Arival Rate 4.545455
Service Rate 14.66667
AverageUtilization Rate 0.3099174
TheProbability SysteminEmptySituation 73.342039%
AverageNumberofPatientinQueuing 44.43555
AverageNumberofPatientinSystem 44.745468
Average Patient’sWaitingTimeinQueuing 9.7758211
Average Patient’sWaitingTimeinSystem 9.8440029
![Page 44: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/44.jpg)
VALIDATION• ProModel validation
45
Watching the Animation
![Page 45: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/45.jpg)
VALIDATION• ProModel validation
46
• Total entities: 22200
Extreme Condition Test
• Total entities: 0
![Page 46: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/46.jpg)
VALIDATION• ProModel validation
47
Running Traces
![Page 47: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/47.jpg)
VERIFICATION
![Page 48: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/48.jpg)
VERIFICATION• Modelverification
49
Watching theAnimation
Using Trace andDebugging Facilities
Reviewing theModel Code
Visual verification whether the model
running has been right
Checking for code errors or inconsistency in the statistics results
• Trace : chronologically describe what’s happening during the simulation
• Debugger : showing the stages of the processes in the simulation
• Trace & Debugger enable us to look deeper what’s happening in the simulation
![Page 49: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/49.jpg)
VERIFICATION• Modelverification
50
Watching the Animation
![Page 50: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/50.jpg)
VERIFICATION• Modelverification
51
Reviewing the Model Code
![Page 51: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/51.jpg)
VERIFICATION• Modelverification
52
Reviewing the Model Code (cont’d)
![Page 52: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/52.jpg)
VERIFICATION• Modelverification
53
Reviewing the Model Code (cont’d)
![Page 53: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/53.jpg)
VERIFICATION• Modelverification
54
Reviewing the Model Code (cont’d)
(1) (2)
![Page 54: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/54.jpg)
VERIFICATION• Modelverification
55
• There are no bugs, so the model can run perfectly
Running Trace and Debugging Facilities
![Page 55: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/55.jpg)
06
• ShowingthestatisticsresultsofProModel
OUTPUT ANALYSIS
![Page 56: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/56.jpg)
OUTPUT ANALYSISShowingthestatisticsresultsofProModel
57
![Page 57: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/57.jpg)
OUTPUT ANALYSISShowingthestatisticsresultsofProModel
58
![Page 58: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/58.jpg)
OUTPUT ANALYSISShowingthestatisticsresultsofProModel
59
![Page 59: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/59.jpg)
07
• AnsweringthequestionsthathavegivenbyMr.Arry Rahmawan
QUESTIONS & ANSWERS
![Page 60: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/60.jpg)
ANSWER TO THE 1ST QUESTION
61
• Whatisthebestlineformation?• SingleLine->MultiServer
SquadBPJ
![Page 61: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/61.jpg)
62
• Wherearetheworstbottlenecksofsystem?
SquadBPJANSWER TO THE 2ND QUESTION
BPJSBaru Registration• Alotofthenewpatientsdonotknowaboutthedocumentstheymustbringinordertoregistersothatsometimestheyhavetogobackhomeorgotophotocopystationifthere’smissingdocuments.Thisaffecttheregistrationtimesincesometimestheyhavebeencalledbutthey’restillsomewhereelse.
BPJSLamaRegistration• Lackofserver&ineffectivequeuingposition
Poli Penyakit• Everyserverhasdifferentopeningtimewherealotofpatientshavebeenwaiting
Pharmacy• Thereisnospecificjobforeachemployees&sometimesthereisdowntimesintheDoctorssendthemedicinereceiptbyserveronline
![Page 62: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/62.jpg)
63
• Howmanystaffshouldbeassignedtoreachtheobjectivewiththelowestpossiblecost?
SquadBPJANSWER TO THE 3RD QUESTION
BPJSBaru• 4staff
BPJSLama• 7staff
Poli Penyakit• Penyakit Dalam 8staff,Syaraf 4staff&jantung 4staff
Pharmacy• 2staff
![Page 63: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/63.jpg)
64
• Whatarethenewandmosteffectivebusinessprocessideasforthehospitaltoreachtheobjective?
SquadBPJANSWER TO THE 4TH QUESTION
BPJSLama• Addservers&services,&giveclearway-findinginstructionforpatients
Poli Penyakit Dalam• Openroomthatusedtobeunused,openeverycheckingroomatthesametime(7.30a.m.)&makethefirstlineaspriorityseat
Poli Jantung• Openeverycheckingroomatthesametime(7.30a.m.)&make8priorityseat
Poli Syaraf• Openeverycheckingroomatthesametime(7.30a.m.)
![Page 64: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/64.jpg)
32
• Othersolutionsthatshouldbeconsidered
SquadBPJANSWER TO THE 5TH QUESTION
Makeaclearway-finding&signage
system
MakeinformationboarddetailingtheproceduresofBPJS
registration
Utilizingthewebsiteforreal-timewaitinglineinformationat
thehospital
Makingaclearjobdescriptionfor
resourcestoavoididlehumanresources
![Page 65: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/65.jpg)
08MODEL IMPROVEMENT
![Page 66: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/66.jpg)
ANALYSIS MODEL IMPROVEMENT
32
![Page 67: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/67.jpg)
ANALYSIS MODEL IMPROVEMENT
68
TheDataAfterImprovement(WaitingTime)BPJSLAMA =79.23minBPJSBARU =40.34minPOLIPD =68.71minPOLISYARAF =60.86minPOLIJANTUNG =77.21minFARMASI =50.31min
TheDataBeforeImprovement(WaitingTime)BPJSLAMA =112.4minBPJSBARU =47.71minPOLIPD =98.67minPOLISYARAF =71.48minPOLIJANTUNG =155.59minFARMASI =196.42min
![Page 68: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/68.jpg)
69
ANALYSIS MODEL IMPROVEMENT
![Page 69: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/69.jpg)
09
• Concludingourprojectresearch
CONCLUSION
![Page 70: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/70.jpg)
CONCLUSIONConcludingourprojectresearch
71
• Theprocessoffindingsolutionsthroughmakingmodelsinvolvesmakingaconceptualmodelbasedontherealworld andthenacomputermodelbasedontheconceptualmodel.
• TheBPJSsysteminRSUDPasar Minggu consistsofBPJSLamaregistration,BPJSBaru registration,polyclinic,andpharmacy.
• Thebottleneckofthesystemrelativetothenumberofentriesis PoliJantung.
• Weimprovedthesystembyaddingserversandintroducingapunctualitypolicyfordoctorsandemployees.
![Page 71: Contoh Presentasi Pembelajaran Berbasis Riset (PBR) Mata Kuliah Pemodelan Sistem](https://reader034.fdocuments.us/reader034/viewer/2022052405/58e49cd01a28abf5428b5543/html5/thumbnails/71.jpg)
THANK YOU
- Aisha Adilla (1406606152)- Givanny Permata Sari (1406606070)- Hanny Riana (1406606341)- Latifa Ayu Lestari (1406606354)- Salma Nabila Hadi (1406553133)- Sarah Marsha Davinna (1406553285)
SquadBPJ