Seatech Engineering Ltd. 1. General Information 2. SE-601 – Coastal 3000m3 LNG Bunkering Vessel 3. LNG Bunkering Vessel – Variety of Propulsion Systems 4. Conclusions
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 2
Our history
www.seatech.com.pl
SEATECH ENGINEERING Ltd. - Engineering and ship designing company founded in 2003, as part of an international shipbuilding group PIRIOU.
PIRIOU : - Chantiers Piriou, France - PNS, France - SEAS, Vietnam - WAS, Nigeria - CNOI, Mauritius - BOPP, France - Piriou Ingénierie, France - Seatech Engineering, Poland
After management buyout in March 2018 Seatech became fully independent company (all shares in private hands).
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 3
Scope of activities / New bulildings
www.seatech.com.pl Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 4
www.seatech.com.pl
Seatech Engineering Ltd. 1. General Information 2. SE-601 – Coastal 3000m3 LNG Bunkering Vessel 3. LNG Bunkering Vessel – Variety of Propulsion Systems 4. Conclusions
Content of Presentation
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 5
Cooperation with KERSHIP
SE-601 – Coastal 3000m3 LNG Bunkering Vessel
PRINCIPAL CHARACTERISTICS Length over all/between perp.: 81.90/80.50 m Breadth Moulded: 16.50 m Depth to Main Deck: 7.05 m Design Draught (full load at dep.)/ Max Draught (ballast for air draught reduction): 4.00/5.00 m Deadweight at Design Draught 1 500 t Service Speed at design draught (15%SM, 75% MCR) 10.00 kn LNG Capacity (100%) 3 000 m3 Class DNVGL (or equivalent IACS)
www.seatech.com.pl
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 6
Cooperation with KERSHIP
SE-601 – Coastal 3000m3 LNG Bunkering Vessel
www.seatech.com.pl Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 7
Cooperation with KERSHIP
SE-601 – Coastal 3000m3 LNG Bunkering Vessel
www.seatech.com.pl Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 8
www.seatech.com.pl
Content of Presentation
Seatech Engineering Ltd. 1. General Information 2. SE-601 – Coastal 3000m3 LNG Bunkering Vessel 3. LNG Bunkering Vessel – Variety of Propulsion Systems 4. Conclusions
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 9
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 1. Dual Fuel - Mechanical • 2 x Wärtsilä 6L20DF (2x1110kW) • 2 x Reduction Gears • 2 x PTO (2x250kWe) • 2 x Shaft lines • 2 x Rudders and Steering Gears. • 2 x Generators (2x450kWe)
6L20DF CPP
250kWe
GE
AR
PTO
CPP
GE
AR
PTO
250kWe 6L20DF
450kWe G
450kWe G
Ship Consumers
DIS
TR
IBU
TIO
N S
WIT
CH
BO
AR
D
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 10
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 1. Dual Fuel - Mechanical
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 11
PROS CONS
Conventional system Additional generating sets for operation in terminal/harbor
High efficiency of propulsion system optimized for one service point
Low efficiency for lower load of engines
Two sets of engines means two sets of spare parts
Lower maneuverability compare with azimuth thrusters
Expensive CPPs
Additional stern thruster for crabbing
Complicated to midify if new sources of Energy come (eg. Fuel cells)
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 2. Dual Fuel - Mechanical • 2 x Wärtsilä 6L20DF (2x1110kW) • 2 x Wärtsilä WST11 azimuth thrusters • 2 x PTO (2x250kWe) • 2 x Shaft lines with Cardan joints • 2 x Generators (2x450kWe)
6L20DF CPP G
EA
R
PTO
6L20DF CPP
250kWe
GE
AR
PTO
450kWe G
450kWe G
Ship Consumers
DIS
TR
IBU
TIO
N S
WIT
CH
BO
AR
D
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 12
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 2. Dual Fuel - Mechanical
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 13
PROS CONS
Conventional system Additional generating sets for operation in terminal/harbor
High maneuverability Low propulsion efficiency
Crabbing Low efficiency for lower load of engines
Easier to adopt to new sources of Energy.
Two sets of engines means two sets of spare parts
Expensive CPPs
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 3. Dual Fuel - Electric • 2 x Wärtsilä 6L20DF (2x1065kWe) – Generating Sets • 2 x Wärtsilä WST11 azimuth thrusters • 2 x Electric motors (2x900kWe) • 2 x Variable Frequency Drive
FPP GE
AR
Variable frequency drive
El.
motor
6L20DF G
6L20DF G
FPP GE
AR
Variable frequency drive El.
motor DIS
TR
IBU
TIO
N S
WIT
CH
BO
AR
D
Ship Consumers
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 14
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 3. Dual Fuel - Electric
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 15
PROS CONS
High maneuverability incl. crabbing
More sophisticated propulsion system
No additional genets for hotel/terminal load
Additional costs for more complicated el. system
Only two DF generators able to cover propulsion and hotel/terminal loads.
Optimal load factor for main engines (one running if lower speed needed)
Fixed pitch propellers
Vessel can be work as power unit (BOG management when idling)
Easy to plug-in different sources of el. power (solar, fuel cells…)
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 4. Dual Fuel - Hybrid • 2 x Wärtsilä 6L20DF (2x1065kWe) – Generating Sets • 2 x Wärtsilä WST11 azimuth thrusters • 1 x Battery pack 450kWh • 2 x Electric motors (2x900kWe) • 2 x Variable Frequency Drive
FPP GE
AR
Variable frequency drive
El.
motor
6L20DF G
6L20DF G
FPP GE
AR
Variable frequency drive El.
motor
Ship Consumers
DIS
TR
IBU
TIO
N S
WIT
CH
BO
AR
D
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 16
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl
Version No. 4. Dual Fuel - Hybrid
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 17
PROS CONS
High maneuverability More sophisticated propulsion system
Only one DF generator running. Second - loading batteries.
Additional costs for more complicated el. system
Super-Optimal load factor for main engines (gensets tuned for one optimum load)
Additional costs for batteries
Batteries shaving peak loads Battery life cycle (approx. 7years)
Fixed pitch propellers
Vessel can be work as power unit (BOG management when idling)
Easy to plug-in different sources of el. power (solar, fuel cells…)
LNG Bunkering Vessel – Variety of Propulsion Systems
www.seatech.com.pl Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 18
Assumed operation profile: • 30% sailing with service speed, • 15% maneuvering, • 20%LNG loading, • 20%LNG discharging, • 10% stand-by, • 5% idling
100%
93%
109%
130%
100% 100%
94%
84%
0%
20%
40%
60%
80%
100%
120%
140%
Version No. 1DF-Mechanical
Version No. 2DF-Mechanical
Version No.3DF-Electric
Version No.4DF-Hybrid
Investment & Annual Operation Costs
CAPEX
OPEX(Forecast)
www.seatech.com.pl
Content of Presentation
Seatech Engineering Ltd. 1. General Information 2. SE-601 – Coastal 3000m3 LNG Bunkering Vessel 3. LNG Bunkering Vessel – Variety of Propulsion Systems 4. Conclusions
Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 19
www.seatech.com.pl Coastal 3000m3 LNG Bunkering Vessel – Variety of Propulsion Systems Krzysztof Czerski – Seatech Engineering 3/11/2019 Page: 20
Finally, DF electric system (Version 3) was chosen with optional installation of batteries (DF Hybrid System – Version 4) .
Conclusions
Thank You For Your Attention
Krzysztof Czerski – Seatech Engineering e-mail: [email protected]
mobile: +48 697 077 302