    Vuyk Engineering Rotterdam B.V.Naval architects, Marine engineers, Consultants

    P.O. Box 1, De Linie 72900 AA Capelle aan den IJsselPhone +31 (0)10 450 25 00Fax +31 (0)10 458 72 45Email [email protected] www.vuykrotterdam.com Values are for presentation only

    Principal dimensions

    Consultancy SMIT anchor

    handling tug/supply vessels

    70-ton bollard pullAHTS

    70.90 m63.00 m16.00 m7.00 m5.60 m

    2x Wrtsil, type 6R322x 2 460 kW

    2x Lips CPP in nozzle2x 1 200 kW

    2x 540 kW1x 150 kW2x 550 kW1x 500 kW

    120-ton bollard pullAHTS

    70.90 m63.00 m16.00 m7.00 m5.60 m

    2x Wrtsil, type 9R322x 3 280 kW

    2x Lips CPP in nozzle2x 1 200 kW

    2x 540 kW1x 150 kW2x 550 kW1x 500 kW

    Length overallLength between perpendicularsBreadth mouldedDepth mouldedDesign draught

    Main enginesOutputPropellersShaft generatorsAuxiliary generatorsEmergency generatorBow thrusters:Stern thruster

    During the last quarter of 2003, Vuyk Engineering Rotterdam was contracted bySmit Engineering - part of the SMIT Group - to review a basic design for adynamically positioned anchor handling tug/supply vessel (AHTS), providing abasis for modular upgrading to diving support, oil recovery and other duties.In the first phase, SMIT intended to order two 70-ton bollard pull vessels and one120-ton bollard pull AHTS.After an international tender, resulting in offers from yards in The Netherlands,Norway, Spain and Singapore, Smit Transport & Heavy Lift B.V. ordered in March

    2004 two 70-ton bp AHTS from the Keppel Singmarine yard in Singapore with anoption for two 120-ton bp AHTS. In July 2004 Smit exercised its option to build thisvessel.

    VER project 03.344

    Introduction

    Machinery

  • 8/8/2019 Consultancy AHTS

    2/2

    Vuyk Engineering Rotterdam B.V.Naval architects, Marine engineers, Consultants

    P.O. Box 1, De Linie 72900 AA Capelle aan den IJsselPhone +31 (0)10 450 25 00Fax +31 (0)10 458 72 45Email [email protected] www.vuykrotterdam.com Values are for presentation only

    Consultancy SMIT anchor

    handling tug/supply vessels

    All photos courtesy URS of Antwerp, Belgium

    Classification

    VER scope of work

    All vessels are certfied by American Bureau of Shipping for the class notation:A1(e), Offshore Support Vessel, Anchor Handling Towing Vessel, AMS,ACCU, FiFi Class 1, +DPS-2

    The first AHTS - named 'Smit Kamara' - has been contracted by the NederlandseAardolie Maatschappij B.V.'(NAM) for a 5-year charter period.The second 70-ton bollard pull AHTS - named 'Smit Komodo' - shall also be fittedas Diving Support Vessel. For this purpose this vessel shall have two 850 kW bowthrusters and two 550 kW stern thrusters, enhancing dynamic positioningcapabilities. Furthermore the vessel can accommodate 50 persons instead of 42persons.The 'Smit Komodo'' will be deployed on a long -term charter in Egypt and the 120ton bollard pull 'Smit Nicobar', which is due for delivery June 2006 and will start a

    charter in Sakhalin, Russia.On March 31, 2006 SMIT announced that they have reached an agreement for thepurchase of seven newly built work vessels from Hadi H. Al-Hammam Est. ofSaudi Arabia. These vessels of approximately 75 tons bp are a modified version ofthe 'Smit Kamara' and 'Smit Komodo'' The first two vessels of this new series willbe delivered during 2006 and the last one is expected to be delivered in 2008.They will be managed by the SMIT Singapore organisation.

    VER project 03.344

    SpeedBollard pull

    Cargo deck areaFire Fighting ClassWinch brake force

    pull forceWinch drum capacity

    Accommodation

    70-ton bollard pullAHTS

    14.5 kn83 ton

    450 mFi-Fi 1

    225 ton150 ton

    2x 1 000 m x 58 mm

    42 persons

    120-ton bollard pullAHTS

    14.5 kn120 ton

    450 mFi-Fi 1

    400 ton150 ton

    2x 1 300 m x 68 mm1x 1 800 m x 68 mm

    42 persons

    Performance

    Capacity

    Vuyk Engineering Rotterdam assisted Smit Engineering to compare the variousshipyards offers in technical and commercial way and made ship motioncalculations to advise for the correct configuration of main propulsion, bow andstern thruster to obtain the DP-2 class notation.