Content(5)

2
WAPDA WCSR-2013 (Zone-6) C O N T E N T S Section Title Pages Preface…………………………………………………………… i to iii Abbreviation & Symbol.……………………………………….. iv to v Conversion Factors……………………………………………. vi to viii 1. CARRIAGE OF MATERIAL, LOADING AND UNLOADING. 1-1 to 1-13 A) Carriage of Material………………………………… 1-1 to 1-10 B) Loading, Unloading and Stacking…………………. 1-11 to 1-13 2. EARTHWORK (EXCAVATION AND EMBANKMENT)……. 2-1 to 2-8 3. DISMANTLING (DEMOLITION)……………………………… 3-1 to 3-4 4. MORTAR………………………………………………………… 4-1 5. CONCRETE……………………………………………………. 5-1 to 5-5 6. BRICK WORK………………………………………………….. 6-1 to 6-5 7. STONE MASONRY…………………………………………… 7-1 to 7-5 8. ROOFING………………………………………………………. 8-1 to 8-5 9. FLOORING……………………………………………………. 9-1 to 9-6 10. SURFACE RENDERING……………………………………… 10-1 to 10-3 11. WOOD WORK…………………………………………………. 11-1 to 11-7 12. PAINTING AND VARNISHING………………………………. 12-1 to 12-5 13. WATER SUPPLY AND SANITATION……………………….. 13-1 to 13-24 14. ROAD AND ROAD STRUCTURES………………………….. 14-1 to 14-5 15. LINING OF CANALS…………………………………………... 15-1 to 15-2 16. SHEET PILING………………………………………………… 16-1 17. RIVER TRAINING AND DIVERSION WORKS…………….. 17-1 to 17-3 18. OUTLETS………………………………………………………. 18-1 to 18-3 19. SINKING OF WELLS………………………………………….. 19-1 20. MISCELLANEOUS……………………………………………. 20-1 to 20-24

description

WAPDA

Transcript of Content(5)

Page 1: Content(5)

WAPDA WCSR-2013 (Zone-6)

C O N T E N T S

Section Title Pages

Preface…………………………………………………………… i to iii

Abbreviation & Symbol.……………………………………….. iv to v

Conversion Factors……………………………………………. vi to viii

1. CARRIAGE OF MATERIAL, LOADING AND UNLOADING. 1-1 to 1-13

A) Carriage of Material………………………………… 1-1 to 1-10

B) Loading, Unloading and Stacking…………………. 1-11 to 1-13

2. EARTHWORK (EXCAVATION AND EMBANKMENT)……. 2-1 to 2-8

3. DISMANTLING (DEMOLITION)……………………………… 3-1 to 3-4

4. MORTAR………………………………………………………… 4-1

5. CONCRETE……………………………………………………. 5-1 to 5-5

6. BRICK WORK………………………………………………….. 6-1 to 6-5

7. STONE MASONRY…………………………………………… 7-1 to 7-5

8. ROOFING………………………………………………………. 8-1 to 8-5

9. FLOORING……………………………………………………. 9-1 to 9-6

10. SURFACE RENDERING……………………………………… 10-1 to 10-3

11. WOOD WORK…………………………………………………. 11-1 to 11-7

12. PAINTING AND VARNISHING………………………………. 12-1 to 12-5

13. WATER SUPPLY AND SANITATION……………………….. 13-1 to 13-24

14. ROAD AND ROAD STRUCTURES………………………….. 14-1 to 14-5

15. LINING OF CANALS…………………………………………... 15-1 to 15-2

16. SHEET PILING………………………………………………… 16-1

17. RIVER TRAINING AND DIVERSION WORKS…………….. 17-1 to 17-3

18. OUTLETS………………………………………………………. 18-1 to 18-3

19. SINKING OF WELLS………………………………………….. 19-1

20. MISCELLANEOUS……………………………………………. 20-1 to 20-24

Page 2: Content(5)

WAPDA WCSR-2013 (Zone-6)

Section Title Pages

21. ELECTRIFICATION…………………………………………… 21-1 to 21-45

A-I Internal Electrification of Building………………….. 21-1 to 21-40

1. Point Wiring………………………………………. 21-1 to 21-5

2. Miscellaneous……………………………………. 21-5

3. Mains and Sub-Mains…………………………… 21-6 to 21-22

4. Electrical accessories…………………………… 21-23 to 21-26

5. Boards……………………………………………. 21-26 to 21-27

6. Fittings and Fixtures…………………………….. 21-27 to 21-28

7. Fans………………………………………………. 21-28 to 21-30

8. Switch Gears…………………………………….. 21-30 to 21-36

A-II Internal Electrification of Building…………………. 21-37 to 21-45

B) O/H Transmission & Distribution…………………… 21-41 to 21-44

22. BASIC RATES OF MATERIAL FOR CIVIL WORKS………. 22-1 to 22-18

23. BASIC RATES OF MATERIAL FOR ELECTRICAL WORKS 23-1 to 23-14

24. BASIC RATES OF LABOUR………………………………….. 24-1 to 24-2

25. BASIC RATES OF MACHINERY USAGE ……………… 25-1 to 25-3