Columbus City Schools
FACILITIES MASTER PLANNING PROCESS
COMMUNITY DIALOGUES
APRIL 18-21. 2016
2
Ad-Hoc Committee Co-Chairs W. Shawna Gibbs – Board Member Dominic Paretti – Board Member
District-wide Data Presentation Tracy Richter, DeJONG-RICHTER
INTRODUCTIONS AND PROCESS
3
This is the beginning of the conversation: The approved plan will take at least 10-15 years to complete. The plan will be completed in phases. Each phase may be adjusted in the future due to demographic or
programmatic shifts. No changes proposed in this plan will be implemented in the 2016-17
school year.
THE FACILITIES MASTER PLAN
4
Place every student in a new or fully renovated facility. Position the District to operate facilities efficiently to put valuable tax-
payer dollars into the classroom. Balance diverse educational programs, neighborhood schools, and
long term operational costs.
GOALS OF THIS FACILITIES MASTER PLAN
5
Options DevelopmentDevelopment of Facility Options that Consider:
Application of Data Demographic Programmatic Condition - Physical & Adequacy Financial
Application of Educational Framework Equitable Application Action Types & Prioritization by Need
Renovations Boundary Consolidations New Schools Replacements Programmatic - Choice, Grade Configurations, etc… Alternative Uses
Enrollment(Live-In & Attend)
Condition
Programs
CapacityOSFC/CCS Programs
Planning Rules
(OSFC)(2/3rd Rule,
350 rule)
Community Surveys
FACILITY PLANNING PROCESS
6
CAPACITY• OSFC/OFCC - SQUARE FOOTAGE CAPACITY• CCS STUDENT CAPACITY
FCI - FACILITY CONDITION INDEX• RENOVATION vs REPLACMENT• 2/3RDS RULE
LIVE-IN ENROLLMENT vs. PROJECTED ENROLLMENT
SURVEY RESULTS• BY ZIP CODE
DATA TERMS
FACILITY PORTFOLIO: Remaining vs. Completed
7
# Completed
Median Capacity
Overall Utilization
# RemainingMedian
CapacityOverall
UtilizationAverage Condition
Elementary Schools 35 405 95% 34 314 114% 84%
Middle Schools 3 525 91% 13 533 88% 82%
High Schools 6 979 67% 14 932 86% 72%Note: Ecole Kenwood, Spanish Immersion, and Africentric are all considered completed facilit ies and will open in the Fall of 2016
Completed Remaining
FACILITY PORTFOLIO: Remaining vs. Completed
8
New ES Seats already built 15,952Max ES Enrollment in 5 Year Projection 27,253
Remaining Co-Funded Replacement Seats 11,301
ES Students Currently Enrolled in Old Buildings 13,474Deficit of Co-Funded Replacement Seats 2,173
Buildings are Co-Funded at 120 SQFT / Student 1,249,560Old ES Square Footage 1,382,371Square Footage that will not be eligible for Co-Funding 132,811
Seat Analysis
Square Footage Analysis
Note: Co-funding seat analyses are estimates and will finalized during the recommendations process.
ELEMENTARY SCHOOL – OSFC CO-FUNDING SEAT ANALYSIS
New MS Seats already built 2,769Max MS Enrollment in 5 Year Projection 10,577
Remaining Co-Funded Replacement Seats 7,808
MS Students Currently Enrolled in Old Buildings 6,902Deficit of Co-Funded Replacement Seats 906
Buildings are Co-Funded at 145 SQFT / Student 1,132,160Old MS Square Footage 1,341,605Square Footage that will not be eligible for Co-Funding 209,445
Seat Analysis
Square Footage Analysis
Note: Co-funding seat analyses are estimates and will finalized during the recommendations process.
MIDDLE SCHOOL – OSFC CO-FUNDING SEAT ANALYSIS
New HS Seats already built (excludes Fort Hayes Career Center) 4,888Max HS Enrollment in 5 Year Projection 12,503
Remaining Co-Funded Replacement Seats 7,615
HS Students Currently Enrolled in Old Buildings 9,809Deficit of Co-Funded Replacement Seats 2,194
Buildings are Co-Funded at 160 SQFT / Student 1,218,400Old HS Square Footage 1,907,896Square Footage that will not be eligible for Co-Funding 689,496
Seat Analysis
Square Footage Analysis
Note: Co-funding seat analyses are estimates and will finalized during the recommendations process.
HIGH SCHOOL – OSFC CO-FUNDING SEAT ANALYSIS
12
Developed by “Planning Areas” & District Wide Programs Elementary & Middle Schools
• Options for PK-5, 6-8 Grade Configurations Only• Options for Blended PK-8, PK-5, 6-8 Grade Configurations• Options include Replacements, Renovations, and Consolidations
High Schools• Every Planning Area has an Option to keep all High Schools• Every Planning Area has an Option to Reduce High School Space• Options for all High Schools to be 9-12 Grade Configurations• Options that keep Existing Grade Configurations
OPTIONS - CONSIDERATIONS
13
Breakout for Options Presentation Northwest Area – Cafeteria Northeast Area – Gymnasium
Presentation of Area Specific Data and Options (20 minutes) Individual Questionnaire
Small Group Table Discussion Group Questionnaire
Adjourn All materials will be available online at http://www.dejongrichter.com/ccsoh/ Online questionnaire will be available for one week.
EVENING PROCESS
Northeast Planning Area
14
15
INFORMATION PACKETS
16
INFORMATION PACKETS
Grade Level2015/16 Official
Enrollment
Overall Capacity
OSFC
Overall % Utilizationby Enrollment
PK-5 5,584 4,232 132%
PK-6 1,936 1,788 108%
6-8 1,720 2,014 85%
7-12 768 1,000 77%
9-12 2,487 2,661 93%Note: OSFC- Ohio School Facilities Commission, Facility Assessment Capacity
17
INFORMATION PACKETS
Grade Level # of StudentsLive-In
# of Students Transfer out
# of StudentsTransfer into
PK-5 5,993 2,836 2,242
PK-6 2,627 1,117 426
6-8 2,134 967 438
7-12 1,588 1,022 138
9-12 3,296 1,942 956
NORTHEAST PLANNING AREA
Note: DOES NOT INCLUDE STUDENTS THAT LIVE OUTSIDE CCS BOUNDARIES AND ATTEND CCS SCHOOLS
18
INFORMATION PACKETS
Alpine ES 85%
Cassady Alt. ES 80%
Devonshire Alt. ES 90%
Forest Park ES 87%
Hamilton STEM ES 85%Maize ES 89%North Linden ES 89%North Towne ES 78%Valley Forge ES 90%Windsor STEM ES 83%Medina MS 73%Mifflin MS 91%Woodward Park MS 81%Beechcroft HS 74%Note: Higher % = Poorer Condition
School Facilities Renovation Costs Exceeds 2/3rd Cost of Replacement
(FCI)
Completed Facilities
East Linden ES
Huy/AG Bell ES
Linden STEM ES
South Mifflin STEM ES
Linden McKinley STEM 7-12
19
GRADE CONFIGURATION
COMMUNITY SURVEY RESPONSE
PK-5, 6-8, 9-12 PK-6, 7-12 PK-8, 9-12 PK-12 Campus
Strongly Support 247 32 69 72Support 117 82 97 55No Opinion 20 52 45 44Do Not Support 13 109 88 85Strongly Do Not Support 12 78 60 112
20
SCHOOL SIZE
COMMUNITY SURVEY RESPONSE
Small Buildings
53
<-----> 55
<----->126
<----->70
<-----> 38
Larger Buildings 49
On the scale below, which do you prefer more: small buildings (smaller learning communities) or larger buildings (more program offerings)?
21
OVERCROWDING
COMMUNITY SURVEY RESPONSE
Change the grade arrangement (move a grade out of a school - example change from a K - 5 to a K - 4 building) 144
Renovate and/or build a school 260Reassign some of the students to another school 104
Change attendance boundaries of nearby schools 175None of the above/No opinion 28
Which of the following do you recommend for schools that are overcrowded? Please check all that apply.
22
BACKGROUND DATA SHEETS
23
REMEMBER- WHAT YOU SEE SO FAR IS THE STARTING POINT OF THE DISCUSSIONNOTHING IS FINAL AND THESE ARE DRAFT ONLY
DO NOT HAVE TO SOLVE THE FACILITIES MASTER PLAN
SMALL GROUP TABLE DISCUSSIONS
24
COST ESTIMATES
Construction cost estimates are based on square foot cost figures provided by the OSFC in 2015 which have been adjusted to reflect 2016 dollars.
Building square footage is based on the 2015 OSFC design manual. Elementary costs DO NOT include LFI pre-kindergarten spaces. All middle school costs include a fixed seat auditorium built to seat the capacity of
the facility. All high school costs include a fixed seat auditorium built to seat the capacity of
the facility. Buildings with portions constructed before to 1940 have a 10% premium added to
the renovation costs to cover historical renovations and abatement. Costs DO NOT include any site acquisition costs. All costs are estimated projected totals before OSFC co-funding.
25
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONS
NORTHEAST PLANNING AREA
26
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 1 OptionOPTION 1aPK-5, 6-8 Grade Configuration
Elementary Schools to be Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
27
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 1 OptionOPTION 1bPK-5, 6-8 Grade Configuration
Elementary Schools to be Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
28
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 1 OptionOPTION 1cBlended PK-6, PK-5, 6-8 Grade Configuration
Elementary Schools to be Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
29
Elementary Schools to be Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 1aPK-5, 6-8 Grade Configuration
30
Elementary Schools to be Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 1bPK-5, 6-8 Grade Configuration
31
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 2aPK-6, PK-5, 6-8 Grade Configuration Elementary Schools to be
Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
32
ELEMENTARY & MIDDLE SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 2bPK-6, PK-5, 6-8 Grade Configuration Elementary Schools to be
Addressed in this Master Plan
Completed Elementary Schools
Completed Middle Schools
Middle Schools to be Addressed in this Master Plan
Building to be Retired
33
HIGH SCHOOL DRAFT OPTIONS
NORTHEAST PLANNING AREA
34
HIGH SCHOOL DRAFT OPTIONSROUND 1 OptionOPTION 1a, 1b, 1cReduce 1 High School
35
HIGH SCHOOL DRAFT OPTIONSROUND 1 OptionOPTION 2Keep Existing High Schools
Beechcroft High SchoolReplace @ 800
Mifflin High SchoolReplace @ 1000
Northland High SchoolReplace at 1000
Linden-McKinley 7-12No action- facility completed
36
HIGH SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 1Keep Existing Schools, 9-12 Grade Configuration
37
HIGH SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 2aReduce 1 High School, 9-12 Grade Configuration
38
HIGH SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 2bReduce 1 High School, 9-12 Grade Configuration
39
HIGH SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 3aLinden-McKinley, Convert to 9-12 Grade Configuration
40
HIGH SCHOOL DRAFT OPTIONSROUND 2 OptionOPTION 3bLinden-McKinley, Remain 7-12 Grade Configuration
41
THANK YOU