Construction Schedule
1
Work to do during week 15/12/20 14 Week 1 Create Drafts for all 3 pages and annotate where needed. Week 2 Do photoshoot and do experiemtnal photo to possibly use. Week 3 Contruct front cover and decide cover lines and font. Week 4 Contruct Contents page Week No. Week 5 Contruct doublepage spread without feature article. Week 6 Write feature article and finalise other text. Week 7 Overdraft time to make final products Week 8 Overdraft time to make final products Week 9 Ask target audience for opinions and make changes where necessary. 13/02/20 15 Week 10 Final changes to magazine products.
-
Upload
armouredkangaroo -
Category
Education
-
view
29 -
download
0
Transcript of Construction Schedule
Work to do during week15/12/201
4 Week 1 Create Drafts for all 3 pages and annotate where needed.Week 2 Do photoshoot and do experiemtnal photo to possibly use.Week 3 Contruct front cover and decide cover lines and font.Week 4 Contruct Contents page
Week No. Week 5 Contruct doublepage spread without feature article.Week 6 Write feature article and finalise other text.Week 7 Overdraft time to make final products
Week 8Overdraft time to make final products
Week 9 Ask target audience for opinions and make changes where necessary.13/02/201
5 Week 10 Final changes to magazine products.