Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an...

36
AABC Commissioning Group AIA Provider Number 50111116 Completing a Global Enterprise Building Commissioning Program in Six Months Course Number: CXENERGY1614 Michael Chimack, PE, QCxP, CEM, PMP, LEED GA Steven Dodd, EMP, LEED GA Siemens April 12, 2016

Transcript of Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an...

Page 1: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

AABC Commissioning GroupAIA Provider Number 50111116

Completing a Global Enterprise

Building Commissioning Program in

Six MonthsCourse Number: CXENERGY1614

Michael Chimack, PE, QCxP, CEM, PMP, LEED GA

Steven Dodd, EMP, LEED GA

Siemens

April 12, 2016

Page 2: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Credit(s) earned on completion of

this course will be reported to AIA

CES for AIA members.

Certificates of Completion for both

AIA members and non-AIA

members are available upon request.

This course is registered with AIA

CES for continuing professional

education. As such, it does not

include content that may be

deemed or construed to be an

approval or endorsement by the

AIA of any material of construction

or any method or manner of

handling, using, distributing, or

dealing in any material or product._______________________________________

Questions related to specific materials, methods and services will be addressed at the conclusion of this presentation.

Page 3: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

This presentation is protected by U.S. and International Copyright laws. Reproduction, distribution, display and use of the presentation without written

permission of the speaker is prohibited.

Restricted © Siemens Industry, Inc. 2016 All rights reserved

Copyright Materials

Page 4: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Six months to complete an existing building

commissioning program at 12 facilities in 8

countries is daunting. This, real-world case study

with lessons learned shows how with

coordination, global resources and a proven

approach, it was completed and exceeded Cx

Objectives.

CourseDescription

Page 5: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

LearningObjectives

1. Tailor common commissioning practices and strategies to meet global market

challenges.

2. Understand how commissioning strategies can be used to enhance system

performance and increase energy efficiency.

3. Learn how to deliver maximum value to customers with a fixed budget and a

significantly compressed project timeline.

4. Understand some of the key managerial, financial and tactical challenges of

managing a global commissioning project. .

At the end of the this course, participants will be able to:

Page 6: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Consumption

Results

Building Commissioning Market Drivers

Pilot Project

Global Project

Building

Commissioning

Market Drivers

4 Phase Commissioning

Process

Results

Page 7: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 7

Demand and expectations for commissioning continue to grow

Global revenue projection from building commissioning

services

$50B

$20B

$10B

$3B

2014 2016 2018 2020 2022 2024

© 2013 Navigant Research

$6B

$30B

$40B

Value drivers

• Energy savings

• Improve building performance/value

• Increase tenant satisfaction/retention

• Other-specific owner/manager goals

Challenges

Financial

• Meet payback expectations

• Address RFP variances

Procedural

• M&V processes

• Ensure persistence of savings

Organizational

• Organizational challenges

• Consistent delivery

• Implementation procedures

Page 8: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 8

This is not your standard commissioning process…

Page 9: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Consumption

Results

Pilot Project

Building Commissioning Market Drivers

Global Project

Pilot

Project

4 Phase Commissioning

Process

Results

Page 10: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 10

• Complete all assessment, investigation and implement

approved corrective actions by April 30, 2014.

• Support the target of reducing GHG emissions to 20 percent

below 2005 levels. (Energy use accounts for 98 percent of

the greenhouse gas (GHG) emissions generated)

• Identify corrective actions and measures through the project.

• Achieve a simple payback of 2.5 years for the overall project

through energy improvement measures executed during the

project.

• Review and document HVAC systems performance

Work Within the

Customer’s

Expedited Timeline

Support

Sustainability

Target

Find and Achieve

Energy Savings

Project Goal Challenges:

Document

Performance

Goals for the pilot project

Page 11: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 11

Key results of the pilot EBCx project

1 Saved 940,000 kWh,17,000 therms and over $96,000 in the first year. Achieved by identifying

and executing 11 facility improvement measures.

3 New sequence of operations: Documented existing sequence of operations and created new

sequences based on current facility requirements.

2 79 sensors verified/OAT sensor replaced and relocated: Completed by using NIST traceable

calibrated devices and functional testing of major HVAC systems.

4BAS programming updates: Implemented building automation system programming updates

based on the new sequence of operations.

5Failed device replacement: Identified and replaced failed devices including sensors (28% of all

sensors), control modules, thermostats and terminal box controllers.

6Performance recommendations: Generated actions to preserve and enhance value achieved

through the existing building commissioning process.

Page 12: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Consumption

Results

Global Project

Building Commissioning Market Drivers

Pilot ProjectGlobal

Project

4 Phase Commissioning

Process

Results

Page 13: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 13

Global EBCx project overview

• Commission 6.3MSF of mixed use

buildings located in 8 countries (4

continents) in 6 months or less!

• Reduce energy consumption by

10-20% per site

• Save a minimum of $2.5M across the

portfolio

• Building managed by separate facility

managers

• Submit proposal (RFP) in less than one

month

Page 14: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 14

Siemens challenges

• Minimal response time (proposal)

• Incomplete/inaccurate RFP data

• Limited resource availability internally and

externally

• Contracting

• Cost conversions with fluctuations in rate

exchange

• Site visits to 11 campuses in 8 countries

and 9 time zones

• Project paid by corporate but executed by

local site management

• Limited execution timeline

Page 15: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 15

Walkthrough findings:

Variance from specs in RFP

• 23% more equipment than listed

• Over 30 central plants and over 70 chillers

• 1000’s of terminal units

• 100’s of miscellaneous unique pieces of HVAC equipment

Technical complexities

• Load disaggregation estimates understated total manufacturing load

• Eight different BAS systems of varying age and complexity

Organizational challenges

• Difficult to gain access to sites from local site managers

• Lack of data transparency made it difficult to communicate level of

inefficiency

Page 16: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 16

• Two commissioning components

1. Planning, finding, quantifying, reporting

2. Implementing, verifying

• Approximately 60-65% of the budget was allocated to component #1

• The remaining 35-40% of the budget was set aside to implement low cost

corrective actions and conservation measures

Assessment and

InvestigationImplementation

Project Budget Breakdown

Page 17: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 17

Program Process Flow

Implementation

Assessment

Investigation

Hand Off

Page 18: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 18

A journey of one thousand miles…

Starter pistol fired, only a few started running (immediate challenges)

• Assembling and deploying our teams

• Contracting and getting POs

• Scheduling and access

• Lots of deferred maintenance items

Page 19: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 19

The Siemens Team

Site Team (typ.)

Lead Energy Eng.

Engineering QA/QC

Tool Development

Operations Support

Project Manager

Asia

Project Manager

Europe

Global Commissioning Program Team

Program Manager

Regional PM

North American Sites

Regional PM

Europe/Asia Sites

Program Admin.

Engineering Technical

Support Mgr.

IT Manager

Finance/Business

Admin

National Ops Mgr.

Executive Sponsor

Client Relationship

Mgr

Legal

Site Scheduling

Support

Booking/Invoicing

Collections

Controller

Commissioning Eng.

Energy Engineer

Project Manager

Senior Technician

Mechanic

Site Team (typ.)

Commissioning Eng.

Energy Engineer

Project Manager

Senior Technician

Mechanic

Site Team (typ.)

Commissioning Eng.

Energy Engineer

Project Manager

Senior Technician

Mechanic

Subcontracted

Commissioning

Team

Customer

Deliverables

Report

Reviewers

QA/QC

Contracting

Page 20: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Consumption

Results

4 Phase Commissioning

Process

Building Commissioning Market Drivers

Pilot Project

4 Phase

Commissioning Process

Results

Global Project

Page 21: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 21

Tasks:• Kick-off of projects/schedule weekly meetings

• Align teams

• ID Current Facility Requirements

• Develop and execute commissioning plans

• ID corrective actions

Challenges:• ID Current Facility Requirements

• Goal misalignment between

corporate and field management

• Scheduling building occupant interviews

• Vetting corrective actions and implementation

Implementation

Hand-off

Assessment

Investigation

Assessment Phase

Page 22: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 22

Tasks:• Manage teams (weekly updates)

• Internal

• External site team

• Corporate

• ID conservation measures

• Update commissioning plans

• Prioritize and present

conservation measures

Challenges:• Managing timeline

• Quality of analysis (master CM

tool)

• Implementation Plan

Implementation

Hand-off

Assessment

Investigation

Investigation Phase

Page 23: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 23

Global project initial improvements

Corrective Actions

• Sensor verification/replacement

• AHU maintenance

• Damper seals

• Damper actuation

• Air filters

• Leaking valves

• VAV box functionality

• Minor programming modifications

Conservation Measures

• Temperature setpoint and over-

ventilating

• V in VFD means variable

• Night setback

• OA, MA, RA damper modulation

• Air and water balancing

• Major sequence of operation

modifications

Page 24: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 24

Tasks:• Implementing corrective actions

and conservation measures

• Verifying savings and

performance

• Updating commissioning plans

• Create Persistence Phase plan

Challenges:• Managing timeline

• Spending all the budget in

the allotted timeframe

• Coordinating with

subcontractors and site teams

Project Development and Multi-

facility planning

Implementation

Hand-off

Assessment

Investigation

Implementation Phase

Page 25: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 25

Informed Advisors:

• VP Energy (portfolio)

• Portfolio Program Manager

• Regional Project Managers

ImplementDecisionIssue

Identified

Siemens Team

Site Manager

Engineer

Engineer

Sr. Controls Technician

“Other Staff”Project

Manager

Project Team and

Meeting Structure

created to support a

Fast Track Workflow

Global project initial improvements

Page 26: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 26

Implementation

Issue Identified

Recommend Corrective

Action

Decision Made

Remediation Executed

Corrective Action Verified

Weekly Status

Meeting

Assessment

Investigation

Hand Off

Global project initial improvements

Page 27: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 27

Tasks:• Preparing final reports

• Preparing site trainings

• Preparing corporate PowerPoint presentation

Challenges:• Running out of TIME

• QA/QC of final reports

• Sharing implementation dollars

Implementation

Hand-off

Assessment

Investigation

Project Development and Multi-

facility planning

Hand-off Phase

Page 28: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

Consumption

Results

Building Commissioning Market Drivers

Pilot Project

Results

Global Project

5 Phase Commissioning

Process

4 Phase Commissioning Process

Page 29: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 29

Energy Savings Results

Page 30: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 30

Environmental Metrics

Key Performance Metric Result

Emissions Reduction 20,103 Mt CO2e

Criteria Pollutant Reduction MT NOx

Area preserved from Deforestation 161 acres

Cars taken off of the road 4,384 cars

Page 31: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 31

Lessons learned (Internal)

1 Are your teams ready? Is management ready?

2 Contracting globally – many issues

3 Make sure all internal stakeholders are identified early

4 Weekly meetings with PM and site decision maker

5 Intangibles

Page 32: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 32

Lessons learned (External-site and corporate)

1Corporations and their internal teams must be aligned

prior to the start

2 Full transparency of savings / cost data

3 Weekly meetings with PM and site decision maker

4 Building commissioning is a great investment

Page 33: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 33

• Post project pull-through implementations

• CAPEX Planning

• Leverage Technology

• Commissioning of additional sites

Page 34: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 34

Thank you!

Mike Chimack

Director, Energy Services, Building Technologies Division,

Siemens Industry, Inc.

Phone: (847) 941-6191

Email: [email protected]

Steven Dodd, Senior National Sales Manager, EMP, LEED

Green, Building Technologies Division, Siemens Industry, Inc.

Phone: (804) 925-7656

Email: [email protected]

Page 35: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

CxEnergy 2016 Conference Course Number: CXENERGY1614

Restricted © Siemens Industry, Inc. 2016 All rights reserved.

Page 35

Questions & additional resources

Learn more about Commissioning

http://usa.siemens.com/commissioning

Additional resources

Commissioning: An essential

Part of a Comprehensive Energy

Strategy

Three Big Myths about Big DataConsulting-Specifying Engineer Magazine,

March 2016

http://www.csemag.com/magazine.html

Page 36: Completing a Global Enterprise Building Commissioning ...€¦ · Six months to complete an existing building commissioning program at 12 facilities in 8 countries is daunting. This,

This concludes The American Institute of Architects Continuing Education Systems Course