• Agenda– About the Presenters– Introduction– Configuration– Flow

2

• Senior Management Consultant with Rolta TUSC

• Over 13 Years Experience Implementing and Supporting Oracle Applications

• OAUG Project SIG Development Liaison– Duties Include Gathering Customer ERs and

Facilitating Prioritization and Communicating Those to Oracle Product Strategy

Wendy Lamar

3

Becky Alvarez – Director of E&C Practice

[email protected]

WHAT WE DO

Rysigo Technologies Corp. provides Collaborative Work Management software and services.

STRATEGIC CONSULTING SERVICES

• Business and Finance Transformation

• Management Consulting

• ERP, CRM and Analytics Reporting

• Applications Management

SPECIALIST AREAS

PRODUCTS

• Collaborative Proposal Management• Collaborative Risk Management• Risk Management for Oracle Projects

• Engineering and Construction• Professional Services• Energy and Utilities• Hi Tech / IT• Transportation• Oracle EBS, CRM, Primavera, OBIEE• Global Deployments, Shared Service Centers• Global Program Offices™• Project Centric Organizations

70 years of collective experience designing, building and implementing

many of the Oracle Application is use today.

4

Introduction

Where are we in the P2P Flow

5

Where are we now in P2P?Quote to

Cash

Procure to Pay

Design to Build

Accounting to Financial Reports

End

Start People to Paycheck

Project to Close

6

7

Configuration

How to Set Up Projects for P2P

8

Configuration• Define Payables Options for Discounts

– Prorate Expense: Discount prorated across all distribution lines

– Prorate Tax: Percentage of discount prorated across all tax distribution lines

– System Account: Credits the total discount to the discount taken account defined in AP Financial Options

9

Configuration• Profile Options

– PA: Allow Adjustments to Receipt Accruals and Exchange Rate Variance

– PA: Allow Override of PA Distributions in AP/PO– PA: Default Expenditure Item Date for Supplier

Cost– PA: Default Expenditure Organization in AP/PO

10

Configuration• Supplier Invoice and Project Related

Purchasing Account Generators• Default Supplier Cost Credit Account

– (PA System Options)

• Interface AP & PO DFF Profile Options– PA: Transfer DFF with AP

• Expense Reports, Vendor Invoices

– PA: Transfer DFF with PO• Receipt Accruals

11

Configuration

12

Project Suite Considerations• When running the process ‘PRC: Interface

Supplier Costs’ ensure that the following parameters are set to Yes:– Interface Supplier Invoices– Interface Receipt Accruals– Interface AP Discounts

13

Project Suite Considerations• All modules have a Create Accounting process

that interfaces journal entries to Subledger Accounting. The parameters control interface to GL and posting of GL journal entry.

• The Create Accounting process per module typically must complete successfully prior to interface of expenditure item to Project

• Transactions create journal entries in the source module – cost collects in Project module

14

P2P Flow

How Contract/Billable Projects are updated by POs

15

P2P Process Flow

16

Create Requisition and/or PO• Requisition or PO Line is Entered Referencing:

– Project– Task– Expenditure Item and Expenditure Organization– Account Generator Derives Default Charge

Account, Accrued Liability (Inventory AP Accrual), and Variance Accounts

17

Create PO

18

Distribute to Project

19

Updates Committed Costs

Before

After

20

Receive Goods / Confirm Work• Receive Goods / Confirm Work - Accrue on

Receipt Interfaces Cost to Project @ PO Price– Receiving Transaction Processor– Create Accounting for Receiving

DR Inventory or Expense Account OR CIPCR Accrued Liability

– PRC: Interface Supplier Cost Parameter ‘ Interface Receipt Accruals’ = YES

21

Receive Goods / Confirm Work

22

Match Vendor Invoice to PO• Vendor Invoice Match to PO - Variances are

Interfaced to Project (New Expenditure Item)– Validate Vendor Invoice– Create Accounting

DR Accrued Liability CR Accounts Payable DR/CR Price Variance

23

Match to PO

24

Update ProjectsBefore Supplier Invoice for Match against PO

After $5,000 Supplier Invoice Entered and Interfaced to Projects. Period to Dateand Inception to Date Costs increase by the invoice amount and the Commitment is reduced by the invoice amount.

25

Pay Vendor Invoice• Pay Vendor Invoice - Discounts Taken are

Interfaced to Project (New Expenditure Item)– Create Accounting

• DR Accounts Payable• DR Discounts Taken**• CR Cash

– PRC: Interface Supplier Cost Parameter ‘Interface Payment Discounts’ = YES

**Discounts Taken dependent upon AP configuration

26

P2P Flow

How Capital Projects are updated by POs

27

Capital Project to Assets Flow

28

Asset Charges – AP to PA• AP Distribution Line Charges Project and Asset

Clearing Account:– Contract Project

• Payables Interfaces the Cost to Oracle Assets for Capitalization and GL Accounting

• Payables Interfaces the Cost to Oracle Projects for Cost Collection to the Project and Reporting; No GL Impact

– Capital Project• Payables Interfaces the Cost to Oracle Projects for

Capitalization, GL Account Generation, Project Cost Collection and Reporting. Journal Entry Sources are Payables and Assets.

29

Capital Project• Create Capital Project

– Add Asset Definition including Asset Attributes at Project or Task

• Collect Costs against Project– Distribute all Costs, Generate Cost Accounting

Events, Create Accounting BEFORE Generating Asset Lines

– Summarize your Project Data (Project Performance or Project Summary) BEFORE Generating Asset Lines

30

Project Asset Setup

31

Project Task Asset Line

32

Project Task Asset Setup

33

Capital Project• When Ready to Place the Asset in Service,

Update the Asset Assignment with an Actual In Service Date (Current Period)

• Run the PRC: Generate Asset Lines process to Create Summary Asset Lines– Adjust Lines, Associate Unassigned Lines– Auto Accounting Rules Determine Journal Entry

DR Asset CR CIP

34

Update Asset Service

35

PRC: Generate Asset Lines Creates the Asset Line(s)

36

Capital Project• Run the PRC: Interface Assets to Oracle Assets

process• In Oracle Assets Review and Post Mass

Additions• Monthly: Run Depreciation

– Creates Accounting • Interfaces and Posts Journal Entry to GL

37

Interface Asset to FA

38

View Asset in FA after Additions

39

Contract Project• Create Contract Project

– Include Customer and Billing Setup

• Collect Costs– Distribute Costs– Generate Cost Accounting Events– Create Accounting

40

Customer Invoice Flow

41

Revenue Recognition Flow

42

Contract Project - Revenue• Generate Draft Revenue based on Distribution

Rule of Project– Release

• Generate Revenue Accounting Events• Create Accounting

– Transfers and Posts Journal Entry to GL

DR UBR CR Revenue

43

Contract Project - Receivables• Generate Draft Invoice based on Distribution

Rule of Project– Approve and Release– The next three steps can be combined in PRC:

Submit Interface Streamline (Option XI)

• PRC: Interface Invoices to Receivables• Autoinvoice Import• PRC: Tieback Invoices from Receivables