COMPANY PROFILE
S H A L A K A I N F R A - T E C H ( I ) P V T L T D
siplonserver1/coprofile
Date :
To,
Subject :- Company Profile
Dear Sir,It gives us great privilege to introduce ourselves as a group of young, qualified, devoted, experienced, andefficient Engineers/Professionals in the field of Turn-Key Projects. During the last 20 years since inception,we have successfully executed projects in Government; Semi Govt.; Industrial, Commercial ;as well asResidential sectors.
We have to our credit some prestigious projects like "Sakhar Sankul", Commissionerate of Sugar, Govt. ofMaharashtra (State of the art Administrative Building Complex); Life Insurance Corpn. of India, ("Yogakshema" , Western Zone office, Nariman Point, Mumbai); Airports Authority of India ( Domesticand International Airports at Ahmedabad, Pune, Aurangabad, Nagpur, Bhubaneswar, Goa ) National Councilof Science Museums, Pimpri, Pune; MIDC ( 5 star Industrial Estate); GED, MSEDCL, MSETCL,POWERGRID; MHADA (Housing project); PCMC, IDA, CPWD, EPIL, CGHB, NBCC, CIDCO,MADC, TIDC, BESCOM, BSNL, Central Raiway, Uttar Pradesh Samaj Kalyan Nirman Nigam Ltd. &MSRDC (Infrastructure development of power supply network); Spinning Mills, Hotel Industries, UltraModern Shopping Malls, Polymer Sitting Arrangement DPE, Club Houses, Telecom projects (OFC work,OSP wiring work, PMP cluster wiring), replacement of meter & allied works etc. We have now ventured intoSolar Power Generation Projects. The detailed profile of our company is enclosed herewith for your readyreference. We believe in quality work because it is the Quality that is remembered forever. Safety and Reliability is thekey of Electrical System and is very important for any project. Many latest technological advance systems arebeing introduced in this field to improve the efficiency and reliability of Electrical systems. Our youngenergetic engineers implement these advanced systems.
If you require any clarifications or further information, please contact us at your convenience. Thanking you and assuring you of our best services at all times, we remain.
Yours sincerely,
Uday LidbideProject Head
siplonserver1/coprofile
siplonserver1/coprofile
1 :
2 Registered Office & H.O. :
3 Branch Offices Nagpur :
Goa : Vasant Arcade, 1st floor, office no.02,Comba- Margao, Goa- 403 601Tel. No. 0832-2700174
Sangli : Flat No. 51 & 55, 2nd Floor, Shiv- Pavilion Building,Near Ram Mandir, Sangli-Miraj Road, Sangli-416 416Tele No. 84118 83972
Ahemedabad
Tel No. 079 – 40051222, 40031612.
Raipur :
Tel- 0771-4265567
Wardha : Dr. Punjabrao Housing SocietyPlot No.38 Aarvi Road, Wardha
Telangana :
4 :
5 Managing Director :Director
Status of Organization
E-mail : [email protected]
Mr. Ravindra Lunawat
Plot No.285, Abhyankar Nagar,
Mrs. Swati Lunawat
C-185, Near Saroj Nursingh Home,
Telefax : 0712 - 224 0575 / +919422501602
Bio data
Tel : 020- 2565 7000 / 01 / 02; Fax: 020- 2565 7004Mob: +9194220 30431
Nagpur - 440010
Name of the Organization Shalaka Infra-Tech (I) Pvt Ltd.
Private Limited
"Shalaka House", Plot No. 22, Gajanan Housing Society, Ganeshkhind Road, Shivaji Nagar, Pune-411016
A-1, Block No. A, Safal Profitaire, Opp. Ramada Hotel,Corporate Road, Prahladnagar, Ahmedabad - 380 015.
G4, MahaLaxmi Nilayam, Road No 5, Sri Balaji Nagar,Medchal, RangaReddy, Telangana - 501401.
NMDC Colony, Near Rajendra Nagar,Raipur - 49200
siplonserver1/coprofile
6Govt. Please refer enclosed list for details.
7 :
8 :
9 :
10 Work experience :
11 :
12 :
13 :
State Bank of IndiaC.C.- Rs.6 Cr. L.C. 10 Cr.
14 Bank Solvency :
15 :
As per enclosed Organization Chart
As per enclosed list.
Organization
Registrations and Licences
As per enclosed list.
Bank of Maharashtra
Corporate Finance Branch, F.C. Road, Pune-411005Bankers
Industrial finance Branch, Wakdewadi, Pune-411 003
Registered Electrical & Civil Contractor with various State
Rs. 100 Crore
As per enclosed list.
Human Resource
As per enclosed list.Work in hand
Credit Facility from BankC.C.- Rs.18.5 Cr, B.G.- Rs. 75 Cr, L.C. 20 Cr
Plant and Machinery
State Bank of India
Bank of Maharashtra
Collector Solvency Rs. 53.39 Lacs.
siplonserver1/coprofile
Organisation Chart
EXE.DIRECTOR
IN CHARGE -PROJECT
FINANCEADMINISTRATION
ADMIN OFFICER
FRONT OFFICE
ACCOUNTS OFFICER
INTERNAL AUDITOR
ESTIMATION & PLANNING
PROJECT ENGINEER MATERIALS & QUALITY CONTROL
SITE SUPERVISOR
OTHER SITE STAFF
PURCHASE OFFICER
Q.C.ENGINEERESTIMATION ENGINEER
SITE CO-ORDINATOR
MANAGING DIRECTOR
siplonserver1/coprofile
Registration of firmPrivate Limited, incorporated under theCompanies Act, 1956 (No.1 of 1956) by theRegistrar of Companies, Maharashtra, Pune
: Regn . No. CIN U 45203 PN 2006 PTC 021915
Registration for Civil Works
PWD-Electrical (Govt. of Maharashtra) in Class A (No limit) A-67
Govt. of Maharashtra Electrical Contractors License No. 11429
Govt. of Goa GLB- 791
Govt. of Chhattisgarh Electrical Contractor's License No. 8/802
MES Enlistment in Class- "SS" (Civil & Electrical & Solar Projects) SS-171
DRDO Electrical & DG Sets- Category ED-IV
Class IV
A. Licenses / Registrations
Licenses and Registrations
Registration for Electrical Works /
allied works
PWD (Govt. of Maharashtra)
siplonserver1/coprofile
Telangana State 36AAJCS6397Q1Z7
Maharashtra State 27AAJCS6397Q1Z6
Goa State 30AAJCS6397Q1ZJ
Delhi State 07AAJCS6397Q1Z8
Orissa State 21AAJCS6397Q1ZI
Karnataka State 29AAJCS6397Q1Z2
Gujrat State 24AAJCS6397Q1ZC
Raipur State 22AAJCS6397Q1ZG
Madhya Pradesh State 23AAJCS6397Q1ZE
Haryana State 06AAJCS6397Q1ZA
P. A. N. AAJCS6397Q
Professional Tax No. PT/E/2/2/6/28/18/2952 and PT/R/2/2/6/28/12010
Provident Fund Regn. No. MH/PUNE/123681
E.S.I.C.Regn. No. 33000354920001000
T.A.N.No. PNES16584B
Import Export Code No. 3107008346
Other Registrations
GST No.
B. Taxes & other registrations:
siplonserver1/coprofile
Sr. No. Name Qualification Experience Designation
1 Mr. Ravindra Lunawat B.E., B.Com., D.B.M. 30 Years Managing Director
2 Mrs. Swati Lunawat B.com 26 Years Director
3 Mr. Suyash Lunawat B.E., M.Sc (U.K.) 2 Years Executive Director
4 Mr. Kishor Chhajjed B.com 20 Years Project Sales Head
5 Mr. Uday Lidbide D.M.E. 35 Years Project Head (Electrical)
6 Mr. Zainoddin Sayyed D.C.E. 23 Years Project Head (Civil)
Details of Directors & Key Personnel
siplonserver1/coprofile
Sr.No. Name Designation Age Qualification Experience1 Vinay Ganu Project Incharge 50 yrs B.E. (Elect) 28 yrs2 Brijesh Sanklecha Project Co-ordinator 44 yrs B.Com 22 yrs3 Gajanan Karvekar Site In charge 44 yrs D.E.E. 20 yrs
4 Dhanashri Jain Sr. Project Engineer 35 yrs B.E. (Elect), PGDBM 12 yrs
5 Prajakta Satav Sr. Project Engineer 33 yrs B.E. (Elect) 10 yrs6 Madhuri Pradhan Electrical Engineer 30 yrs B.E. (Elect) 7 yrs7 Sneha Powar Electrical Engineer 26 Yrs B.E. (Elect) 4 yrs8 Shreenivas Ingale Sr. Engineer 29 yrs B.E. (Elect) 6 yrs9 Dnyaneshwar Raut Site Engineer 29 yrs B.E. (Elect) 5 yrs10 Vinod Tukde Site Engineer 35 yrs B.E.(EEE) 9 yrs11 Shripal Bothra Site Engineer 30 yrs B.E. (Elect) 8 yrs 12 Akash Raut Site Engineer 26 yrs B.E. (Civil) 2 yrs13 Samadhan Bhagat Site Engineer 34 yrs D.C.E. 15 yrs14 Rajesh Shastarkar Civil Engineer 40 yrs D.C.E. 11 yrs15 Pandurang Patil Billing Engineer 34 yrs 12th 12 yrs16 Satish Madiwal Store-Incharge 31 yrs B.A. 7 yrs17 Sameer Thakare Site Supervisor 25 yrs D.C.E. 7 yrs 18 Sachin Vaidya Site Supervisor 38 yrs ITI (Elect.) 9 yrs19 Sataywan Jadhav Site-Supervisior 30 yrs B.A . 6 yrs20 Ishwar Jondhale Site Supervisor 42 yrs B.Com 10 yrs21 Arvind Sawant Site Engineer 31 yrs M.Tech 8 yrs22 Prashant Dhapute Site Supervisor 32 yrs 12 th 12 yrs23 Rajesh Shinde Store-Keepar 52 yrs B.A. 5 yrs24 Parshuram Nalwade Store-Keepar 29 yrs 10 th 10 yrs25 Roshan Khanna Site Supervisor 33 yrs B.E. 10 yrs26 Mahendra Patole Site Supervisor 31 yrs B.Tech 6 yrs27 Chetan Sawalkar Site Supervisor 30 yrs B.E. 3 yrs28 Yuvraj Joshi Store-Keepar 36 yrs 10th 10 yrs29 Purushottam Pate Store-Keepar 59 yrs 10th 15 yrs
List of Technical Personnel
siplonserver1/coprofile
Sr.No. Name Designation Age Qualification Experience1 Sandip Soni CFO 40 yrs M.Com 18 yrs2 Ramchandra Jadhav Sr. Accountant 45 yrs B.Com 17 yrs3 Reena Dive Admin Officer 27 yrs M.A. 8 yrs4 Sunil Raut Accountant 29 yrs B.Com 6 yrs5 Deepali Gaikwad Accountant 30 yrs C.A. 6 yrs6 Shrikant Bhawsar Accountant 52 yrs B.Com 29 yrs7 Sandip Hulawale Accountant 36 yrs M. com 10 yrs8 Shantaram Shinde Office Asst. 42 yrs 10th 18 yrs9 Balasaheb Gaikwad Office Asst. 45 yrs MA 18 yrs
OTHER STAFF1 Wireman / Electrician : 75 Nos.2 Sub Contractors
List of Administrative Personnel
: 18 Contractor with their own machinery & manpower
siplonserver1/coprofile
Sr. No. Qty
1 1 No.2 Hi Pot machine for testing HT Cable up to 33 KV 1 No.3 HT & lt Cable fault detector machine with Mobile Van 1 No.4 Welding Transformer (250 Amp, 3ph) 2 Nos5 Gas cutter 1 No.6 Chain pulley Block ( 5,3,2.5 Tonnes) 3 Nos7 Electric Drill Machine (1000W, 500 W, 250 W ) 5 Nos8 Elecric Concrete Cutter ( Up to 63mm ) 3 Nos.9 Blower ( 500 W, 300 W) 2 Nos
10 Electric Hammer Tool 2 Nos11 Hand Grinder 2 Nos12 Crimping Tool (Up to 300, 95, 25 10 sq.mm.) 4 Nos13 Electric Pump 2 Nos14 Water Tanker 2 Nos15 Excavator cum loader 1 No.16 Pneumatic Compressors 2 Nos17 Pneumatic Hand drills 8 Nos18 Tile Cutting Machine 2 Nos19 2 Nos20 Rope (25, 19, 16 mm ) 150 Mtr21 Scaffolding 4 Sets22 Aluminium, Wooden Ladders 7 Sets23 Testing Equipments24 a) Digital Tong Tester 8 Nos25 b) Analog Tong Tester 5 Nos26 c) D.C.Voltage Source 2 Nos27 d) Multimeter 15 Nos28 e) Auto Transformer 1 No29 1 No
Note : Relay testing kit and secondary injection kit and any other equipments/machinery can be made available as and when required.
Description
Tool Box
Plant & Machinery ( Electrical)
15 KVA Mobile DG Set with Canopy
Truck mounted Crane- 12.4 MT, Hook Height- 10.2 Mtr
siplonserver1/coprofile
Sr. No. Name of Equipment No. of
Units Kind and Make Capacity Age and Condition
1 JCB - Tracked Excavator 1 no. JCB- JS120 0.5 Year in good condition
2 Tipper 4 Nos. Tata 1210 SF 12 T 4 yrs. In working condition
3 Concrete Mixer 6 Nos Miller, Cosmos 0.2 Cum 0.3 cum 2 yrs. In working condition
4 Centering Material 1500 Sqm. Cosmos - 1 Year in good condition5 Weigh Batcher 23 Nos Universal New
6 Needle Vibrator 25 mm to 50 mm dia 8 Nos Cosmos,
Universal3 HP 5 HP 1 yr. In working condition
7 Surface vibrator 2 Nos Universal 1 yr. In working condition8 Water Pumps (Electrical) 15 Nos Vigneshwar 1- 3 H.P. 2 yrs. In working condition
9 Water Pumpe (Diesel) 6 Nos Kirloskar 5 H. P. 18 Months in working condition
10 Lift & Hoist 3 Nos Universal 0.5 M.T 2 yrs. In working condition11 Earth Compactor 2 Nos Cosmos 5 H. P. 2 yrs. In working condition
12 H' Frame for Scraffolding 125 Nos Cosmos 1 yr. In working condition
13 Sand Screening Machine 4 Nos Universal 2 yrs. In working condition
14 Concrete cube moulds 72 Nos Local Made 15X15X15 1 yr. In working condition
15 Compression testing Machine 3 Nos L & Mayo 3 yrs. In working condition
16 Floor Polishing Machine 6 Nos Local Made 2 yrs. In working condition17 Theodolite 2 Nos L & Mayo 1 Sec. 1 yr. In working condition18 Auto Level 6 Nos L & Mayo 5 yrs. In working condition19 Excavator 1 No. Escort JCB 0.9 Cum 3 yrs. In working condition20 Water Tanker 1 No. Tractor 6000 Ltr. 2 yrs. In working condition
21 Centering Plates 4000 Nos. Local Made 24000 S.Ft. In Good condition
22 D.G.set 1 No. Kirloskar 250 KVA 6 months23 D.G.set 1 No. Kirloskar 50 KVA 2 Years24 Hot Mix Plant 45D 1 No. 4 yrs. In working condition25 Tipper 12 Nos. 2 yrs. In working condition26 Pokland 1 No. New27 Dummper 10 Nos. 1 yr. In working condition28 Blasting Tractor 1 No. 1 yr. In working condition29 Regular Tractor 4 Nos. 2 yrs. In working condition
30 Crusher 1 No. 18 Months in working condition
31 Road Roller 2 Nos. 2 yrs. In working condition32 Statistic Roller 1 No. 2 yrs. In working condition
Plant & Machinery (Civil)
siplonserver1/coprofile
A }
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
1 Commissioner of Sugar (Maharashtra State Pune)
S/I/T/C of Internal & External Elct. Work of Admin. Bldg.
Sakhar Sankul Shivajinagar Pune
Architect Shashi Prabhu & Asso.
Mumbai Consultant- M/s Gajanan Entrp.
Pune
229.74 380.81 Mar 00 Dec 00
2 LIC (Life Insurance Corporation of India), Mumbai
Electrical installation work of Central office of LIC
Yogkshema' J.B.Marg Nariman point Mumbai
Architect M/s Nitin Parulekar Architects
Pvt. Ltd. Mumbai
118.00 110.00 June 02 Dec. 04
3 NIPHT (National Institute of Post Harvest Technology) under Mah. State Agricultural Mktg. Board
Internal & External Electrification work of Horticulture Training Centre of NIPHT
Sr. No. 398-400 Next to CRPF Campus,
Talegaon Dabhade Tal. Maval Dist. Pune
M/s Satyajeet Rane & Associates Pune
68.66 29.10 Aug. 02 Feb. 03
4 SDCC ( Satara District Central Co-operative Bank) Satara
Electrical installation work of Central Building of SDCC Bank at Satara
SDCC Bank Shivaji Circle Powai Naka
Satara
Bhosale-Kadam Associates
52.69 36.00 Sept 03 June 05
B} Power Supply- Electricity Board/ Corporation / Industrial / Commercial Project ( 2005 On words1 Kakade Construction
Company (Promoters & Builders)
S/I/T/C/ of Internal & External Electrification work icluding Indoor Sub-station, D.G.Sets, HT & LT Panels& other equipments.
Kakade Magnum Mall ( SGS Mall) Moledina
Road, Pune
M/s S.N.Joshi Consultants Pvt. Ltd
LBS Road, Pune
486.00 528.48 June 05 March 06
2 U.N. Mehta Institute of Cardiology and Research Centre, Ahmedabad
Supply, Testing commissioning & installation of Electrification of U.N. Mehta Institute of Cardiology & Research Centre
Director, U.N. Mehta Institute of Cardiology and Research Centre,
Ahmedabad
Ahmedabad 275.00 321.01 Jul.09 Sep.10
3 U.N. Mehta Institute of Cardiology and Research Centre, Ahmedabad
SITC of 2x500 KVA silent D.G. set with auto synchronizing panel & uploading existing 2x250 KVA DG set with its panel to work in parallel with 2x500 KVA DG Set
Director, U.N. Mehta Institute of Cardiology and Research Centre,
Ahmedabad
Ahmedabad 81.00 81.00 Aug.09 Oct.10
4 Maharashtra Labour Welfare Board Elphinstone Rd, Mumbai (M.L.W.B.)
S/I/T/C/ of H.T. and L.T. Electrical work, D.G.Set. and internal electrification work
Lalit Kala Bhavan, Sahakarnagar No. 1,
Parvati Pune
M/s Space Designer Syndicate Pune
40.68 49.91 July 06 Sept.06
5 Military Engineering Services Secundarabad
HT VCB, HT Cabling Panels and internal Elect. Work
HEMRL Sutarwadi, Pune
Military Engineering Services
Secundarabad
99.82 103.00 Nov.05 Feb. 07
6 Accelerated Power Development Reform Programme Through MSEB funded by Govt. of India and Rural Electrification corp. Ltd. New Delhi
11 KV UG Lines with 300 sq.mm. XLPE Cable and allied works
Nagpur Urban Zone, Nagur Maharashtra
Chief Engineer MSEDCL (MSEB)
Nagpur Maharashtra
4495.00 4495.00 Mar 05 Oct. 07
7 National Highway Authority of India, New Delhi (NHAI)
Shifting, erecting & Laying of Electrical poles/lines (O/H, U/G) of 33KV 11 KV and distribution Transformer in the State of Rajasthan
NH-76 between Km 338 to 411 in the state
of Rajasthan
Mr.B.L.Meena Project Director NHAI-PIU Kota
Rajasthan
230.07 263.89 Sept 05 Nov 07
8 MIDC (Maharashtra Industrial Development Corpn.) Nagpur
Streching of 33 KC feeder from Hingna -1 Sub station of MSEB to 33 KV Sub Station at IT Park, Parsodi, Nagpur
IT Park at Parsodi Nagpur
Mr. P.G.Deogiri Executive Engineer
(E&M) MIDC, Nagpur
188.83 180.57 July 06 Aug 07
9 MIDC (Maharashtra Industrial Development Corpn.) Nagpur
Providing, Erecting & commissioning 33KV/ 5 MVA Sub station
IT Park at Parsodi Nagpur
Mr. P.G.Deogiri Executive Engineer
(E&M) MIDC, Nagpur
243.45 242.00 July 06 Aug 07
List of Projects Completed ( Electrical)
Major Projects between 1995 to 2005
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
10 MSEDCL, Sidhudurg circle MIDC area Kudal
Revamping of 33/11 KV Malvan Sub Station & other allied works in Sindhudurg Dist.Sindhudurg Maharashtra
Suptd. Engineer, Kudal, Dist. Sindhudurg
79.05 79.05 Jan.08 Aug. 08
11 Atlanta Ltd. JNNURM Project of Municipal Corpn.
Shifting existing street lighting and MSEDCL utilities and fixing new ones
Baner Road, Pune M/s Consulting Engineering Services
401.95 393.00 May 08 Oct 08
12 Sandeep Associates JNNURM Project of Municipal Corpn
Shifting of Electrical Utilities & Street Lights of Baner Road
Baner Road, Pune M/s Consulting Engineering Services
87.43 87.43 May 08 Oct 08
13 Sandeep Associates JNNURM Project of Municipal Corpn
Shifting of Electrical Utilities Sancheti Hospital to Govt. Poultry Farm &
from Govt. Poultry Farm to Harries Bridge Pune-Mumbai Highway
M/s Consulting Engineering Services
150.91 150.91 May 08 Oct 08
14 MIDC (Maharashtra Industrial Development Corpn. ) Pune
Providing power supply arrangement in D & C Block….. 5 MVA , 33/11 KV Sub Station, 100 KVA Dist. Transformer Center (25 Nos) etc.
Five Star Indl. Area Shendra (Dist. Aurangabad)
Executive Engineers (E& M)
251.43 243 May 08 Dec. 08
15 MSEDCL(Maharashtra State Electricity Distribution Co.Ltd.) Sangli Circle, Sangli
Construction of 33 KV Substation, 33 KV & 11 KV Lines & Augmentation of 33/11 KV substation, Dist. Sangli
Sangli District, Maharashtra.
Suptd. Engineer, Sangli Circle, Sangli
421.55 417.3345 March 08 Sept 09
16 Central Public Works Department New Delhi CPWD
Construction of Jawaharlal Nehru Bhawan at Janpath, New Delhi.(SH: Supplying, installation, testing, commissioning of Sub Station and Bus Trunking etc.
Janpath, New Delhi Executive Engineer , JNB Project, CPWD,
New Delhi.
367.69 367.69 Sept. 08 May,11
17 Bharat Sanchar Nigam Ltd., Mumbai (BSNL)
Supply of 2 x 3000 KVA Transformers, HT Panel ,Bus trunking, MV Panels at Fountain -II T.E. Bldg Fort Mumbai-1& ITC of 2 x 3000 KVA Transformers, HT Panel, Bus trunking, MV Panels and other associated works at Fountain -II,T.E. Bldg
Fountain, Mumbai Executive Engineer (E), BSNL Elect.
Divn. No.1, Mumbai.
189.89 189.89 Feb.09 August.09
18 Government of Goa, Electricity Department, Division No. : IV , Margao, Goa- 19(08)
Coversion of 11 KV overhead lines to underground network in Loutolim Constituency in Salcete Taluka, for Electricity Department, Govt. of Goa
Loutolim Constituency in Salcete Taluka,
Goa.
Executive Engineer, Div. IV, Electricity
Department, Margao, Goa.
3967.00 3668.82 Feb.09 June,11
19 MSEDCL, Vidut Bhavan Katol Road, Nagpur
“Turnkey Contract for the Works of Backlog scheme work. at Chandrapur Circle.under Nagpur Zone.”
Chandrapur Maharashtra
Suptd. Engineer, O&M Circle, Chandrapur/
901.67 851.15 Nov.08 Dec.10
20 Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
Turnkey Contract for commissioning of 33/11 KV Sub-stations at Dhawadwadi Tal. Jath along with allied Works
Dhavadwadi Tal. Jath Sangli Circle
Suptg Engineer, (SC)-MSEDCL
Sangli
390.98 428.46 Jul-10 Dec-11
21 MSEDCL, Sangli, T-45 Turnkey Contract for Power Transformer, HT lines& allied works for commissioning of 33/11 KV Sub- Station at Bhikwadi (Kh.) Ta: KadegaonDist . Sangli
Sangli, Maharashtra Superintending Engineer, MSEDCL
276.32 253.5 Mar-11 Jan-13
22 Indore Development Authority
External electrification with HT and LT underground cabling in scheme No.140,
Indore M.P. Suptd. Engineer, I.D.A. Indore.
3064.00 3064.00 Sep-08 Mar-12
23 National Council of Science Museums
Internal & External Electrical Installation Works for Regional Science Centre, Chinchwad, Pune
Chinchwad, Pune Kothari & Associates 21.98 24.98 Jul-10 Sep-12
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
24 Maharashtra State Electricity Transmission Company Limited- State Load Dispatch Centre, Kalwa
Supply, Installation, Testing & Commissioning of the Internal Electrification of New Building at State Load Dispatch Center, Airoli, Navi Mumbai.
Kalwa M/s Shethgiri Associates, Mumbai
121.53 142.67 Nov-11 Apr-13
25 CPWD, Mumbai Construction of Office Building for Canara Bank at Plot No. C 14, BKC, Mumbai. SH: SITC of 2 No.s 750 KVA DG Sets
IDBI PED CPWD, Mumbai
CPWD 160.62 149.11 Apr-11 June -13
26 Chhattisgarh Housing Board
Exeternal Electrification work i/c Underground Cable System for Residential Colony at Sector-27 Naya Raipur.
Raipur Executive Engineer, Chhattisgarh
Housing Board, Raipur
2193.80 2139.72 Apr-12 Mar-14
27 Chhattisgarh Housing Board
External Electrification work i/c Underground Cable System for Twin City, Talpuri, Amdi Ruabandha, Durg-BhilaiDistrict-Durg (C.G.)
Bhilai, Durg Executive Engineer, Chhattisgarh
Housing Board, Bhilai
1649.70 1651.55 July -12 Mar-16
28 Maharashtra Airport Development Company Ltd.
Execution of 33 KV Supply System to MRO Unit from PSS IV in SEZ Area of Mihan Project at Nagpur
Nagpur Chief Engineer, MADC Ltd., Nagpur
215.24 194.1 July-12 Sep-14
29 Maharashtra State Electricity Distribution Company Limited
Tender No: T-5: Internal Electrification, Telephone and LAN cabling work for new Administrative Building at Chaturshrungi, Pune
Pune Superintending Engineer (C)
MSEDCL, Pune
115.4 114.72 Oct-12 Oct-14
30 Bharat Sanchar Nigam Limited
SITC of 1 X 800 KVA E/A sets for Internal Data Centre (IDC) at TE Bldg, Vidya Dhar Nagar, Jaipur
Jaipur Executive Engineer, BSNL, Electrical Division, Jaipur
50.29 50.29 Oct-11 Dec-14
31 Bharat Sanchar Nigam Limited
SITC of 2 X 800 KVA D.G. set for Internet Data Centre (IDC) at Bapunagar, T.E. Bldg, Ahmedabad (Supply portion)
Ahmedabad Executive Engineer (E), BSNL, Electrical
Division- III, Ahmedabad
97.2 97.2 Sep-11 Dec-14
32 Bharat Sanchar Nigam Limited
SITC of 2 X 800 KVA D.G. set for Internet Data Centre (IDC) at Bapunagar, T.E. Bldg, Ahmedabad (ITC & Misc. portion)
Ahmedabad Executive Engineer (E), BSNL, Electrical
Division- III, Ahmedabad
10.0275 10.02 Sep-11 Nov-14
33 MSEDCL, Nagpur Rural Circle, Nagpur
HT Power Supply in r/o Executive Engineer, Water Works, Nagpur Municipal Corporation, Kamptee on 33 KV Express feeder from 220 KV Kanhan Sub-station under Nagpur Rural Circle.
Nagpur The Superintending Engineer, MSEDCL,
NRC, Nagpur
403.61 403.61 Aug-13 Sep-14
34 Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in Joint Venture with M/s. GTL Ltd.
Turnkey Contract for Tender No. 27 of Infrastructure Plan, Phase -II in Vita Division under Sangli Circle, Kolhapur Zone, of MSEDCL
Sangli, Vita Chief Engineer, MSEDCL, Infra
Projects, MSEDCL, Prakashgad, Mumbai
4581.00 4032.16 Jul-09 Apr-15
35 Directorate of Primary Education
Supply of Polymer Sitting Arrengement (PSA Desk) in the state of Maharashtra
All over Maharashtra Director of Primary Education
16499 16499 Feb-15 Jan-16
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
36 Engineering Projects (I) Ltd.
Tender No. NRO/CON/ 588/571 : External Electrical works for Metrology Block at National Physical Laboratory, Pusa Campus, New Delhi.
New Delhi, General Manager, MMD, Engineering Projects (India) Ltd.,
New Delhi
1007.33 1011.8 Oct-11 Dec-14
37 Engineering Projects (I) Ltd.
Tender no. NRO/CON/ 588/574: External Electrical works for Clean Room at NPL, New Delhi.
New Delhi, General Manager, MMD, Engineering Projects (India) Ltd.,
New Delhi
564.76 539.10 Nov-11 Dec-14
38 CIDCO, Navi Mumbai Providing street lighting on various roads in sector 34,35 & peripheral 45 mtr wide road (Jal Marg) from sector-16 to 45 at Kharghar. (2nd call)
Kharghar, Navi Mumbai
Executive Engineer (Elect-I), CIDCO
464.06 466.92 Jan-14 Sep-14
39 Central Railway Provision of 2x500KVA, 11KV /415 volt substation, 2X30 KVA UPS and 320KVA DG set alongwith other associated equipments in the basement of New IRICEN institute building at Koregaon park, Pune
Pune Divisional Electrical Engineer (C )
113.11 108.20 Aug-12 Sep-14
40 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)- T-01
Work of Shifting & Conversion of 22 KV HT OH Line by U/G Cable of Malvali & Lis Feeder At 220 KV Chinchwad Sub-Station (Turnkey Contract)
Chinchwad, Pune The Chief Engineer, MSETCL
67.01 67.01 Aug-10 July-12
41 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)-T-04
Supply, Erection & Commissioning of 1 x 100 MVA, 220/132 KV ICT including shifting of 132 KV Bay at 220 KV Baramati Sub-station, Dist, Pune
Baramati, Pune The Chief Engineer, MSETCL
168.33 168.33 May-10 Jul-13
42 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)-T-05
Supply, Erection & Commissioning of 1 x 25 MVA, 220/33 KV Transformer with 4 x 33 KV Outlets at 220 KV Baramati Sub-station, Dist, Pune
Baramati, Pune The Chief Engineer, MSETCL
196.15 196.15 May-10 Apr-12
43 Maharashtra State Electricity Transmission Co. Ltd (MSETCL)- T-25
Supply, Erection & Commissioning of 1X25 MVA, 132-100/22 KV Transformer with 4 X22 KV Bays At 100 KV Pawana Nagar S/ Stn., Dist : Pune.
Pawana Nagar, Dist.Pune
The Chief Engineer, MSETCL
299.79 299.79 Aug-10 May-13
44 Maharashtra State Electricity Transmission Company Limited (MSETCL)- T-42
Supply, Erection, Commissioning of 220 KV & 132 KV TBC & BC Bays at 220 KV Jeur Substation, Dist. Solapur
Solapur The Chief Engineer, MSETCL
187.43 176.59 Sep-10 Apr-17
45 Maharashtra State Electricity Transmission Company Ltd.- T-06
Work of additional 25 MVA, 132/22 KV transformer including 1 X 22 kv incomer feeder & allied civil works at 132 kv Varasgaon S/stn
Varasgaon The Chief Engineer, MSETCL
322.99 322.99 Mar-12 June-16
46 Government of Goa, Electricity Department, Division No. : IV (O&M) Margao, Goa- 23(08)
Supply, erection, testing & commissioning of 33 KV VCB's Bay equipment including structural material for upgrading existing infrastructure & improving of flexibility at various substation
Aquem Margao, Goa Executive Engineer, Div. IV, Electricity
Department, Margao, Goa.
278.03 139.42 Aug.09 Apr-17
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
47 Government of Goa, Electricity Department, Division No. : IV (O&M) Margao, Goa- 22(09)
s from (i) Ponda s/s to Fatorda s/s via Raia s/s (ii) Xeldem s/s to Cuncolim s/s & (iii) Xeldem s/s to Aquem s/s, for Govt. of Goa, Electricity Department, Division, IV, Margao, Goa.
Margao, Goa Executive Engineer, Div. IV, Electricity
Department, Margao, Goa.
1996.47 1486.15 Aug-10 Apr-17
48 BESCOM- R-APDRP/BGR/56 (BESCOM)
Execution of Restructured Accelerated Power Development and Reforms Programme (R-APDRP) Part-B”of Anekal, Dobbaballapura & Hoskote towns of Banglore Rural District in BESCOM
Banglore Chief General Manager, BESCOM,
K.R.Circle, Bangalore
3319.21 2959.55 Mar-11 Feb-15
49 Bangalore Electricity Supply Co. Ltd. (BESCOM)
Execution of “Restructured Accelerated Power Development and Reforms Programme (R-APDRP) Part-B” of Chintamani, Chikkaballapura, Gowribidanur & Sidlanghatta Towns of Chikkaballapura District in BESCOM
Bangalore & Chikkabalpur Districts.
Chief General Manager, BESCOM,
K.R.Circle, Bangalore
3102.45 2627.07 Mar-11 Feb-15
50 Goa Electricity Department
Tender No. 04(13-14): Supply, Erection, Testing & Commissioning of 100 KVA DTC containing RMU & LV Switchboard along with laying of 11 KV underground cable & erection of LT overhead line for electrification of Nadquem village in Canacona under Schedule Tribe Development Scheme (Plan)
Goa Executive Engineer-XVI, Margao, Goa
97.75 44.62 Nov-13 Jan-17
51 Maharashtra State Electricity Distribution Company Limited (R-APDRP Part B scheme)
Tender No : CE/APDRP/RAPDRP PART-B/T-11: Turnkey Contract for R-APDRP Part B scheme works for Pune Zone
Pune Chief Engineer (APDRP),
MSEDCL, Mumbai
1402.37 1418.88 Mar-12 Apr-17
52 MSEDCL, Mumbai Tender No. CE (Infra) /Infra-Part II/Phase-A/Mumbai/EE-
IV/13-14/T-21: Kolhapur Zone: Vita & Sangli ('R)
Division
Sangli Chief Engineer (Infrastructure Plan)
MSEDCL, MUMBAI
10992.35 10055 Oct-13 Jul-17
53 MSEDCL, Nagpur Tender No. CE (NZ) /Infra Part II/Nagpur S/Dn.-I(Fetri S/S)/15-
16/T-36
Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai
698.78 698.78 Apr-16 Aug-17
54 Chhattisgarh Housing Board
Tender for “External Electrification work through under ground cabling system
for GAD Quarters Phase- I at Sector -17, Naya Raipur
(C.G.)”
Naya Raipur Executive Engineer, Chhattisgarh
Housing Board, Naya Raipur
993.43 933.09 Jul-14 Nov-16
55 NBCC External Electrification Works in “NBCC Heights”,
Residential Group Housing
New Delhi DGM, NBCC, New Delhi
912.1 1073.17 June-13 Mar-17
56 MSEDCL Tender No. CE(Infra) /Infra Part II/Phase-B-
3/EE-III/Mumbai/15-16- Mouda Town, Nagpur
Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai
1766.91 1835.02 Dec-15 Nov-17
57 Tapi Irrigation Development Corporation
“Construction of 132/33 KV Sub-station @ Iserkhed, 132
KV Double Circuit Transmission Line, 33KV
distribution line and allied civil works”
Jalgaon Superintending Engineer, Jalgoan
Irrigation Dept
6317.58 5906.65 Jan.10 Jan-15
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
58 Vidarbha Hydro Electric & Lift IrrigationDivision, Nagpur
Design, Supply, Erection, Testing and commissioning of 33/6.6kv switchyard equipment
for Borghat lift Irrigation Scheme Ta. Mul Distt:
Chandrapur
Borghat-Chandrapur Vidarbha Hydro Electric & Lift
irrigationDivision, Nagpur
190.4 189.58 Feb-14 Feb-18
59 Water Resource Department, Birwadi Lift Irrigation Scheme
Design, manufacture, Supply, transport, erection, testing,
commissioning of 22/3.3 KV Switchyard equipment, power transformer, power and control
cables etc. in respect of Birwadi Lift Irrigation Scheme
Tal. Shahapur Dist. Thane
Shahapur, Thane Water Resource Department, Birwadi
Lift Irrigation Scheme
178.92 84.9 June-14 Jan-18
60 MSEDCL, Mumbai Tender No. CE (Infra) /Infra-Part II/Phase-C (Town
Scheme)/Mumbai/EE-IV/13-14/T-44: Pune Zone: Nagar
Road Division
Nagar Road, Pune Chief Engineer (Infrastructure Plan)
MSEDCL, MUMBAI
3451.06 2851.12 Jul-14 Jan-18
62 Indian Institute of Science Education & Research, Bhopal
Construction of IISER Bhopal (Package-I : Academic Block- 1 & 2, Lecture Hall Complex,
Hostel-1, Dining Hall & Development work) SH: External Development
(Electrical) SW: SITC of L.T. Panels & installing of
Substation work
Bhopal Superintending Engineer, IWD, IISER Bhopal
662.02 378.94 Sep-12 May-16
63 CPWD Providing HT Supply to the NIASM Campus at Malegaon, Baramati, Pune including Sub-station equipment’s, DG sets, Feeder pillars & cabling and construction of sub-station
building”.
Baramati, Pune The Executive Engineer (E), CPWD, Pune.
380.73 343.24 Dec-15 Jun-17
64 MSEDCL, Mumbai Tender No: CE (NZ) /Infra Part II/Nagpur Dn.-II/15-16/T-05-
Nagpur Rural Circle
Nagpur The Chief Engineer (Nagpur Zone),
MSEDCL, Nagpur
1723.81 1733.95 Dec-15 Aug-19
65 MSEDCL, Mumbai Supply of Material, testing, transport, construction, erection, testing & commissioning of material, completion of Civil works for New Danoli Sub statins of capacity 2X5 MVA, 33 KV/11 KV lines in Jaysingpur Divisions under Kolhapur Zone
Sangli The Chief Engineer, Kolhapur Zone,
Kolhapur
482.41 489.00 Dec-17 June-19
Jan-1961 Goa Electricity Department, Tender No. (01)10
Laying of underground 33 KV double circuit cables by
Horizontal Directional Drilling method from Sancole s/stn to
Majorda s/station & from Verna s/station to Kadamba
s/station using departmentally supplied 3C, 400 Sq.mm
XLPE cable, including Jointing & Termination kits & SITC of
33 KV incoming / outgoing equipment & bay arrangements
along with control & switchgears
Vasco, Goa Executive Engineer, GED
1109.00 796.05 May-11
siplonserver1/coprofile
S. No. Name of Employer Name of Work Location of Project Architect/ Consultant
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of Start of Work
Date of Completion
of Work
66 MSEDCL, Mumbai Tender No.CE (NZ) /Infra Part II/Nagpur S/Dn.-I(Surabardi S/S)/15-16/T-37
Nagpur Chief Engineer (Infrastructure Plan), MSEDCL, Mumbai
884.548 829.09 Apr-16 Apr-18
67 MSEDCL, Mumbai Urban Electrification Works of Sangli Circle in Maharashtra State under Integrated Power
Development Scheme (IPDS).
Sangli The Chief Engineer, Kolhapur Zone,
Kolhapur
2185.48 1251.64 Feb-17 Dec-19
68 Madhuban Inn Pvt. Ltd. Electrical work of Amar Madhuban Tech Park
Pune Genius Systems 10.00 10.00 Apr-19 Aug-19
C} Airports
1 Airports Authority of India, New Delhi AAI
Expansion and modification of existing Terminal building at Pune Airport
Pune Airport, Pune Asst. G.M Engg (K. Dilip Singh)
189.00 196.00 Apr.06 May 07
2 Airports Authority of India Delhi AAI
SITC of new substation equipments and allied works at Nagpur airport
Dr.Babasaheb Ambedkar Airport,
Nagpur
Sr, Manager Engg ( Elect)
519.94 519.03 Apr. 07 Oct. 08
3 Airports Authority of India, Aurangabad (AAI)
SITC of substation equipment and allied works at Aurangabad Airport
Aurangabad Airport Deputy General Manager Engg (E) AAI, Aurangabad
674.71 658.00 Apr.08 Apr. 09
4 Airports Authorities of India, Ahmedabad AAI
“Construction of new integrated terminal building at Ahmedabad Airport. SH: SITC of substation equipment & DG Set.
Sardar Vallabhai Patel International Airport
Ahmedabad
Senior Manager Engg (E) AAI,
Ahmedabad
1492.00 1803.52 Aug.08 Jul.10
5 Airports Authority of India
Augmentation of Essential Power Supply by providing higher capacity DG sets
Pune Senior Manager, (Engg- E ), AAI,
Pune Airport, Pune
201.06 201.06 Aug-13 Jul-14
6 Airports Authority of India, Goa Airport, Goa
Construction of New Integrated Terminal Building at Goa Airport, SH: Supply & laying of 33 KV 300 Sq.mm secondary incomer for NITB
Goa Asst. Gen. Manager (Engg-E)
15.1 15.2 Sep-12 Dec-14
7 Airports Authority of India
Supply, Installation, Testing & Commissioning (SITC) of substation Equipments & DG sets at Biju Patnaik Airport, Bhubaneswar
Bhubaneswar Airports Authority of India
549.13 532.57 May-11 Feb-17
siplonserver1/coprofile
Sr. No
Name of the Employer Name of the work Location of
Project
Architect/ Consultant/
Contact Person
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of start of work
Date of completion of
work
1 Maharashtra Jeevan R R Loham and five village Satara, Maharashtra Executive Engineer, 391.15 410.08 Mar-99 Oct-01Pradhikaran Works water supply scheme Tal: Maharashtra Jeevan
Division Satara Kharadala, Dist Satara Pradhikaran Works For Maharashtra Jeevan Division Satara
Pradhikaran Works DivisionSatara
2 Maharashtre State Construction of Buildings Talegaon Dabhade, General Manager 228 343.00 Aug-02 Oct 03Agriculture and on S. No. 398 at Talegaon Pune Maharashtre State
Marketing Board Dabhade For NIPHT'S HTC Agriculture andPune For Maharashtra State Marketing Board
Agriculture & Marketing PuneBoard
3 Maharashtra Renovation and Extension Dist. Jalna Executive Engineer, 167.59 176.21 Jan. 2002 Feb 05Health Systems of Dist. Hospital at Jalna M.H.S.D.P.Development Dist. Jalna Engineering Division
Project4 Agriculture Construction of new cotton Khamgoan Project Architect, 216.722 216.722 Jan 01 Mar-05
Product Market Market Yard under TMC at APMC KhamgaonCommittee APMC Khamgoan
5 Maharashtra Redevelopment of Lalit Kala Sahakarnagar, Pune Civil Engineer, 964.63 964.46 Feb-04 Jan-06Labour Welfare Bhavan including MLWBBoard, Mumbai Multipurpose Hall swimming
pool, Stedia Gallary sitedevelopment, compound wall& allied facilities at S. No. 78
C.T.S.No. 2612 Parvati Sahakarnagar, Pune 411 009
6 Central Railway Construction of Director's Koregaon Park, Dy.Chief Engineer 253.57 229.12 Mar-05 Sep-07Construction Bungalow, Sports complex Pune (Construction)Division Pune swimming pool and allied Central Railway,
works at Koregaon Park PunePune
7 Panchashil Construction of Panchshil Moshi, Pune M/s Creations 659 400.00 Oct-98 Oct-00Recreation Club recreation club buildings
Pvt. Ltd. swimming pool,electrificationetc. PHASE - I
8 Pravara Rural Construction of full Olympic Gogalgoan Road Chief Civil Engineer 183.6 183.97 Jan-01 Oct-10
Education Society size swimming pool for LoniGogalgoan Road Pravara Rural Education
Loni Society, PravaranagarFor Pravara Rural Education Society PROSSP Gogalgaon
Road, Loni9 Fixity Packaging Construction of Factory Hinjewadi, Pune Managing Director, 518 497 Jan-04 Jan-05
Pvt. Ltd. Building Unit - 2 Fixity Packaging Pvt Ltd.
10 MSPH&WCL Maharashtra State Police Housing &
welfare Corpn. Ltd. Mumbai
Construction of balance work of 442 quarters for SRPF Gr.I at
Wanawadi,Pune
Wanawadi, Pune General Manager, Maharashtra State Police Housing &
welfare Corpn. Ltd. Mumbai
2275 2406.92 Dec-07 Dec-09
List of Projects Completed ( Civil & Interior Works )
siplonserver1/coprofile
Sr. No
Name of the Employer Name of the work Location of
Project
Architect/ Consultant/
Contact Person
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of start of work
Date of completion of
work
List of Projects Completed ( Civil & Interior Works )
11 MSPH&WCL Maharashtra State Police Housing &
welfare Corpn. Ltd. Mumbai
Construction of 6 Additional classroom, One mess Building
for 300 trainees Total 1758 Sq. . Bult up area & Parade ground 4800 sq. mtr. at P.T.S.Marol,
Andheri (East) Mumbai
Andheri (East) Mumbai
General Manager, Maharashtra State Police Housing &
welfare Corpn. Ltd. Mumbai
314.8 372.65 Jan-08 Oct-08
12 MSPH&WCL Maharashtra State Police Housing &
welfare Corpn. Ltd. Mumbai
Construction of 197 Residential Staff Quarters for SRPF Gr X at
Soregaon,Dist. Solapur.
Solapur M/s S.G. Sule Architect & town
planner, Pune
2072.79 2252.22 May-09 May-12
13 National Council of Science Museums
Construction of proposed regional science center building
and allied works at Pimpri Chinchwad Municipal Corporation at Pune.
Pimpri - Chinchwad
M/s Kothari & Associates, Kolkata
449.44 442.06 Sep-09 Nov-11
14 Maharashtra State Load Despatch
Centre (MSLDC) At & Post AiroiliNavi Mumbai
MSETCL
Construction of Control Room building for SLDC Kalwa at
Airoli, Navi Mumbai.
Airoli, Navi Mumbai
M/s Shethgiri Associates, Mumbai
999.05 999.05 Aug.09 Apr-13
15 Maharashtra State Load Despatch
Centre (MSLDC) At & Post AiroiliNavi Mumbai
MSETCL
Tender No. MSLDC/CELD /INT/T-1111/004: Interior, furnishing, plumbing and sanitary, water supply and
drainage, Lifts and site beautification works for new
Building at State Load Dispatch Center, Airoli, Navi Mumbai.
Airoli, Navi Mumbai
M/s Shethgiri Associates, Mumbai
472.66 542.09 Apr-12 May-13
16 Maharashtra Tribal Public School
Society, Nashik
Construction of English Medium Residential School Building
boys hostel, Girls hostel, Principal quarter, teachers
quarter, peon/ cook quarter, compound wall, site
development & electrification in Gat no. 1030 at Mundhegaon,
Tal. Igatpuri Dist. Nashik
Nashik Maharashtra Tribal Public School
Society
2000.75 2220.97 Jan-11 Mar-14
17 Swami Ramanand Tirth Marathwada
University, Nanded
Construction of the administrative building of
University Sub- Centre at Latur.
Latur M/s Dilip G. Kale, Pune
906.00 896.84 Mar-09 Feb-15
18 Power Grid Corpn. India Ltd.
Const. of multistoried (high rise) building at township of 400/220
KV substation at Talegoan at Pune
Talegaon, Pune M/s Shethgiri Associates, Mumbai
1051 929.32 Mar-10 Nov-16
19 Maharashtra State Agricultural
Marketing Board
Landscape & allied work at Head office Building of
Maharashtra State Agricultural Marketing Board, Pune
Pune Maharashtra State Agricultural
Marketing Board
165 153.23 Feb-14 Nov-16
20 Directorate of Primary Education
Supply of Polymer Sitting Arrengement in the state of
Maharashtra
All over Maharashtra
Director of Primary Education
8870 8870.00 Feb-16 Dec-16
siplonserver1/coprofile
Sr. No
Name of the Employer Name of the work Location of
Project
Architect/ Consultant/
Contact Person
Contract Price (Lacs)
Final Completed
cost of Project (Lacs)
Date of start of work
Date of completion of
work
List of Projects Completed ( Civil & Interior Works )
21 Goa State Infrastructure Development
Corporation Limited (GSIDC)
Construction of Government College of Commerce and
Economics at Margao, Goa - Interior Furniture Works –
PhaseI
Margao, Goa Goa State Infrastructure Development
Corporation Limited (GSIDC)
167.08 144.43 Feb-15 Apr-18
22 CIDCO, CBD Belapur
Design and Execution of Interior work for the offices at 1st floor North wing, Part of 6th floor
South wing at CIDCO Bhavan and part at 3rd floor of Raigad Bhavan, CBD Belapur, Navi
Mumbai
Navi Mumbai The Executive Engineer (NM),
CIDCO
383.4 277.21 Feb-15 Mar-18
23 Airports Authority of India
Construction of operational office building for Airports
Authority of India, Bureau of Civil Aviation Security (BCAS)
and Director General of Civil Aviation (DGCA) at Mumbai
Airport. SH: Balance Works (Civil &
Electrical)
Mumbai Airports Authority of India
669.82 565.13 Feb-15 Dec-17
24 National Centre For Cell Science
Interior Works at NCCS, Pune Pune Shirish Beri & Associates
266.6 220.25 May-15 Mar-18
25 The Sports Authority of Goa
Construction of Pavilion on the west side with Changing Rooms, Office Dias, Gymnasium along
with necessary development works at Assagao, Bardez-Goa
Bardez, Goa The Sports Authority of Goa
341.75 364.22 Feb-15 Mar-19
siplonserver1/coprofile
Name of Client Nature of Work Location of site Architect/ Consultant
Value of Contract
(Lacs)
Value of Work
completed (Lacs)
Value of Bal. work.
(Lacs)
Date of start of work
Target date of
Completion
Present progress
(%)
MSEDCL, Mumbai
Turnkey Contract for Infrastructure Plan Part-II
Project for Tender T-59 for Works in
Amravati Zone, Akola / Amravati Circle/
Achalpur Division.
Amravati The Superintending Engineer,
Amravati
287.216 194.34 92.88 Oct-16 Jun-20 68%
MSEDCL, Mumbai
Turnkey Contract for Infrastructure Plan Part-II
Project for Tender T-63 for Works in
Amravati Zone, Akola / Amravati Circle/
Achalpur Division.
Amravati The Superintending Engineer,
Amravati
168.012 121.12 46.89 Oct-16 Jun-20 72%
MSEDCL, Mumbai
Turnkey Contract for Infrastructure Plan Part-II
Project for Tender T-65 for Works in
Amravati Zone, Akola / Amravati Circle/
Achalpur Division.
Amravati The Superintending Engineer,
Amravati
126.18 71.34 54.84 Oct-16 Jun-20 57%
MSEDCL, Mumbai
Rural Electrification Works of Chandrapur
District in Maharashtra State under Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)”
Chandrapur The Chief Engineer
(Infra) MSEDCL, Mumbai
3984.2 2583.4 1400.77 Nov-16 Jul-20 65%
MSEDCL, Mumbai
Urban Electrification works of Wardha Circle
in Maharashtra state under Integrated Power Development (IPDS)
Scheme
Wardha The Chief Engineer (IPDS),
MSEDCL, Mumbai
2424.4 2439.6 0 Feb-17 May-20 Final bill in progress
Naya raipur Development
Authority
Power supply arrangement and
operation & maintenance of two years for
Prime Minister Housing Scheme for various
sectors at Naya Raipur
Naya Raipur Chief Executive Officer, NRDA
2144.97 797.21 1347.76 Feb-18 Jul-20 37%
Rural Electrification Corporation , Noida (UP)
Electrification works IN GANDERBAL CIRCLE ON FULL TURNKEY
BASIS UNDER RAPDRP PART-B.
GANDERBAL( Jammu and
Kashmir)
Rural Electrication
Corpn
1308.88 392.38 916.5 Jun-18 Aug-20 30%
Rural Electrification Corporation , Noida (UP)
Electrification works IN SOPORE CIRCLE ON
FULL TURNKEY BASIS UNDER
RAPDRP PART-B.
SOPORE( Jammu and
Kashmir)
Rural Electrication
Corpn
1932.99 560.7 1372.29 Jun-18 Aug-20 29%
Project Wing, Jammu
RuralElectrification works of KISHTWAR District in Jammu Province under
(DDUGJY)/PMDP (RURAL)/ RGGVYII
KISHTWAR District in
Jammu
Project Wing, Jammu
6953.57 1973.85 4979.72 Jun-18 Aug-20 28%
List of Projects in Hand ( Electrical)
siplonserver1/coprofile
Name of Client Nature of Work Location of site Architect/ Consultant
Value of Contract
(Lacs)
Value of Work
completed (Lacs)
Value of Bal. work.
(Lacs)
Date of start of work
Target date of
Completion
Present progress
(%)
List of Projects in Hand ( Electrical)
Project Wing, Jammu
RuralElectrification works of
DODA District in Jammu Province under
(DDUGJY)/PMDP (RURAL)/ RGGVYII
DODA District in Jammu
Project Wing, Jammu
8409.13 2351.72 6057.41 Jun-18 Aug-20 28%
Project Wing, Kashmir
Rural Electrification works of District
Bandipora and District Ganderbal in the state of
Jammu and Kashmir under
(DDUGJY) and (PMDP-Rural)
Bandipora and Ganderbal,
Jammu
Project Wing,
Kashmir
9967.00 2651.45 7315.55 Jun-18 Aug-20 27%
Project Wing, Kashmir
Rural Electrification works of Kupwara & Baramulla District in
Kashmir Province under Deen Dayal Upadhaya
Gramin Jyoti Yojna (DDUGJY)/ PMDP
Rural.
Kupwara & Baramulla
Project Wing,
Kashmir
14097.75 4040.76 10056.99 Jun-18 Aug-20 29%
Imagine Panaji Smart City
Development Limited
Smart Conversion ofOverhead to Underground
Electrical Network – Panaji & Ribander
Panaji & Ribander
Managing Director &
CEO, IPSCDL
7375.20 4189.47 3185.73 Nov-18 May-20 57%
Ajmer Vidyut Vitran Nigam
Limited
Providing Rural House hold electrification work, which inter-alia includes construction of 11 KV & LT Lines, installation of distribution transformers
and providing service connections to rural
house hol of Udaipur District (LOT 8), under SAUBHAGYA Scheme
package AVVNL/SAUBHAGYA/
UDR/TN-78/LOT-8
Udaipur, Rajasthan
The Superintending Engineer (DDUGJY),
AVVNL, Ajmer
1392.24 252.44 1139.8 Jan-19 Aug-20 18%
Pritam Constructions
Pvt. Ltd.
132 KV DC line shifting work for MSETCL
Pune Pritam Construction
s Pvt. Ltd.
238.75 0 238.75 Dec-19 May-20 Work in progress
Madhuban Inn Pvt. Ltd.
Electrical work of Amar Madhuban Tech Park
Pune Madhuban Inn Pvt. Ltd.
302.14 0 302.14 Dec-19 May-20 Work in progress
Airports Authority of
India
Construction of combined operational offices forDGCA, BCAS, AAIB, AERA and AAI at Safdarjung Airport, New Delhi.SH- SITCof Substation equipments etc.
Delhi Airports Authority of
India
1592.36 0 1592.36 May-20 Dec-20 Work order received
Ajmer Vidyut Vitran Nigam
Limited
AVVNL/KUSUM-C/GRID-SPV/TN-84/(Lot-10)- Solarization of grid connected agriculture consumers (Dungarpur-I)
Ajmer The Superintending Engineer (DDUGJY),
AVVNL, Ajmer
1152.89 0 1152.89 Aug-20 May-21 We are L1. LOA awaited
siplonserver1/coprofile
Name of Client
Nature of Work
Location of site
Architect/ Consultant
Value of Contract
(Lacs)
Value of Work
completed
(Lacs)
Value of Work Bal.
(Lacs)
Date of start of work
Stipulated date
of Complet
ion
Present progresss
(%)
Uttar Pradesh Samaj Kalyan
Nirman Nigam Limited
Construction of Museum at M.G.AH.V.
Wardha.
Wardha Uttar Pradesh Samaj Kalyan
Nirman Nigam Limited
971.04 618.32 352.72 June-13 Jul-20 64%
Uttar Pradesh Samaj Kalyan
Nirman Nigam Limited
Construction of Residence at M.G.A.H.V.
Wardha
Wardha Uttar Pradesh Samaj Kalyan
Nirman Nigam Limited
998.46 596.80 401.66 June-13 Jul-20 60%
Goa Housing Board
Construction of new market
complex marriage hall,
conference halland joggers park
at Porvorim Bardez -Goa
Goa Goa Housing Board
2178.22 1612.8 565.42 Mar-14 June-20 74%
Goa State Infrastructure Development Corporation
Limited (GSIDC)
Construction of Sanskruti
Bhavans for the Department of Tribal Welfare in Canacona
Taluka at Adarshgram, Ammonae-Poinguinim,
Gaondongrem, Kulgati, Edda & Gullem villages
Goa Goa State Infrastructure Development Corporation
Limited (GSIDC)
1135.51 697.46 438.05 Nov-14 June-20 61%
List of Projects in Hand ( Civil & Interior)
siplonserver1/coprofile
Name of Client
Nature of Work
Location of site
Architect/ Consultant
Value of Contract
(Lacs)
Value of Work
completed
(Lacs)
Value of Work Bal.
(Lacs)
Date of start of work
Stipulated date
of Complet
ion
Present progresss
(%)
List of Projects in Hand ( Civil & Interior)
Agricultural Produce Market
Committee
Proposed Construction of Flower Trading
Centre at Marketyard,
Gultekdi, Pune- 411 037
Pune Agricultural Produce Market
Committee
5054.08 3739.07 1315.01 May-15 Oct-20 74%
Nehru Science Centre
Construction of Science and Innovation
Activity Centre at Satara
Satara Nehru Science Centre, Mumbai
110.04 95.4 14.64 Sep-17 May-20 87%
siplonserver1/coprofile
Name of Client
Location of Project Name of the work
Architect/ Consultant/
Contact Person
Contract Price (Lacs)
Final Completed cost of Project (Lacs)
Date of start of work
Date of completi
on of work
Bharat Dynamics Limited
Bhanur, Telangana
Design, engineering, procurement & supply, construction & erection, testing, commissioing, associated transmission
system & comprehensive operation & maintenance for 5 yrs of 5 MW (AC) Solar PV Power Plant at BDL,
Bhanur (Telangana)
SECI 3303.79 3097.26 Nov-16 Nov-17
Siddhant College Of Engineering
Pimpri, Pune
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 221 KW Solar PV rooftop power
plant at Pune
Self 120 120 May-18 Oct-18
Pravin Industries
Mumbai, Maharashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 310 KW Solar PV rooftop power
plant at Pune
Self 110 110 Nov-18 Jan-19
Jaihind Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 20 KW Solar PV rooftop power
plant at Pune
Self 18 18 May-19 May-19
Chikaskar Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 11 KW Solar PV rooftop power
plant at Pune
Self 9 9 May-19 May-19
List of Projects Completed (Solar)
Name of Client
Location of Project Name of the work
Architect/ Consultant/
Contact Person
Contract Price (Lacs)
Final Completed cost of Project (Lacs)
Date of start of work
Date of completi
on of work
Kumar Buildtech
Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 22 KW Solar PV rooftop power
plant at Pune
Self 15 15 May-19 May-19
Silver Star Fashion
Pimpri, Maharashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 41 KW Solar PV rooftop power
plant at Pune
Self 29 29 Jun-19 Jun-19
Rajas Jain Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 21 KW Solar PV rooftop power
plant at Pune
Self 15 15 Mar-19 Apr-19
Shalaka House
Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 20 KW Solar PV rooftop power
plant at Pune
Self 15 15 Jun-19 Jun-19
Kushi Society
Pune, Mahrashtra
Design, engineering, procurement & supply, construction & erection,
testing, commissioing of 18 KW Solar PV rooftop power
plant at Pune
Self 11.9 11.9 Jun-19 Jun-19
Name of Client
Location of Site Name of the work
Architect/ Consultant
Value of Contract
(Lacs)
Date of start of work
Target date of
Completion & COD
Present progress
(%)
Southern Power
Distribution Company of Telangana Limited
(TSSPDCL)
Alair SS, District Yadadri,
Telangana State
Setting up of Grid connected solar PV project in Telangana
on "Build Own Operate" basis for the capacity of 15 MW AC / 18 MW DC for a
period of 25 yrs on PPA Basis
Southern Power
Distribution Company of Telangana Limited
(TSSPDCL)
12000.00 Mar-18 Nov-18 100% complete
d & commissi
oned
List of Solar Projects completed as a developer
Sr.No.Name Client & Proejct Value of
Contract (Lacs)
Date of start of work
Stipulated date of
Completion
Remark
1 Navi Mumbai Municipal Corporation: Design, supply, erection, installation & commissioning of 20 MW grid Project connected solar PV power plant & 1.5 MW of Hydro-power plant at MORBE dam on turnkey basis including: O&M for 25 yrs”
16300 May-2020 May-2021 Tech specs & Statutory approvals
under process
Sr.No. Name of Client CapacityProject
Value (Rs. In Lacs)
Location of site
Stipulated period of
completion
1 Java Labs 640 KW 350 Chakan, Pune 3 months2 Appolo Hospitals 400 KW 250 Hyderabad 3 months3 Bricks & Milestones Office 100 KW 125 Bangalore 1 month4 Greenshire Residential Project 100 KW 100 Bangalore 1 month5 Jaihind Collections, Nashik 50 KW 35 Nashik 1 month6 Sun Shine -Bhavisha Homes 150 KW 150 Bangalore 2 months7 Kandivali Apartments 250 KW 200 Mumbai 2 months8 Aditya House 5 KW 5 Pune 1 month9 Navjeet Houe 15 KW 15 Pune 1 month10 Shah House 10 KW 10 Pune 1 month11 Dutt House 2 KW 2 Bangalore 1 month12 Bhikshu Marbles 40 KW 25 Pune 1 month13 Bhavisha Homes P - 1 75 KW 50 Bangalore 1 month14 Bhavisha Homes P - 2 100 KW 80 Bangalore 1 month15 New Dawn 200 KW 125 Bangalore 2 months16 Sanskriti School 100 KW 45 Pune 1 month
Projects in Pipeline- Solar
ROOF TOP SOLAR SYSTEM
GROUND MOUNTED SOLAR SYSTEM
Sr.No. Name of Client Name of Work Location of site Tender Value (Rs. In Lacs)
1North Cachar Hills Autonomous Council (NCHAC)
Development, Design, Engineering, Supply & Procurement, Construction & Erection, Testing, Commissioning & Comprehensive Operation & Maintenance for 2 years of (50+20) MWp Solar PV Power Plant at Dima Hassao, Assam
Dima Hassao (Assam) 77000.00
2Karbi Anglong Autonomous Council (KAAC), Guwahati
Construction of Karbi Bhavan at Sector-13, Dwarka, New Delhi New Delhi 3000.00
Tenders in pipeline