CIAL-A PATHBREAKER Cochin International airport, the country’s
first Greenfield airport built under public private partnership is a trendsetter in aviation infrastructure development.
The unique rehabilitation package, the astonishing public participation and a sustainable business model have made CIAL a path breaker
2
UNIQUE ARCHITECTURE
The airport, featuring Kerala’s typical architecture is unique
3
CREDENTIALS Over 5 million passengers a year47072 aircraft movements 54440 tons of cargo CIASL- Aviation Services LimitedCIAL Infrastructure limited18 hole golf courseAviation security training academy
4
NEW INTERNATIONAL TERMINAL
CIAL is gearing up to take new challenges in passenger traffic growth as its dream project is about to set in. Chief minister Mr.Oommen Chandy laid the foundation stone of the new international passenger terminal on feb 1.
5
AT THE CEREMONY
6
HOW IT IS TO BE
7
SALIENT FEATURES Two level terminal-Arrival in ground level Departure in first level
8
SALIENT FEATURESFinger pier concept to handle 13-15 aircrafts
through aerobridges during peak operations
9
SALIENT FEATURESElevated road approach to departure level
Parking area with a capacity of 3000 cars
10
SALIENT FEATURES
Departure level 2Covered road/ Kerb area of 3 lakh sft- 3+3+2
lane traffic56 check in counters with provision for
additional 5648 immigration counters10000 sft duty free shop13 security gates
11
SALIENT FEATURES
Departure level 3
2 food courts4 premium lounges
12
SALIENT FEATURESArrival level-1Connectivity to departure for transit
passengers at arrival corridorConnectivity to remote arrival50 immigration countersAquarium, vertical garden, hanging
installations, murals
13
SALIENT FEATURESArrival level-020000 sft duty free shop6 conveyor belts18000 sft passenger exit lounge with 2 main
exit pointsVisitors waiting area and related
concessionariesMeet and greet area
14
Cost of the project & period for completion
15
Us $ 150m( Rs. 8500 m)The terminal will have a built up area of 15
lakh sft. It will have a peak hour capacity of 4000 passengers.
The project is expected to be completed in 24 months.