Colorado Department ofColorado Department of University of ... · Colorado Department ofColorado...
Transcript of Colorado Department ofColorado Department of University of ... · Colorado Department ofColorado...
1
Colorado Department ofColorado Department of Transportation
University of DenverUniversity of DenverUniversity of DenverUniversity of DenverThe Future of State GovernmentThe Future of State Government
Strategic Issues PanelStrategic Issues Panel
September 9, 2010September 9, 2010
Oversight
23 000 lane miles of state highways
Oversight
23,000 lane miles of state highways
9,134 centerline miles of state highways including interstates
3,754 on-system bridges
28.7 billion vehicle miles traveled t t hi h d i t t t hi h /on state highways and interstate highways/year
278 regularly monitored/controlled avalanche paths6 000 il f dit h6,000 miles of ditches
and much more!
ResponsibilitiesResponsibilities•Highways (Maintenance and Operations)Operations)•Transit (Planning & Grant Admin)•Aviation (Interface with FAA)( )•Local Roads (long range planning)•OutreachPl i & B d t•Planning & Budget
3
Transportation Commission (TC)Transportation Commission (TC)
11-member CDOT governing body (appointed by the Governor and confirmed by the Senate)
• Serve four-year terms• Meet monthlyMeet monthly
• Responsible for• Sets overall fiscal and policy direction statewide via investment p y
categories• System Quality, Safety, Program Delivery, and Mobility• Short term and long-term priorities
A b d t & ll ti f f d
4
• Approves budget & allocation of funds
High Performance TransportationHigh Performance Transportation Enterprise (HPTE)
• 7 Members▫ Created in 2009 by SB 09-108 (FASTER)▫ Made up of 3 members of the TC, and 4 (appointed by Governor)
▫ The HPTE operates as a government-owned business within the department and is a division of the department.
• Responsible for▫ Aggressively pursue innovative means of more efficiently
financing projects g j▫ Innovative means of include, but are not limited to, public-private
partnerships, operating concession agreements, user fee-based project financing, availability payment and design-build contracting.
Other Boards and CommissionsOther Boards and Commissions• Bridge Enterprise
Created in 2009 by SB 09 108 (FASTER)Created in 2009 by SB 09-108 (FASTER)Comprised of the members of the TC
R ibl f b id id tifi d t t ll d fi i tResponsible for bridges identified as structurally deficient or functionally obsolete and rated poor
C l d A ti Di i i• Colorado Aeronautics DivisionCreated in 1988 by HB 88-1205 7 Member Aeronautics Board (appointed by Governor, approved by Senate)Represent both government and aviation-interest constituenciesRepresent both government and aviation interest constituencies
Responsible for aviation development in Colorado Administration of the Aviation FundInclusion of aviation needs in statewide transportation planAdopts budget for the Division of Aviation
CDOT Engineering RegionsCDOT Engineering Regions
Each region Each region manages all activities
within their higeographic
area.
8
Transportation PlanningTransportation PlanningWorking
Planning PartnersTransportation Planning Regions (TPR)
together for acontinuing,
cooperative, •Meet periodically
•Elected officials of urban and rural
areas•CDOT Representation
•Federal Partners
and comprehensive transportation
planning Elected Offi i l planning
process per federal law
County Hearing Process
Officials Meetings
STAC
Public Transportation •Representatives from all 15 TPR’s advise CDOT
Statewide Transportation Advisory Committee
99
Involvement Commissionall 15 TPR s advise CDOT
•Monthly meetings
Sources of Transportation FundingSources of Transportation Funding
Vehicle registration
fees
+22¢/gal.
Gasoline+18¢/gal.Gasoline
fees Including SB 09-108 FASTER
24.4¢/gal.
Diesel Diesel
20.5¢/gal.
+ Other Fees & Tickets
SB 09-228 SB 09 228 2% excess
General Fund
Year to Year FundingYear to Year FundingCDOT Funding Sources by Fiscal Year 1990-2010 and Projected 2011-2017
Actual
1 4001,6001,800
of d
olla
rs)
CDOT Funding Sources by Fiscal Year, 1990-2010 and Projected 2011-2017
600800
1,0001,2001,400
(in
mill
ions
o
0200400600
CD
OT
fund
ing
C
State Highway Users Tax Fund (State Gas Tax)State General Fund Revenue (SB1, HB1310, SB228)Federal Highway Administration and Highway Safety (Federal Gas Tax)Senate Bill 09-108 ("FASTER") Revenue
Inflation Adjusted
800
olla
rs)
CDOT Funding Sources by Fiscal Year, Actual 1990-2010 and Projected 2011-2017
j
400
500
600
700
mill
ions
of d
o
100
200
300
400
OT
fund
ing
(in
0CD
O
State Highway Users Tax Fund (State Gas Tax)g y ( )State General Fund Revenue (SB1, HB1310, SB228)Federal Highway Administration and Highway Safety (Federal Gas Tax)Senate Bill 09-108 ("FASTER") RevenueOther federal, state and local
CDOT’S Aging SystemCDOT S Aging System
128 of Colorado
Some highways
70-100Colorado Bridges are rated “Poor”
52.5 % of Colorado
Highways are33% of highways
d l t
70 100 years old
Highways are Rated “Poor”
need complete reconstruction
14
Mobilityob ty485
Centerline miles of CO Population over 65 will
roadway are congestedover 65 will double by
2025
1.5 million more
Truck traffic ill d bl
people by 2020
I-70 congestion costs
$700 million
will double by 2030
$annually
SolutionSolution•The need to fix and maintain our aging
i f t t ill tinfrastructure will not go away. •Colorado must provide a permanent, p p ,
dependable and sustainable revenue source that will provide a safe, reliable, and p , ,
convenient transportation system to support our economy and the needs of our citizens.y
Transportation Finance and Implementation
Ke Recommendations
Transportation Finance and Implementation Panel
• Key Recommendations:•“Fix-it-First”•Strategic mobility•Improve shouldersL l h•Local share
•Urban and rural transit investments•Bike/Ped improvements•Bike/Ped improvements•Environment investments•TollingTolling•Public private partnerships
Mileage Based User Fee (MBUF)
Next federal reauthorization will
Mileage Based User Fee (MBUF) Study
Next federal reauthorization will likely include funding for studies
and/or pilot programsa d/o p o p og a sCDOT is preparing to explore the conceptual framework for a pilot project evaluating the feasibility and effectiveness of introducing MBUF in Colorado.
Focus areas include:
•what issues must be considered and dealt with
•urban vs. rural dynamic
•behavioral changes that may result
Federal UpdateFederal Update•For FY ’11, Federal Funds are expected to make up about 34% of CDOT’s budget.
•Transportation expenditures have exceeded gas tax receipts in t b t th T t F d i tl l t th k trecent years, but the Trust Fund is currently solvent thanks to
$19.5 billion in general fund transfers.
•SAFETEA LU extension expires December 31 Federal•SAFETEA-LU extension expires December 31. Federal program remains unstable and difficult to predict.
b b l f $900 M
$447 MFY ‘12 RA
$499.4 M FY’10 SAFETEA‐LU
Probability of payment to CDOT
30%
$900 M
$413.3 MFY ’12 Collections
Probability of payment to CDOT
60% FY’1260%
Probability of payment to CDOT
FY’12 Federal Funds $349.3 M
Budget FY ’11 TCp y90%
Probability of
BarometerBudget FY 11 TC
payment to CDOT 95% $223.8 M
Worst Case S iProbability of
payment to CDOT 100%
Scenario
ARRA UpdateARRA Update
$596 Milli T t ti D ll
American Recovery and Reinvestment Act (ARRA)
$596 Million Transportation Dollars • Highway - $385 million
• Transit $120 7 million• Transit - $120.7 million
• Aviation - $37 million
• Transit - $40 million RTD New Starts Grant
• Transit – $1.095 million RTD “TIGGER” Energy Grants
• Multimodal - $10 TIGER TIFIA Challenge Grant
• Rail – $1 million Interregional Connectivity Study Grant
• Rail - $400,000 State Rail Plan Grant
J b T i i $610 000 CDOT t ti l t d• Job Training –$610,000 CDOT construction related training and placement program (3 grants)
ARRA Update:ARRA Update: (Colorado - as of July 31, 2010)
Transportation Spending - Highway and Transit • 127 Projects Put out to Bid worth $396,249,578
• 125 Projects Under Contract worth $395,161,988
• 119 Projects Under Construction or Starting Soon worth $381,737,234
• 38 Projects Complete worth $58 073 363• 38 Projects Complete worth $58,073,363
Job Information - Highway and Transit • 32,530 Direct Jobs Created or Sustained
• 1,721,635 Direct Job Hours Created or Sustained
• $47,041,754 Payroll from Job Hours Created or Sustained
State UpdateState Update
F FY ’11 St t F d t d t•For FY ’11, State Funds are expected to make up about 59% of CDOT’s budget, including 16% from FASTER.
•FASTER receipts are providing a much needed infusion of funds into CDOT’s budget.budget.
•2010 state legislative actions reduce funding for highway projects by over $40 g g y p j ymillion for the next two years.
Funding Advancements forFunding Advancements forFunding Advancements for Funding Advancements for Surface Transportation and Economic Recovery Surface Transportation and Economic Recovery
(FASTER)(FASTER)
• In 2009 the General Assembly passed Senate Bill 09-108 also known as FASTER:
• This legislation changed the way that transportation funding works in Coloradoworks in Colorado.
FASTER SafetyMonies collected under FASTER are used forconstruction, reconstruction, or maintenance projectsthat the Transportation Commission, a county or
y
p ymunicipality determine are needed to enhance thesafety of a state highway, county road, or city street.
FY 10 $83 2 illi CDOT R d S f tFY 10- $83.2 million CDOT Road Safety surcharge/Vehicle Rental fee /Late Fee/ Supplemental OS/OW fee collections:
FASTER Bridge Fund monies are to be used to repair or l d b id hi h
FASTER Bridge
replace poor rated bridges on our highway system.
FY 10- $44.1 million=Bridge Safety fee CollectionsBridge Safety fee Collections
Web sites
CDOT www.coloradodot.info
FASTERFASTER/www.coloradodot.info/projects/faster
ARRAwww.recovery.goveco e y go
Questions?
Russell George
CDOT
E ti Di tExecutive Director
303-757-9201
[email protected] geo ge@dot state co us