Commitment to Reliable Power Service Presented to the Chamber of Commerce by: John M. Benavente,...

28
Commitment to Reliable Power Service Presented to the Chamber of Commerce by: John M. Benavente, P.E. General Manager Joaquin C. Flores, P.E. Assistant General Manager, Operations Randall V. Wiegand Chief Financial Officer Guam Power Authority

Transcript of Commitment to Reliable Power Service Presented to the Chamber of Commerce by: John M. Benavente,...

  • Commitment to Reliable Power Service Presented to the Chamber of Commerce by:

    John M. Benavente, P.E.General ManagerJoaquin C. Flores, P.E.Assistant General Manager, OperationsRandall V. WiegandChief Financial OfficerGuam Power Authority

  • IntroductionThe Consolidated Commission on Utilities (CCU) is an Elected Group of Experienced Professionals from Various Sectors of the Guam Community5-member CommissionElected in November 2002 to 4-year staggered termsResponsible for the governance of Guam Power Authority and Guam Waterworks AuthorityMeets on a weekly basis to formulate policy and conduct oversightGPA was made an independent public corporation in June 2002Since its inception in January 2003, the CCU has conducted all business under full public disclosureDeveloped strong working relationships with policy makers, the U.S. Military and the community

  • IntroductionConsolidated Commission on Utilities (CCU)Simon Sanchez, ChairmanFormer Senator, 8 years on PUC, businessman, graduate of Stanford University & Harvard UniversityFrank Shimizu, Vice Chairman (GPA)GPA Chairman (1995-2000), businessman, former J.H.S. math-science teacher, B.S. Mathematics Pomona CollegeVincent Camacho, TreasurerCertified Public Accountant, Series 7, 6, 63, 26 licenses, RVP of Great West Financial Services, B.S. Accounting, M.B.A., Professor of Finance at University of Guam

    Guam Power AuthorityJohn Benavente, General Manager20 years experience at GPA, General Manager (1987-1993), licensed professional engineer, businessman, M.E. University of Dayton, Masters in Engineering Management University of MissouriRandy Wiegand, Chief Financial Officer Certified Public Accountant, former OPA Audit Manager, GPA Comptroller (1995-2000), Deloitte & Touche (1990-1995), B.A. Finance Seattle Pacific University, M.B.A. Finance University of Washington

  • Guam Public Utilities CommissionBoth the CCU and GPA have a Strong Working Relationship with the Guam PUCPUC members are appointed by the Governor and confirmed by the Legislature for six-year termsGPAs bond covenants require that the PUC must be able to act independentlyPUC members cannot be forced to resignThe PUC is required by the laws of the Territory of Guam to set rates which are fair, non-discriminatory and adequate to provide revenues sufficient to pay for all costs of owning, properly maintaining and operating the Authoritys electric utility systemThe PUC may require the Authoritys rates to be adjusted upwards or downwards at any time in order to meet these conditions; however, rates must always be set at a level to meet Indenture requirementsIn October 2001, the PUC approved a surcharge to enable GWA to pay $18MM in GPA past due billsIn May 2003, the PUC approved the request of the CCU to allow GWA to also pay for a $9MM Navy obligation The PUC approved the LEAC adjustment which took effect on October 1, 2003

  • Rate DesignRates for Electric Service are Initiated by the CCU and Approved by the PUCGPAs Rate design consists of the following charges :kWh Energy ChargeDemand Charge (Non-Residential)Customer ChargeEmergency Water Well and Wastewater ChargeLifeline Rate (for Residential class)Fuel Recovery Charge (LEAC)Insurance Charge (if Self Insurance Fund falls below a $2.5MM threshold)Special Surcharges

  • Rate ComparisonGPAs Rates are Competitive in Comparison to Other Island Utilities(1) Converted to U.S. Dollars using exchange rates as of 12/04/02

  • GPA Revenue BaseGPA Customer Revenue Composition by ClassAs of Fiscal Year 2002GPAs Revenue Base is Well Diversified and is Steadily Growing

    GPA Customer Growth1998-2002

  • Top 10 CustomersApproximately 30% of GPAs Revenues is Derived from its Top 10 CustomersGPA Top 10 CustomersAs of FY 2002

    FISCAL YEAR 2002

    GUAM POWER AUTHORITY

    TEN LARGEST CUSTOMERS

    FOR FISCAL YEAR 2002

    OVERALL TOP TEN

    ACCOUNT NAMEKWHANNUAL REVENUE

    kWhAnnual Revenue

    U.S. Navy316,985,533$31,030,315

    Guam Waterworks Authority50,501,1697,717,852

    Dept of Education46,440,5397,627,747

    Guam Airport Authority27,366,9423,845,052

    Goodwin Development16,996,8002,237,705

    Hyatt Regency Guam15,411,2001,902,526

    Tanota Partners14,182,5201,790,010

    University of Guam13,101,6822,177,727

    Pacific Island Club12,624,4001,587,385

    Miyama Guam Inc.12,146,4001,571,245

    Total525,757,185$61,487,563

    Average Monthly Total43,813,099$5,123,964

    % of GPA Total33%30%

    (Annual Basis)

    TOP 10 COMMERCIAL

    ACCOUNT NAMEKWHANNUAL REVENUE

    1GOODWIN DEVELOPMENT CORP16,996,8002,237,705

    2HYATT REGENCY GUAM15,411,2001,902,526

    3TANOTA PARTNERS14,182,5201,790,010

    4PACIFIC ISLAND CLUB12,624,4001,587,385

    5MIYAMA GUAM (WESTIN)12,146,4001,571,245

    6DUTY FREE SHOPPERS11,480,1001,485,721

    7REPUBLIC OF NAURU (MARRIOTT)10,659,6001,345,393

    8CITY HILL CO (GUAM)10,584,7201,416,376

    9ONWARD BEACH RESORT INC.10,434,0001,306,440

    10TNN GUAM INC (NIKKO)9,102,6001,231,080

    Total123,622,34015,873,882

    TOP 10 GOVERNMENT

    1Guam Waterworks Authority50,501,1697,717,852

    2Dept of Education46,440,5397,627,747

    3Guam Airport Authority27,366,9423,845,052

    4University of Guam13,101,6822,177,727

    5DPW Village St Lights12,037,6912,909,030

    6Guam Memorial Hospital9,515,7431,275,573

    7Guam Telephone Authority5,899,058882,768

    8Dept of Correction4,656,634704,185

    9DPW-Fac/Adm4,339,030678,422

    10Superior Court of Guam3,991,468567,515

    Total177,849,95628,385,870

  • Historical & Projected Non-Fuel Revenues from Energy SalesIncludes the Authority's small general non-demand, small general demand, small government non-demand and small government demand categories.Includes the Authority's large general and large government categories. Most hotels are included in this category. Includes the Authority's private and government public street/outdoor lighting categories.Despite a weak economy, revenues from energy sales prior to FY 2002 experienced steady growthSales in FY 2002 and FY 2003 were impacted by two major typhoonsSales for FY 2004 through FY 2007 are projected to match the pre-typhoon growth rateTyphoon ChataanTyphoon Pongsona

  • GPA Organizational StructureThe CCU and GPA New Management are Well-Qualified and Have Many Years of Experience General Manager & Chief Financial Officer appointed by the Consolidated Commission on Utilities

  • Independent Power Producer & Performance Management ContractsGPA has Agreements with Independent Power Producers (IPPs) to Improve Reserves and ReliabilityMEC (Enron) 88 MW slow speed diesel plant in PitiTEMES 40 MW combustion turbine plant in Piti, reserve unitPruvient Energy 53 MW refurbishment of GPAs Tanguisson power plantTEMES 132 MW Cabras 1 & 2 management contractCabras 3 & 4 will be converted to a Performance Management Contract (PMC) during FY 2004GPA continues to put more of the system under IPPs and PMCs to improve operations, maintenance, management, procurement and training (O-M-M-P-T)

  • Risk Management PoliciesGPA implemented a Fuel Hedging Program in January 2001 Received $5.8 million since implementedCurrently in-the-moneyGPA and Fuel Hedge Provider assess the oil market on a regular basis Preparing to extend hedge past December 2004GPA has a Risk Management Consultant who is a power utility specialistAdvises GPA Board and Management on all insurance mattersAssists in the renewals of insurance policies, which are currently out for bid and will be awarded before the October 31, 2003 expiration date Assists in review of contractual insurance provisions

    GPA Has Instituted Both Fuel Risk and Insurance Risk Management ProgramsSingapore 180 CST vs. GPA Ceiling July 2002 July 2003

    Chart1

    155.3207156.5

    161.6012156.5

    170.675156.5

    159.8043156.5

    150.45156.5

    165.4625156.5

    183.1875156.5

    200.7458156.5

    180.475156.5

    155.8274156.5

    160.3487156.5

    167.244156.5

    176.4402156.5

    $/mt

    GPA Ceiling

    Hedging

    Funds received from fuel hedging since the January 2001 inception

    Sep-02$193,216

    Oct-020.0

    Nov-020.0

    Dec-02$351,281

    Jan-03$293,555

    Feb-03$1,186,366

    Mar-03$1,182,120

    Apr-03$928,011

    May-030.0

    Jun-03$138,255

    Jul-03406,961

    Aug-03755,287

    $5,435,051

    180 CST PRICES

    Historical Average Monthly Price of Singapore FO180

    Sing FO180$/mtGPA Ceiling

    1-Jan-90102.24

    1-Feb-9094.09

    1-Mar-9091.84

    1-Apr-9085.18

    1-May-9082.89

    1-Jun-9061.13

    1-Jul-9074.11

    1-Aug-90136.10

    1-Sep-90144.27

    1-Oct-90148.35

    1-Nov-90143.30

    1-Dec-90142.94

    1-Jan-91161.95

    1-Feb-91107.52

    1-Mar-9175.05

    1-Apr-9180.00

    1-May-9184.53

    1-Jun-9185.72

    1-Jul-9186.65

    1-Aug-9182.66

    1-Sep-9178.38

    1-Oct-9187.76

    1-Nov-9188.33

    1-Dec-9174.10

    1-Jan-9268.47

    1-Feb-9268.55

    1-Mar-9276.03

    1-Apr-9284.83

    1-May-9289.34

    1-Jun-9292.43

    1-Jul-9291.59

    1-Aug-9294.78

    1-Sep-92102.88

    1-Oct-92105.64

    1-Nov-9292.04

    1-Dec-9274.34

    1-Jan-9376.37

    1-Feb-9382.82

    1-Mar-9386.00

    1-Apr-9391.48

    1-May-9387.49

    1-Jun-9377.46

    1-Jul-9368.52

    1-Aug-9375.48

    1-Sep-9376.04

    1-Oct-9373.89

    1-Nov-9361.39

    1-Dec-9358.66

    1-Jan-9470.26

    1-Feb-9468.76

    1-Mar-9465.11

    1-Apr-9478.13

    1-May-9489.77

    1-Jun-9490.24

    1-Jul-94102.60

    1-Aug-9499.48

    1-Sep-9479.37

    1-Oct-9489.22

    1-Nov-9496.10

    1-Dec-9490.39

    1-Jan-9597.14

    1-Feb-95103.63

    1-Mar-95106.22

    1-Apr-95107.30

    1-May-95105.86

    1-Jun-9593.27

    1-Jul-9585.42

    1-Aug-9585.65

    1-Sep-9583.43

    1-Oct-9589.14

    1-Nov-9596.58

    1-Dec-95110.41

    1-Jan-96115.76

    1-Feb-96108.44

    1-Mar-96108.46

    1-Apr-96112.18

    1-May-9699.92

    1-Jun-9690.95

    1-Jul-9693.28

    1-Aug-9699.65

    1-Sep-96114.92

    1-Oct-96119.53

    1-Nov-96119.75

    1-Dec-96122.71

    1-Jan-97108.00

    1-Feb-9799.94

    1-Mar-97100.67

    1-Apr-9799.16

    1-May-97101.84

    1-Jun-97100.55

    1-Jul-9798.64

    1-Aug-97103.95

    1-Sep-97110.70

    1-Oct-97111.98

    1-Nov-97106.64

    1-Dec-9792.48

    1-Jan-9865.91

    1-Feb-9857.86

    1-Mar-9868.35

    1-Apr-9877.90

    1-May-9873.31

    1-Jun-9864.85

    1-Jul-9862.35

    1-Aug-9859.92

    1-Sep-9876.51

    1-Oct-9882.04

    1-Nov-9875.05

    1-Dec-9863.28

    1-Jan-9965.59

    1-Feb-9958.16

    1-Mar-9967.74

    1-Apr-9982.46

    1-May-9987.40

    1-Jun-9986.91

    1-Jul-9999.88

    1-Aug-99117.65

    1-Sep-99127.30

    1-Oct-99138.05

    1-Nov-99142.92

    1-Dec-99141.45

    1-Jan-00135.88

    1-Feb-00143.44

    1-Mar-00170.41

    1-Apr-00152.92

    1-May-00163.19

    1-Jun-00174.80

    1-Jul-00152.04

    1-Aug-00149.03

    1-Sep-00171.44

    1-Oct-00181.79

    1-Nov-00167.68

    1-Dec-00136.02

    1-Jan-01127.41156.5

    1-Feb-01137.88156.5

    1-Mar-01138.77156.5

    1-Apr-01142.29156.5

    1-May-01151.65156.5

    1-Jun-01139.48156.5

    1-Jul-01131.97156.5

    1-Aug-01143.23156.5

    1-Sep-01150.45156.5

    1-Oct-01127.78156.5

    1-Nov-01107.28156.5

    1-Dec-01111.31156.5

    1-Jan-02111.02156.5

    1-Feb-02117.73156.5

    1-Mar-02133.85156.5

    1-Apr-02148.20156.5

    1-May-02156.18156.5

    1-Jun-02149.65156.5

    1-Jul-02155.32156.5

    1-Aug-02161.60156.5

    1-Sep-02170.68156.5

    1-Oct-02159.80156.5

    1-Nov-02150.45156.5

    1-Dec-02165.46156.5

    1-Jan-03183.19156.5

    1-Feb-03200.75156.5

    1-Mar-03180.48156.5

    1-Apr-03155.83156.5

    1-May-03160.35156.5

    1-Jun-03167.24156.5

    1-Jul-03176.44156.5

    CHART

    CHART

    155.3207156.5

    161.6012156.5

    170.675156.5

    159.8043156.5

    150.45156.5

    165.4625156.5

    183.1875156.5

    200.7458156.5

    180.475156.5

    155.8274156.5

    160.3487156.5

    167.244156.5

    176.4402156.5

    $/mt

    GPA Ceiling

  • Sufficient Generation Capacity

    The GPA system will support a 1 day in 4.5 Years LOLE for a peak of 345 MW or what amounts to a 70 MW increase in present day system demand.

    Sheet1

    Chart1

    242.3

    232.3

    244.3

    246.4

    255.4

    251.47

    252.6

    258.8

    253.6

    260.3

    261.75

    257.7

    250.2

    243.9

    249.9

    264.5

    270.05

    274

    265.7

    269.5

    274.5

    271.8

    268.2

    254

    267.5

    261

    262

    269

    278.5

    274

    276

    277.5

    281

    279.5

    271

    276.1

    227.5

    237

    253.1

    258.5

    262.5

    264.6

    268

    278.5

    268.3

    273.5

    267

    269

    256.5

    258.5

    267.5

    271

    269

    262.3

    258

    275.5

    277

    275.7

    276

    274

    264

    272

    274

    275.5

    278.1

    268

    262.7

    268

    273

    266.5

    276.1

    276.5

    272.6

    264

    265

    276.5

    278.5

    272.5

    277

    280

    280

    281.5

    281

    269

    254

    260

    256

    261

    265

    262

    265

    266

    266

    264

    268

    257

    205

    226

    243

    247

    259

    250

    254

    263

    260.2

    265

    258

    261

    Peak System Load (MW)

    Month

    Peak System Demand (MW)

    Chart2

    274406435.41658590

    264396435.41658552.3

    272404435.41658552.3

    274406435.41658552.3

    275.5407.5435.41658552.3

    278.1410.1435.41658552.3

    268400435.41658552.3

    262.7394.7435.41658552.3

    268400435.41658552.3

    273405435.41658552.3

    266.5398.5435.41658552.3

    276.1408.1435.41658552.3

    276.5408.5435.41658552.3

    272.6404.6435.41658552.3

    264396435.41658552.3

    265397435.41658552.3

    276.5408.5435.41658552.3

    278.5410.5435.41658552.3

    272.5404.5435.41658552.3

    277409435.41658552.3

    280412435.41658552.3

    280412435.41658552.3

    281.5413.5435.41658552.3

    281413435.41658552.3

    269401435.41658552.3

    254386435.41658552.3

    260392435.41658552.3

    256388435.41658552.3

    261393435.41658552.3

    265397435.41658552.3

    262394435.41658552.3

    265397435.41658552.3

    266398435.41658552.3

    266398435.41658552.3

    264396435.41658552.3

    268400435.41658552.3

    257389435.41658552.3

    205337435.41658552.3

    226358435.41658552.3

    243375435.41658552.3

    247379435.41658552.3

    259391435.41658552.3

    250382435.41658552.3

    254386435.41658552.3

    263395435.41658552.3

    260.2392.2435.41658552.3

    265397435.41658552.3

    258390435.41658552.3

    261393435.41658552.3

    Peak System Load (MW)

    Peak + 2 Largest Units (MW)

    Reserve to Support 1 Day in 4.5 years (MW)

    Installed Capacity (MW)

    Power Demand and Reserve Requirements

    552.3 MW Installed Capacity

    Sheet2

    Month/YearGross Peak Demand (MW)

    199519961997199819992000200120022003

    January242.3250.2267.5227.5256.5264272.6254205

    February232.3243.9261237258.5272264260226

    March244.3249.9262253.1267.5274265256243

    April246.4264.5269258.5271275.5276.5261247

    May255.4270.05278.5262.5269278.1278.5265259

    June251.47274274264.6262.3268272.5262250

    July252.6265.7276268258262.7277265254

    August258.8269.5277.5278.5275.5268280266263

    September253.6274.5281268.3277273280266260.2

    October260.3271.8279.5273.5275.7266.5281.5264265

    November261.75268.2271267276276.1281268258

    December257.7254276.1269274276.5269257261

    Min232.3243.9261227.5256.5262.7264254205

    Max261.75274.5281278.5277278.1281.5268265

    MonthMonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)

    January1995January 1995Jan-95242.3374.3435.41658

    February1995February 1995Feb-95232.3364.3435.41658

    March1995March 1995Mar-95244.3376.3435.41658

    April1995April 1995Apr-95246.4378.4435.41658

    May1995May 1995May-95255.4387.4435.41658

    June1995June 1995Jun-95251.47383.47435.41658

    July1995July 1995Jul-95252.6384.6435.41658

    August1995August 1995Aug-95258.8390.8435.41658

    September1995September 1995Sep-95253.6385.6435.41658

    October1995October 1995Oct-95260.3392.3435.41658

    November1995November 1995Nov-95261.75393.75435.41658

    December1995December 1995Dec-95257.7389.7435.41658

    January1996January 1996Jan-96250.2382.2435.41658

    February1996February 1996Feb-96243.9375.9435.41658

    March1996March 1996Mar-96249.9381.9435.41658

    April1996April 1996Apr-96264.5396.5435.41658

    May1996May 1996May-96270.05402.05435.41658

    June1996June 1996Jun-96274406435.41658

    July1996July 1996Jul-96265.7397.7435.41658

    August1996August 1996Aug-96269.5401.5435.41658

    September1996September 1996Sep-96274.5406.5435.41658

    October1996October 1996Oct-96271.8403.8435.41658

    November1996November 1996Nov-96268.2400.2435.41658

    December1996December 1996Dec-96254386435.41658

    January1997January 1997Jan-97267.5399.5435.41658

    February1997February 1997Feb-97261393435.41658

    March1997March 1997Mar-97262394435.41658

    April1997April 1997Apr-97269401435.41658

    May1997May 1997May-97278.5410.5435.41658

    June1997June 1997Jun-97274406435.41658

    July1997July 1997Jul-97276408435.41658

    August1997August 1997Aug-97277.5409.5435.41658

    September1997September 1997Sep-97281413435.41658

    October1997October 1997Oct-97279.5411.5435.41658

    November1997November 1997Nov-97271403435.41658

    December1997December 1997Dec-97276.1408.1435.41658

    January1998January 1998Jan-98227.5359.5435.41658

    February1998February 1998Feb-98237369435.41658

    March1998March 1998Mar-98253.1385.1435.41658

    April1998April 1998Apr-98258.5390.5435.41658

    May1998May 1998May-98262.5394.5435.41658

    June1998June 1998Jun-98264.6396.6435.41658

    July1998July 1998Jul-98268400435.41658

    August1998August 1998Aug-98278.5410.5435.41658

    September1998September 1998Sep-98268.3400.3435.41658

    October1998October 1998Oct-98273.5405.5435.41658

    November1998November 1998Nov-98267399435.41658

    December1998December 1998Dec-98269401435.41658

    January1999January 1999Jan-99256.5388.5435.41658590

    February1999February 1999Feb-99258.5390.5435.41658590

    March1999March 1999Mar-99267.5399.5435.41658590

    April1999April 1999Apr-99271403435.41658590

    May1999May 1999May-99269401435.41658590

    June1999June 1999Jun-99262.3394.3435.41658590

    July1999July 1999Jul-99258390435.41658590

    August1999August 1999Aug-99275.5407.5435.41658590

    September1999September 1999Sep-99277409435.41658590

    October1999October 1999Oct-99275.7407.7435.41658590

    November1999November 1999Nov-99276408435.41658590

    MonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)Installed Capacity (MW)

    December1999December 1999Dec-99274406435.41658590

    January2000January 2000Jan-00264396435.41658552.3

    February2000February 2000Feb-00272404435.41658552.3

    March2000March 2000Mar-00274406435.41658552.3

    April2000April 2000Apr-00275.5407.5435.41658552.3

    May2000May 2000May-00278.1410.1435.41658552.3

    June2000June 2000Jun-00268400435.41658552.3

    July2000July 2000Jul-00262.7394.7435.41658552.3

    August2000August 2000Aug-00268400435.41658552.3

    September2000September 2000Sep-00273405435.41658552.3

    October2000October 2000Oct-00266.5398.5435.41658552.3

    November2000November 2000Nov-00276.1408.1435.41658552.3

    December2000December 2000Dec-00276.5408.5435.41658552.3

    January2001January 2001Jan-01272.6404.6435.41658552.3

    February2001February 2001Feb-01264396435.41658552.3

    March2001March 2001Mar-01265397435.41658552.3

    April2001April 2001Apr-01276.5408.5435.41658552.3

    May2001May 2001May-01278.5410.5435.41658552.3

    June2001June 2001Jun-01272.5404.5435.41658552.3

    July2001July 2001Jul-01277409435.41658552.3

    August2001August 2001Aug-01280412435.41658552.3

    September2001September 2001Sep-01280412435.41658552.3

    October2001October 2001Oct-01281.5413.5435.41658552.3

    November2001November 2001Nov-01281413435.41658552.3

    December2001December 2001Dec-01269401435.41658552.3

    January2002January 2002Jan-02254386435.41658552.3

    February2002February 2002Feb-02260392435.41658552.3

    March2002March 2002Mar-02256388435.41658552.3

    April2002April 2002Apr-02261393435.41658552.3

    May2002May 2002May-02265397435.41658552.3

    June2002June 2002Jun-02262394435.41658552.3

    July2002July 2002Jul-02265397435.41658552.3

    August2002August 2002Aug-02266398435.41658552.3

    September2002September 2002Sep-02266398435.41658552.3

    October2002October 2002Oct-02264396435.41658552.3

    November2002November 2002Nov-02268400435.41658552.3

    December2002December 2002Dec-02257389435.41658552.3

    January2003January 2003Jan-03205337435.41658552.3

    February2003February 2003Feb-03226358435.41658552.3

    March2003March 2003Mar-03243375435.41658552.3

    April2003April 2003Apr-03247379435.41658552.3

    May2003May 2003May-03259391435.41658552.3

    June2003June 2003Jun-03250382435.41658552.3

    July2003July 2003Jul-03254386435.41658552.3

    August2003August 2003Aug-03263395435.41658552.3

    September2003September 2003Sep-03260.2392.2435.41658552.3

    October2003October 2003Oct-03265397435.41658552.3

    November2003November 2003Nov-03258390435.41658552.3

    December2003December 2003Dec-03261393435.41658552.3

    Sheet3

    Generation UnitTechnologyPrimary FuelMax. Gross Capacity(MW)Yr. Commissioned

    Cabras 1Steam TurbineRFO #6661974

    Cabras 2Steam TurbineRFO #6661975

    Cabras 3Slow Speed DieselRFO #6401996

    Cabras 4Slow Speed DieselRFO #6401996

    Piti 8 (ENRON/MEC)Slow Speed DieselRFO #6441999

    Piti 9 (ENRON/MEC)Slow Speed DieselRFO #6441999

    Tanguisson 1 (MIRANT)Steam TurbineRFO #626.51976

    Tanguisson 2 (MIRANT)Steam TurbineRFO #626.51976

    Dededo CT 1Combustion TurbineDiesel #2231992

    Dededo CT 2Combustion TurbineDiesel #2231994

    Macheche CtCombustion TurbineDiesel #2211993

    Marbo CTCombustion TurbineDiesel #2161993

    Yigo CTCombustion TurbineDiesel #2211993

    Piti 7 (TEMES)Combustion TurbineDiesel #2401997

    Dededo Diesel 1Medium Speed DieselDiesel #22.51972

    Dededo Diesel 2Medium Speed DieselDiesel #22.51972

    Dededo Diesel 3Medium Speed DieselDiesel #22.51972

    Dededo Diesel 4Medium Speed DieselDiesel #22.51972

    Pulantat Diesel 1Medium Speed DieselDiesel #251994

    Pulantat Diesel 2Medium Speed DieselDiesel #251994

    Talofofo Diesel 1Medium Speed DieselDiesel #24.41993

    Talofofo Diesel 2Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 1Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 2Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 3Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 4Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 5Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 6Medium Speed DieselDiesel #24.41993

    Yr. Commissioned

    MBD00010E9F.xls

    Chart1

    267.212590393.212408.83436

    276.126546402.126422.47278

    284.586546410.586435.41658

    292.173546418.173447.02469

    300.664546426.664460.01592

    309.334546435.334473.28102

    320.475546446.475490.32675

    332.121546458.121508.14513

    345.187546471.187528.13611

    359.02586485.02549.3006

    366.714586492.714561.07242

    373.965616499.965572.16645

    381.641616507.641583.91073

    388.812616514.812594.88236

    398.323656524.323609.43419

    407.341656533.341623.23173

    416.752929656542.752929637.63198137

    Peak Load

    Installed Capacity

    Peak Load + 2 Largest Unit Capacities

    Peak Load + 1 Day In 4.5 LOLE Reserve Reqm't

    Chart2

    267.212590393.212408.83436

    276.126546402.126422.47278

    284.586546410.586435.41658

    292.173546418.173447.02469

    300.664546426.664460.01592

    309.334546435.334473.28102

    320.475546446.475490.32675

    332.121546458.121508.14513

    345.187546471.187528.13611

    Peak Load

    Installed Capacity

    Peak Load + 2 Largest Unit Capacities

    Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't

    Fiscal Year

    Capacity Requirements (MW)

    proscrn

    SYSTEM19992000200120022003200420052006200720082009201020112012201320142015

    ENERGY REQUIREDGWH17301738173917451749177017781785179718101824183918551872189719251953

    THERM GENERATIONGWH17301738173917451749177017781785179718101824183918551872189719251953

    EMERGENCY ENERGYGWH00000000000000000

    PEAK LOADMW286287289290292295298300302304307310312314318321326

    LOAD FACTORPCT69.0368.9768.7468.668.4268.2568.1167.9367.8467.7767.7967.7867.7967.7768.0768.3768.44

    INSTALLED CAPACITYMW590546546546546546546546546586586616616616656656656

    RESERVE MARGINMW304259257256254251248246244282279306303301337334330

    RESERVE MARGINPCT106.2690.3489.078887.1384.9483.2582.0380.5392.790.7498.7597.0695.77106.06104101.25

    CAPACITY MARGINPCT51.5247.4647.1146.8146.5645.9345.4345.0644.6148.1147.5749.6949.2648.9251.4750.9850.31

    ENERGY RESV MARGINPCT-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100

    LOSS LOADHOURS00000000000000000

    FUEL BURNED 000MBTU1680616433164361646916582168201687316949170571719017351171231725117258174851777018024

    FIXED FUEL COST$00020792090210221142127214021532167218121962210222622422258227422922309

    TOTAL FUEL COST$0005413853723535985405954935562155692957875587265972560792609876200862696640796575867404

    VAR. O&M COST$00048444509462247604888506552175370554056976100636765787176741676587977

    FIXED O&M COST$0004915454282542635661957425565345732958148608616331962387650126610569402714877059271971

    TOTAL THERM COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352

    THERMAL COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44

    EMER ENERGY COST$00000000000000000000

    TOTAL SYS. COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352

    SYSTEM COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44

    AVG. MARG. COST$/MWH32.5831.9331.7732.0432.3532.7333.1133.5633.9334.4234.6633.9234.434.935.535.8836.46

    EXTERNAL COSTS$00000000000000000000

    CUST. IMPACT COSTS$00000000000000000000

    1.53

    19992000200120022003200420052006200720082009201020112012201320142015

    Peak Load267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929

    Installed Capacity590546546546546546546546546586586616616616656656656

    Peak Load + 2 Largest Unit Capacities393.212402.126410.586418.173426.664435.334446.475458.121471.187485.02492.714499.965507.641514.812524.323533.341542.752929

    Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't408.83436422.47278435.41658447.02469460.01592473.28102490.32675508.14513528.13611549.3006561.07242572.16645583.91073594.88236609.43419623.23173637.63198137

    Year199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020

    Low Estimate280.384272.594238.146252.951261.243264.941269.314273.417279.151284.731290.843296.843301.363305.443309.773313.609319.177324.234329.448929334.021464083340.3752436132346.1038961908352.022040388357.2692844784

    Forecast280.384272.842267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929425.532464083436.8612436132447.6168961908458.885040388469.5292844784

    High Estimate280.384273.09283.494292.759303.279312.949326.549340.963359.179379.258402.559428.755440.522451.966464.125475.861490.754505.3520.609929535.554464083554.1042436132572.3498961908591.735040388610.8132844784

  • Baseload Availability Cabras 1&2 PMC since January 2003Cabras 3&4 PMC in Place by October 2004

    Chart3

    0.91070.73560.8810.91460.964219970.89380.8811

    0.90290.43760.91270.85890.955119980.61360.9299

    0.53520.37340.86370.77960.93730.95150.87850.9142

    0.25678571430.6299750.796200.91520.95610.96650.9024

    0.67693333330.5898750.8680.4110.88970.92640.95540.9567

    0.66990.70454166670.32980.647520020.94910.92710.8018

    0.87025528570.812728314400.271420030.93380.95810.8936

    Cabras 1

    Cabras 2

    Cabras 3

    Cabras 4

    MEC 8

    MEC 9

    Tango 1

    Tango 2

    GPA Fiscal Year

    Equivalent Availability Factor (%)

    Sheet4

    Fiscal YearCabras 1Cabras 2Cabras 3Cabras 4MEC 8MEC 9Tango 1Tango 2

    199791.07%73.56%88%91%89%88%

    199890.29%43.76%91%86%61%93%

    199953.52%37.34%86%78%96%95%88%91%

    200025.68%63.00%80%0%96%96%97%90%

    200167.69%58.99%87%41%94%93%96%96%

    200266.99%70.45%33%65%92%95%93%80%

    200387.03%81.27%0%27%89%93%96%89%

    Sheet1

    Chart1

    242.3

    232.3

    244.3

    246.4

    255.4

    251.47

    252.6

    258.8

    253.6

    260.3

    261.75

    257.7

    250.2

    243.9

    249.9

    264.5

    270.05

    274

    265.7

    269.5

    274.5

    271.8

    268.2

    254

    267.5

    261

    262

    269

    278.5

    274

    276

    277.5

    281

    279.5

    271

    276.1

    227.5

    237

    253.1

    258.5

    262.5

    264.6

    268

    278.5

    268.3

    273.5

    267

    269

    256.5

    258.5

    267.5

    271

    269

    262.3

    258

    275.5

    277

    275.7

    276

    0

    274

    264

    272

    274

    275.5

    278.1

    268

    262.7

    268

    273

    266.5

    276.1

    276.5

    272.6

    264

    265

    276.5

    278.5

    272.5

    277

    280

    280

    281.5

    281

    269

    254

    260

    256

    261

    265

    262

    265

    266

    266

    264

    268

    257

    205

    226

    243

    247

    259

    250

    254

    263

    260.2

    265

    258

    261

    Peak System Load (MW)

    Month

    Peak System Demand (MW)

    Chart2

    274406435.41658590

    264396435.41658552.3

    272404435.41658552.3

    274406435.41658552.3

    275.5407.5435.41658552.3

    278.1410.1435.41658552.3

    268400435.41658552.3

    262.7394.7435.41658552.3

    268400435.41658552.3

    273405435.41658552.3

    266.5398.5435.41658552.3

    276.1408.1435.41658552.3

    276.5408.5435.41658552.3

    272.6404.6435.41658552.3

    264396435.41658552.3

    265397435.41658552.3

    276.5408.5435.41658552.3

    278.5410.5435.41658552.3

    272.5404.5435.41658552.3

    277409435.41658552.3

    280412435.41658552.3

    280412435.41658552.3

    281.5413.5435.41658552.3

    281413435.41658552.3

    269401435.41658552.3

    254386435.41658552.3

    260392435.41658552.3

    256388435.41658552.3

    261393435.41658552.3

    265397435.41658552.3

    262394435.41658552.3

    265397435.41658552.3

    266398435.41658552.3

    266398435.41658552.3

    264396435.41658552.3

    268400435.41658552.3

    257389435.41658552.3

    205337435.41658552.3

    226358435.41658552.3

    243375435.41658552.3

    247379435.41658552.3

    259391435.41658552.3

    250382435.41658552.3

    254386435.41658552.3

    263395435.41658552.3

    260.2392.2435.41658552.3

    265397435.41658552.3

    258390435.41658552.3

    261393435.41658552.3

    Peak System Load (MW)

    Peak + 2 Largest Units (MW)

    Reserve to Support 1 Day in 4.5 years (MW)

    Installed Capacity (MW)

    Power Demand and Reserve Requirements

    Sheet2

    Month/YearGross Peak Demand (MW)

    199519961997199819992000200120022003

    January242.3250.2267.5227.5256.5264272.6254205

    February232.3243.9261237258.5272264260226

    March244.3249.9262253.1267.5274265256243

    April246.4264.5269258.5271275.5276.5261247

    May255.4270.05278.5262.5269278.1278.5265259

    June251.47274274264.6262.3268272.5262250

    July252.6265.7276268258262.7277265254

    August258.8269.5277.5278.5275.5268280266263

    September253.6274.5281268.3277273280266260.2

    October260.3271.8279.5273.5275.7266.5281.5264265

    November261.75268.2271267276276.1281268258

    December257.7254276.1269274276.5269257261

    Min232.3243.9261227.5256.5262.7264254205

    Max261.75274.5281278.5277278.1281.5268265

    MonthMonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)

    January1995January 1995Jan-95242.3374.3435.41658

    February1995February 1995Feb-95232.3364.3435.41658

    March1995March 1995Mar-95244.3376.3435.41658

    April1995April 1995Apr-95246.4378.4435.41658

    May1995May 1995May-95255.4387.4435.41658

    June1995June 1995Jun-95251.47383.47435.41658

    July1995July 1995Jul-95252.6384.6435.41658

    August1995August 1995Aug-95258.8390.8435.41658

    September1995September 1995Sep-95253.6385.6435.41658

    October1995October 1995Oct-95260.3392.3435.41658

    November1995November 1995Nov-95261.75393.75435.41658

    December1995December 1995Dec-95257.7389.7435.41658

    January1996January 1996Jan-96250.2382.2435.41658

    February1996February 1996Feb-96243.9375.9435.41658

    March1996March 1996Mar-96249.9381.9435.41658

    April1996April 1996Apr-96264.5396.5435.41658

    May1996May 1996May-96270.05402.05435.41658

    June1996June 1996Jun-96274406435.41658

    July1996July 1996Jul-96265.7397.7435.41658

    August1996August 1996Aug-96269.5401.5435.41658

    September1996September 1996Sep-96274.5406.5435.41658

    October1996October 1996Oct-96271.8403.8435.41658

    November1996November 1996Nov-96268.2400.2435.41658

    December1996December 1996Dec-96254386435.41658

    January1997January 1997Jan-97267.5399.5435.41658

    February1997February 1997Feb-97261393435.41658

    March1997March 1997Mar-97262394435.41658

    April1997April 1997Apr-97269401435.41658

    May1997May 1997May-97278.5410.5435.41658

    June1997June 1997Jun-97274406435.41658

    July1997July 1997Jul-97276408435.41658

    August1997August 1997Aug-97277.5409.5435.41658

    September1997September 1997Sep-97281413435.41658

    October1997October 1997Oct-97279.5411.5435.41658

    November1997November 1997Nov-97271403435.41658

    December1997December 1997Dec-97276.1408.1435.41658

    January1998January 1998Jan-98227.5359.5435.41658

    February1998February 1998Feb-98237369435.41658

    March1998March 1998Mar-98253.1385.1435.41658

    April1998April 1998Apr-98258.5390.5435.41658

    May1998May 1998May-98262.5394.5435.41658

    June1998June 1998Jun-98264.6396.6435.41658

    July1998July 1998Jul-98268400435.41658

    August1998August 1998Aug-98278.5410.5435.41658

    September1998September 1998Sep-98268.3400.3435.41658

    October1998October 1998Oct-98273.5405.5435.41658

    November1998November 1998Nov-98267399435.41658

    December1998December 1998Dec-98269401435.41658

    January1999January 1999Jan-99256.5388.5435.41658590

    February1999February 1999Feb-99258.5390.5435.41658590

    March1999March 1999Mar-99267.5399.5435.41658590

    April1999April 1999Apr-99271403435.41658590

    May1999May 1999May-99269401435.41658590

    June1999June 1999Jun-99262.3394.3435.41658590

    July1999July 1999Jul-99258390435.41658590

    August1999August 1999Aug-99275.5407.5435.41658590

    September1999September 1999Sep-99277409435.41658590

    October1999October 1999Oct-99275.7407.7435.41658590

    November1999November 1999Nov-99276408435.41658590

    MonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)Installed Capacity (MW)

    December1999December 1999Dec-99274406435.41658590

    January2000January 2000Jan-00264396435.41658552.3

    February2000February 2000Feb-00272404435.41658552.3

    March2000March 2000Mar-00274406435.41658552.3

    April2000April 2000Apr-00275.5407.5435.41658552.3

    May2000May 2000May-00278.1410.1435.41658552.3

    June2000June 2000Jun-00268400435.41658552.3

    July2000July 2000Jul-00262.7394.7435.41658552.3

    August2000August 2000Aug-00268400435.41658552.3

    September2000September 2000Sep-00273405435.41658552.3

    October2000October 2000Oct-00266.5398.5435.41658552.3

    November2000November 2000Nov-00276.1408.1435.41658552.3

    December2000December 2000Dec-00276.5408.5435.41658552.3

    January2001January 2001Jan-01272.6404.6435.41658552.3

    February2001February 2001Feb-01264396435.41658552.3

    March2001March 2001Mar-01265397435.41658552.3

    April2001April 2001Apr-01276.5408.5435.41658552.3

    May2001May 2001May-01278.5410.5435.41658552.3

    June2001June 2001Jun-01272.5404.5435.41658552.3

    July2001July 2001Jul-01277409435.41658552.3

    August2001August 2001Aug-01280412435.41658552.3

    September2001September 2001Sep-01280412435.41658552.3

    October2001October 2001Oct-01281.5413.5435.41658552.3

    November2001November 2001Nov-01281413435.41658552.3

    December2001December 2001Dec-01269401435.41658552.3

    January2002January 2002Jan-02254386435.41658552.3

    February2002February 2002Feb-02260392435.41658552.3

    March2002March 2002Mar-02256388435.41658552.3

    April2002April 2002Apr-02261393435.41658552.3

    May2002May 2002May-02265397435.41658552.3

    June2002June 2002Jun-02262394435.41658552.3

    July2002July 2002Jul-02265397435.41658552.3

    August2002August 2002Aug-02266398435.41658552.3

    September2002September 2002Sep-02266398435.41658552.3

    October2002October 2002Oct-02264396435.41658552.3

    November2002November 2002Nov-02268400435.41658552.3

    December2002December 2002Dec-02257389435.41658552.3

    January2003January 2003Jan-03205337435.41658552.3

    February2003February 2003Feb-03226358435.41658552.3

    March2003March 2003Mar-03243375435.41658552.3

    April2003April 2003Apr-03247379435.41658552.3

    May2003May 2003May-03259391435.41658552.3

    June2003June 2003Jun-03250382435.41658552.3

    July2003July 2003Jul-03254386435.41658552.3

    August2003August 2003Aug-03263395435.41658552.3

    September2003September 2003Sep-03260.2392.2435.41658552.3

    October2003October 2003Oct-03265397435.41658552.3

    November2003November 2003Nov-03258390435.41658552.3

    December2003December 2003Dec-03261393435.41658552.3

    Sheet3

    Generation UnitTechnologyPrimary FuelMax. Gross Capacity(MW)Yr. Commissioned

    Cabras 1Steam TurbineRFO #6661974

    Cabras 2Steam TurbineRFO #6661975

    Cabras 3Slow Speed DieselRFO #6401996

    Cabras 4Slow Speed DieselRFO #6401996

    Piti 8 (ENRON/MEC)Slow Speed DieselRFO #6441999

    Piti 9 (ENRON/MEC)Slow Speed DieselRFO #6441999

    Tanguisson 1 (MIRANT)Steam TurbineRFO #626.51976

    Tanguisson 2 (MIRANT)Steam TurbineRFO #626.51976

    Dededo CT 1Combustion TurbineDiesel #2231992

    Dededo CT 2Combustion TurbineDiesel #2231994

    Macheche CtCombustion TurbineDiesel #2211993

    Marbo CTCombustion TurbineDiesel #2161993

    Yigo CTCombustion TurbineDiesel #2211993

    Piti 7 (TEMES)Combustion TurbineDiesel #2401997

    Dededo Diesel 1Medium Speed DieselDiesel #22.51972

    Dededo Diesel 2Medium Speed DieselDiesel #22.51972

    Dededo Diesel 3Medium Speed DieselDiesel #22.51972

    Dededo Diesel 4Medium Speed DieselDiesel #22.51972

    Pulantat Diesel 1Medium Speed DieselDiesel #251994

    Pulantat Diesel 2Medium Speed DieselDiesel #251994

    Talofofo Diesel 1Medium Speed DieselDiesel #24.41993

    Talofofo Diesel 2Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 1Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 2Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 3Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 4Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 5Medium Speed DieselDiesel #24.41993

    Tenjo Diesel 6Medium Speed DieselDiesel #24.41993

    Yr. Commissioned

    MBD00010E9F.xls

    Chart1

    267.212590393.212408.83436

    276.126546402.126422.47278

    284.586546410.586435.41658

    292.173546418.173447.02469

    300.664546426.664460.01592

    309.334546435.334473.28102

    320.475546446.475490.32675

    332.121546458.121508.14513

    345.187546471.187528.13611

    359.02586485.02549.3006

    366.714586492.714561.07242

    373.965616499.965572.16645

    381.641616507.641583.91073

    388.812616514.812594.88236

    398.323656524.323609.43419

    407.341656533.341623.23173

    416.752929656542.752929637.63198137

    Peak Load

    Installed Capacity

    Peak Load + 2 Largest Unit Capacities

    Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't

    Chart2

    267.212590393.212408.83436

    276.126546402.126422.47278

    284.586546410.586435.41658

    292.173546418.173447.02469

    300.664546426.664460.01592

    309.334546435.334473.28102

    320.475546446.475490.32675

    332.121546458.121508.14513

    345.187546471.187528.13611

    Peak Load

    Installed Capacity

    Peak Load + 2 Largest Unit Capacities

    Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't

    Fiscal Year

    Capacity Requirements (MW)

    proscrn

    SYSTEM19992000200120022003200420052006200720082009201020112012201320142015

    ENERGY REQUIREDGWH17301738173917451749177017781785179718101824183918551872189719251953

    THERM GENERATIONGWH17301738173917451749177017781785179718101824183918551872189719251953

    EMERGENCY ENERGYGWH00000000000000000

    PEAK LOADMW286287289290292295298300302304307310312314318321326

    LOAD FACTORPCT69.0368.9768.7468.668.4268.2568.1167.9367.8467.7767.7967.7867.7967.7768.0768.3768.44

    INSTALLED CAPACITYMW590546546546546546546546546586586616616616656656656

    RESERVE MARGINMW304259257256254251248246244282279306303301337334330

    RESERVE MARGINPCT106.2690.3489.078887.1384.9483.2582.0380.5392.790.7498.7597.0695.77106.06104101.25

    CAPACITY MARGINPCT51.5247.4647.1146.8146.5645.9345.4345.0644.6148.1147.5749.6949.2648.9251.4750.9850.31

    ENERGY RESV MARGINPCT-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100

    LOSS LOADHOURS00000000000000000

    FUEL BURNED 000MBTU1680616433164361646916582168201687316949170571719017351171231725117258174851777018024

    FIXED FUEL COST$00020792090210221142127214021532167218121962210222622422258227422922309

    TOTAL FUEL COST$0005413853723535985405954935562155692957875587265972560792609876200862696640796575867404

    VAR. O&M COST$00048444509462247604888506552175370554056976100636765787176741676587977

    FIXED O&M COST$0004915454282542635661957425565345732958148608616331962387650126610569402714877059271971

    TOTAL THERM COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352

    THERMAL COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44

    EMER ENERGY COST$00000000000000000000

    TOTAL SYS. COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352

    SYSTEM COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44

    AVG. MARG. COST$/MWH32.5831.9331.7732.0432.3532.7333.1133.5633.9334.4234.6633.9234.434.935.535.8836.46

    EXTERNAL COSTS$00000000000000000000

    CUST. IMPACT COSTS$00000000000000000000

    1.53

    19992000200120022003200420052006200720082009201020112012201320142015

    Peak Load267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929

    Installed Capacity590546546546546546546546546586586616616616656656656

    Peak Load + 2 Largest Unit Capacities393.212402.126410.586418.173426.664435.334446.475458.121471.187485.02492.714499.965507.641514.812524.323533.341542.752929

    Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't408.83436422.47278435.41658447.02469460.01592473.28102490.32675508.14513528.13611549.3006561.07242572.16645583.91073594.88236609.43419623.23173637.63198137

    Year199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020

    Low Estimate280.384272.594238.146252.951261.243264.941269.314273.417279.151284.731290.843296.843301.363305.443309.773313.609319.177324.234329.448929334.021464083340.3752436132346.1038961908352.022040388357.2692844784

    Forecast280.384272.842267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929425.532464083436.8612436132447.6168961908458.885040388469.5292844784

    High Estimate280.384273.09283.494292.759303.279312.949326.549340.963359.179379.258402.559428.755440.522451.966464.125475.861490.754505.3520.609929535.554464083554.1042436132572.3498961908591.735040388610.8132844784

  • IWPS Status

    Sheet1

    PlantStation RatingDispatch Availability (MW)

    Cabras 1 & 2132132

    Cabras 3 & 478.668

    MEC 8 & 98844

    Tanguisson 1 & 25326.5

    Total Baseload351.6270.5

    Dededo C.T. 1 & 2 (23 MW + 22 MW)4522

    Macheche C.T.220

    Marbo C.T.167

    Yigo C.T.2218

    TEMES CT4040

    Tenjo Disels (4.4 MW x 6 Units)26.426.4

    Dededo Diesels (2.5 MW x 4 Units)105

    MDI Diesels (5.3 MW x 2 Units)10.65.3

    Talofofo Diesels (4.4 MW x 2 Units)8.88.8

    Total Peaking200.8132.5

    GRAND TOTAL552.4403

    Sheet2

    Sheet3

  • Overhaul/Outage Status

    Sheet1

    Goals & ObjectivesTarget Date

    1.Full Implementation of GPA Environmental Compliance ProgramsOct-2004

    2.Complete Implementation of the Cabras-Piti Fuel Switching RequirementDec-2004

    3.On time submittal of all USEPA & GEPA reporting requirementsJun-2004

    4.Produce a Facility Response Plan for Cabras Power PlantOct-2004

    5.Emergency Spill Response and clean up in 24 hoursFeb-2004

    6.Complete revision of the SPCC Plans for all GPA FacilitiesAug-2004

    Sheet2

    Project DescriptionPlantStatus / Target Completion

    Major Turbine Overhaul of Dededo CT #1 by Nuovo PignoneDededo CTJan/Feb 2004

    Repair of Macheche CT LM2500 main turbine set.Macheche CTBid (May 2004)

    Major Overhaul of MDI diesel unitsMDI #1Unit #2 Completed, Unit #1 Ongoing (10% Complete-Feb 2004)

    Second Year PIPs/CIPsCabras 1&2Dec-2004

    Implement PMCCabras 3&4Oct-2004

    Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)

    Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Evaluation Ongoing (May 2004)

    Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsSep-2004

    Installation of remote start/auto-sync systems Mark V systems for CT 1&2CT 1&2Dec-2004

    Upgrade Perimeter Fence, Gate & Lighting (Fuel Farm)Generation Admin

    Construct New Office & Maintenance Building (Fuel Farm)Generation Admin

    Upgrade Fire Protection & Smoke Alarm System at Diesel & C.T.Generation Admin

    Construct Storage Facility for SPCC EquipmentGeneration Admin

    Services for disposal of Hazardous Waste Oil Products at PitiGeneration Admin

    Upgrade Sewage Systems (MDI )Diesel

    Remove and Replace Fixed Window w/Awning Type, Install Ladder outside window, this will be utilized as a Fire ExitDiesel

    Repair/Replace Breaching ducts @ Dededo PlantDiesel

    Repair/Replace Smoke Stacks @ Talofofo PlantDiesel

    Installation of Station Power KW Meter @ TalofofoDiesel

    Building to house 10 mobil generators & equipmentWater Systems

    Emergency Generator 750 kwCabras 3 & 4

    Project DescriptionStatus / Target Completion

    CENTRAL MAINTENANCE, WSD, & TRANSPORTATION

    Repair of Damaged Gen Set units at various water well sites80% by Jun-2004 (bal. by Dec-2004)

    Final Stages of Mongmong-Toto-Maite Spill CleanupBid Evaluation Completed (Jul-2004)

    TRANSPORTATION- Implement Performance Management ContractMay-2004

    Purchase of 30 new vehicles/heavy equipmentVehicles (Mar-2004) Hvy Equip (Jul-2004)

    Fire Protection Upgrade & Smoke Alarm, Office & ShopTransportation

    Repair Office Roof & RestroomsTransportation

    Sheet3

    No.Unit / Outage DescriptionAnticipated Return to ServiceComments

    1Dededo CT #1 - Major Turbine OverhaulFeb 2004

    2Tanguisson #2 - Scheduled OutageFeb. 15, 2004

    3Macheche CT - Turbine Rotor RepairMay 2004Bid closing th

    4Manenggon Diesel #1 - Major OverhaulMarch 2004

    5Dededo Diesel #1 - Station Switchgear Cable ReplacementApril 2004

    6Dededo Diesel #2 - PT Transformer Replacement / Turbocharger RefurbishmentApril 2004

    7Talofofo 1&2 - Stack RepairsJuly 2004

  • Improvement Projects

    Sheet1

    Goals & ObjectivesTarget Date

    1.Full Implementation of GPA Environmental Compliance ProgramsOct-2004

    2.Complete Implementation of the Cabras-Piti Fuel Switching RequirementDec-2004

    3.On time submittal of all USEPA & GEPA reporting requirementsJun-2004

    4.Produce a Facility Response Plan for Cabras Power PlantOct-2004

    5.Emergency Spill Response and clean up in 24 hoursFeb-2004

    6.Complete revision of the SPCC Plans for all GPA FacilitiesAug-2004

    Sheet2

    Project DescriptionPlantStatus / Target Completion

    Implement PMCCabras 3&4Oct-2004

    Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)

    Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Evaluation Ongoing (May 2004)

    Emergency Generator 750 kwCabras 3 & 4Sep-2004

    Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsDec-2004

    Installation of remote start/auto-sync systems Mark V systems for CT 1&2CT 1&2

    Upgrade Perimeter Fence, Gate & Lighting (Fuel Farm)Generation Admin

    Construct New Office & Maintenance Building (Fuel Farm)Generation Admin

    Upgrade Fire Protection & Smoke Alarm System at Diesel & C.T.Generation Admin

    Construct Storage Facility for SPCC EquipmentGeneration Admin

    Services for disposal of Hazardous Waste Oil Products at PitiGeneration Admin

    Upgrade Sewage Systems (MDI )Diesel

    Remove and Replace Fixed Window w/Awning Type, Install Ladder outside window, this will be utilized as a Fire ExitDiesel

    Repair/Replace Breaching ducts @ Dededo PlantDiesel

    Repair/Replace Smoke Stacks @ Talofofo PlantDiesel

    Installation of Station Power KW Meter @ TalofofoDiesel

    Building to house 10 mobil generators & equipmentWater Systems

    Project DescriptionStatus / Target Completion

    CENTRAL MAINTENANCE, WSD, & TRANSPORTATION

    Repair of Damaged Gen Set units at various water well sites80% by Jun-2004 (bal. by Dec-2004)

    Final Stages of Mongmong-Toto-Maite Spill CleanupBid Evaluation Completed (Jul-2004)

    TRANSPORTATION- Implement Performance Management ContractMay-2004

    Purchase of 30 new vehicles/heavy equipmentVehicles (Mar-2004) Hvy Equip (Jul-2004)

    Fire Protection Upgrade & Smoke Alarm, Office & ShopTransportation

    Repair Office Roof & RestroomsTransportation

    Major Turbine Overhaul of Dededo CT #1 by Nuovo PignoneDededo CTJan/Feb 2004

    Repair of Macheche CT LM2500 main turbine set.Macheche CTBid (May 2004)

    Major Overhaul of MDI diesel unitsMDI #1Unit #2 Completed, Unit #1 Ongoing (10% Complete-Feb 2004)

    Second Year PIPs/CIPsCabras 1&2Dec-2004

    Sheet3

    No.Unit / Outage DescriptionAnticipated Return to ServiceComments

    1Dededo CT #1 - Major Turbine OverhaulFeb 2004

    2Tanguisson #2 - Scheduled OutageFeb. 15, 2004

    3Macheche CT - Turbine Rotor RepairMay 2004Bid closing th

    4Manenggon Diesel #1 - Major OverhaulMarch 2004

    5Dededo Diesel #1 - Station Switchgear Cable ReplacementApril 2004

    6Dededo Diesel #2 - PT Transformer Replacement / Turbocharger RefurbishmentApril 2004

    7Talofofo 1&2 - Stack Repairs

    Sheet4

    Project DescriptionPlant / SiteStatus / Target Completion

    Implement Performance Management Contract (PMC)Cabras 3&4Oct-2004

    Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)

    Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Eval. Ongoing (May 2004)

    Emergency Generator 750 kwCabras 3&4Sep-2004

    Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsDec-2004

    Building Upgrades and Stack RepairsTalofofo DieselJuly 2004

    Modification for Dead Bus Synchronisation and Mark V Control Systems for CT 1&2CT 1&2July 2004

    Upgrade Perimeter Fence, Gate & LightingFuel Farm

    Construct New Office & Maintenance BuildingFuel Farm

  • Fuel Storage & SupplyResidual Fuel Oil No. 6 (HSFO/LSFO)Fuel deliveries approximately every 35 days to meet consumption requirements (8,000 bbls/day). Leased Storage Capacity (506,000 bbls.)Bulk Storage Capacity (536,000 bbls.)On-Site Storage Capacity (94,941 bbls.)Diesel Fuel No. 2Commercial Supply Contracts for all Diesel Fired Power Stations.MOBIL Oil GuamShell Oil Guam

  • Transmission & Distribution System StatisticsSubstation Capability29 Substations594.5 MVA Installed Capacity279.3 MVA Peak Load (53% Reserve Margin)

    Transmission System29 Substations34.49 Miles of 115 kV Transmission Lines147.08 Miles of 34.5 kV Transmission Lines

    Distribution System495 Miles of 13.8 kV Distribution Lines

  • Underground Improvements

    Sheet1

    GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)

    Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds

    P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200

    P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700

    Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960

    Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480

    San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520

    Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550

    Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510

    Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240

    TOTAL INVESTMENT19,160

    Sheet2

    GPA System ImprovementsStatusPlanned FinishFundingEstimate (x $1,000)

    Substation and Distribution Capacitor ProgramOngoingFY '04Revenue Funds867

    T&D Asset Assessment & MappingOngoingFY '04Revenue Funds300

    Relay Coordination StudyPlannedFY '04Revenue Funds250

    Eng

    GUAM POWER AUTHORITY

    Engineering Capital Improvement Projects (CIP)

    FY 2004 - FY 2023 (x $1,000)

    RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotalAppearedCode 1Code 2Code Definitions

    B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,9262,92620001.11.2Code 1: X(1).X(2)Code 2: X(3).X(4)

    B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,6582,65819981.12.2X(1): Funding TypeX(3): Status

    B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,0207,02020001.12.21: Bond1: Construction

    B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,0003,00020021.12.42: External2: Design

    B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability38047085085020021.12.43: Revenue3: Planned

    B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability1001505030030020021.12.4X(2): Project TypeX(4): Reason

    B7Spill Containment at Various PlantsFQDesignGenerationReliability20015035035020041.12.41: Generation1: Safety

    B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,3001,30020041.13.42: Substation/Transmission2: Legal

    B9Cabras Miscellaneous ProjectsPlannedGenerationReliability24824824820041.13.43: Distribution3: Loading

    B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,3164,31620001.21.34: DSM4: Reliability

    B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,9001,90020001.21.3

    B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,2501,25020011.21.4

    B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,5962,59620011.21.4

    B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,2253,22519991.22.4

    B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability48015023886886820011.31.4

    E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,6622,66220042.22.4

    R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability608814829629620043.22.4

    E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,7511,75120042.22.4

    R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability507412424824820043.22.4

    E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,1201,12020042.32.4

    R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability24366012012020043.32.4

    E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability12618931563063020042.32.4

    R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability142135707020043.32.4

    R24Underground Fuel Pipeline at NASDesignGenerationSafety40030070070020043.12.1

    R25Talofofo Power Plant ImprovementsDesignGenerationReliability18018018020043.12.4

    R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading56710010010086786720043.21.3

    R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3

    R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3

    R29Pulantat Substation Grounding TransformerDesignSubstationReliability20020020020043.22.4

    R30Substation Equipment Predictive MaintenancePlannedSubstationLegal2013015015020043.23.2

    R31Merizo U/G RelocationDesignDistributionLegal12512512520043.32.2

    R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability15020035035020043.32.4

    R33Load StudyPlannedDSMLoading15010025025020013.43.3

    B3434.5 kV Transmission Line Along Rt. 2ADesignTransmissionReliability73524598098020051.22.4

    B35Old Dededo Kaiser Pole Hardening - Phase IIJGAPlannedDistributionReliability54036590590520051.33.4

    B36Old Dededo Kaiser Pole Hardening - Phase IIIJGAPlannedDistributionReliability7003721,0721,07220051.33.4

    B37Agana Heights Village Pole HardeningETFPlannedDistributionReliability1152201,3501,6851,68520051.33.4

    B38Barrigada Village Pole HardeningPlannedDistributionReliability191,4441,4631,46320051.33.4

    E39San Vitores to Macheche 34.5 kV Underground Conversion-FEMADesignTransmissionReliability6349511,5853,1703,17020052.22.4

    R40San Vitores to Macheche 34.5 kV Underground Conversion-GPADesignTransmissionReliability7110517635235220053.22.4

    E41Harmon to Tanguisson 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability6409581,5983,1963,19620052.23.4

    R42Harmon to Tanguisson 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability7110617835535520053.23.4

    E43Macheche to GAA 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability2714076791,3571,35720052.23.4

    R44Macheche to GAA 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability31457515115120053.23.4

    E45Agana to Tamuning and P202 Underground Conversion-FEMAPlannedDistributionReliability5828741,4562,9122,91220052.23.4

    R46Agana to Tamuning and P202 Underground Conversion-GPAPlannedDistributionReliability659716232432420053.23.4

    E47Umatac Substation Drainage Modification -FEMAPlannedSubstationReliability172440818120052.23.4

    R48Umatac Substation Drainage Modification -GPAPlannedSubstationReliability1258820053.23.4

    E49P087 Underground Conversion for GWA Water Wells-FEMAPlannedDistributionReliability2163245401,0801,08020052.33.4

    R50P087 Underground Conversion for GWA Water Wells-GPAPlannedDistributionReliability24366012012020053.33.4

    R51Andersen Substation Control System ReconstructionDesignSubstationReliability1901,1501,3401,34020053.22.4

    R52Hagatna 34.5 kV Protection Refurbishment and UpgradeDesignSubstationReliability2159091,1241,12420053.22.4

    R53Harmon to GIAT 34.5 kV Line ReconductoringPlannedTransmissionLoading5575581081020053.23.3

    R54Orote Substation Control System ReconstructionPlannedSubstationReliability1991,2111,4101,41020053.23.4

    R55Hagatna 115 kV Protection Refurbishment and UpgradePlannedSubstationReliability71071071020053.23.4

    R56Harmon Substation Switchyard ReconstructionPlannedSubstationReliability603406001,0001,00020053.23.4

    R57Hagatna-Tamuning Protection System UpgradePlannedTransmissionReliability364265062962920053.23.4

    R58Piti-Anigua-Hagatna Protection System UpgradePlannedTransmissionReliability250500075075020053.23.4

    R59San Vitores to Agana 34.5 KV LineFQPlannedTransmissionReliability100741084184120053.23.4

    R60P-27 U/G ReconstructionDesignDistributionReliability5015014234234220053.32.4

    R61Agat Village Pole HardeningPlannedDistributionReliability2507501,0001,00020053.33.4

    R62U/G Reconstruction Latte Heights Phase IPlannedDistributionReliability20020020020053.33.4

    R63U/G Reconstruction - Sinajana Phase IIETFPlannedDistributionReliability34034068068020053.33.4

    R64Tiyan Substation UpgradePlannedSubstationLoading2602602,8683,3883,38820063.23.3

    R65Tumon Sands to Harmon ReconductoringPlannedTransmissionLoading24148572672620063.23.3

    R66Marbo to Yigo 34.5 KV LinePlannedTransmissionLoading8017817843643620063.23.3

    R67Agana to Radio Barrigada ReconductoringPlannedTransmissionReliability70070070020063.23.4

    R68Hagatna 115 kV and 34.5 kV Breaker ReplacementPlannedSubstationReliability87287287220063.23.4

    R69P-330 Hardening and ReconductoringPlannedDistributionReliability34534534520063.33.4

    R70U/G Reconstruction Latte heights Phase IIPlannedDistributionReliability20020020020063.33.4

    R71U/G Reconstruction Sinajana - Phase IIIETFPlannedDistributionReliability30130130190390320063.33.4

    R72Reconductor Harmon to Yigo 34.5 KV Line to 927 kcmil ALPlannedTransmissionLoading5007121,2121,21220073.23.3

    R73Talofofo Substation 30 MVA UpgradeMCSPlannedSubstationLoading3190293393320073.23.3

    R74Tamuning-Tumon Protection System UpgradePlannedTransmissionReliability22713235935920073.23.4

    R75X143-X123 Pulantat to Talofofo UGXTMPlannedTransmissionReliability106215942,6565,3125,31220093.23.4

    R76X006-X015 Piti to Cabras UGXTMPlannedTransmissionReliability11216928156256220093.23.4

    R77X022/X037-X190 Piti/Apra to Tenjo Tap UGXTMPlannedTransmissionReliability99114872,4784,9564,95620093.23.4

    R78X221-X150/X152 Dededo to Dededo CT UGXTMPlannedTransmissionReliability6910317334534520093.23.4

    R79X039-X250 Apra to Umatac UGXTMPlannedTransmissionReliability235135275,87711,75511,75520093.23.4

    R80P210 & P323 GCC/GW/UOG UGSchoolPlannedDistributionReliability71610731,7893,5783,57820093.33.4

    R81X045-X055 Agana to R. Barrigada UGXTMPlannedTransmissionReliability87113062,1774,3544,35420103.23.4

    R82X054-X246 Agana to Barrigada UGXTMPlannedTransmissionReliability6009011,5003,0013,00120103.23.4

    R83X070-X161 Andersen to Yigo UGXTMPlannedTransmissionReliability5948901,4842,9682,96820103.23.4

    R84X110-X024 Anigua to Piti UGXTMPlannedTransmissionReliability67910191,6973,3953,39520103.23.4

    R85X134-X180 Macheche to Pagat UGXTMPlannedTransmissionReliability80312042,0064,0134,01320103.23.4

    R86P221 Mt. Carmel/Sablan/Ocean View/South Christian UGSchoolPlannedDistributionReliability17132,5704,2838,5668,56620103.33.4

    R87P223 Truman/Southern UGSchoolPlannedDistributionReliability3144727851,5711,57120103.33.4

    R88P283 Agana Heights ES UGSchoolPlannedDistributionReliability3945909841,9681,96820103.33.4

    R89P301 M.U. Lujan/St. Francis UGSchoolPlannedDistributionReliability3915879781,9561,95620103.33.4

    R90P331 FBLG/Sanchez UGSchoolPlannedDistributionReliability6159211,5353,0713,07120103.33.4

    R91P340 Merizo ES UGSchoolPlannedDistributionReliability4056081,0132,0262,02620103.33.4

    R92X020-X035 Piti to Orote UGXTMPlannedTransmissionReliability4947421,2362,4722,47220113.23.4

    R93X037-X022 Apra to Piti UGXTMPlannedTransmissionReliability99114872,4784,9564,95620113.23.4

    R94X038-X124 Apra to Talofofo UGXTMPlannedTransmissionReliability12741,91131846,3696,36920113.23.4

    R95X066-X071 Marbo to Andersen UGXTMPlannedTransmissionReliability2113175271,0551,05520113.23.4

    R96P088 M. Ulloa/Santa Barbara/Benavente/Wettengel UGSchoolPlannedDistributionReliability8821,3242,2054,4114,41120113.33.4

    R97P212 San Vicente School UGSchoolPlannedDistributionReliability18627946593093020113.33.4

    R98P240/P244 JFK/Chief Brodie UGSchoolPlannedDistributionReliability15823839579179120113.33.4

    R99P250 AJMS/OCP UGSchoolPlannedDistributionReliability5498231,3722,7442,74420113.33.4

    R100P261 Notre Dame/Talofofo UGSchoolPlannedDistributionReliability3034547561,5131,51320113.33.4

    R101P270 J.M. Guerrero ES UGSchoolPlannedDistributionReliability8212320541041020113.33.4

    R102Piti - Agana X023-X043 UG ConversionPlannedTransmissionReliability1,0711,6062,6775,3545,35420123.23.4

    R103Orote - Apra X033-X036 UG ConversionPlannedTransmissionReliability7291,0941,8223,6453,64520123.23.4

    R104Agana - Anigua X040-X112 UG ConversionPlannedTransmissionReliability4957431,2372,4752,47520123.23.4

    R105Agana - SV Tap - Harmon X042-X263-X080 UG ConversionPlannedTransmissionReliability1,0861,6292,7145,4295,42920123.23.4

    R106GIAT - Agana (Open switch) X178-X041 UG ConversionPlannedTransmissionReliability1,2161,8233,0393,03920123.23.4

    R107Agana - Tamuning X053-X209 UG ConversionPlannedTransmissionReliability4717061,1761,17620123.23.4

    R108R. Barrigada - Marbo X056-X065 UG ConversionPlannedTransmissionReliability9711,4562,4272,42720133.23.4

    R109Marbo - Dededo X067-X222 UG ConversionPlannedTransmissionReliability38557796296220133.23.4

    R110Andersen - Harmon X073-X087 UG ConversionPlannedTransmissionReliability9441,4162,3612,36120133.23.4

    R111Harmon - Yigo X082-X160 UG ConversionPlannedTransmissionReliability1,1471,7212,8682,86820133.23.4

    R112Harmon - Dededo CT X088-X151/X154 UG ConversionPlannedTransmissionReliability50550550520133.23.4

    R113Pulantat - Barrigada X140-X247 UG ConversionPlannedTransmissionReliability1,4431,4431,44320133.23.4

    R114GAA - Barrigada X-173-X245 UG ConversionPlannedTransmissionReliability57157157120143.23.4

    R115P-003 Piti UG ConversionPlannedDistributionReliability71371371320143.33.4

    R116P-005 Piti UG ConversionPlannedDistributionReliability1,8501,8501,85020143.33.4

    R117P-007 Piti UG ConversionPlannedDistributionReliability71471471420143.33.4

    Issued by:JCF/AEB/MCL/JJC/PBT/JGAALL PROJECTSTotals:$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386

    Note:1. Project totals include previous fiscal year costs.

    2. Only planning estimates are available for FY06 - FY13.REVENUE FUNDED PROJECTSTotals:$0$0$0$150$0$0$1,950$4,295$10,968$8,781$18,620$24,906$22,127$16,882$18,930$22,907$150,515

    3. Fiscal totals do not include line extensions, blanket J.O.s, general plant items.

    4. All dollars are FY03 dollars.BOND FUNDED PROJECTSTotals:$658$743$3,986$5,069$1,422$2,346$13,548$5,944$5,196$0$0$0$0$0$0$0$38,912

    EXTERNALLY FUNDED PROJECTSTotals:$0$0$0$0$0$0$1,266$4,196$6,599$5,898$0$0$0$0$0$0$17,959

    $658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386

    CIP Stats

    GUAM POWER AUTHORITY

    Engineering Capital Improvement Projects (CIP)

    FY 2004 - FY 2023 (x $1,000)

    RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotal

    B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,92619532Generation

    B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,65813743Substation

    B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,020120785Transmission

    B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,00053326Distribution

    B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability380470850207386

    B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability10015050300

    B7Spill Containment at Various PlantsFQDesignGenerationReliability200150350

    B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,300

    B9Cabras Miscellaneous ProjectsPlannedGenerationReliability248248

    B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,316

    B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,900

    B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,250

    B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,596

    B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,225

    B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability480150238868

    E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,662

    R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability6088148296

    E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,751

    R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability5074124248

    E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,120

    R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability243660120

    E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability126189315630

    R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability14213570

    R24Underground Fuel Pipeline at NASDesignGenerationSafety400300700

    R25Talofofo Power Plant ImprovementsDesignGenerationReliability180180

    R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading567100100100867

    R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading8080

    R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading8080

    R29Pulantat Substation Grounding TransformerDesignSubstationReliability200200

    R30Substation Equipment Predictive MaintenancePlannedSubstationLegal20130150

    R31Merizo U/G RelocationDesignDistributionLegal125125

    R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability150200350

    R33Load StudyPlannedSubstationLoading150100250

    B3434.5 kV Transmission Line Along Rt. 2ADesignTransmissionReliability735245980

    B35Old Dededo Kaiser Pole Hardening - Phase IIJGAPlannedDistributionReliability540365905

    B36Old Dededo Kaiser Pole Hardening - Phase IIIJGAPlannedDistributionReliability7003721,072

    B37Agana Heights Village Pole HardeningETFPlannedDistributionReliability1152201,3501,685

    B38Barrigada Village Pole HardeningPlannedDistributionReliability191,4441,463

    E39San Vitores to Macheche 34.5 kV Underground Conversion-FEMADesignTransmissionReliability6349511,5853,170

    R40San Vitores to Macheche 34.5 kV Underground Conversion-GPADesignTransmissionReliability71105176352

    E41Harmon to Tanguisson 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability6409581,5983,196

    R42Harmon to Tanguisson 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability71106178355

    E43Macheche to GAA 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability2714076791,357

    R44Macheche to GAA 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability314575151

    E45Agana to Tamuning and P202 Underground Conversion-FEMAPlannedDistributionReliability5828741,4562,912

    R46Agana to Tamuning and P202 Underground Conversion-GPAPlannedDistributionReliability6597162324

    E47Umatac Substation Drainage Modification -FEMAPlannedSubstationReliability17244081

    R48Umatac Substation Drainage Modification -GPAPlannedSubstationReliability1258

    E49P087 Underground Conversion for GWA Water Wells-FEMAPlannedDistributionReliability2163245401,080

    R50P087 Underground Conversion for GWA Water Wells-GPAPlannedDistributionReliability243660120

    R51Andersen Substation Control System ReconstructionDesignSubstationReliability1901,1501,340

    R52Hagatna 34.5 kV Protection Refurbishment and UpgradeDesignSubstationReliability2159091,124

    R53Harmon to GIAT 34.5 kV Line ReconductoringPlannedTransmissionLoading55755810

    R54Orote Substation Control System ReconstructionPlannedSubstationReliability1991,2111,410

    R55Hagatna 115 kV Protection Refurbishment and UpgradePlannedSubstationReliability710710

    R56Harmon Substation Switchyard ReconstructionPlannedSubstationReliability603406001,000

    R57Hagatna-Tamuning Protection System UpgradePlannedTransmissionReliability3642650629

    R58Piti-Anigua-Hagatna Protection System UpgradePlannedTransmissionReliability2505000750

    R59San Vitores to Agana 34.5 KV LineFQPlannedTransmissionReliability1007410841

    R60P-27 U/G ReconstructionDesignDistributionReliability50150142342

    R61Agat Village Pole HardeningPlannedDistributionReliability2507501,000

    R62U/G Reconstruction Latte Heights Phase IPlannedDistributionReliability200200

    R63U/G Reconstruction - Sinajana Phase IIETFPlannedDistributionReliability340340680

    R64Tiyan Substation UpgradePlannedSubstationLoading2602602,8683,388

    R65Tumon Sands to Harmon ReconductoringPlannedTransmissionLoading241485726

    R66Marbo to Yigo 34.5 KV LinePlannedTransmissionLoading80178178436

    R67Agana to Radio Barrigada ReconductoringPlannedTransmissionReliability700700

    R68Hagatna 115 kV and 34.5 kV Breaker ReplacementPlannedSubstationReliability872872

    R69P-330 Hardening and ReconductoringPlannedDistributionReliability345345

    R70U/G Reconstruction Latte heights Phase IIPlannedDistributionReliability200200

    R71U/G Reconstruction Sinajana - Phase IIIETFPlannedDistributionReliability301301301903

    R72Reconductor Harmon to Yigo 34.5 KV Line to 927 kcmil ALPlannedTransmissionLoading5007121,212

    R73Talofofo Substation 30 MVA UpgradeMCSPlannedSubstationLoading31902933

    R74Tamuning-Tumon Protection System UpgradePlannedTransmissionReliability227132359

    R75X143-X123 Pulantat to Talofofo UGXTMPlannedTransmissionReliability106215942,6565,312

    R76X006-X015 Piti to Cabras UGXTMPlannedTransmissionReliability112169281562

    R77X022/X037-X190 Piti/Apra to Tenjo Tap UGXTMPlannedTransmissionReliability99114872,4784,956

    R78X221-X150/X152 Dededo to Dededo CT UGXTMPlannedTransmissionReliability69103173345

    R79X039-X250 Apra to Umatac UGXTMPlannedTransmissionReliability235135275,87711,755

    R80P210 & P323 GCC/GW/UOG UGSchoolPlannedDistributionReliability71610731,7893,578

    R81X045-X055 Agana to R. Barrigada UGXTMPlannedTransmissionReliability87113062,1774,354

    R82X054-X246 Agana to Barrigada UGXTMPlannedTransmissionReliability6009011,5003,001

    R83X070-X161 Andersen to Yigo UGXTMPlannedTransmissionReliability5948901,4842,968

    R84X110-X024 Anigua to Piti UGXTMPlannedTransmissionReliability67910191,6973,395

    R85X134-X180 Macheche to Pagat UGXTMPlannedTransmissionReliability80312042,0064,013

    R86P221 Mt. Carmel/Sablan/Ocean View/South Christian UGSchoolPlannedDistributionReliability17132,5704,2838,566

    R87P223 Truman/Southern UGSchoolPlannedDistributionReliability3144727851,571

    R88P283 Agana Heights ES UGSchoolPlannedDistributionReliability3945909841,968

    R89P301 M.U. Lujan/St. Francis UGSchoolPlannedDistributionReliability3915879781,956

    R90P331 FBLG/Sanchez UGSchoolPlannedDistributionReliability6159211,5353,071

    R91P340 Merizo ES UGSchoolPlannedDistributionReliability4056081,0132,026

    R92X020-X035 Piti to Orote UGXTMPlannedTransmissionReliability4947421,2362,472

    R93X037-X022 Apra to Piti UGXTMPlannedTransmissionReliability99114872,4784,956

    R94X038-X124 Apra to Talofofo UGXTMPlannedTransmissionReliability12741,91131846,369

    R95X066-X071 Marbo to Andersen UGXTMPlannedTransmissionReliability2113175271,055

    R96P088 M. Ulloa/Santa Barbara/Benavente/Wettengel UGSchoolPlannedDistributionReliability8821,3242,2054,411

    R97P212 San Vicente School UGSchoolPlannedDistributionReliability186279465930

    R98P240/P244 JFK/Chief Brodie UGSchoolPlannedDistributionReliability158238395791

    R99P250 AJMS/OCP UGSchoolPlannedDistributionReliability5498231,3722,744

    R100P261 Notre Dame/Talofofo UGSchoolPlannedDistributionReliability3034547561,513

    R101P270 J.M. Guerrero ES UGSchoolPlannedDistributionReliability82123205410

    R102Piti - Agana X023-X043 UG ConversionPlannedTransmissionReliability1,0711,6062,6775,354

    R103Orote - Apra X033-X036 UG ConversionPlannedTransmissionReliability7291,0941,8223,645

    R104Agana - Anigua X040-X112 UG ConversionPlannedTransmissionReliability4957431,2372,475

    R105Agana - SV Tap - Harmon X042-X263-X080 UG ConversionPlannedTransmissionReliability1,0861,6292,7145,429

    R106GIAT - Agana (Open switch) X178-X041 UG ConversionPlannedTransmissionReliability1,2161,8233,039

    R107Agana - Tamuning X053-X209 UG ConversionPlannedTransmissionReliability4717061,176

    R108R. Barrigada - Marbo X056-X065 UG ConversionPlannedTransmissionReliability9711,4562,427

    R109Marbo - Dededo X067-X222 UG ConversionPlannedTransmissionReliability385577962

    R110Andersen - Harmon X073-X087 UG ConversionPlannedTransmissionReliability9441,4162,361

    R111Harmon - Yigo X082-X160 UG ConversionPlannedTransmissionReliability1,1471,7212,868

    R112Harmon - Dededo CT X088-X151/X154 UG ConversionPlannedTransmissionReliability505505

    R113Pulantat - Barrigada X140-X247 UG ConversionPlannedTransmissionReliability1,4431,443

    R114GAA - Barrigada X-173-X245 UG ConversionPlannedTransmissionReliability571571

    R115P-003 Piti UG ConversionPlannedDistributionReliability713713

    R116P-005 Piti UG ConversionPlannedDistributionReliability1,8501,850

    R117P-007 Piti UG ConversionPlannedDistributionReliability714714

    Issued by:JCF/AEB/MCL/JJC/PBT/JGAALL PROJECTSTotals:$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386

    Note:1. Project totals include previous fiscal year costs.

    2. Only planning estimates are available for FY06 - FY13.REVENUE FUNDED PROJECTSTotals:$0$0$0$150$0$0$1,950$4,295$10,968$8,781$18,620$24,906$22,127$16,882$18,930$22,907$150,515

    3. Fiscal totals do not include line extensions, blanket J.O.s, general plant items.

    4. All dollars are FY03 dollars.BOND FUNDED PROJECTSTotals:$658$743$3,986$5,069$1,422$2,346$13,548$5,944$5,196$0$0$0$0$0$0$0$38,912

    EXTERNALLY FUNDED PROJECTSTotals:$0$0$0$0$0$0$1,266$4,196$6,599$5,898$0$0$0$0$0$0$17,959

    $658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386

    Sheet3

    FY'04 - FY'13

    (X $1,000)

    Total Number of Projects117

    Total Estimated Cost$207,386

    Revenue Funded$150,515

    Bond Funded$38,912

    Externally Funded$17,959

    Generation Projects$19,532

    Substation Projects$13,743

    Transmission Projects$120,785

    Distribution Projects$53,326

  • System Improvements(Revenue Funded)

    Sheet1

    GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)

    Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds

    P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200

    P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700

    Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960

    Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480

    San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520

    Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550

    Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510

    Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240

    Sheet2

    GPA System ImprovementsStatusPlanned FinishBenefitsCost (x $1,000)

    Substation and Distribution Capacitor ProgramOngoingFY '04- Improved Voltage Delivery- Reduced System Losses Improved Power Quality867

    T&D Asset Assessment & MappingOngoingFY '04- Aid in System Planning/Improvements- Inventory Asset Management- Timely Trouble Call Response300

    Relay Coordination StudyPlannedFY '04- Improve System Stability- Eliminate Island Wide Blackouts- Improve System Reliability250

    Sheet3

  • 10 Year Capital Improvement Project Plan

    Sheet1

    GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)

    Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds

    P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200

    P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700

    Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960

    Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480

    San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520

    Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550

    Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510

    Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240

    Sheet2

    GPA System ImprovementsStatusPlanned FinishFundingEstimate (x $1,000)

    Substation and Distribution Capacitor ProgramOngoingFY '04Revenue Funds867

    T&D Asset Assessment & MappingOngoingFY '04Revenue Funds300

    Relay Coordination StudyPlannedFY '04Revenue Funds250

    Eng

    GUAM POWER AUTHORITY

    Engineering Capital Improvement Projects (CIP)

    FY 2004 - FY 2023 (x $1,000)

    RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotalAppearedCode 1Code 2Code Definitions

    B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,9262,92620001.11.2Code 1: X(1).X(2)Code 2: X(3).X(4)

    B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,6582,65819981.12.2X(1): Funding TypeX(3): Status

    B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,0207,02020001.12.21: Bond1: Construction

    B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,0003,00020021.12.42: External2: Design

    B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability38047085085020021.12.43: Revenue3: Planned

    B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability1001505030030020021.12.4X(2): Project TypeX(4): Reason

    B7Spill Containment at Various PlantsFQDesignGenerationReliability20015035035020041.12.41: Generation1: Safety

    B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,3001,30020041.13.42: Substation/Transmission2: Legal

    B9Cabras Miscellaneous ProjectsPlannedGenerationReliability24824824820041.13.43: Distribution3: Loading

    B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,3164,31620001.21.34: DSM4: Reliability

    B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,9001,90020001.21.3

    B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,2501,25020011.21.4

    B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,5962,59620011.21.4

    B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,2253,22519991.22.4

    B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability48015023886886820011.31.4

    E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,6622,66220042.22.4

    R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability608814829629620043.22.4

    E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,7511,75120042.22.4

    R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability507412424824820043.22.4

    E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,1201,12020042.32.4

    R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability24366012012020043.32.4

    E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability12618931563063020042.32.4

    R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability142135707020043.32.4

    R24Underground Fuel Pipeline at NASDesignGenerationSafety40030070070020043.12.1

    R25Talofofo Power Plant ImprovementsDesignGenerationReliability18018018020043.12.4

    R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading56710010010086786720043.21.3

    R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3

    R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3

    R29Pulantat Substation Grounding TransformerDesignSubstationReliability20020020020043.22.4

    R30Substation Equipment Predictive MaintenancePlannedSubstationLegal2013015015020043.23.2

    R31Merizo U/G RelocationDesignDistributionLegal12512512520043.32.2

    R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability15020035035020043.32.4

    R33Load StudyPlannedDSMLoading15010025025020013.43.3